84
4000MW Boiler & Auxiliaries Erection Presentation Date Department

Boiler Presentation.pdf

Embed Size (px)

Citation preview

  • 4000MW

    Boiler & Auxiliaries Erection Presentation

    DateDepartment

  • 4000MW ULTRA MEGA POWER PROJECT

    Power Boiler Design TeamThermal Power Plant Business Group

    800 MW Large Capacity 800 MW Large Capacity Coal Fired Steam GeneratorCoal Fired Steam Generator

  • M U N D RA

    Thermal Power Plant

    Units 7 & 8 (500MW x 2 )

    Supercritical Coal Fired Steam Generator

    MUNDRA ULTRA MEGA POWER PLANTUNIT 1 ~ 5 ( 800MW X 5 )SUPERCRITICAL COAL FIRED STEAM GENERATOR

    REHEATER INLET

    STEAM COIL AIR HEATER DRAIN TANK60

    REHEATER INLET PIPES (CRH)29

    ECONOMIZER OUTLET FLUE GAS DUCT55

    SUPERHEATER DIV. PANELETTES24

    FURNACE BOTTOM ASH HOPPER54L.T.S.H. OUTLET HEADER23

    COAL PIPNG53L.T.S.H. PENDANT ASSEMBLIES22

    COAL MILLS (PULVERIZER)52

    L.T.S.H. HORIZONTAL ASSEMBLIES21

    COAL FEEDERS51BACKPASS LOWER REAR HEADER20

    FLUE GAS DUCT TO STACK58

    SUPERHEATER FINAL OUTLET HEADERS27

    INDUCED DRAFT FANS57SUPERHEATER FINAL ASSEMBLIES26

    ELECTROSTATIC PRECIPITATOR56

    SUPERHEATER FINAL INLET HEADER25

    STACK59SUPERHEATER OUTLET PIPES (MS)28

    COAL SILOS50BACKPASS UPPER SIDE WALL INLET HEADERS19

    COAL TRIPPER CONVEYOR ROOM49

    BACKPASS SIDE WALL TUBES18

    MIXED HOT AIR DUCT TO MILLS48

    BACKPASS LOWER SIDE HEADERS17

    COLD PRIMARY AIR DUCT TO MILLS47

    BOILER WATER RECIRCULATING PUMP16

    HOT PRIMARY AIR DUCT TO MILLS46

    CONDENSATE DRAIN TRANSFER PUMPS15

    PRIMARY AIR FANS45CONDENSATE RECEIVING TANK14

    SCANNER & COOLING AIR FANS44FLASH TANK13

    WINDBOX & TILTING TANGETIAL BURNER43

    SEPARATOR STORAGE TANK12

    HOT SECONDARY AIR DUCT TO WINDBOX42WATER SEPARATORS11

    GAS AIR PREHEATERS41FURNACE UPP. REAR HEADER10

    STEAM COIL AIR HEATERS40

    FURNACE UPP. FRONT HEADER9

    SECONDARY AIR DUCT TO GAS AIR PREHEATERS

    39FURNACE VERTICAL W/W TUBES8

    FORCED DRAFT FANS38FURNACE SPIRAL W/W TUBES7

    F.D. FAN SUCTION W/SILENCERS37

    FURNACE LOWER RING HEADERS6

    SILENCERS (PSV, ERV, START UP VENT)36

    ECONOMIZER HANGER TUBE OUTLET HEADER5

    FLASH TANK VENT PIPE35ECONOMIZER HANGER TUBES4

    REHEATER OUTLET PIPES (HRH)34

    ECONOMIZER ASSEMBLIES3

    REHEATER OUTLET HEADER33

    ECONOMIZER INLET HEADER2

    REHEATER REAR FINAL ASSEMBLIES32FEED WATER PIPE1

    Spiral Wound / Vertical Wall

    FURNACE TYPE

    BalancedDRAFT STSTEM

    Low Nox Tangential Burners

    FIRING SYSTEM

    Hi-Vol. c , Bit. CoalFUEL

    596 C

    REHEATER

    569 cMAIN STEAMTEMP.CONDITION

    53.6 Kg/cm2g

    REHEATER

    255 Kg/cm2g

    MAIN STEAM

    PRESS.CONDITION

    1,325 Ton/Hr

    REHEATER

    1,672 Ton/Hr

    MAIN STEAMCAPA

    CITY

    Supercritical Once-Thru BoilerBOILER TYPE

    DESCRIPTION OF COMPONENTS BOILER SPEC.

    LEGEND & ABBREVIATIONSACCESS DOOR

    ACCESS DOOR IN ROOF EMCLOSURE

    OBSERVATION DOORS

    WALL BLOWER

    RETRACTABLE SOOTBLOWER-DOUBLE SIDE

    HALF TRACT SOOTBLOWER-DOUBLE SIDE

    FURNACE TEMPERATURE PROBE

    FURNACE MONITORING CAMERA (CCTV)

    CLIENT : ENGINEER : CONTRACTOR :

    TUR

    BIN

    E B

    UILD

    ING

  • Table of Contents

    1. General

    2. Organization

    3. Schedule

    4. Steel Structure Erection

    5. Temporary Works ( Boiler )

    6. Construction Plans

    7. Erection Procedure

  • 1. General

    1) Summary of Construction

    Project Title

    Type/Capacity

    Owner

    Location

    Scope

    Ordering Mode

    Duration

    Major Quantity

    4000MW Mundra Ultra Mega Power Project

    Supercritical One-Thru Boiler / 800 MW x 5 Units

    TATA Power

    Mundra, Gujarat state

    Boiler Island + EP System + Fuel Tank

    Exclusive Bidding with TATA Power

    40mths/1Unit, 56mths/5Unit, Except LD Moratorium 2mths

    Total : 146,923ton BLR Steel : 40,500ton Boiler : 68,798ton

    EP :28,575ton Con'c : 74,738 Re-bar : 4,783ton

    Steel : 1,602ton Pile : 2,716(dia 600 L 25m)

    Cable : 1,500,000M TRAY : 70,000M CONDUIT : 50,000M

  • 1. General

    2) Steam Condition

  • 1. General

    3) Major Progress of Works

  • 2. Organization

    1) Present

  • /

    / () 1 K 1 K 2 K 1 K 1 K

    () 1 K 1 K 1 K 1 K

    / ` 1 K 1 K

    P.R.O* () MGR 1 L Engin 2 L Engin 3 L Engin 1 L Engin 2 L Engin 3 L

    Staff 2 L Engin 2 L Engin 3 L Engin 1 L Engin 1 L Engin 2 L

    // / Office 3 L Engin 2 L Engin 2 L Engin 1 L

    *PRO : Public Relation Officer

    1

    1

    FDN / Building

    1 1

    Piling

    FDN

    Building

    Quality

    Safety

    1

    ()

    Piling

    Contractor Adv.

    1

    1 1 12 14 3 10 13 10 4 14 3 / 5 8 17 1 31 49

    2. Organization

    2) Peak

  • 3. Schedule

    1) Man Power

  • 3. Schedule

    2) Equipment

  • 3. Schedule

    3) Milestone

  • 3. Schedule

    4) Detail

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 4. Steel Structure Erection

  • 5. Temporary Works

    1) Plan

  • 5. Temporary Works

    2) Shop DWG

  • 5. Temporary Works (Power)

    3) Temporary Power

  • 5. Temporary Works (Power)

    2.1 Panel erection

    3.4 PWHT Machine2.3 Welding machine

    2.2 Panel erection

  • 5. Temporary Works (Lift Car)

    4) Lift Car

    Man Lift Car

  • 5. Temporary Works (Lift Car)

    5.3 Lift Car Bell

    5.1 lift car FDN 5.2 Lift Car

    5.4 Test

  • 5. Temporary Works (Winch)

    5) Winch

  • 5. Temporary Works (Winch)

    5) Winch

  • 5. Temporary Works (Winch)

    3.1 Winch temp. sup,t

    3.4 Winch lifting3.3 Winch lifting

    3.2 Winch temp. supt

  • 5. Temporary Works (Winch)

    3.5 Winch erection 3.6 Warning

    3.7 Winch wire temp. jig 3.8 Winch lifting device

  • 5. Temporary Works (Gas & Air Distribution)

    6) Gas & Air Distribution

  • 4.4 Gas manifold

    4.1 Gas Station 4.2 Gas manifold

    4.3 Gas test

    5. Temporary Works (Gas & Air Distribution)

  • 4.7 Gas Piping

    4.5 Gas manifold 4.6 Compressor room

    4.8 Gas Piping

    5. Temporary Works (Gas & Air Distribution)

  • 5. Temporary Works (Ground assemble bed)

    7) Ground assemble bed

  • 5. Temporary Works (Ground assemble bed)

    7) Ground assemble bed

  • 5. Temporary Works (Ground assemble bed)

    7) Tube Panel assembly

  • 5. Temporary Works (Ground assemble bed)

    7) Spiral wall panel

  • 5. Temporary Works (Ground assemble bed)

    7) Ground assemble bed

  • 5. Temporary Works (Ground assemble bed)

    6.3 panel lifting divice6.2 Ground Assy temp die

    6.4 wall panel ground assy

  • 6. Construction Plans

    1) Scope of Works

  • 6. Construction Plans

    1) Scope of Works

    - Pressure part

    - Non pressure part

    - Permit

    - IBR Welder

    - Paint

    - Heat Treatment requirements

    - Equipment Supply

    - NDE

    BoilerBoiler

    Steel StructureSteel Structure - Structure tructure

    - Handrail & Grating

    - Enclosure

    - Deck Concrete

  • 6. Construction Plans

    2) Flow of Erection

  • 6. Construction Plans

    3) Construction Quantity

  • 6. Construction Plans

    4) Welding Points

  • 6. Construction Plans

    5) Ground Assembly

    Items

  • 6. Construction Plans

    Furnace Rear Arch Panel Lifting of component Lifting after ground assembly Arch Panel and Buckstay1

    ITEM Preceding unit Improved method No.

    5-1) Rear Arch Panel

  • Furn Rear Wall Screen & Hanger Tube

    1 2 3 4 5 6 7

    5Ton 4.9Ton 4.9Ton 5.4Ton 5.1Ton 5.3Ton 5Ton

    A

    BUCKSTAY

    19,486 mm

    10

    ,433

    mm

    Furnace Rear Arch panel

    6. Construction Plans

  • LEL.99,700

    EL.92,700

    K

    9.2m 9.1m

    1

    .WINCH(5TON 2 ).:PNL

    .WINCH(10TON 2 ). : PNL

    2

    .WINCH WIRE ROPE18mm92

    .WINCH WIRE ROPE22mm92

    J

    A

    A

    L

    EL.99,700

    EL.92,700

    K

    9.2m 9.1m

    J

    A

    A

    .TEMPORARY

    . WINCH

    EL.70,000()

    .WINCH(10TON 2 ). : PNL

    .WINCH(5TON 2 ).:PNL

    .TEMPORARY &PERMANENT BEAM

    Arch Panel Lifting

    6. Construction Plans

  • Backpass Outlet Header & Backpass Front Screen Tube

    Lifting of component Lifting after assembly HDR and Wall Screen Tube2

    ITEM Preceding unit Improved method No.

    5-2) BP Front Screen Tube

    6. Construction Plans

  • 500L

    9670

    850

    1,000

    H-200200812(TYP.6)

    850

    9670

    19.2

    64

    290

    H-200200812(TYP.4)

    HD-S05 :BP ROOF OUTLET HDR(5.1 Ton)

    BP FRONT SCREEN TUBE (7SET): 18.6 Ton

    1

    L-75756 (TYP.8)

    3

    EV-200

    EV-201

    EV-202

    EV-203

    EV-204

    EV-205

    EV-206

    2

    N

    Ground Assembly BP Roof Outlet Header & BP Front Screen Tube

    6. Construction Plans

  • .WINCH(5TON 2 ). :

    .18mm 6

    .Wire rope 25 2 2 (:23.5Ton)

    .SNATCH BLOCK(14"4)

    5.5 8.7

    .

    EV-200 EV-201 EV-202 EV-203 EV-204 EV-205 EV-206

    EL.43,700

    .WINCH(5TON 2 ). :

    .18mm 6

    .Wire rope 25 2 2 (:23.5Ton)

    .SNATCH BLOCK(14"4)

    5.5 8.7

    .

    EV-200 EV-201 EV-202 EV-203 EV-204 EV-205 EV-206

    EL.43,700

    ERECTION

    Screen Tube Lifting

    6. Construction Plans

  • Backpass extended Floor Panel Lifting of component

    Lifting ground Assembly HDR Floor Panel and Buckstay

    3

    ITEM Preceding unit Improved method No.

    5-3) BP. Extended floor panel

    6. Construction Plans

  • W-19

    W-19

    EV-109 EV-110 EV-111

    EV-106 EV-107 EV-108

    W-20

    UNIT

    BP EXT. FLOOR PANEL

    S-16 (BP EXT.SIDE INLET HDR): 5.2 Ton

    PANEL TOTAL WEIGHT: 13.1Ton

    BUCKSTAY(TYP.7)B/S Total : 8.8 Ton

    Ground Assemble BP EXT. Floor Panel

    6. Construction Plans

  • Furnace Upper Rear Header & Screen Tube Lifting of component

    Lifting after ground assyHeader and Screen Tube4

    ITEM Preceding unit Improved method No.

    5-4) Furnace upper rear screen tube

    6. Construction Plans

  • H-200200812(TYP.6)

    1,00

    015

    ,834

    19.5

    00

    290

    H-200200812(TYP.4)

    FD-F19 FURN UPPER REAR HDR(7.98 Ton)

    FURN REAR WALL SCREEN TUBE(58SET) : 66.5 Ton

    1

    L-75756 (TYP.58)

    2

    3

    15,8

    34

    1,0

    00

    Furnace Upper Rear HDR & Screen Tube

    6. Construction Plans

  • .WINCH(10TON 2 ). :

    .22mm 9

    .Wire rope 25 4 2 (:78Ton)

    .SNATCH BLOCK(14"4)

    5.5 8.7

    .

    .WINCH(10TON 2 ). :

    .22mm 9

    .Wire rope 25 4 2 (:78Ton)

    .SNATCH BLOCK(14"4)

    5.5 8.7

    .

    Lifting Furnace Upper Rear HDR & Screen Tube

    6. Construction Plans

  • Hopper Panel Lifting of component Lifting after ground assyHopper Panel and Buckstay5

    ITEM Preceding unit Improved method No.

    5-5) Hopper Panel

    6. Construction Plans

  • UnitA

    BUCKSTAY

    A

    Hopper Rear & Front Pan

    6. Construction Plans

  • LEL.99,700

    EL.92,700

    K

    9.2m 9.1m

    1

    .WINCH(10TON 2 ).:PNL

    .WINCH(5TON 2 ). : PNL

    2

    .WINCH WIRE ROPE18mm92.WINCH WIRE ROPE

    22mm122

    J

    A A

    .WINCH WIRE ROPE22mm82

    .WINCH(10TON 2 ). : PNL

    EL.40,000

    . WINCH

    3

    4

    DETAL "A"

    H-250*250

    H-200*200

    1500

    H-300*300

    350

    400

    PL-400*350*30T

    DETAL "A"

    PL-20T

    Hopper Panel

    6. Construction Plans

  • Transition Panel Lifting of component Lifting ground assyHeader, Tran. Panel and Spiral Panel6

    ITEM Preceding unit Improved method No.

    5-6) Transition panel

    6. Construction Plans

  • Spiral Wall Panel

    6. Construction Plans

  • LEL.99,700

    EL.92,700

    1

    .WINCH(5TON 2 ). : PNL

    .WINCH WIRE ROPE 18mm82

    J

    A

    A

    .WINCH(5TON 2 ).:

    2

    .WINCH WIRE ROPE18mm92

    EL+57,670 ( )

    .WINCH WIRE ROPE18mm92

    HEADER

    BUCK - STAY BUCK STAY

    .WINCH WIRE ROPE16mm92

    B

    B

    SECTION "B-B"

    Temp.Beam (3EA)Temp.HDR Band

    (5EA)

    Temp.Beam (5EA)

    PanelHead e r

    Temp.Beam (3EA)

    Buckstay

    Transition Panel Lifting

    6. Construction Plans

  • Furnace Panel Lifting of component Lifting ground ass,yFurn.PNL UPP.HDR,Buckstay7

    ITEM Preceding unit Improved method No.

    5-7) Furnace panel

    6. Construction Plans

  • 7. Erection Procedure

  • 7. Erection Procedure

  • END OF DOCUMENT