SESAR -Overall Framework and Concept
Bob GrahamEUROCONTROLCND - Collaborative Network Design
European Organisation for the Safety of Air Navigation
2
What I will talk to …
SESARWork ProgrammeCurrent Timeline (to Work Programme)Concept FocusOpportunity
3
SESARObjectives and Structure
Objective – “to eliminate the fragmented approach to ATM, transform the European ATM system and synchronise the plans and actions of the different partners and federate resources”.
SESAR is structured in three major phases:
Definition Phase (2005 - 2008 – complete with delivery of the ATMMaster Plan)
Development Phase (2008 - 2013 – started and under management ofthe SESAR JU)
Deployment Phase 2014 - 2020 – implement the results of theDevelopment Phase)
4
SESARDefinition - Delivered ..
AirTransport
Framework:The
CurrentSituation
AirTransport
Framework:The
CurrentSituation
ATM Performance
Targets
ATM Performance
TargetsATM
TargetConcept
ATM Target
Concept
ATMDeploymentSequence
ATMDeploymentSequence
ATMMaster Plan
of Action
ATMMaster Plan
of Action
WorkProgramme
for 2008-2012
WorkProgramme
for 2008-2012
07/06 12/06 06/07 11/07 02/08 03/08
AirTransport
Framework:The
CurrentSituation
AirTransport
Framework:The
CurrentSituation
ATM Performance
Targets
ATM Performance
TargetsATM
TargetConcept
ATM Target
Concept
ATMDeploymentSequence
ATMDeploymentSequence
ATMMaster Plan
of Action
ATMMaster Plan
of Action
WorkProgramme
for 2008-2012
WorkProgramme
for 2008-2012
07/06 12/06 06/07 11/07 02/08 03/08
5
SESARDevelopment – Joint Undertaking
To manage the development phase a legal entity was created, under European Community law, on 27th of February 2007: The SESAR Joint Undertaking.
The aim of the Joint Undertaking is to ensure the modernisation of the European air traffic management system by federating research & development efforts in the Community.
As such, it will organise and coordinate the development activities of the SESAR project, in accordance with the ATM Master Plan.
www.sesarju.eu
6
SESAR JUWork Programme
(High-level)Target Concept and
Architecture Maintenance(B)
Master Plan Maintenance
(C)
SJU
ATM Network R&D Programme
Validation infrastructure Needs Management
(WP 3)
R&D Transversal Areas
(WP 16)
Networking Operation
En Route Operation
TMA Operation
Airport Operation
Information Management
SWIM technical
architecture
Aircraft Systems
F/WOC Network Information Management System
En-Route & Approach ATC Systems
Airport system
Non Avionic CNS System
WP 7 WP 5
WP 4 WP 6
WP 8 WP 14
WP 9
WP 11 WP 15 WP 13
WP 10 WP 12
Transversal Thread
Operational Thread SWIM Thread System Thread
Long-Term andInnovative
Research Programme(E)
(PSO and Industry Support)
7
SESAR JUWork Programme
Programme Management – 4 LevelsProgramme LevelWork Package LevelSub-Work Package LevelProject Level
Project Life Cycle PhasesProject InitiationProject ExecutionDeliverables Acceptance
InitiationInitiation ExecutionExecution ReportingAcceptanceReportingAcceptance
SESAR JU Project Lifecycle
Toll Gate 1 Toll Gate 2Maturity Gate x
8
SESAR JUWork Programme
Stakeholder Buy-inThrough direct participation in the delivery of projects.Endorsement of output via ATM Performance Partnership Stakeholders
(recommendation to the EDJU before proposal for acceptance to the Administrative Board)
9
Current Timeline
Call for binding proposals – 17th December
Closing date for binding proposals 16th February (at 5 pm)
Selection by project (according to published selection criteria)
Results submitted to Administrative Board 17th March
EU Council Endorsement of Master Plan in March
Signature of MA Mid-April
Initiation of Work Programme April(initiation phase per project)
January February March April May Onwards
10
An example ..
WP6 / 12 WP6 / 12
WP7 / 13
WP8 / 14
ToC ToDWP5 / 10 WP5 / 10
WPA / B / C
WP16
WP9 / 11
WP4 / 10
Structuring the concept
An integrated and concept driven approach
Concept Focusand Work Programme Context
11
Concept FocusIntegrated High Performance ATM
Three key enablers: Time, Arrival Runway based and globally agreed 4D Trajectory definition. And …..
A clear focus on safety, efficiency, predictability and reduced emissions;An agreed common “Time” reference to match the need for precise predictability at the arrival runway with the Airport airside turn-around integrated into ATM;Globally defined and agreed 4D trajectory exchange format;Common shared data and information network providing for collaboration between partners;Strategically and tactically planned business from gate to gate based on collaboratively agreed business/mission trajectory;Establishment of ATM as an enterprise system where airspace users participates as performance partners and the aircraft is fully integrated into as a component of the system.
12
TBO 2
PerformanceBased
Operations
2009 20202012 2017
Time BasedOperations
Trajectory BasedOperations
An example ..
STEP
1
STEP
2
TBO 1
Structuringthe concept
An incremental approach Network TM and
Automation
Airport
InformationManagement
NetworkManagement
Network TM andAutomation
Airport
InformationManagement
NetworkManagement
Concept FocusTime, Trajectory and Performance
13
> 2012
An example ..
ToC ToD
Arrival SlotDeparture Slot
Turnaround
VortexDepartureSeparations &Cross wind operations
Dynamic Demand & Capacity Balancing
Controlled Time of Arrival
ContinuousClimbDeparture
Data Link – Aircraft Derived Data
Integrated Arrival andDeparture Management
P-RNAV & RNP
Continuous Descent Arrival
Time Based Spacing
Brake to Vacate
Routing
High Level Free Routing
User Preferred Routing
“Rolling” Network Operations Plan
VortexSpacing
Low Visibility Procedures
AdvancedFlexible Use of Airspace
Initial 4D OperationsStructuring the concept
TimeBased Operations
ASAS:ATSA SURFASPA S&MATSA ITP
Concept FocusTime
14
An example ..An example ..
Network Wide Management using Shared and Business trajectoriesSupported by air ground exchanges and SWIM.
User DefinedPriority Process
Conflict Free trajectory clearancesfor pre-defined segments - PTC
Dynamic ATFM using the RBT
Reference Business & Mission Trajectories
Trajectories revised by Data Link
Tailored Terminal Airborne and Ground Operations
Performance based navigationwith trajectory “tubes”
Multi Airport arrival & departure Management
Free Routing between TOC & TOD
Flexible : Dynamic military airspace
Network Operations Plan integrated with SWIM
Gate, Surface and Runwaymanagement is integrated
Multiple TrajectoryConstraints
Trajectory Based Operations
ToC ToD
> 2017
Structuring the concept
TrajectoryBased Operations
ASAS:ASEP S&MASEP C&PASEP ITP
Concept FocusTrajectory
15
An example ..An example ..
User Defined Priority Process
Airspace Continuum & Two Categories
User Preferred Trajectories
Trajectory Management Requirementsand full SWIM enable the Business Trajectory and dynamic NetworkOperations Plan
Integrated Multi Airport arrivalsand “tubes in space”
Free Routing between TMA
Dynamic military mobile areas
Network Operations Plan integrated with SWIM
LVP with Synthetic VisionSystems
Trajectory Based Operations
LVP with Synthetic VisionSystems
> 2020
Pilot manages time based and vortexspacing
Structuringthe concept
PerformanceBasedOperations
ASAS:SSEP
Concept FocusPerformance
16
Opportunity:Initial emphasis on early benefits
EC Council CommunicationOctober 2008
The SESAR JU is encouraged to “to identify, at an early stage, existing and validated technical solutions that can serve as a basis for early deployment to secure early benefits.”