Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00 Soft Cost.(Design, F.F.&E., Material Testing, Etc.) $ 5,700,000.00 Total $ 34,200,000.00 Agenda Item 6B Attachment A December 14, 2016

Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

• Blinn @ RELLIS Campus

Project Construction Budget

Guarantee Maximum Price (GMP) $ 28,500,000.00

Soft Cost….(Design, F.F.&E., Material Testing, Etc.) $ 5,700,000.00

Total $ 34,200,000.00

Agenda Item 6BAttachment ADecember 14, 2016

Page 2: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

Soft Cost….(Design, F.F.&E.,Material Testing, Etc.)• Professional Fees $ 1,000,000.00

• Furniture & Fixtures 1,750,000.00

• Audio Visual/Technology/Security 1,500,000.00

• Laboratory Equipment 700,000.00

• Material Testing, Commissioning, etc 200,000.00

• Utilities, Insurance, Etc. 100,000.00

• Signage/Graphics 250,000.00

• Contingency 200,000.00

Total $ 5,700,000.00

Agenda Item 6BAttachment ADecember 14, 2016

Page 3: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

Agenda Item 6B Attachment A December 14, 2016

Page 4: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

Agenda Item 6B Attachment A December 14, 2016

Page 5: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

Agenda Item 6B Attachment A December 14, 2016

Page 6: Blinn @ RELLIS Campuswtaw.com/wp-content/uploads/2016/12/Blinn121416RELLISpresentation.pdf•Blinn @ RELLIS Campus Project Construction Budget Guarantee Maximum Price (GMP) $ 28,500,000.00

Agenda Item 6B Attachment A December 14, 2016