G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Blinn College New Campus Proposal

Page 2: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Background - Gift of Land

•  Realized need to accommodate continued growth of Blinn •  Began discussing gift to Blinn in 2010 •  Federal funding secured for 7-lane overpass at Hwy. 6/Old

Reliance – construction now completed •  Lobbied successfully to have the proposed property annexed

into the Bryan city limits •  Old Reliance Rd expanded to 5 lanes •  Dedicated a 75’ R.O.W. to the City to bring current

infrastructure – power, sewer and water lines now in place

Page 3: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

The Gift of Land

•  50 Acres – Gift of Land •  50 Acres – First Right of Refusal – allows for phased growth •  City utilities already in place to the site •  4 points of access: SH 6, SH 21, Austin Colony Pkwy, and

Old Reliance Rd

Page 4: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Site Features •  Approx. 330 Ac. Mixed Use

Development •  Campus/Education, Retail,

Commercial, Office, Residential •  Multiple points of access able to

accommodate >20K students •  Addresses immediate, intermediate

and long-term needs of Blinn

Page 5: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Old Reliance Site

Kroger Center Premiere Cinema

Target Center

Texas A&M

Villa Maria Campus

Coulter Airport Industrial Park

Austin’s Colony Austin’s Estates

Rudder High School

Page 6: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Phase 1 – Immediate Need

Page 7: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Phase 1 – Immediate Need

Page 8: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Phase 2 – Intermediate Need

Page 9: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Phase 3 •  Long-term Conceptual

Page 10: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Phase 3 •  Long-term Conceptual

Page 11: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Site Features •  Ability to phase expansion

with student growth •  Community Based Campus

with full amenities

Page 12: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Page 13: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Cost for Phase 1

Site Improvements •  Streets, parking, and access •  Internal waterlines and fire protection •  Sanitary sewer services •  Storm sewer and water feature/detention area •  Site grading •  Site improvements approximately $2.5 M (with

15% contingency, $2.9 M) •  8-9 months from commencement of plans to

completion of site work (6 months if phased)

Page 14: Blinn College New Campus Proposal - WTAWwtaw.com/wp-content/uploads/2014/06/BlinnBryanOption060514.pdf · Blinn College New Campus Proposal . GESSNER ENGINEERING CIVIL STRUCTURAL

G E S S N E R E N G I N E E R I N G

CIVIL STRUCTURAL GEOTECHNICAL LAND SURVEYING CONSTRUCTION MATERIALS TESTING

Costs for Phase 1

Buildings •  4 new classroom buildings, 13,230 SF each •  Cost to purchase - $7 M-$9 M •  Cost to lease (10yr): $700K/yr-$900K/yr •  Flexible Terms – Blinn decides best option