Bhopal Development Authority, Bhopal http://www.bda.org.in Tender Notice Text Display Tender No : 62 N.I.T.No.: 475/Div-07/BDA/11 N.I.T.Date: 25 /06/11 Contractor Class: 'B' class and above registered with new unified e registration system Contractor Level: Above - 10 Tender Category: BDA Work - Percentage Rate, Open Currency: INR Description: Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen Report title: Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen No. of Work: 0 Splitting Rule: No Restrictions Tender Type: Percent Rate - Open Basin/Project: All Circle/Division: Division-07, Circle -02 Officer: Raghuvir Prasad Dubey Designation: Executive Engineer TENDER NOTICE TEXT CONTENTS BHOPAL DEVELOPMENT AUTHORITY, BHOPAL (M.P.) NOTICE INVITING TENDER No. 475/Div-07/BDA/11, Dated 25/06/2011 Percentage Rate Tenders in form-A for the following works are hereby invited on behalf of the Bhopal Development Authority (here-in-after called B.D.A.) from the contractors who are registered in 'B' class and above category with new unified e registration system. Tenders are invited on-line through e-tendering methodology at the website http://bda.mpeprocurement.gov.in up to 08 th July, 2011 as per time schedule mentioned in para of "key-dates". SN Name of Work District Probable Amount of Contract Amount of Earnest Money Time Allowed for Completion of work (1) Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen Raisen ` 643.00 Lacs ` 6,43,000.00 12 Months including rainy season Note:- 1. Tender documents can be purchased on payment of cost of tender document @ Rs.20000/- each on- line at the aforesaid website from 28 th June, 2011 (10:30 Hrs.) and up to 06 th July, 2011 (17:30 Hrs.). Contractors willing to participate in aforesaid tender are advised to go through the para of "Guidelines for contractors for Implementation of e-procurement systems in B.D.A." mentioned and attached with this tender document. 2. The tenders are hereby invited through three Envelope System i.e. Post Qualification Systems. The Bid-Data should be filled and the Bid-Seals (Hashes) of all the envelopes and the documents which are to be uploaded by the bidders, should be submitted on-line at the aforesaid website between 28 th June, 2011 (18:00 Hrs.) to 08 th July, 2011 (17:30 Hrs.) as mentioned in para of key dates. 3. The Bidders shall have to submit their bids on-line at the aforesaid website (decrypt the bids and re- encrypt the bids) and upload the relevant documents from 11 th July, 2011 (17:31 Hrs.) to 17 th July, 2011 (17:30 Hrs.). Documents required to be submitted manually such as Envelope-A (Earnest Money) and Envelope-B (Technical Bid) only and not to be applicable to Envelope-C (Financial Bid); should reach the office of Baaopala ivakasa P`aaiQakrNa

Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

  • Upload
    ledan

  • View
    244

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Bhopal Development Authority, Bhopalhttp://www.bda.org.in

Tender Notice Text DisplayTender No : 62

N.I.T.No.: 475/Div-07/BDA/11 N.I.T.Date: 25 /06/11Contractor

Class:'B' class and above registered with new unified e registration system

Contractor Level: Above - 10

Tender Category: BDA Work - Percentage Rate, Open Currency: INR Description: Construction Of College Building ( Including Internal Electrification Work) & External

Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen

Report title: Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen

No. of Work: 0 Splitting Rule: No RestrictionsTender Type: Percent Rate - Open

Basin/Project: All Circle/Division: Division-07, Circle -02Officer: Raghuvir Prasad Dubey Designation: Executive Engineer

TENDER NOTICE TEXT CONTENTSBHOPAL DEVELOPMENT AUTHORITY, BHOPAL (M.P.)

NOTICE INVITING TENDER

No. 475/Div-07/BDA/11, Dated 25/06/2011Percentage Rate Tenders in form-A for the following works are hereby invited on behalf of the Bhopal

Development Authority (here-in-after called B.D.A.) from the contractors who are registered in 'B' class and above category with new unified e registration system. Tenders are invited on-line through e-tendering methodology at the website http://bda.mpeprocurement.gov.in up to 08th July, 2011 as per time schedule mentioned in para of "key-dates".

SN Name of Work District Probable Amount of Contract

Amount of Earnest Money

Time Allowed for Completion of work

(1) Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen

Raisen ` 643.00 Lacs

` 6,43,000.00 12 Months including rainy season

Note:-

1. Tender documents can be purchased on payment of cost of tender document @ Rs.20000/- each on-line at the aforesaid website from 28th June, 2011 (10:30 Hrs.) and up to 06th July, 2011 (17:30 Hrs.). Contractors willing to participate in aforesaid tender are advised to go through the para of "Guidelines for contractors for Implementation of e-procurement systems in B.D.A." mentioned and attached with this tender document.

2. The tenders are hereby invited through three Envelope System i.e. Post Qualification Systems.

The Bid-Data should be filled and the Bid-Seals (Hashes) of all the envelopes and the documents which are to be uploaded by the bidders, should be submitted on-line at the aforesaid website between 28th June, 2011 (18:00 Hrs.) to 08th July, 2011 (17:30 Hrs.) as mentioned in para of key dates.

3. The Bidders shall have to submit their bids on-line at the aforesaid website (decrypt the bids and re-encrypt the bids) and upload the relevant documents from 11th July, 2011 (17:31 Hrs.) to 17th July, 2011 (17:30 Hrs.).

Documents required to be submitted manually such as Envelope-A (Earnest Money) and Envelope-B (Technical Bid) only and not to be applicable to Envelope-C (Financial Bid); should reach the office of

Baaopala ivakasa P`aaiQakrNa

Page 2: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I, Bhopal-462011 (M.P.) by 18th July 2011 [17:30 Hrs.]

4. Since, the bids for the tender are required to be digitally signed using Class-III digital certificate of the authorized representative of the intending contractor / company / firm, contractors are advised to obtain the same at the earliest, as this process may take up to seven working days for issuance of Class-III digital certificate. Further information on the same may be obtained from e-procurement cell of BDA, Bhopal.

5. The Earnest Money Deposit Envelope (Envelope-A) and Technical Bid Envelope (Envelope-B) shall be opened on-line on 19th July 2011 (10:30 Hrs. to 17:30 Hrs.) in the presence of any intending contractors or their representatives, if they choose to be present. After assessment of eligibility of the bidders on the basis of Technical Bids (Post Qualification Documents) in Envelope-B submitted by the contractor, the Envelope-C (Financial Bid) of only post-qualified contractors shall be opened on-line on 20th July 2011 (10:30 Hrs. to 17:30 Hrs.) . The start date & time and the end date & time of opening of Financial Bid mentioned in the time schedule at para of key dates are tentative and subject to change.

6. Earnest Money Deposit to be accepted only in the shape of Bank Draft / Pay Orders in favour of Bhopal Development Authority / Bhopal Vikas Pradhikaran payable at Bhopal.

Executive Engineer Division No: - 07,

Bhopal Development Authority, Bhopal

Baaopala ivakasa P`aaiQakrNa

Page 3: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

dk;kZy; ] Hkksiky fodkl izkf/kdj.k ] Hkksiky ØekWd 475@bZ-Vh-@l&7@Hkksfoizk@2011 Hkksiky] fnukad 25@06@2011

fufonk vkea=.k lwpuk Hkksiky fodkl izkf/kdj.k }kjk Ukohu ,dhd`r Js.kh esa iathd`r Bsdsnkjksa ls SaasakIya pa^ilaToi@nak

pirsar rayasaona evaM Saajaapur maoM ka^laoja Bavana ko inamaa-Na kaya- evaM pirsar ko ivakasa kayaao-M hotu e0 iz0 yksd fuekZ.k foHkkx ds Hkou ,l-vks-vkj fnukad 15-6-2009 ls izHkko’khy, vkarfjd fo|qrhdj.k dk;Z gsrq ,l-vks-vkj- fnukad 1-4-2008 ls izHkko’khy ,oa yksd fuekZ.k foHkkx lM+d ,oa fczt gsrq fnukad 15-04-2009 ls izHkko'khy o fufonk fnukad rd la’kksf/kr ,l-vks-vkj- pr E –Tender izfØ;k ds Antga-t Online fufonk vkeaf=r dh tkrh gSaA fufonk izi= ,oa dk;Z ds lEcU/k esa vU; tkudkjh web portal http://bda.mpeprocurement.gov.in ij ns[kh tk ldrh gSaA fufonk izi= Online Ø; djus dh vafre frfFk fnukad 06@07@2011 le; 5-30 cts rd fu/kkZfjr gSA fooj.k fuEukuqlkj gS %&Ø dk;Z dk uke dk;Z dh

vuqekfur ykxr ¼:i;s½

/kjksgj jkf'k¼:i;s½

fufonk izi= dk ewY;¼:i;s½

le;kof/k Bsdsnkj dh Js.kh

1 SaasakIya pa^ilaToi@nak pirsar rayasaona maoM ka^laoja Bavana ka inamaa-Na kaya- ³maya AaMtirk ivaVut kaya- saiht´ evaM ivakasa kaya- ³eP`aaoca raoD ¸saoiPTk TOMk ¸saIvar laa[-na ¸ vaaTr saPlaa[ laa[-na evaM baa]nD/I vaala inamaa-Na kaya- saiht ´

643-00 yk[k

643000-00 20000@& 12 ekg o"kkZ _rq lfgr

Ukohu ,dhd`r iath;u Js.kh & ^c^ ,oa Åij dh

Jsa.kh

2 SaasakIya pa^ilaToi@nak pirsar Saajaapur maoM ka^laoja Bavana ka inamaa-Na kaya- ³maya AaMtirk ivaVut kaya- saiht´ evaM ivakasa kaya- ³eP`aaoca raoD ¸saoiPTk TOMk ¸saIvar laa[-na ¸ vaaTr saPlaa[ laa[-na evaM baa]nD/I vaala inamaa-Na kaya- saiht ´

643-00 yk[k

643000-00 20000@& 12 ekg o"kkZ _rq lfgr

Ukohu ,dhd`r iath;u Js.kh & ^c^ ,oa Åij dh

Jsa.kh

Visit http://www.bda.org.in

dk;Zikyu ;a=h] laHkkx ØekWad&7]

Hkksiky fodkl izkf/kdj.k] Hkksiky Ai ØekWd 476@bZ-Vh-@l&7@Hkksfoizk@2011 Hkksiky] fnukad 25@06@2011izfrfyfi%&1 fut lfpo] ekuuh; v/;{k egksn;] Hkksiky fodkl izkf/kdj.k] Hkksiky A2 fut lfpo] ekuuh; mik/;{k egksn;] Hkksiky fodkl izkf/kdj.k] Hkksiky A3 eq[; dk;Zikyu vf/kdkjh] Hkksiky fodkl izkf/kdj.k] HkksikyA4 v/kh{k.k ;a=h] oRr ØekWd ,d@nks] Hkksiky fodkl izkf/kdj.k] Hkksiky A5 okLrqfon] Hkksiky fodkl izkf/kdj.k] Hkksiky A6 dk;Zikyu ;a=h] laHkkx ØekWd 1]2]3]4]5]6]8]9] Hkksiky fodkl izkf/kdj.k] Hkksiky A7 tu lEidZ vf/kdkjh] Hkksiky fodkl izkf/kdj.k] Hkksiky A8 ys[kk vf/kdkjh] Hkksiky fodkl izkf/kdj.k] Hkksiky A9 lgk;d ;a=h] mi laHkkx ØekWd 02@03@05] laHkkx ØekWd 07] Hkksiky fodkl izkf/kdj.k] Hkksiky A10 dk;kZy;] lwpuk iVy] Hkksiky fodkl izkf/kdj.k] Hkksiky A

dk;Zikyu ;a=h] laHkkx ØekWad&7]

Hkksiky fodkl izkf/kdj.k] Hkksiky A

Baaopala ivakasa P`aaiQakrNa

Page 4: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Bhopal Development Authority, Bhopalhttp://www.bda.org.in

DETAILED NOTICE INVITING TENDER(IN FORM A, B & C)

Online tenders are invited on behalf of the Bhopal Development Authority, Bhopal (here-in-after called the B.D.A.) for the following work in Form A and will be received online on the website http://mpeprocurement.gov.in (main portal) and the tenders of Bhopal Development Authority (B.D.A.) would be made available on sub portal http:/bda.mpeprocurement.gov.in as per time schedule (key dates) in the notice published on the above website and as mentioned below from categories 'B' class and above contractors registered with new unified e registration system.

1.1 Name of work Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen

1.2 Probable amount of contract ` 643.00 Lacs1.3 Amount of Earnest Money ` 6,43,000.001.4 Time allowed for completion

including/ excluding rainy season12 Months including Rainy Season.

1.5 Cost of Tender form for online purchase

` 20000.00

Key Dates:-Seq.No.

BDA stage Contractor Stage

Start date & time

Expiry date & time

Envelopes

1. Tender preparation and release of NIT

- 24-06-201110:30

27-06-201117:30

2. Tender purchase

online

28-06-201110:30

06-07-201117:30

Envelope - AEnvelope - BEnvelope - C

3. Tender download

28-06-201110:30

07-07-201117:30

Envelope - AEnvelope - BEnvelope - C

4. Submit Bid Hash online

28-06-201118:00

08-07-201117:30

Envelope - AEnvelope - BEnvelope - C

5. Close for bidding - Generation of super

hash

- 09-07-201110:30

11-07-201117:30

Envelope - AEnvelope - BEnvelope - C

6. Submit bids online - Re- encryption

11-07-201117:31

17-07-201117:30

Envelope - AEnvelope - BEnvelope - C

7. Open EMD /Tech. Bid

- 19-07-201110:30

19-07-201117:30

Envelope - AEnvelope - B

8. Open financial / price bid of

successful tenderers

- 20-07-201110:30

20-07-201117:30

Envelope - C

The last date for physical submission of EMD instrument and other supporting documents is 18.07.2011 upto 05:30 PM.Note: The bidders shall have to submit their bids online (Decrypt the bids and re-encrypt the bids) and upload the relevant documents from as per key schedule (key dates).Original EMD instrument, valid period revenue/bank solvency & technical documents should reach the office of the Bhopal Development Authority, Pragati Bhawan, Bhopal, M.P. by 18.07.2011 upto 05:30 PM through speed post/regd. Post/Manually.

1.2 The electrical works shall be executed only through the contractors who posses proper valid electrical license from Chief Electrical Inspector to the Govt. of M.P. He should also upload a copy of the license.

1.3 Not more than one tender shall be submitted by contractor or by a firm of contractors.1.4 No two or more concerns in which an individual is interested as a proprietor and or as a partner

shall tender for the execution of the same work. if they do so, all such tenders shall be liable to be rejected.

1.5 The Chairman, Bhopal Development Authority shall be accepting authority hereinafter referred to as such, for the purpose of this contract.

Baaopala ivakasa P`aaiQakrNa

Page 5: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

1.6 "Engineer-in-charge" means the "Executive Engineer" in-charge who shall supervise and be in charge of work and who shall sign the contract on behalf of the B.D.A.

1.7 Tender document consisting of plans, specifications, schedule of quantities of the various classes of work to be done, the conditions of contract and other necessary documents, will be open for inspection online and issued/sold online on payment of ` 20000.00 to e-paid online on or before 06 - 07 - 2011 upto 5.30p.m.

1.8 The copies of other drawings and documents pertaining to the work signed for the purpose of identification by the accepting officer of his accredited representative and samples of material to be arranged by the contractor will be open for inspection by tenderers at the following office during working hours between the dates mentioned in clause -1.7 above

2. RATES

2.1 The Schedule of Items. The schedule of main items of work to be executed is enclosed as annexure-E.

2.2 Percentage rate tender in form 'A' or 'C'.

2.2.1 In respect of percentage rate tenders, contractor should quote his rates above/below, or at par with the following Schedule of Rates:(a) Building work & Water Supply & Sanitary Fittings - The schedule of rates issued by

Engineer in Chief , M.P.P.W.D. for Building Works w.e.f. 15/06/2009 and its amendments and correction slips issued up to date of N.I.T.

(b) Internal Electrification Work - The schedule of rates issued by Engineer in Chief , M.P.P.W.D. for Internal Electrification Works w.e.f. 01/04/2008 and its amendments and correction slips issued up to date of N.I.T.

(c) Road & Bridge Work - The schedule of rates issued by Engineer in Chief , M.P.P.W.D. for Road and Bridge Works inforce from 15/04/2009 and its amendments and correction slips issued up to date of N.I.T.

The tender shall be submitted by the tenderer in the following three separate envelopes online:-

(a) Earnest money, scan copy of contractor registration in Bhopal Vikas Pradhikaran, scan copy of valid period revenue solvency / bank solvency of nationalized /scheduled bank.

Envelope - A

(b) NIT & technical bid Envelope - B(c) Price bid Envelope - C

Note: Online bidders are required to submit the physical EMD in physical EMD envelope - 'A' and any other documents related to technical bid which can not be submitted online in a physical technical envelope - 'B'. Price bids are to be submitted mandatorily online and shall not be accepted in any physical form as mentioned above.Reference of the EMD is to be mentioned online and a scanned copy of EMD is to be uploaded online. Also in case of technical bids the list of documents being submitted manually is to be uploaded online. Above envelopes, as applicable shall be kept in a big outer envelope, which shall also be sealed.In the first instance, the Envelope - 'A' containing the earnest money shall be opened online and manually. If the earnest money is found proper the Envelope 'B' containing technical bid shall be opened in the presence of such contractors who choose to be present. The financial offer in Envelope 'C' shall be opened only if tenderer meet the qualification criteria and availability of bid capacity as per qualification, criteria of the technical bid documents. Financial Bid will be opened as per online key date schedule. Bhopal Development Authority may change the date of Financial Bid Opening. All changes made in key dates will be made available online for bidder’s reference.

2.2.2 (For Form “A” only)The percentage of tender above/below or at par with the relevant schedule of rates inclusive of amendments and correction slips, issued upto the date of issue of this notice inviting tender should be expressed on the tender form itself, both in words and figures, in such a way that interpolation is not possible. Tenders not specifying percentage in words will summarily be rejected. Any amendment to the schedule of rates after the date of issue of this tender notice or the date of issue of any amendment to the N.I.T. specially notifying the said amendment to the current schedule of rates shall not apply to this tender.

2.2.3 The Percentage tendered by the contractor will apply to those rates which find place in the current schedule of rate mentioned in clause 2.2.1 or have been derived from the said current schedule of rates and not to other items.

2.2.4 The contractor shall not alter the percentage quoted by the contractor during the term of contract.

Baaopala ivakasa P`aaiQakrNa

Page 6: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

2.3 Item Rate Tenders in form - "B" In respect of item rate tenders, contractor should quote his rates for the items mentioned in the schedule of item of this N.I.T. Only rates quoted shall be considered. The rates should be expressed in figures as well as words and the unit should be as given by the Department. The contractor will not have freedom to change the unit.

2.4 LEAD AND LIFT OF WATER:- No lead and lift for carting of water will be paid.2.5 LEAD AND LIFT OF MATERIALS:- No lead and lift for carting of material shall be payable to the

contractors except in case of such items for which specific provision for payment of lead and lift are provided in the current schedule of rates, mentioned in clause 2.2.1 of the N.I.T. or in the schedule of items in respect of items rate tender.

2.6 NON SCHEDULED ITEMS OF WORK: During the execution of work there is likelihood of such items of works which do not find place in the current schedule of rates, referred to above, in respect of percentage rate contract or such items which are not given in the schedule of items in respect of item rate contracts, for which contractor has not quoted his rates, contractor will have to carry out these items of work.

Rates of such items for work which do not find place in the current schedule of rates referred to above, in respect of percentage rate contracts or such items in respect of item rate contracts shall be decided by the Superintending Engineer and the decision of the Chief Engineer (Superintending Engineer in case when Chief Engineer is not posted) shall be final.

shall be binding on the contractor. The quantum of such work will not exceed 10% of amount of contract unless accepted by the department and the contractor.

3. SUBMISSION OF TENDER:3.1 EARNEST MONEY - No tender will be received without a deposit of earnest money of Rs

6,43,000.00 (Rs Six Lacs & Forty Three Thousand only) which will be returned to the unsuccessful tenderers on the rejection of their tenders, or earlier as may be decided by the competent authority and on production of a certificate of Executive Engineer, Division - 07, B.D.A. Bhopal that the all tender documents have been returned and will be retained from the successful tenderers as part of the security deposit.

3.2 FORM OF EARNEST MONEY: 3.2.1 Where the amount of Earnest money is more than Rs. 500/- the same shall be accepted only in the

shape of Bank Drafts in favour of the “Bhopal Development Authority”, Bhopal the same will not be converted in the form of Bank Guarantee, after execution of agreement. The instructions issued vide office. Order No ST/BVP/1983 Dt. 3.10.83 for acceptance of Bank Guarantee towards earnest money for works costing above five Lacks will not be acceptable in this case.

3.2.2 The intending tenderers from other states may remit E.M. in the form of the Bank draft of any schedule bank, in favour of the Bhopal Development Authority, Bhopal. Bidder has to upload the scan copy of Bank draft compulsorily. In absence of Scan copy of Bank Draft bid shall liable to be rejected.

3.3 EARNEST MONEY IN SEPARATE COVERS: - The earnest money in one of the prescribed forms should be produced/sent separately and not kept in covers containing the tender and if the earnest money is not found in accordance with the prescribed mode, the tender will be returned unopened to the tender. The reference details of EMD are required to be mentioned and a scanned copy of EMD is to be uploaded in the online EMD envelope for verification during opening by the online bidders.

3.4 ADJUSTMENT OF EARNEST MONEY: Earnest money which has been deposited for a particular work, will not ordinary, be adjusted towards the earnest money for another work, but if the tender of a contractor for a work has been rejected and the earnest money has been refunded to him due to some reasons it may be so adjusted by Executive Engineer.

3.5 SECURITY DEPOSIT:

(a) Security Deposit shall be recovered from the Running Bills, @ 5% (Five Percent) on, percentage basis as per clauses of the agreement read with Para 3.5 of the N.I.T.

(b) The amount of the E.M. shall not be adjusted when value of work done reaches the limit of the amount of Contract or exceeds the probable amount of the contract.

3.6 IMPLICATION OF SUBMISSION OF TENDER: Tenders are advised to visit the site sufficiently in advance of the last date fixed for submission of the tender. A tenderer shall be deemed to have full knowledge of all the relevant documents and site etc. whether he inspect them or not.The bid for the tender being submitted online must be digitally signed using digital certificate of the Individual in case of Individuals / proprietorships and Authorised representative in case of partnership firm / private limited companies / public limited companies / joint ventures. In any of the

Baaopala ivakasa P`aaiQakrNa

Page 7: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

above cases, a lawful power of attorney holder can also obtain the digital certificate to sign on behalf of the individual / organisation.

3.7 THE SUBMISSION OF A TENDER BY CONTRACTORS IMPLIES THAT : He has read the notice, conditions of tender. All other contract documents and has made himself aware of the standards and procedures in this respect laid down in the National Building Code of India 1970. the scope and specification of the work to be done and the conditions and rates at which stores, tools and plants etc. will be issued to him by the Authority further that he has seen the queries with their approaches, site of work etc. and satisfied himself regarding the suitability and availability of the material at the queries. The responsibility of opening new queries and construction and maintenance of approaches thereto shall lie wholly with the contractor.

3.8 INCOME TAX CLEARANCE CERTIFICATE - A tenderer purchasing tender documents for works exceeding Rs. 2.00 lacs shall submit either an income Tax Clearance Certificate in the form printed as Annexure D or a certificate for the. Income Tax authority that the assessment is under consideration No tender document can be issued/sold to him unless such certificate is submitted.

3.9 LIST OF WORK IN PROGRESS - Tender must be accompanied by a list of Contracts already held by the tenderer at the time of submitting the tender in the Department and elsewhere showing therein -

(i) The amount of each contract.

(ii) Balance of work remaining to be done, and

(iii) The amount of solvency certificate produced by him at the time of enrolment in

B.D.A., Bhopal.

3.10 RELATIONSHIP - The contractor shall not be permitted to tender for works in the Division (responsible for award and Execution of contracts) in which his near relative is posted as Executive Engineer/ Chief Account Officer. He shall intimate the name of his near relative working in Bhopal Development Authority. He shall also intimate the name of persons who are working with him in any capacity of subsequently employed by him and who are near relatives to any officer in the B.D.A. Bhopal. Any breach of this condition by the contractor would render himself liable to be removed from the approved list of contractors of the Bhopal Development Authority, Bhopal.

NOTE: By the term near relatives is meant wife, husband, parents and son, grandson, brothers, sister, brother-in-law, father-in-law and mother-in-law.

4. OPENING AND ACCEPTANCE OF TENDER:

4.1 PLACE AND TIME OF OPENING: The tenders shall be opened online on the website of BDA i.e. http://bda.mpeprocurement.gov.in as per key dates and time by the Executive Engineer (Division No - 07) in the presence of the tenderers or their duly authorised agents, who may choose to attend. The Executive Engineer under unavoidable circumstance may depute another officer in his absence to receive and open the tenders on his behalf.

4.2 Power of Executive Engineer: The Executive Engineer does not bind himself to accept or to recommend for the acceptance the lowest or any tender or to give any reasons for his decision.

4.3 Conditional Tender: Conditional tenders will be rejected.

4.4 Canvassing: Canvassing whether directly or indirectly, in connection with tenders is strictly prohibited and the tenders submitted by the bidders who resort to canvassing will be liable to rejection and bidder himself liable to penalties which may include removal of his name from the list of approved & registered contractors of Bhopal Development Authority and/or penal action under the section-8 of Madhya Pradesh Vinirdishtta Bhrast Acharan Nivaran Vidheyak- 1982 and such tenders are liable to be rejected.

4.5 Unsealed Tenders: The tender may be rejected if not properly sealed. (Physical Earnest money and technical bid envelope). Financial proposal should be submitted online only, in case of physical submission of financial bid tender shall be liable to be rejected. The tender will also be rejected if all required stages will not get completed message online.

4.6 Accepting authority's discretions: The accepting authority reserves the right of accepting the tender for the whole work or for a distinct part of it or distributing the work between one or more tenderers.

Baaopala ivakasa P`aaiQakrNa

Page 8: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

4.7 Validity of offer : Tender shall remain valid upto 120 days from the date of receipt of tender and in the event of the tenderer withdrawing the offer before aforesaid date for any reason whatsoever, earnest money deposited with the tender shall be forfeited by B.D.A. Bhopal.

5. SPECIFICATIONS:

5.1 BRIEF SPECIFICATION - A brief note on construction and specifications of the work is enclosed in Annexure - E.

5.2 MATERIAL OF CONSTRUCTION - The materials for construction to be used in the work shall be governed by the provision of part - V of the National Building Code of India. 1970 and the relevant Indian Standard specifications with amendments and revisions issued up to the date of tender notice.

5.3 WORKMAN SHIP - The work shall be carried out according to the specification referred to hereinafter and according to sound engineering practice. The decision of the Executive Engineer, in respect of workmanship will be final.

5.4 SPECIFICATION FOR BUILDING WORK - (Including water supply and sanitary fittings).

5.4.1 The contractor shall execute the work in conformity with the standards procedure laid down in the National Building Code of India, 1970 and as per C.P.W.D. specification or specifications in force or specification whichever enclosed separately, and in accordance with the approved drawing.

CONCRETE - All concrete shall be mixed in concrete Mixers and compacted by mechanical Vibrators, Slump test shall be carried out during concrete and sample test cubes prepared and tested in due course. The testing will be carried out by/through the Department. The result of the test shall confirm with the required standard and if the Engineer-in-Charge consider that a structural test in necessary, the same shall be carried out as instructed by the Engineer-in-Charge at the Contractor's expense and if result of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of work which has given unsatisfactory test results.

5.4.2 BRICKS - The Contractor should use the bricks manufactured on the measures, as far as possible.

5.4.3 All timber used in wood for all new works must be properly seasoned in case of important buildings mechanical seasoning should be done in good seasoning plant. In case the contractor does not procure good seasoned wood he may be asked to get it seasoned in plant at his own expense but a certificate is required where no additional rate is paid.

5.4.4 MAINTENANCE OF ROOFS - Subjects to the provision in the agreement, it will be the responsibility of the contractor to see that the building does not leak, during the period of the first rainy season in respect of tile and sheet roofing and two consecutive rainy season in respect of lime concrete and cement concrete terraced roof after its completion and he will make good and replace all the defective work on this account.

5.5 SPECIFICATION OF ELECTRICAL WORKS

5.5.1 The work will be carried out as per the approved drawing and as directed by the Executive Engineer (E/M) BDA the work will be governed by "General Specifications" for the Electrical works in Government buildings in Madhya Pradesh in force from 1972.

5.5.2 All samples of electrical accessories should be got approved from the Engineer-in-Charge. Contractor will have to arrange and afford all facilities for their inspection and rectify the defects pointed out by them. A list of accessories is enclosed in Annexure-H.

5.5.3 The period of testing and refund of deposit will be 6 months after completion of works.

5.5.4 In case of supply of ceiling fan, table fan, exhaust fan cabin fan, tube light fixtures will be made by the B.D.A. as mentioned in the S.O.R. As such labour rates only as per S.O.R. will be paid for fitting such items in position as per S.O.R.

5.5.5 The contractor should submit line diagram on tracing cloth showing the point position of switch, length of point, position of D.B. and main switch circuit Nos. which points fall at the time of final bill. Otherwise deduction of 1/2 percent (half percent) will be made from the bill.

5.6 SPECIFICATIONS FOR ROAD WORK

The road works and collection of materials for road works shall be carried out according to C.P.W.D. specifications, as adopted for this work or specifications in force or special specifications wherever enclosed separately, or the relevant specifications published by the Indian road Congress.

5.5 CONTRADICTION OR AMENDMENTS: In the event of contradictions between the stipulation of the current schedule of rates and specifications (vide paras 5.1 to 5.4 above) the stipulation in the current schedule of rates shall gain precedence. In the event of contradiction, if any, between

Baaopala ivakasa P`aaiQakrNa

Page 9: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

specifications and codes and practice, referred to above the decision of the Engineer-in-Charge shall be final and binding on the contractor.

6. SUPPLY OF MATERIALS - No material will be supplied by the B.D.A., Bhopal.

7. MISCELLANEOUS CONDITIONS -

7.1 SUBLETTING - The contractor shall not, without the prior approval of the competent authority in writing, sublet or assign to any other party or parties the whole or any portion of the work under the contract. Where such approval is granted, the contractor shall not be relieved of any obligation or duty or responsibility, which he undertakes under the contract.

7.2 TAXES - All dues regarding taxes, including the sales tax, other duties etc. levied on the contractor's work by Government and local bodies or private individuals will be payable by the contractor. The Executive Engineer Division No.- 07, B.D.A. will grant a certificate for the quantities actually used on the work but will not entertain any claim on this account.

7.3 Minerals extracted for works carried out on behalf of the Government of India, from the quarries in possession of and controlled by the state Government is subject to payment of Royalty by the contractor to whom it shall not be refundable. The Bhopal Development Authority shall not also issue any certificate in respect of such materials extracted for Government of India work (Applicable to Government of India works only).

7.4 RULES OF LABOUR CAMPS - The contractor will be bound to follow the Madhya Pradesh Model Rule relating to layout, water supply and sanitation on labour campus 1(Vide Annexure-A) and the provisions of the National Building Code of India, regard to constructions and safety.

7.5 FAIR WAGES - The contractor shall pay not less than fair wage to labourers engaged by him on the works (rules enclosed vide Annexure-B).

7.6 WORK IN THE VICINITY - The Executive Engineer reserves the right to take up departmental work or to award work on contract in the vicinity without prejudice to the terms of contract.

7.7 BEST QUALITY OF CONSTRUCTION MATERIALS - Materials of best quality will be used as approved by the Executive Engineer.

7.8 REMOVAL OF UNDESIRED PERSONS - The contractor shall on receipt of the requisition from the Executive Engineer at once remove any person employed by him on the work who, if in the opinion of the Executive Engineer is unsuitable or undesirable.

7.9 AMOUNT DUE FROM CONTRACTOR - Any amount due to B.D.A. Bhopal from the contractor on any account concerning work may be recovered from his as arrears of land revenue..

7.10 TOOLS AND PLANTS - The contractor shall arrange at his own cost tools and plants required for the proper execution of the work.

7.11 RIGHTS TO INCREASE OR DECREASE WORK - The competent authority reserve the right to increase or decrease work. The competent authority reserves the right to increase or decrease any item of the work during the currency of the contract and the contractor will be bound to comply with the order of the competent authority without any claim for compensation.

7.12 TIME SCHEDULE - the contractor according to the time schedule fixed by the competent authority shall do the work.

7.13 TIME OF CONTRACT - Time allowed for carrying out the work as entered in the N.I.T. shall be strictly observed by the Contractor and shall be reckoned from the date of work order to commence the work.

7.14 PAYMENT BY CHEQUES - The payment will be made by cheques on the Nationalized Bank payable at Bhopal only. No Bank commission charges on releasing such payments will be borne by the B.D.A. Bhopal.

7.15 TRANSPORT OF MATERIALS - The contractor shall make his own arrangement for transport of all material. The Bhopal Development Authority is not bound to arrange for priority in getting wagon or any other materials though all possible assistance by way or recommendation will be given if it is found necessary in the operation by the Engineer in charge. If it proves to be ineffective, the contractor shall have no claim for any compensation on that account.

8. SPECIAL CONDITIONS – Special Conditions are enclosed in Annexure-”D “

8.1 AGREEMENT

8.1.1 EXECUTION OF AGREEMENT - The tenderer whose tender has been accepted here in after referred as the contractor, shall produce an appropriate solvency certificate, if so required by the Executive Engineer and will executed the agreement in the prescribed form, within a fortnight of the

Baaopala ivakasa P`aaiQakrNa

Page 10: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

date of communication of the acceptance of his tender by competent authority. Failure to do so will result in the earnest money being forfeited to B.D.A. and tender being cancelled.

8.1.2 (a) The contractor shall employ the following Technical Staff during the execution of work.

1. One Graduate Engineer when work to be executed is more then Rs. 5 lakh.

2. One diploma Holder, Sub-Engineer when the cost of work to be executed is from Rs.2 lacs or more but not more than Rs. 5 lacs.

(b) The Technical Staff should be available at site whenever required by the Engineer-in-Charge to take instructions.

(c) In case the contractor fails to employ the technical staff as aforesaid, the E.E. shall have the right to take suitable measures.

(d) The contractor should give the names and other detail of the Graduate Engineer/Diploma Holder, Sub-Engineer whom he intends to employ to who is under employment on the work at the time he commences the work.

(e) The Contractor should give a certificate to the effect that the Engineer/Diploma holder, Sub Engineer is exclusively in his employment.

PROVIDED THAT:

(i) An Engineer or Sub Engineer may look after more than on work in the same locality but the total value of such work under him should not exceed. Rs 25 lakhs in the case of an Engineer and Rs. 5 lakh in the case of a Sub-Engineer.

(ii) It is not necessary for the contractor's partner in case of firm/company, who is himself an Engineer, Sub-Engineer to employ another Engineer, Sub-Engineer for the Supervision of work.

(iii) The Retired Assistant Engineer who is holding a Diploma may be treated at par with a Graduate for the operation of the above Clause.

In case the contractor fails to employ the technical staff as aforesaid he shall be liable to pay the Bhopal Development Authority sum of Rs. 10000 (Ten Thousand only) for each month of default in the case of graduate engineer and Rs. 5000 (Five Thousand only) for each month of default in the case of Diploma Holder Sub Engineer.

8.2 CONDITIONS APPLICABLE FOR CONTRACT - All the condition of the tender notice will be binding on the contractors in addition to the conditions of the contract in the prescribed form:

Following documents annexed with this N.I.T. shall form a part of the contract.

Annexure "A" : Model Rules relating to labour, water supply and Sanitation in labour camps etc.

Annexure "B" : Contractor's labour regulations.

Annexure "C" : Technical Specifications

Annexure "D" : Special Conditions

Annexure "E" : Schedule of items

Annexure "F" : Form of Bank Guarantee.

Annexure "G" : Form of Income Tax Clearance Certificate.

Annexure "H" : Proformas

Executive Engineer Division No: - 07,

Bhopal Development Authority, Bhopal

Baaopala ivakasa P`aaiQakrNa

Page 11: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Guidelines to Contractors for Implementationof

E- procurement Systemin

Bhopal Development Authorityhttp://bda.mpeprocurement.gov.in

1. Tenders must be invited for all works proposed to be given on contract unless the amount of work proposed to be given on contract is Rs. 15000 or less. The N.I.T. shall be posted in public places signed by the authority inviting the tenders.

N.I.T. will state the work to be carried out as well as the date for submitting and opening tenders & the time allowed for carrying out the work, also the amount of earnest money to be deposited with the tender & the amount of the security deposit to be deposited by the successful tenderer and the percentage. If any, to be deducted from bills. It will also state whether refund of quarry fees, royalties, and ground rents will be granted. Copies of the specifications, design and drawings and a schedule of items and rates of the various description of work, and any other documents required in connection with the work signed for the purpose of identification by the authority competent to approve the tender shall also be open for inspection by the contractor at the office of the authority selling the tender forms during office hours.

Further that the schedule of items along with the rates payable shall be attached to the tender documents and in the event of variation in rates given such list with the Current Schedule of Rates the rates given in the S.O.R. approved by the competent authority shall prevail.

1 A Note: These conditions will over-rule the conditions stated in the tender documents, wherever relevant and applicable.

2. Registration of Bidders on e-Procurement System:

All the Bidders (Contractors) registered / intending to register with Bhopal Development Authority are required to register on the e-Procurement System on the website http://mpeprocurement.gov.in and get empanelled on http://bda.mpeprocurement.gov.in in order to participate in tenders processed by Bhopal Development Authority using the e-Procurement System.

For more details, please contact e-Procurement Cell, Accounts Officer Mr. K.L. Shinde, contact mobile no. 09303132819 and Mr. Pankaj Shrivastava E.E-5 Nodal Officer contact mobile no. 09425376755 Bhopal Development Authority, Bhopal.

3. Digital Certificates:

The Bids submitted online should be signed electronically with a Class III Digital Certificate to establish the identity of the Bidder submitting the Bid online. The Bidders may obtain Class III Digital Certificates issued by an approved Certifying Authority authorized by the Controller of Certifying Authorities, Government of India.

A Class III Digital Certificate is issued upon receipt of mandatory identity proofs along with an Application Form. Only upon the receipt of the required documents, a Digital Certificate can be issued.

Note: It may take upto 4 working days for issuance of Class III Digital Certificate, hence the bidders are advised to obtain them at the earliest.

The Bidders may obtain more information and the Application Forms required to be submitted for the issuance of Digital Certificate from The Service Provider of e-Procurement System, Wipro Ltd. - NexTenders (India) Pvt. Ltd., A-6, Sahyog Parisae, E-8, Shahpura Bhopal – 462039. Telephone No. – 0755- 4075010

Important Note: Bid for a particular tender can be submitted during the ONLINE BID SUBMISSION stage only using the Digital Certificate that is used to encrypt the data and sign the hash during the ONLINE BID PREPARATION AND HASH SUBMISSION stage.

In case, during the process of a particular tender, the bidder looses his Digital Certificate because of any problem (such as misplacement, virus attack, hardware problem, operating system problem, etc.); he may not be able to submit his bid online.

Hence, the bidders are advised to keep their Digital Certificates in a safe place under proper security to be used whenever required.

The digital certificate issued to the Authorised User of a Partnership firm / Private Limited Company / Public Limited Company / Joint Venture and used for online bidding will be considered as equivalent to a no-objection certificate / power of attorney to that user.

In case of Partnership Firm, majority of the Partners have to authorize a specific individual through Authority Letter signed by majority of the Partners of the firm.

Baaopala ivakasa P`aaiQakrNa

Page 12: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

In case of Private Limited Company, Public Limited Company, the Managing Director / any other Person (having designated authority to authorize a specific individual) has to authorize a specific individual through Authority Letter.

Unless the certificate is revoked, it will be assumed to represent adequate authority of the specific individual to bid on behalf of the Organisation for online tenders as per Information Technology Act 2000. This Authorized User will be required to obtain a Digital Certificate. The Digital Signature executed through the use of Digital Certificate of this Authorized User will be binding on the firm in all respect. It shall be the responsibility of Management / Partners of the concerned firm to inform the Certifying Authority, if the Authorized User changes, and apply for a fresh digital certificate for the new Authorised User.

4. Set Up of Bidders’ Computer System:

In order for a Bidder to operate on the e-Procurement System, the Computer System of the Bidder is required to be set up for Operating System, Internet Connectivity, Utilities, Fonts, etc. A help file on setting up of the Computer System can be obtained from e-Procurement Cell.

5. Publishing of N.I.T.: For the Tenders processed using the e-Procurement System, only a brief Advertisement related to the Tender shall be published in the newspapers and the Detailed Notice shall be published only on the e-Procurement System. The contractors can view the Detailed Notice and the time schedule for all the Tenders processed using the e-Procurement System on the website http://bda.mpeprocurement.gov.in.

6. Key Dates: The Bidders are strictly advised to follow the time schedule (Key Dates) of the Tender for their side for tasks and responsibilities to participate in the Tender, as all the stages of each Tender are locked before the start time and date and after the end time and date for the relevant stage of the Tender as set by the concerned Department Official.

7. Purchase of Tender Documents:

The Tender documents can be purchased ONLY online. The Tender shall be available for purchase to concerned eligible contractors immediately after online release of the Tender and upto scheduled date and time as set in the key dates. Arrangements have been made for the Bidders to make payments online via Credit Card / Internet Banking. In case of online tendering, the application form for the purchase of tender documents shall not be required.

The Bidders can purchase the tender documents online by making online payment of tender document fees using the service of the secure electronic payments gateway (see point 7 below for further details), and should print out the system generated receipt for their reference which can be produced whenever required.

8. Electronic Payment Account:

As the tender documents shall be available for purchase only online, Bidders are required to pay the Tender Document fees online using the Online Payments Gateway Service integrated into the e-Procurement System.

For the list of available modes of electronic payments that are presently accepted on the Online Payments Gateway Service, please check the link ‘List of e-Payments accepted Online’ on http://mpeprocurement.gov.in.

9. Preparation of Bids and Submission of Bid Seals (Hashes) of Online Bids by the Bidders:

The Bidders have to prepare their Bids online, encrypt their Bid Data in the Bid Forms and submit Bid Seals (Hashes) of all the envelopes and documents required to be uploaded related to the Tender as per the time schedule mentioned in the key dates of the Notice Inviting Tenders after signing of the same by the Digital Signature of their authorized representative.

10. Generation of Super - Hash:

After the time of submission of Bid Seal (Hash) by the Contractors has lapsed, the bid round will be closed and the concerned Department Official shall generate a Tender Super – Hash which shall be digitally signed by the Department Official.

11. Decryption and Re - Encryption Bids:

Bidders have to decrypt the Bid Data with their Digital Certificate and re-encrypt the Bid Data and also upload the relevant documents using Online Briefcase feature for which they had generated the Bid Seals (Hashes) during the Bid Preparation and Hash Submission stage within the specified time as stated in the time schedule (Key Dates).

The encrypted data of only those Bidders who have submitted their Bid Seals (Hashes) within the stipulated time, as per the tender time schedule (Key Dates), will be accepted by the system. A Bidder who has not submitted Bid Seals (Hashes) within the stipulated time will not be allowed to decrypt and re-encrypt his Bid Data or upload the relevant documents.

12. Submission of Earnest Money Deposit:

Baaopala ivakasa P`aaiQakrNa

Page 13: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

The Bidders shall submit their Earnest Money Deposit as usual in a physically sealed Earnest Money Deposit envelope and the same should reach the concerned Office as stated in the Notice Inviting Tender by post or in person. Delays in post shall be the responsibility of Contractor.

The Bidders have to upload scanned copy of Earnest Money Deposit instrument along with the reference details.

13. Opening of Tenders:

The concerned Department Official receiving the tenders or his duly authorised Officer shall first open the online Earnest Money Deposit envelope of all the Bidders and verify the scanned copy of the Earnest Money Deposit uploaded by the Bidders. He shall check for the validity of Earnest Money Deposit as required. He shall also verify the scanned documents uploaded by the Bidders, if any, as required. In case, the requirements are incomplete, the commercial and other envelopes of the concerned Bidders received online shall not be opened.

The concerned Official shall then open the other envelopes submitted online by the Bidders in the presence of the Bidders or their authorised representatives who choose to be present in the order of opening.

He will match the Bid Seal (Hash) of each envelope and the documents uploaded, during the respective opening, with the hash submitted by the Bidders during the Bid Preparation and Hash Submission stage. In the event of a mismatch of hash, the bid shall be liable to be rejected.

(i) Mr. Pankaj Shrivastava

Nodal Officer - e-Procurement System and Executive Engineer, B.D.A.,1, Pragati Bhawan, Press Complex, Zone-I, M.P.Nagar, Bhopal. Mobile No. 9425376755.

(ii) The Service Provider of e-Procurement System, Wipro Ltd. - NexTenders (India) Pvt. Ltd., A - 6, Sahayog Parisar, E-8 Shahpura Bhopal - 462039 Telephone No - 0755 4075010

14. Any person who submits a tender, shall fill up above or below the S.O.R. specified in rule 1, he is willing to undertake the work. Only one rate of percentage above or below the S.O.R. on all the scheduled items shall be named. Tenders which propose any alternation in the work specified in the said N.I.T. or in the time allowed for carrying out the work, or which contain any other conditions of any sort, will be liable to rejection. No single tender shall include more than one work, but contractors, who wish to tender for two or more works shall submit a separate tender for each. Tenders have the name and number of the work to which they refer, written outside the envelope.

15. The authority receiving the tenders or his duly authorised assistant will open tenders in the presence of any in attending contractors who may be present at the time, and will enter the amount of the several tenders in a comparative statement in a suitable form. Receipts for earnest money will be given to all tenderers except those tenders are rejected and whose earnest money is refunded on the day the tenders are opened.

16. The Chairman B.D.A. Bhopal shall have the right of rejecting all or any of the tenders.

The receipt of a clerk for any money paid by the contractor will not be considered as any acknowledgement of payment to the Sub Divisional Officer/Divisional acknowledgement of payment to the authority selling the tender form and the contractor shall be responsible for seeing that he procures a receipt signed by that authority or any other person duly authorised by him.

17. The memorandum of work tendered for and the schedule of material to be supplied by the B.D.A. and their issue rates be filled in and completed before the tender form is issued. If a form is issued to an intending tenderer without having been so filled in and completed, he shall request the office to have this done before he completes and delivers, his tender.

Executive EngineerDivision No – 07,

Bhopal Development Authority,Bhopal

Baaopala ivakasa P`aaiQakrNa

Page 14: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

BHOPAL DEVELOPMENT AUTHORITY, BHOPAL (M.P.)TENDER FORM-'A'

PERCENTAGE RATE TENDER & CONTRACT FOR WORK

TENDER OF WORKS

I/We have done myself/ourselves fully satisfied to read & examine the detailed notice inviting tender, general conditions and various clauses of contract, all annexure, special conditions & specifications, applicable specification, drawings, designs, applicable Schedule of Rates, descriptions of the items of work, all the rules in respect of contract and all other contents in the tender documents and hereby agreed for the execution of the said specified work for Bhopal Development Authority within the above specified time period in accordance with that at the rate (in figures) ............................................. (In words) ................................................................................................................................................. percent below/above to the rates entered in the applicable Schedule of Rates as mentioned in para 2.2.1 of detailed notice inviting tender of this tender form.

MEMORANDUM

(a) Name of work : Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen

(b) Cost of work put to tender

: 643.00 Lacs

(c) Earnest money : 6,43,000.00

(d) Security deposit : (1) Security Deposit 5% (Five Percent)

(e) Percentage if any to be deducted from bills

: (2) Income Tax, Commercial Tax, karmakar Kalyan Upkar, Labour Cess, Royalty Charges and other taxes will be levied as per Government rules and rates.

(f) Time allowed for the work from date of written order to commence the work

: 12 Months including rainy season

I/We agree to keep the tender open at least for further 120 days from its due date and not to make any modifications in its terms and conditions:

A sum of Rs.……….. Lacs (Rupees ……………………………………………………Lacs only) is hereby forwarded as earnest money. If/We, fail to commence the work specified, I/We agree that the said Chairman of Bhopal Development Authority or his successors in office shall without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money absolutely, otherwise the said earnest money shall be retained by him towards security deposit to execute the works in accordance in all respects with the terms & conditions mentioned in this tender document.

WITNESS FOR SIGNATURE OF BIDDER/CONTRACTOR (At the time of execution of agreement)

(Signature of witness)Name of Witness ........................... (Signature of Bidder/ with Seal) Occupation of witness ..................... Address ................................Address of witness ....................... ................................ ......................... Date .................................

ACCEPTANCE

This tender is accepted by me for and on behalf of the Bhopal Development Authority for the entered Tender rate as above.

Dated............... Signature ..............................

Designation............................

Baaopala ivakasa P`aaiQakrNa

Page 15: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Bhopal Development Authority, Bhopal (M.P)

General Conditions of Contract

1- Definitions:-

a. The contract mean the documents forming the tender and acceptance thereof and the formal agreement executed between the Executive Engineer, Division No.-07, Bhopal Development Authority on behalf of the Chairman of Bhopal Development Authority and the contractor, together with the documents referred to therein including there conditions, the specifications, designs and instructions issued from time to time by the Engineer-in-charge and all these documents taken together, shall be deemed to form one contract and shall be complementary to one another.

b. In the contract, the following expressions shall, unless the context otherwise requires, have the meanings, hereby respectively assigned to them:-

I. The expression Works or Works shall, unless there be something either in the subject or context repugnant to such construction, be constructed and taken to mean the works by or by virtue of the contract, contracted to be executed whether temporary or permanent, and whether original, altered, substituted or additional.

II. The Site shall mean the land/or other places on, into or through which work is to be executed under the contract or any adjacent land, path or street through which work is to be executed under the contract or any adjacent land, path or street which may be allotted or used for the purpose of carrying out the contract.

III. The Contractor shall mean the individual, firm or company, whether incorporated or not, undertaking the works and shall include the legal personal representative of such individual or the persons composing such firm or company, or the successors of such firm or company and the permitted assignees of such individual, firm or company.

IV. The Chairman means the Chairman of Bhopal Development Authority.

V. The Chief Executive officer or C.E.O. means the Chief Executive Officer of Bhopal Development Authority.

VI. The Engineer-in-Charge or Executive Engineer means the Executive Engineer who shall supervise and be in-charge of the work -and who shall sign the contract on behalf of the Bhopal Development Authority i.e. Executive Engineer of Division No.- 07 of the Bhopal Development

Authority for time being, but for the electrical works, Executive Engineer-Electrical & Mechanical Division of the Bhopal Development Authority shall be the Engineer In charge of the work.

VII. Accepting-Authority shall mean the Bhopal Development Authority in this case.

VIII. The Chief Engineer, means the Chief Engineer of Bhopal Development Authority.

IX. The Superintending Engineer means the Superintending Engineer of that circle of Bhopal Development Authority under which the Engineer-in-Charge is being posted, but incase of electrical works, Superintending Engineer-Electrical & Mechanical circle of Bhopal Development Authority.

X. The Assistant Engineer means that Assistant Engineer of Bhopal Development Authority posted on site by the Engineer-in-Charge for supervision of work.

XI. The Sub-Engineer means that Sub-Engineer of Bhopal Development Authority posted on site by the Engineer-in-Charge for supervision of work.

XII. Department means the Bhopal Development Authority.

XIII. BDA or BVP means the Bhopal Development Authority.

XIV. Chief Accounts Officer means the Chief Accounts Officer of Bhopal Development Authority.

XV. Accounts Officer means the Account Officer of the Bhopal Development Authority.

Baaopala ivakasa P`aaiQakrNa

Page 16: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

XVI. Market Rate shall be the rate as decided by the Engineer-in-Charge on the basis of the cost of materials and labour at the site where the work is to be executed plus the fifteen percentage cost to cover, all overheads & profit.

XVII. Excepted Risk are risks due to riots (other than those on account of contractor's employees), war (whether declared or not), invasion, act of foreign enemies, hostilities, civil-war, rebellion revolution, insurrection, military or usurped power, any acts of Government, damages from aircraft, acts of God such as earthquake, lightening and unprecedented floods and other causes over which the contractor has no control and accepted as such by the Chairman or causes solely due to use or occupation by Department of the part of the works in respect of which a certificate of completion has been issued or a cause solely due to Department's faulty design of works.

XVIII. Schedule(s)/ S.O.R. referred to in these conditions shall mean the Schedule of Rates applicable on works with all its amendments up to the date of issue the tender notice as mentioned in Para -5 of Detailed Notice Inviting Tender.

XIX. District Specifications means the specification, followed by the State Government in the area where the work is to be executed.

XX. B.I.S. would refer to Bureau of Indian Standards.

XXI. C.P.W.D. means Central Public works Department of Government of India.

XXII. Government means the State Government of Madhya Pradesh or Central Government of India Local bodies/statutory Authority, whichever is applicable.

XXIII. Allot tees means any person or institution or agency to whom the built-up property or its part has been allotted by Bhopal Development Authority.

2 Scope and Performance:-

2.1 Where the context so requires, words imparting the singular only also include the plural and vice versa. Any reference to masculine gender shall whenever required include feminine gender and vice versa.

2.2 Headings and marginal notes of these General Conditions of Contract shall not be deemed to form part thereof or be taken into consideration in the interpretation or construction thereof or of the contract.

2.3 The contractor shall be furnished, free of cost one certified copy of the contract documents except standard specifications, Schedule of Rates and such other printed and published documents, together with all drawings as may be forming part of the tender papers. None of these documents shall be used for any purpose other than that of this contract.

3 Works to be carried out:-

The work to be carried out under the Contract shall, except as otherwise provided in these conditions, include all labour, materials, tools, plants, equipment and transport which may be required in preparation of and for and in the full and entire execution and completion of the work. The descriptions given in the Schedule of Rates shall unless otherwise stated, be held to include wastage on materials, carriage and cartage, carrying and return of empties, hoisting, setting, fitting and fixing in position and all other labours necessary in and for the full and entire execution and completion of the work as aforesaid in accordance with good practice and recognised principles.

4 Discrepancies and Adjustment of Errors:-

4.1 The several documents forming the Contract are to be taken as mutually explanatory of one another, detailed drawings being followed in preference to small scale drawing and figured dimensions in preference to scale and special conditions in preference to General Conditions.

4.2 In the case of any discrepancy between the descriptions for item of works as per Schedule of Rates applicable on work, the specifications and/or the drawings, the following order of preference shall be observed:-

I. Special-conditions & conditions mentioned in Notice Inviting Tenders.

II. Particular Specification and Condition if any.

Baaopala ivakasa P`aaiQakrNa

Page 17: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

III. Description of items of work as per Schedule of Rates applicable on work.

IV. Drawings

V. C.P.W.D. and M.O.S.T. Specifications.

VI. Indian Standard Specifications of Bureau of Indian Standards & I.R.C.

4.3 If there are varying or conflicting provisions made in anyone document forming part of the contract, the Superintending-Engineer shall be the deciding authority with regard to the intention of the document and his decision shall be final and binding on the contractor.

4.4 Any error in description, rate in Schedule of Rates or any omission there from shall not vitiate the Contract or release the Contractor from the execution of the whole or any part of the works comprised therein according to drawings and specifications or from any of his obligations under the contract.

4.5. Special Conditions as mentioned in Annexure-E are over & above to all the terms, conditions and clauses etc. of this agreement.

5. As soon as possible after the contract is conducted the contractor shall submit a "Time and Progress Chart" and get it approved by the Engineer-in-Charge. The chart shall be prepared in direct relation to the time stated in the contract documents for completion of items of the works. It shall indicates the forecast of the dates of commencement and completion of various trades of sections of the work and may be amended as necessary by mutual understanding between the contractor and Engineer-in-Charge within the limitations of time imposed in the contract documents.

6. Payment of Taxes:- In respect of this contract, all dues regarding any kind of tax levied by the local bodies, Government or private individuals will be payable by the contractor. The Engineer-in-Charge will grant a certificate for the quantities of various materials actually used on the work but will not entertain any claim on this account.

7. List of Near Relatives:- The contractor shall give a list of his all near relatives who are employees in Bhopal Development Authority as well as in Housing & Environment Department of Madhya Pradesh Government.

8. Work to be Executed Through Appropriate Agencies:- This tender for work includes in addition to building work all other works such as sanitary & water supply installations, drainage installation, Internal electrification works and path etc, the bidder must associate himself with such appropriate agencies which are eligible to execute these works and the internal electrical works shall be executed only through the agency who posses proper valid electrical license issued by the chief electrical advisor of Government of Madhya Pradesh. He should also submit a certified copy of the license.

9. Safety Code & Model Rules for labours:-

The Contractor is bound to follow the model rules as given in Annexure-"B" relating to layout, water supply and sanitation on labour camps. To follow the safety code as Annexure- 'A' in this tender form, is necessary for construction and safety.

10. Removal of Undesired Persons :-

The contractor shall on receipt of the requisition from the Engineer-in-Charge at once remove any person employed by him on the work, who is in the opinion of the Engineer-in-Charge is unsuitable or undesirable.

11 Best Quality of Construction Materials: Materials of best quality will be used as approved by the Engineer-in-Charge.

12 Work in The Vicinity:-

The Executive Engineer reserves the right to take up departmental work or to award work on contract in the vicinity without prejudice to the term of contract.

13. Amount Due From The Contractor:-

Any amount related to any work recoverable in favour of Bhopal Development Authority from the contractor or his related other concern on any account, may be recovered from the payable amount of this work as arrear of land revenue.

14. Tools & Plants:-

Baaopala ivakasa P`aaiQakrNa

Page 18: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

The contractor shall arrange at his cost all the tools & plants required for the proper execution of the work.

15. Rights to Increase or Decrease Work:-

The Engineer-in-Charge reserves the rights to increase or decrease work. The Engineer-in-Charge reserves the right to increase or decrease any item of work during the currency of work/currency of contract and the contractor will be bound to comply with the order of the Engineer-in-Charge without any claim for compensation.

16. Time-Schedule:-

The work shall be done by the contractor according to the time schedule fixed by The Engineer-in-Charge.

17. Transportation of Materials :-

The contractor shall make his own arrangements for transport of all materials.

18. Payment by Local Cheque:-

The payment will be made by the local cheque (crossed) of Schedule Bank payable only at Bhopal to the contractor and obtained by contractor himself or his authorised representative from the Account section of Bhopal Development Authority in person. Cheques cannot be delivered by post in any case.

19. Employment of Technical Employees :-

The contractor shall employ an independent engineer having at least qualification of B.E. or its equivalent during the execution of work. This technical employee of contractor should be available at site whenever required by the Engineer-in-Charge and other work in charge engineers to take necessary instructions.

If the contractor (or any partner incase of firm/company) who himself has such qualification of B.E. or its equivalent, then it will not be necessary for the said contractor to appoint such a technical employee separately, but the contractor shall designate and appoint a responsible agent to represent him and to be present at the work whenever the contractor is not in a position to be so present.

The contractor should give the name, address, age, qualification & experience in writing with necessary certificates to the Engineer-in-Charge before starting the work. Also the contractor should give a certificate to employ that technical employee exclusively is his employment.

The Retired Assistant Engineer who is holding a Diploma may be treated at par with an engineer having qualification of degree.

In case of the contractor fails to employ the technical employee as aforesaid, the deductions from his bills at rate of Rupees Fifty thousand per month will be made.

20. Regarding Electrical Works :-

For all contractual provisions in respect of electrical works shall be independently exercised by the Executive Engineer of Electrical & Mechanical Division, Bhopal Development Authority, Bhopal in place of Executive Engineer Division-07, Bhopal Development Authority.

21. Possession of Completed Houses:-

Under order of the competent authority of Bhopal Development Authority, the possession of the houses shall be given to the allot tees directly to his full satisfaction by the contractor.

22 Change in Item of Works:-

The Engineer-in-Charge has right to change any item(s) of work as desired by allot tees/Bhopal Vikas Pradhikaran, for which difference in cost shall be reimbursed as per contractual provisions.

Baaopala ivakasa P`aaiQakrNa

Page 19: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Bhopal Development Authority, Bhopal (M.P.)

CLAUSES OF CONTRACT

Security Deposit

Clause 1: The person/persons whose tender may be accepted (herein after called the contractors, which expression shall unless excluded by repugnant to the context, include his heirs executors, administrators, representatives and assigns) shall permit B.D.A. at the time of marking any payments to him for the value of work done under the contract to deduct the security deposit as under.

The Security Deposit to be taken for due performance of the contract under the terms and conditions printed on the tender form will be the earnest money plus a deduction of 5 percent from the payment made in the running bills, till the two together amount of 5% percent of the cost of work put to tender or 5 percent of the cost of the works executed when the same exceeds the cost of work put to tender.

All compensation or the other sums of money payable by the contractor under the terms of this contract may be deducted from his security deposit or from any sums which may be due or may become due to the contractor by B.V.P.

The above said amount of security deposit and Earnest money deposited with the tender will kept in the account of the Bhopal Development Authority and will be refundable according to the conditions mentioned in clause-19 of this contract and B.V.P. will not pay any interest or bank commission etc. on account of this amount.

COMPENSATION FOR DELAYClause -2 The time allowed for the carrying out the work, as entered in the tender from, shall be strictly observed by the contractor and shall be deemed to be essence of the contract and shall be reckoned form the fifteenth day after the date on which the order to commence the work, Issued to the contractor, for the work where completion is upto 6 months.

For works, for which the completion period is beyond six months - The period will be reckoned from the thirtieth day on which the order to commence the work is issued to the contractor. The work shall throughout the stipulated period of contract be proceeded with all due diligence, keeping in view that time is the essence of the contract. The contractor shall be bound in all cases, in which the time allowed for any work exceeds one month, to complete 1/8th of the whole work before 1/4th of the whole time allowed under the contract has elapsed 3/8th of the work before 1/2 of such time has elapsed and 3/4 th of the work before 3/4th of such time has elapsed In the event of the contractor failing to comply with the above conditions, the Executive Engineer shall levy on the contractor, as compensation an amount equal to:

(1) ½ percent of the value of work per week in respect of work costing upto Rs .2, 00,000.00(2) 3/8 percent of the value of work per week in respect of work costing above Rs. 2,00,000.00 and upto Rs.

5,00,000.00(3) 1/4th percent of the value of work per week in respect of work costing above Rs.5,00,000.00 and upto

Rs. 6,43,000.00(4) 1/8th percent of the value of work per week in respect of work costing above Rs.10,00,000.00 and upto

Rs.25,00,000.00(5) 1/16th percent of the value of work per week in respect of work costing Rs.25,00,000.00 and above.

The total amount of compensation under the provision of the clause shall be limited to 6 percent of the value of work. The decision of the Superintending Engineer shall be final. The delay in departmental assistance ingrained in the contract will be taken duly into account while recovering any compensation for the delay in the scales prescribed above Where the Engineer-in-charge decided that the contractor is liable to pay compensation for not giving proportionate progress under this clause and the compensation is recommended during the intermediate period such compensation shall be kept in deposit and shall be refunded if the contractor subsequently makes up the progress for the lost time, within the period of contract including extension granted, if any.

Action when the work is Left Incomplete, Abandoned orDelayed Beyond the Permitted Limit Allowed by the

Divisional officer

Clause 3: In any case in which under any clause or clauses of the contract shall have rendered himself liable to pay compensation amounting to the whole of the security deposit (whether paid in one sum or deducted by installments) or committed a breach of any of the rules contained in clause-24 or in the case of abandonment of the work, except due to permanent disability or death of the contractor or any other clause the Divisional Officer on behalf of the CHAIRMAN B.D.A. shall give a notice before 15 days for work costing upto Rs.10.00 lakhs and before 30 days for works costing above Rs. 10.00 lakhs and in the event of the contractor failing to comply with the directions contained in the said notice, shall have power to adopt any of the following courses, as he may deem best in the interests of the B.D.A.

Baaopala ivakasa P`aaiQakrNa

Page 20: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

(a) To rescind the contract (of which recession notice in writing to the contractor under the hand of the Executive Engineer shall be exclusive) and in which case the security deposit of the contractor shall stand forfeited and be absolutely at the disposal of B.D.A.

(b) To employ labour paid by the works Department and supply materials to carry out the work or any part of the work debiting the contractor with cost of the labour and the price of the materials (of the amount of which cost and price certificate of the Divisional Officer shall be final and conclusive against the contractor) and crediting him with value of the work done in all respect in the same manner and the same rates as if it had been carried out by the contract or the cost of the labour and the price of materials as certified by the Divisional Officer, which ever is less. The certificate of the divisional Officer as to the value of the. work done shall be final and conclusive against the contractor.

(c) To measure up the work of the contractor and to take such part there of shall as be unexecuted out of his hands, and to give it to another contractor to complete in which case any expenses which may be incurred in excess of the sum which would have been paid to the original contractor, if the whole work had been executed by him (of the amount of which excess certificate in writing of the Divisional Officer shall be final and conclusive) shall be borne and paid by the original contractor and may be deducted from any money due to him by B.D.A. under the contract or otherwise or from his security deposit or the processed of sale there for a sufficient part thereof.

In the event of any of the above courses being adopted by the Divisional Officer, the contractor shall have no claim to compensation for any loss sustained by him by reason of his having purchased or procured any materials or entered into any agreements or made any advances on account of or with a view to the execution of the work or the performance of the contract. And in case the contract shall be rescinded under the provision aforesaid the contractor shall not be entitled to recover or be paid any sum for any work thereto for actually performed under the contracts bill shall be finalised within three months Officer will have certified in writing the performance of such work and the value payable in respect thereof, and he shall only entitled to be paid the value so certified.

Whenever action is taken under clause 3(a) the contractor’s bill shall be finalised up within three months from the date of rescission both in the case of building works and road and bridge works.

Power to take Possession of or Require Removal of MaterialsTools and Plants or Sale of Contractor’s Plants etc.

Clause 4: In any case in which any of the powers, conferred upon the Divisional Officer by clause 3 hereof shall have become exercisable and the same shall not be exercised, the non-exercise thereof shall not constitute a waiver of any of the conditions hereof and such power shall not with standing be exercisable in the event of any further case of default by the contractor for which by any clause or clauses hereof he if declared liable to pay compensation amounting to the whole of his security deposit, and the liability of the contractor for the past and future compensation shall remain unaffected in the event of the Divisional Officer putting in force either of the power (a), (b) or (c) vested in him under the proceeding clause he may, if he so desires, take possession of all or any tools plant materials, and stores, in or upon the work, of the site thereof or belonging to the contractor or procured by him and intended to be used for the execution of the work or any part thereof, paying or allowing for the same in account at the contract rates or, in case of these not being applicable, at current market rates, to be certified by Divisional Officer, whose certificates thereof, shall be final, otherwise the Divisional Officer may by notice in writing to the contractor or his clerk of the works foreman or other authorised agent require him to remove such tools, plant, materials, or stores from the premises (within a time to be specified in such notice) and in the event of the contractor failing to comply with any such requisition, the Divisional Officer may remove them at the contractor’s expenses or sell them by auction or private sale on account of the contractor and at his risk in all respects and the certificate of the Divisional Officer as to the expense of any such removal, and the amount of the proceeds and expense of any such sale be final and conclusive against the con tractor.

Extension of Time

Clause 5: If the contractor shall desire an extension of time for completion of the work on the grounds of his having been unavoidable hindered in its execution or any other ground, he shall apply in writing to the Divisional Officer / Sub-Divisional Officer within 30 days of the date of hindrance on account of which he desires such extension as aforesaid and the E.E., with whom he has signed the Agreement shall if in his opinion, (which shall be final) reasonable grounds are shown there for, may authorise such extension for a period not exceeding 3 months. Any further extension shall be subjected to previous sanction of the SE. (grounds to be shown thereof) provided always where the Divisional Officer / Sub-Divisional Officer has recommended the grant of the extension / permitted the contractor to carry out the work reserving the right of the Department to impose the liquidated damages (as provided for under the agreement) the running bills shall continue to be paid to him

Provided further if any extension applied for is proposed to be refuse, the competent authority shall give the contractor an opportunity to be heard before taking final decision.

Final Certificate

Clause 6: On completion of the work, the contractor shall be furnished with a certificate by the Divisional Officer/Sub Divisional Officer (hereinafter called the Engineer in charge) of such completion but no such certificate shall be given, nor shall the work be considered to be complete until the contractor shall have removed from the premises on which the work shall be executed all scaffolding, surplus materials and rubbish and cleaned off the dirt

Baaopala ivakasa P`aaiQakrNa

Page 21: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

from all wood work door, windows, walls, floors, or other parts of any building or structure in, upon or about which the work is to be executed, or of which he may have had possession for the purpose of the execution thereof, not until the work shall have been measured by the Engineer in charge whose measurements shall be binding and conclusive against the contractor.; If the contractor shall fail to comply with the requirements of this clause as to removal of scaffolding surplus materials and rubbish and cleaning of dirt on or before the date fixed for the completion of the work, the Engineer in charge may, at the expense of the contractor Remove such scaffolding, surplus materials and rubbish and disposed of the same as he thinks fit and clean off such dirt as aforesaid and the contractor shall for which pay the amount of all expenses so incurred and shall have no claim in respect of any such scaffolding or surplus materials as aforesaid except for any sum actually realised by the sale thereof

Payments on Intermediate CertificateTo be Regarded as Advance

Clause 7: No payment shall ordinarily be made for works estimated to cost less than Rs. 1,000 (Rupees One Thousand) till after the whole of the works shall have been completed and a certificate of completion given, but if intermediate payment during the course of the execution of works is considered desirable in the interest of works the contractor may be paid at the discretion of the Engineer in charge. But in the case of works estimated to cost more than rupees one thousand the contractor shall on submitting the bills therefore be entitled to receive, a monthly payment proportionate to the part thereof then approved and passed by the Engineer in charge, whose certificate of such approval and passing of the sum so payable shall be final the conclusive against the contractor.; But all such intermediate payments shall be regarded as payment by way of advance contractor. But all such intermediate payments shall be regarded and taken away and reconstructed, or re erected or be considered as an admission of the due performance. of the contract, or any part thereof, in any respect or the accruing of any claim not shall it conclude, determine or effect in any way the powers of the Engineer in charge under these conditions or any of them as to the final settlement and adjustment of the accounts or otherwise or in any other way very or affect the contract. The final bill shall be submitted by the contractor within one month of the date of fixed for completion of the work, otherwise the Engineer in charge’s certificate of the measurement and of the total amount payable for the work accordingly shall be final and binding on all parties.

Bills to be submitted Monthly

Clause 8: A bill shall be submitted by the contractor each month on or before the date fixed by the Engineer in charge for all works executed in the previous month, and the Engineer in charge shall take or cause to be taken requisite measurement for the purpose of having the same verified and the claim as far as admissible adjusted if possible, before expiry of ten days from the presentation of the bill. If the contractor does not submit the bill within the time fixed as aforesaid the Engineer in charge may depute a subordinate to measure up the said work in the presence of the contractor whose counter signature on measurement list will be sufficient warrant, and the Engineer in charge may prepare a bill from such list which shall be binding on the contractor in all respects.

Bills to be on Printed Forms

Clause: 9 The contractor shall submit all bills on printed forms to be had on application at the office of the Engineer in charge and the charges in the bill shall always be entered at the rates specified in the tender or in the case of any extra work ordered in pursuance of these conditions and not mentioned or provided for in the tender at the rates hereinafter provided for such work.The deduction or addition as the case may be of the percentage will be calculated on the amount of the bill for the work done after deducting the cost of materials supplied departmentally at rates specified in the agreement.

Receipts to be Signed by Partners or Persons having Authority to do so.

Clause: 10 Receipts for payments made on account of a work when executed by a firm must also be signed by the several partners except where the contractors are described in their tender as a firm, in which case the receipts must be signed in the name of the firm by one of the partners or by some other person having authority to give effectual receipt for the firm.

Materials to be supplied by Bhopal Development Authority

Clause 11(A): No material will be supplied by the department.

Clause 11(B): Secured advance will be paid to the contractor. Cases in which a contractors, whose contract is for finished work, requires an advances on the security of non perishable materials brought to sites Divisional Officer may in such cases, sanction advances up to an amount not exceeding 75% of the value but 90% in the case of steel (as assessed by the Divisional Officer) provided that the rate allowed in no case is more than the rate payable for the finished item as stipulated in the contract of such materials, provided that they are of imperishable nature and that a formal agreement is drawn up with the contractor under which B. D. A. secures a lien on the materials and is safeguarded against losses due to the contractor postponing the execution of the work or to the shortage or to the shortage or misuse of the materials and against the expense entitled for their proper watch and safe custody.

Payment of such advances should be made only on the certificate of an officer not below the rank of Sub Divisional Officer that the quantities of materials upon which the advances are made have actually been brought to site, that

Baaopala ivakasa P`aaiQakrNa

Page 22: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

the contractor has not previously received any advance on the security and that al the materials are required by the contractor for use on items of work for which rates for finished work have been. agreed upon. Recoveries of advances so made should not be postponed until the whole of the work entrusted to the contractor is completed. They should be made from his bills, for work done as the materials are used the necessary deduction being made for balance amount whenever the item of work in which they are used are billed for. Before granting the above secured advance the contractor shall sign the prescribed indenture Bond in the prescribed form on a revenue stamp of Rs.50/-

Escalation in prices

Clause 11(C): The operative date hereinafter referred to means the date of receipt of tenders, if not otherwise mentioned in the contract. The operative period hereafter referred to, means the time ofCompletion of the work mentioned in clause-5 of the contract. For the purpose of calculating adjustment in the tender price by way of payment (s)/ refunds arising out of ‘variations the cost materials, P.O.L. and labour wages, the operative period shall end on the last date of the completion period as per clause 5 of the contract or with the last date of the valid time extension granted by the superintending Engineer only to cover the increase in the original scope of the work resulting in increase in the quantum of work over and the above the approved design as per terms of the contract and time extension granted, incase work is delayed by the department. This period of extension shall be considered in continuation of the original operative period as mentioned above.Provided that no claim for escalation on account of any reason whatsoever shall be entertained where the last date of total operative period is less than Eighteen months.In all cases, the decision of the Superintending Engineer of the B.D.A. with regard to the operative period shall be final and of binding on the original operative period as mentioned above. In after the operative date and during the total operative period there by any variation in the wholesale price index total commodities by groups and sub-groups source being the publication of the Economic Advisor to the Government of India Published in the Reserve Bank of India Bulletin, and Valid for the operative date.The calculation of payable or recoverable amount due to escalation in price for each component of Materials, High Speed Diesel and Labours according to the following formulae:-

Material

The price adjustment of materials (excluding cement, steels and bitumen) which are supplied by the Department) shall be calculated in the following manner subject, however, to the provisions of clause.

V1 = 0.75 x Po x K1 (M2-M1)/M1WhereVI = The amount of the price adjustment in INR.Po = Value of work in INR executed during the period under consideration.K1 = A factor representing all materials to be arranged and supplied for all works connected with the

completion for the work under the contract including all allied/ancillary/temporary work and over head etc. but excluding materials like cement, steel and bitumen.

M1 = Whole sale price index for all commodities on the operative dates as published in the Reserve Bank of India Bulletin by the Economic Advisor to the Government of India at Ministry of Industries & Commerce.

M2 = Whole sale price index for all commodities during the period under consideration as published in the Reserve Bank of India Bulletin by the Economic Advisor to the Government of India at Ministry of Industries & Commerce.

High Speed Diesel

For working out price adjustment on transportation case the representative item for reference shall be the cost of high-speed diesel oil only at nearest H.S.D. Pumps supply depot. If after the operative date and operative period there be any variation in the price H.S.D. such variation being duly notified by the Government of India, the price adjustments for transportation component of the work shall be calculated in the following manner

V2 = 0.75 x Po x K2 (D2-D1)/D1WhereV2 = The amount of the price adjustment in INR.Po = The Value of work in INR executed during the period under consideration.K2 = A factor representing the component of transportation cost of the entire complexion of the work.D2 = Price per litre of H.S.D. during the period under consideration.D1 = Price per litre of H.S.D. on the operative date

Labour

If after the operative date and during total operative period, there any variation in the consumer price index for industrial at the town nearest to site, of work, the source for such indices being publication of labours bulletin bureau, Government of India published in the reserve bank of india bulletin, the price adjustment on component representing labour cost including all type of benefits and amenities etc shall be calculated in the following manner

V3 = 0.75 x Po x K3 (L2-L1)/L1Where

Baaopala ivakasa P`aaiQakrNa

Page 23: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

V3 = The amount of the price adjustment in INR.Po = Value of work in INR executed during the period under considerationK3 = A factor representing labour cost including benefits, and amenities etc. to be incurred by the contractor

for their work including all allied/ancillary/temporary works and overheads etcL2 = Consumer price index for industrial workers during the period under consideration as published in the

Reserve Bank of India Bulletin by the Economic Advisor to the Government of India at Ministry of Industries & Commerce.

LI = Consumer price index for industrial workers on operative date as published in the Reserve Bank of India Bulletin by the Economic Advisor to the Government of India at Ministry of Industries & Commerce.

Note; Value of factors KI, K2 and K3 in clauses mentioned above are specified separately for different types of works as follows:

Particulars K1(Materials) K2 (P,O,L) K3 (Labour)Building works 0.25 0.075 0.35Road works (W.B.M.) 0.40 0.60Bridge works 0.20 0.05 0.30Road works (Bituminous) 0.15 0.05 0.15

The variation in cost of cement shall be calculated according to the consumed quantity in the work, on the basis of the rate issued either by DGS & D Rate or by local authorised Dealer/Depot as applicable on the operative date and during the period under consideration.

The variation in cost of steel (reinforced steel and structural steel) be calculated according to the consumed quantity in the work, on the basis of the rates issued either by Local/Nearest Depot of Steel Authority of India Limited or by Authorised Dealer.

Work to be executed in accordanceWith Specification Drawing Order etc.

Clause 12: The contractor shall execute the whole and every part of the work in the most substantial and workmen like manner, and both as regards materials and otherwise in every respect in strict accordance with the specification. The contractor shall also conform exactly full and faithfully ,to the designs, drawings and instruction in writing relating to the work signed by the Engineer-in-charge and lodged in his office and to which the contractor shall be entitled to have access at such office or on the site of the work for the purpose of inspection during office hours and the contractor shall, if he so requires, be entitled at his own expense to take or cause to be made copies of the specification and of all such designs, drawings and instruction aforesaid.

C.P.W.D. specification shall apply along with the various IS I code in the case of any variance, the following order of precedence shall prevail:-

1. Specifications as per NIT2. Specification as per SOR of the circle3 l.S.l. code/ICC specification4. Central PWD specification.5. Mode- of measurements for building shall be provided .in the S.O.R. applicable to the contract. Where such mode of measurement is not specified in, the S.O.R. it shall be done as per I.SI code of building measurement. However, if any mode of measurements is specifically mentioned in the NIT the same will get precedence over all the above.

Clause 12 A: In respect of all bearings, hinges or similar parts intended for use in the superstructure of any bridge,, the contractor shall, whenever required, in the course of manufacture arrange and afford all facilities for the purpose of inspection and test of all or any of the parts and the material used therein to any officer of the Directorate of the inspection of the Ministry of works, production and supply of the B.D.A., and such bearing hinges or similar parts the Directorate to inspection all inspection charges will be payable by the contractors.

(This clause may be struck off it the tender is not for bridgework.)

Additions Alteration in Specifications and Designs

Clause 13: The Engineer-in-charge shall have power to make. any alterations in omissions from additions to or substitutions for, the original specification drawings and designs and instructions that may appear to him to be necessary or advisable during the progress of the work and the contractor shall be bound to carry out the work in accordance with any instructions which may be given to him in writing signed by the Engineer -in-charge and such alterations omissions additions or substitutions shall not invalidate the contract and any altered, additional or substituted work which the contractor may be directed to do in the manner above specified as part of the work shall be carried out by the contractor on the same conditions in all respects on which he agreed to do the main work and at the same rates as are specified in the tender for the main work provided the total value of such increased or altered or substituted work does not exceed 25% of the amount put to tender, inclusive of contractor’s percentage If such value exceeds 25% It shall be open to the contractor either to determine the contract or apply for extension.

13.1 Extension of Time in Consequence of Alterations.

Baaopala ivakasa P`aaiQakrNa

Page 24: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

The time for the completion of the work shall be extended in the proportion that the altered, additional or substituted work bears to the original contract work and certificate of the Engineer-in-charge shall be conclusive as to such proportion.

13.2 Rates for works not in Schedule of Rates of the Circle.

And if the altered. additional or substituted work includes any class of work, for which no rate is specified in this contract, then such class of work shall be carried out at the rates entered in the applicable schedule of rates of the circle which was in force at the date of the acceptance of the contract and if such class of work is not entered in the said schedule of rates then the contractor shall within 7 days of the date of his receipt of the order to carry out the work inform the Engineer in charge of the rate which it is his intention to charge for such class of work, and if the Engineer in. Charge does not agree to this rate he shall by notice in writing be at liberty to cancel his order to carry out as he may consider advisable provided always that if the contractor shall commence Work or incur any expenditure in this regard there to before the rates shall have been determined as lastly herein before mentioned then and in such case he shall only be entitled to be paid in respect of the work carried out on expenditure incurred by him prior to the date of the determination of the rates as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge and approved by the CE (S.E. in case when C.E. is not posted) of the B. D. A. shall be final

If during the course of execution. Where it is found necessary that certain item/items of work. not provided for in the S.O.R. of the circle required to be carried out then the Engineer-in-charge shall identify such item/items including approximate quantity of the contract and ask the contractor to submit his rates in writing supported by the requisite data within a period of 7 days. The Engineer- in-charge shall obtain approval/modification of the proposed rate from the competent authority and communicate the same within a period of’ four weeks to the contractor, in case the contractor agrees to the above rate as fixed by the competent authority then they shall form part of supplementary schedule of the contract agreement. If the contractor does not agree to the rate of the competent authority then it shall be open for the Engineer-in-charge to get the work executed through any other agency. The contractor will not however be entitled to any compensation due to delay or hindrance or loss or profit accruing on account of this extra work be executed by alternative agency.If the contractor commences non-schedule work or incur expenditure in this regard there to before the rates shall have been determined by the competent authority, then he shall be entitled for payment for the work done as may be finally decided by the competent authority. In the event of dispute the decision of the Chief Engineer (S.E. incase when C.E. is not posted) shall be final.

No claim to payment or compensationfor alteration in or Restriction of work

Clause 14: If at any time after the execution of the contract documents the Engineer-in charge shall for any reason whatsoever require the whole or any part of the work as specified in the tender to be stopped for any period or shall not require the whole or any part of the work to be carried out at all or to be carried out by the contractor, he shall give notice in writing of the fact to contractor who shall there upon suspend or stop the work totally or partially as the case may be.

In any such case, except as provided hereunder, the contractor shall have no claim to any payment of compensation whatsoever on account of any profit of advantage which he might have derived from the execution of the work in full but which he did not so derive in consequence of the full amount of the work not having been carried out or on account of any loss that he may put to on account of materials purchased or agreed to be purchased, or for unemployment of labour recruited by him. He shall not also have any claim for compensation by reason of any alteration having been made in the original specifications drawings, designs and instructions, which may involve any curtailment to the work as originally contemplated where, however, materials have already been purchased or agreed to be purchased by the contractor before receipt by him of’ the said notice the contractor shall be paid for such material at the rates determined rates by the Engineer-in-charge provided they are not in excess of requirement and are of approved quality and/or shall be compensated for the loss any, that he may be put to in respect of materials agreed to be purchased by him the amount of such compensation to be determined by the Engineer-in-charge and approved by the CE (S.E. in case when C.E. is not posted) whose decision shall he final. If the contractor suffers any loss on account of his having to pay labour charges during the period during which the stoppage of work has been ordered under this clause the contractor shall on application be entitled to such compensation on account of labour charges as the Engineer-in-Charge, whose decision shall be final may consider reasonable. Provided that the contractor shall not be entitled to any compensation on account of labour charges, if in the opinion of the Engineer-in-Charge, the contractor else could have employed the labour where for the whole or part of the period, during which the stoppage of the work has been ordered as aforesaid.

If the total duration of suspension of the work is more than six months, then this suspension of the work will be considered as permanent stoppage of the work, and the contractor determine the contract, if he so desires.

Time limits for unforeseen claims

Clause 15: Under no circumstances whatever shall the contractor be entitled to any compensation from B.D.A. on any account unless the contractor shall have submitted a claim in writing to the engineer-in-charge within one month of the cause of such claim occurring.

Action and Compensation Payable in Case of Bad work

Baaopala ivakasa P`aaiQakrNa

Page 25: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Clause 16: If at any time before the security deposit is refunded to the contractor, it shall appear to the Engineer-in-charge or his subordinate in-charge of the work, that any work has been executed with unsound, imperfect or unskillful workmanship or with materials of inferior quality, or that any materials or articles provided by him for the execution of the work are unsound, or of a quality, inferior to the contracted for, or are otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the contractor and then not withstanding the fact that the work, materials or articles complained of may have been inadvertently passed certified and paid for the contractor shall be bound forthwith to rectify, or remove and reconstruct the work so specified in whole or in part, as the case may required, or if so required, shall remove the materials or articles so specified and provide other proper and suitable materials or articles at his own proper charge and cost, and in the event of his failing to do so within a period to be specified by the Engineer-in-charge in the written intimation aforesaid, the contractor shall be liable to pay compensation at the rate of one percent, on the amount of contract put to Tender every day not exceeding ten days, during which the failure so continues, and in the case of any such failure the Engineer-in- charge may rectify or remove and re-execute the work or remove and replace the materials or articles complained of as the case may be at the risk and expenses in all respects of the contractor. Should the Engineer-in-charge consider that any such inferior work or material as described above may be accepted or made use of it shall be within his discretion to accept the same at such reduced rates, as he may fix therefore.

Work to be Open for Inspection — Contractoror Responsible Agent to be present

Clause 17: All work under or in course of execution or executed in pursuance of the contract shall at all time be open to the inspection and supervision of the Engineer-in-charge and his subordinates and the shall at all times during the usual working hours and at all other times, at which reasonable notice of the intention of the Engineer-in-charge or his subordinate to visit the work shall have been given to the contractor, either himself be present to receive order and instructions or have a responsible agent duly accredited in writing present for that purpose orders given to the contractor’s agent shall be considered to have the same force as if they had been, given to the contractor himself.

Notice to be given before work is covered up

Clause 18: The contractor shall give not less than five days notice in writing to the Engineer-in-charge or his subordinate in charge of the work before covering up or otherwise placing beyond the reach of measurement any work in order that the same may be measured, and correct dimensions thereof be taken before the same is so covered up or placed beyond the reach of measurement, any work (without the consent in writing of the Engineer-in-charge or his subordinate in charge of the work and) if any work, shall be covered up or placed beyond the reach of measurement without such notice having been given or consent obtained, the same shall be uncovered at the contractor’s expenses or in default thereof, no payment or allowance shall be made for such work or the materials with which the same was executed.

Contractor Liable for Damage Done and for imperfectionsfor Twelve Months After Certificate

Clause 19: If the contractor or his work people or servants shall break, deface injure or destroy any part of building in which they may be working or any building, road, curbs, fences, enclosures, water pipes cables, drains, electric or telephone posts or wires tress, grass or grassland or cultivated ground continuous to the premises on which the work or any part of it is being executed, or if any damage shall happen to the work. while in progress, from any cause whatever, or any imperfections become apparent in it within three months (six months in the case of a road work) after a certificate final or otherwise or its completion shall have been given by the Engineer-in-charge as aforesaid, the contractor shall make good the same at his own expense or in default, the Engineer-in- charge may cause the same to be made good by other workman, and deduct the expense (of which certificate of the Engineer-in-charge shall be final) from any sums that maybe then or at any time there after, may be come due to the contractor or from his security deposits, or the proceeds, of sale thereof, or of a sufficient portion thereof.The contractor hereby also covenants that it shall be his responsibility to see that the buildings constructed under his contract do/does not leak during the period of two consecutive rainy seasons after its (their) completion and if any defects are pointed out to him by the Engineer-in-charge during the said period, the same shall be removed by him at his own expenses or in default the Engineer-in-charge may get them removed and deduct the expenses thereof from any sum that may he then due or may become due to the contractor or from the security deposit of the contractor on amount equal to 20% cost of the roof shall not withstanding anything contained in this clause he retained, till the roofs are tested during two consecutive rainy seasons as aforesaid and the defects are frilly removed if any amount is still remains due to this account after making deduction as aforesaid the same may be recovered from him as an arrears of land revenue/cash security. The Security deposit of the contractor to the extent of 50% shall be refunded on his getting the completion certificate, provided that all the. recoveries outstanding against him are realised 25% of the amount shall be refunded on maintenance period being over even if the final bill is not passed and balance 25 % shall be refunded after the final bill is passed.

Contractor to Supply Plant, Ladders, Scaffolding etc.

Clause 20: The contractor shall supply at his own cost, materials (except such special materials if any as may in accordance with the contract be supplied from the Engineer-in-charge’s store) plant, tools, appliances implement, ladders, cordage, tackle, scaffolding and temporary works, requisite for the proper execution of the work whether

Baaopala ivakasa P`aaiQakrNa

Page 26: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

original, altered or substituted and whether included in the specifications or other documents forming part of the contract or referred to in this conditions or not, or which may be necessary for the purpose of satisfying or complying with the requirements of the Engineer-in-charge as to any matter as to which under these conditions he is entitled to be satisfied, or which he is entitled to require together with carriage therefore to and from the work. The contractor shall also supply without charge the requisite number of persons with the means and materials necessary for the purpose of setting Out works, and counting weighting and assisting in the measurement or examination at any time and from time to time of the work or materials, failing his so doing the same may be provided by the Engineer-in-charge at the and expenses may be deducted from money due of the contractor under the contract or from his security deposit or the proceeds of sale. thereof or of a sufficient portion, thereof.

Contractor is liable for damages arising from non-provision of lights fencing etc. The contractor shall also provide at on his cost, except when the contract specifically provides otherwise and except for payments due under clause all necessary fencing and lights required to protect the public from accident, and shall be bound to bear the expenses of defense of every suit, action or other proceedings at law and may be brought by any person for injury sustained owning to neglect of the above precautions and to pay any damage and costs which may be awarded in any such suit action or proceedings to any such person or which may with the consent of the contractor be paid to compromise any claim by any such person.

Compensation under Section 12 Sub Section (1)of the Workman’s compensation Act. 1923

Clause 21: ln every case in which by virtue of the provision of Section 12, sub section (1) of the workman’s compensation Act I 923 B. V. P. is obliged to pay compensation to a workman employed by the contractor in execution of the works, and without prejudice to the right of B. D. A. Under section (1) Sub section (2) of the said Act. B. D. A. shall be at liberty to recover the amount or any part thereof by deducting it from the security deposit or from any sum due by B. D. A. to the contractor whether under this contract or otherwise B. D. A. may not. be bound to contest any claim made against them under section 12 sub section (1) of the said act except on the written request of the contractor and upon his giving to B. D. A. full security for all cases for which B. D. A. might become liable in consequence of contesting such claim.

Labour

Clause 22: The contractor should get himself registered under contract labour regulations and abolition Act, 1970 including its amendments after getting a certificate from the principal employer. who will be the Engineer-in-charge

Clause 23: Labour below the age of 12 years no labour below the age of 12 years shall be employed on the workFair wage

Clause 24: The contractor shall pay not less than fair wage to labours engaged by him on the work.

Explanation:(a) "Fair wage" means wage whether for time or piece work notified at the time of inviting tenders for the

work and where such wages have not been so notified, the wages prescribed by the works department for the division in which the work is done.

(b) The contractor shall not withstanding the provisions of any contract to the contrary, cause to be paid a fair wage to labourers indirectly engaged on the work, including any labour engaged by his sub contractors in connection with the said works as if the laboures had been immediately employed by him.

(c) In respect of all labour directly or indirectly employed on the works for the performance of the contractors part of this agreement. the contractor shall comply with or cause to be complied with the labour Act inforce.

(d) The Executive Engineer/SDO shall have the right to deduct, from the moneys due to the contractor any sum required or estimated to be required for making good the loss suffered by a worker, or workers by reason of non fulfillment of the conditions of the contract for the benefit of the workers non payment of wages of deductions made from his or their wages which are not justified by the terms of the contract or non observance of the regulations.

(e) The contractor shall be primarily liable for all payments to be made under and for the observance of the regulation aforesaid without prejudice to his right to claim indemnity from his sub contractors.

(f) The regulations shall be deemed to a part of this contract and any beach there of shall be deemed to be a breach of this contract.

Work not to be sublet

Clause 25: the contract may be rescinded and security deposit forfeited for subletting birding or if contractor become insolvent: The contract shall not be assigned or sublet without the written approval of the Divisional Officer and if the contractor shall assign or sublet his contract or attempt so to do or become insolvent, or commence any insolvency proceedings or make any composition with his creditor, or attempt so to do, or if any bribe gratuity, gift loan prerequisite, reward or advantage pecuniary or otherwise, shall either directly or indirectly be given promised or offered by the contractor or any of his servants or agents to any public officer or person in the employment of B.D.A.in any way relating to his office or employment, or if any such officer or person shall become in any way

Baaopala ivakasa P`aaiQakrNa

Page 27: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

directly indirectly interested in the contract the Divisional Officer may there upon by notice in writing rescind the contract and the security deposit of the contractor shall thereupon stand forfeited and be absolutely at the disposal of B.D.A. and the same consequences shall ensure as if the contract had been rescinded under clause 3. Thereof and in addition the contractors shall not be entitled to recover or be paid for any work there fore performed under the contract.

If the contractor gets item/items of work executed on a task mate basis with or without materials this shall not amount to subletting of the contract.

Sum payable by way of compensation to be considered as reasonable compensation without reference to actual loss.

Clause 26: All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the use of Government without reference to the actual loss or damage sustained, and whether or not any damage shall have been sustained.

Changes in the Constitution of Firm

Clause 27: In the case of tender by partners any change in the constitution of the firm shall be forthwith notified by the contractor to the Engineer-in-charge for his information.

Work to be under the Direction ofExecutive Engineer/Superintending Engineer

Clause 28: All works to be executed under the contract shall be executed under the direction and subject to the approval in all respect of the Executive Engineer/SE of the Division / Circle for the time being who shall be entitle to direct at what point or points and in what manner they are to be commended and from time to time carried on.

Arbitration Clause

Clause 29: Except as otherwise provided in this Contract all question and dispute relating to the meaning of the specification, designs drawing and instructions herein before mentioned and as to thing whatsoever in any way arising out of or relating to the contract, designs, drawings, specifications, estimates, concerning the works, or the execution or failure to executive the same, whether arising during the progress of the work or after the completion or abandonment there of shall be refereed to the Superintending Engineer in writing. for the decision, within a period of 30 days of such occurrence. Thereupon the Superintending Engineer shall give his written instructions and/or decisions within a period of 60 days of such request. This period can be extended by mutual consent of the partiesUpon receipt of written instructions or decisions, the parties shall promptly proceed without delay to comply such instructions or decisions. If the -Superintending. Engineer fails to give his instructions or decisions in writing within a period of 60 days or mutually. Agreed time after being requested of if the parties are aggrieved against the decision of the SE the parties may within 30 days prefer an appeal to the Chairman B.D.A./Chief Engineer who shall afford an-opportunity to the parties of being heard and to offer evidence in support of his appeal. The Chairman/Chief Engineer will give his decision within 90days. If any party is not satisfied with the decisions of the Chairman/Chief Engineer he can refer such disputes for arbitration by an Arbitration Board to be constituted by the State Government which shall consist of three members of whom one shall be chosen-from among the officers belonging to the Department not below the rank of S.E. , one Retired Chief Engineer of any Technical Department, and one serving officer not below the rank of SE, belonging another Technical Department.The following are also the terms of this contract namely:a) No person other than the aforesaid Arbitration Board constituted by the Government (to handle cases of

all Technical Departments) Shall act as Arbitrator and if for any reason that is not possible the matter shall not be referred to arbitration at all

b) The State Government may at any time effect any change in the personnel of the Board and the new member or members appointed to the arbitration board shall be entitled to proceed with the reference from the stage at which it was left by his or there predecessors.

c) The party invoking arbitration shall specify the dispute or disputes to be referred to Arbitration under this clause together with the amount or amounts claimed in respect of each such dispute(s).

d) Where the party invoking arbitration is the contractor, no reference for arbitration shall be maintainable, unless the contractor furnishes a security deposit of some determined according to the table given below, and the sum so deposited shall on the determination of Arbitration proceedings be adjusted against the cost if any awarded by the board against the party and the balance remaining after such adjustment or in the absence of the such cost being awarded, the whole of he sum shall be refunded to him within one month from the date of the award.

Amount of Claim Rate of Security DepositsFor Claims below Rs. 10,000 5% of the amount claimedFor claims of Rs. 10,000 & above but below Rs 100000.00

3% of the amount claimed subject to a minimum of Rs. 500

For claims of Rs. 1,00,000 & above 2% of the amount claimed subject to a Minimum of

Baaopala ivakasa P`aaiQakrNa

Page 28: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Rs.3,000

e) If the contractor does not make any demand for arbitration in respect of any claim(s) in writing within 90 days on receiving intimation from the Executive Engineer that the final bill is ready for payment the claim of the contractor shall be deemed to have been waived and absolutely barred and the B. D. A. shall be discharged or released of all liabilities under the contract in respect of such claims.

f) The arbitration board may from time to time, with the consent of the parties extend the time for making the award.

g) A reference to the Arbitration Board shall be no ground for not continuing the work on the part of the contractor and payment as per terms and conditions of the agreement shall be continued by the department.

h) Except where otherwise provided in this contract, the provisions of the Arbitration Act 1940 and the rules made there under the time being inforce, shall apply to the arbitration proceedings under this clause.

Lump Sums in Estimate

Clause 30: When the estimate on which a tender is made includes lump sums in respect of parts of the work, the contractor shall be entitled to payment in respect of the items of work involved or the part of the work in question at the same rates as are payable under this contract for such items, or if the part of the work in question is not, in the opinion of the Engineer-in-charge. May at his description pay the lump sum amount entered in the estimate and the certificate in Writing of the Engineer-in-charge shall be final and conclusive against the contractor, with regard to any sum or sums payable to him under the provision of this clause.

Action where no specification

Clause 31: in the case of any class of work for which there is no such specification as is mentioned in rule such work shall be carried out in accordance with the specification approved by the Superintending Engineer/Chief Engineer, for application to works in the district, and in the event of there being no such specification, then in such case the work shall be carried in all respect in accordance with the instructions and requirements of the Engineer-in-charge.

Contractor’s Percentage whether applied toNet or Gross amount of Bills

Clause 32: The percentage referred to at para 7 of the tender will be deducted from/added to the gross amount of the bill for work done/after deducting the cost of materials supplied by the Department

Claim for quantities Entered in the Tender or Estimate

Clause 33: Quantities shown in the tender are approximate and no claim shall be entertained for quantities of work executed being either more or less than those entered in the tender or estimate

Claim for Compensation for Delay in Starting the Work

Clause 34: No compensation shall be allowed for any delay caused in the starting of the work on account of acquisition of land, or in the case of clearance works, on account of any delay in according sanction to estimates.

Employment of Scarcity Labour

Clause 35: If B.D.A. declare a state of scarcity or famine to exist in any village situated within 16 km. of the work the contractor shall employ upon such part of the work as are suitable for unskilled labour, any person certified to him by the Executive Engineer or by any person to whom the Executive Engineer may have delegated this duty in writing to be in need of relief and shall be bound to pay such persons wages not below the minimum which government may have fixed in this behalf any dispute which may arise in connection with the implementation of this clause shall be decided by the Executive Engineer whose decision shall be final and binding on the contractor.

Refund of Quarry Fees and Royalties

Clause 36: All quarry fees, royalties, octroi duties and ground rent for stacking materials, if any, should be paid by the contractor, who will however, be entitled to a refund, of such of the charges as are permissible under the rules. after obtaining a certificate from the Engineer-in-Charge, that the materials were required for use on B.D.A. work. In the case of quarries, where extraction of minor minerals is done by the contractor, after taking permit from the collector, the contractor will get refund of royalty charges, after the work is completed and after obtaining a certificate from the Executive Engineer that the materials extracted by the contractor have been used on B.D.A. work. In the case of quarries which have been leased Out (Trade quarries) the contractor should make all payments of royalty charges at Government approved rates. These royalty charges will also be refunded to the contractor on production of actual cash vouchers on the certificate obtained from the Executive Engineer that these materials obtained by the contractor from the leased quarries have been used on B.D.A. work only.

Baaopala ivakasa P`aaiQakrNa

Page 29: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

In the first instance royalty charges will be refunded by the Collector and in the Second instance royalty charges will be refunded by the Executive Engineer. In the case of any dispute payment of royalty charges, decision of the Superintending Engineer will be final.

Technical Examination

Clause 37: The B.D.A. shall have the right. to cause Audit & Technical Examination of the works and the final bills of the contractor including all supporting vouchers abstracts, etc to be made as per payments of the final bill and if as a result of such audit and technical examination the sum is found to have been overpaid in respect of any work done by the contractor under the contract or any work claimed by him to have been done under contract and found not to have been executed, the contractor shall be liable to refund the amount of over payment and it shall be lawful for the B.D.A. to recover the same from the security deposit of the contractor or from any dues payable to the contractor from the B.D.A. account. If it is found that the contractor was paid lesser than what was due to him under the contract in respect of any work executed by him under it, the amount of such under payment shall be duly paid by the B.D.A.to the contractor.

In the case of any audit examination and recovery consequent on the same the contractor shall be given an opportunity to explain his case and the decision of the Superintending Engineer shall be final.

In the case of Technical Audit, consequent on which there is a recovery from the contractor no recovery should be made without orders of the Chief Engineer, (S.E. when C.E. is not posted) whose decision shall be final. All action under this clause should be initiated and intimated to the contractor within a period of twelve months from the date of completion.

Death or Permanent Invalidity of Contractor

Clause 38: If the contractor is an individual or a proprietary concern, Partnership concern, dies during the currency of the contract or becomes permanently incapacitated where the surviving partners are only minors the contract shall be closed without levying any damages/compensation as provided for in clause 3 of the contract agreement.

However if the competent authority is satisfied about the competence of the survivors then the competent authority shall enter into a fresh agreement for the remaining work strictly on the same terms and conditions under which the contract was awarded.

Penalty for Breach of Contract

Clause 39: On the breach of any term or condition of this contract by the contractor the said CHAIRMAN B.D.A. shall be entitled to forfeit the security deposit or the balance thereof that may at that time be remaining and to realise and retain the same as damages and compensation for the said breach but without prejudice to the right of the CHAIRMAN B.D.A.to recover further sums as damages from any sums due or which may become due to the contractor by B.D.A. or otherwise however.

Note: The person or firm submitting the tender should see that the rates in the schedule showing materials to be supplied by the department are filled up by the Engineer-in-charge on the issue of the form prior to the submission of the tender.

Unfiltered Water Supply

Clause-40 (A)

The contractor(s) shall make his/their own arrangements for water required for the work and nothing extra will be paid for the same. This will be subject to the following conditions.

i. That the water used by the contractor(s) shall be fit for construction purposes to the satisfaction of the Engineer-in-Charge.

ii. The Engineer-in-Charge shall make alternative arrangements for supply of water at the risk and cost of contractor(s) if the arrangements made by the contractor(.s) for procurement of water are in the opinion of the Engineer-in-Charge, unsatisfactory.

Alternate Water Arrangements

Clause-40 (B)

i. Where there is no piped water supply arrangement and the water is taken by the contractor from the wells or hand pump constructed by the Government no charge shall be recovered from the contractor on that account. The contractor shall, however, draw water at such hours of the day that it does not interfere with the normal use for· which the hand pumps and wells are intended. He will

Baaopala ivakasa P`aaiQakrNa

Page 30: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

also be responsible for all damage and abnormal repairs arising out of his use, the cost of which shall be recoverable from him. The Engineer-in-Charge shall be the final authority to determine the cost recoverable from the contractor on this account and his decision shall be binding on the contractor.

ii. The contractor shall be allowed to construct temporary wells in B.D.A. land for taking water for construction purposes only after he has got permission of the Engineer-in-Charge in writing. No charges shall be recovered from the contractor on this account, but the contractor shall be required to provide necessary safety arrangements to avoid any accidents or damage to adjacent building, roads and service lines. He shall be responsible for any accidents or damage caused due to construction and subsequent maintenance of the wells and shall restore the ground to its original condition after the wells are dismantled on completion of the work or leave it IS for the use of B. D .A. if desired by the Engineer-in-Charge.

With-holding and lien in Respect of Sums due From Contractor

Clause-41(A)

Whenever any claim or claims for payment of a sum of money arises out of or under the contract or against the contractor, the Engineer-in-Charge or the BDA shall be entitled to withhold and also have a lien to retain such sum or sums in whole or in part from the security, if any deposited by the contractor and for the purpose aforesaid, the Engineer-in-Charge of the BDA shall be entitled to withhold the security deposit, if any, furnished as the case may be and also have a lien over the same pending finalization or adjudication of any such claim. In the event of the security being insufficient to cover the claimed amount or amounts of if no security has been taken from the contractor, the Engineer-in-Charge of the BDA shall be entitled to withhold and have a lien to retain to the extent of such claimed amount or amounts referred to above, from any sum or sums found payable or which may at any time thereafter become payable to the contractor under the same contract or any other contract with the Engineer-in-Charge of the BDA or any contracting person through the Engineer-in-Charge pending finalization of adjudication of any such claim.

It is an agreed term of the contract that the sum of money or moneys so withheld or retained under the lien referred to above by the Engineer-in Charge or BDA. will be kept withheld or retained as such by the Engineer-in Charge or B.D.A. till the claim arising out of or under the contract is determined by the arbitrator (if the contract is governed by the arbitration clause) by the competent court, as the case may be and that the contractor will have no claim for interest or damages whatsoever on any account in respect of such withholding or retention under the lien referred to above and duly notified as such to the contractor. For the purpose of this clause, where the contractor is a partnership firm or a limited company, the Engineer-in-Charge or the BDA shall be entitled to withhold and also have a lien to retain towards such claimed amount or amounts in whole or in part from any sum found payable to any partner/limited company as the case may be, whether in his individual capacity or otherwise.

Lien in Respect of Claims in Other Contracts

Clause-41 (B)

Any sum of money due and payable to the contractor (including the security deposit returnable to him) under the contract may be with-held or retained by way of lien by the Engineer-in-Charge of the B.D.A. or any other contracting person or persons through Engineer-in-Charge against any claim of the Engineer-in-Charge or B.D.A. or such other person or persons in respect of payment of a sum of money arising out of or under any other contract made by the contractor with the Engineer-in-Charge or the B.D.A. or with such other person or persons.

It is as agreed term of the contract that the sum of money so withheld or retained under this clause by the Engineer-in-Charge or the B.D.A. will be kept withheld or retained as such by the Engineer-in-Charge or the B.D.A. or till his claim arising out of the same contract or any other contract is either mutually settled or determined by the arbitration clause or by the competent court, as the case may be and that the contractor shall have no claim for interest or damages whatsoever on this account or on any other ground in respect of any sum of money withheld or retained under this clause and duly notified as such to the contractor.

Compensation during Warlike Situations

Clause- 42

The work (Whether fully constructed or not) and all materials, machines, tools and plants, scaffolding, temporary buildings and other things connected therewith shall be at the risk of the contractor until the work has been delivered to the Engineer-in-Charge and a certificate from him to that effect obtained. In the event of the work or any materials properly brought to the site for incorporation in the work being

Baaopala ivakasa P`aaiQakrNa

Page 31: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

damaged or destroyed in consequence of hostilities or warlike operation, the contractor shall when ordered (in writing) by the Engineer-in-Charge to remove any debris from the site, collect and properly stack or remove in store all serviceable materials salvaged from the damaged work and shall be paid at the contract rates in accordance with the provision of this agreement for the work of clearing the site of debris, stacking removal of serviceable material and for reconstruction of all works ordered by the Engineer-in-Charge, such payments being in addition to compensation up to the value of the work originally executed before being damaged or destroyed and not paid for. In case of works damaged or destroyed but not already measured and paid for, the compensation shall be assessed by the Executive Engineer up to Rs. 5,000/- and by the Superintending Engineer concerned for a higher amount. The contractor shall be paid for the damages/destruction suffered and for the restoring the material at the rate based on analysis of rates tendered for in accordance with the provision of the contract. The certificate of the Engineer in-Charge regarding the quality and quantity of materials and the purpose for which they were collected shall be final and binding on all parties to this contract.

Provided always that no compensation shall be payable for any loss in consequence of hostilities or warlike operations (a) unless the contractor had taken all such precautions against air raid as are deemed necessary by the Air Raid Protection (A.R.P.) Officers or the Engineer-in-Charge (b) for any material etc. not on the site of the work or for any tools, plant, machinery, scaffolding, temporary building and other things not intended for the work.

In the event of the contractor having to carry out reconstruction as aforesaid, he shall be allowed such extension of time for its completion as is considered reasonable by the Executive-Engineer.

Executive EngineerDivision No: - 07,

Bhopal Development Authority, Bhopal

Notice to the Contractor to Start Work

Your contract for the work for Construction Of College Building ( Including Internal Electrification Work) & External Development Work (Boundary Wall, Approach Road, Septic Tank, Sewer Line and Water Supply Line etc.) at Govt. Polytechnic Premises, Raisen has been accepted by me / Superintending Engineer / B.D.A. on behalf of the CHAIRMAN B.D.A. on the........................... day of ..................2011........... and you are hereby ordered to commence the work.

Executive EngineerDivision No: - 07,

Bhopal Development Authority, Bhopal

The notice to the contractor(s) to start work from the..................... day of............ 2011................................. was issued vide this office memorandum No............... dated the...................2011................

Executive EngineerDivision No: - 07,

Bhopal Development Authority, Bhopal

Baaopala ivakasa P`aaiQakrNa

Page 32: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE "A"

Model Rules Relating to Labour, Water Supply and Sanitation in labour Camps

NOTE:These model rules are intended primarily for labour camps which are not of a permanent nature. They lay down the minimum desirable standard which should be adhered to standards in permanent or semi permanent labour camps should not obviously be lower than those for temporary camps.

1. LOCATION - The camp should be located in elevated and well drained ground in the locality.

2. Labour huts to be constructed for one family of 5 persons each. The lay out to be shown in the prescribed sketch.

3. HUTTING - The hut to be built of local Materials. Each hut should provide at least 20 Sq. meters of living space.

4. SANITARY FACILITIES - Latrines and urinals shall be provided at least 15 meters away from the nearest quarters separately for men and women and specially so marked on the following scale.

5. LATRINE - Pit provided at the rate of 10 users or two families per seat, separate urinals as required as the privy can also be used for this purpose.

6. DRINKING WATER - Adequate arrangement shall be made for the supply of drinking water. If practicable filtered and chlorinated supplies shall be arranged, when supplies are from intermittent source overhead storage tank shall be provided with a capacity of 5 liters a person per day where the supply is to be made from well it shall confirm to the sanitary standard laid down in the Rural Sanitation Committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible hand pump should be installed for drawing the water from well. The well should be effectively disinfected once every month and the water should be got tested at the public Health Institution between each work of disinfecting.

7. BATHING AND WASHING - Separate bathing and washing place shall be provided for men and women for every 25 persons in the camp. There shall be one gap and space of 2 Sq. meters for washing and bathing. Proper drainage for the waste water should be provided.

8. WASTE DISPOSAL - Dustbin shall be provided at suitable places in camp and the residents shall be directed to throw all rubbish into those dustbins. The Dustbins shall be provided with cover. The contents shall be removed every day the disposed off by trenching.

9. MEDICAL FACILITIES

(A) Every camp where 1000 or more persons reside shall be provided with whole time doctor and dispensary. If there are women in the camp a whole time nurse shall be employed.

(B) Every camp where less than 1000, but more than 250 persons reside shall be provided with a dispensary and a part time nurse/midwife shall also be employed.

(C) If there are less than 250 persons in any camp a first aid kit shall be maintained in charge of whole time persons, trained in first aid.

All the medical facilities mentioned above shall be for all residents in camp including a dependent of the worker, if any, free of cost.

SANITARY STAFF - For each labour camp there should be qualified sanitary inspector and sweeper should be provided in the following scales.

(1) For camps with strength over 200 but not exceeding 500 persons one sweeper for every 75 persons above the first 200 for which 3 sweepers shall be provided.

(2) For Camps with strength over 500 persons one sweeper for every 100 persons above first 500 for which 6 sweepers should be provided.

(3) For a camp with a strength of 200 persons, four sweepers.

Baaopala ivakasa P`aaiQakrNa

Page 33: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE - "B"

CONTRACTORS LABOUR REGULATION

The Contractor shall not pay less than fair wage to labourers engaged by him in the work.

EXPLANATION:

(a) "Fair wages" means wage whether for time or piece work as notified at the time of inviting tender, for works and where such wage have not been so notified at the time wages prescribed by the labour department for the division in which the work is done.

(b) The contractor shall not with standing the provision of any contract to the contrary, cause to be paid a fair wage to labourers indirectly engaged on the work including any labour engaged by his subcontractors in connection with the said work as if labourers has been immediately employed by him.

(c) In respect of all labour directly or indirectly employed on the works or the performance of his contract by the contractor shall comply with or cause to be complied with the Labour Act in-force.

(d) The executive Engineer/Sub Divisional Officer shall have the right to deduct from the money due to the contractor any sum required or estimated to required for making good the loss suffered by a worker or workers by reason of non-fulfillment of the conditions of the contract for the benefit of the workers, non-payment of wages or of deductions made from his or their wages which are not justified by their terms of the contract or non-observance or regulations.

(e) The Contractor shall be primarily liable for all payments to be made under and for the observance of the regulations aforesaid without prejudice to his right to claim indemnity from his sub-contract.

(f) The regulations aforesaid shall be deemed to be a part of this contract any breach shall deemed to be a breach of this contract.

(g) The contractor shall obtain a valid license under the Contract (Regulation and Abolition) Act. 1970 and rules made there under by competent authority time to time before commencement or work, and continue to have a valid license unit the completion of the works.

Any failure to fulfill this requirement shall attract the penal provisions of this contract arising out of the resulted non-execution of work assigned to the Contractor.

Baaopala ivakasa P`aaiQakrNa

Page 34: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Annexure "C"

TECHNICAL SPECIFICATIONS

1.1 CIVIL WORKS:-

1.1.1 Works shall be done as per latest C.P.W.D. specifications.

1.1.2 In the event of any discrepancy between the nomenclature of the item of work as per applicable Schedule of Rates and the attached specifications or C.P.W.D. specifications, the nomenclature of the item of work as per schedule of Rates applicable with the agreement shall prevail.

1.1.3 In the event of any discrepancy between the specifications as mentioned under particular specifications and as given in the C.P.W.D. specifications, the specifications mentioned and attached specifications shall prevail.

1.1.4 The relevant latest I.S. codes shall be followed if the specifications for the item are not available either in the C.P.W.D. Specifications or in attached specifications in the agreement.

1.1.5 The structural and architectural drawings shall at all times, be properly correlated before executing any work and no claim whatsoever shall be entertained. Any discrepancy in the above drawings should be brought to the notice of Engineer-in-charge promptly

1.1.6 Latest National Building Code shall be followed.

1.2 ELECTRICAL WORKS:-

1.2.1 The electrical works shall be done as per C.P.W.D. specifications and as per the provisions of latest B.I.S. relevant code according to the directions of engineers of electrical & mechanical divisions of Bhopal Development Authority.

1.2.2 Least National Electrical Code shall be followed.

1.3 ROAD WORKS:-

1.3.1 The road works and collection of materials for road works shall be carried out according to C.P.W.D. specifications, as adopted for this work or specifications in force or special specifications wherever enclosed separately, or the relevant specifications published by the Indian road Congress and M.O.R.T.H.

Baaopala ivakasa P`aaiQakrNa

Page 35: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Annexure "D"

SPECIAL CONDITIONS

1. The department has full liberty to abundant or finalised the contact work at any stage of the work and at any cost level and in such case the payments will be made to the contractor against the amount of work done only. No any compensation or claim shall be allowed in such any case.

2. Clause 11 (C) and Clause 36 of agreement shall not be applicable on the work and to be treated as deleted from this agreement.

3. If as per local bodies notification, the huts for labourers are not to be erected at the site for work by contractors, then the contractors are required to provide such accommodation as is acceptable to local bodies and nothing extra shall be paid on this account.

4. Royalty at the prevalent rates shall have to be paid by the Contractor on all the boulders, bricks, metals shingle, sand and moorum etc., collected by him for the execution of the work, direct to the Revenue authority of authorised agent of the State Government concerned or Central Government.

5. Any damage done by the Contractor to any existing work during the course of execution of the work tendered for shall be made good by him at his own cost.

6. The contractor shall take all precautions to avoid all accidents by exhibiting necessary caution boards day and night, speed limit boards, red flags, red lights and providing barriers etc. He shall be responsible for all damages and accidents caused due to negligence on his part.

7. No payment will be made to the Contractor for damage caused by rains or other natural calamities during the execution of work and no such claim on this account will be entertained.

8. The work will be carried out in the manner complying in all respects with the requirements of relevant bye-laws of the local body under the jurisdiction of which the work is to be executed or as directed by the Engineer-in-charge and nothing extra will be paid on this account.

9. Some restrictions may be imposed by the security staff etc. on the working and/or movement of labour, materials etc. the contractor shall be bound to follow all such restrictions/instructions and nothing extra shall be payable on the account.

10. The Contractor shall comply with proper and legal orders and directions of the local or public authority or municipality and abide by their rules and regulations and pay all fees and charges which he may be liable.

11. Necessary TDS (Taxes Deductible at source) such as Income Tax, Commercial Tax, Education Cess, Labour Cess etc. shall be deducted from this bills as applicable as per the Govt. Rules. All the taxes imposed by Central Govt. / State Govt. / Local bodies etc. shall be borne by the Contractor / Agency.

12. Sample of various materials required for testing shall be provided free of charge by the Contractor. Testing charges, if any, with all other expenditure required to be incurred for testing the samples, conveyance, packaging etc. shall be borne by the contractor himself.

13. Relevant analysis of rates shall be referred regarding calculation of rates for the item of work not included is the applicable Schedule of Rules i.e. item of work executed is Non Scheduled of Rate item (Non S.O.R. item)

14. The tender rates quoted by the contractor in his tender and accepted by B.D.A. is not applicable on the Non S.O.R. items of work.

15. The structural and architectural drawings shall at all times, be properly correlated before executing any work and no claim whatsoever, be entertained. Any discrepancy in the above drawings should be brought to the notice of the Engineer-in-charge promptly.

16. The Contractor shall be required to produce samples of all materials sufficiently in advance to obtain approval of the Engineer-in-charge. Subsequently, the materials used in the actual execution of the work shall strictly confirm to the quality of sample approved.

17. The work will be carried out in the manner complying in all respects with the requirements of relevant bye- laws of the local body under the jurisdiction of which the work is to be executed or as directed by the Engineer-in-charge and nothing extra will be paid on this account.

Baaopala ivakasa P`aaiQakrNa

Page 36: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE - "E"

Schedule of ItemsDescription of Schedule of Item of Work

A. Building works, Water supply, sanitary and Drainage works Based on Schedule of Rates for Building Works in force from 15th June 2009 issued by Engineer-in-Chief Madhya Pradesh Public works Department.

S.No. Description of Item Unit Rate in Rs.

1. SOR Item No. 2.1/Page-4

Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15cm. deep and disposal of rubbish, lead upto 50m and lift up to 1.5m.

100 Sqm. 553.00

2. SOR Item No. 2.2/Page-4

Clearing jungle including uprooting of rank vegetation, grass, brush wood tress and sapling of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of thearea cleared.

100 Sqm. 285.00

3. SOR Item No. 2.3/Page-4

Clearing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared.

100 Sqm. 146.00

4. SOR Item No. 2.5/Page-4

Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth upto 50m and lift upto 1.5m disposed soil to be levelled and neatly dressed.

Sqm. 22.00

5. SOR Item No. 2.6/Page-4

Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in over areas foundation trenches of drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.

Cum 107.00

6. SOR Item No. 2.7/Page-4

Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.

2.7.1 Ordinary rock Cum 171.00

2.7.3 Hard rock (blasting prohibited) Cum 364.00

7. SOR Item No. 2.8/Page-4-5

Excavation work in foundation trenches or drains not exceeding 1.5m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.

2.8.1 Ordinary Rock Cum 182.00

2.8.3 Hard rock (blasting prohibited) Cum 369.00

Baaopala ivakasa P`aaiQakrNa

Page 37: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

8. SOR Item No. 2.9/Page-5

Excavation trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm. in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50m.

2.9.1 al kinds of soil

2.9.1.1 Pipes, cables etc. not exceeding 80mm dia. Meter 75.00

2.9.1.2 Pipes, cables etc. Exceeding 80mm dia but not exceeding 300mm dia.

Meter 122.00

9. SOR Item No. 2.12/Page-5

Excavating trenches of required with for pipes, cables, etc. including excavation for sockets, depth upto 1.5m including getting out the excavated materials, refilling the excavated soil as required in layers not exceeding 20 cm in depth including consolidation each deposited layers by ramming, watering etc. stacking serviceable material for measurements and disposal of unserviceable materials as directed, within a lead of 50m.

2.12.1 Ordinary rock.

2.12.1.1 Pipes, cables etc. not exceeding 80mm dia Meter 127.00

2.12.1.2 Pipes, cables etc. Exceeding 80mm dia but not exceeding 30mm dia.

Meter 275.00

10. SOR Item No. 2.24/Page-7

Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm. in depth consolidating each deposited layer by ramming and watering lead up to 50m and lift upto 1.5m.

Cum 49.00

11. SOR Item No. 2.25/Page-7

Extra for every additional lift of 1.5m or part thereof in.

2.25.1 All kinds of soil Cum 20.00

2.25.2 Ordinary or hard rock Cum 36.00

12. SOR Item No. 2.26/Page-7

Supplying and filling inplinth with crusher stone dust/ coarse sand under floors including, waterin, ramming consolidating in layers not exceeding 20cm. in depth in layers not exceeding 20cm. in depth and dressing complete.

Cum 530.00

13. SOR Item No. 2.27/Page-7

Supplying and filling in plinth with Hard muram/Hard copra under floors including, watering, ramming consolidating and dressing complete.

Baaopala ivakasa P`aaiQakrNa

Page 38: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

14. SOR Item No. 2.31/Page-8-9

Preconstruction curative Cum. preventive antitermite treatment to the building under construction by providing (i) surface treatment by spreading emulsion over the plinth area before laying the base concrete under floors @ 5.0 litres/sqm. (ii) Pumping the emulsionin plinth masonry on filling side at floor junction @ 7.5 litres/sqm (iii) Pumping the emulsion from outer side of the plinth below ground alround the masonry @ 5.0 litres/sqm as per I.S. 8944 Emulsion. (1 Chlorpyrifos: 19 water) with five years service guarantee (Measurements to be taken for plinth area)

Sqm. 132.00

15. SOR Item No. 2.32/Page-9

Making bore holes for providing dowel bars at designed depth in rock foundation by drilling 40mm dia bore hole in rock including necessary bending hooking in position and grouting with cement slurry etc. complete as per drawing and specification (Steel to be paid separately).

Rm 196.00

16. SOR Item No. 4.1/Page-15

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level.

4.1.1.3 M 15 Cum 3414.00

4.1.1.4 M 10 Cum 2900.00

4.1.2.2 M 10 Cum 2833.00

4.1.2.3 M 7.5 Cum 2546.00

17 SOR Item No. 4.2/Page-15

Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. up to floor two level, excluding the cost of centering, shuttering and finishing:

4.2.1 With 20mm nominal size graded stone aggregate

4.2.1.2 M 20 Cum 4039.00

4.2.1.3 M 15 Cum 3643.00

18 SOR Item No. 4.3/Page-15

Centering and shuttering including strutting, propping etc.and removal of form work for:

4.3.1 Foundations, footings, bases for columns. Sqm. 127.00

4.3.2 Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets etc.

Sqm 193.00

4.3.3 Columns, piers, abutments, pillars, posts and struts. Sqm 199.00

19 SOR Item No. 4.4/Page-16

Baaopala ivakasa P`aaiQakrNa

Page 39: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing.

4.4.1 M15 (with 20mm nominal size graded stone aggregate) Cum 3414.00

4.4.2 M 10 (with 20mm nominal size graded stone aggregate) Cum 2900.00

20 SOR Item No. 4.5/Page-16

Providing and fixing up to floor two level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc. including hoisting and setting in position with cement mortar 1:3 (1 cement: 3 sand), cost of required centering shuttering and finishing smooth with 6mm thick cement plaster 1:3 (1 Cement : 3 sand) on exposed surfaces complete.

4.5.1 M15 (with 20mm nominal size graded stone aggregate) Cum 4670.00

4.5.2 M10 (With 20mm nominal size graded stone aggregate) Cum 4218.00

21 SOR Item No. 4.6/Page-16

Providing and fixing at or near ground Llevel precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 cement: 3 sand) including the cost of required centering, shuttering and finishing smooth with 6mm thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete.

4.6.1 M15 (with 20mm nominal size graded stone aggregate) Cum 4115.00

22 SOR Item No. 4.7/Page-16

Providing and fixing up to floor two level precast cement concrete solid block including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 sand), cost of required centering, shuttering and finishing smooth with 6mm thick cement plaster 1:3 (1 cement: 3 fine sand) on exposed surfaces complete.

4.7.1 M15 (with 20mm nominal size graded stone aggregate) Cum 5395.00

4.7.2 M10 (with 20mm nominal size graded stone aggregate) Cum 4942.00

23 SOR Item No. 4.9/Page-16

Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 12.5mm nominal size)

Sqm 151.00

24 SOR Item No. 4.11/Page-16

Extra for providing and mixing water proofing material in cement concrete work @ 1 Kg. per 50 kg. of cement.

Per 50 Kg. cement

44.00

25 SOR Item No. 4.12/Page-17

Applying a coat of residual petroleum bitumen of penetration 80/100 of approved quality using 1.7 kg per square meter on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.

Sqm 79.00

Baaopala ivakasa P`aaiQakrNa

Page 40: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

26 SOR Item No. 4.13/Page-17

Extra for concrete work in superstructure above floor two level for each floors or part thereof.

@1% of rate of

concrete

27 SOR Item No. 4.16/Page-17

Making plinth protection 50mm thick of cement concrete grade M10 over 75mm bed of dry metal ballast 40mm nominal size well rammed and consolidated and filled with sand including finishing the top smooth (with 20mm nominal size graded stone aggregate).

Sqm. 332.00

28 SOR Item No. 5.1/Page-20

Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level.

5.1.1 M 20 Nominal mix Cum 3936.00

29 SOR Item No. 5.2/Page-20

Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, filets, columns, pillars, posts and struts suspended floor of slab, beams, etc. up to floor two level excluding cost of centering, shuttering, finishing and reinforcement:

5.2.1 M 20 Nominal mix (with 20mm nominal size graded stone aggregate)

Cum 4321.00

30 SOR Item No. 5.3/Page-20

Reinforced cement concrete work in beams, suspended floors, roofs, having slope of any degree landings, balconies, shelves chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor two level excluding the cost of centering shuttering finishing and reinforcement in concrete grade.

5.3.1 M 20 Nominal mix (with 20mm nominal size graded stone aggregate).

Cum 3863.00

31 SOR Item No. 5.4/Page-20

Providing and laying up to floor two level reinforced cement concrete, in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with concrete grade M20 Nominal mix (with 20mm normal size graded stone aggregate).

cum 4103.00

32. SOR Item No. 5.5/Page-20

Reinforced cement concrete work in arches, archribs, domes vaults, shells, folded plate and roofs having slope at any degree up to floor two level excluding the cost of centering, shuttering, finishing and reinforcement in concrete grade.

5.5.1 M20 Nominal mix (with 20mm nominal size graded stone aggregate).

Cum 4135.00

33 SOR Item No. 5.8/Page-20

Baaopala ivakasa P`aaiQakrNa

Page 41: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards up to floor two level excluding the cost of centering, shuttering, finishing and reinforcement in concrete grade.

5.8.1 M 20 Nominal mix (with 20mm nominal size graded stone aggregate)

Cum 3077.00

34 SOR Item No. 5.9/Page-21

Centering and shuttering including strutting, propping etc. and removal of form for:

5.9.1 Foundations, footings, bases of columns, etc. for mass concrete up to plinth level

Sqm 127.00

5.9.2 Walls (any thickness) including attached pilasters butteresses, plinth beams and string courses etc. up to plinth level.

Sqm. 193.00

5.9.3 Suspended floors, roofs, landings, balconies and access platform, shelves (cast in situ) Lintels, beams, beams, girders, bressumers and cantilevers, Columns, Pillars, Posts and Struts Walls in super structure.

Sqm. 199.00

5.9.4 All types of staircases including riser & landing. Sqm 248.00

5.9.5 Arches, domes, vaults up to 6m span Sqm 691.00

5.9.6 Extra for arches, domes, vaults exceeding 6m span Sqm 260.00

5.9.8 Vertical and horizontalfins individually or forming box louvers band, facias and eaves boards Weather shade Chajjas, corbels etc. including edges.

Sqm. 259.00

5.9.9 Extra for shutterng in circular work or any other geometrical shape (20% of respective centering and shuttering items).

Sqm. 20% of respective

item

5.9.10 Comices and mouldings Sqm 323.00

5.9.11 Coffer/waffle slab of any size or shape as shown in the drawing. Sqm. 710.00

35 SOR Item No. 5.10/Page-21

Extra for additional height in centering, shuttering where ever required with adequate branching, propping etc. including cost of deshutteirng and decentering at all levels, over a height of 4m for every additional height of 1 metre or part thereof (Plan area to be measured)

5.10.1 Suspended floors roofs, landing, beams and balconies Sqm. 113.00

36 SOR Item No. 5.11/Page-21

Providing, hoisting and fixing up to floor, two level precast reinforced cement concrete inshelves including setting in cement mortar 1:3 (1 cement : 3 and), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement with concrete grade M-15 (with 12.5mm normal size graded stone aggregate)

Cum 6905.00

Baaopala ivakasa P`aaiQakrNa

Page 42: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

37 SOR Item No. 5.12/Page-21

Providing precast cement concrete Jail 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement : 3 fine sand) etc. complete excluding plastering of the jambs, ills and soffits.

5.12.2 40mm thick Sqm 381.00

5.12.3 25mm thick Sqm 372.00

38. SOR Item No. 5.16/Page-22

Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete.

5.16.3 Cold twisted bars (CTD) Kilogram 42.00

5.16.6 Thermo-Mechanically Treated bars (TMT) Kilogram 42.00

39 SOR Item No. 5.17/Page-22

Add extra for providing reinforcement above floor two level for every additional floor or part there of

Kilogram 1% of the respective

item

40 SOR Item No. 5.21/Page-22

Providing and fixing in position 25mm thick bitumen impregnated fibre board conforming to IS: 1838 including cost of primer, sealing compound in expansion joints.

Sqm 351.00

41 SOR Item No. 5.22/Page-22

Providing and fixing sheet covering over expansion joints with iron screws as per design to match the colour/shade of wall treatment.

5.22.1 Non-asbestos fibre cement board 6mm thick as per IS:14862 Meter 71.00

5.22.1.1 150mm wide Meter 94.00

5.22.2 Aluminium fluted strips 3.15mm thick.

5.22.2.1 150mm wide Meter 324.00

42 SOR Item No. 5.23/Page-23

Providing for plaster drip course/groove in plastered surface or moulding to R.C.C. projections.

Meter 12.50

43 SOR Item No. 6.1/Page-27

Brick work with well burnt chimney bricks in bulls patent trench kiln manufactured by ghol process crushing strength not less than 40 kg. / sqcm and water absorption not more than 15% in foundation and plinth.

Baaopala ivakasa P`aaiQakrNa

Page 43: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

6.1.2 Cement Mortar 1:6 (1 cement: 6 sand) Cum 3381.00

44 SOR Item No. 6.2/Page-27

Brick work with well burnt chimney bricks in bulls patent trench kiln crushing strength not less than 25 kg/sqcm and water absorption not more than 20% in foundation and plinth

6.2.2 Cement Mortar 1:6 (1 cement: 6 sand). Cum 2190.00

45 SOR Item No. 6.5/Page-27

Extra for brick work in superstructure above floor II level for each additional floor or part thereof.

Cum Add @ 1% of

respective item

46 SOR Item No. 6.10/Page-27

Half brick masonry with M.S. brick of class designation 40 in super structure above plinth level up to floor II level

6.10.2 Cement mortar 1:4 (1 cement : 4 sand) Sqm 419.00

47 SOR Item No. 6.11/Page-28

Half brick masonry with M.S. brick of class designation 25 in superstructure above plinth level up to floor II level.

6.11.2 Cement mortar 1:4 (1 cement: 4 sand) Sqm 302.80

48 SOR Item No. 6.12/Page-28

Extra for half brick masonry in superstructure, above floor Ii level for every floor or part thereof respective item.

Sqm @1% of respective

item

49 SOR Item No. 6.13/Page-28

Extra for providing and placing in position 2 Nos.8mm dia M.S. bars at every third course of half brick masonry (with M.S. bricks).

Sqm. 48.00

50. SOR Item No. 7.1/Page-31

Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1.6.12 (1 cement: 6 sand: 12 graded stone aggregate 20mm nominal size) at plinth level with:

7.1.1 Cement mortar 1:6 (1 cement: 6 sand) Cum 1962.00

51 SOR Item No. 8.2/Page-38

Providing and fixing 16mm thick gang saw cut mirror polished premoulded and prepolished) machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement: 4 sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edge to give high gloss finish etc. complete at all levels. (Sample to be got approved by Engineer-in-charge.

8.2.1.1 Area of slab upto 0.50 sqm. But not less than 0.30 sqm. Sqm. 1362.00

Baaopala ivakasa P`aaiQakrNa

Page 44: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

8.2.1.2 Area of slab over 0.50 sqm. Sqm. 1570.00

8.2.2.1 Area of slab upto 0.50 sqm But not less than 0.30 sqm. Sqm 2515.00

8.2.2.2 Area of slab over 0.50 Sqm. Sqm. 2612.00

52 SOR Item No. 8.3/Page-38

Providing edge moulding to 16mm thick marble stone counters, Vanities etc. including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge.

8.3.1 Marble work Metre 95.00

8.3.2 Granite work Meter 117.00

53 SOR Item No. 8.4/Page-38

Extra for fixing marble/ granite stone over and above corresponding basic item, in facia and drops of width upto 150mm with epoxy resin based adhesive including cleaning etc. complete.

Meter 112.00

54 SOR Item No. 8.5/Page-38

Extra for providing opening of required size &shape for wash basins/ kitchen sink in kitchen platform, vanity counters and similar location in marble/Granite/stone work including necessary holes for pillar taps etc. including rubbing and polishing of cut edges etc. complete.

Each 158.00

55 SOR Item No. 8.6/Page-38

Mirror polishing on kota stone marble work/Granite work/stone work where ever required to give high glossy finish complete.

Sqm 93.00

56 SOR Item No. 9.20/Page-44

Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part-I( decorative type, core of block board construction with frame of 1st

class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.

9.20.1 35mm thick including ISI marked Stainless Steel but hinges with necessary screws.

Sqm 1593.00

9.20.2 30mm thick including ISI marked Stainless Steel butt hinges with necessary screws.

Sqm. 1477.00

9.20.3 25mm thick (for cupboard) including ISI marked nickel plated bright finished M.S. Piano hinges IS: 3818 marked with necessary screws.

Sqm 1459.00

57 SOR Item No. 9.21/Page-45

Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical granis or cross bands and face veneers on both faces of shutters:

9.21.1 35mm thick including ISI marked stainless steel butt hinges with necessary screws.

Sqm 1244.00

Baaopala ivakasa P`aaiQakrNa

Page 45: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

9.21.2 30mm thick including ISI marked stainless steel butt hinges with necessary screws.

Sqm. 1116.00

9.21.3 25mm thick (for cupboard) including ISImarked nickel plated bright finished MS (piano hinges with necessary screws.

Sqm. 1082.00

58. SOR Item No. 9.22/Page-45

Extra for providing and fixing flush doors with decorative veneering

Sqm 227.00

59 SOR Item No. 9.23/Page-45

Extra for providing lipping with 2nd class teak wood batterns 25 mm minimum depth on all edges of shutters (over all area of door shutter to be measured) Over item no. 9.20 and 9.21.

Sqm. 285.00

60 SOR Item No. 9.26/Page-45

Extra for cutting rebate in flush door shutters (Total area of the shutter to be measured).

Sqm. 66.00

61 SOR Item No. 9.48/Page-49

Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. all complete.

9.44.1 Fixed to steel windows by welding. Kg. 60.00

9.48.1 Fixed to openings/ wooden frames with rawl plugs screws etc. Kg 65.00

62 SOR Item No. 9.96/Page-54

Providing and fixing aluminium sliding door bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour of shade with nuts and screws etc. complete.

9.96.1 300x16mm Each 159.00

9.96.2 250x16mm Each 135.00

63 SOR Item No. 9.97/Page-45

Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade with necessary screws etc. complete.

9.97.1 300x10mm Each 72.00

9.97.2 250x10mm Each 64.00

9.97.3 200x10mm Each 55.00

64 SOR Item No. 9.100/Page-55

Providing and fixing aluminium handles ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade with necessary screws etc. complete.

Baaopala ivakasa P`aaiQakrNa

Page 46: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

9.100.1 125mm Each 49.00

9.100.2 100mm Each 35.00

65 SOR Item No. 9.101/Page-55

Providing and fixing aluminium handging floor door stopper ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade with necessary screws etc. complete.

9.101.1 Single rubber stopper Each 39.00

9.101.2 Twin rubber stopper Each 49.00

66 SOR Item No. 9.119/Page-59

Providing and fixing factory made P.V.C. door frame of size 50x47mm with a wall thickness of 5mm made out of extruded 5mm rigid PVC foam sheet mitred at corners and joined with 2 Nos. of 150mm long brackets of 15x15mm M.S. square tube, the vertical door profiles to be reinforced with 19x19mm M.S. square tube of 19 gauge, EPDM rubber gasket weather seal to be provided through out the frame. The door frame to be fixed to the wall using M.S. Screws of 65/100mm size complete as per manufactures specification and direction of Engineer-in-charge.

Metre 382.00

67 SOR Item No. 9.120/Page-60

Providing and fixing door frames.

9.12.1 30mm thick factory made panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for styles and 15x15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame covered with 5mm thick heat moulded PVC 'C' channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 45 degree angle on either side forming styles, and 5mm thick, 95mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered in 45 degree on the inner side to form top and bottom rail and 115mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel. 10mm (5mmx2) thick, 20mm wide cross PVC sheet be provided as gap insert for top rail & bottom rail, paneling of 5mm thick both side PVC sheet to be fitted in the M.S. frame welded/ sealed to the styles & rails with 7mm (5mm+2mm) thick x 15mm wide PVC sheet beading on inner side, and joined together with solvent cement adhesive. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the 'C' Channel using PVC solvent adhesive etc. complete as per direction of Engineer-in-charge. Manufacturer's specification & drawing (for W.C. and bath room door shutter).

Sqm. 2188.00

68 SOR Item No. 9.121/Page-61

Providing and fixing of Fiber Glass Reinforced plastic (FRP) Door frames of three legged of cross-section 90mm x 45mm having single rebate of 32mm x 15mm to receive shutter of 30mm thickness. The laminate doorframe molded with fire resistant grade unsaturated polyester resin and chopped mat Doorframe laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiberglass from all sides. M.S. stay shall be provided at the bottom to steady the frame.

Meter 413.00

Baaopala ivakasa P`aaiQakrNa

Page 47: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

69 SOR Item No. 9.122 /Page-61

9.122.1 30mm thick Glass Fibre Reinforced Plastic (FRP) panelled dor shutter of required colour and approved brand and manufacture, made with fire-retardant grade unsaturated polyester resin, moulded to 3mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5mm thick FRP laminte for panels and conforming to IS: 14856-2000 including fixing to frames.

Sqm. 1955.00

70 SOR Item No. 10. 1/Page-71

Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

Kg. 43.80

71 SOR Item No. 10.2/Page-71

Structural steel work riveted, bolted or welded in builtup for all type sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

Kg. 44.70

72 SOR Item No. 10.6/Page-71

Supplying and fixing rolling shutters of approved make, made of required size M.S. laths interlocked together through their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete including the cost of providing and fixing necessary 27.5cm. long wire springs grade No. 2 and M.S. top cover of required thickness for rolling shutters.

10.6.1 80x1.25mm M.S.laths with 1.25mm thick top cover. Sqm. 1557.00

73 SOR Item No. 10.7/Page-71

Providing and fixing ball bearing for rolling shutters.

Each 554.00

74 SOR Item No. 10.14/Page-73

Providing and fixing pressed steel door frames confirming to IS; 4351 manufactured from commercial mild steel sheet of 1.25 mm thickness including hinges jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25mm or base ties of 1.25mm pressed mild steel welded or rigidly fixed together by mechanical means, adjustable lugs with spilit end tail to each jamb including steel butt hinges 2.5mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge.

10.14.1 Single rebhate (size 80mm x 50mm) Metre 313.00

10.14.2 Single rebate (size 100mm x 50mm) Metre 330.00

10.14.3 Double rebate (size, 115mm x 50mm) Metre 348.00

75 SOR Item No. 10.15/Page-73

Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular section made of 1.60mm thick M.S. Sheet, joints mitred and welded and grinded finish profiles required size with

Kg. 87.00

Baaopala ivakasa P`aaiQakrNa

Page 48: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

15x3mm lugs 10cm long embedded in cement concrete blocks 15x10x10cm of 1:3:6 (1 cement : 3sand : 6 graded stone aggregate 20mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or with bolts and nuts as required including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primers.

76 SOR Item No. 10.22/Page-74

Welding by gas or electric plant including transportation of plant at site etc. complete.

Cm. 2.60

77 SOR Item No. 10.23/Page-74

Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required hoisting, fixing in position and applying a priming coat of approved steel

10.23.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

Kg. 55.50

78 SOR Item No. 10.24/Page-74

Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing and staircase railing including applying a priming coat of approved steel primer.

10.24.1 M.S. tube. Kg. 70.00

10.24.2 E.R.W. tubes Kg. 90.00

10.24.3 G.I. pipes Kg. 67.00

79 SOR Item No. 10.25/Page-74

Providing and fixing glazing in steel doors windows, ventilator, shutters & partitions etc. per architectural drawing & as per direction of Engineer-in-charge. With steel beading metal sash puttey.

10.25.1 With float glass 4mm thick Sqm. 646.00

10.25.2 with float glass 5.5mm thick Sqm 800.00

10.25.3 With float glass 8mm thick Sqm. 961.00

80 SOR Item No. 11.1/Page-79

Cement concrete flooring 1:2:4 (1 cement : 2 sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete (Area of panels not exceeding 2 sqm)

11.1.1 40mm thick with 20mm nominal size stone aggregate. Sqm 208.00

81 SOR Item No. 11.2/Page-79

52mm thick cement concrete flooring with concrete hardener topping under layer 40mm thick cement concrete 1:2:4 (1cement : 2 snd : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick

Sqm 305.00

Baaopala ivakasa P`aaiQakrNa

Page 49: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

cement hardener consisting of mix 1:2 (1 cement hardener mix 2 graded stone aggregate 6 mm nominal size) by volume hardening compound is mixed @ 2 litre per 50kg. of cement or as per manufacturers specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.

82 SOR Item No. 11.4/Page-79

Cement plaster skirting (up to 30cm height) with cement mortar 1:3 (1 cement : 3 sand) finished with a floating coat of neat cement.

11.4.1 18mm thick Sqm 182.00

83 SOR Item No. 11.5/Page-79

Cement concrete pavement with 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) including finishing complete.

Cum 3696.00

84 SOR Item No. 11.7/Page-79

40mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 34 mm thick cement concrete 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from 1mm to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight in proportion of

11.7.3 Medium shade pigment with 50% white cement and 50% ordinary cement.

Sqm 358.00

85 SOR Item No. 11.10/Page-81

Marble chips skirting (up to 30cm height) rubbed and polished to granolithic finish, top layer 6mm thick with white, black, chocolate grey, yellow or green marble chips of sizes from smallest to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 marble chips) by volume:

11.10.1 18mm thick with under layer 12mm thick in cement plaster 1:3 (1 cement : 3 sand):

11.10.1.3 Medium shade pigment with 50% white cement and 50% ordinary cement.

Sqm 405.00

86 SOR Item No. 11.11/Page-81

Providing and fixing glass strips of required high in joints of terrazo/cement concrete floors.

11.11.1 40mm wide and 4mm thick Metre 22.00

87 SOR Item No. 11.12/Page-81

Extra for laying terrazo flooring on staircase treads not exceeding 30cm. in width including cost of forming, nosing etc.

Sqm 21.00

88 SOR Item No. 11.14/Page-81

Precast terrazo tiles 2mm thick with graded marble chips of size upto 12mm laid in floors, and landings, jointed with neat cement slurry mixed

Baaopala ivakasa P`aaiQakrNa

Page 50: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

with pigment to match the shade of the tiles including rubbing and polishing complete with precast tiles on 20mm thick bed of cement mortar 1:4 (1 cement : 4 sand):

11.14.2 Medium shade using 50% white cement and 50% ordinary cement.

Sqm 532.00

89 SOR Item No. 11.15/Page-82

Extra if terrazo tiles are laid in treads of steps not exceeding 30cm in width.

Sqm 19.00

90 SOR Item No. 11.16/Page-82

Precast terrazo tiles 20mm thick with graded marble chips of sizes upto 12mm in skirting and risers of steps not exceeding 30 cm in height on 12mm thick cement plaster 1:3 (1 cement: 3 sand) jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete with tiles of:

11.16.2 Medium shades using 50% white cement and 50% ordinary cement

Sqm 574.00

91 SOR Item No. 11.19/Page-82

Providing and fixing 10mm thick acid and or alkali resistant tiles of approved make and colour using acid and or alkali resisting mortar bedding and joints filled with acid and or alkali resisting cement as per IS: 4457 complete as per the direction of Engineer-in-charge.

11.19.1 In flooring on a bed of 10mm thick mortar 1:4 (1 acid proof cement: 4 sand).

11.19.1.1 Acid and alkali resistant tile. Sqm 873.00

11.19.2 In dado/skirting on 12mm thick mortar 1:4 (1 acid proof cement : 4 sand).

11.19.2.1 Acid and alkali resistant tile. Sqm 909.00

92 SOR Item No. 11.20/Page-83

The work in skirting, risers of steps and dado (up to 2m height) over 12mm thick bed of cement mortar 1:3 (1 cement : 3 sand) and jointed with grey cement slurry @ 3.3 kg/sqm including pointing in white cement mixed with pigment of matching shade complete.

11.20.1.1 8mm thick Sqm 608.00

93 SOR Item No. 11.21/Page-83

Marble stone flooring with 16mm thick marble stone (sample of marble shall be approved by Engineer-in-charge) over 20 mm (average) thick base of cement mortar 1:4 (1 cement: 4 sand) laid and jointed with grey cement slurry including rubbing and polishing complete with: (area of Slabs over 0.50 sqm)

11.21.1 Makrana white second quality Sqm 2871.00

Baaopala ivakasa P`aaiQakrNa

Page 51: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

11.21.2 Raj Nagar plain. Sqm 801.00

11.21.3 Agaria White/katani marble Sqm 1670.00

11.21.4 Black Zebra Sqm 858.00

11.21.5 Udaipur/Baroda green marble Sqm 981.00

11.21.6 pink plain marble Sqm 970.00

11.21.7 Jaisalmer yellow Sqm 970.00

94 SOR Item No. 11.22/Page-83

Extra for marble stone flooring in treads of steps and risers using single length up to 2.00 metre.

Sqm 129.00

95 SOR Item No. 11.23/Page-83

Kota/cuddapah stone slab flooring over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 sand):

11.23.1 25mm thick Sqm 670.00

96 SOR Item No. 11.24/Page-83

Kota/cuddapah stone slabs 25mm thick in risers of steps, skirting, dado and pillars laid on 12mm (average) thick cement mortar 1:3 (1cement 3 sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete.

Sqm 701.00

97 SOR Item No. 11.25/Page-83

40mm thick stone flooring over 20mm (average) thick base of cement mortar 1:5 (1 cement:5 sand) including pointing with cement mortar 1:2 (1 cement: 2 sand) with an admixture of pigment to match the shade of stone. Red sand stone/White sand stone).

11.25.1 Roughchiseled dressed stone Sqm 268.00

11.25.2 Fine dressed stone Sqm 361.00

98 SOR Item No. 11.26/Page-84

Providing nosing in treads of steps of Kota stone/sand stone slab/Marble stone i/c rubbing polishing etc. complete.

Metre 27.00

99 SOR Item No. 11.27/Page-84

Extra for Kota stone/sand stone in treads of steps and risers using single length up to 1.05 metre.

Sqm 7.00

100 SOR Item No. 11.31/Page-84

Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (6-7 mm thickness) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-

Sqm 547.00

Baaopala ivakasa P`aaiQakrNa

Page 52: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

charge in skirting, risers of steps and dados over 12mm thick bed of cement mortar 1:3 (1 cement : 3 sand) and jointing with grey cement slurry @ 3.3kg. per sqm including pointing in white cement mixed with pigment of matching shade complete.

101 SOR Item No. 11.32/Page-84

Providing and laying ceramic glazed floor tiles of any size (9-10mm thickness) of 1st quality conforming to IS: 15622 of approved make in colours such as white, lvory, Grey, fume Red Brown, laid on 20mm thick Cement Mortar 1:4 (1 Cement : 4 Sand) including pointing the joints with white cement and matching pigment etc., complete.

Sqm 737.00

102 SOR Item No. 11.33/Page-85

Providing and laying ceramic glazed floor tiles of any size (9-10mm thickness) of 1st quality conforming to IS: 15622 of approved make in all colours, shades, except White, lvory, Grey, Fume Red Brown laid on 20mm thick bed of Cement Mortar 1:4 (1 cement : 4 sand) including pointing the joints with white cement sand matching pigments etc. complete.

Sqm. 579.00

103 SOR Item No. 11.34/Page-85

Providing and laying polished vitrified floor tiles in different sizes of 10mm thickness with water absorption's less than0.08% and conforming to IS: 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 sand) including grouting the joints with white cement and matching pigments etc., complete.

11.34.1 Size of tile 50x50 cm Sqm 868.00

11.34.2 Size of tile 60x60 cm Sqm 958.00

11.34.3 Size of tile 80x80 cm Sqm 1458.00

11.34.4 Size of tile 100x100 cm Sqm 1627.00

104. SOR Item No. 11.35/Page-85

Deduct for not using 20mm thick cement mortar 1:4 (1 cement : 4 sand) bedding.

Sqm 98.00

105 SOR Item No. 11.37/Page-85

Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and shape laid in required colour and pattern over and including 40mm thick compacted bed of course sand filling the joints with sand etc. all complete as per the direction of Engineer in charge.

Sqm 367.00

106 SOR Item No. 11.38/Page-85

Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade reflective type rubber modulded glossy colour paving block made by block making machine with strong vibratory compaction and of approved size and shape laid in required colour and pattern over and including 60mm thick compacted bed of stone dust filling the joints with sand etc. all complete as per the direction of Engineer in charge including locking edges wherever required withing cement concrete M-15 grade or cement mortor 1:3 with pigment of

Sqm 473.00

Baaopala ivakasa P`aaiQakrNa

Page 53: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

required shade to match the colour/shade of block including cost of labour, material, etc. all complete.

107 SOR Item No. 11.39/Page-85

Granite stone flooring with 18mm thick granite stone (sample of granite shall be approved by Engineer-in-charge) over 20mm (average) thick base of cement mortar 1:4 (1 cement : 4 sand) laid and jointed with white cement slurry mixed with pigment of required shade to match the shade of stone complete. (area of slab over 0.50 sqm) item to be executed only in public buildings).

11.39.1 Black Granite stone Sqm. 1868.00

11.39.2 all shades other than black Sqm 2367.00

108 SOR Item No. 12.17/Page-90

Providing 75x75mm in cement concrete 1:2:4 (1 cement: 2 sand: 4 stone aggregate 10mm and down graded) including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design:

12.17.1 In 75x75mm deep chase Metre 71.00

109 Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1mx1mx400 micron, finished with 12mm cement plaster 1:3 (1 cement 3 sand) and a coat of neat cement rounding the edge sand: making and finishing the outlet complete.

Each 150.00

110 SOR Item No. 12.33/Page-93

Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10mm gap for thermal expansion (i) Single socketed pipes for working pressure of 4kg/cm2

12.33.1 75mm diameter Metre 136.00

12.33.2 90mm diameter Meter 181.00

12.33.3 110mm diameter Meter 225.00

111 SOR Item No. 12.34/Page-93

Providing and fixing on wall face unplasticised-PVC moulded fittings/ accessories for unplasticised Rigid PVC Rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10mm gap for thermal expansion.

12.34.1 Coupler

12.34.1.1 75mm Each 159.00

12.34.1.2 90mm Each 186.00

12.34.1.3 110mm Each 213.00

Baaopala ivakasa P`aaiQakrNa

Page 54: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

12.34.2 Single pushfit Coupler:

12.34.2.1 75mm Each 200.00

12.34.2.2 90mm Each 230.00

12.34.2.3 110mm Each 260.00

12.34.3 Single tee with door

12.34.3.1 75x75x75mm Each 268.00

12.34.3.2 90x90x90mm Each 333.00

12.34.3.3 110x110x110mm Each 399.00

12.34.4 Single tee without door

12.34.4.1 75x75x75mm Each 268.00

12.34.4.2 90x90x90mm Each 322.00

12.34.4.3 110x110x110mm Each 376.00

12.34.5 Bend 87.5º

12.34.5.1 75mm bend Each 142.00

12.34.5.2 90mm bend Each 183.00

12.34.5.3 110mm bend Each 225.00

12.34.6 Shoe

12.34.6.1 75mm shoe Each 241.00

12.34.6.2 90mm shoe Each 331.00

12.34.6.3 110mm shoe Each 422.00

112 SOR Item No. 12.35/Page-93

Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised-PVC rain water pipe by means of required length including cutting brick work and fixing in cement mortar 1:4 (1cement : 4 sand) and making good the wall etc. complete.

12.35.1 75mm Each 100.00

12.35.2 110mm Each 137.00

113 SOR Item No. 12.36/Page-94 Each 63.00

Baaopala ivakasa P`aaiQakrNa

Page 55: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15cm diameter and weighing not less than 440 grams.

114 SOR Item No. 13.1/Page-99

13.1 12mm cement plaster of mix:

13.1.2 1:6 (1 cement : 6 sand) Sqm 80.00

115 SOR Item No. 13.2/Page-99

15mm cement plaster onrought side of single or half brick wall of mix:

13.2.2 1:6 (1 cement : 6 sand) Sqm. 93.00

116 SOR Item No. 13.6/Page-99

18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 (1 cement : 5 sand) finished with a top layer 6mm thick cement plaster 1:6 ( 1 cement : 6 fine sand).

Sqm. 117.00

117 SOR Item No. 13.8/Page-99

6mm cement plaster of mix : CM 1:3 (1 cement : 3 sand)

Sqm 69.00

118 SOR Item No. 13.12A/Page-100

Providing sand faced plaster to concrete or brick masonry surfaces in all positions in two coats, base coat of 13mm thick incement mortar 1:4 (1 cement : 4 sand), clearing the surface by combing it sand finishing coat of 8mm thick in cement mortar 1:3 (1cement : 3 sand) and surface taking out grains by mechanical arrangement by with cost of all material, labour, and T & P including all lead, lift and scaffolding etc. complete.

Sqm 198.00

119 SOR Item No. 13.13/Page-100

Extra for providing and mixing water proofing material incement plaster work in proportion recommended by the manufacturers. For each bag of 50 kg cement used in the mix.

Each Bag 45.00

120 SOR Item No. 13.14/Page-100

Extra for plastering on circular work not exceeding 6m in radius:

13.15.1 In one coat Sqm 8.00

13.15.2 In two coats Sqm 12.00

121 SOR Item No. 13.16/Page-100

Extra for plastering done on moulding cornices or architraves including neat finish to line and level:

13.16.1 In one coat Sqm 109.00

13.16.2 In two coats Sqm 180.00

122 SOR Item No. 13.18/Page-100 Sqm 59.00

Baaopala ivakasa P`aaiQakrNa

Page 56: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete

123 SOR Item No. 13.27/Page-101

White washing with lime to give an even shade:

13.27.1 New work (three or more coats) Sqm 7.00

124 SOR Item No. 13.30/Page-101

Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade

13.30.1 New work (two or more coats) over and including priming coat with cement primer.

Sqm 45.00

125 SOR Item No. 13.31/Page-100

Distempering with 1st quality acrylic washable distemper (ready mixed) or approved manufacturer and of required shade and colour complete as per manufacturer's specification.

13.31.1 Two or more coats on new work Sqm 31.00

126 SOR Item No. 13.32/Page-100

Applying one coat of cement primer of approved brand and manufacture on wall surface.

13.32.1 Cement primer Sqm 19.00

127 SOR Item No. 13.33/Page-102

Finishing walls with water proofing cement paint of required shade:

13.33.1 New work (two or more coats applied @ 3.84 kg/10 sqm.) Sqm. 31.00

128 SOR Item No. 13.34/Page-102

Finishing walls with textured exterior paint of required shade:

13.34.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including base coat of water proofing cement paint applied @ 2.20 kg/10 sqm.

Sqm 105.00

129 SOR Item No. 13.35/Page-102

Finishing walls with Acrylic smooth exterior + paint of required shade:

13.35.1 New work (two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/10 sqm.).

Sqm. 59.00

130 SOR Item No. 13.36/Page-102

Finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade

Baaopala ivakasa P`aaiQakrNa

Page 57: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

13.36.1 New work (two or more coats applied @ 1.43 ltr/10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/10 sqm.

Sqm. 65.00

131 SOR Item No. 13.37/Page-102

Finishing walls with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:

13.37.1 Two or more coats applied @ 1.25 ltr/10 sqm. over and including one coat of special primer applied @ 0.75 ltr/10 sqm.

Sqm. 71.00

13.37.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand or manufacture

Sqm. 59.00

132 SOR Item No. 13.38/Page-102

Extra for applying water proofing cement paint as primer applied @ 2.29 kg/10 sqm instead of primer for exterior finishing in item No. 13.37.1

Sqm. 1.10

133 SOR Item No. 13.39/Page-102

Applying priming coat:

13.39.1 With ready mixed pink/Grey primer of approved brand and manufacture on wood work (hard & soft wood)

Sqm 20.00

13.39.2 with ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood

Sqm 20.00

13.39.3 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works

Sqm 16.00

13.39.4 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)

Sqm 9.00

134. SOR Item No. 13.50/Page-104

Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an evenshade:

13.50.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

Sqm 56.00

135 SOR Item No. 13.68/Page-106

Providing & fixing chicken mesh as per ISI specification and in the required with 50mm long bombay nails on vertical and horizontal junctions of RCC and brick wall including scaffolding and all lead and lift etc. complete before plastering upto 10 meter height.

Sqm. 74.00

136 SOR Item No. 13.69/Page-106

Providing and applying special putty intwo coats based materials varnish, Belgium chalk, turpentile oil, white paint, shafeda including sand papering for making the surface smooth for applying any or vinyl paints including all cost of material and labour etc. complete.

Sqm. 29.00

137 SOR Item No. 13.70/Page-106 Sqm 93.00

Baaopala ivakasa P`aaiQakrNa

Page 58: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and applying Birla/J.K. or equivalent wall care exterior/interior mix putty for outer surface i/c and pappering for making the surface smooth for applying any or vinyle paint with all cost of materials, labours, and scaffolding etc. in all position complete (this item is to be executed only in new public buildings).

138 SOR Item No. 17.1/Page-133

Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100mm sand cast iron P or S trap, 10 litre low level white P.V.C. flushing cistern with manually controlled device (handle lever) conforming to IS: 7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required.

17.1.1 White vitreous china Orissa pattern W.C. pan of size 580x440mm with integral type foot rests.

Each 2468.00

139 SOR Item No. 17.2/Page-133

Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern with manually controlled device (handle lever), conforming to IS: 7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required:

17.2.1 W.C. pan with ISImarked white solid plastic seat and lid. Each 2310.00

17.2.2 W.C. pan with ISI marked black solid plastic seat and lid Each 2287.00

140 SOR Item No. 17.3/Page-133

Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern, C.P. flush bend with fittings, C.I. brackets, 40mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete including painting of fittings and brackets, cutting and making good the walls and floors wherever required:

17.3.1 W.C. pan with ISI marked white solid plastic seat and lid. Each 3294.00

17.3.2 W.C. pan with ISI marked black solid plastic seat and lid. Each 3270.00

141 SOR Item No. 17.7/Page-134

Providing and fixing wash basin with C.I. brackets, 15mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern including painting of fittings and brackets, cutting and making good the walls wherever require:

17.7.1 White Vitreous China Wash basin size 630x450mm with a pair of 15mm C.P. brass pillar taps.

Each 1492.00

17.7.2 White Vitreous China Wash basin size 630x450mm with single 15mm C.P. brass pillar taps.

Each 1330.00

17.7.3 White Vitreous China Wash basin size 550x400mm with a pair of 15mm C.P. brass pillar taps.

Each 1353.00

142 SOR Item No. 17.10/Page-136

Baaopala ivakasa P`aaiQakrNa

Page 59: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and fixing stainless steel ISI 304 (18/8) kitchen sink as per IS 13983 with C.I. brackets and 40mm stainless steel plug including painting of fittings and brackets, cutting and making good the walls wherever required.

17.10.1 kitchen sink with drain board

17.10.1.1 510x1040mm bowl depth 250mm Each 4885.00

17.10.2 Kitchen sink without drain board

17.10.2.1 610x510mm bowl depth 200mm Each 2761.00

17.10.2.2 610x460mm bowl depth 200mm Each 2587.00

17.10.2.3 470x420mm bowl depth 178mm Each 2016.00

143 SOR Item No. 17.29/Page-138

Providing and fixing 100mm sand cast iron grating for gully trap.

Each 19.00

144 SOR Item No. 17.30/Page-138

Providing and fixing in position 25mm diameter mosquito proof coupling of approved municipal design.

Each 26.00

145 SOR Item No. 17.73/Page-145

Providing and fixing M.S. holder bat clamp of approved design to sand cast iron/ cast iron (spun) pipes comprising of M.S. flat brackets made of 50x5mm flat of specified shape, projecting 75mm outside the wall surface and fixed on wall with 4 nos. 6mm dia expansion hold fasteners including drilling necessary holes in brick wall/CC/RCC surface and the cost of bolts etc. the pipes shall be fixed to the already fixed brackets with the help of 30mm x 1.6mm galvanised M.S. flats of specified shape and of total length 420mm and shall be fixed with M.S. nuts, bolts, & washers of size 25x6mm, one bolts on each side of the pipe.

17.73.1 Total bracket length 850mm of approved shape and design (for single 100mm dia pipe).

Each 143.00

146 SOR Item No. 17.74/Page-145

Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS: 13592 type A including jointing with seal ring conforming to IS: 5382 leaving 10mm gap for thermal expansion for soil and wast pipes single socketed pipes for working pressure of 4 kg/cm2

17.74.1 75mm diameter Meter 136.00

17.74.2 90mm diameter Meter 181.00

17.74.3 110mm diameter Meter 225.00

147 SOR Item No. 17.75/Page-145

Providing and fixing on wall face unplasticised-PVC moulded fittings. accessories for unplasticised Rigid PVC Rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382

Baaopala ivakasa P`aaiQakrNa

Page 60: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

leaving 10mm gap for thermal expansion.

17.75.1 Coupler

17.75.1.1 75mm Each 159.00

17.75.1.2 90mm Each 186.00

17.75.1.3 110mm Each 213.00

17.75.2 Single pushfit Coupler: Each 159.00

17.75.2.1 75mm Each 200.00

17.75.2.2 90mm Each 230.00

17.75.3.3 110mm Each 260.00

17.75.3 Single tee with door Each 159.00

17.75.3.1 75x75x75 mm Each 268.00

17.75.3.2 90x90x90mm Each 333.00

17.75.3.3 110x110x110mm Each 399.00

17.75.4 Single tee without door:

17.75.4.1 75x75x75 mm Each 268.00

17.75.4.2 90x90x90mm Each 322.00

17.75.4.3 110x110x110mm Each 376.00

17.75.5 Bend 87.5º

17.75.5.1 75mm bend Each 142.00

17.75.5.2 90mm bend Each 183.00

17.75.5.3 110mm bend Each 225.00

17.75.6 Shoe

17.75.6.1 75mm bend Each 241.00

17.75.6.2 90mm bend Each 331.00

17.75.6.3 110mm bend Each 422.00

148 SOR Item No. 18.10/Page-153

Baaopala ivakasa P`aaiQakrNa

Page 61: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc.

18.10.1 15mm dia nominal bore Metre 106.00

18.10.2 20mm dia nominal bore Metre 134.00

149 SOR Item No. 18.11/Page-153

Concealed pipe including painting with anti corrosive bitumastic pant, cutting chases and making good the wall.

18.11.1 15mm dia nominal bore Metre 145.00

18.11.2 15mm dia nominal bore Metre 170.00

150 SOR Item No. 18.12/Page-153

Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.

18.12.1 15mm dia nominal bore Metre 94.00

18.12.2 20mm dia nominal bore Metre 117.00

18.12.3 25mm dia nominal bore Metre 157.00

18.12.4 32mm dia nominal bore Metre 194.00

18.12.5 40mm dia nominal bore Metre 220.00

18.12.6 50mm dia nominal bore Metre 280.00

151 SOR Item No. 18.13/Page-154

Making connection G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete:

18.13.1 25 to 40mm nominal bore Each 166.00

152 SOR Item No. 18.17/Page-154

Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end):

18.17.1 15mm nominal bore Each 206.00

18.17.2 20mm nominal bore Each 245.00

18.17.3 25mm nominal bore Each 286.00

18.17.4 32mm nominal bore Each 358.00

18.17.5 40mm nominal bore Each 399.00

Baaopala ivakasa P`aaiQakrNa

Page 62: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

18.17.6 50mm nominal bore Each 578.00

18.17.7 65mm nominal bore Each 832.00

18.17.8 80mm nominal bore Each 1369.00

153 SOR Item No. 18.32/Page-157

Constructing masonry chamber 30x30x50 cm, inside with class 25 designation brick work in cement mortar 1:4 (1 cement : 4 sand) for stop cock, with C.I. surface box 100x100x75mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) necessary excavation foundation concrete 1:5:10 (1 cement : 5 fine sand: 10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 sand) 12mm thick finished with a floating coat of neat cement complete as per standard design.

18.32.1 With modular bricks Each 600.00

154 SOR Item No. 18.38/Page-159

Painting G.I. pipes and fittings with synthetic enamel white paint over a ready mixed priming coat, both of approved quality for new work.

18.38.1 15mm diameter pipe Meter 5.65

18.38.2 20mm diameter pipe Meter 5.45

18.38.3 25mm diameter pipe Meter 7.20

18.38.4 32mm diameter pipe Meter 8.50

18.38.5 40mm diameter pipe Meter 10.10

18.38.6 50mm diameter pipe Meter 11.80

155 SOR Item No. 18.41/Page-160

Providing and filling coarse sand all-round the G.I. pipes in external work

18.41.1 15mm diameter pipe Metre 22.00

18.41.2 20mm diameter pipe Metre 22.00

18.41.3 25mm diameter pipe Metre 23.00

18.41.4 32mm diameter pipe Metre 23.00

18.41.5 40mm diameter pipe Metre 24.00

18.41.6 50mm diameter pipe Metre 25.00

18.41.7 65mm diameter pipe Metre 39.00

Baaopala ivakasa P`aaiQakrNa

Page 63: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

18.41.8 80mm diameter pipe Metre 40.00

18.41.9 100mm diameter pipe Metre 42.00

18.41.10150mm diameter pipe Metre 63.00

156 SOR Item No. 18.48/Page-161

Providing and placing on terrace (at all floor levels) high dersign HDPE (polyethylene) water storage tank ISI: 12701 marked withcover and suitable locking arrangement and making necessary holes for inlet, outlet and arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.

157 SOR Item No. 18.49/Page-161

Providing and fixing C.P. brass bib cock of approved quality conforming to IS: 8931

18.49.1 15mm nominal bore Each 313.00

158 SOR Item No. 18.50/Page-161

Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms.

18.50.1 15mm nominal bore Each 274.00

159 SOR Item No. 18.51/Page-161

Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms.

18.51.1 15mm nominal Each 316.00

160 SOR Item No. 18.52/Page-161

Providing and fixing C.P. brass stop cock (conceated) of standard design and of approved make conforming to IS: 8931

18.52.1 15mm nominal bore Each 313.00

161 SOR Item No. 18.53/Page-161

Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 8931 a) 15mm nominal bore

18.53.1 15mm nominal bore Each 348.00

162 SOR Item No. 18.54/Page-162

Providing and fixing C.P. brass pillar cock approved quality and make conforming to IS specification.

Each 501.00

15mm nominal bore 125mm long foam flow

163 SOR Item No. 18.55/Page-161

Providing and fixing C.P. brass base and mixer of approved quality and

Each 1637.00

Baaopala ivakasa P`aaiQakrNa

Page 64: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

make conforming to IS specification.

15mm nominal bore

164 SOR Item No. 18.56/Page-162

Providing and fixing C.P. brass wall mixer of approved quality and make conforming to IS specification.

15mm nominal bore

Each 1893.00

165 SOR Item No. 18.57/Page-162

Providing and fixing C.P. brass wall mixer of approved quality and make conforming to IS specification.

15mm nominal bore

Each 1637.00

166 SOR Item No. 18.58/Page-162

Providing and fixing C.P. brass grating of approved quality and make conforming to IS; specification.

100mm nominal bore

Each 37.00

167 SOR Item No. 18.82/Page-162

Cutting holes up to 30x30 cm in walls including making good the same.

18.82.1 With Modular bricks

Each 91.00

168 SOR Item No. 18.83/Page-162

Cutting holes up to 15x15cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) including finishing complete so as to make it leak proof.

15mm nominal bore

Each 82.00

169 SOR Item No. 19.4/Page-170

Providing and fixing square-mouth S.W. gully trap grade 'A' complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300x300mm size (inside) the weight of cover to be not less than 4.50 kg. and frame to be not less than 2.70 kg. as per standard design: With Modular Bricks class designation 40

19.4.1 100x100mm size P type Each 935.00

19.4.2 150x100mm size P type Each 962.00

19.4.3 180x150mm size P type Each 1.037.00

170 SOR Item No. 19.7/Page-171

Constructing brick masonry manhole in cement mortar 1:4 (1 cement: 4 sand0 R.C.C. top slab with 1:2:4 mix (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size), foundation concrete 1:4:8 mix (1 cement: 4 sand: 8 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1 cement: 3 sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal

Baaopala ivakasa P`aaiQakrNa

Page 65: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

standard design: With modular bricks with class designation 40

19.7.1 Inside size 90x80 cm and 45cm deep including C.I. cover with frame (light duty) 455x610mm internal dimensions total weight of cover and frame to be not less than 38 kg. (weight of cover 23 kg and weight of frame 15 kg.).

Each 5384.00

19.7.2 Inside size 120x90 cm and 90cm deep including C.I. cover with frame (medium duty) 500mm internal diameter, totalweight of cover and frame tobe not less than 116 kg (weight of cover 58 kg. and weight of frame 58 kg.).

Each 11882.00

19.7.3 Inside size 120x90 cm and 90cm deep including C.I. cover with frame (heavy) 560 mm internal diameter, total weight of cover and frame to be not less than 208 kg. (weight of cover 108 kg. and weight of frame 100kg.):

171 SOR Item No. 19.8/Page-172

Extra for depth for manholes with moudular bricks class designation 40

19.8.1 Size 90x80 cm Metre 2654.00

19.8.2 Size 120x90cm Metre 3180.00

172 SOR Item No. 19.35/Page-178

Providing and laying below ground unplasticised PVC pipe to with stand working pressure of 4 kg/cm2 soild waste pipes confirming to IS: 13592 and IS: 4985 including jointing with seal ring confirming to IS: 5282 leaving 10mm gap for thermal expansion all necessary fittings etc. complete.

19.35.1 110mm diameter OD Rm 225.00

19.35.2 160mm diameter OD Rm. 391.00

19.35.3 210mm diameter OD Rm. 754.00

19.35.4 260mm diameter OD Rm. 943.00

19.35.5 310mm diameter OD Rm. 1157.00

173 SOR Item No. 19.36/Page-178

Providing and laying cement concrete 1:5:10(1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) all-round PVC pipes including bed concrete as per standard design.

19.36.1 100mm diameter PVC pipe Meter 331.00

19.36.2 150mm diameter PVC pipe Meter 405.00

19.36.3 200mm diameter PVC pipe Meter 472.00

19.36.4 230mm diameter PVC pipe Meter 517.00

Baaopala ivakasa P`aaiQakrNa

Page 66: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

19.36.5 250mm diameter PVC pipe Meter 546.00

19.36.6 300mm diameter PVC pipe Meter 599.00

174 SOR Item No. 19.37/Page-178

Providing and laying cement concrete 1:5:10 (1 cement: 5 snad : 10 graded stone aggregate 40mm nominal size) up to haunches of PVC pipes including bed concrete as per standard design:

19.37.1 100mm diameter PVC pipe Meter 157.00

19.37.2 150mm diameter PVC pipe Meter 255.00

19.37.3 200mm diameter PVC pipe Meter 300.00

19.37.4 230mm diameter PVC pipe Meter 329.00

19.37.5 250mm diameter PVC pipe Meter 349.00

19.37.6 300mm diameter PVC pipe Meter 403.00

175 SOR Item No. 22.7/Page-187

Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc.consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/sqm. of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300mm height including cleaning the surface before treatment b) laying brick bats with mortar using broken bricks/brick bats 25mm 115mm size with 50% of cement : 5 sand) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 cement: 5 sand) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of junctions of walls and slabs c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer -in-charge d) Finishing the surface with 20mm thick joint less cement mortar of mix 1:4 (1 cement: 4 sand) admixed with water proofing compound conforming to IS; 2645 and approved by Engineer-in-charge including laying glass fibre cloth type Ii grade-I tissue reinforced of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm square 3mm deep e) The whole terrace sofinished shall be flooded with water for a minimum period of twoweeks for curing and for final test. All above operations to be done in order and as directed and specified by the Engineer-in-charge; (with five years service gurantee).

22.7.1 With average thickness of 150mm and minimum thickness at khurra as 75mm

Sqm 744.00

176 SOR Item No. 21.1/Page- 182

Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS : 1285, fixed with rawl plugs and screws or with fixing clips, or with

Baaopala ivakasa P`aaiQakrNa

Page 67: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No. Description of Item Unit Rate in Rs.

expansion hold fasteners including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC/neoprene felt etc. Aluminium sections shall be smooth,rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling,C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing and paneling to be paid for separately). (SOR I.No.- 21.1/P-182)

A For fixed portion

Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15)

Kg 223.00

B For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of PVC / neoprene gasket required (Fittings shall be paid for separately).

Anodised aluminium (anodised transparent or dyed torequired shade according to IS: 1868, Minimum anodic coating of grade AC 15)

Kg 236.00

Assistant Engineer Executive Engineer

Baaopala ivakasa P`aaiQakrNa

Page 68: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

Schedule of Item of WorkB. Based on Schedule of Rates for Internal Electrification Works in force from 01st April 2008 issued by

Engineer-in-Chief Madhya Pradesh Public works Department.

S.No.

Item Unit Rate

1. Point wiring (excluding metallic switch box & sheet but including switches, sockets, lamp holders/ceiling roses etc.) with 1.5 sq.mm. PVC insulated cable FR with copper multistrand conductor ISI marked in concealed rigid steel conduit ISI marked of suitable size and 1.5 SQ.MM. PVC insulated copper earth continuity conductor of green colour inside conduit including painting, etc., as required as per specification for

Using Flush Type Normal Accessories

Using Modular

Accessories

1.1 Light Points/Fan Pointsa) Short point Each 234.00 306.00b) Medium point Each 450.00 522.00c) Long point Each 699.00 770.00

1.2 3 Pin 6 Amps socket outlet on separateBoard.a) Short point Each 233.00 377.00b) Medium point Each 450.00 594.00c) Long point Each 701.00 844.00

1.3 Call Bell/ Buzzer Pointsa) Short point Each 237.00 313.00b) Medium point Each 454.00 531.00c) Long point Each 704.00 781.00

1.4 Twin control light pointsa) Short point Each 263.00 343.00b) Medium point Each 526.00 606.00c) Long point Each 803.00 884.00

2. Point wiring(excluding metallic switch box & sheet but including switches, sockets) for 3 pin 6 Amps socket outlet point with 1.5 Sq.mm. PVC insulated cable with copper multi strand conductor ISI marked in Concealed rigid steel conduit ISI marked of suitable size and 1.5 SQ.MM. PVC insulated copper earth continuity conductor of green colour inside conduit with required materials as per specifications, on same board.

Each 76 219

3. Wiring for circuit wiring with PVC insulated cable FR with copper multi strand conductor ISI marked in concealed rigid steel conduit of ISI marked suitable size including painting, etc., as required as per specification.

Using Flush Type Normal Accessories

Using Modular

Accessories

a) 2x2.5 sq.mm. metre 102.00 102.00b) 4x2.5 sq.mm metre 142.00 142.00c) 6x2.5 sq.mm metre 174.00 174.00d) 8x2.5 sq.mm metre 205.00 205.00

4. Point wiring (excluding metallic switch box & sheet) for 3 pin 16 amps Socket Outlet Point with 4 sq.mm PVC insulated cable FR with Copper multi strand Conductor ISI marked in concealed rigid steel conduit ISI marked of suitable size including painting, etc. with 16 amps switch& socket / S.S. Combined 16 amps of ISI marked and 4 Sq.mm. PVC insulated copper earth continuity conductor of green colour inside conduit as per specification for:-On Separate Boarda) Short point Each 382.00 586.00b) Medium point Each 723.00 927.00c) Long point Each 1130.00 1334.00d) Extra long point -I Each 1752.00 1955.00e) Extra long point -II Each 2354.00 2558.00

Baaopala ivakasa P`aaiQakrNa

Page 69: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

f) Extra long point -III Each 2957.00 3161.004.1 Same Board socket 16 amps Each 95.00 299.00

5. Supplying & fixing rigid steel conduit ISI marked along with the accessories in - concealed system including cutting the wall and plastering & repairing the wall with matching colour to bring in its original condition as required

(a) H.G. Conduit 20 mm, wall thickness-1.6mm metre 58.00(b) H.G. Conduit 25 mm, wall thickness-1.6mm metre 68.00(c) H.G. Conduit 32 mm, wall thickness-1.6mm metre 96.00

S.No.

Item Unit Rate

6. Supplying and fixing PVC conduit ISI marked alongwith the accessories in concealed system including painting, etc. as required

(a) PVC Conduit 20 mm (HMS) metre 29.00(b) PVC Conduit 25 mm (HMS) metre 35.00(c) PVC Conduit 32mm (HMS) metre 50.007. Supplying & fixing factory fabricated hot dip galvanized switch box for

normal flush type accessories of minimum 1.2 mm (18 swg gauge thickness with earth terminal stud with nut and washer, with 3mm thick synthetic phenollic resin bonded laminated sheet conforming to grade p-1 of IS:2036-1974 on surface/ concealed including painting, etc. as required as per specification.

(a) MS Box 100 mm x 100mm x 60mm deep Each 56.00(b) MS Box 200 mm x 150mm x 60mm deep Each 100.00(c) MS Box 180 mm x 100mm x 60mm deep Each 83.00(d) MS Box 125 mm x 300mm x 60mm deep Each 147.00(e) MS Box 200 mm x 250mm x 60mm deep Each 187.00(f) MS Box 250 mm x 300mm x 60mm deep Each 258.00(g) MS Box 300 mm x 380mm x 60mm deep Each 367.008. Supplying & fixing of approved make modular type metal box with

modular frame / base plate arid cover plate including fixing in concealed / surface excluding switch, socket etc. as required for :-

(a) 1 or 2 Module Each 53.00(b) 3 Module Each 65.00(c) 4 Module Each 74.00(d) 6 Module Each 112.00(e) 8 Module Each 149.00(f) 12 Module Each 180.00(g) 16 Module Each 196.00(h) 18 Module Each 221.009. Wiring for sub-main with PVC insulated cable FR with Copper multi

strand Conductor ISI marked in recessed / concealed rigid steel ISI marked conduit of suitable size (conduit included) including connection painting etc. as required as per specification.

9.1 2 WIRE SUB MAIN(a) 6.0 sq.mm cable in 25mm conduit metre 145.00(b) 10.0 sq.mm cable in 25mm conduit metre 169.00(c) 16.0 sq.mm cable in 25mm conduit metre 235.00

9.2 4 WIRE SUBMAINS(a) 6.0 sq.mm cable in 25mm conduit metre 219.00(b) 10.0 sq.mm cable in 25mm conduit metre 267.00(c) 16.0 sq.mm cable in 25mm conduit metre 426.00(d) 25.0 sq.mm cable in 32mm conduit metre 668.0010. Supplying of metal clad ISI Marked busbar chamber made of heavy

gauge iron sheet complete with copper strip and busbar supports as per specification confirming to IS-4064

(a) 32 AMP 440/500 VOLTS, 4 Way Each 528.00(b) 60/63 AMP 440/500 VOLTS, 4 Way Each 1032.00(c) 100 AMP 440/500 VOLTS, 4 Way Each 1536.00(d) 200 AMP 440/500 VOLTS, 4 Way Each 2759.00

Baaopala ivakasa P`aaiQakrNa

Page 70: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

(e) 300 AMP 440/500 VOLTS, 4 Way Each 3296.00(f) 400 AMP 440/500 VOLTS, 4 Way Each 3626.00(g) 500 AMP 440/500 VOLTS, 4 Way Each 4866.0011. Supplying of ISI Marked and approved make of moulded case circuit

breaker (MCCB) suitable for 3 phase, 3 pole, 50 HZ, 415 Volts, A.C. supply with respective interrupting capacity (KA) at 415 Volt cited against their range standard confirming to IS 8828

A. M.C.C.B. with Breaking Capacity 25-KA at 415 Volt(a) Current Rating -25 to 100 Amp & 70% -100% adjustable. Each 4082.00(b) Current Rating -125 Amp & 70% - 100% adjustable. Each 5158.00(c) Current Rating -160 Amp & 70% -100% adjustable. Each 6599.00(d) Current Rating -200 Amp & 70% -100% adjustable. Each 7800.00B. M.C.C.B. with Breaking Capacity 35-KA at 415 Volt(a) Current Rating -160 Amp & adjustable :70% - 100% thermal & 5-10

times magnetic setting.Each 10561.00

(b) Current Rating -200 Amp & adjustable :70% - 100% thermal & 5-10 times magnetic setting.

Each 10909.00

(c) Current Rating -250 Amp & adjustable :70% - 100% thermal & 5-10 times magnetic setting.

Each 13491.00

(d) Current Rating -315 Amp & adjustable :70% - 100% thermal & 5-10 times magnetic setting.

Each 15838.00

(e) Current Rating -400 Amp & adjustable :70% - 100% thermal & 4-10 times magnetic setting.

Each 15838.00

(f) Current Rating -500/630 Amp & adjustable :70% - 100% thermal &4-10 times magnetic setting.

Each 17598.00

(g) Current Rating -800 Amp & adjustable :70% - 100% thermal & 4-10 times magnetic setting.

Each 21116.00

C. M.C.C.B. with Breaking Capacity 50-KA at 415 Volt(a) Current Rating -400 Amp & adjustable :70% - 100% thermal & 4-10

times magnetic setting.Each 17015.00

(b) Current Rating -500/630 Amp & adjustable :70% - 100% thermal &4-10 times magnetiosetting.

Each 19357.00

(c) current Rating -800 Amp & adjustable :70% - 100% thermal & 4-10 times magnetic setting.

Each 22287.00

12. Supplying of ISI Marked and accepted standard of Miniature circuit Breaker(MCB) of C series suitable for 240/415 Volts, 50 Cycle, 10 KA Value AC Supply conforming to IS:8828:1996, IEC:60898:2002 but without enclosures;

A. SINGLE POLE (SP)(a) 0.5 Amp to 5 Amp. Rating Each 184.00(b) 6 Amp to 32 Amp. Rating Each 126.00(c) For 40 Amps Rating only Each 259.00(d) 50 to 63Amps. Rating Each 304.00B. SINGLE POLE AND NEUTRAL (SPN)(a) 0.5 Amp to 5 Amp. Rating Each 424.00(b) 6 Amp to 32 Amp. Rating Each 379.00(c) For 40 Amps Rating only Each 523.00(d) 50 to 63Amps. Rating Each 593.00C. DOUBLE POLE (DP)(a) 0.5 Amp to 5 Amp. Rating Each 508.00(b) 6 Amp to 32 Amp. Rating Each 424.00(c) For 40 Amps Rating only Each 568.00(d) 50 to 63Amps. Rating Each 693.00D. FOR TRIPPLE POLE (TP)(a) 0.5 Amp to 5 Amp. Rating Each 698.00(b) 6 Amp to 32 Amp. Rating Each 628.00(c) For 40 Amps Rating only Each 867.00(d) 50 to 63Amps. Rating Each 1007.00E. FOR TRIPPLE POLE & NEUTRAL (TPN)(a) 0.5 Amp to 5 Amp. Rating Each 942.00(b) 6 Amp to 32 Amp. Rating Each 822.00(c) For 40 Amps Rating only Each 1081.00(d) 50 to 63Amps. Rating Each 1271.00F. FOUR POLE (FP)(a) 0.5 Amp to 5 Amp. Rating Each 1032.00(b) 6 Amp to 32 Amp. Rating Each 912.00

Baaopala ivakasa P`aaiQakrNa

Page 71: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

(c) For 40 Amps Rating only Each 1161.00(d) 50 to 63Amps. Rating Each 1341.00

13. Supplying of MCB Isolators suitable for 240/415 Volts, 50 Hz , AC Supply with KA Value rating 10KA of approved make conforming to IS:13947-part 111:1993 & IEC:60947-3:2001 (without enclosures);

A. SINGLE POLE(a) For 40 Amps Each 159.00(b) 63 Amps. Each 179.00B. DOUBLE POLE(a) For 40 Amps Each 249.00(b) 63 Amps. Each 314.00C. TRIPPLE POLE(a) For 40 Amps Each 454.00(b) 63 Amps. Each 493.00D. FOUR POLE(a) For 40 Amps Each 553.00(b) 63 Amps. Each 573.00(c) 80 Amps Each 748.00(d) 100Amps. Each 748.00

14. Supplying of approved make powder coated sheet enclosure SPN MCB DB inclusive of Busbar, Neutral bar, Earth bar, & two earth terminals etc. complete as per IS:13032 (exclusive of MCB & isolator):-

(a) 2 way single door Each 150.00(b) 4 way single door Each 364.00(c) 4 way double door Each 628.00(d) 6 way double door Each 738.00(e) 8 way double door Each 847.00(f) 12 way double door Each 1091.00(g) 16 way double door Each 1356.00

15. Supplying of approved make TPN MCB DB Metal Double Door with provision for FP MCB/ Isolator/RCCB/RCBO as incomer and SP MCBs as outgoing inclusive of Busbar, Neutral bar, Earth bar, & two earth terminals etc. complete as per IS:13032 (exclusive of MCB & isolator):-

(a) 4 way (4+12) Each 1704.00(b) 6 way (4+18) Each 2158.00(c) 8 way (4+24) Each 2492.00(d) 4 way (4+12) Each 1794.00(e) 6 way (4+18) Each 2218.00(f) 8 way (4+24) Each 2641.00(g) 12 way (8+36) Each 3573.00

16. Supplying of approved make Vertical TPN MCB DB Metal Double Door with provision for FP CB/ Isolator/RCCB to CBO as incomer and SP/TP MCBs as outgoing inclusive of Busbar, Neutral bar, Earth bar, & two earth terminals etc. complete as per IS:13032(exclusive of MCB & isolator):-

(a) 4 way (8+12) Each 5057.00(b) 6 way (8+24) Each 6404.00(c) 12 way (8+36) Each 8573.00

17. Supplying of approved make powder coated Vertical TPN MCB DB Metal Double Door with MCCB 100A TP 10KA as incomer and space for SP/TP MCBs as outgoing (without MCBs) inclusive of Busbar & connections etc without MCB:-

(a) 4 way with MCCB Each 6499.00(b) 8 way with MCCB Each 7212.00(c) 12 way with MCCB Each 8248.00

18. Supplying and fixing of approved make plug socket D.B.s (without MCB) S.P.N, sheet enclosure (dust protected) inclusive of 2 pole and earth metal plug and socket and space to incorporate S.P. M.C.B complete as

Baaopala ivakasa P`aaiQakrNa

Page 72: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

per specification.(a) 10 Amp. Each 553.00(b) 20 Amp. Each 568.00

19. Supply and fixing of ISI Marked Industrial type metal plug socket distribution board (without MCBs) for TPN enclosure three pole and earth metal plug and socket including space incorporating T.P. M.C.B complete as per specification as required.

(a) 20 Amp. Each 1091.00(b) 30 Amp. Each 1520.00

20. Fixing of M.C.B/Isolator SP/DP in sheet steel enclosure as required as per accepted practice, including mounting on Busbar and cable connections etc. complete (Labour only)

Each 2.00

21. Fixing of M.C.B./ M.C.C.B. Isolators TP/T.P.N./FP in sheet metal enclosure as required as accepted practice including mounting on busbar and cable connections etc. complete

Each 5.00

22. Labour charges for fixing sheet steel enclosures, M.C.B. D.B. surface mounting type as per accepted practice on 25x5mm flat iron clamp, duly embedded in wail cable connection etc. complete.

(a) 15 (a,b,c,d) Each 50.00(b) 15(e) 16(a,b) Each 51.00(c) 16 (c,d); 17(a) Each 53 .00

23. Labour charges for fixing sheet steel enclosures, M.C.B. D.B. surface mounting type, as per accepted practice on 25x25x5mm angle iron clamp, including Supplying and fixing clamps duly embedded in wall, cable connection etc. complete:-

(a) 15(f,g), 16(e,f,g), 17(b,c),18(a,b.c) Each 79.00

24. Labour charges for fixing sheet steel enclosures, M.C.B. D.B. flush mounting type, as per accepted practice, duly embedded and end plate completely flushed in wall, cable connection etc. complete:-

(a) 15 (a,b,c,d,e), 16 (a,b,c,d,e); 17(a) Each 49.00(b) 15(f,g), 16(f,g), 17(b,c), 18(a,b.c) Each 65.00

25. Supply and fixing as per specification Bakelite pendent Holder of approved make including flexible cord up to 3 meter length with necessary materials complete.

Each 21.00

26. Supply and fixing as per specification Bakelite Batten Holder of approved make with necessary materials complete.

Each 18.00

27. Supply and fixing as per specification Bulk Head fitting of approved make suitable for 100 watt lamp with necessary materials complete.

(a) ordinary Each 65.0028. Supplying and fixing as per specification Socket outlet of approved

make & ISI marked with necessary materials complete.(a) 6 amp 250 Volts 3 Pin PB Each 45.00(b) 6 amp 250 Volts 3/5 Pin Flush type Each 21.00(c) 16 amp 250 Volts 3 Pin PB Each 67.00(d) 16 amp 250 Volts 3/6 Pin Flush type Each 65.00(e) 10 amp 250 Volts 3 Pin Modular type Each 141.00(f) 20 amp 250 Volts 3 Pin Modular type Each 227.00

29. Supplying and fixing, testing & commissioning, wall/ floor mounted L.T. panel primer coated with two coat of enamel paint and provided with required gasket for dust/vermin proof with degree of protection IP42 suitable for 415V 3 phase, 50Hz, 4 wire system fabricated out of CRCA sheet upto 2 mm thick (1.6 mm for doors) with framework of angle iron/ channel/ bolted type construction duly compartmentalized for incomer, bus section, outgoings, cable alleys & CT,PT Ampere Meter, Volt Meter, selector switches, Frequency Meter ,phase indicating lamps, Energy Meter complete including cost of busbar supports, detachable cable

Kg 95.00

Baaopala ivakasa P`aaiQakrNa

Page 73: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

gland plates, 2 earthing terminals, internal wiring & fixing of separately supplied MCBs, MCCBs, panel mounted changeover switch/SFUs, etc. as required but excluding cost of busbar strips, Ampere Meter, Volt Meter, Selector switch as per approved design & specifications.

30. Supplying and drawing following pair, 0.5 sq mm PVC insulated copper conductor unarmored telephone cable in existing surface/ concealed,steel / PVC Conduit as required.

(a) 1 Pair Metre 16.00(b) 2 Pair Metre 19.00(c) 4 Pair Metre 21.0031. Supplying and drawing Co-axial T.V. Cable RG-6 Grade, 0.7 mm Solid

Copper conductor PE insulated ,shielded with fine tined copper braid and protected with PVC sheath in the existing surface/concealed, steel/PVC. Conduit as required.

Metre 23.00

32. Supplying and fixing fan clamps of 16mm dia steel bas as per specification complete :-

(a) For stone slab roof "J" Type Hook Each 31.00(b) For R.C.C. slabs/ Beams Each 16.00(c) For existing old R.C.C. slabs/ Beams Each 50.0033. Earthing with G.I. earth pipe 4.5 Metre long and 40mm dia with

masonary enclosure in cement mortar, cover plate having lockingarrangement on the top etc.(but without charcoal or coke and salt) complete as per required.

Each 1598.00

(a) Add extra or using charcoal / coke for pipe earth electrode as required including excavation & refilling.

(b) Excavation 2.5 cum by manual labour. Each 429.00(c) Excavation by making hole with

auger.Each 375.00

34. Earthing with G.I. earth plate 600mm x 600mm x 6mm thick including accessories and providing masonary enclosure in cement mortar; cover plate having locking arrangement on the top and G.I. watering pipe 20mm dia 2.7m long etc. (but without charcoal or coke and salt) complete as required

Each 2200.00

35. Earthing with copper earth plate 600mm x 600mm x 3mm thick including accessories andproviding masonary enclosure in cement mortar cover plate having locking arrangement on the top and G.I. watering pipe 20mm dia 2.7m long etc. (but without charcoal or coke and salt) complete as required.

Each 6817.00

36. Add Extra for Using salt and charcoal/coke for G.I. plate or copper plate earth electrode asrequired including excavation & refilling.

Each 472.00

37. Supplying and laying 8 SWG copper wire at 0.50m below ground level as conductor earth electrode including soldering etc. as required

Per Mtr. 74.00

38. Supplying and laying 6 SWG G.I. wire at 0.50m below ground level as conductor earth electrode including soldering etc. as required.

Mtr. 13.00

39. Supplying and laying 25mmx5mm G.I. strip at 0.5 meter below ground level as strip earth electrode including soldering etc. as required

Metre 58.00

40. Supplying & laying 25mmx6mm G.I. strip at 0.5 meter below ground level as strip earth electrode including soldering etc. as required

Metre 69.00

41. Providing and fixing 25mm x 5mm copper strip in 40mm dia G.I. pipe from earth electrode as required

Metre 884.00

42. Providing and fixing 25mm x 5mm Gl strip in 40mm dia G.I. pipe from earth electrode as required

Metre 257.00

43. Providing and laying Earth connection from earth electrode with 4mm dia G.I. wire in 15mm dia G.I. PIPE (B class) from earth electrode as required

Metre 86.00

44. Providing and laying Earth connection from earth electrode with 4mm dia copper wire in 15mm dia G.I. PIPE (B class) from earth electrode as required

Metre 141.00

45. Providing and fixing 25mm x 5mm G.I. copper strip on surface or recessed for connection etc as required

Metre 737.00

46. Providing and fixing 25mm x 4mm G.I. strip on surface or recessed/ concealed for connection etc as required

Metre 77.00

47. Providing and fixing 4mm dia G.I. strip on surface or In recessed/concealed for loop earthing as required

Metre 18.00

Baaopala ivakasa P`aaiQakrNa

Page 74: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

48. Providing and fixing 4mm dia copper wire on surface or In recessed/concealed for loop earthing as required

Metre 82.00

49. Providing and fixing earthing arrangement with 38.1mm dia 2.5 Metre long galvanized iron pipe electrode including packing of charcoal powder and salt as per specification watering pipe 19 mm dia G.I. Connection etc. complete with refilling the pit as required, but excluding the excavation of earth pit

Each 764.00

50. Supplying & laying G.I. earth lead duly installed on wall or in G.I. Pipe including connection etc complete, as required.

(a) 13 sq mm (4mm dia) Metre 6.00(b) 25 sq mm (5.6 mm dia) Metre 10.00(c) 40 sq mm (7.1 mm dia) Metre 15.0051. Providing and laying Earth continuity conductor including fixing with

copper clamps and other necessary materials as per specification along the run of conduit

A. Aluminium Earth Continuity Conductor:-(a) 6 sq mm Metre 5.00(b) 10 sq mm Metre 8.00(c) 16 sq mm Metre 11.00(d) 25 sq mm Metre 18.00B. G.I. or Steel Earth Continuity Conductor:-(a) 6 sq mm Metre 3.00(b) 10 sq mm Metre 5.0052. Supplying and Drawing PVC insulated copper cable(earth

continuity conductor) of green colour FR with copper multi strand conductor ISI marked in existing conduit along with other wires as required as per specifications:-

(a) 4 sq mm Metre 24.00(b) 6 sq mm Metre 38.00(c) 10 sq mm Metre 50.00(d) 16 sq mm Metre 82.00(e) 25 sq mm Metre 129.0053. Supply of XLPE Insulated Power cable (confirming IS-7098) 1100 volts

grade heavy duty power cable confirming to IS 1554-1100 Volt grade, 2 core/ 3 1/2 core/ 4 core ISI MARKED with alu. stranded/solid conductor.

A. Unarmoured 2 Core(a) 2.5 sq mm (Heavy Duty) Metre 35.00(b) 4 sq mm (Heavy Duty) Metre 42.00(c) 6 sq mm (XLPE) Metre 54.00(d) 10 sq mm (XLPE) Metre 70.00(e) 16 sq mm (XLPE) Metre 94.00B. Armoured 2 Core(a) 2.5 sq mm (Heavy Duty) Metre 76.00(b) 4 sq mm (Heavy Duty) Metre 84.00(c) 6 sq mm (XLPE) Metre 95.00(d) 10 sq mm (XLPE) Metre 123.00(e) 16 sq mm (XLPE) Metre 138.00C. Armoured 3 1/2 Core(a) 25 sq mm (XLPE) Metre 232.00(b) 35 sq mm (XLPE) Metre 273.00(c) 50 sq mm (XLPE) Metre 360.00(d) 70 sq mm (XLPE) Metre 465.00(e) 95 sq mm (XLPE) Metre 609.00(f) 120 sq mm (XLPE) Metre 749.00(g) 150sq mm (XLPE) Metre 886.00(h) 185 sq mm (XLPE) Metre 1103.00(i) 240 sq mm (XLPE) Metre 1407.00(j) 300 sq mm (XLPE) Metre 1720.00(k) 400 sq mm (XLPE) Metre 2182.00D. Armoured 4 Core(a) 6 sq mm(XLPE) Metre 136.00(b) 10 sq mm(XLPE) Metre 146.00(c) 16 sq mm(XLPE) Metre 188.00

Baaopala ivakasa P`aaiQakrNa

Page 75: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

(d) 25 sq mm(XLPE) Metre 245.00(e) 35 sqmm (XLPE) Metre 291.00(f) 50 sq mm (XLPE) Metre 394.00(g) 70 sq mm (XLPE) Metre 513.00(h) S5 sq mm (XLPE) Metre 681.00(i) 120 sq mm (XLPE) Metre 826.00(j) 150sq mm (XLPE) Metre 994.0054. Supplying and installing Gl pipes for protection of underground cables

fixed on wall/support/ in trench/fixed between two rigid existing support of wall/beam for erection of ceiling fans/down rod for stiff pendant for light luminaries/fan/protective for earthing, lightening conductor down strip/overhead service lines/for submersible or centrifugal pump for water supply with necessary iron clamp, coupler, bend, tee ,elbow ,nuts and bolts etc. complete in an approved manner as required to complete the job excluding cost of excavation/dismantling and other finished masonary items complete.

A. For 'B' class G.I. pipe ISI MARKED (IS-1161-68)(a) 15 mm Metre 85.00(b) 20 mm Metre 112.00(c) 25 mm Metre 156.00(d) 32 mm Metre 199.00(e) 40 mm Metre 233.00(f) 50 mm Metre 299.00(g) 65 mm Metre 385.00(h) 80 mm Metre 514.00(i) 100 mm Metre 714.00(j) 125 mm Metre 990.00(k) 150 mm Metre 1169.00B. For 'A' class G.I. pipe ISI MARKED (IS-1161-69)(a) 32 mm Metre 175.00(b) 40 mm Metre 223.00(c) 50 mm Metre 276.00(d) 65 mm Metre 371.00(e) 80 mm Metre 439.00(f) 100 mm Metre 629.0055. Supplying and Laying rigid PVC Single socket end ,non-metallic pipe

ISI MARKED (IS-4985-2000) class 5 for protection of underground cable/or for water pump delivery side ,for water supply complete with necessary clamp coupler ,band ,tee ,elbow ,etc. in an approved manner excluding the cost of excavation.

(a) 50.00 mm O.D. Metre 74.00(b) 75.00 mm O.D. Metre 160.00(c) 110.00 mm O.D. Metre 337.0056. Supplying and installing double wall corrugated pipes (DWC) of

HDPE (IS-14930 Part ll-marked) for cable laid underground with necessary connecting sockets/ couplings, tee's of same material and at required depth up to 90 cm below road/ ground surface .including excavation, back filling with excavated material with ramming and making the surface good.

(a) 50.00 mm outside dia. Metre 160.00(b) 63.00 mm outside dia. Metre 170.00(c) 77.00 mm outside dia. Metre 180.00(d) 90.00 mm outside dia. Metre 215.00(e) 110.00 mm outside dia. Metre 250.00(f) 120.00 mm outside dia. Metre 270.00(g) 145.00 mm outside dia. Metre 305.00(h) 160.00 mm outside dia Metre 330.00(i) 175.00 mm outside dia. Metre 350.00(j) 200.00 mm outside dia. Metre 390.0057. Laying of one number PVC insulated and PVC sheathed power cable of

1.1 KV Grade of size not exceeding 25 sq mm direct in ground including excavation, sand cushioning, protective covering and refilling the pit etc. as required.

Metre 102.00

58. Laying of one number PVC insulated power cable of 1.1 KV Grade of size exceeding 25sq mm but not exceeding 120 sq mm direct in ground

Metre 106.00

Baaopala ivakasa P`aaiQakrNa

Page 76: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

including excavation and sand cushioning , protective covering and refilling the pit ,etc. as required.

59. Laying of one number PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size exceeding 120sq mm but not exceeding 400 sq mm direct in ground including excavation and sand cushioning , protective covering and refilling the pit ,etc. as required.

Metre 109.00

60. Laying of one number additional PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size not exceeding 25sq mm direct in ground in the same trench in one tier horizontal formation including excavation and sand cushioning , protective covering and refilling the pit ,etc. as required.

Metre 65.00

61. Laying of one number additional PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size exceeding 25sq mm but not exceeding 120 sq mm direct in ground in the same trench in one tier horizontal formation including excavation and sand cushioning, protective covering and refilling the pit, etc. as required.

Metre 67.00

62. Laying of one number additional PVC insulated and PVC sheathed power cable of 1 1KV Grade of size exceeding 120sq mm but not exceeding 400 sq mm direct in ground in the same trench in one tier horizontal formation including excavation and sand cushioning , protective covering and refilling the pit ,etc. as required.

Metre 68.00

63. Laying of one number PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size not exceeding 25 sq mm in the existing RCC hume/stone/ware/GI pipe as required.

Metre 10.00

64. Laying of one number PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size exceeding 25sq mm but not exceeding 400sq mm in the existing RCC /hume/stoneware/GI pipe as required.

Metre 13.00

65. Laying of one number PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size not exceeding 25 sq mm in the existing masonary open duct as required.

Metre 8.00

66. Laying of one number PVC insulated and PVC sheathed power cable of 1.1 KV Grade of size exceeding 25sq mm but not exceeding 400sq mm in the existing masonary open duct as required.

Metre 10.00

67. Laying of one number PILC/PVC insulated and PVC sheathed power cable of Grade exceeding 1.1 KV but not exceeding 11KV of size not exceeding 120 sq mm direct in ground including excavation and sand cushioning, protective covering and refilling the trench,etc. as required.

Metre 122.00

68. Laying of one number PILC/PVC insulated and PVC sheathed power cable of grade exceeding 11KV of size exceeding 120 sq mm but not exceeding 400 sq mm direct in ground including excavation and sand cushioning, protective covering and refilling the trench ,etc. as required.

Metre 125.00

69. Laying of one number additional PILC/PVC insulated and PVC sheathed power cable of grade exceeding 1.1 KV but not exceeding 11KV of size not exceeding 120 sq.mm direct in ground in the same trench in one tier horizontal formation including excavation and sand cushioning, protective covering and refilling the trench ,etc. as required.

Metre 76.00

70. Laying of one number PILC/PVC insulated and PVC sheathed power cable of grade exceeding 1.1 KV but not exceeding 11KV of size exceeding 120 sq mm but not exceeding 400 sq mm direct in ground in the same trench in one tier horizontal formation including excavation, sand cushioning, protective covering and refilling the trench ,etc. as required.

Metre 78.00

71. Laying of one number PILC/PVC insulated and PVC sheathed power cable of Grade exceeding 1.1 KV but not exceeding 11KV of size not exceeding 400 sq mm in the existing RCC/Hume/ stoneware/G.I. pipe as required.

Metre 19.00

72. Laying of one number PILC/PVC insulated and PVC sheathed power cable of Grade exceeding 1.1 KV but not exceeding 11KV of size not exceeding 400 sq mm in the existing masonary open duct as required.

Metre 15.00

73. Laying and fixing of one number PVC insulated and PVC sheathed aluminium conductor cable of 1.1 KV grade of size not exceeding 25 sq mm on surface etc. as required.

Metre 38.00

74. Laying and fixing of one number PVC insulated and PVC sheathed aluminium conductor cable of 1.1KV grade of size exceeding 25 sq mm but not exceeding 120 sq mm on surface etc. as required.

Metre 56.00

75. Laying and fixing of one number PVC insulated and PVC sheathed aluminium conductor cable of 1.1 KV Grade of size exceeding 120 sq

Metre 80.00

Baaopala ivakasa P`aaiQakrNa

Page 77: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

S.No.

Item Unit Rate

mm but not exceeding 300 sq mm on surface etc. as required.76. Excavation of the trenches in Hard Rock not exceeding 1.5 m in width

and lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within the lead of 50 m (without blasting).

Cum. 262.00

77. Laying of underground cable armoured /unarmoured as per specification in air with approved type of iron clamps complete.

(a) 2/3/4 core cable upto 16 sq. mm. Metre 18.00(b) 2/ 3 1/2 /4 core cable 25 sq. mm. to 120 sq. mm. Metre 26.00(c) 3/ 3 1/2 /4 core cable 150 sq. mm. and above. Metre 34.0078. Laying of Cement Concrete or approved type of cable cover/flag stone

over LT cover trench as per specifications.Metre 19.00

Assistant Engineer Executive Engineer

Baaopala ivakasa P`aaiQakrNa

Page 78: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

NON S.O.R. ITEMSNote: No Tender Percentage above or below will be paid on Non SOR Items.

S.No. Item Unit Rate1. Providing and Fixing 18 gauge M.S. Sheet Hexagonal/Circular fan box complete

with 12 mm rod plain bar fan hook complete.Each 80.60

2. Providing and Fixing Meter box fabricated with 18 Gauge CRCA Sheet having separate compartments for Energy Meter and outgoing^ D.P. /T.P. M.C.B. I/C required number of holes for incomer and outgoing connections and locking arrangement with three coat approved color painting arrangement for fixing Energy Meter M.C.B. including transportation loading ,unloading at site complete Meter box as per requirement of MPMKVV Co.

Each 1200.00

3. Providing and Fixing the following socket outlets on existing GI/MS boxes, fixed surface or recessed on walls with best quality brass screw and other materials required l/C cable/wire termination through appropriate size quality and material of approved type of lugs with it crimping etc. complete as per specification of approved make as directed by Engineer In charge.

(a) 2 Amp 2 pin Telephone socket outlet Each 44.90

Assistant Engineer Executive Engineer

Baaopala ivakasa P`aaiQakrNa

Page 79: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

C. Based on M.P.P.W.D.S.O.R. for Road and Bridge Works inforce from 15/04/2009 with upto date amendments

SN Particulars Unit Rate

1 Excavation for roadway in soil including loading in trucks for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres and as per relevant clauses of section-300. (SOR I.No.- 3.1/P-5)

Cum 69.00

2 Construction of embankment / subgrade with approved material / selected soil having CBR > 5 (Unless specified otherwise in the contract) obtained from excavation of borrow pits i/c all lifts & leads i/c grading to required slope & camber and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement of Table 300.1, 300.2 and as per relevant clause of section 300. (SOR I.No.- 3.13/P-6)

Cum 134.00

3 Construction of granular sub base by providing coarse graded material, spreading in uniform layers with on prepared surface, mixing by mix in place method at OMC, and compacting with vibratory roller to achieve the desired density, complete in all respect and as per relevant clauses of section - 400 . (SOR I.No.- 4.1(ii)/P-8)

a for grading -II material Cum 510.004 Providing, laying, spreading and compacting stone aggregates of specific sizes to

water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density and as per relevant clauses of section-400 . (SOR I - 4.3,P - 8)

I Grading - IIa Using Screening crushable type.{SOR I -4.3[ii](a),Chapter-R4,P-20} Cum 715.00II Grading - IIIa Using Screening Crushable type .{SOR I -4.3[iii](a),Chapter-R4,P-8} Cum 700.00

Assistant Engineer Executive Engineer

Baaopala ivakasa P`aaiQakrNa

Page 80: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE - "F"

Bank Guarantee Bond

(To be used by approved scheduled banks)

1. In consideration of the Chairman B. D. A.(hereinafter called the Government) having, agreed to exempt ..................................................... (hereinafter called the said contractor) from the demand under the terms and conditions of an agreement date .............................. made between..................... .............. and .............................. for ......................................... (hereinafter called the said Agreement) of earnest money deposit for the due fulfillment by the said contractor (s) of the terms and conditions contained in the said agreement on production of a Bank Guarantee for Rs ……………………………………………………………………………(Rs.......................................................... only) We ........................................................... Bank Limited (hereinafter referred to as "the Bank") do hereby undertake to pay to B.D.A. an amount not exceeding Rs. .............................. against any loss or damaged caused to or suffered or would be caused to or suffered by the B.D.A.by the reason of any breach by the said contractor (s) of any terms or condition contained in the agreement.

2. We ..................................................... do hereby undertake to pay the amount due and payable under this guarantee without any demur merely on a demand from the B.D.A. stating that the amount claimed is due by way of loss or damage caused to or suffered by the B.D.A. by reason of any breach by said Contractor(s) of any the terms or contained in the said agreement or by reason of the Contractor (s) of failure to perform the said agreement. Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However our liability under his guarantee shall be restricted to an amount not exceeding Rs. ............................................

3. We .................................... further agree with the guarantee herein contained shall remain in ful force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all dues of B.D.A. under or by virtue of said agreement have been fully paid and its claims satisfied or till .................................... department of ........................................ certifies that the terms of the said agreement have been fully and properly carried out by the said contractor (s) and accordingly discharges the guarantee Unless a demand or claim under this guarantee is made on us in writing on or before the .............................................. we shall be discharged from all liability under this guarantee thereafter.

4. We .............................................. further agree with the B.D.A. that the B. D. A. shall have the fullest liberty without our consent and without our effecting in any manner our obligations hereunder or the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any time or from time to time any of the powers exercisable by the B.D.A. against the said contractor(s) and to forebear or enforce any of the terms and conditions relating to the said Agreement and we shall not be relieved from our liability by reasons of any such variation of extension having guaranteed to the said contractor(s) for any forbearance act or commission on the part of the Government or any indulgence by the B.D.A. of the said contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would but for this provision have effect of so relieving us.

5. ...................................... lastly undertake not to revoke this guarantee during its currency except with the previous consent of the B.D.A.in writing.

6. This guarantee will not be discharged due to the change in the constitutions of the Bank or the Contractor(s)/Supplier(s)

7. We undertake to pay the Government any money so demanded notwithstanding any dispute or disputes raised by the Contractor(s) Supplier(s) in any suit or proceeding pending before any court or Tribunal relating there to our liability under this present being absolute and unequivocal.

The payment so made by us under this bond shall be a valid discharge or our liability for payment there under and the contractor(s) shall have no claim against us for making.

Dated ............................ day of ..............2010

For ............................................. Bank Ltd.

(Indicate the name of Bank)

Baaopala ivakasa P`aaiQakrNa

Page 81: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE “G”

FORM OF CERTIFICATE OF INCOME TAXTO BE SUBMITTED BY CONTRACTOR TENDERING

FOR WORKS COSTING RS. 2.00 LACS OR MORE

1. Name and style (of the company, firm, HUF or individual) in which the applicant is addressed to Income tax and address for purpose of assessment.

2. The income tax circle/ward/ district in which the applicant is assessed to income tax.

3. The following particulars concerning the last income tax assessment made :-

a) Reference No. (or GIR No.) of the assessmentb) Assessment year and accounting yearc) Amount of total income assessedd) Amount of tax assessed e) Amount of tax paidf) Balance, being tax not yet paid and reasons for such arrearsg) Whether any attachment or certificate proceedings pending in

respect of the arrearsh) Whether the company or firm or HUF on which the

assessment was made had been or is being liquidated, wind up, dissolved, participated or being declared insolvent as the case may be

i) The position about later assessment, namely whether returns submitted under section 22(i) or (2) of the Income Tax Act and whether tax paid under section 16-A of the Act and the amount of tax so paid or in arrears (iv). In case there has been no Income tax assessment at all in the past, whether returns submitted under section 21(1) or (2) and 18-A if so, the amount of income returned or tax paid and the income tax circle/ward/ district concerned (v) The name of address of Branch(es) verified the particulars setout above and found correct. Subject to the following remarks.

Dated: Signature of I.T.O.

Seal: Circle/Ward/ District

Baaopala ivakasa P`aaiQakrNa

Page 82: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

ANNEXURE “H”

PROFORMA - A

(FINANCIAL STATEMENT)

1. Name of Applicant

2. Summary of assets and liabilities on the basis of the audited financial statement of last three financial year, (Attach copies of the audited financial statement of the last three financial years.)

Year

(Rs. Lakhs)

Year

(Rs. Lakhs)

Year

(Rs. Lakhs)

Year

(Rs. Lakhs)

Year

(Rs. Lakhs)

a. Total assets

b. Current Assets

c. Cash, temporary investments and current receivable.

d. Total liabilities.

e. Current liabilities

f. Net worth (a) - (d)

g. Working Capital (b) - (e)

h. Authorized capital

i. Capital issued and paid up

j. Current ratio (b) / (e)

k. Acid Test ratio (c) / (e)

l. Total liability to net work (d) / (f)

3. Annual value of construction works, undertaken for each of the last three years and projected for current year.

(Rs. in Lakhs)

Current year

1 year before 2 year before 3 year before 4 year before 5 year before

Home

Abroad

4. Net profit before tax:

(a) Current (Year)

(b) During the last financial year

(c) During each of the four previous financial years :

The profit and loss statements have been certified through __________ by _________________

5. Application specific financial arrangement (mention amount in India rupees)

(a) Own Resources:

(b) Bank Credit:

(c) Other (specify):

6. Credit Facilities:

(a) Non/address of first class/Nationalized Bank providing credit line.

(b) Total amount of credit line (attach certificate form the bank)

7. Approximate value of works in hand.

Signature of Chartered Accountant Signatures of Applicant

Baaopala ivakasa P`aaiQakrNa

Page 83: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "B"

DETAILS OF ALL WORKS OF SIMILAR CLASS COMPLETED DURING THE LAST

FIVE YEARS ENDING LAST DAY OF THE MONTH NOVEMBER 2010

S.No.

Name of work/project and location

Owner or sponsoring organisation

Cost of works in crores

Date of common cement as per contract

Stipulated date of completion

Litigation / arbitration pending in progress with details*

Name and address / telephone number of officer to whom reference may be made

Remarks

1 2 3 4 5 6 7 8 9

*Indicate gross amount claimed and amount awarded by the Arbitrator.

Baaopala ivakasa P`aaiQakrNa

Page 84: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "C"

PROJECTS UNDER EXECUTION OR AWARDS

S.No.

Name of work/project and location

Owner or sponsoring organisation

Cost of works in crores

Date of common cement as per contract

Stipulated date of completion

Litigation / arbitration pending in progress with details*

Name and address / telephone number of officer to whom reference may be made

Remarks

1 2 3 4 5 6 7 8 9

Signature of Applicant(s)

Baaopala ivakasa P`aaiQakrNa

Page 85: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "D"

PERFORMANCE REPORT OF WORKS REFERRED TO PROFORMA "B" "C"

1. Name of work / Project & Location 2. Agreement No. 3. Estimated Cost 4. Tendered Cost 5. Date of start 6. Date of completion

(i) Stipulated date of completion (ii) Actual date of completion

7. Amount of compensation levied for delayed completion, if any.8. Amount of reduced rate items, if any9. Performance Report

(1) Quality of work Very Good/Good/Fair/Poor(2) Financial soundness Very Good/Good/Fair/Poor(3) Technical Proficiency Very Good/Good/Fair/Poor(4) Resources fullness Very Good/Good/Fair/Poor(5) General behavior Very Good/Good/Fair/Poor

Dated : Executive Engineer of Equivalent

Baaopala ivakasa P`aaiQakrNa

Page 86: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "E"STRUCTURE & ORGANIZATION

1. Name & Address of the applicant 2. Telephone No. Telex No. /Fax No. 3. Legal status of the applicant (attach copies of original document defining the legal status).

(a) An individual (b) A proprietary firm (c) A firm in partnership(d) A limited company of Corporation

4. Particulars of registration with various Government bodies (attach attested photocopy)Organization / Place of registration 1.2.3.

5. Name and Titles of Directors & Officers with designation to be concerned with this work.6. Designation of individuals authorized to act for the organization.7. Was the applicant ever required to suspend construction for a period of more than six months continuously

after you commenced the construction? If so, give the name of the project and reasons of suspension of work.

8. Has the applicant or any constituent partner in case of partnership firm, ever abandoned the awarded work before its completion? If so, give name of the project and reasons for abandonment.

9. Has the applicant, or any constituent partner in case of partnership firm, ever been debarred / black listed for tendering in any organization at any time ? If so, give details.

10. Has the applicant, or any constituent partner in case of partnership firm, ever been convicted by accourt of law? If so, give details.

11. Any other information considered necessary but not included above.

Signature of Applicant(s)

Baaopala ivakasa P`aaiQakrNa

Page 87: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "E" Contd.

DETAILS OF TECHNICAL & ADMINISTRATIVE PERSONEL TO BE EMPLOYED FOR THE WORK

Signature of Applicant(s)

Baaopala ivakasa P`aaiQakrNa

S.No.

Designation

Total Number

Number available

for the work

Name Qualification

Professional experience

and details of work carried

out

How these

would be involved in this work

Remarks

1 2 3 4 5 6 7 8 9

Page 88: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "F"

DETAILS OF CONSTRUCTION AND EQUIPMENT LIKELY TO BE USED IN CARRYING OUT THE WORK

S.No.

Name of equipment

Nos. Capacity or type

Age Condition Ownership status Current Location

RemarksPresently Leased To be

Purchased

1 2 3 4 5 6 7 8 9 10 11

Signature of Applicant(s)

Baaopala ivakasa P`aaiQakrNa

Page 89: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "G"

INFORMATION REGARDING LITIGATION, DEBARRING/EXPELLING OF TENDER OR ABANDONMENT OF WORK BY TENDERER

1. (a) (i) Is the Applicant currently involved in any Yes/Nolitigation related to the contract works.

(ii) In last five years Yes/No(b) If yes, give details.

2. (a) Has the Applicant or any of its constituent Yes/Nopartners been debarred/expelled by any Agency in India during the last 5 years.

(b) If yes, give details.3. (a) Has the applicant or any its constituent partners Yes/No

failed to perform on any contract work in India during the last 5 years.

Note : If any information in this schedule is found to be incorrect or concealed, pre-qualification application will be summarily rejected.

Signature of Applicant(s)

Baaopala ivakasa P`aaiQakrNa

Page 90: Bhopal Development Authority, Bhopal - bda · the Executive Engineer, Division No.-07, Bhopal Development Authority, IInd, floor Pragati Bhavan, Indira Press Complex, M.P. Nagar Zone-I,

PROFORMA "H"

AFFIDAVIT

1. I, the undersigned, to hereby certify that all the statement made in the required attachments are true and correct.

2. The undersigned also hereby certifies that neither our firm M/s ________ ___________________ nor any of its constituent partners have abandoned any works nor any contract awarded to us for such works has been rescinded during last five years prior to the date of this bid.

3. The undersigned hereby authorise (s) and request (s) bank, person, firm or corporation to furnish pertinent information deemed necessary and requested by the Department to verify this statement or regarding my (our) competence and general reputation.

4. The undersigned understands and agrees that further qualifying information may be requested, and agrees to furnish any such information at the request of the Department / Project implementing agency.

(Signed by an Authorized Officer of firm)Title of Officer ................................

Date ….............................. Name of firm ….............................

Baaopala ivakasa P`aaiQakrNa