KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2016 OF BESCOM ANNUAL PERFORMANCE REVIEW FOR FY15 & ANNUAL REVENUE REQUIREMENT FOR FY17-19 & REVISION OF RETAIL SUPPLY TARIFF FOR FY17 30 th March 2016 6 th and 7 th Floor, Mahalaxmi Chambers 9/2, M.G. Road, Bengaluru-560 001 Phone: 080-25320213 / 25320214 Fax : 080-25320338 Website: www.karnataka.gov.in/kerc - E-mail: [email protected]

BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

  • Upload
    ngodiep

  • View
    295

  • Download
    5

Embed Size (px)

Citation preview

Page 1: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

KARNATAKA ELECTRICITY REGULATORY COMMISSION

TARIFF ORDER 2016

OF

BESCOM

ANNUAL PERFORMANCE REVIEW FOR FY15

&

ANNUAL REVENUE REQUIREMENT FOR FY17-19

&

REVISION OF RETAIL SUPPLY

TARIFF FOR FY17

30th

March 2016

6th and 7th Floor, Mahalaxmi Chambers

9/2, M.G. Road, Bengaluru-560 001

Phone: 080-25320213 / 25320214

Fax : 080-25320338

Website: www.karnataka.gov.in/kerc - E-mail: [email protected]

Page 2: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ii

C O N T E N T S

CHAPTER

Page No.

1.0 Bangalore Electricity Supply Company Ltd.-

(BESCOM):

3

1.1 BESCOM at a glance 5

1.2 Number of Consumers, Sales in MU to various

categories of consumers and details of Revenue

for FY15 as filed by BESCOM

6

2 Summary of Filing & Tariff Determination Process

7

2.0 Background for Current Filing 7

2.1 Preliminary Observations of the Commission 7

2.2 Public Hearing Process 8

2.3 Consultation with the Advisory Committee of the

Commission

9

3.0 Public Consultation Suggestions / Objections

and Replies

10

3.1 List of Persons who filed written objections 10

4 Annual Performance Review for FY15 15

4.0 BESCOM’s Application for APR for FY15 15

4.1 BESCOM’s Submission 15

4.2 BESCOM’s Financial Performance as per Audited

Accounts for FY15

17

4.2.1 Sales for FY15 18

4.2.2 Distribution Losses for FY15 27

4.2.3 Power Purchase for FY15 28

4.2.4 RPO Compliance by BESCOM for FY15 31

4.2.5 Operation and Maintenance Expenses 32

4.2.6 Depreciation 36

4.2.7 Capital Expenditure for FY15 38

4.2.8 Prudence Check of Capex for FY15 43

4.2.9 Review of decision taken on Prudence Check of

Capital Expenditure incurred during FY13 to FY14

45

4.2.10 Interest and Finance Charges 46

4.2.11 Interest on Working Capital 48

4.2.12 Interest on Consumer Deposits 50

4.2.13 Other Interest and Finance Charges 50

4.2.14 Capitalisation of Interest and other expenses 51

4.2.15 Other Debits 51

4.2.16 Net Prior Period 52

4.2.17 Return on Equity 53

4.2.18 Income Tax 54

4.2.19 Other Income 55

4.2.20 Fund Towards Consumer Relations / Consumer

Education

56

Page 3: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

iii

4.3 Abstract of Approved ARR for FY15 56

4.3.1 Gap in Revenue for FY15 57

4.3.2 Previous Years Gap 58

5 Annual Revenue Requirement for FY17-19 59

5.0 Annual Revenue Requirement for FY17-19 59

5.1 Annual Performance Review for FY15 & FY16 60

5.2 Annual Revenue Requirement for FY17-19 61

5.2.1 Capital Investments for FY17-19 61

5.2.2 Sales Forecast for FY17-19 67

5.2.3 Distribution Losses for FY17-19 82

5.2.4 Power Purchase for FY17-19 83

5.2.5 Sources of Power 85

5.2.6 Power Purchase Cost & Transmission charges 89

5.2.7 RPO Target for FY17 93

5.2.8 O & M Expenses for FY17-19 94

5.2.9 Depreciation 99

5.2.10 Interest on Loans 101

5.2.11 Interest on Working Capital 104

5.2.12 Interest on Consumer Deposit 105

5.2.13 Other Interest and Finance Charges 107

5.2.14 Interest and other expense Capitalized 107

5.2.15 Return on Equity 108

5.2.16 Other Income 110

5.2.17 Fund towards Consumer Relations / Consumer

Education

111

5.3 Treatment of Regulatory Asset and Carrying Cost 111

5.4 RP No.5/2014 and RP No.6/2013 113

5.5 Abstract of ARR for FY17-19 113

5.6 Segregation of ARR into ARR for Distribution

Business and ARR for Retail Supply Business

114

5.7 Gap in Revenue for FY17 116

5.8 Application for Additional Revenue Requirement

for FY17

117

6 Determination of Tariff for FY17 120

6.0 BESCOM’s Proposal and Commission’s Analysis

for FY17

120

6.1 Tariff Application 120

6.2 Statutory Provisions guiding determination of

Tariff

120

6.3 Consideration for Tariff setting 121

6.4 New Tariff Proposals by BESCOM 122

6.5 Revenue at existing tariff and deficit for FY16 126

6.6 Other Issues 160

6.6.1 Tariff for Green Power 160

6.6.2 Determination of Wheeling Charges 160

6.6.3 Wheeling within BESCOM Area 162

6.6.4 Wheeling of Energy using Transmission Network

or Network of More than one licensee

163

6.6.5 Charges for Wheeling of Energy by RE sources

(Non-REC Route) to Consumers in the State

164

Page 4: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

iv

6.6.6 Charges for Wheeling Energy by RE sources

wheeling Energy from the State to A

consumer/others outside the State and for those

opting for Renewable Energy Certificate

164

6.7 Other Tariff related issues 165

6.8 Cross Subsidy levels for FY17 169

6.9 Effect of Revised Tariff 169

6.10 Summary of Tariff Order 170

6.11 Commission’s Order 171

Appendix 172

Appendix - 1 218

Page 5: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

v

LIST OF TABLES

Table

No.

Content Page

No.

4.1 ARR for FY15 – BESCOM’s Submission 16

4.2 Financial Performance of BESCOM for FY15 17

4.3 BESCOM’s Accumulated Profit / Losses 18

4.4 Category wise Breakup of Unbilled Sales for FY15 20

4.5 Approved and Actuals Sales for FY15 26

4.6 Penalty for exceeding approved distribution losses in

FY15

28

4.7 BESCOM’s Power Purchase for FY15 28

4.8 RPO Compliance as submitted by BESCOM for FY15 31

4.9 Normative O & M Expenses – BESCOM’s Submission

32

4.10 Approved O & M Expenses as per Tariff Order dated

12.05.2014

33

4.11 O & M Expenses of BESCOM as per Audited Accounts

for FY15

33

4.12 Allowable O & M Expenses for FY15 36

4.13 Depreciation for FY15 – BESCOM’s Submission 37

4.14 Allowable Depreciation for FY15 37

4.15 Capital Expenditure for FY15 38

4.16 Details of Excess Expenditure over approved capex

for FY15

39

4.17 Approved and Actual Capex incurred 42

4.18 Summary of Prudence check findings for FY15 44

4.19 Summary of Works having cost overrun 44

4.20 Summary of Works having Time overrun 44

4.21 Interest on Loans – BESCOM’s Submission 47

4.22 Allowable Interest on Loans – FY15 47

4.23 Interest on Working Capital – BESCOM’s Submission 48

4.24 Allowable Interest on Working Capital for FY15 49

4.25 Interest on Consumer Deposits for FY15 – BESCOM’s

Submission

50

4.26 Allowable Interest and Finance charges 51

4.27 Other Debits – BESCOM’s Submission 51

4.28 Allowable Other Debits 52

4.29 Net Prior Period Charges – BESCOM’s Submission 52

4.30 Return on Equity – BESCOM’s Submission 53

4.31 Allowable Return on Equity 54

4.32 Other Income – BESCOM’s Submission 55

4.33 Approved ARR for FY15 as per APR 56

5.1 Proposed ARR for FY17-19 59

5.2 DPR Preparation and Sanctioning by REC for the

DDUGJY Projects

62

5.3 Capital Investment Proposed for FY17 to FY21 by

BESCOM

63

Page 6: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

vi

5.4 Category wise approved number of installations 80

5.5 Category wise approves sales 81

5.6 Projected Distribution Losses FY17-19 – BESCOM’s

Submission

82

5.7 Approved & Actual Distribution Losses FY10 to FY16 82

5.8 Approved Distribution Losses for FY17-19 83

5.9 Requirement of Electricity s filed by Licensees 84

5.10 Energy Requirement as filed by BESCOM 84

5.11 Power Purchase requirement allowed for the Control

Period FY17 to FY19

85

5.12 Consolidated power purchase requirement for FY17 85

5.13 Consolidated power purchase requirement for FY18 86

5.14 Consolidated power purchase requirement for FY19 87

5.15 Abstract of Power Purchase allowed for ESCOMs for

the Control Period FY17 to FY19

89

5.16 Power Purchase Cost of BESCOM for FY17 91

5.17 Power Purchase Cost of BESCOM for FY18 92

5.18 Power Purchase Cost of BESCOM for FY19 92

5.19 O & M Expenses – BESCOM’s Proposal 95

5.20 Computation of Inflation Index for FY17 97

5.21 Approved O & M Expenses for FY17-19 98

5.22 Depreciation – FY17-19 – BESCOM’s Submission 99

5.23 Approved Depreciation for FY17-19 101

5.24 Interest on Loan – BESCOM’s Proposal 102

5.25 Approved Interest on Loans for FY17-19 103

5.26 Interest on Working Capital – BECOM’s Submission 104

5.27 Approved Interest on Working Capital for FY17-19 105

5.28 Interest on Consumer Deposits – BESCOM’s Submission 106

5.29 Approved Interest on Consumer Security Deposits for

FY17-19

106

5.30 Approved Interest and Finance Charges for FY17-19 107

5.31 Status of Debt Equity Ratio for FY17-19 109

5.32 Approved Return on Equity for FY17-19 109

5.33 Other Income - BESCOM’s Proposal 110

5.34 Approved ARR for FY17-19 113

5.35 Segregation of ARR – BESCOM’s Submission 114

5.36 Approved Segregation of ARR FY17-19 115

5.37 Approved Revised ARR for Distribution Business FY17-

19

115

5.38 Approved ARR for Retail Supply Business FY17-19 116

5.39 Revenue Gap for FY17 116

6.1 Revenue Deficit for FY17 127

6.2 Wheeling Charges 162

Page 7: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

vii

LIST OF ANNEXURES

SL.NO. DETAILS OF ANNEXURES Page

No.

I Total Approved Power Purchase Quantum and Cost

of all ESCOMs for FY17

263

II Approved Power Purchase quantum and cost of

BESCOM for FY17

269

III Proposed and approved Revenue for FY17 275

IV Electricity Tariff – 2017 276

Page 8: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

viii

ABBREVIATIONS

AAD Advance Against Depreciation

AEH All Electric Home

ABT Availability Based Tariff

A & G Administrative & General Expenses

ARR Annual Revenue Requirement

ATE Appellate Tribunal for Electricity

BBMP Bruhut Bangalore Mahanagara Palike

BDA Bangalore Development Authority

BESCOM Bangalore Electricity Supply Company

BMP Bangalore Mahanagara Palike

BST Bulk Supply Tariff

BWSSB Bangalore Water Supply & Sewerage Board

CAPEX Capital Expenditure

CCS Consumer Care Society

CERC Central Electricity Regulatory Commission

CEA Central Electricity Authority

CESC Chamundeshwari Electricity Supply Corporation

CPI Consumer Price Index

CWIP Capital Work in Progress

DA Dearness Allowance

DCB Demand Collection & Balance

DPR Detailed Project Report

EA Electricity Act

EC Energy Charges

ERC Expected Revenue From Charges

ESAAR Electricity Supply Annual Accounting Rules

ESCOMs Electricity Supply Companies

FA Financial Adviser

FKCCI Federation of Karnataka Chamber of Commerce & Industry

FR Feasibility Report

FoR Forum of Regulators

FY Financial Year

GESCOM Gulbarga Electricity Supply Company

GFA Gross Fixed Assets

GoI Government Of India

GoK Government Of Karnataka

GRIDCO Grid Corporation

HESCOM Hubli Electricity Supply Company

HP Horse Power

HRIS Human Resource Information System

ICAI Institute of Chartered Accountants of India

IFC Interest and Finance Charges

IW Industrial Worker

Page 9: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ix

IP SETS Irrigation Pump Sets

KASSIA Karnataka Small Scale Industries Association

KEB Karnataka Electricity Board

KER Act Karnataka Electricity Reform Act

KERC Karnataka Electricity Regulatory Commission

KM/Km Kilometre

KPCL Karnataka Power Corporation Limited

KPTCL Karnataka Power Transmission Corporation Limited

KV Kilo Volts

KVA Kilo Volt Ampere

KW Kilo Watt

KWH Kilo Watt Hour

LDC Load Despatch Centre

MAT Minimum Alternate Tax

MD Managing Director

MESCOM Mangalore Electricity Supply Company

MFA Miscellaneous First Appeal

MIS Management Information System

MoP Ministry of Power

MU Million Units

MVA Mega Volt Ampere

MW Mega Watt

MYT Multi Year Tariff

NFA Net Fixed Assets

NLC Neyveli Lignite Corporation

NCP Non Coincident Peak

NTP National Tariff Policy

O&M Operation & Maintenance

P & L Profit & Loss Account

PLR Prime Lending Rate

PPA Power Purchase Agreement

PRDC Power Research & Development Consultants

REL Reliance Energy Limited

R & M Repairs and Maintenance

ROE Return on Equity

ROR Rate of Return

ROW Right of Way

RPO Renewable Purchase Obligation

SBI State Bank of India

SCADA Supervisory Control and Data Acquisition System

SERCs State Electricity Regulatory Commissions

SLDC State Load Despatch Centre

SRLDC Southern Regional Load Dispatch Centre

STU State Transmission Utility

TAC Technical Advisory Committee

TCC Total Contracted Capacity

Page 10: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

x

T&D Transmission & Distribution

TCs Transformer Centres

TR Transmission Rate

VVNL Visvesvaraya Vidyuth Nigama Limited

WPI Wholesale Price Index

WC Working Capital

Page 11: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xi

KARNATAKA ELECTRICITY REGULATORY COMMISSION,

BENGALURU - 560 001

Dated this 30th day of March, 2016

Order on BESCOM’s Annual Performance Review for FY15 & Annual Revenue

Requirement for FY17-19 & Revision of

Retail Supply Tariff for FY17

In the matter of:

Application of BESCOM in respect of the Annual Performance Review for FY15,

Annual Revenue Requirement for FY17-19 and Revision of Retail Supply Tariff for

FY17, under Multi Year Tariff framework.

Present: Shri M.K.Shankaralinge Gowda Chairman

Shri H.D.Arun Kumar Member

Shri D.B.Manival Raju Member

O R D E R

The Bangalore Electricity Supply Company Ltd., (hereinafter

referred to as BESCOM) is a Distribution Licensee under the

provisions of the Electricity Act, 2003, and has, on 15.12.2015, filed

the following applications for consideration and orders:

a) Review of Annual Performance for FY15 and approval of

revised ARR thereon.

b) Approval of ARR for FY17-19

Page 12: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xii

c) Approval for revision of Retail Supply Tariff, for the financial year

2016-17 (FY17)

In exercise of the powers conferred under Sections 62, 64 and other

provisions of the Electricity Act, 2003, read with KERC (Terms and

conditions for Determination of Tariff for Distribution and Retail Sale of

Electricity) Regulations 2006, and other enabling Regulations, the

Commission has considered the applications and the views and

objections submitted by the consumers and other stakeholders. The

Commission’s decisions are given in this order, Chapter wise.

Page 13: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xiii

CHAPTER – 1

INTRODUCTION

1.0 Bangalore Electricity Supply Company Ltd.- (BESCOM):

The BESCOM is a Distribution Licensee under Section 14 of the Electricity

Act, 2003 (herein after referred to as the Act). The BESCOM is responsible

for purchase of power, distribution and retail supply of electricity to its

consumers and also providing infrastructure for open access, Wheeling

and Banking in its area of operation, which includes eight Districts of the

State as indicated below:

1. Bengaluru Rural

2. Bengaluru Urban

3. Chikkaballapura

4. Chitradurga

5. Davanagere

6. Kolar

7. Ramanagara

8. Tumkur

The BESCOM is a registered company under the Companies Act, 1956,

incorporated on 30th April, 2002. The BESCOM commenced its

operations on 1stJune, 2002.

At present BESCOM’s area of operation is structured as follows:

Page 14: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xiv

O&M Zones O&M Circles O&M Divisions

Bengaluru Metropolitan

Area

Bengaluru North Circle

Malleshwaram

Peenya

Hebbal

Bengaluru East Circle

Shivajinagar

Vidhanasoudha

Inidranagar

Bengaluru South Circle

Koramangala

HSR Layout

Jayanagar

Bengaluru West Circle

RajaRajeshwarinagar

Rajajinagar

Kengeri

Bengaluru Rural Area

Bengaluru Rural Circle

Nelamangala

Chandapura

Yelahanka

Ramanagara

Kolar Circle

Chikkaballapur

Chinthamani

Kolar

KGF

Chitradurga

Tumkur Circle

Tumkur

Tiptur

Madhugiri

Davangere Circle

Davangere

Harihara

Hiriyur

Page 15: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xv

Chitradurga

The O & M divisions of BESCOM are further divided into one hundred and

sixteen sub-divisions with each of the sub-divisions having two to three O

& M section offices.

The section offices are the base level offices looking into operation and

maintenance of the distribution system in order to provide reliable and

quality power supply to BESCOM’s consumers.

1.1 BESCOM at a glance:

The profile of BESCOM is as indicated below:

Sl.

No. Particulars (As on 31-03-2015) Statistics

1. Area Sq. km. 41092

2. Districts Nos. 8

3. Taluks Nos. 44

4. Population lakhs 207

5. Consumers lakhs 94.45

6. Energy Sales MUs 24436

7. Zone Nos. 3

8. DTCs Nos. 227551

9. Assets Rs. in Crores 14647

10. HT lines Ckt. Kms 87919

11. LT lines Ckt. Kms 162193

12. Total employees

strength:

A Sanctioned Nos. 21572

B Working Nos. 12444

13. Revenue Demand Rs. in Crores 13479.59

14. Revenue Collection Rs. in Crores 13209

Page 16: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xvi

1.2 Number of Consumers, Sales in MU to various categories of

consumers and details of Revenue for FY15 as filed by

BESCOM are as follows:

CATEGORY

BESCOM

No. of

Installation

Sales in

MU

Revenue

in Rs.Crs.

Domestic 7148471 5813.75 2754.6

Commercial 869492 4459.21 3703.48

Industrial 180759 5884.43 4035.51

Agriculture 770480 5957.01 1379.94

Others 475316 2321.66 1606.06

Total 9444518 24436.06 13479.59

BESCOM has filed its application for Annual Performance Review for FY15,

approval of Annual Revenue Requirement (ARR) for FY17-19 and Retail Supply

Tariff for FY17.

BESCOM’s applications, the objections / views of stakeholders thereon and the

Commission’s decisions are discussed in detail, in the subsequent Chapters of this

Order.

Page 17: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xvii

CHAPTER – 2

SUMMARY OF FILING & TARIFF DETERMINATION PROCESS

2.0 Background for Current Filing:

The Commission in its Tariff Order dated 6thMay, 2013 had approved the

ERC for FY14 to FY16 and the Retail Supply Tariff of BESCOM for FY14

under MYT principles for the control period of FY14 to FY16. BESCOM in

its present application filed on 15th December, 2015 has sought Annual

Performance Review for FY15 based on the audited accounts, approval

of ARR for the fourth control period i.e. FY17-19 and Revised Retail Supply

Tariff for FY17.

BESCOM, in its application, has made the following new proposals:

i) Introduction of telescopic tariff for domestic sector;

ii) Increasing the fixed cost;

iii) Voltage wise tariff for HT consumers;

iv) Billing EHT/HT consumers on kVAh basis;

v) Exclusive tariff for Kalyan Mantapas;

vi) Inclusion of morning peak hours under ToD tariff;

2.1 Preliminary Observations of the Commission:

After the scrutiny of applications, the Commission communicated its

preliminary observations to BESCOM on 1st January, 2016. The preliminary

observations were mainly on the following points:

Capital Expenditure

Sales Forecast

Assessment of IP set consumption

Page 18: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xviii

Power Purchase

Issues pertaining to items of revenue and expenditure

Compliance to Directives.

Financial implications on the new proposals.

BESCOM has furnished its replies on 11th January, 2016. The replies furnished

by BESCOM are considered in the respective Chapters of this Order. Further,

the Commission also held a validation meeting to discuss the proposals of

BESCOM on 10th February, 2016.

2.2 Public Hearing Process:

As per the provisions of the Electricity Act 2003, the Karnataka Electricity

Regulatory Commission (Terms and Conditions for Determination of Tariff

for Distribution and Retail Sale of Electricity) Regulations, 2006, read with

the KERC Tariff Regulations 2000, and KERC (General and Conduct of

Proceedings) Regulations, 2000, the Commission, vide its letter dated

14th January, 2016, treated the application of the BESCOM as a petition

and directed the BESCOM to publish the summary of the application for

APR of FY15, approval of ARR for FY17-19 and retail supply tariff for FY17,

in the newspapers, to call for objections, from the interested

persons/stakeholders.

Accordingly, BESCOM has published the Notices in the newspapers as

follows:

Name of the News Paper Language Date of Publication

Indian Express English 19/1/2016

&

20/1/2016

Times of India

Prajavani Kannada

Vijayavani

The BESCOM’s application on APR of FY15, ARR for FY17-19 and Retail

supply tariff for FY17 were also hosted on the web-sites of BESCOM and the

Page 19: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xix

Commission for the ready reference and information of the stakeholders and

the general public.

In response to the application of BESCOM, the Commission has received fifty

statements / letters of objections. BESCOM has furnished the replies to all

these objections. The Commission has also held a Public Hearing in the

Commission’s Office on 26th February, 2016 at the Court Hall of the

Commission in Bengaluru. The details of the written / oral submissions made

by various stake holders and the response from BESCOM thereon, have been

discussed in Chapter - 3/ Appendix, appended to this Order.

2.3 Consultation with the Advisory Committee of the Commission:

The Commission has also discussed the proposals of KPTCL and all ESCOMs

in the State Advisory Committee meeting held on 10th March, 2016. During the

meeting the following important issues were also discussed:

Performance of KPTCL / ESCOMs during FY15

Major items of expenditure of KPTCL / ESCOMs for FY17-19

Members of the Committee have offered valuable suggestions on the

proposals. The Commission has taken note of these suggestions while

passing the order.

Page 20: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xx

CHAPTER – 3

PUBLIC CONSULTATION Suggestions/Objections and Replies

3.1 In pursuance of the provisions of Section 64(3) of the Electricity Act, 2003, the

Commission directed the BESCOM to publish the summary of the Revised ARR

and tariff proposals in the newspapers, inviting written objections/ suggestions/

comments, if any, from interested persons/stakeholders. Further, in order to

elicit the views of interested persons/ stakeholders on the tariff application, the

Commission held a public hearing on 26.02. 2016, at Court Hall of the

Commission in Bengaluru. During the public hearing, several Stake-holders and

public have raised several objections and also filed written submissions on the

Tariff Application filed by the BESCOM.

Names of the persons, who have filed written objections, are given below:

Sl.No

Application No.

Name & Address of Objectors

1 BB-01 Doddannavar Global Energy Pvt Ltd., Bengaluru.

2 BB-02 Sri. N.Udayasimha, Bengaluru.

3 BB -03 Sri. Yagnanarayana M.N, General Secretary, Laghu Udyog Bharati – Karnataka, Bengaluru.

4 BB-05 Sri. Y.G.Muralidharan, Co-ordinator, Karnataka Electricity Governance Network, Bengaluru.

5 BB-06 Sri. T.V.Mohandas Pai, Vice President, B.PAC, Bengaluru.

6 BA-01 Sri M Sitaram, Vice President, The Nurserymen Co-operative Society Ltd., Bengaluru.

7 BA-02 Sri. R.Ramanna, Financial Advisor & Chief Accounts Officer, BWSSB, Bengaluru.

8 BA-03 Sri. K.B.Arasappa, Hon. Gen. Secretary, KASSIA.

9 BA -04 Sri, V. Anbu, Secretary and Director General, Indian Machine Tool Manufactures Association, Bengaluru.

10 BA-05 Sri. Giri M.M, Hon. Gen. Secretary, Peenya Industries Association, Bengaluru.

11 BA-06 Sri Lokaraj, Secretary, Federation of Karnataka Chambers of Commerce and Industry, Bengaluru.

12 BA-07 Sri. B.N. Venkatesh, Anekal.

13 BA-08 Sri. G. Manjunath, Anekal.

14 BA-09 Sri. Puttaswamy, Bengaluru Urban.

15 BA-10 to BA-22

Sri. J.Rajesh,& others Y.N. Camp, Davanagere.

16 BA-23 to BA-30

Sri. C.Arun Kumar & Others, Nelamangala.

17 BA-31 Sri. Srinivasa Reddy, Bommasandra, Bengaluru.

18 BA-32 to BA-45

Sri. Srikanth & others, Kanakapura, Channapatna and Ramanagara.

19 AE-01 Sri. P.N.Karanth, Kundapura.

20 AE-02 Sri. Praveen Sood, IPS, Additional Director General of Police, Administration, Bengaluru.

The above persons have raised several issues concerning (i) Tariff, (ii) Quality

of power Supply and Service (iii) Compliance of Commission’s directives and

(iv) Certain specific requests. The summary of objections, BESCOM’s reply and

Commission’s views are annexed as Appendix – 1 to this Order.

Page 21: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxi

3.2 During the public hearing, the following persons have made oral submissions

before the Commission:

SL.No. Names & Addresses of Objectors

1 Sri. M.Seetharam, S.L. Nagaraj, C. Aswath, Nurserymen Co-operative Society.

2 Sri. V.Shankar Nesargi, DGEPL.

3 Sri. ChannaKeshava, Turuvekere.

4 Sri. Ramakrishnaiah & Rangaswamy, Mugalur.

5 Sri. Praveen Gupta – Better Power.

6 Sri. Sridhar Rao, Manipal University.

7 Sri. Ramesh Ramegowda, Infosys.

8 Sri. Y.R. Gurudath & Manoj Nichani, Manjushree Techno Park Ltd.

9 Sri. Puneet Goel, Greenko.

10 Sri. V.K. Dikshit, President & Sri. K.S. Mallapa Gowda, KASSIA.

11 Sri. H.N. Ramakrishnaiah, BANSSIA.

12 Sri. Sridhar Prabhu, Advocate for Indian Machine Tool Manufactures Association.

13 Sri. Lakshmisha C.V., Laghu Udyog Bharati.

14 Sri. Sunidhi Sharan, Stat kraft Markets, New Delhi.

15 Sri. Venkatesh S. Arbatti, Advocate for BWSSB.

16 Sri. P.B. Mahesha, Kunigal Taluk.

17 Sri. S. Manjunatha, Anekal Taluk.

18 Sri. Gangadhar, Kasaraghatta.

19 Sri. Thippaswamy, Bharatiya Kissan Sangha.

20 Sri. Gangadharaiah, Turuvekere.

21 Sri. M.S. Raghavendra Prasad, Advocate, FKCCI.

22 Sri. K. Kallappa, KKGL, Davanagere.

23 Sri. S.K. Srinivasa, Turuvekere.

24 Sri. S.N. Neelakantappa, Jagalur, Davanagere.

25 Sri. Maharudrappa. M. Bharatiya Kissan Sangha.

26 Sri. Mohandas Pai, B PAC.

27 Sri. Puttaswamy, Bharatiya Kissan Sangha, Bengaluru.

28 Sri. M.L. Ashok, Consumer care Society.

29 Sri. G.N. Krishnappa, Bengaluru.

30 Sri. Chetain Jain, IEX.

3.3 Following are the additional points made during the Public Hearing:

1) Tariff applicable to HT category should not be revised.

2) Capital expenditure incurred without DPRs should not be approved.

3) Rs. 543 Crores of regulatory asset should be contributed by the GoK.

4) BESCOM has erred in calculating Electricity Tax applicable to

different categories.

5) Cross-subsidy provided to MSME consuming more than 200 units or 40

HP should be reduced.

6) There is inordinate delay in implementation of Distribution Automation

System (DAS) project. Further, BESCOM should estimate the

quantifiable efficiency gains on account of implementation of the

same.

7) The ratio of HT: LT should be brought down to 1:1.

8) Introduce pre-paid meters for all the industries.

Page 22: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxii

9) Fixed charges should not be increased.

10) Steps should be taken to enhance consumers’ awareness regarding

implementation of solar rooftop scheme.

11) Quality of power supply should be improved.

12) Deposits needs to be adjusted in the bills since 2012.

13) There should be one single industrial holiday for entire Bengaluru

area.

14) Open Access should be encouraged by reducing Open Access

charges.

15) While arranging power supply to newly formed layouts, sufficient

deposits should be collected which could compensate for the

distribution losses.

16) BESCOM should furnish the details regarding number of R-APDRP

works undertaken, number of works completed, amount spent and

the efficiency gained.

17) BESCOM is yet to carry out distribution of efficient pump sets under

DSM.

18) Duties of officials should be displayed on the Consumers’ Charter in

all the BESCOM offices.

19) BESCOM is incurring losses despite 90% of the work being carried out

on self-execution basis.

20) Frequency of replacement of meters is very high.

21) Green houses are getting cheaper power under LT5 category.

22) Defunct IP sets should be disconnected.

23) Self-execution works should be carried under strict supervision to

avoid misuse of departmental materials.

24) Electricity should be supplied to IP sets during day time to avoid

problems to farmers.

25) Transformers are being over-loaded by un-authorized IP sets.

26) Inspite of repeated complaints by farmers, BESCOM does not

replace broken pole;

27) One transformer should be provided for every five pump sets

connections and dilapidated poles should be replaced.

28) Mandatory TOD metering should be removed.

29) Penalty should not be charged under TOD metering.

30) Interest on advance payment of energy charges of one year should

be increased.

Page 23: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxiii

31) The calculations done under D21 and D22 formats are erroneous.

32) Capacitors should be installed in agricultural sector.

33) Information regarding number of IP set connections are not in the

public domain.

34) BESCOM has not refunded the consumers’ excess security deposits.

35) Petition should be provided in Kannada.

36) Separate emergency numbers should be given for each ESCOMs.

37) Electricity supply to IP sets should be given at fixed timings.

38) There should be one CGRF in each taluk.

39) Cash counter are kept open on holidays, due to which employees

are given double wages resulting in loss to the company.

40) BESCOM is paying highest salaries to its employees.

41) Compensation in cases of accidents should be increased to 10

Lakh/person and 1 lakh/animal.

42) Outsourcing of works is a loss to the company.

43) Petition should be precise and in an understandable format. Petitions

should be got analyzed by an independent external agency.

44) Energy audit of agricultural IP sets should be done.

45) Projections should be based on unrestricted demand.

46) BESCOM has extended infrastructure without analysis of load to be

connected, leading to the wastage of capital expenditure.

47) Subsidies should be paid in advance.

48) Public awareness should be created regarding regularization of load.

49) Transformers feeding to IP sets should be of higher capacity to avoid

over-loading.

50) BESCOM employees are not promptly attending to the consumer

grievances.

51) While arranging power supply under temporary category, pre-paid

meters should be provided across Bengaluru. Further, billing should

be done on monthly basis.

The Managing Director of the BESCOM has given replies / clarifications

to the above points and also assured prompt action on consumer

complaints.

Page 24: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxiv

3.4 The gist of the objections raised, BESCOM’s reply and the Commission’s

view on each of the issues raised by the objectors is given in Appendix-1

of this order.

Page 25: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxv

CHAPTER – 4

ANNUAL PERFORMANCE REVIEW FOR FY15

4.0 BESCOM’s Application for APR for FY15:

BESCOM, in its application dated 15th December, 2015, has sought

approval of its revised ARR in the Annual Performance Review (APR) for

FY15 based on the Audited Accounts.

The Commission in its letter dated 1st January, 2016 had communicated

its preliminary observations to the application. BESCOM, in its letter

dated 11thJanuary, 2016 has furnished its replies to the preliminary

observations of the Commission.

The Commission in its Multi Year Tariff (MYT) Order dated 6th May, 2013

had approved BESCOM’s Annual Revenue Requirement (ARR) for FY14 –

FY16. Further, in its Tariff Order dated 12th May, 2014, the Commission had

approved the APR for FY13 and had revised the ARR for FY15 along with

Retail Supply Tariff for FY15.

The Annual Performance Review for FY15 based on BESCOM’s Audited

Accounts is discussed in this Chapter.

4.1 BESCOM’s Submission:

BESCOM has submitted its proposals for revision of ARR for FY15 based on

the Audited Accounts as follows:

Page 26: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxvi

TABLE – 4.1

ARR for FY15 – BESCOM’s Submission Amount in Rs. Crores

Sl.

No Particulars As Filed

1 Energy @ Gen Bus in MU 29423.03

2 Energy @ Interface in MU 28261.00

3 Distribution Losses in % 13.53

Sales in MU

4 Sales to other than IP & BJ/KJ 18452.30

5 Sales to IP & BJ/KJ 5983.75

Total Sales 24436.05

Revenue

6 Revenue from tariff and Misc. Charges 11829.93

7 RE Subsidy 1245.25

Total Revenue 13075.18

Expenditure

8 Power Purchase Cost 10635.32

9 Transmission charges of KPTCL 1032.54

10 SLDC Charges 17.16

Power Purchase Cost including cost of

transmission 11685.02

11 Employee Cost 826.21

12 Repairs & Maintenance 54.94

13 Admin. & General Expenses 203.68

Total O&M Expenses 1084.83

14 Depreciation 199.78

Interest & Finance charges

15 Interest on Loans 217.68

16 Interest on Working capital 348.98

17 Interest on consumer deposits 210.38

18 Other Interest & Finance charges 10.19

19

Less interest & other expenses

capitalised 78.87

Total Interest & Finance charges 708.36

20 Other Debits (6.70)

21 Net Prior Period Debit/Credit (14.04)

22 Return on Equity 84.77

23 Provision for taxation 25.75

24 Other Income 124.44

ARR 13643.33

25

Deficit for FY13 carried

forward(Regulatory Asset & Carrying

Cost) 154.32

Net ARR 13797.65

Page 27: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxvii

Considering the revenue of Rs.13075.18 Crores against a net ARR of

Rs.13797.65 Crores, BESCOM has reported a gap in revenue of Rs.722.47

Crores for FY15.

4.2 BESCOM’s Financial Performance as per Audited Accounts for FY15:

An overview of the financial performance of BESCOM for FY15 as per its

Audited Accounts is given below:

TABLE – 4.2

Financial Performance of BESCOM for FY15

Amount in Rs. Crores

Sl.

No. Particulars FY15

Receipts

1 Revenue from Tariff and misc. charges 12079.37

2 Tariff Subsidy 1400.23

Total Revenue 13479.60

Expenditure

3 Power Purchase Cost 10635.33

4 Transmission charges of KPTCL 1032.54

5 SLDC Charges 17.16

Power Purchase Cost including cost of transmission 11685.03

6 O&M Expenses 1065.74

7 Depreciation 199.78

Interest & Finance charges

8 Interest on Loans 222.76

9 Interest on Working capital 242.65

10 Interest on consumer deposits 210.38

11 Other Interest & Finance charges 10.19

12 Less Interest and other expenses capitalized 78.89

Total Interest & Finance charges 607.10

13 Other Debits (20.80)

14 Net Prior Period Debit/Credit (14.04)

15 Exceptional items 22.85

16 Other income 205.24

17 Income tax 25.75

Net ARR 13366.16

As per the Audited Accounts, BESCOM has earned a profit of Rs.113.44

Crores for FY15. The profits / losses reported by BESCOM in its audited

accounts in the previous years are as follows:

Page 28: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxviii

TABLE – 4.3

BESCOM’s Accumulated Profits / Losses

Particulars Rs. Crores

Accumulated losses as at the end of FY10 (350.88)

Profit earned in FY11 0.20

Profit earned in FY12 118.14

Losses incurred in FY13 (432.77)

Profits earned in FY14 76.10

Profits earned in FY15 113.44

Accumulated losses as at the end of FY15 (475.77)

As seen from the above table, the accumulated losses are Rs.475.77

Crores.

Commission’s analysis and decisions:

The Annual Performance Review for FY15 has been taken up duly

considering the actual expenditure as per the Audited Accounts against

the expenditure approved by the Commission in its Tariff Order dated

12th May, 2014. The item wise review of expenditure and the decisions of

the Commission thereon are as discussed in the following paragraphs:

4.2.1 Sales for FY15:

a) Sales other than IP Sets:

The Commission in its Tariff Order dated 12.05.2014 had approved total

sales to various consumer categories at 25395.08 MU as against the

BESCOM’s proposal of 25868.25 MU. Based on the information furnished

in D-2 format, the Commission in its preliminary observations had noted

that actual sales is 24436.05 MU, indicating a short-fall in sales to an

extent of 958.97 MU with respect to the approved sales, with a reduction

in sales of 43.67 MU in LT-categories and 918.03 MU in HT-categories.

Page 29: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxix

The Commission in its preliminary observations had also noted that the

major categories contributing to the reduction in sales with respect to

the estimates are LT industries (143.24 MU), LT Water Supply (103.53 MU),

HT Industries (814.55 MU) and HT Commercial (541.74 MU) and the major

categories contributing to the increase in sales with respect to the

estimates are LT 2(a) (60.99 MU), HT2(c) (179.84 MU), HT5 (226.53 MU) and

IP Sets (217.28 MU).

In the preliminary observations, BESCOM was informed to analyze the

reasons for reduction in sales to HT categories. In this regard, BESCOM

has attributed the reduction in sales to energy wheeled by HT consumers

under open access to an extent of 1148 MU in FY15. The Commission

notes that, as per the reply furnished by the BESCOM, the sales to HT

categories under wheeling/open access has increased from 683 MU in

FY13 to 1148 MU in FY15, indicating a CAGR of about 30%. However, the

overall sales to HT categories (sale by BESCOM plus Open access sales)

have shown only a marginal growth of 0.76% during the period FY13 to

FY15.

Further, the Commission had also directed BESCOM to furnish the details

of the number of installations shifted from HT2a, HT2b and HT-4 to HT-2c

and the corresponding sales figures for FY14 and FY15 to estimate the

impact of shifting of these installations. BESCOM in its preliminary replies

had stated that such data is not available. Though the above details

were sought again during the validation process, BESCOM did not furnish

the details. In absence of the above data the impact of shifting of

installations from HT2a, HT2b and HT-4 to HT-2c could not be analyzed.

The Commission notes that such data should have been maintained by

BESCOM and therefore, directs BESCOM to maintain such data at least

in future.

During the process of validation, the Commission vide its letter dated 28th

January, 2016, had observed that there is a discrepancy in the data

furnished on the un-billed sales as per Table 3.42 (218.56 MU) and Table

Page 30: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxx

3.49 (353.13) of the filing. Further, it was observed that as the sale is not

billed it should be considered as commercial loss and included in the

losses. BESCOM was also requested to furnish category-wise break up of

un-billed sales factored in the APR duly reconciling the figures.

In its reply dated 12th February, 2016, BESCOM has confirmed the un-

billed sales as 353.13 MU and has also furnished the category-wise sales

for FY15 as indicated below:

TABLE – 4.4

CATEGORY WISE BREAKUP OF UNBILLED SALES FOR FY15

Categories

Unbilled provision

of FY13-14

(Reversal of March

14) in MU

Add LT – 75% of

Average of March

15 & April 15 & HT

100% of April 15

(Provision for the

year) in MU

Unbilled sales in

MU

1 2 3 4 = 3-2

HT1 47.5 55.7 8.2

HT-2A 232.4 367.5 135.0

HT-2B 176.1 234.4 58.3

HT-2C 14.1 19.4 5.3

HT-3A 0.8 3.0 2.2

HT-3B 0.00 0.0 0.0

HT-4 7.8 9.4 1.6

HT-5 0.0 5.4 5.4

HT TOTAL 478.7 694.7 216.0

LT-1 UPTO 18 Units 7.8 8.2 0.4

LT-1 Above 18 Units 0.0 0.0 0.0

LT-2 315.7 365.9 50.1

LT-3 92.6 106.5 14.5

Page 31: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxi

LT-4A 468,8 530.3 61.5

LT-4B 0.0 0.0 0.0

LT-4C 0.0 0.0 0.0

LT-5 67.1 71.9 4.8

LT-6A (WS) 28.9 24.3 -4.6

LT-6B (SL) 26.2 24.8 -1.4

LT-7 0.0 11.8 11.8

LT TOTAL 1006.5 1143.6 137.1

LT + HT TOTAL 1485.2 1838.3 353.1

The Commission had sought additional information vide its letter dated

1st March, 2016 to further validate the un-billed sales. BESCOM vide its

letter dated 14th March, 2016 has furnished the additional information.

Based on the information furnished the Commission has noted the

following data discrepancies:

a) The data for March, 2014 as per DCB indicates sales to HT 5 category

as 5.08 MU whereas the same was indicated as zero in the replies

furnished at the validation meeting.

b) The data of HT5 as per DCB for April, 2014 is indicated as 198.77 MU

which is not correct as the total sales for the financial year FY15 for

this category is 285.58 MU.

c) For the financial year FY14, 75% of average of March, 2014 and April,

2014 sales does not tally with the data furnished in the replies at the

validation meeting.

The Commission notes that, BESCOM has not furnished any explanation

to the observation made by the Commission regarding treatment of un-

billed sales as commercial loss. Normally to arrive at the sales for the

financial year (i.e. from April to March), the sales as per DCB of April of

the following year is added and the sales as per DCB of April of the

financial year is deducted to the overall sales as per April to March DCB

Page 32: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxii

of any financial year, as the consumption recorded in the DCB of any

month normally corresponds to the previous month. This approach in

arriving at sales is being followed in MESCOM and is also clearly

indicated in its accounts. In contrast to the above, the following

discrepancies are observed in computation of sales by BESCOM:

a) BESCOM has adopted different approaches for estimating the un-

billed sales in respect of LT and HT categories. The Commission has

observed that BESCOM has considered 75% of average of March,

2015 and April, 2015 for estimating sales and revenue for LT category

and for HT category only sales of April 2015 have been considered.

BESCOM has not explained the reasons for adopting different

approaches for LT and HT sales.

b) While computing the sales for HT category, BESCOM has added the

sales as per DCB of April, 2015 and subtracted sales as per the DCB of

March, 2014 to the HT category sales for the year as per DCB. This is

erroneous for the reason that it should have considered sales of April,

2014 instead of March, 2014 so that the sales corresponds to the

Financial Year 2015. BESCOM has also not furnished any reason for

this. Instead of considering consumption as per DCB of April, 2014,

when data as per March, 2014 DCB which relates to consumption of

February 2014 is considered the losses of BESCOM get distorted.

c) While computing the sales for LT category, BESCOM has added the

sales considering 75% of the average of sales for LT category as per

DCB of April, 2015 and March, 2015 and subtracted 75% of the

average of sales for LT category of April, 2014 and March, 2014

instead of considering the difference of April, 2015 and April, 2014

sales. BESCOM has not explained anywhere the reasons for

adopting this methodology.

For the reasons stated above the Commission is of the view that, the

addition of sales of 353.13 MU including for IP sets is not correct and not

Page 33: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxiii

justified as satisfactory explanation is not furnished by BESCOM. Hence,

the Commission decides to consider the above sales of 353.13 MU as

distribution loss and not as sales and hence corresponding disallowance

has been made in the sales for FY15. BESCOM may approach the

Commission if it has any additional data to substantiate its claim that

unbilled sales of 353.13 MU are part of its regular sales.

b) Sales to IP Sets:

In its Tariff Order dated 6th May, 2013, the Commission had approved

specific consumption of IP sets as 8,284 units/installation/annum for the

FY14 to the FY 16, whereas as per the data reported by the BESCOM in its

filing, the specific consumption works out to 8,037 units / installation /

annum for the FY15, which indicates a decrease in the specific

consumption by 247 units / installation / annum. The total IP set

consumption reported for the FY15 including the unbilled consumption of

61.5 MU claimed by the BESCOM is 5,930.3 MU. Therefore, the net

consumption for the FY15 by deducting the unbilled consumption of 61.5

MU is 5,868.8 MU as against approved quantum of 5,712.97 MU. The

difference in consumption between the approved and the actual is

155.83 MU. Thus, the quantum of sales to the IP Sets category has

exceeded the approved quantum for the FY15, by 155.83 MU though

the specific consumption has come down by 247 units / installation /

annum.

Further, the Commission had approved 6,98,604 as number of IP set

installations likely to be serviced during the FY15; the actual numbers of

installations serviced, as reported by the BESCOM, are 7,68,577. The

difference in number of installations is 69,973. This indicates increase in

the number of installations by about 10 percent as against approved

number of installations for the FY15. The BESCOM has reported that the

increase in number of installations in the FY15 is due to regularization of a

large number of un-authorized IP sets, under Regularization Scheme.

The Commission, in its Tariff Order dated 12th May, 2014, had directed the

BESCOM to furnish 11 kV feeder wise IP set consumption based on

Page 34: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxiv

energy meters data in respect of agriculture feeders segregated under

NJY scheme, duly taking into consideration the distribution losses

prevailing in 11 kV lines, distribution transformers and LT system, to the

Commission, every month instead of assessing the IP set consumption on

the basis of readings from energy meters fixed to the sample distribution

transformers predominantly feeding to IP set loads. However, the

BESCOM has not submitted the required monthly IP set consumption

data to the Commission regularly.

The Commission, in its preliminary observations, had raised the issue of

increase in sales to the IP set category despite decrease in specific

consumption and had also directed the BESCOM to furnish necessary

feeder wise data as per the energy recorded in the segregated

agricultural feeders, in support of its claims of IP set consumption for the

FY15.

The BESCOM, in its reply to the preliminary observations, has stated that,

consumption of IP sets has increased as compared to the approved

quantum due to servicing of 76,731 numbers of IP sets under

Regularization Scheme during the FY15.

However, the BESCOM has not complied with the Commission’s direction

in respect of submitting the feeder wise consumption data as per the

energy recorded in the segregated agricultural feeders, to justify its

claims of IP set consumption for the FY15, which has been submitted in its

filing to the Commission despite availability of data of agricultural

feeder-wise consumption, for the FY15 consequent on commissioning of

NJY feeders. It has merely submitted that tagging of consumer

installations with the concerned DTCs/feeders is underway and has

sought extension of time to submit the desired information to the

Commission in the prescribed formats and has requested the

Commission to approve the quantum of sales for the FY15 as furnished

by it in its tariff application.

Page 35: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxv

The Commission notes that the increase in IP sales for the FY15 may be

partly due to the fact that the BESCOM has serviced a larger number of

IP sets under regularization scheme, than it had projected. However, it is

noted that the BESCOM has not submitted the month-wise number of

installations regularized during the FY15 in order to know the month in

which more number of IP sets were serviced, under Regularization

Scheme, which have contributed to the increase in consumption. The

BESCOM in its reply to the preliminary observations, has reported that

64,038 numbers of installations have been serviced during the period

from April, 2014 to November, 2014, accounting for 2,584.54 MU in

consumption and only 12,693 numbers of installations have been

serviced during the period from December 2014 to March 2015,

accounting for 3,994.16 MU in consumption. It is observed that only

during the last four months in the FY15, the consumption has increased

by 1,409.62 MU as compared to the consumption of 2,584.54 MU in the

first eight months of the FY15. This increase in consumption of IP sets

during the last four months is abnormal and not justified even after

considering that the farmers use IP sets more during the months of

January and March.

Further, it is observed that there is no link between the tagging of

consumer installations with the concerned DTCs/feeders and the

computation of IP set consumption as sought to be done by the

BESCOM, as the IP set consumption has to be computed on the basis of

energy meter readings of 11 kV agricultural feeders duly deducting the

11 kV, distribution transformers and LT system losses to arrive at net

consumption. Therefore, the Commission considers that the reasons

cited by the BESCOM for not submitting the monthly IP set consumption

data based on segregated agricultural feeders to the Commission

regularly is not valid. The BESCOM has not complied with this direction

of the Commission despite segregating 542 numbers of 11 kV feeders

under NJY scheme, because of which it was possible to compute total IP

set consumption on the basis of feeder meter readings.

Page 36: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxvi

As per the methodology approved by the Commission for computation

of IP set consumption, the BESCOM is required to furnish only the data of

energy meters of the segregated agricultural feeders, at the substation,

which has not been submitted even after segregating a large number of

agricultural feeders under NJY scheme. Further, it is also not clear as to

which methodology the BESCOM has adopted to compute the total IP

set consumption for the FY15, as filed in its tariff application.

The Commission, during the validation meeting held on 10.02.2016, had

also directed the BESCOM to submit the IP set consumption on the basis

of energy meter readings of 11 kV agricultural feeders which have been

segregated under NJY. In response, the BESCOM has submitted the

details of IP set consumption based on the meter data of agricultural

feeders segregated under NJY. On verification of the energy

consumption data in respect of agriculture feeders, it is observed that

the distribution loss figures reckoned to compute the net IP set

consumption in the feeders, is not based on actual calculation

considering the distribution network sketches. The BESCOM should have

considered the actual distribution losses prevailing in 11 kV lines, DTCs

and LT lines, as per the methodology approved by the Commission for

arriving at the net IP consumption.

In view of the above discussion, the Commission decides to approve

5,868.8 MU towards sales to IP sets for the FY15, as against 5,930.3 MU

claimed by the BESCOM, after disallowing the unbilled sales to an extent

of 61.5 MU, claimed by the BESCOM, in respect of sales towards IP sets.

The category wise sales approved by the Commission in Tariff Order

2014-15 and the actuals allowed now for FY 15 are as indicated in the

table below:

TABLE – 4.5

Approved and Actuals Sales for FY15

Figures In MUs

Page 37: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxvii

Category As

Approved

Actuals

allowed**

Approved-

Actuals

(Difference)

LT-2a* 5703.77 5714.99 -11.22

LT-2b 38.95 40.82 -1.87

LT-3 1719.96 1648.82 71.14

LT-4b 8.47 1.87 6.60

LT-4c 4.71 6.58 -1.87

LT-5 1277.47 1129.51 147.96

LT-6 534.59 435.67 98.92

LT-6 432.62 390.32 42.30

LT-7 150.37 182.67 -32.30

HT-1 629.29 656.09 -26.80

HT-2a 5564.71 4615.09 949.62

HT-2b 3337.63 2737.64 599.99

HT-2c 9.48 184.05 -174.57

HT-3a& b 19.95 16.06 3.89

HT-4 128.65 125.65 3.0

HT-5 59.06 280.17 -221.11

Sub total 19619.67 18166.00 1453.68

BJ/KJ 62.44 48.20 14.24

IP 5712.97 5868.80 -155.83

Sub total 5775.41 5917.00 -141.59

Grand total 25395.08 24083.00 1312.09 *Including BJ/KJ installations consuming more than 18 units/month

** Unbilled sales not included

The actual share of sales to categories other than BJ/KJ and IP sets is

75.44% as against the estimated share of 77.26% resulting in 1.85

percentage point reduction in share to these categories, while the

actual share of sales to BJ/KJ and IP sets has increased by the same

percentage point.

Thus, the Commission approves total sales of 24083.00 MU for FY-15.

Page 38: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxviii

4.2.2 Distribution Losses for FY15:

BESCOM’s Submission:

The Commission had approved distribution losses for FY15 as

shown in the table below:

Range FY15

Upper limit 13.80%

Average 13.60%

Lower Limit 13.40%

BESCOM has reported a loss level of 13.53% in its annual accounts

as detailed below:

1 Energy at Interface Points in MU 28261.00

2 Total sales in MU 24436.05

3 Distribution losses as a percentage of

input energy at IF points 13.53%

Commission’s analysis and decisions:

The distribution loss of 13.53% reported by BESCOM is based on the

sales of 24436 MU as against the energy of 28261 MU at interface

points. However, as discussed in the preceding paragraph under

Sales, the Commission has not recognised 353.08MU of unbilled

sales. Accordingly the retail sales will be 24083 MU. Considering

the revised sales, the distribution losses for FY15 will be 14.78% as

detailed below:

1 Energy at Interface Points in MU 28261

2 Total sales in MU 24083

3 Distribution losses as a percentage of

input energy at IF points 14.78%

Considering the approved range of losses for FY15 as per the Tariff Order

dated 12th May, 2014, the distribution losses reported by BESCOM is 0.98%

more than the approved upper limit (13.80%). In accordance with the

Page 39: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xxxix

regulation 3.4 of the MYT Regulations, BESCOM is liable for levy of penalty

for FY15 as detailed below:

TABLE – 4.6

Penalty for exceeding approved distribution losses in FY15

Particulars FY15

Actual input at IF points as per audited accounts in

MU 28261.00

Retail sales in MU 24083.00

Percentage of distribution losses 14.78%

Target for upper limit of distribution loss 13.80%

Increase in percentage loss 0.98%

Input at loss target for actual sales in MU 27938.52

Increase in input due to increase in distribution losses

in MU 322.48

Average cost of power purchase in Rs./unit 3.61

Increase in power purchase cost due to higher

distribution losses in Rs. Crs 116.57

Thus, the Commission decides to levy a penalty of Rs.116.57 Crores for

increase in distribution losses beyond the target fixed for FY15 in the APR.

4.2.3 Power Purchase for FY15:

BESCOM’s Submission:

1. The Commission in its Tariff order dated 12th May, 2014 had

approved source wise quantum and cost of power purchase for

FY15. BESCOM, in its application has submitted the details of actual

power purchase for FY15 for the purpose of reviewing its Annual

Performance. The details of power purchase is detailed hereunder:

TABLE – 4.7

BESCOM’s POWER PURCHASE FOR FY15

Source of Generation

Actuals for FY15 Approved for FY15 Difference-between Actuals and

Approved-for FY15

% increase

(+)/decrease (-)

over an

approved figures

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy Cost

KPCL Hydel

Stations 3682.16 210.77 0.57 3646.01 207.72 0.57 36.15 3.05 0 0.99 1.47

Page 40: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xl

Source of Generation

Actuals for FY15 Approved for FY15 Difference-between Actuals and

Approved-for FY15

% increase

(+)/decrease (-)

over an

approved figures

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy in

MUs

Cost in

Rs Cr.

Rate in

Rs per

Unit

Energy Cost

KPCL-

Thermal

Stations

7774.03 3032.13 3.9 8091.69 3081.57 3.81 -317.66 -49.44 0.09 -3.93 -1.60

Total 11456.2 3242.90 2.83 11737.7 3289.29 2.8 -281.51 -46.39 0.03 -2.40 -1.41

CGS 7291.51 2205.24 3.02 7945.5 2590.73 3.26 -653.99 -385.49 -0.24 -8.23 -

14.88

Major IPPs 4550.28 2117.90 4.65 5503.08 2512.46 4.57 -952.8 -394.56 0.09 -17.31 -

15.70

IPPs -Minor

(NCE

Projects)

3162.61 1183.16 3.74 3323.87 1226.61 3.69 -161.26 -43.45 0.05 -4.85 -3.54

Other

States

Projects

64.35 26.30 4.09 103.66 33.01 3.18 -39.31 -6.71 0.9 -37.92 -

20.33

Short

/Medium

term

including U

I & Sec-11

3673.40 1863.68 5.07 1942.85 1013.41 5.22 1730.55 850.27 -0.14 89.07 83.90

Transmissio

n Charges

(KPTCL &

PGCIL)

1267.10 1243.16 0 23.94 0 1.93

LDC

Charges

(POSOOC

& SLDC)

18.83 13.42 0 5.41 0 40.31

Energy

Balancing -775.28 -292.13 3.77 -775.28 -292.13 3.77

Others

Charges 52.03 0 56.55 0

TOTAL 29423.03 11685.01 3.97 30556.7 11922.1 3.9 -1133.6 -232.56 0.07 -3.71 -1.95

Commission’s analysis and decisions;

1. The actual power purchase for FY15 as filed by BESCOM for approval

of Annual Performance Review is 29423.03 MU amounting to

Rs.11689.55 Crores, as against the approved quantum of 30556.66 MU

amounting to Rs.11922.09 Crores. This represents reduction in

quantum of power purchase to an extent of 1133.60 MU and its cost

by Rs.232.56 Crores.

2. On an analysis of the source-wise approved and actual power

purchases, the following deviations in the quantum of energy and its

cost of purchase are found:

Page 41: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xli

i. As against the approved quantum of 30556.66 MU the actual

power purchased by BESCOM is 29423.05 MU for FY15, which is

about 3.71% less than the approved quantum and in comparison

the shortfall during FY14 was 7.41% and thus the accuracy of

projection of approved power purchase has increased from

92.59% to 96.29 %. The reduction in sales reflected in reduced

power purchase.

ii. On verification of the source-wise power purchase, it is found that,

except for KPCL Hydel, there is reduction in supply from KPCL

Thermal, CGS, IPPs, NCE sources and in other States projects

sources to an extent of 2125.02 MU at a cost of Rs.879.65 Crores.

Consequently, BESCOM has purchased short-term power to a

tune of 3673.40 MU at a cost of Rs.1863.68 Crores. BESCOM has

incurred an additional cost Rs.850.27 Crores towards short-term/

medium-term Power Purchase, resulting in an increase in per unit

cost by 7 Paise.

iii. All these factors including the change in the source-wise mix of

supply, reconciliation of energy and its cost among ESCOMs have

resulted in increased average power purchase cost of BESCOM

at the rate of Rs.3.97 per KWh as against the approved rate of

Rs.3.90 per KWh.

3. The Commission notes that, the SLDC has not implemented the intra-

state ABT. As per the directions issued by the Government of

Karnataka vide its letter dated 28th January, 2016, intra state ABT has

to be implemented immediately by the KPTCL and ESCOMs. The

Commission therefore directs the SLDC, KPCL and the BESCOM to

take appropriate action immediately to implement intra-state ABT

and to host the details thereof, on their respective websites.

4. The Commission in its Tariff order dated 2nd March, 2015 had directed

BESCOM to move the Government to effect necessary adjustments in

the tariff subsidy payable to ESCOMs and ensure that there are no

Page 42: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlii

inter ESCOM payments outstanding in their accounts. Further,

BESCOM was also directed to reconcile the inter ESCOM energy

exchanges and its costs duly making necessary adjustments to

ensure proper accounting of energy and its cost.

5. The Commission notes that, ESCOMs’ balanced energy to an extent

of 775.28 MU at a cost of Rs.292.13 Crores has resulted in increased

receivables of BESCOM to an extent of Rs.292.13 Crores in FY15.

Further it is also noted that, as per the audited accounts, the

outstanding receivables from other ESCOMs are increasing year after

year. This indicates that, out-standing payments/receivables related

to inter-ESCOMs energy balancing and energy charges have not

been adjusted against subsidy payable by the \ Government, as per

the directions of the Commission.

6. BESCOM is directed to reconcile the inter ESCOM energy exchanges

and its costs every month and it shall collect/pay the amounts out of

the tariff subsidy received from Government of Karnataka, to ensure

proper accounting of energy and its cost.

7. In terms of the MYT Regulations, the Commission taking note of the

above facts decides, to consider 29423 MU at a cost of Rs.11685.03

Crores towards power purchases for FY15.

4.2.4 Renewable Purchase Obligation (RPO) compliance by BESCOM for FY15:

BESCOM has submitted that its achievement of non-solar RPO and solar

RPO are at 11.78% and 0.35% respectively, as against the target of 10%

and 0.25% respectively, as indicated below:

TABLE – 4.8

RPO compliance as submitted by BESCOM for FY15 Company

Name

Total

Input

Energy

(MU)

Non-Solar RPO Solar RPO

Target Achieved Target Achieved

(MU) (%) (MU) (%) (MU) (%) (MU) (%)

BESCOM 29423.03 2942.30 10 3468.12 11.78 73.56 0.25 103.74 0.35

Page 43: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xliii

The Commission has perused the data furnished and the explanation

submitted by BESCOM. The Commission has approved total input energy

of 29423 MU for FY15 in its APR. Thus, BESCOM was required to purchase

2942.3 MU of Non-solar energy and 73.56 MU of solar energy to meet its

RPO targets.

Based on the information furnished, the Commission notes that BESCOM

has achieved 11.78% of non-solar and 0.35% of solar RPO for FY15. Thus,

BESCOM has over-achieved its non-solar and solar RPO targets by 1.78

percentage points and 0.10 percentage points respectively.

4.2.5 Operation and Maintenance Expenses:

BESCOM’s Submission:

BESCOM in its filing has sought approval of O&M expenditure of

Rs.1084.83 Crores for FY15. It has requested the Commission to

consider indexation of CPI: WPI at 76: 24 for working out the

weighted inflation rate at 8.47% calculated on one year CPI & WPI

index from January- December, 2014 and arrive at the normative

O&M expenditure after factoring in the CAGR of growth in the

number of consumers at 5.83% computed based on the consumer

growth as per actuals of FY15 over FY14 (One year) with the base

O & M expenses as per APR of FY14. BESCOM has projected the

normative O&M expenses as follows:

TABLE – 4.9

Normative O & M Expenses – BESCOM’s submission

Particulars FY15

Consumer growth rate as per actual (CGI) 5.83%

Weighted Inflation Index (WII) 8.47%

Page 44: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xliv

O&M Cost of FY14as per APR Rs.in Crs. 957.46

O&M Index= 0&M (t-1)*(1+WII+CGI-X) Rs.in

Crs. 1084.83

Commission’s analysis and decisions:

The Commission in its Tariff Order dated 12th May, 2014 had approved

O&M expenses for FY15 as detailed below:

Page 45: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlv

TABLE – 4.10

Approved O&M Expenses as per Tariff Order dated 12.05.2014

Particulars FY15

No. of installations as per actuals as per Audited Accts 9260781

Weighted Inflation Index 6.89%

CGI based on 3 Year CAGR 5.37%

Actual O&M expenses for FY13 901.15

Total Approved O&M Expenses for FY15 – Rs.in Crores 1110.95

As per the Annual Audited Accounts of BESCOM for FY15, the actual

O&M expenditure is as follows:

TABLE – 4.11

O&M Expenses of BESCOM as per Annual Audited Accounts for FY15

Amount In Rs. Crores

Repairs & Maintenance 54.95

Employee Expenses 807.11

A&G expenses 203.68

O&M expenses 1165.74

The Commission in its preliminary observations had sought the details of

the certain expenses booked under A&G expenses by BESCOM during

FY15. BESCOM in its replies has stated that it has incurred expenses of

Rs.109.61 Crores towards remuneration to contract agencies including

Gramavidyuth Prathinidhi, IT related services, services for total revenue

management and towards obtaining man power services. Further, an

amount of Rs.38.73 Crores has been incurred towards conveyance and

travel expenses. On detailed review of the expenses, it is observed that

BESCOM is incurring substantial expenses on vehicle hire charges and

professional charges. The vehicle hire charges are indicated as Rs.31.27

Crores and professional charges / remuneration to contract agencies as

Rs.113.15 Crores.

The R&M expenses are also increasing year on year without proper

justification. One of the major items observed is expenses incurred on

repairs of faulty distribution transformers. BESCOM needs to institutionalize

Page 46: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlvi

a mechanism besides initiating financial prudence measures for

minimizing these expenses.

Further, it is observed that O&M expenses are abnormally increasing as

compared to the previous years. Having incurred such increased

expenses, BESCOM is pleading for allowing O & M expenses as per

actuals. It shall be noted that, the O & M expenses are controllable

expenses, and BESCOM is required to take steps to ensure prudence in

incurring these expenses and limit the same to the allowable O & M

expenses as per norms.

BESCOM has sought consideration of one year data of WPI and CPI for

determining the inflation index and consumer growth rate. It is to be

noted that, the Commission in its Tariff Order dated 12th May, 2014 has

considered the weighted inflation index based on 12 year data in line

with the methodology followed by the CERC and consumer growth is

based on three year Compounded Annual Growth Rate (CAGR) to

represent the true inflation and growth rate. The Commission is of the

view that, one year data of WPI and CPI and consumer growth rate

does not reflect the true index due to situational variations if any. The

Commission in its Order dated 7th January, 2016 in RP No.5/2014, has

decided to allow O & M expenses as per the norms of the MYT

Regulations. Thus, in accordance with the methodology adopted while

approving the ARR for FY14-16 and subsequent APR, the Commission

proceeds with determination of the normative O & M expenses based

on the 12 year data of WPI and CPI and three year CAGR of consumers.

Considering the Wholesale Price Index (WPI) as per the data available

from the Ministry of Commerce & Industry, Government of India and

Consumer Price Index (CPI) as per the data available from the Labour

Bureau, Government of India and adopting the methodology followed

by the CERC, with CPI and WPI in a ratio of 80 : 20, the allowable inflation

for FY15 is computed as follows:

Page 47: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlvii

Year WPI CPI Composite

Series Yt/Y1=Rt Ln Rt

Year

(t-1)

Product [(t-

1)* (LnRt)]

2003 92.6 107 104.12

2004 98.72 111.1 108.624 1.04 0.04 1 0.04

2005 103.37 115.8 113.314 1.09 0.08 2 0.17

2006 109.59 122.9 120.238 1.15 0.14 3 0.43

2007 114.94 130.8 127.628 1.23 0.20 4 0.81

2008 124.92 141.7 138.344 1.33 0.28 5 1.42

2009 127.86 157.1 151.252 1.45 0.37 6 2.24

2010 140.08 175.9 168.736 1.62 0.48 7 3.38

2011 153.35 191.5 183.87 1.77 0.57 8 4.55

2012 164.93 209.3 200.426 1.92 0.65 9 5.89

2013 175.35 232.2 220.83 2.12 0.75 10 7.52

2014 182 246.9 233.92 2.25 0.81 11 8.90

A= Sum of the product column 35.36

B= 6 Times of A 212.19

C= (n-1)*n*(2n-1) where n= No of years of data=12 3036.00

D=B/C 0.07

g(Exponential factor)= Exponential (D)-1 0.0724

e=Annual Escalation Rate (%)=g*100

7.24

For the purpose of determining the normative O & M expenses for FY15,

the Commission has considered the following:

a) The actual O & M expenses allowed for FY13 excluding contribution

to Pension and Gratuity Trust.

b) The three year compounded annual growth rate (CAGR) of the

number of installations considering the actual number of installations

as per the audited accounts up to FY15.

c) The weighted inflation index (WII) at 7.24% as computed above.

d) Efficiency factor at 1% as considered in the earlier two control

periods.

Thus, the normative O & M expenses for FY15 will be as follows:

Particulars FY15

No. of Installations As per actuals as per Audited Accts 9444518

Weighted Inflation Index 7.24%

Consumer Growth Index (CGI) based on 3 Year CAGR 6.07%

Normative O & M expenses for FY13 excluding P&G

contribution - Rs. Crs. 737.09

O&M Index= 0&M (t-1)*(1+WII+CGI-X)- Rs. Crs. 919.68

Page 48: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlviii

The above normative O & M expenses have been computed without

considering the contribution to Pension and Gratuity Trust.

The Commission treats employee costs on account of contribution to

P&G Trust as uncontrollable O&M expenses. This component has been

allowed beyond the normative O&M expenses to enable ESCOMs to

meet their actual employee costs.

BESCOM in its audited accounts for FY15 has indicated an amount of

Rs.134.32 Crores towards contribution to Pension and Gratuity Trust.

Considering the BESCOM’s request to treat the contribution to Pension

and Gratuity Trust as uncontrollable O & M expenses, the Commission

computes the allowable O & M expenses for FY15 as follows:

TABLE – 4.12

Allowable O & M Expenses for FY15

Amount in Rs. Crores

Sl.

No. Particulars FY15

1 Normative O & M expenses 919.68

2 Additional employee cost (uncontrollable

O & M expenses)

134.32

3 Allowable O & M expenses for FY14 1053.99

Thus, the Commission decides to allow an amount of Rs.1053.99 Crores

as O&M expenses for FY15.

4.2.6 Depreciation:

BESCOM’s Submission:

BESCOM in its filing as per its audited accounts has claimed an amount

of Rs.199.78 Crores as depreciation worked out after deducting an

amount of Rs.110.50 Crores towards depreciation withdrawn on account

of assets created out of consumers’ contributions / grants as per

Accounting Standards (AS) – 12 as detailed below:

Page 49: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xlix

TABLE – 4.13

Depreciation for FY15 – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

Gross fixed assets at the beginning of the year 5605.28

Additions during the year 1645.01

Deductions during the year 175.93

Gross fixed assets at the end of the year 7074.36

Depreciation provided 310.28

Average rate of Depreciation 4.87%

Less: Depreciation withdrawn from contribution as per AS 12 110.49

Depreciation 199.78

The average rate of depreciation works out to 4.87%. The BESCOM has

requested the Commission to allow a depreciation amount of Rs.199.78

Crores for FY15.

Commission’s analysis and decisions:

The depreciation has been determined by the Commission in

accordance with the provisions of the KERC (Terms and Conditions for

Determination of Tariff) Regulations, 2006 as amended on 1st February,

2012. The allowable depreciation for FY15 based on the data as per the

audited accounts are as follows:

TABLE – 4.14

Allowable Depreciation for FY15

Amount in Rs. Crores

Particulars

Opening

Balance of

Asset as on

01.04.2014

Closing

Balance of

Asset as

on

31.03.2015

Depreciation

for FY15

Buildings 60.39 79.36 3.02

Civil 3.06 3.39 0.14

Other Civil 0.51 0.81 0.05

Plant & M/c 1168.38 1499.28 74.36

Line, Cable Network 4327.48 5441.73 230.66

Vehicles 18.70 18.68 1.02

Furniture 10.43 11.64 0.49

Office Equipments 8.82 11.92 0.55

Intangible Assets 2.77 4.88 0.004

Page 50: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

l

Sub Total 5600.55 7071.69 310.29

Less Depreciation on

account of assets

created out of

consumer contribution

/ grants

110.50

Net allowable depreciation 199.78

Considering the opening and closing balance of gross blocks of fixed

assets for FY15 and the depreciation as per annual accounts, the

weighted average rate of depreciation works out to 4.90%.

As per the audited accounts for FY15, an amount of Rs.110.50 Crores on

account of depreciation on assets created out of consumers

contribution and grants on actual basis is considered for computation of

allowable depreciation for FY15.

Based on the above, the Commission decides to allow the actual net

depreciation of Rs.199.78 Crores for FY15.

4.2.7 Capital Expenditure for FY15:

a) The BESCOM has reported a capital expenditure of Rs.1782.85 Crores

for FY15 as per Format-D17, as against an approved capex of Rs.763

Crores. As per the category-wise expenditure furnished by the

BESCOM, an amount of Rs.1474.58 Crores is stated to have been spent

for FY15. The category-wise expenses are as detailed below:

TABLE – 4.15

Capital expenditure for FY15 – BESCOM’s Submission

Amount in Rs. Crores

Sl No. Particulars

Approved

capex for

FY15

Actual

Expenditure

1 E & I Works(11kV link lines) 50.00 54.58

2 E & I Works(Additional DTC's) 40.00 54.13

3

Expenditure incurred under E& I Works(HT and LT

Reconductoring, Providing AB cable, Spill over,

Urgent works, Emergency and T&P etc.,)

153.00 195.75

4 Local Planning 20.00 31.30

5 Ganga Kalyana scheme 45.00 34.76

Page 51: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

li

6 Service Connection & Drinking water supply 85.35

7 Meter Programming 95.00 193.16

8 Replacement of Faulty transformers by new

Transformers 15.00 101.54

9 Providing infrastructure to Unauthorized IP sets 60.00 166.78

10 RGGVY 12th Plan 0 0.15

11 Niranthara Jyothi Yojane 0 221.05

12 R-APDRP Part-A(IT implementation)

140.00

-27.00

13 DAS 50.53

14 R-APDRP Part-B 34.18

15 HVDS 120.00 248.96

16 Civil Eng. works and DSM 25.00 29.36

Total 763.00 1474.58

However, BESCOM has not explained the reasons for the difference

between the amount as per Format D-17 and the category-wise

expenses furnished.

Commission’s Analysis and decision:

BESCOM’s capital expenditure for FY15 at Rs.1474.58 Crores is 93% more

than the approved capex of Rs.763 Crores. The Commission had

directed BESCOM to approach the Commission with proper justification,

if the capex in any category is likely to exceed 10% or Rs.10 Crores in the

financial year for an in-principle approval, but BESCOM has not sought

any such approval. The category wise excess amount incurred over and

above the approved capex, is as below:

TABLE – 4.16

Details of Excess expenditure over approved capex for FY15

Amount in Rs. Crores

Particulars

Approved

capex for

FY15

Actual

Expenditure

Excess

expenditure

over approved

E & I Works(Additional DTC's) 40 54.13 14.13

Expenditure incurred under E& I Works(HT

and LT Reconductoring, Providing AB

cable, Spill over, Urgent works, Emergency

and T&P etc.,)

153 195.75 42.75

Local Planning 20 31.30 11.30

Ganga Kalyana 45

34.76 75.11

Service Connection & Drinking water supply 85.35

Replacement of Faulty transformers by new

Transformers 15 101.54 86.54

Page 52: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lii

Providing infrastructure to Unauthorized IP

sets 60 166.78 106.78

Meter Programming 95 193.16 98.16

Niranthara Jyothi Yojane 0 221.06 221.06

DAS 140

50.53 -55.29

R-APDRP Part-B 34.18

HVDS 120 248.96 128.96

Total 688 1417.50 784.79

From the above Commission notes that, BESCOM has exceeded the

approved capex of Rs.688 Crores for the above mentioned categories

by Rs.784.79 Crores. In reply to the preliminary observations on this issue,

BESCOM has stated that, the Ganga Kalyana scheme, local planning

works and replacement of faulty transformers are taken up as social

responsibility works, at the behest of elected representatives and also to

comply with the performance standards. Further, BESCOM has stated

that, the expenses incurred during FY15 were planned during FY13 (as on

30.11.2012-MYT 3rd control period), and it was difficult to establish the

exact phase of projects, while projecting the capex for 3 year control

period. It is also stated that the Government of Karnataka frames

policies to undertake work of regularization of un-authorized IP sets,

taking up Ganga Kalyan works and Niranthara Jyothi works. Further,

service connection works, extension and improvement works and

replacement of transformers are essential to supply electricity and to

ensure compliance of the Standards of Performance as mandated by

the Commission. Hence, execution of the spill over works pertaining to

the previous years and incurring expenditure to supply/ restore electricity

supply has resulted in exceeding the approved capex.

The Commission would like to emphasise that, any work to be carried out

by ESCOMs should be planned well in advance and the costs thereon

factored in the ARR of the relevant financial year so as to ensure the

recovery of costs through tariff. With this observation, the Commission

accepts the explanation offered by BESCOM on it exceeding the

approved capex.

Page 53: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

liii

Further the Commission notes that, in respect of Replacement of Faulty

transformers by new Transformers, BESCOM has indicated a capital

expenditure of Rs.101.54 Crores against the approved capex of Rs.15

Crores. In this regard, it is to be noted that, the failed transformers should

be replaced by repaired good transformers only and its cost should be

charged to revenue expenditure. In case, the failed transformer is not fit

for repairs it should be scrapped and only such transformers can be

replaced by new transformers and expenditure thereon shall be booked

under capex. The Commission, in its preliminary observations, had sought

the details of failure of transformers, repaired transformers and

procurement of new transformers for replacement of failed transformers

for FY15 from BESCOM. In reply, BESCOM has stated that, total failed

transformers were 15,556, out of which 12797 repaired and 799 were

scrapped. But, BESCOM has stated that, it has used 1843 new

transformers for replacing failed transformers at a total cost of Rs.46.44

Crores. This amount of Rs.46.44 Crores should have been indicated as

capex incurred for Replacement of Faulty transformers by new

Transformers as against Rs.101.54 Crores declared. Thus, an amount of

Rs.55.10 Crores is overstated towards replacement of Transformers in the

capex. Hence, the actual Capex incurred during FY15 would be

Rs.1727.75 Crores instead of Rs.1782.85 Crores.

As regards providing infrastructure to Unauthorized IP sets, BESCOM has

achieved only 18383 Nos. and has not reached its own target of

completing infrastructure for 36228 Nos. of IP Sets. In the area of High

Voltage Distribution System (HVDS) and also NJY scheme, BESCOM has

over achieved the capex for FY15.

As regards Distribution Automation System (DAS), which has been started

in 2009, BESCOM has indicated the capital expenditure up to FY15 and

stated that, various phases of works are under execution and the cost

benefit can be worked out only after the completion of the project. But,

BESCOM has not mentioned the likely date of completion of DAS

project.

Page 54: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

liv

Further, considering the capital expenditure in respect of works which

are met out of grants and deducting the excess capex declared for

replacement of failed transformers, the total capital expenditure

actually incurred from BESCOM funds for FY15 would be Rs.1460.85

Crores.

The following table indicates an increasing trend in the year-wise

expenditure incurred by BESCOM, against the approved Capex during

the last four years indicates

TABLE – 4.17

Approved and Actual Capex incurred –FY12-FY15

Amount in Rs. Crores.

Particulars FY12 FY13 FY14 FY15

Capital investment approved by the

Commission 660 510 848 763

Actual capital investment incurred

as per audited accounts 557.68 851 1052 1782.85

Shortfall 102.32 -341 -204 -1019.85

Percentage achievement 84.49 167% 124% 233.7%

It is seen from the above data, while in FY12 the achievement was 84%

of the approved capex. In the year FY15, the achievement of capex vis-

à-vis approved capex is 234%, which indicates an increasing trend in the

year on year capex.

In light of the above discussions and considering the increasing trend in

capex performance by BESCOM from the past three years, the

Commission decides to consider the capital expenditure incurred at

Rs.1727.75 Crores for the purpose of APR for FY15.

(i) Prudence Check of investment on Special Design Transformers (SDTs)

A complaint (No. 12/13) has been filed alleging wasteful expenditure in

respect of implementation of NJY scheme by procuring and installing

Special Design Transformers (SDTs) in BESCOM with a request to disallow

the corresponding expenditure. After detailed examination of the issue,

the Commission in its Order dated 14th January, 2016, has decided as

follows:

Page 55: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lv

The procurement of the 18 SDTs for pilot project by the Respondent

(BESCOM) shall be considered as an experimental initiative and the

corresponding capital expenditure allowed.

The expenditure on procurement and installation of 400 Nos. of the SDTs,

incurred without assessing the performance and utility of the 18 SDTs

installed in the pilot project, is held to be imprudent capital expenditure

and therefore the corresponding charge on the costs (interest and

depreciation) would be disallowed in the ARR of Respondent for the

FY17.

While examining the above disallowance, the Commission notes that the

SDTs procured have not been useful and that they cannot be used

elsewhere. As they are not useful, the same have to be treated as scrap

asset. Hence, the whole of the investment on the 400 SDTs is a wasteful

expenditure. In view of this, the Commission decides to disallow 90% of

the capex of Rs.661.44 Lakh (leaving 10% as scrap value) amounting to

Rs.595.3 lakhs relating to procurement and installation of SDTs. The

Commission decides to deduct this amount in the APR of FY15.

4.2.8 Prudence check of capex for FY15:

The prudence check of capex of BESCOM was taken in two parts:

i. Prudence check of execution of the capital works of FY15.

ii. Prudence check of Material Procurement process of FY15.

i) Prudence check of execution of the capital works of FY15

The Commission has been allowing the capital expenditure as proposed

by BESCOM subject to prudence check. Therefore, the Commission

undertook prudence check of the capital expenditure incurred by

BESCOM for the FY15 by engaging the services of M/s. Power Research

and Development Consultants Pvt. Ltd. (PRDCL) as consultant, to

evaluate the capital expenditure incurred during FY15, in respect of

completed and categorized works.

As per the report of the consultant, the following is the summary of

Prudence check findings for FY15:

TABLE – 4.18

Page 56: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lvi

Summary of Prudence check findings for FY15

Particulars Numbers Cost in

Rs.Crs

Works costing Rs.6 Lakhs and above

considered as samples 120

117.86

Works costing between than Rs.6 Lakhs

and Rs.3 Lakhs considered as samples 50

3.43

Works costing below Rs.3 Lakhs

considered as samples 46

1.02

Works not

meeting the

norms of

prudence

Rs.6 Lakhs and

above Nil

Rs.6 Lakhs and Rs.3

Lakhs Nil

below Rs.3 Lakhs Nil

Total works not meeting the norms of

prudence as stipulated in the

guidelines issued by this Commission

Nil

TABLE – 4.19

Summary of Works having cost overrun

Particulars Within 10% 10-25% Above 25%

Rs.6 Lakhs and above 13 06 04

Rs.6 Lakhs and Rs.3 Lakhs 02 03 00

below Rs.3 Lakhs 04 01 02

TABLE – 4.20

Summary of Works having Time overrun

Particulars Within Year Between one

and two Years

Above 2

Years

Rs.6 Lakhs and above 24 03 03

Rs.6 Lakhs and Rs.3 Lakhs 09 00 00

below Rs.3 Lakhs 06 00 00

The Commission has forwarded the copy of the Report of the Consultant

on the Prudence check to BESCOM for information and guidance.

Page 57: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lvii

ii) Prudence check of Material Procurement process of FY15:

The BESCOM has been executing capital works both on turnkey as well

as partial turnkey contracts. In the process, the BESCOM takes up

procurement of major materials like, distribution transformers, poles and

conductor etc., and issue them to the partial turnkey contractor for

carrying out the labour contract work as per the award. The contractor

would also invest on some of the smaller materials associated with the

works viz., cross arm, bolt & nuts, earthing materials etc., in case of

necessity.

In view of the fact that, a large quantity of major materials are being

procured by the BESCOM, the Commission decided to review material

procurement process of major materials as a part of prudence check

carried out by the consultant. The consultants report does not identify

any instances of imprudence in the procurement process.

4.2. 9 Review of decision taken on Prudence check of capital expenditure

incurred during FY13 to FY14:

The Commission had disallowed the interest and depreciation pertaining

to two works which were not meeting prudence norms in the previous

years’ Tariff exercise. BESCOM has furnished the present status of two

works and requested the Commission to consider the works as meeting

the prudence norms:

1) Evacuation of new 11kV feeder from Brigade Station from feeder

No.4 to Harishchandraghat Circle RMU by providing a intermediate

RMU (2 OD+3VL) in C-1 Sub-Division (3.5kM), Malleshwaram Division,

Estimated cost: Rs.162.82 lakhs;

BESCOM has stated that, Brigade representatives and residential

forum did not allow BESCOM staff to tap the power supply as the GIS

Brigade station as it was established under self-execution basis.

Page 58: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lviii

Alternatively, the Power was tapped from F7 IISC feeder which was

idle, instead of Brigade compound substation. The above work is

completed and load of the crematorium has been transferred on

IISC F7 feeder, the existing F10 NRS feeder is used as an alternative

source to the crematorium.

2) New 11 kV line from REMCO MUSS to police quarters RMU, Mysore

road through 3CX400sq mm HT UG cable to a distance of 4.3 Kms

with 2OD+4VL and 2OD+1VL RMUs and installing new breaker at

REMCO MUSS to reduce overload on F-15 feeder of REMCO MUSS in

O&M-8 unit, W3 sub division, Vidhana Soudha Division/Estimated cost:

Rs.190 lakhs:

BESCOM has stated that, the UG cable from REMCO MUSS upto

Anantharamaiah compound has been damaged due to

construction of flyover, metro and road widening works near

Nayandahhalli. Hence, as an alternative, the under-loaded F10

feeder of REMCO MUSS was made use of, near Ananthramaiah

compound and the load of F15 feeder was shifted on F10 feeder.

The Commission having examined the explanation furnished by

BESCOM, decided to get the works revalidated by the consultants

conducting the prudence check of capital expenditure of BESCOM

for FY15.

Accordingly, the consultants have revalidated the works and stated

that, the investment made on the above two works have been put to

use by BESCOM. The Commission therefore decides to consider the

works as meeting norms of prudence and discontinues the

disallowance. Further, in case of two works termed as non prudent

pertaining to FY10 to FY12, the Commission has disallowed adequate

proportion of expenditure and decides that, further disallowance is

not called for.

4.2.10 Interest and Finance Charges

Page 59: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lix

a) Interest on loan:

BESCOM’s Submission:

BESCOM in its filing has claimed an amount of Rs.217.78 Crores

towards interest on long term loans drawn from banks / financial

institutions. The details of interest on loans claimed by BESCOM are

as follows:

TABLE – 4.21

Interest on Loans- BESCOM’s Submission

Amount in Rs.Crores

Particulars FY15

Long term Loan outstanding as on 31.03.2014 2324.51

Long term Loan outstanding as on 31.03.2015 1763.87

Interest on long term loans 217.69

Considering the opening balance of loans, fresh borrowings and

the repayment of loans during FY15, the weighted average rate of

interest on the average loan amount works out to 10.65%.

BESCOM has requested the Commission to allow amount of

Rs.217.69 Crores for FY15 towards interest on long term loans.

However, BESCOM in its replies to the preliminary observations has

stated that the long term loans outstanding for FY15 as on

31.03.2015 is Rs.2487.94 Crores.

Commission’s analysis and decisions:

The Commission has noted the status of opening and closing balances

of long term loans as per the audited accounts for FY15 and format D9

of the filings as shown below:

TABLE – 4.22

Allowable Interest on Loans – FY15

Amount in Rs.Crores

Page 60: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lx

Particulars FY15

Opening Balance Secured Loans 2277.18

Opening Balance Un-secured Loans 227.97

Total opening balance of loans 2505.16

Less Short term loans/ Over draft 0.00

Less Interest accrued & dues 0.00

Total Long term secured & unsecured loans 2505.16

Add new Loans 479.33

Less Repayments 315.74

Total loan at the end of the year 2668.75

Average Loan 2586.96

Interest on long term loans as per audited accounts for FY15 222.76

Considering the average loan of Rs.2586.96 Crores and an amount of

Rs.222.76 Crores incurred towards interest on long term loans, the

weighted average of interest works out to 8.61%. The Commission notes

that the weighted average rate of interest is lesser than the prevailing

interest rates.

Thus, the Commission decides to allow an amount of Rs.222.76 Crores

towards interest on loan for FY15.

4.2.11 Interest on Working Capital:

BESCOM’s Submission:

BESCOM has stated that it has borrowed short term loans and

overdrafts during the year to meet day to day expenditure

(working capital) during FY15. As per the audited accounts

BESCOM has indicated the opening and closing balances of short

term loans at Rs.2018.84 Crores and Rs.2493.81 Crores respectively

for FY15. The interest on short term loan and overdraft booked is

indicated at Rs.247.73 Crores. The weighted average rate of

interest is 10.98% p.a.

Further, BESCOM citing the provisions of the MYT Regulations has

claimed the normative interest on working capital of Rs.298.35

Page 61: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxi

Crores based on prime lending rate (BPLR) of 14.60% p.a. for FY15

as detailed below:

TABLE – 4.23

Interest on Working Capital - BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

One-twelfth of the amount of O&M Expenses 90.40

Opening GFA as per Audited Accounts 5605.27

Stores, materials and supplies at 1% of Opening balance of

GFA 56.05

One-sixth of the Revenue 2246.60

Total Working Capital 2393.05

Rate of Interest (% p.a.) 14.60

Interest on Working Capital 349.38

Actual Interest incurred for FY-15 247.73

Difference of interest incurred and interest on normative basis 101.65

Normative Interest on Working capital 298.35

Commission’s analysis and decisions:

As per the audited accounts, BESCOM has incurred an interest of

Rs.141.11 Crores on short term borrowings and Rs.101.54 Crores on bank

overdraft during FY15. Thus, an amount of Rs.242.65 Crores has been

incurred as interest on working capital during FY15.

The present interest rates by commercial banks and financial institutions

are charged mainly on the basis of base rate of interest declared by RBI

from time to time and the earlier concept of charging interest on the

basis prime lending rate of SBI does not exist. Hence, the Commission

would consider base rate plus certain basis points depending upon the

tenure of the loan. As per the BESCOM’s application, it is stated that

short term loans for FY15 has been availed at a weighted average rate

of interest of 10.98%. However, considering the base rate of interest with

spread of 250 basis points and noting the downward trend in the interest

rate, the Commission decides to allow short term loans at a normative

interest of 11.75% for FY15.

Page 62: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxii

As per the KERC (Terms and Conditions for Determination of Tariff)

Regulations, 2006 as amended on 1st February, 2012, the Commission has

computed the allowable interest on working capital for FY15 as follows:

TABLE – 4.24

Allowable Interest on Working Capital for FY15

Amount in Rs.Crores

Particulars FY15

One-twelfth of the amount of O&M Expenses 87.83

Opening GFA 5608.05

Stores, materials and supplies 1% of Opening balance of GFA 56.08

One-sixth of the Revenue 2209.16

Total Working Capital 2353.07

Rate of Interest (% p.a.) 11.75

Normative Interest on Working Capital 276.49

Actual interest on WC as per audited accounts for FY15 242.65

Allowable Interest on Working Capital 259.57

Thus, the Commission decides to allow an amount of Rs.259.57 Crores

towards interest on working capital for FY15.

4.2.12 Interest on Consumer Deposits:

BESCOM’s Submission:

BESCOM has claimed an amount of Rs.210.38 Crores towards

payment of interest on security deposits for FY15.

TABLE – 4.25

Interest on consumer deposits for FY15 – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

Opening balance of Consumer Deposits 2453.79

Closing balance of consumer deposits. 2831.86

Average Consumer deposit for FY15 2642.83

Interest on consumer deposits 210.38

Rate of Interest 7.96%

Commission’s analysis and decisions:

The Commission notes that, as per the audited accounts for FY15, the

interest on consumer deposits amounting to Rs.210.38 Crores claimed by

BESCOM works out to a weighted average rate of interest of 7.96%. As

Page 63: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxiii

per KERC (Interest on Security Deposit) Regulations, 2005 the interest on

consumer deposits is to be allowed as per the bank rate prevailing as on

the 1st of April of the relevant year. The bank rate as on 1st April, 2014

was 9.00%. The actual weighted average rate of interest is below the

applicable bank rate.

Thus, the Commission decides to allow an amount of Rs.210.38 Crores

claimed towards interest on consumer deposits for FY15.

4.2.13 Other Interest and Finance charges:

BESCOM has claimed an amount of Rs.10.19 Crores towards other

interest and finance charges for FY15 which includes charges payable to

banks / financial institutions and guarantee commission payable to GoK.

The Commission notes that the claims are as per the audited accounts

and hence decides to allow the same for FY15.

4.2.14 Capitalisation of Interest and other expenses:

BESCOM in its filing has claimed as per audited accounts an amount of

Rs.78.89 Crores towards capitalization of interest on loan and other

operation and maintenance expenses for FY15. The same has been

considered for computation of APR for FY15.

Thus the allowable interest and finance charges for FY15 are as follows:

TABLE – 4.26

Allowable Interest and Finance Charges

Amount in Rs.Crores

Sl.

No. Particulars FY15

1. Interest on Loan capital 222.76

2. Interest on working capital 259.57

3. Interest on consumer deposits 210.38

4. Other interest and finance charges 10.19

5. Less Interest and other expenses capitalized 78.89

6. Total interest and finance charges 624.01

4.2.15 Other Debits:

Page 64: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxiv

BESCOM’s Submission:

BESCOM, in its application has claimed credit balance of Rs.6.70

Crores towards other debits as detailed below:

TABLE – 4.27

Other Debits-BESCOM’s Submission

Amount in Rs. Crores

Sl

No Particulars FY15

1 Small and Low value items written off 0.27

2 Losses/gains relating to Fixed assets 14.10

3 Assets decommissioning cost (0.04)

4 Bad debts written off 0.01

5 Miscellaneous losses and write offs 5.03

6 Material cost variance (15.09)

7 Provision for loss on obsolescence of

stores etc. in stock (10.98)

Total (6.70)

Commission’s analysis and decisions:

The Commission notes that as per the audited accounts for FY15, an

amount of Rs.10.98 Crores has been factored as provisions for loss on

obsolescence of stores. Such provisions cannot be considered unless

the same is incurred. As such the allowable other debits excluding

provisions for bad and doubtful debts for FY15 are as detailed below:

TABLE – 4.28

Allowable Other Debits

Amount in Rs. Crores

Sl

No Particulars FY15

1 Small and Low value items written off 0.27

2 Material cost variance (15.09)

3 Losses relating to fixed assets 14.10

4 Assets decommissioning cost (0.04)

5 Bad debts written off 0.01

6 Miscellaneous losses and write offs 5.03

Total 4.28

Thus, the Commission decides to consider an amount of Rs.4.28 Crores

as other debits for FY15.

Page 65: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxv

4.2.16 Net Prior Period Charges:

BESCOM’s Submission:

BESCOM in its filing as per audited accounts has claimed the net

credit balance of Rs.14.04 Crores towards Prior Period credit / debits

as detailed below:

TABLE – 4.29

Net Prior Period Charges-BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

Short provision of prior period depreciation and

other expenses 14.59

Excess provisions of prior period interest and

finance charges and others (28.63)

Net prior period credits (14.04)

Commission’s analysis and decisions:

As per the Audited Accounts for FY15, the prior period debit is Rs.16.40

Crores on account of employee costs, A&G expenses and under

provided depreciation of earlier years. Further, the prior period credit of

Rs.30.44 Crores is on account of excess provision for depreciation and

other expenses. Hence the Commission decides to allow a net prior

period credit of Rs.14.04 Crores for FY15.

4.2.17 Return on Equity:

BESCOM’s Submission:

BESCOM in its application has claimed Return on Equity of Rs.71.15

Crores for FY15 as detailed below:

TABLE – 4.30

Return on Equity – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

Paid up share capital 546.91

Page 66: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxvi

Net profit for FY15 113.44

Total share capital 660.35

Reserves and surplus (589.20)

Equity for FY15 71.15

However, BESCOM has requested to allow Rs.84.77 Crores as RoE

considering only the equity of Rs.546.91 Crores held as on 31st March,

2015 (end of FY15) without taking into account the accumulated losses.

Commission’s analysis and decisions:

As per the KERC (Terms and Conditions for Determination of Tariff)

Regulations, 2006 as amended on 1st February, 2012, the Commission has

computed the allowable Return on Equity at 15.5% on equity plus

reserves and surplus as at the beginning of the year besides allowing

taxes as per actuals .Considering the status of equity as per the audited

accounts for FY15, the allowable RoE is determined as follows:

TABLE – 4.31

Allowable Return on Equity

Amount in Rs. Crores

Particulars FY15

Paid Up Share Capital 546.92

Share deposit 133.08

Reserves and Surplus as on 31.03.2014 (589.21)

Recapitalisation of security deposit (100.00)

Total Equity (9.21)

Considering total equity of Rs.680.00 Crores and accumulated losses of

Rs.589.21 Crores as at the beginning of the year FY15 and factoring

recapitalization of security deposit of Rs.100.00 Crores in compliance with the

Orders of the Hon’ble ATE in appeal No.46/2014, BESCOM has a negative net

worth of Rs.9.21 Crores.

Thus, the Commission decides not to allow any Return on Equity for

FY15.

4.2.18 Income tax :

Page 67: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxvii

As per the audited accounts, BESCOM has incurred an expenditure of

Rs.25.75 Crores towards payment of Income Tax for FY15. The Commission

decides to allow the actual Income Tax paid of Rs.25.75 Crores for FY15.

4.2.19 Other Income:

BESCOM’s Submission:

BESCOM in its application has claimed an amount of Rs.124.44 Crores as

other income for FY15. However, as per the audited accounts, an

amount of Rs.205.24 Crores is shown as Other Income for FY15. This

amount includes income from interest on fixed deposits, profit from sale

of scrap / stores, rent from staff quarters and incentives earned due to

prompt payment of power purchase bills besides miscellaneous income

and rebate on payment of electricity duty.

BESCOM has earned Rs.141.39 Crores as incentive towards prompt

payments for power purchase. BESCOM has proposed to retain an

amount of Rs.70.70 Crores i.e.50% of the incentive earned. Further,

BESCOM has not considered the interest earned on Bank fixed

deposits for Rs.10.72 Crores as other income. The details as per

BESCOM filing are as under:

TABLE – 4.32

Other Income – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY15

Profit on sale of stores 0.98

Rent 1.90

Incentives received 70.70

Value of materials found excess during physical

verification 0.41

Miscellaneous 47.49

Rebate at 0.5% for collection of Electricity Duty 2.97

Excess provision made in prior period which is no longer

required 0.01

Total other income 124.44

Page 68: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxviii

Commission’s analysis and decisions:

As per the audited accounts, an amount of Rs.205.24 Crores is indicated

as other income for FY15. As decided in the earlier Tariff Orders, to

encourage and bring in financial discipline in timely payment of monthly

power purchase bills, the Commission continues to allow10% of the total

incentive amounting to Rs.14.13 Crores on account of timely payment of

power purchase bills to be retained by BESCOM for FY15. Further, the

amount of Rs.10.72 Crores earned by BESCOM by way of interest on

bank fixed deposits is to be considered as other income since BESCOM

has deposited the funds available from the business. Thus after

deducting the incentive amount of Rs.14.13 Crores and considering the

interest earned on fixed deposits of Rs.10.72 Crores, the Commission

decides to allow an amount of Rs.191.11 Crores as other income for FY15.

Page 69: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxix

4.2.20 Fund towards Consumer Relations / Consumer Education:

The Commission has been allowing an amount of Rs.1.00 Crore per year

towards consumer relations / consumer education. BESCOM in its application

had not reported any expenditure towards Consumer Relations / Consumer

Education incurred separately during FY15. However, BESCOM in is replies to

the Commission’s preliminary observations has informed that an amount of

Rs.4.77 Crores has been incurred towards consumer awareness programmes

on safety measures, energy conservation and demand side management

initiatives under separate head of account. The Commission notes that these

expenses have been factored in the audited accounts under A&G expenses.

The expenditure reported by BESCOM is inclusive of expenses towards

activities other than those intended in Rs.1.00 Crores earmarked in the ARR.

Hence, considering the overall expenditure reported by BESCOM, the

Commission decides to factor Rs.1.00 Crores in the APR as expenses towards

consumer relations / consumer education for FY15. The balance amount is

already considered while computing the O & M expenses on normative basis

as discussed in the earlier paragraphs of this Chapter.

4.3 Abstract of Approved ARR for FY15:

As per the above item-wise decisions of the Commission, the

consolidated Statement of ARR for FY15 is as follows:

TABLE – 4.33

Approved ARR for FY15 as per APR

Amount in Rs.

Crores.

Sl.

No Particulars

APR FY15

As Appd As Filed As per

APR

1 Energy @ Gen Bus 30557 29423 29423.03

2 Transmission Losses in % 3.81% 3.95% 3.95%

3 Energy @ Interface in MU 29392 28261.00 28261.00

4 Distribution Losses in % 13.60% 13.53% 14.78%

Sales in MU

5 Sales to other than IP & BJ/KJ 19619.67 18452.30 18164.74

6 Sales to IP & BJ/KJ 5775.41 5983.75 5918.26

Page 70: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxx

7 Total Sales 25395.08 24436.05 24083.00

8 Revenue at existing tariff in Rs Crs

9 Revenue from tariff and Misc. Charges 12409.27 11829.93 11919.82

10 Tariff Subsidy 1192.92 1245.25 1335.13

11 Total Existing Revenue 13602.19 13075.18 13254.95

Expenditure in Rs Crs

12 Power Purchase Cost 10887.71 10635.32 10635.32

13 Transmission charges of KPTCL 1022.49 1032.54 1032.54

14 SLDC Charges 11.89 17.16 17.16

15 Power Purchase Cost including cost of transmission 11922.09 11685.02 11685.02

Employee Cost

Repairs & Maintenance

Admin & General Expenses

16 Total O&M Expenses 1110.95 1084.83 1053.99

17 Depreciation 168.58 199.78 199.78

18 Interest & Finance charges

19 Interest on Loans 160.92 217.68 222.76

20 Interest on Working capital 265.15 348.98 259.57

21 Interest on belated payment on PP Cost* 0 0 0

22 Interest on consumer deposits 214.74 210.38 210.38

23 Other Interest & Finance charges 7.63 10.19 10.19

24 Less interest & other expenses capitalised 39.99 78.87 78.89

25 Total Interest & Finance charges 608.45 708.36 624.01

26 Other Debits 0 -6.7 4.28

27 Net Prior Period Debit/Credit 0 -14.04 -14.04

28 RoE 0.00 84.77 0.00

29 Provision for taxation 0 25.75 25.75

30

Funds towards Consumer Relations/Consumer

Education 1 0 1.00

31 Other Income 225 124.44 191.11

32 ARR 13586.07 13643.33 13388.68

33 Deficit for FY13 carried forward 627.13 154.32 0

34

Penalty for increase in distribution losses and

disallowance of imprudent capex as KERC Order

dated 14.01.2016 in Case No 12/2013

122.52

35 Net ARR 14213.20 13797.65 13266.16

36 Regulatory asset to be recovered in FY16 & FY17 -611.01

37 Net ARR for FY15 13602.19 13797.65 13266.16

4.3.1 Gap in Revenue for FY15:

As against an approved ARR of Rs.13602.19 Crores, the Commission after

the Annual Performance Review of BESCOM for FY15 decides to allow

an ARR of Rs.13266.16 Crores for FY15. Considering the revenue of

Page 71: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxi

Rs.13254.95 Crores, the deficit of Rs.11.21 Crores is determined for the

year FY15.

The Commission decides to carry forward the deficit of Rs.11.21 Crores of

FY15 to the proposed ARR for FY17as discussed in the subsequent

Chapter of this Order.

4.3.2 Previous years’ Gap:

BESCOM, in its tariff application has claimed Rs.475.77 Crores against

accumulated losses of the previous years. The Commission notes that

during the Annual Performance Review of the relevant years, the

Commission has been allowing the actual expenditure based on the

MYT norms and the revenue gap or surplus thereon is being carried

forward to the subsequent year’s ARR. The ESCOMs are expected to

regulate their income and expenditure within the within approved

amounts exercising due diligence and efficiency. Once the APR is

approved in terms of the MYT Regulations, the Commission cannot

further review the performance of the previous years. Therefore, the

Commission has not considered the accumulated losses of the previous

years as claimed by the BESCOM.

Page 72: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxii

CHAPTER – 5

ANNUAL REVENUE REQUIREMENT FOR FY17-19

5.0 Annual Revenue Requirement (ARR) for FY17-FY19

BESCOM’s Application:

BESCOM in its application dated 15th December, 2015, has sought

approval of ARR for FY17-19. The summary of the proposed ARR for FY17-

19 is as follows:

TABLE – 5.1

Proposed ARR for FY17-19

Amount in Rs.Crores

Sl.

No. Particulars FY17 FY18 FY19

1 Energy @ Gen Bus in MU 32907.24 34674.06 36540.95

2 Transmission Losses in % 3.47% 3.37% 3.27%

3 Energy @ Interface in MU 31765.36 33505.54 35346.06

4 Distribution Losses in % 13.30% 13.20% 13.10%

Sales in MU

5 Sales to other than IP & BJ/KJ 20554.10 21852.54 23241.88

6 Sales to IP & BJ/KJ 6986.30 7229.96 7473.62

7 Total Sales 27540.00 29082.50 30715.50

Revenue at existing tariff in Rs Crs

8 Revenue from tariff and Misc Charges 13066.38 13797.16 14577.70

9 Tariff Subsidy 1680.08 1738.07 1796.06

10 Total Existing Revenue 14746.46 15535.23 16373.76

Expenditure in Rs Crs

11 Power Purchase Cost 12479.32 14477.41 15583.53

12 Transmission charges of KPTCL 1203.00 1203.00 1203.00

13 SLDC Charges

14

Power Purchase Cost including cost of

transmission 13682.32 15680.41 16786.53

15 Employee Cost 1059.60 1318.30 1476.20

16 Repairs & Maintenance 65.40 81.40 91.10

17 Admin & General Expenses 183.10 227.80 255.10

18 Total O&M Expenses 1308.10 1627.50 1822.40

19 Depreciation 310.00 326.00 338.00

20 Interest & Finance charges

21 Interest on Loans 247.68 334.29 369.35

22 Interest on Working capital 373.28 392.28 410.51

23 Interest on belated payment on PP Cost - - -

24 Interest on consumer deposits 266.40 285.66 304.92

Page 73: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxiii

25 Other Interest & Finance charges 10.19 10.19 10.19

26 Less interest & other expenses capitalised 80.00 82.00 86.00

27 Total Interest & Finance charges 817.55 940.42 1008.97

28 Other Debits 0.00 0.00 0.00

29 Net Prior Period Debit/Credit 0.00 0.00 0.00

30 Return on Equity 84.77 84.77 84.77

31

Funds towards Consumer

Relations/Consumer Education 0.00 0.00 0.00

32 Other Income 38.66 42.17 46.06

33 ARR 16164.08 18616.93 19994.60

34 Deficit for the year -1417.62 140.15 -3081.70

35 Deficit for FY15 carried forward -722.47

36 Regulatory asset -541.97

37 Carrying cost on RA -127.95

38 Net ARR 17556.47 18616.93 19994.60

The BESCOM has requested the Commission to approve the Annual

Revenue Requirement of Rs.17556.47 Crores for FY17, Rs.18616.93 Crores

for FY18 and Rs.19994.60 Crores for FY19. Further, it has proposed

increase in retail supply tariff by 102 paise per unit in respect of all the

categories of consumers including BJ/KJ and IP set consumers for FY17, in

order to bridge the gap in revenue of Rs.2810.01 Crores.

5.1 Annual Performance Review for FY15 & FY16:

As discussed in the preceding chapter of this Order, the Commission has

carried out the Annual Performance Review for FY15 based on the

audited accounts furnished by BESCOM. Accordingly, a deficit of

Rs.11.21 Crores of FY15 is required to be carried forward in to the ARR of

FY17.

As regards APR for FY16, the current financial year (i.e. FY16) is yet to be

completed. Hence, the Commission decides to take up the APR of FY16

during the revision of ARR / Retail Tariff for FY18.

Page 74: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxiv

5.2 Annual Revenue Requirement for FY17-19:

5.2.1 Capital Investments for FY17-19:

The BESCOM, for the control period has proposed capex of Rs.1529.41

Crores, Rs.967.30 Crores and Rs.713.20 Crores for FY17, FY18 and FY19

respectively. The BESCOM has stated that, it has proposed a capex

based on the data available for FY17 and has stated that, the capex for

FY-18 to FY-21 may have deviations in the coming years, due to

technology up-gradation, Innovations, Statutory adherence, System

compulsion etc. and any change in the proposal, that may happen in

due course, will be submitted to the Commission for approval.

The BESCOM has stated that, it has prepared DPRs, processing of tenders

and work award is under way, for the proposed projects under IPDS,

DDUGJY, HVDS and NJY phase-3.

In the case of Integrated Power Development Scheme (IPDS), the main

objectives are: (1) AT&C loss reduction as per trajectory finalized by MoP

(2) Providing access to all households and (3) 24x7 Power for All.

The scope of works under this scheme is stated to be:

(1) Strengthening of sub-transmission and distribution network;

(2) Metering at input points of the feeders, distribution transformers and

all categories of consumers, replacement of faulty meters & electro-

mechanical meters, introduction of Pre-paid/smart meters and AMI

and

(3) Provisioning for Solar Panels.

In the case of Deen Dayal Upadyaya Grama Jyothi Yojana (DDUGJY),

the main objective is electrification of rural households, especially the

BPL households by creating infrastructure (like extension of HT/LT lines,

installation of new DTCs). The other works include feeder separation,

system strengthening and metering.

Page 75: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxv

in respect of IPD scheme the Govt. of India is likely to contribute 60% of

the sanctioned project cost as grant and the remaining amount shall

have to be borne by the utility/ESCOMs. Thus the financing of the

scheme as worked is - 60% grant by the Government of India, 10% borne

by BESCOM and 30% through loans from the lending institutions. The time

line fixed for completion of the project is 24 months from the date of

issue of Detailed Work Award (DWA) by the BESCOM. The BESCOM has

stated that, the works will be monitored by M/s. RECPDCL, New Delhi,

who are appointed as Project Monitoring Agency (PMA), for IPDS

Scheme.

M/s. REC has sanctioned an amount of Rs.1754 Crores for the entire state

towards DDUGJY and the Energy Department, GoK has re-allocated

Rs.235 Crores for the BESCOM and has directed it to submit the DPRs.

The details of DPR preparation and sanctioning by REC are shown

below:

TABLE – 5.2

DPR preparation and sanctioning by REC for the DDUGJY projects

Amount in Rs.Crores

Sl

No Name of the work

DPRs

submitted

by

BESCOM

DPRs

sanctioned

by M/s REC

Revised

allocation by

Dept.of

Energy, GoK

Re-allocation

requested by

BESCOM

1 Feeder separation

(DTCs) 88.71 88.71 88.71 0

2

Rural Electrification

(Electrification BPL HH

including creation of

infrastructure)

95.94 7.75 41.86

95.94

3 System strengthening 193.54 15.55 86.79

4 SAGY 38.51 38.51 38.51 38.51

5 Metering 14.12 14.12 66.28 14.12

Total 430.82 164.64 235.36 235.36

Page 76: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxvi

Considering the above, BESCOM has proposed a capex requirement for

different categories of works, for FY17 to FY19 as shown in the table

below:

TABLE – 5.3

Capital Investment proposed for FY17 to FY21by BESCOM

Amount in Rs.Crores

Sl

No Particulars FY -17 FY -18 FY -19

1 11 KV Evacuation & Link Lines 68.32 72.05 78.06

2

Safety and Strengthening of HT/LT

network including OH/UG cable and

AB cable works

34.37 38.33 43.15

3 HT Reconductoring 27.95 29.6 30.87

4 LT Reconductoring 30.77 29.63 26.71

5 Providing Additional

DTC's/Enhancement of DTC's 50.49 48.83 44.8

6

Planned works (RE / SCP /

TSP/Drinking Water Ganga Kalyana

and service connection)

52.27 47.21 45.48

7 Local Planning 37.2 36.01 34.91

8 RMU Works 3.89 4.232 3.827

9 Safety Measures/ Hazardous (shifting

DTC at school premises) 12.2 12.74 11.76

10 OH to UG Conversion 2.19 2.10 1.98

11 Infrastructure to Unauthorized IP sets 19.95 5.19 3.27

12 Providing & replacement of RMUs 0.62 0.59 0.56

13

Replacement of meters, Smart

meters, replacement of HTMC of HT

installation

34.65 23.77 8.75

14 DTC Metering programme 2.25 2 1.75

15 IPDS 357 100 100

16 DDUGJY 330 100 100

17 HVDS 100 100 100

18 NJY Phase-3 250 250 -

19 DSM 64.51 64.97 77.3

20 DAS 50.78 - -

Total 1529.41 967.30 713.20

Commission’s Analysis and decision:

In response to the Commission’s preliminary observations on the capex

proposed for implementation of HVDS at Rs.100 Crores each year for the

control period, the BESCOM has submitted a table depicting the works

awarded in Kanakapura urban & Rural sub-division, Harohally, Sathanur

and Huliyurdurga at an awarded cost of Rs.89.66 Crores during FY16. But,

Page 77: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxvii

the BESCOM has not furnished any details for the proposal of HVDS

during FY17, FY18 and FY19. Further, it is observed that, the Commission

had issued guidelines on implementation of HVDS and directed the

ESCOMs to obtain approval for the HVDS projects separately, as each of

the ESCOMs had adopted different approach, in preparing the

estimates, indicating different costs for the project.

In the case of NJY phase II, the BESCOM has stated that, the work has

been awarded during November and December, 2015 and it would be

incurring a capex of Rs.250 Crores each for FY17 and FY18.

In respect of the DSM works, the BESCOM has proposed Rs.64.51 Crores

for the FY17, Rs.64.97 Crores for FY18 and Rs.77.30 Crores for FY19 as

capex and has stated that, it is taking up DSM programmes like,

Replacement of less energy efficient IP sets by high energy efficient IP

sets under agriculture DSM program, implementation of Dynamic

Reactive Compensation (DRC) for improving power factor of the DTCs

under Distribution Energy efficient Project (DEEP) and initiating efficient

maintenance of office building in BESCOM.

In respect of the DTC metering, the BESCOM has stated that, it has

completed 75% of the metering of DTCs excluding IP Sets and a balance

of 1,16,618 Nos. of DTCs are yet to be metered.

The BESCOM has been indicating a huge capital expenditure in respect

of Replacement of Faulty transformers by new Transformers in the

previous years. For instance, BESCOM had indicated a capital

expenditure of Rs.101.54 Crores against the approved capex of Rs.15

Crores during FY15. The Commission in its preliminary observations had

sought the details of failure of transformers, repairs and procurement

installation of new transformers for replacement of failed transformers for

FY15 from BESCOM. In reply, the BESCOM has stated that, total failed

transformers were 15,556, out of which 12797 are repaired and 799 are

scrapped. But, it has used 1843 new transformers for replacing failed

Page 78: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxviii

transformers at a total cost of Rs.24.03 Crores. This amount of Rs.24.03

Crores is less than 25% of the cost (Rs.101.54 Crores) indicated as capex

supposed to have been incurred for Replacement of Faulty transformers,

by new Transformers.

In this regard, BESCOM shall note that, the failed transformers should be

replaced by repaired good transformers only and it should be charged

to revenue expenditure. Only when the failed transformer is scrapped, it

can be replaced by a new transformer, which is accounted under

capex. The BESCOM has not shown any outlay for this work for FY17 to

FY19 and it is not clear as to where, the Replacement of Faulty

transformers by new Transformers is going to be accounted for.

BESCOM has furnished the sources of funding at Rs.1245 Crores, Rs.674

Crores and Rs.410 Crores for FY17, FY18 and FY19. But, the BESCOM has

stated in the validation meeting that, it is going to finance the capex by

long term loans to an extent of Rs.697.65 Crores for FY17 and Rs.674

Crores and Rs.410 Crores for FY18 and FY19 respectively. The funding

details for some of the categories for which the breakup of sources of

funding is furnished as follows:

Sl.

No Name of the project

Fund details

BESCOM GOI GOK Loan

1 IPDS/DDUGJY 10% 60% - 30%

GK/IP/WS - - 100% -

2 NJY 60% - 40% -

3 UNIP 65% 35%

4 CAPEX works including HVDS 30% - - 70%

The BESCOM, while projecting the capital expenditure, shall be guided

by the “capital expenditure guidelines for ESCOMs” issued by the

Commission and should identify high loss feeders, high loss subdivision,

division and circles and prioritize its capex specifically, to reduce loss

and improve reliability of distribution system. The length of some of the

11kV feeders in rural areas is stated to be more than 100 KMs, hence, the

feeder bifurcation and load segregation are to be taken up on a priority

Page 79: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxix

basis by the BESCOM to reduce losses and interruptions as well as to

improve the voltage regulation and reliability.

The optimal distribution system loss should be less than 10% even to

maintain the voltage regulations within the permissible limits of 9 % for

11kV system and 6% for LT distribution system. The BESCOM should

formulate plans to bring down the distribution system losses below 10%

by the end of the Control Period.

The BESCOM should prepare a detailed perspective plan by conducting

11kV feeder-wise and DTC wise load flow studies to ascertain the present

and projected loads on each of the feeders and to arrive at, least cost,

techno economically feasible improvement methods for reducing the

current level of distribution system energy losses to less than 10%.

The BESCOM should make efforts to work out the Techno-economic

analysis for the works considered in system strengthening, improvement

and other works for the control period, so as to ascertain the extent of

capex investment required for reduction losses. In this regard, the

BESCOM should take up system improvement works such as:

a) Reactive power compensation to improve the PF to 0.9-0.95 lag.

b) Reconfiguration of distribution lines

c) Replacement of conductors by higher size, wherever required.

d) Drawing express feeders to bifurcate the loads

e) Establishing new 33kV substations and proposing establishment of

new transmission voltage substations by KPTCL.

f) Installing additional DTCs and shifting DTCs to load centers to

reduce the LT line lengths.

Based on the previous years’ achievements and the new works to be

undertaken as per the GoI schemes in a time bound manner and

considering the long term loans tied up by the BESCOM, the Commission

recognizes the capex proposal of BESCOM at Rs.1529.41 Crores,

Rs.967.30 Crores and Rs.713.20 Crores for FY17, FY18 and FY19

Page 80: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxx

respectively. However, considering the loan amount as indicated by the

BESCOM, the Commission recognizes Rs.697.65 Crores, Rs.674 Crores

and Rs.410 Crores for FY17, FY18 and FY19 respectively, for tariff

computations, subject to prudence check and directs the BESCOM to

approach the Commission in case, it requires any additional capex

during the financial year. for obtaining in principle approval,

5.2.2 Sales Forecast for FY17-19:

I. Category wise estimation of number of installations and sales by

BESCOM for the control period:

1) As per the BESCOM’s filing, the number of installations has been

estimated for the control period considering four year CAGR with the

following deviations:

For LT2(b), 3 years CAGR is considered.

For LT5 and LT7, 1 year CAGR is considered.

For HT2(c) the growth rate of HT2(b) is considered as this tariff

category was chalked out of HT2(b) tariff category.

For HT3 (a) and HT3 (b), no increase in number of installation is

considered.

For HT5, the growth rate of LT7 is considered i.e. 24%, as this tariff

category was chalked out of LT7 tariff category.

Further, the BESCOM has stated that, the energy sales have been

estimated for the control period considering four year CAGR with

following deviations:

i) Actual category wise sales of FY14 and FY15 are considered for

projections.

ii) Half yearly sales i.e. cumulative DCB of September, 15 is considered.

iii) In respect of BJ/KJ scheme, as no new schemes are announced by

GoK, the consumption of FY15 is retained for the future years.

Page 81: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxi

iv) Agriculture energy consumption projections are based on specific

consumption; Commission had approved 7795 units/IP/annum for

FY16. But, the BESCOM has considered the specific consumption of

8122 units / IP/ annum for FY16, FY17, FY18 and FY19 for arriving at the

agriculture consumption. The BESCOM has considered an increase of

25,000 consumers for the second half of FY16 and addition of 30,000

consumers for each year of the control period i.e. FY17, FY18 and

FY19.

v) In respect of LT4 (b) as the 4 year CAGR is 12%, the sales for FY16 is

retained for projection as all the years.

vi) As the 4 year CAGR for LT6 water supply and LT6 street light, are -2.7%

and -2.1%, 5 years’ CAGR of 0.3% and 0.6% are adopted.

vii) For HT2(c) category, the HT2 (b) growth rate of 1.4% is considered (as

it was billed under this category earlier).

viii) In case of HT3 (a) and HT3(b) the 4 year CAGR shows abnormal

growth. Hence, no growth rate is considered.

ix) In respect of HT4, the 4 year CAGR is -3.4%. Hence 6 years CAGR of

1.6% is adopted.

x) For HT5 category 8% growth rate of LT7 category is considered as it

was part of LT7 category earlier.

2) The preliminary observations and the queries raised during the

validation meeting on sales forecast for the control period and the

replies furnished by BESCOM are discussed in the following

paragraphs:

i) LT(1) – BJ/KJ category:

The Commission had noted that BESCOM has not indicated any increase

in the number of installations in this category from FY16 onwards, even

though 17,094 installations and 37,123 installations were added in FY14

and FY15 respectively.

Page 82: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxii

The BESCOM, in its replies to the preliminary observations, had stated

that no installations has been serviced under RGGVY during the 12th plan

and therefore, it has retained the same number of installations and sales

to this category during the control period, as proposed in the filing. The

BESCOM had also furnished the breakup of installations consuming less

than or equal to 18 units and above 18 units, as directed by the

Commission.

The above issue was again raised during the validation meeting, wherein

the Commission had noted that there were discrepancies in the data

regarding number of installations and energy sales to BJ/KJ category. In

their response to queries raised during the validation meeting, the

BESCOM has stated that for FY15, the number of BJ/KJ installations

consuming less than or equal to 18 units and more than 18 units are

619570 and 149583 respectively. Further, the BESCOM has reiterated that

the total number of BJ/KJ installations would remain the same for the

entire control period, stating that any addition of installations, under the

DDUGY and the IPDS cannot be directly considered as BJ/KJ

installations.

Since the BESCOM has stated that, there would be no additions to this

category during the control period, the Commission accepts the total

number of installations [both consuming less than or equal to 18 units

and more than 18 units] as proposed by BESCOM. Further, BJ/KJ

installations consuming less than or equal to eighteen units and more

than 18 units are considered as 619570 and 149583 respectively as

furnished by BESCOM for FY15.

Regarding the energy sales to BJ/KJ installations consuming less than or

equal to 18 units, the BESCOM, in its response to the queries in the

validation meeting, has requested the Commission to consider the sales

as indicated at page -22 of their replies to the preliminary observations

which works out to 48.63 MU and 54.44 MU for FY15 and FY16

respectively.

Page 83: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxiii

The Commission has considered 48.20MU as the sales to BJ/KJ

installations consuming less than or equal to 18 units [after deducting

0.42 MU of unbilled sales from 48.62 MU indicated in the FY15 audited

accounts] and 87.23 MU, as the sales to BJ/KJ installations consuming

more than 18 units [considering the total BJ/KJ sales of 135.43 MU as

furnished by the BESCOM at page-19 of the replies to preliminary

observations] for FY15. Considering the specific consumption of FY15,

based on the above data, the Commission has worked out the sales to

BJ/KJ category for the control period.

ii) Other categories excluding IP Sets:

a) The Commission in its preliminary observations had noted that for the

number of installations, the growth rate considered for LT2 (b) and LT6

Street light category was on the higher side and that no additions

were considered to HT3(a) and HT3 (b) categories.

The BESCOM has stated that it has considered 4% growth rate for LT2

(b) and 5% for LT6 Street light category, based on 4-year CAGR.

Regarding, HT-3a and 3b, it is stated that the number of installations

during first half of FY-16 has reduced to 22 from 27 in FY15 in HT-3a

category and in case of HT-3b category the number has increased

to 10 from 2. Further it has stated that in HT-3b, the past trend

indicates 3 to 4 additions/year and therefore, it has retained the

estimates as proposed in the filing.

b) Further, the Commission during the process of validation had

observed that the year-end number of installations estimated for FY16

for LT-2b, LT-3, LT-5, LT-7, HT-2a, HT-2b, HT-2c, HT-3 and HT-4 is lower

than the number of installations as on 30.11.2015. The BESCOM in

response has stated that number of installations up to November-

2015 is abnormally high than the previous years and therefore, the

BESCOM has adopted previous year’s growth rate.

Page 84: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxiv

c) The Commission in its preliminary observations had noted that the

sales growth rates considered for LT2(a),LT 2(b), LT-7 and HT-2a is

lower. Further, the BESCOM was directed to analyze the reasons for

reduction in sales in respect of LT6- water supply and street light

categories during FY15, even though there was a positive growth in

the number of installations. Also, the BESCOM was directed to furnish

reasons for retaining sales toLT4 (b),at the same level, despite an

increase the number of installations during the control period.

The BESCOM has stated that it has considered an overall growth rate

of 5% based on 4-year CAGR and has retained the sales estimates as

proposed.

d) The Commission in its preliminary observations had directed the

BESCOM to justify the additional sales proposed for the Control

period and also to analyze the impact of NJY on category-wise sales.

The BESCOM has stated that as per CEA website report for October,

2015, there is energy deficit by 3%, for the Southern region and

therefore, it has considered 3% shortage under energy not served for

FY17.

The Commission notes that the assumption made by the BESCOM is

incorrect, as the shortage is for the Southern on an average, which

includes other States namely Tamil Nadu, Andhra Pradesh, Kerala,

Puducherry and Telengana, which cannot be adopted for the

BESCOM. Further, it is observed that the BESCOM has not carried out

any independent study to ascertain the impact of load shedding on

its consumption pattern. Also, none of the other ESCOMs have sought

for such additional sales, as duration of supply to consumers is

governed by the State specific Government Policy. In addition, the

BESCOM itself, in its earlier filing, has stated that over-projection of

sales would affect their revenues adversely. The Commission also

notes that in the past four years, the BESCOM has not been able to

Page 85: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxv

sell energy as approved by the Commission, though it had requested

for higher sales as indicated below:

Figures in Million Units

Year Filed by

BESCOM

Approved

by the

Commission

Actual

FY12 23238 21911 21030

FY13 26512 25856 22796

FY14 25387 24978 23065

FY15 25868 25395 24083

In the light of the above, the Commission has not considered any

additional sales for the purpose of determination of tariff as proposed

by the licensee. However, if the BESCOM is able to sell more than the

approved quantum, the Commission would consider the same during

the APR of FY17.

iii) Inconsistency in Sales data:

Regarding the inconsistencies in the sales figures submitted in the

Load forecast and business plan dated 17.08.2015 and the current

tariff filing, the BESCOM, in its replies to preliminary observations, has

stated that for load forecast studies it had considered provisional

data for FY15, whereas in the current filing it has considered audited

figures and that in the current filing correction factor for energy not

supplied based on the discussion with Chairman, BESCOM has been

incorporated and hence, there is a deviation. Further, the BESCOM

has stated that it is not modifying the sales estimate as filed in the

current tariff filing.

Since the BESCOM has not furnished satisfactory replies to the queries

raised earlier by the Commission regarding the Business Plan

submitted, the Commission in this order has restricted the projections

to the control period FY17 to FY19. The BESCOM shall submit the

Page 86: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxvi

Business plan duly complying with the observations, for Commission’s

consideration, for future review.

iv) Inclusion of FY16 data in the calculation of CAGR:

Regarding inclusion of FY16 in the calculation of CAGR, the BESCOM

in its replies has stated that FY16 being the base year for the control

period FY-17 to FY-19, there is an anomaly in the CAGR calculated by

the Commission.

The Commission notes that as per the MYT Regulations for the base

year, best estimate has to be done based on available information.

Since FY16 data itself is an estimated figure, the CAGR should be

calculated considering the period for which actual data is available

i.e. up to FY15, as inclusion of estimated data cannot reflect the

actual growth rate.

Since the BESCOM has reiterated to retain the sales estimate as filed

in the current tariff petition, the Commission has proceeded to

estimate the sales, considering the data furnished in this tariff filing

and the replies furnished to the preliminary observations and to the

queries raised during validation process.

II. Commission’s approach for estimating the number of installations

and sales for Control Period FY17-19:

The Commission notes that, it has issued the KERC (Load Forecast)

Regulations, 2009 which specify that the Commission shall normally

adopt the forecast as per EPS and can deviate from the EPS while

approving ERCs or PPAs by passing orders after duly giving

opportunity to the stakeholders.

For the present control period FY17 to FY19, the projections made by

the ESCOMs including the BESCOM indicate that, their sales forecast

is not in tune with the 18th EPS. The tariff petition filed by the ESCOMs,

which includes the sales estimates and power purchase quantum,

Page 87: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxvii

has been made public and the stakeholders have been heard in the

matter. After considering the views expressed by the stakeholders,

the Commission has decided to adopt the methodology indicated in

the following paragraphs. The methodology so adopted is different

from the CEA’s approach for the reasons stated below:

a. The State of Karnataka is under peak and energy shortage situation

and the supply of electricity is determined by the present restricted

availability of generation capacity. The last three year data of

energy at generation bus actually supplied and as planned in the

EPS, justifies the Commission’s approach:

Year

18th EPS-

Generation

MU

Actual supplied

MU

2013 58513 57046

2014 63001 57725

2015 67833 59969

From the above Table, it is seen that the actual growth rate is

different from those estimated by in the 18th EPS, by the CEA.

b. The loss levels considered by the Commission are as per the loss

reduction trajectory fixed by the Commission for the respective

control periods. Hence the loss levels as adopted by the CEA are not

relevant for the purpose of the approval of ARR and Tariff.

In view of the above, the Commission has considered the business as

usual scenario and the methodology adopted by the Commission to

Page 88: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxviii

estimate the number of installations and sales to categories other than

BJ/KJ and IP sets is discussed below:

1) No. of Installations:

While estimating the number of installations (Excluding BJ/KJ and IP), the

following approach is adopted:

a. The base year number of installations for FY16 is modified, duly

validating the revised estimate furnished by the BESCOM in the

current filing and the data available as on 30.11.2015. The

Commission has noted that in the case of LT-2b, LT-3,LT-5,LT-7 and all

the HT categories excluding HT-1 and HT-5, the end year number of

installations for FY16 is lower than the number of installations as

existing on 30.11.2015. Hence, the Commission has validated both

the number of installations and sales to various categories

considering the actuals as on 30.11.2015 and has estimated the

number of installations and sales for the remaining period reasonably.

Accordingly, the base year estimation has been revised which has

an impact on the estimates on number of installations and sales for

the control period

b. Wherever the number of installations estimated by the BESCOM for

the control period is within the range of the estimates based on the

CAGR for the period FY10 – FY15 and for the period FY12 - FY15, the

estimates of the BESCOM are retained.

c. Wherever the number of installations estimated by the BESCOM for

the control period is lower than the estimates based on the CAGRs

for the period FY10 – FY15 and for the period FY12 - FY15, the

estimates based on the lower of the CAGRs for the period FY10 – FY15

and for the period FY12 - FY15 are considered.

d. Wherever the number of installations estimated by BESCOM for the

control period is higher than the estimates based on the CAGRs for

the period FY10 – FY15 and for the period FY12 - FY15, the estimates

Page 89: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

lxxxix

based on the higher of the CAGRs for the period FY10 – FY15 and for

the period FY12 - FY15 are considered.

e. For LT 2b, LT-7, HT-2(c) and HT-5 categories, the estimates of BESCOM

are retained as there is no specific growth pattern.

Based on the above approach, the total number of installations

(excluding BJ/KJ and IP installations) estimated by the Commission for

the control period is indicated in the table below:

Approved Number of installations

FY17 FY18 FY19

Filed Approved Filed Approved Filed Approved

9098640 9088759 9675671 9646750 10307127 10256996

2) Energy Sales:

(i) For categories other than BJ/KJ and IP sets, generally the sales are

being estimated, considering the following approach:

a. The base year sale for FY16 as estimated by the BESCOM is validated

duly considering the actual sale up to November, 2015 and modified

suitably as stated earlier.

b. Wherever the sale estimated by the BESCOM, for the control period,

is within the range of the estimates based on the CAGR for the period

FY10 – FY15 and for the period FY12 - FY15, the estimates of the

BESCOM are considered.

c. Wherever the sales estimated by the BESCOM for the control period is

lower than the estimates based on the CAGRs for the period FY10 –

FY15 and for the period FY12- FY15, the estimates based on the lower

of the CAGRs for the period FY10 – FY15 and for the period FY12 -

FY15 are considered.

Page 90: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xc

d. Wherever sale estimated by BESCOM is higher than the estimates

based on the CAGRs for the period FY10 – FY15 and for the period

FY12 - FY15, the estimates based on the higher CAGRs for the period

FY10 – FY15 and for the period FY12 - FY15 are considered.

e. For LT2 (b), LT(6) water supply, LT-7, HT-2(c) and HT-5, the proposal of

BESCOM is retained as there is no specific growth pattern.

f. For LT-6 water supplies, FY15 specific consumption per installation is

adopted for estimating the sales.

Based on the above approach, the sales (excluding BJ/KJ and IP sales)

estimated by the Commission for the control period is indicated in the

table below:

Figures in MU

FY17 FY18 FY19

As Filed* As

Approved As Filed*

As

Approved As Filed*

As

Approved

19641.06 19684.41 20563.55 20824.05 21548.91 22054.63

Does not include additional sales proposed by the BESCOM

(ii) Sales to BJ/KJ :

The break-up of sales to BJ/KJ installations considered for FY-15 is as

indicated below:

Particulars No. of

Installations

Consumption

in units

Specific

consumption per

installation per

month (kWh)

Installations consuming less than

or equal to18 units*

619570 48.20 6.48

Installations consuming more

than 18 units and billed under

LT2(a)

149583 87.23 48.60

Page 91: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xci

The Commission notes that, the number of installations indicated in D-2

format includes both the installations consuming less than or equal to

eighteen units/month and also more than eighteen units/month. As

stated earlier, the specific consumption works out to 6.48 units

/installation/month for BJ/KJ installations consuming less than or equal to

18 units per month and 48.60 units /installation/month for BJ/KJ

installations consuming more than 18 units per month.

Since, the BESCOM has not proposed any additional installations during

the control period, the number of installations BJ/KJ installations

consuming less than or equal to 18 units per month and more than 18

units per month is retained as on 30.11.2015 and the sales is worked out

as per the above specific consumption for the control period as

indicated below:

Figures in MU

Particulars FY17 FY18 FY19

Installations consuming less than

or equal to18 units

49.15 49.15 49.15

Installations consuming more

than 18 units and billed under

LT2(a)

80.12 80.12 80.12

Page 92: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcii

(iii) IP set sales projections for ARR FY 17-19

In its Tariff Order dated 6th May, 2013, the Commission had approved a

specific consumption of IP sets as 8,284 units/installation/annum for the

entire control period of the FY14 to the FY16 by considering the existence

of unauthorized IP sets in the distribution system. However, based on the

actual data of sales to IP sets during the FY14, submitted by the BESCOM

in its filing for the FY15, the Commission had revised the specific

consumption as 7,795 units/installation/annum from 8,284

units/installation/annum for the FY16.

The approved sales quantity for the FY15 was 5712.97 MU. This indicates

an increase in sales to an extent of 155.83 MU which can be partly

attributed to servicing of a large number of IP sets under regularization

scheme. However, it is noted that the BESCOM has already segregated

significant number of feeders under NJY which means that power supply

to IP sets could be regulated which could have contributed to reduction

in the agricultural consumption during the FY15. Further, the BESCOM has

reported the total sales of 5,930.30 MU including unbilled consumption to

an extent of 61.5 MU, against 7,68,577 numbers of IP set installations

serviced. Therefore, the net sales for the FY15, deducting the unbilled

sales of 61.5 MU was 5,868.8 MU, which translates into a specific

consumption of 8,037 units/installation/annum for the FY15. It is observed

that the actual specific consumption reported by the BESCOM for the

FY15 is less than the approved figure of 8,284 units / installation /annum

by 247 units /installation/annum. Hence, it is relevant to consider the

specific consumption achieved by it during the FY15 for the ARR for the

FY17 to FY19 also. In view of this, the Commission decides to approve the

specific consumption of 8,037 units/installation /annum achieved by the

BESCOM during the FY15, for the FY17 to FY19 also.

It is noted that the BESCOM has projected the number of IP set

installations as 8,53,515, 8,83,519 and 9,13,519 for the FY17 to FY19 in the

present Tariff filing. In view of this, the Commission has considered the

Page 93: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xciii

number of IP sets furnished by the BESCOM for the FY17 to the FY19

without any modifications. Hence, based on the estimated number of

installations for the FY17 to the FY19, the midyear number of installations

is determined and the sales to IP Set consumers are indicated as below: i)

Particulars As filed by the BESCOM

As approved by the

Commission

FY16 FY17 FY18 FY19 FY17 FY18 FY19

No of installations 8,23,519 8,53,519 8,83,519 9,13,519 8,53,519 8,83,519 9,13,519

Mid-Year no of

installations

8,38,519 8,68,519 8,98,519 8,38,519 8,68,519 8,98,519

Specific consumption in

units/installation/annum

8,267 8,262 8,257 8,037 8,037 8,037

Sales in MU 6,932.30 7,175.96 7,419.62 6,739.18 6,980.27 7,221.39

Accordingly, the Commission approves 6,739.18 MU, 6,980.27 MU, and

7,221.39 MU as energy sales to IP sets as against the BESCOM’s sales

projections of 6,932.30 MU, 7,175.96 MU, and 7,419.62 respectively for the

FY17 to the FY19. Further, any variation in sales in the FY17 would be

trued up during the Annual Performance Review for the FY17 based on

the energy consumption in respect of exclusive agriculture feeders

segregated under NJY.

The above approved IP set consumption is with the assumption that the

Government of Karnataka would release full subsidy to cover the

approved quantum. However, if there is any variation in the subsidy

allocation by the GoK, the quantum of power to be supplied to IP sets of

10 HP and below shall be proportionately regulated. The payment of

subsidy by the GoK on supply to IP sets is detailed in Chapter 6 of this

Order.

Further, it is noted that the BESCOM has already segregated 542

numbers of agriculture feeders from rural loads under NJY phase1&2 and

the energy consumed by the IP sets could be more accurately

measured at the 11 KV feeder level at the sub-stations after duly

allowing for distribution system losses in 11 KV line, distribution

transformers and LT lines. Hence, the Commission reiterates that the

Page 94: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xciv

BESCOM shall report the total IP set consumption on the basis of data

from energy meters in respect of agriculture feeders segregated under

NJY only, to the Commission every month regularly.

Further, the BESCOM is directed to adhere to the duration of power

supply stipulated by the Government in respect of arranging power

supply to exclusive agricultural feeders. The Commission also directs the

BESCOM to take up enumeration of IP sets in its jurisdiction in order to

identify defunct/dried up wells & un-authorized IP sets in the field and

take necessary action to arrive at correct number of IP sets in its account

on the basis of enumeration report. The compliance regarding the same

shall be submitted to the Commission within six months from the date of

issue of this order.

Based on the above discussions, the category wise approved number of

installations for the control period vis-à-vis the estimates made by the

BESCOM is indicated below:

TABLE – 5.4

Category wise approved number of installations

Category

FY-17

FY-18

FY-19

BESCOM’s

estimate

Approved BESCOM’s

estimate

Approved BESCOM’s

estimate

Approved

No. No. No. No. No. No.

LT-2a* 7264413 7214327 7645994 7570528 8048209 7944659

LT-2b 10900 10900 11374 11374 11869 11869

LT-3 952569 985386 1003235 1039878 1056596 1097384

LT-4 (b) 863 817 973 873 1098 933

LT-4 (c) 1679 1675 1905 1897 2161 2147

LT-5 187608 195943 194068 204951 200750 214373

LT-6 WS 70524 68649 77808 76046 85844 84241

LT-6 SL 63179 63012 66260 65910 69491 68941

LT-7 533394 533394 659470 659470 815345 815345

HT-1 238 234 268 261 301 292

HT-2 (a) 6296 6719 6800 7265 7345 7856

HT-2 (b) 5446 6108 5766 6481 6105 6878

HT2C 510 510 540 540 572 572

HT-3(a)& (b) 32 37 32 39 32 41

HT-4 255 314 270 328 286 342

Page 95: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcv

HT-5 734 734 908 908 1123 1123

Sub-Total other

than BJ/KJ

and IP sets

Other than

BJ/KJ & IP

9098640 9088759 9675671 9646750 10307127 10256996

BJ/KJ 561646 631754 561646 631754 561646 631754

IP Sets 853519 853519 883519 883519 913519 913519

Sub Total BJ/KJ

and IP sets

1415165 1485273 1445165 1515273 1475165 1545273

Total 10513805 10574032 11120836 11162023 11782292 11802269

*Includes BJ/KJ consuming more than 18 units/installation/month

Accordingly, the category wise approved sales for the control period

vis-à-vis the estimates made by the BESCOM are indicated below:

TABLE – 5.5

Category wise approved energy sales

Category

FY-17

FY-18

FY-19

BESCOM’s

Estimate

MU

Approved

by

Commission

MU

BESCOM’s

Estimate

MU

Approved

by

Commission

MU

BESCOM’s

Estimate

MU

Approved

by

Commission

MU

LT-2a* 6679.36 6617.58 7203.55 7148.71 7768.87 7722.98

LT-2b 43.12 43.12 43.49 43.49 43.86 43.86

LT-3 1952.20 1942.44 2106.90 2123.51 2273.86 2321.46

LT-4 (b) 3.95 2.88 3.95 3.08 3.95 3.29

LT-4 (c) 5.17 6.07 5.47 7.21 5.78 8.57

LT-5 1220.00 1203.65 1258.60 1256.11 1298.41 1310.86

LT-6 WS 414.23 509.97 415.46 564.92 416.69 625.80

LT-6 SL 370.38 370.38 372.69 374.34 375.01

5.01

378.34

LT-7 185.94 185.94 200.79 200.79 216.83 216.83

HT-1 723.98 723.98 782.34 779.37 845.40 838.99

HT-2 (a) 4732.03 4743.47 4809.39 4832.95 4888.03 4924.12

HT-2 (b) 2834.01 2834.01 2872.97 2947.52 2912.45 3065.58

HT2C 240.28 240.28 243.59 243.59 246.93 246.93

HT-3(a)& (b) 53.38 77.60 53.38 105.62 53.38 143.75

HT-4 104.50 104.50 106.18 108.04 107.88 111.70

HT-5 78.53 78.53 84.80 84.80 91.58 91.58

Sub-Total

other than BJ/KJ

and IP sets

Other than BJ/KJ

& IP

19641.06 19684.41 20563.55 20824.05 21548.91 22054.63

BJ/KJ 54.00 49.15 54.00 49.15 54.00 49.15

IP 6932.30 6739.18 7175.96 6980.27 7419.62 7221.39

Sub Total

BJ/KJ and IP sets

6986.30 6788.33 7229.96 7029.42 7473.62 7270.54

Total 26627.36 26472.74 27793.51 27853.46 29022.53 29325.16

Page 96: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcvi

Additional sales 913 0 1289 0 1693 0

Grand Total 27540.36 26472.74 29082.51 27853.46 30715.53 29325.16

*Includes BJ/KJ consuming more than 18 units/installation

Page 97: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcvii

5.2.3 Distribution Losses for FY17-19:

BESCOM’s Submission:

As per the audited accounts for FY15, the BESCOM has reported

distribution losses of 13.53% as against an approved loss level of 13.60%.

However, as discussed in the previous chapter of this Order, by not

recognizing the unbilled sales of 353.08 MU, the distribution losses

reckoned by the Commission for FY15 is 14.78%. The Commission in its

Tariff Order dated 2nd March, 2015 had fixed the target level of losses for

FY16 at 13.40%. BESCOM in its filing has proposed to achieve the

following loss levels during FY17-19:

TABLE – 5.6

Projected Distribution Losses-FY17-19 – BESCOM’s Submission

Figures in % Losses

Particulars FY17 FY18 FY19

Projected

Distribution losses

13.30 13.20 13.10

Commission’s Analysis and Decisions:

The performance of BESCOM in achieving the loss targets set by the

Commission in the past five years is as follows:

TABLE – 5.7

Approved & Actual Distribution Losses-FY10 to FY16

Figures in % Losses

Particulars FY10 FY11 FY12 FY13 FY14 FY15 FY16

Approved

Distribution losses

16.00 14.75 14.50 14.00 13.80 13.60 13.40

Actual

distribution losses

15.09 14.48 14.46 14.20 13.89 14.78* -

*Actual losses for FY15 are reported as 13.53%. As per Commission’s APR the losses for FY15 is 14.78% after validation of sales.

Page 98: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcviii

The Commission notes that the loss reduction achieved by BESCOM in

the control period FY11-13 was 0.89 percentage point. In the preceding

years of FY14 & 15, the distribution losses has increased by 0.58

percentage point (in two years of the control period FY14-16). Overall in

the past five years BESCOM has been able to achieve distribution loss

reduction of 0.31percentage point.

The distribution loss projections indicated by the BESCOM shows

reduction from existing reported losses of 13.53% in FY15 to 13.30% in

FY17 and further reduction 0.10% for each year in FY18 and FY19. It is

observed that, the Commission has been allowing capital expenditure

as incurred by the BESCOM and it has also allowed the capex as

proposed for the ensuing control period. Most of the capex spent on the

works like HVDS, E&I works, NJY, DTC metering, RAPDRP should enable

the BESCOM, not only to strengthen its infrastructure but also to reduce

the distribution losses substantially.

The loss reduction proposed by BESCOM is meager, as compared to the

current loss levels. Hence, the Commission, during the validation

meeting stressed on the need of further reduction in the distribution loss

levels proposed by the BESCOM, for the control period FY17-19, duly

considering the past and the present capex. BESCOM has agreed to

the suggestion of the Commission for further loss reduction.

Thus, the Commission decides to fix the following distribution loss targets

for FY17-19:

TABLE – 5.8

Approved Distribution Losses for FY17-19

Figures in % Losses

Particulars FY17 FY18 FY19

Upper limit 13.25 13.00 12.75

Average 13.00 12.75 12.50

Page 99: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

xcix

Lower limit 12.75 12.50 12.25

5.2.4 Power Purchase for FY17-19

The ESCOMs in their filings, have submitted the D-1 statement where in

the requirement of power purchase for the control period has been

furnished. The consolidated statement showing the energy requirement,

year-wise is shown hereunder:

TABLE – 5.9

Requirement of electricity as filed by Licensees

Distribution

Utilities Energy (MU)

Energy

(MU) Energy (MU)

FY17 FY18 FY19

BESCOM 32907.24 34674.06 36540.95

MESCOM 5589.96 5904.27 6236.49

CESC 7214.18 7725.09 8274.48

HESCOM 13738.00 13942.08 14849.40

GESCOM 8559.14 8902.63 9292.18

HRECS 322.87 350.14 372.61

AEQUS 12.98 17.78 22.46

MSEZ 80.49 89.33 113.06

TOTAL 68424.40 72168.78 76161.08

BESCOM’s submission:

The BESCOM has submitted its power purchase requirement for the

control period FY17 to FY19 based on the projected sales as follows:

TABLE – 5.10

Energy Requirement as filed by BESCOM

Particulars

As filed by BESCOM

FY 17 FY18 FY19

Sales (MU) 27541.00 29083.00 30716.00

Distribution losses (%) 13.30 13.20 13.10

Energy at IF point (MU) 31765.36 33505.54 35345.06

Page 100: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

c

Transmission Losses (%) 3.47 3.37 3.27

Energy Required to meet the

sales of BESCOM (MU) 32907.24 34674.06 36540.95

Page 101: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ci

Commission’s analysis and decisions:

The validation of sales and allowable distribution losses has been

discussed in the previous section of this chapter. Based on the approved

sales and the allowable distribution losses, the requirement of Power for

the BESCOM, for the control period FY17 to FY19 is worked out as

detailed below:

TABLE – 5.11

Power Purchase requirement approved for the

Control period FY17 to FY19

Particulars FY 17 FY18 FY19

Sales (MU) 26472.74 27853.46 29325.16

Distribution losses (%) 13.00 12.75 12.50

Energy at IF point (MU) 30428.44 31923.74 33514.47

Transmission Losses (%) 3.47 3.37 3.27

Energy Required to meet the sales of

BESCOM (MU) 31522.26 33037.09 34647.44

5.2.5 Sources of Power:

BESCOM’s submission;

In its filings, the BESCOM has furnished the sources of Power to meet the

requirement of Power of all ESCOMs for the control period FY17 to FY19.

The BESCOM has submitted the sources of Power and the availability of

each source on the basis of:

(i) the details furnished by the KPCL in respect of KPCL Generating

Stations.

(ii) ex-Bus generation details furnished by the Central Generating

Stations to CEA for preparation of LGBR of FY16 in respect of CGS

Generating Stations.

Page 102: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cii

(iii) the contracted capacity in the case of Major IPPs (UPCL), Minor IPPs

(NCE sources) and others such as Jurala Power & TB Dam Power.

The Capacity share of the existing sources and the envisaged additional

sources vis-à-vis the energy requirement for the entire State, its fixed

charges and variable charges are discussed in the tariff application of

BESCOM. The same are shown in the following Tables. The requirement

indicated in the tables includes the requirement of HRECS, MESCOM -

SEZ and AEQUS - SEZ.

TABLE – 5.12

Consolidated power purchase requirement for FY 17

SOURCES Energy in

MU

Fixed Cost

in

Rs Cr

Variable

Cost in

Rs Cr

Gross Cost

in Rs Cr

Per unit

Cost

KPCL Hydel Energy: 11604.37 28.77 739.16 767.93 0.66

KPCL Thermal Energy: 21690.83 3110.50 6493.51 9604.01 4.43

CGS Energy: 18721.72 1983.03 4574.50 6557.54 3.50

UPCL: 7523.00 1231.51 1653.26 2884.77 3.83

Renewable Energy: 6821.92 0.00 2661.08 2661.08 3.90

Other State Hydel 147.75 63.75 0.00 63.75 4.31

Short Term 1500.52 0.00 756.53 756.53 5.04

PGCIL & POSOCO

Charges 0.00 916.23 0.00 916.23 0.49

KPTCL Transmission,

SLDC and PGCIL

POSOCO Charges 0.00 2745.17 0.00 2745.17 0.40

DEDUCT/ADD THE

EXCESS/DEFICIT

AVAILABILITY -2.04 0.00 -0.64 -0.64

Requirement of Utilities

other than ESCOMs 416.34 0.00 176.80 176.80 4.25

TOTAL 68424.40 10078.96 17054.21 27133.17 3.97

TABLE – 5.13

Consolidated power purchase requirement filed for FY 18

SOURCES Energy in

MU

Fixed Cost

in Rs Cr

Variable

Cost in Rs

Cr

Gross Cost

in Rs Cr

Per

unit

Cost

KPCL Hydel Energy 12042.05 0.00 754.14 754.14 0.63

KPCL Thermal Energy 24277.85 5070.00 7060.74 12130.75 5.00

Page 103: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ciii

CGS Energy 21274.61 1983.04 5920.22 7903.27 3.71

UPCL 5628.59 1231.51 1261.69 2493.20 4.43

Renewable Energy 8349.07 0.00 3362.68 3362.68 4.03

Other State Hydel 147.75 53.52 0.00 53.52 3.62

PGCIL & POSOCO Charges 0.00 1186.65 0.00 1186.65 0.56

KPTCL Transmission and

SLDC & PGCIL POSOCO

Charges 0.00 2918.23 0.00 2918.23 0.40

DEDUCT/ADD THE

EXCESS/DEFICIT

AVAILABILITY -8.39 0.00 -3.24 -3.24 3.86

HRECS, AEQUS-SEZ AND M-

SEZ FILINGS 457.25 0.00 204.75 204.75 4.48

TOTAL 72168.78 12442.96 18560.98 31003.94 4.30

TABLE – 5.14

Consolidated power purchase requirement filed for FY 19

SOURCES Energy in

MU

Fixed Cost

in Rs Cr

Variable

Cost in Rs

Cr

Gross Cost

in Rs Cr

Per unit

Cost

KPCL Hydel Energy 12042.05 0.00 772.48 772.48 0.64

KPCL Thermal Energy 24277.89 4932.96 7250.85 12183.80 5.02

CGS Energy 23344.44 1983.05 6744.61 8727.67 3.74

UPCL 5628.59 1231.51 1286.92 2518.43 4.47

Renewable Energy 10219.82 0.00 4362.05 4362.05 4.27

Other State Hydel 147.75 53.52 0.00 53.52 3.62

PGCIL & POSOCO

Charges 0.00 1365.22 0.00 1365.22 0.58

KPTCL Transmission &

SLDC and PGCIL

POSOCO Charges 0.00 2961.86 0.00 2961.86 0.39

DEDUCT/ADD THE

EXCESS/DEFICIT

AVAILABILITY -8.59 0.00 -37.24 -37.24 43.35

HRECS, AEQUS-SEZ

AND M-SEZ FILINGS 509.13 0.00 245.66 245.66 4.83

TOTAL 76161.08 12528.13 20625.33 33153.46 4.35

Commission’s analysis and decisions

The energy requirement of the ESCOMs, including BESCOM, is being met

by Karnataka Power Corporation Limited (KPCL) Generating stations,

Central Generating Stations (CGS), Major Independent Power producers

(IPPs) and Minor Independent Power producers (NCE sources) through

long-term power purchase agreement. The contingent requirement to

Page 104: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

civ

meet the deficit is being met through purchases from Short/Medium

term sources by calling for bids and also purchases from the Power

Exchange. Hence, to arrive at the available quantum of energy and

power for the control period FY17 to FY19, the Commission has

considered the availability as furnished by KPCL and by

SRPC/CERC/CEA for CGS, in respect of their respective Generating

Stations. The availability of CGS stations is based on the share of

Karnataka, as notified from time to time.

In the case of Minor IPPs (NCE/RE sources), the actual generation

capacity contracted by the ESCOMs, as indicated in D-1 format has

been considered. The availability from the other sources such as Jurala

Hydel Station and TB dam Power Stations of Telangana State are taken

at 50% and 20 % of their installed capacity respectively as the share of

Karnataka, as per the contracts executed with these generators.

Further, as the Short Term Power/Medium Term Power procurement to an

extent of around 1108.80 MU has already been contracted by ESCOMs

till May 2016, the same has been considered towards availability for

FY17.

The availability as furnished by the KPCL in respect of Yermarus Unit-1 &

Unit-2 and Yelahanka Combined Cycle Power Plant (YCCPP), having a

capacity of 1600 MW and 350 MW respectively, has not been

considered, as the said generating stations are yet to be synchronized

with the grid and the CoD is yet to be declared. Similarly, Kudgi Unit1,

Unit2 and Unit3, having a total capacity of 2400 MW, are not considered

since they are yet to be synchronized with the grid and CoD is yet to be

declared.

The availability of BTPS unit 3 has been considered since it has been

synchronized and supplying power to the grid. As its commissioning date

and Commercial operation date of is yet to be declared by the KPCL,

the quantum of energy is restricted to the requirement of ESCOMs and

allowed fuel expenses in FY17. For FY18 and FY19, the availability of

Page 105: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cv

energy from this unit has been considered, as furnished by the KPCL, duly

limiting the quantum of energy as per the requirement of ESCOMs, to

meet the sales targets.

Based on the above availability criteria, the energy allowed for the State

to achieve the sales target of the respective years, is given in the

following Table.

TABLE – 5.15

ABSTRACT OF POWER PURCHASE APPROVED FOR ESCOMS FOR THE CONTROL PERIOD

FY17 to FY19

SOURCES

FINANCIAL YEAR 2016-17 FINANCIAL YEAR 2017-18 FINANCIAL YEAR 2018-19

Energy

in MU

Cost in Rs

Cr

Per unit

Cost

Energy in

MU

Cost in Rs

Cr

Per unit

Cost

Energy in

MU

Cost in Rs

Cr

Per

unit

Cost

in Rs.

KPCL Hydel

Energy 10704.90 1001.38 0.94 12045.33 1099.16 0.91 12045.33 1139.37 0.95

KPCL Thermal

Energy 17646.77 7252.08 4.11 19323.50 8392.29 4.34 20992.89 9198.23 4.38

CGS Energy 21525.17 6980.84 3.24 21525.17 7082.24 3.29 21525.17 7184.17 3.34

UPCL 7462.68 3093.67 4.15 7462.68 3129.03 4.19 7462.68 3165.10 4.24

Renewable

Energy: 6846.71 2790.38 4.08 8394.81 3413.83 4.07 10265.57 4452.20 4.34

Other State

Hydel 144.08 67.73 4.70 144.08 71.64 4.97 144.08 75.78 5.26

Short Term 1108.80 558.84 5.04 0.00 0.00 0.00 0.00

PGCIL &

POSOCO

Charges - 949.21 0.44 958.70 0.45 968.29 0.45

KPTCL

Transmission

& SLDC and

PGCIL

POSOCO

Charges - 3112.76 0.48 3197.08 0.47 3500.45 0.50

TOTAL 65439.11 25806.89 3.94 68895.57 27343.97 3.97 72435.72 29683.58 4.10

5.2.6 Power Purchase Cost & Transmission charges:

BESCOM’s Submission

BESCOM has submitted the Power Purchase requirement along with the

cost including the transmission charges and SLDC charges, in D-1 format.

BESCOM has sought approval of the Commission for purchase of power

Page 106: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cvi

to en extent of 32907.24 MU, 34674.06 MU and 36540.95 MU at a cost of

Rs.13682.54, Rs.15680.41 and Rs.16786.53 for the control period years of

FY17, FY18 and FY19 respectively

As regards the cost of power, the BESCOM has submitted that, same is

considered as per the norms defined in contracts (PPAs)/ Regulations

and based on the tariff indicated by KPCL for its Stations and the tariff

determined by the CERC in respect of Central Generating Stations, DVC

Stations and UPCL stations. Further, it is submitted that, the average cost

without escalation, paid towards the supply of NCE during FY15 has

been considered, to arrive at the cost of NCE for the control period FY 17

to FY19.

Commission’s analysis and decisions

After a detailed analysis of the tariff rates claimed by the BESCOM, the

Commission has arrived at the power purchase cost to be allowed in the

ARR for the control period.

The basis for computation of power purchase cost for the control period

FY17 to FY19 is as indicated below:

The fixed charges and variable charges of RTPS Unit 1 to 7, BTPS unit 1

and the Hydel Generating Stations exclusive of Muinirabad, MGHE, Shiva

& Shimsha, are reckoned based on the respective PPAs approved by

the Commission.

The fixed charges and variable charges of Muinirabad, MGHE, Shiva &

Shimsha hydel Stations, BTPS Unit 2 and RTPS unit 8, have been

computed based on the tariffs determined by the Commission and the

Commission’s norms approved in the PPAs.

The fixed charges and variable charges for the Central Generating

Stations, UPCL Station and the Stations of DVC are reckoned based on

the tariffs determined by the CERC and the CERC norms.

Page 107: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cvii

The variable charges of all the thermal stations including CGS stations

are reckoned based on the recent landed cost of fuel and other

variable components.

The variations, if any, in these allowed costs, will be considered during

the FAC exercise / Annual Performance Review of FY17.

Based on the allowed requirement of energy and the power allocation

given by the Government of Karnataka, the Power Purchase quantum

and its costs are approved in the ARR of BESCOM for the control period

FY17 to FY19, as shown in Annexure- 1 & 2.

The consolidated power purchase cost allowed by the Commission vis-a-

vis the power purchase cost as filed by the BESCOM for the control

period FY17 to FY19 is shown the following:

TABLE – 5.16

Approved Power Purchase Cost of BESCOM for FY17

Source of Power

Power Purchase Cost as filed by

BESCOM

Power Purchase Cost approved by

the Commission

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in Rs

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in Rs

KPCL Hydel Energy 3361.41 227.42 0.677 3636.159 407.226 1.120

KPCL Thermal

Energy 11116.11 4918.98 4.425 9912.495 4044.067 4.080

CGS Energy 9463.52 3312.18 3.500 10286.415 3335.994 3.243

UPCL 4513.79 1730.86 3.835 3566.254 1478.399 4.146

Renewable Energy 3497.41 1349.19 3.858 3522.210 1439.082 4.086

Other State Hydel 67.91 32.47 4.780 68.854 32.367 4.701

Short Term 887.08 444.91 5.015 529.872 267.058 5.040

PGCIL & POSOCO

Charges 463.54 0.490 453.606 0.441

KPTCL Transmission

& SLDC and PGCIL

POSOCO Charges 1203.00 0.366 1496.390 0.475

TOTAL 32907.24 13682.54 4.158 31522.276 12954.188 4.110

Page 108: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cviii

Page 109: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cix

TABLE – 5.17

Approved Power Purchase Cost of BESCOM for FY18

Source of Power

Power Purchase Cost as filed by

BESCOM

Power Purchase Cost approved

by the Commission

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in Rs

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in

Rs

KPCL Hydel Energy 3183.18 213.53 0.671 5738.745 523.671 0.913

KPCL Thermal Energy 12768.86 6349.97 4.973 9206.275 3998.329 4.343

CGS Energy 10751.20 3990.51 3.712 10255.214 3374.185 3.290

UPCL 3765.52 1667.94 4.430 3555.437 1490.760 4.193

Renewable Energy 4174.48 1643.39 3.937 4212.770 1710.114 4.059

Other State Hydel 30.82 11.73 3.808 68.645 34.129 4.972

PGCIL & POSOCO

Charges 0.00 600.33 0.558 456.752 0.445

KPTCL Transmission

and SLDC & PGCIL

POSOCO Charges 0.00 1203.00 0.347 1635.780 0.495

TOTAL 34674.06 15680.419 4.522 33037.09 13223.720 4.003

TABLE – 5.18

Approved Power Purchase Cost of BESCOM for FY19

Source of Power

Power Purchase Cost as filed by

BESCOM

Power Purchase Cost approved

by the Commission

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in

Rs

Energy in

MU

Cost in Rs

Cr

Per Unit

cost in

Rs

KPCL Hydel Energy 3183.18 218.68 0.687 5761.407 544.972 0.946

KPCL Thermal Energy 12768.86 6379.84 4.996 10041.118 4399.611 4.382

CGS Energy 11795.23 4406.90 3.736 10295.712 3436.265 3.338

UPCL 3765.52 1684.82 4.474 3569.477 1513.898 4.241

Renewable Energy 4872.52 2141.24 4.395 4910.810 2063.072 4.201

Other State Hydel 155.65 102.31 4.194 68.917 36.244 5.259

PGCIL & POSOCO

Charges 0.00 687.41 0.583 0.00 463.141 0.450

KPTCL Transmission

and SLDC & PGCIL

POSOCO Charges 0.00 1203.00 0.328 0.00 1796.280 0.518

TOTAL 36540.95 16786.53 4.593 34647.440 14253.483 4.113863

Page 110: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cx

The BESCOM shall regulate the quantum and cost of power as allowed

above by the Commission.

However, since the power purchase costs are uncontrollable as per MYT

Regulations, any excess quantum or cost will be trued up in Annual

Performance Review of the respective years.

The Commission has fixed a ceiling rate of Rs.4.50 per unit for short-term

procurement and the same is retained for the year FY17.

The Commission notes that, the procurement of power under short term

has come down significantly over the years. With a view to reduce the

cost of power procurement by avoiding purchase of high cost energy,

the Commission reiterates its earlier directive that, any short-term/

contingent power procurement over and above the approved rate

Rs.4.50 per Kwh, shall be made by the ESCOMs only with the prior

approval of the Commission.

The Commission also reiterates its earlier directive that any short-term or

medium-term power procurement to be made over and above the

approved quantities, shall be made only through competitive bidding

duly complying with the GoI guidelines issued in the matter from time to

time.

5.2.7 RPO target for FY17:

a. Non-Solar RPO:

BESCOM has submitted that it will only be able achieve non-solar RPO of

9.96% as against target of 11% as specified by the Commission vide its

(Procurement of Energy from Renewable Sources)(Third Amendment)

Regulations, 2015 for FY17. BESCOM has proposed to purchase RECs for

Page 111: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxi

complying with the remaining 1.04% i.e. 340.60 MU of its RPO target at a

cost of Rs.170.30 Crore assuming REC price at Rs.5 per unit.

The Commission has approved power purchase quantum of 31522.26

MU for FY17. The Non-solar RPO target at 11% would be 3467.45 MU. The

Commission has approved purchase of 2840.54 MU from non-solar RE

sources. Further, out of the approved short-term power of 529.87 MU, the

Commission has considered 442.34 MU [as estimated by BESCOM] as the

purchase from non-solar RE sources. Thus, BESCOM would be able to

procure 3282.88 MU as against an estimated RPO of 3467.45 MU,

resulting in shortfall of 184.57 MU, which could be met by the anticipated

surplus of solar energy as discussed in the subsequent paragraphs of this

Chapter. Therefore, the need for purchasing RECs may not arise.

However, in case there is a shortfall based on the actuals, BESCOM may

purchase RECs at the market rates, which would be considered by the

Commission in the APR of FY17.

b. Solar RPO:

BESCOM has proposed to achieve solar RPO of 2.01% [660.62 MU] as

against target of 0.75% as specified by the Commission vide its

(Procurement of Energy from Renewable Sources) (Third Amendment)

Regulations, 2015 for FY17. The Commission has approved power

purchase quantum of 31522.26MU for FY17. The Solar RPO target at 0.75

% would be 236.42MU. The Commission has approved purchase of

681.67 MU of Solar energy. Thus, BESCOM would exceed the solar RPO

by 445.25 MU, which could be utilized to meet the shortfall in non-solar

RPO.

In case, there is any need to buy RECs to fully meet the solar RPO, the

cost thereon would be factored in the APR of FY17.

5.2.8 O & M Expenses for FY17-19:

BESCOM’s Proposal:

Page 112: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxii

The BESCOM, in its application, has requested the Commission to

consider an inflation index of 8.34%, 8.46% and 8.48% for FY17, FY18 and

FY19 respectively for computing the O&M expenses. This is based on 12

year data (2005 – 2016) of CPI and WPI, in the ratio of 81 : 19, using the

methodology followed by the CERC. Further, the BESCOM has

considered four year CAGR (FY11 to FY15) of 4.50%, for computing the

consumer growth index

Based on the above indices and projected O & M expenses of

Rs.1169.68 Crores for the base year (FY16), the BESCOM has sought the O

& M expenses for FY17-19 as detailed below:

Sl.No. Particulars FY-16 FY-17 FY-18 FY-19

1 Inflation index in% 8.34 8.46 8.48

2 Consumer Growth Index in % 4.50 4.50 4.50

3 BESCOM efficiency in % 1.00 1.00 1.00

4 Base year O&M Cost in Rs.Crs. 1169.68

5 Revision of Scales Impact at 17.93%

in Rs.Crs. 162.87

6 O&M expenses t-year= 0&M (t-

1)*(1+WII+CGI-X) (Rs.Crs) 1308.12 1627.48 1822.43

Further, in the replies to the preliminary observations of the Commission,

BESCOM has requested to allow the expenses that may arise out of

recruitment and revision of wages, which is due from 1st April, 2017.

The breakup of projected O & M expenses, as furnished by the BESCOM,

for the control period, is as follows:

TABLE – 5.19

O &M Expenses - BESCOM’s Proposal

Amount in Rs.Crores

Sl.

No. Particulars FY17 FY18 FY19

1 Employee cost 1059.60 1318.30 1476.20

2 Administrative and General

expenses

183.10 227.80 255.10

3 Repairs and Maintenance

expenses

65.40 81.40 91.10

Total O & M Expenses 1308.10 1627.50 1822.40

Page 113: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxiii

Commission’s analysis &decision:

As per the norms specified under the MYT Regulations, the O & M

expenses are controllable expenses and the distribution licensee is

required to incur these expenses within the approved limits.

The Commission in its preliminary observations had sought details of the

employees working in each of the year of the control period along with

the cost implications. Further, the Commission had sought the basis for

projecting the employee cost for FY18 citing the revision of pay scales

and contribution to Pension and Gratuity Trust for the increased

projections for FY17-19.

The BESCOM in its replies has stated that, the officers and employees

working in the BESCOM are employed by KPTCL and their retirement is

published annually and hence factoring the employee cost due to

retirements is a difficult task. As regards the factoring employee cost

due to proposed revision of pay scales effective from 1st April, 2017, the

BESCOM has not furnished any justification in support of its claims.

Further, the Commission notes that, BESCOM has claimed contribution to

P&G Trust at 30% and 6.01% towards Pension and Gratuity respectively

without furnishing any information about contribution to employees

covered under newly defined contributory pension scheme (NDCPS)

and without any statement of computation.

In the absence of supporting data for claiming additional employee

cost due to revision of pay scales effective from 1st April, 2017, the

Commission is of the view that such expenses could be factored only

after being incurred by the distribution licensee. Further, the Commission

is of the view that any revision of pay scales should reflect in improved

productivity and efficiency for the betterment of services rendered by

the ESCOMs to its consumers in the State. As per the decisions of the

Commission in the similar situations in the earlier Tariff Orders, the

Page 114: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxiv

distribution licensees are required to justify any increase in pay scale with

commensurate increase in real employee productivity. Accordingly, the

Commission will look into the issue, at the time of approving the APR for

relevant years when the actual revision of pay scales takes place

instead of loading these costs upfront, in the present ARR exercise,

In view of the above discussion, the Commission has computed the O &

M expenses for FY17-19 duly considering the actual O & M expenses of

FY15 as per the audited accounts (being the latest data available as per

the audited accounts) to arrive at the O & M expenses for the base year

i.e. FY16. The actual O& M expenses for FY15 are Rs.1065.76 Crores.

Considering the Wholesale Price Index (WPI) as per the data available

from the Ministry of Commerce & Industry, Government of India and

Consumer Price Index (CPI) as per the data available from the Labour

Bureau, Government of India and adopting the methodology followed

by CERC with CPI and WPI in a ratio of 80 : 20, the allowable annual

escalation rate for FY17 is computed as follows:

TABLE – 5.20

Computation of Inflation Index for FY17

Year WPI CPI Composite

Series Yt/Y1=Rt Ln Rt

Year

(t-1)

Product [(t-

1)* (LnRt)]

2003 92.6 107 104.12

2004 98.72 111.1 108.624 1.04 0.04 1 0.04

2005 103.37 115.8 113.314 1.09 0.08 2 0.17

2006 109.59 122.9 120.238 1.15 0.14 3 0.43

2007 114.94 130.8 127.628 1.23 0.20 4 0.81

2008 124.92 141.7 138.344 1.33 0.28 5 1.42

2009 127.86 157.1 151.252 1.45 0.37 6 2.24

2010 140.08 175.9 168.736 1.62 0.48 7 3.38

2011 153.35 191.5 183.87 1.77 0.57 8 4.55

2012 164.93 209.3 200.426 1.92 0.65 9 5.89

2013 175.35 232.2 220.83 2.12 0.75 10 7.52

2014 182 246.9 233.92 2.25 0.81 11 8.90

A= Sum of the product column 35.36

B= 6 Times of A 212.19

C= (n-1)*n*(2n-1) where n= No of years of data=12 3036.00

D=B/C 0.07

g(Exponential factor)= Exponential (D)-1 0.0724

e=Annual Escalation Rate (%)=g*100

7.24

Page 115: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxv

For the purpose of determining the normative O & M expenses for FY17-

19, the Commission has considered the following:

e) The actual O & M expenses incurred as per the audited accounts for

FY15 inclusive of contribution to the Pension and Gratuity Trust to

determine the O & M expenses for the base year FY16.

f) The three year compounded annual growth rate (CAGR) of the

number of installations considering the actual number of installations

as per the audited accounts up to FY15 and as projected by the

Commission for FY16-FY19.

g) The weighted inflation index (WII) at 7.24% as computed above.

h) Efficiency factor at 1% as considered in the earlier two control

periods.

The above said parameters are computed duly considering the same

methodology as was followed in the earlier Tariff Orders of the

Commission and the relevant orders of the Commission on Review

Petitions.

Accordingly, the normative O & M expenses for FY17-19 are as follows:

TABLE – 5.21

Approved O & M expenses for FY17-19

Particulars FY16 FY17 FY18 FY19

No. of Installations 10574032 11162023 11802269

CGI based on 3 Year CAGR 6.01% 5.73% 5.57%

Inflation index 7.24% 7.24% 7.24%

Base Year O&M expenses (as per

actuals of FY15 )-Rs.Crs 1201.45

Total allowable O&M Expenses-Rs.Crs 1348.61 1510.01 1688.27

Since, the base year data includes the O & M expenses inclusive of

contribution to the P & G Trust, the Commission has not considered

allowing contribution to the P & G Trust separately.

Page 116: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxvi

Thus, the Commission decides to approve O&M expenses of Rs.1348.61

Crores for FY17, Rs.1510.01 Crores for FY18 and Rs.1688.27 Crores for FY19.

Page 117: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxvii

5.2.9 Depreciation:

BESCOM’s Proposal:

The BESCOM, in its application has claimed the depreciation for the

control period based on the following assumptions:

1) Actual closing Gross Fixed Assets (GFA) of FY-15 as per audited

accounts of FY-15.

2) Estimated Additions and Retirement of assets for FY-16 are based on

the accounts available up to 30.09.2016 and estimation for the next

half year.

3) 75% of the capex envisaged during each year of the Control period

is booked in that year and 90% of the booked cost will be

capitalized.

4) Capital work in progress at the end of previous year being

categorized in the succeeding year of the Control period.

5) Depreciation rates as specified by CERC is applied on 90% of the

Closing Gross fixed Asset of each year of the control period.

6) Depreciation withdrawn on the assets created on account of

contribution /subsidies as per Accounting Standard-12 at the same

rate of depreciation as at the end of each year for the control

period.

Accordingly, BESCOM has claimed the depreciation for FY17-19 as

detailed below:

TABLE – 5.22

Depreciation-FY17-19- BESCOM’s Submission

Amount in Rs.Crores

Particulars FY-16 FY-17 FY-18 FY-19

Opening Gross Fixed Asset (GFA) 7074.36 8541.36 9713.44 10378.47

Add: Additions during the year 1567.00 1032 515.03 423.23

Page 118: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxviii

Less: Retirement 100.00 110 120 130

Add. Consumer Contribution 240.00 250 270 290

Closing GFA 8781.36 9713 10378 10962

90% of GFA 7903.23 8742 9341 9866

Average Dep. Rate (In %) 4.58% 4.58% 4.58% 4.58%

Depreciation 361.97 400 428 452

Less: Depreciation withdrawn from

Consumer contribution/subsidies

plus withdrawal of depreciation

(Rs.1711 Crs. is the consumer

contribution for FY15 and consumer

contribution added for FY16 is

Rs.240 Crs.)

80.42 91 102 114

Depreciation 281.55 310 326 338

Commission’s analysis and decision:

In accordance with the provisions of the MYT Regulations and

amendments issued thereon, the Commission has determined the

depreciation for FY17-19 considering the following:

a) The actual rate of depreciation of category wise assets has been

determined considering the depreciation and gross block of opening

and closing balance of fixed assets, as per the audited accounts for

FY15.

b) The actual rate of depreciation, so arrived at, is considered to allow

the depreciation on the gross block of fixed assets projected by

BESCOM, in its filing for FY17-19 duly considering the projection as

approved by the Commission for FY16, in its Tariff Order dated 2nd

March, 2015.

c) The depreciation on account of assets created out of consumers

contribution / grants are considered (deducted),based on the

opening and closing balance of such assets duly considering the

addition of assets as proposed by the BESCOM, at the weighted

average rate of depreciation as per actuals in FY15.

Accordingly, the depreciation for FY17-19 is arrived at as follows:

Page 119: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxix

TABLE – 5.23

Approved Depreciation for FY17-19

Amount in Rs. Crores

Particulars FY17 FY18 FY19

Buildings 4.03 4.55 4.92

Civil 0.16 0.17 0.18

Other Civil 0.07 0.08 0.09

Plant & M/c 97.83 109.27 116.25

Line, Cable Network 294.78 327.75 350.80

Vehicles 1.06 1.06 1.05

Furniture 0.57 0.61 0.63

Office Equipments 0.77 0.87 0.95

Intangible assets 0.01 0.01 0.01

Sub Total 399.26 444.35 474.87

Depreciation Withdrawn AS12 127.98 144.15 160.32

Total 271.29 300.20 314.54

Thus, the Commission decides to approve an amount of Rs.271.29 Crores,

Rs.300.20 Crores and Rs.314.54 Crores towards depreciation for FY17,

FY18 and FY19 respectively.

5.2.10 Interest on Loans:

BESCOM’s proposal:

BESCOM in its application has stated that, the Interest on loan for the

control period are computed based on the following assumptions:

a. Loan outstanding as on 31.03.2015 as per provisional accounts duly

considering the rate of interest and terms of repayment.

b. For FY-16, loan existing as on 30.09.2015 and the estimation for the

next half year is considered for computation of interest.

c. For financing of future capital cost of the projects, a Debt: Equity

ratio of 70:30 is adopted as per the norms framed by the Commission

under Clause 3.7.1 of the MYT regulations.

Page 120: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxx

d. The new loans proposed to be borrowed from the Central

Government Financial Institutions at a rate of 11.75% with three years

moratorium and tenure of 10 years.

e. The interest on the existing loans are computed on the basis of actual

rate of weighted average rate of interest of FY15.

Based on the above assumptions, the BESCOM has requested to

approve interest on loan capital for FY17-19 as follows:

TABLE – 5.24

Interest on Loan– BESCOM’s Proposal

Amount in Rs. Crores

Commission’s analysis and decision:

The Commission notes that based on the approved capex for FY17-19

and the loan proposals of the BESCOM and the replies to the

Commission’s preliminary observations/validation meeting, the

requirement of loan capital is Rs.697.65 Crores, Rs.674.00 Crores and

Rs.410.00 Crores for FY17, FY18 and FY19 respectively. Further, the

Commission has considered the repayment of loan as proposed by the

BESCOM at Rs.352.36 Crores, Rs.382.68 Crores and Rs.382.48 Crores for

FY17, FY18 and FY19 respectively.

As per the audited accounts and as per the APR of FY15, the BESCOM

had incurred interest on capital loan at a weighted average rate of

interest of 8.61% p.a. This rate of interest is considered for the existing

loan balances for which interest has to be factored during FY17. Further,

for the years FY18 and FY19, the weighted average rate of interest of the

preceding year has been considered on the existing loan balances. The

Commission notes that, as per Format D-17, BESCOM has proposed

Particulars FY-17 FY-18 FY-19

Interest on existing loan Capital 169.87 136.54 103.23

Interest on New loan Capital 77.81 197.75 266.12

Total 247.68 334.29 369.35

Page 121: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxi

capex amount of Rs.1147.00 Crores for FY17, Rs.1108.00 Crores for FY18

and Rs.777.00 Crores for FY19. However, as discussed in para 5.2.1, the

Commission considers new loans of Rs.697.65 Crores, Rs.674 Crores and

Rs.410 Crores for FY17, FY18 and FY19 respectively. The Commission has

considered new loans, in compliance of the debt equity ratio of 70 : 30

as in MYT Regulations.

The present interest rates by commercial banks and financial institutions

are charged mainly on the basis of base rate of interest declared by the

RBI from time to time. Hence, the Commission has considered the base

rate plus spread of certain basis points, depending upon the tenure of

the loan. As per the data furnished by the BESCOM, the interest on new

loans is proposed at a rate of 12.5%. The Commission notes that, the

interest rates proposed by BESCOM are comparatively on a higher side.

BESCOM needs to initiate financial prudence measures so as to avail

loans at comparatively lower interest rates and reduce its interest

burden on the consumers. However, considering the present base rate

of interest with spread of 200 basis points and noting a downward trend

in the interest rate, the Commission decides to allow an interest rate of

11.25% for FY17-19 for new long term loans. It shall be noted that, the

rate of interest now considered by the Commission on the new capital

loans for the control period is subject to review during APR and revision

of ARR of the relevant years of the control period.

Accordingly, the approved interest on loans for FY17-19 are as follows:

TABLE – 5.25

Approved Interest on Loans for FY17-19

Amount in Rs.Crores

Particulars FY17 FY18 FY19

Opening Balance long term loans 3005.12 3350.41 3641.73

Add new Loans 697.65 674 410

Less: Repayments 352.36 382.68 382.48

Total loan at the end of the year 3350.41 3641.73 3669.25

Average Loan 3177.77 3496.07 3655.49

Interest on long term loans 282.84 319.09 337.99

Weighted average rate of interest in % 8.90% 9.13% 9.25%

Page 122: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxii

Interest on long term loans 282.84 319.09 337.99

Thus, the Commission decides to approve interest of Rs.282.84, Rs.319.09

Crores and Rs.337.99 Crores on long term loans for FY17, FY18 and FY19

respectively.

5.2.11 Interest on Working Capital:

BESCOM’s proposal:

BESCOM has claimed interest on working capital based on the norms

prescribed in the MYT Regulations and considering the rate of interest as

per the short term prime lending rate of SBI at 14.45% p.a. The interest on

working capital computed by BESCOM are as follows:

TABLE – 5.26

Interest on Working Capital – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY-17 FY-18 FY-19

1/12th Operation and Maintenance 109.01 135.62 151.87

1% of Gross fixed assets at the beginning

of the year 97.13 103.78 109.62

2 months Receivables 2,377 2,475 2,579

Estimated Working Capital 2583.24 2714.75 2840.90

Rate of Interest 14.45% 14.45% 14.45%

Interest on working capital 373.28 392.28 410.51

Commission’s analysis and decision:

As per the norms specified under the MYT Regulations, the Commission

has computed the interest on working capital which consists of one

month’s O & M expenses, 1% of opening GFA and two months’ revenue.

Further, the Commission notes that the comments made by BESCOM, in

its application on the methodology of computation of interest on

working capital, is not relevant in the context of ARR. Further, the

Regulations have been framed to encourage efficiency in operation

keeping in view the spirit of the provisions of the Electricity Act, 2003.

Hence, BESCOM is required to comply with the provisions of the

Regulations.

Page 123: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxiii

The present interest rates by commercial banks and financial institutions

are charged mainly on the basis of base rate of interest declared by RBI

from time to time and the earlier concept of charging interest on the

basis prime lending rate of SBI does not exist. Hence, the Commission

would consider base rate plus spread of certain basis points depending

upon the tenure of the loan. As per the BESCOM’s application, it is

stated that short term loans for FY15 has been availed at a weighted

average rate of interest of 10.98%. The Commission notes that, BESCOM

needs to initiate financial prudence measures in availing short term loans

so that the interest burden on its consumers is reduced. However,

considering the base rate of interest with spread of 250 basis points and

taking note of the downward trend in the interest rate, the Commission

decides to allow short term loans at a normative interest rate of 11.75%

for FY17-19.

Accordingly, the approved interest on working capital for FY17-19 is as

follows:

TABLE – 5.27

Approved Interest on Working Capital for FY17-19

Amount in Rs. Crs

Particulars FY 17 FY 18 FY 19

One-twelfth of the amount of O&M Expenses 112.38 125.83 140.69

Opening Gross Fixed Assets (GFA) 7568.30 8740.30 9405.34

Stores, materials and supplies 1% of Opening

balance of GFA 75.68 87.40 94.05

One-sixth of the Revenue 2416.23 2542.25 2676.57

Total Working Capital 2604.29 2755.48 2911.31

Rate of Interest (% p.a.) 11.75% 11.75% 11.75%

Interest on Working Capital 306.00 323.77 342.08

Thus, the Commission hereby approves interest on working capital of

Rs.306.00, Rs.323.77 Crores and Rs.342.08 Crores for the control period

years FY17, FY18 and FY19 respectively.

5.2.12 Interest on Consumer Deposit:

BESCOM’s proposal:

Page 124: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxiv

BESCOM in its application has claimed interest on consumer security

deposit duly considering the addition of deposits for each year of the

control period FY17-19 based on Bank rate of 9 per cent per annum as

per the Monetary and Credit Information Review, Volume VIII, Issue 10th

April, 2012. The interest on consumer deposit projected for the control

period is as follows:

TABLE – 5.28

Interest on Consumer Deposits – BESCOM’s Submission

Amount in Rs. Crores

Particulars FY-17 FY-18 FY-19

Consumer Security Deposit 2960 3174 3388

Rate of Interest 9.00% 9.00% 9.00%

Interest on consumer security

deposit 266.4 285.66 304.92

Commission’s analysis and decision:

In accordance with the KERC (Interest on Security Deposit) Regulations

2005, the interest rate on consumer security deposit to be allowed is the

bank rate prevailing on the 1st of April of the financial year for which

interest is due. As per Reserve Bank of India notification dated 29th

September, 2015, the bank rate is 7.75%. This being the latest available

bank rate, the Commission has considered the same, for computation of

interest on consumer deposits for FY17-19.

The Commission has considered the consumer security deposits as per

audited accounts of FY15 and half yearly accounts of FY16 for onward

projection for FY17-19. The interest on consumer deposits for FY17-19 are

as follows:

TABLE – 5.29

Approved Interest on Consumer Security Deposits for FY17-19

Amount in Rs. Crores

Particulars FY17 FY18 FY19

Opening balance of consumer security

deposits 3171.94 3471.94 3771.94

Interest on consumer security deposits as

filed 266.4 285.66 304.92

Rate of Interest as filed 9.00% 9.00% 9.00%

Page 125: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxv

Rate of Interest at bank rate to be allowed

as per Regulations 7.75% 7.75% 7.75%

Approved Interest on average Consumer

Security Deposit 257.45 280.70 303.95

Thus, the Commission decides to approve interest on consumer security

deposits of Rs.257.45, Rs.280.70 Crores and Rs.303.95 Crores for FY17,

FY18 and FY19 respectively.

5.2.13 Other Interest and Finance Charges:

BESCOM has claimed an amount of Rs.10.19 Crores towards other

interest and finance charges for each year of the control period FY17-19.

Considering, the expenditure on this item in the earlier years, the

Commission decides to allow an amount of Rs.10.19 Crores towards

interest and finance charges for each of the years during the control

period FY17-19.

5.2.14 Interest and other expenses Capitalized:

BESCOM has claimed an amount of Rs.80.00 Crores, Rs.82.00 Crores and

Rs.86.00 Crores towards capitalization of interest and other expenses

during FY17, FY18 and FY19 respectively. Considering, the capital

expenditure incurred and capitalized in the previous years, the

Commission decides to allow capitalization of interest and other

expenses as proposed by BESCOM for the control period FY17-19.

The abstract of approved interest and finance charges for FY17-19 are

as follows:

TABLE – 5.30

Approved Interest and finance charges for FY17-19

Amount in Rs. Crores

Particulars FY17 FY18 FY19

Interest on Loan Capital 282.84 319.09 337.99

Interest on Working Capital 306.00 323.77 342.08

Interest on Consumers Security Deposit 257.45 280.70 303.95

Page 126: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxvi

Other Interest & Finance Charges 10.19 10.19 10.19

Less Interest & other expenses capitalized (80.00) (82.00) (86.00)

Total Interest & Finance Charges 776.49 851.75 908.21

Page 127: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxvii

5.2.15 Return on Equity:

BESCOM’s proposal:

BESCOM in its application has claimed RoE for the control period FY17-19

based on the equity alone without considering the share deposits,

reserves and surplus and recapitalized amount of security deposit as

detailed below:

Amount in Rs. Crores

Particulars FY-17 FY-18 FY-19

Equity held as on

31.03.2016 546.91 546.91 546.91

Rate of Return 15.5% 15.5% 15.5%

Proposed Return 84.77 84.77 84.77

Commission’s analysis and decision:

The Commission has considered the actual amount of share capital,

share deposits and reserves & surplus as per the audited accounts for

FY15 and the additional share deposit reported in the half yearly

accounts for FY16 for arriving at the allowable equity base for the control

period FY17-19.

The Commission, in accordance with the provisions of the MYT

Regulations, has considered 15.5% of Return on Equity duly grossed up

with the applicable Minimum Alternate Tax (MAT) of 21.342%. This works

out to 19.706% per annum. Further, as per the decision of the

Commission in the Review Petition No.6/2013 and Review Petition 5/2014,

the Return on Equity is to be computed based on the opening balances

of share capital, share deposits and reserves and surplus. Further, an

amount of Rs.100.00 Crores of recapitalized consumer security deposit as

net-worth is considered as per the orders of the Hon’ble Appellate

Tribunal for Electricity in Appeal No.46/2014.

Further, in compliance with the Orders of the Hon’ble ATE in Appeal

No.46/2014, wherein it is directed to indicate the opening and closing

balances of gross fixed assets along with break-up of equity and loan

Page 128: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxviii

component in the Tariff Order henceforth, the details of GFA, debt and

equity (net-worth) for FY17-19 are indicated as follows:

TABLE – 5.31

Status of Debt Equity Ratio for FY17-19

Amount in Rs. Crores

Year Particulars GFA Debt

Equity

(Net-

worth)

Normative

Debt @ 70%

of GFA

Normative

Equity @

30% of GFA

%age of

actual

debt on

GFA

%age of

actual

equity

on GFA

FY17 Opening

Balance

7568 3005 178 39.71% 2.86%

Closing

Balance

8740 3350 205 6118 2622 38.33% 2.35%

FY18 Opening

Balance

8740 3350 205 38.33% 2.35%

Closing

Balance

9405 3642 238 6583 2822 38.72% 2.53%

FY19 Opening

Balance

9405 3642 238 38.72% 2.53%

Closing

Balance

9989 3669 274 6992 2997 36.73% 2.74%

From the above table it is seen that the debt equity ratio is within the

normative debt equity ratio of 70 : 30 on the closing balances of GFA for

each year of the control period. Further, the Commission would review

the same during the Annual Performance Review, for each year of the

control period, based on the actual data, as per the audited accounts.

Accordingly, the Return on Equity that could be approved for FY17-19,

works out as follows:

TABLE – 5.32

Approved Return on Equity for FY17-19

Amount in Rs. Crores

Particulars FY17 FY18 FY19

Opening Balance of Paid Up Share

Capital 546.915 546.915 546.915

Share Deposit 188.03 188.03 188.03

Reserves and Surplus (456.82) (429.21) (397.32)

Less Recapitalised Security Deposit (100.00) (100.00) (100.00)

Total Equity 178.13 205.74 237.62

Approved Return on Equity with MAT 35.10 40.54 46.83

Page 129: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxix

Thus, the Commission decides to approve Return on Equity of Rs.35.10

Crores, Rs.40.54 Crores and Rs.46.83 Crores for FY17, FY18 and FY19

respectively.

5.2.16 Other Income:

BESCOM’s proposal:

BESCOM has claimed other income for the control period as detailed

below:

TABLE – 5.33

Other Income - BESCOM’s Proposal

Amount in Rs. Crores

Particulars FY-17 FY-18 FY-19

Interest on Bank Deposits 0.00 0.00 0.00

Profit on sale of Stores 0.84 0.84 0.84

Sale of Scrap 0.27 0.27 0.27

Rental from Staff quarters 2.15 2.37 2.6

Value of materials found excess

during physical verification 0.33 0.3 0.33

Rebate for collection of Electricity

duty 3.21 3.34 3.47

Incentives 0.00 0.00 0.00

Subsidy 0 0 0

Miscellaneous recoveries 31.86 35.05 38.55

Total 38.66 42.17 46.06

Commission’s analysis and decision:

The other income received by the BESCOM mainly includes income from

miscellaneous recoveries, interest on bank deposits, rent from staff

quarters and sale of scrap, profit on sale of stores besides incentives for

timely payment of power purchase bills. The actual ‘other income’ as

per the audited accounts for FY15 is Rs.205.24 Crores. The Commission

notes that, the BESCOM, in its projection of other income for the control

period has not included income from interest on fixed deposits and

estimated incentives likely to be earned on account of timely payment

of power purchase bills.

Based on the other income earned by the BESCOM in the past three

years, the average other income works out to Rs.203.00 Crores per year.

Page 130: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxx

Considering the same for FY17 and nominal escalation of 5% for next two

years, the Commission decides to approve other income of Rs.203.00

Crores for FY17, Rs.213.00 Crores for FY18 and Rs.223.00 Crores for FY19.

5.2.17 Fund towards Consumer Relations / Consumer Education:

The Commission has been allowing an amount of Rs.1.00 Crore per year

towards consumer relations / consumer education. This amount is

earmarked to conduct consumer awareness and grievance redressal

meetings periodically and institutionalize a mechanism for addressing

common problems of the consumers. The Commission has already

issued guidelines for consumer education and grievance redressal

activities.

The Commission decides to continue providing an amount of Rs.1.00

Crore for each year of the control period FY17-19, towards meeting the

expenditure on consumer relations / consumer education.

The Commission directs BESCOM to furnish a detailed plan of action for

utilization of this amount and also maintain a separate account of these

funds and furnish the same at the time of APR.

5.3 Treatment of Regulatory Asset & Carrying Cost:

BESCOM in its application has claimed an amount of Rs. 541.97 as

Regulatory asset. Further, BESCOM has stated that as per the

Commission’s Order dated 12th May, 2014, an amount of Rs.524.53

Crores was payable by the Government of Karnataka towards

additional subsidy for FY13 for having supplied energy to IP Sets and

BJ/KJ Consumers in excess of the quantum of energy approved in the

ARR for FY13. However, BESCOM has reported that the said amount is not

yet considered by the Government of Karnataka and hence has

Page 131: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxi

claimed an amount of Rs.127.95 Crores as carrying cost at 12% on

Rs.524.53 Crores yet to be received from the Government of Karnataka

and the Regulatory Asset of Rs.541.97 Crores.

It is to be noted that, the Commission in its Tariff Order dated 12th May,

2014, has determined an amount of Rs.524.53 Crores as payable by the

Government of Karnataka towards additional subsidy for FY13. The

amount being receivable from the Government of Karnataka, BESCOM

cannot claim carrying cost to be recovered from the consumers, in the

ARR for FY17.

The Commission notes that as per the Tariff Order dated 12thMay, 2014

the deficit of Rs.627.13 Crores for FY13 was determined duly factoring the

additional subsidy of Rs.524.53 Crores payable by the Government of

Karnataka. This deficit was included in the ARR for FY15. Further, while

approving the ARR for FY15, an amount of Rs.611.00 Crores was set aside

as regulatory asset to be recovered in the tariff over the next two years

(FY16 & FY17). The Commission had decided to allow carrying cost at

12% p.a. on the regulatory asset to be assessed at the time of Annual

Performance Review for FY15 and FY16. Accordingly, in the present APR

for FY15, as discussed in the previous chapter of this Order, the revenue

earned was sufficient enough to meet the expenses incurred during FY15

excluding the penalty levied on account of increase in distribution losses

during FY15. Hence, allowing carrying cost on the regulatory asset

which was the notional deficit for FY15 does not arise.

Further, the Commission in its Tariff Order dated 2nd March, 2015 had

decided to carry forward a Regulatory asset of Rs.541.97 Crores which

was determined as detailed below:

Treatment of Regulatory Asset

Sl.

No Particulars Rs. Crores

1 Regulatory asset as per Commission’s Order dated 12th May, 2014. 611.00

2 Gap in revenue on APR of FY14 367.33

3 Gap in revenue as per ARR for FY16. 27.46

4 Total Gap for FY16 1005.79

5 Additional revenue allowed by revision of tariff in FY16 455.86

6 Balance unfilled gap in revenue 549.93

Page 132: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxii

7 Amount disallowed on imprudent capex (7.96)

8 Regulatory asset to be recovered in FY17 541.97

As stated in the above table, the Commission has already considered

the uncovered gap of Rs.611.00 Crores in the previous Tariff Order dated

2nd March, 2015 while determining the ARR and gap in revenue for FY16.

Hence, Commission decides to include net amount of Rs.541.97 Crores

of Regulatory Asset set aside in the Tariff Order dated 2nd March, 2015, in

the ARR for FY17.

Page 133: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxiii

5.4 RP No.5/2014 and RP No.6/2013:

The Commission in its order dated 10th December, 2015 in R.P. No.6/2013

and Order dated 7th January, 2016 in the R.P. No.5/2014 has decided to

factor an amount of Rs.17.12 Crores and Rs.10.99 Crores respectively in

the ARR of FY17.

In pursuance of these Orders, an amount of Rs.28.11 Crores has been

factored in the ARR for FY17.

5.5 Abstract of ARR for FY17-19:

In the light of the above analysis and decisions of the Commission, the

following is the approved ARR for the control period FY17-19:

TABLE – 5.34

Approved ARR for FY17-19 Amount in Rs.Crores

Sl.

No Particulars FY17 FY18 FY19

Revenue at existing tariff

1 Revenue from tariff and Misc. Charges 12865.95

2 Tariff Subsidy 1631.40

3 Total Existing Revenue 14497.35 0.00 0.00

Expenditure in Rs Crs

4 Power Purchase Cost 11457.80 11587.95 12457.21

5 Transmission charges of KPTCL 1487.22 1622.58 1781.99

6 SLDC Charges 9.17 13.20 14.29

7

Power Purchase Cost including cost of

transmission 12954.19 13223.73 14253.49

8 O&M Expenses 1348.61 1510.01 1688.27

9 Depreciation 271.29 300.20 314.54

Interest & Finance charges

10 Interest on Capital Loans 282.84 319.09 337.99

11 Interest on Working capital Loans 306.00 323.77 342.08

12 Interest on consumer security deposits 257.45 280.70 303.95

13 Other Interest & Finance charges 10.19 10.19 10.19

14 Less interest & other expenses capitalised 80.00 82.00 86.00

15 Total Interest & Finance charges 776.49 851.75 908.21

16 Other Debits 0.00 0.00 0.00

17 Net Prior Period Debit/Credit 0.00 0.00 0.00

18 Return on Equity 35.10 40.54 46.83

Page 134: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxiv

19

Funds towards Consumer

Relations/Consumer Education 1.00 1.00 1.00

20 Other Income 203.00 213.00 223.00

21 ARR 15183.68 15714.23 16989.34

22 Deficit for FY15 carried forward 11.21

23

Regulatory asset as per T.O. dtd.

02.03.2015 541.97

24

Additional allowable expenses as per

decision of KERC in RP5/2014 & RP6/2013 28.11

25 Net ARR 15764.97 15714.23 16989.34

5.6 Segregation of ARR into ARR for Distribution Business and ARR for Retail

Supply Business:

BESCOM in its application has proposed the following segregation of

consolidated ARR into ARR for Distribution Business and ARR for Retail

Supply Business based on its internal committee report:

TABLE – 5.35

Segregation of ARR – BESCOM’s Submission

Particulars Distribution

Business

Retail Supply

Business

Power purchase cost

100%

R&M Expenses 62% 38%

Employee Expenses 52% 48%

A&G Expenses 62% 38%

Depreciation 71% 29%

Interest & Finance

Charges 16% 84%

Other Debits (incl.

Prov. for Bad debts) 53% 47%

Other (Misc.)-net prior

period credit 19% 81%

Other Income 51% 49%

ROE 100%

Commission’s Analysis and Decisions:

BESCOM in its application has proposed the segregation of ARR into ARR

for Distribution Business and ARR for Retail Supply Business based on its

internal committee report. The Commission notes that, BESCOM has

Page 135: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxv

proposed the same segregation as proposed in the previous control

periods.

Since no new proposal with justification has been furnished by BESCOM,

the Commission decides to continue with the existing ratio of

segregation of ARR as detailed below:

TABLE – 5.36

Approved Segregation of ARR – FY17 - 19

Particulars Distribution

Business

Retail Supply

Business

O&M 56% 44%

Depreciation 88% 12%

Interest on Loans 100% 0%

Interest on Consumer Deposits 0% 100%

RoE 50% 50%

GFA 88% 12%

Non-Tariff Income 19% 81%

Accordingly, the following is the approved ARR for Distribution Business

and Retail supply business:

TABLE – 5.37 APPROVED REVISED ARR FOR DISTRIBUTION BUSINESS – FY17 - 19

Amount in Rs. Crores

Sl.

No Particulars

FY17 FY18 FY19

1 O&M Expenses 755.22 845.60 945.43

2 Depreciation 238.73 264.18 276.80

Interest & Finance Charges

3 Interest on Capital Loans 282.84 319.09 337.99

4 Interest on Working capital loans 35.09 38.23 41.00

5 Interest on consumer security deposits 0.00 0.00 0.00

6 Other Interest & Finance charges 10.19 10.19 10.19

7 Less interest & other expenses capitalised 80.00 82.00 86.00

8 ROE 17.55 20.27 23.41

9 Other Income 38.57 40.47 42.37

10 Provision for taxes 0.00 0.00 0.00

11 NET ARR 1221.06 1375.09 1506.45

Page 136: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxvi

TABLE – 5.38

APPROVED ARR FOR RETAIL SUPPLY BUSINESS – FY17 - 19

Amount in Rs.Crores

Sl.

No Particulars FY17 FY18 FY19

1 Power Purchase 11457.80 11587.95 12457.21

2 Transmission Charges 1496.39 1635.78 1796.28

3 O&M Expenses 593.39 664.40 742.84

4 Depreciation 32.55 36.02 37.74

Interest & Finance Charges

5 Interest on Capital Loans 0.00 0.00 0.00

6 Interest on Working capital Loans 270.91 285.54 301.08

7 Interest on consumer security deposits 257.45 280.70 303.95

8 ROE 17.55 20.27 23.41

9 Other Income 164.43 172.53 180.63

10

Fund towards Consumer Relations /

Consumer Education 1.00 1.00 1.00

11 NET ARR 13962.62 14339.14 15482.89

5.7 Gap in Revenue for FY17:

As discussed above, the Commission decides to approve the Annual

Revenue Requirement (ARR) of BESCOM for its operations in FY17 at

Rs.15764.97 Crores as against BESCOM’s application proposing an ARR of

Rs.17556.47 Crores. This ARR includes an amount of Rs.11.21 Crores which

is determined as the deficit in FY15 as discussed in Chapter-4. Based on

the existing retail supply tariff, the total realization of revenue will be

Rs.14497.35 Crores which is Rs.1267.62 Crores less than the projected

revenue requirement for FY17.

The net ARR and the gap in revenue for FY17 are shown in the following

table:

TABLE – 5.39

Revenue gap for FY17

Particulars FY17

Net ARR including carry forward gap of FY15 (in Rs. Crores) 15764.97

Approved sales (in MU) 26472.74

Average cost of supply for FY17 (in Rs./unit) 5.96

Revenue at existing tariff (in Rs. Crores) 14497.35

Gap in revenue for FY17 (in Rs. Crores) (1267.62)

Page 137: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxvii

The determination of revised retail supply tariff on the basis of the above

approved ARR is detailed in the following Chapter.

5.8 Application for Additional Revenue Requirement for FY17:

BESCOM’s Proposal:

The BESCOM, in its application dated 16th March, 2016, filed on 22nd

March, 2016, seeking additional ARR for FY17, has submitted that:

1. The Second Transfer Scheme Rules dated 31.05.2002 were issued by

the GoK, for transfer of assets and liabilities and personnel of KPTCL to

ESCOMs. According to Rule 4(13) of these Rules, the State

Government is responsible for funding the pension and other liabilities

of the personnel as on the date of Second Transfer i.e. 31.05.2002

and sub rule 13(2)(b) provides for establishment of a Pension Trust for

managing the fund.

2. The GoK, vide its order dated 19.12.2002, has ordered constitution of

the Pension and Gratuity Trust and also decided to adopt “Pay as

you go” approach, in funding the pension and gratuity requirement.

3. The GoK vide its letter dated 25.02.2016, has informed that against

the proposed pension and gratuity contribution of Rs.996.39 Crores

for FY17 and the arrears of pension contribution of Rs.2047.84 Crores

payable to KPTCL and the ESCOMs, the Finance Department (FD)

has agreed to provide Rs.550 Crores for meeting the pension liability.

As there is difference between the proposed requirement and the

availability as indicated by the FD for FY17, the Pension Trust is

directed to work out the amount of contribution to be recovered

through tariff, considering the indicative amount of contribution

available from the Government.

4. It is submitted by BESCOM that, as worked out by the Pension Trust,

an amount of Rs.729.37 Crores (Arrears of Rs.599.29 Crores and

Rs.130.08 Crores for FY17), has to be recovered through tariff.

5. Further, BESCOM has submitted that, additional power purchase cost

has to be incurred by the ESCOMs due to outage of Sharavathi

Page 138: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxviii

generating Station and consequent revision of availability of energy,

resulting in increase in cost of power purchases to an extent of

Rs.195.30 Crores, for FY17.

Accordingly, BESCOM has filed an application claiming an additional

ARR of Rs.448.28 Crores towards pension and gratuity contribution and

Rs.195.30 Crores towards additional power purchase cost, to be

recovered through tariff.

Commission’s views and decision:

The Commission proceeds to dispose of the application filed by

BESCOM, as follows:

a) The application for additional ARR has been filed on 16th March,

2016, that is much after completion of the process of calling for

objections on the original tariff application and furnishing replies

thereon. The Commission has also completed the process of public

consultation by holding a public hearing, in respect of BESCOM, on

26th February, 2016.

b) As per Rule 4(13) of the Karnataka Electricity Reforms (Transfer of

Undertakings of KPTCL and its Personnel to Electricity Distribution and

Retail Supply Companies) Rules, 2002, notified by the Government on

31.05.2002, the State Government is liable for funding the pension

and gratuity liability of existing pensioners as on the effective date of

Second Transfer Scheme.

c) The Government, as per its order dated 19.12.2002, has adopted

“pay as you go” approach to meet the pension and gratuity

requirements of existing pensioners on the effective date of second

transfer Scheme. With this arrangement, the GoK is liable to meet the

pension and gratuity requirement of existing pensioners as noted

above. Hence, this liability cannot be passed on to the consumers,

through tariff.

Page 139: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxxxix

d) The Commission has considered the energy availability from

Sharavathi generating station as projected by the KPCL, after the fire

accident and the same is factored in the power purchase cost of

BESCOM.

In view of the above, the Commission is unable to accept the

application for approval of additional ARR towards pension and gratuity

of the said pensioners. Accordingly, the said application stands

disposed of.

Page 140: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxl

CHAPTER – 6

DETERMINATION OF TARIFF FOR FY17

6.0 BESCOM’S Proposal and Commission’s Analysis for FY17:

6.1 Tariff Application

As discussed in the preceding Chapters, BESCOM has projected an

unmet gap in revenue of Rs.2810.01 Crores for FY17. In order to bridge

this gap in revenue, BESCOM, in its Tariff Application, has proposed a

tariff increase of 102 paise per unit in respect of all the categories of

consumers.

6.2 Statutory Provisions guiding determination of Tariff

As per Section 61 of the Electricity Act 2003, the Commission is guided

inter-alia, by the National Electricity Policy, the Tariff Policy and the

following factors, while, determining the tariff so that,

the distribution and supply of electricity are conducted on

commercial basis;

competition, efficiency, economical use of resources, good

performance, and optimum investment are encouraged;

the tariff progressively reflects the cost of supply of electricity, and also

reduces and eliminates cross subsidies within the period to be

specified by the Commission;

efficiency in performance is to be rewarded : and

that a multi-year tariff framework is adopted:

Section 62(5) of the Electricity Act 2003, read with Section 27(1) of the KER

Act 1999, empowers the Commission to specify, from time to time, the

methodologies and the procedure to be observed by the licensees in

calculating the Expected Revenue from Charges (ERC). The Commission

determines the Tariff in accordance with the Regulations and the Orders

issued by the Commission from time to time.

Page 141: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxli

6.3 Consideration for Tariff setting:

The Commission has considered the following relevant factors for

determination of retail supply tariff:

a) Tariff Philosophy:

As discussed in the earlier tariff orders, the Commission continues to

fix tariff below the average cost of supply for consumers whose ability

to pay is considered inadequate and fix tariff at or above the

average cost of supply for categories of consumers whose ability to

pay is considered to be higher. As a result the system of cross subsidy

continues. However, the Commission has taken due care to

progressively bring down the cross subsidy levels as envisaged in the

Tariff Policy of the Government of India.

b) Average Cost of Supply:

The Commission has been determining the retail supply tariff on the

basis of the average cost of supply. The KERC (Tariff) Regulations,

2000 require the licensees to provide details of embedded cost of

electricity voltage / consumer category-wise. The distribution

network of Karnataka is such that, it is difficult to segregate the

common cost between voltage levels. Therefore, the Commission

has decided to continue the average cost of supply approach for

recovery of the ARR. With regard to the indication of voltage- wise

cross subsidy with reference to the voltage wise cost of supply, the

decision of the Commission is noted in the subsequent para of this

Chapter.

c) Differential Tariff:

Beginning with its tariff order dated 25th November, 2009, the

Commission has been determining differential retail supply tariff for

consumers in urban and rural areas. The Commission decides to

continue the same in the present order also.

Page 142: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlii

6.4 New Tariff Proposals by BESCOM

BESCOM, in its tariff application has made the following new proposals:

1. Increase in Fixed Charges:

BESCOM has proposed to increase the fixed cost by Rs.10/- (Rupees Ten

only) Per KVA/HP/KW for all the consumers.

Commission’s Analysis and decisions:

On an analysis of the revenue at existing tariff of BESCOM, the

Commission notes that the total amount of fixed charges likely to be

recovered on the projected sales works out to Rs.1682.09 Crores for FY17.

Whereas as per the approved ARR of BESCOM for FY17, the fixed cost to

be incurred in each of the activity in generation, transmission and

distribution is as follows:

Amount in Rs. Crores

Activity Total Fixed Cost

to be incurred

Generation 2547.69

Transmission including

SLDC charges

1496.39

Distribution network cost 1221.06

Total Fixed cost 5265.14

From the above analysis that, as against the total fixed expenditure of

Rs.5265.14 Crores, BESCOM is able to collect the fixed expenditure only

to an extent of Rs.1682.09 Crores, in the form of fixed charges, at the

existing rates. This accounts for recovery of only 31.95% Fixed Charges.

The remaining 68.05% is being recovered in the form of energy charges,

which is not an efficient methodology of recovery of fixed expenditure.

As per the new Tariff Policy issued by the Ministry of Power, Government

of India, dated 28th January, 2016, two-part Tariff featuring separate fixed

and variable charges shall be introduced for all consumers. In order to

ensure to ensure their financial viability it is imperative that the fixed

expenditure incurred by the ESCOMs are recovered in the form of fixed

charges. On study of the existing rate of fixed charges levied on the

Page 143: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxliii

consumers and the amount collected thereon, it is observed that fixed

charges needs to be increased gradually to meet the above objective.

Hence the Commission hereby decides to provide for collection of

additional fixed charge of Rs.5/- per KW/HP per month from the

Domestic and LT Industrial consumers and RS.10/- per KW /HP/ KVA per

month from all the other categories of consumers. This would enable the

BESCOM to recover an additional amount towards the fixed charges to

an extent of Rs. 196.00 Crores and the projected total recovery of fixed

charges would be Rs.1878.09 Crores for FY17, which accounts for 35.67%

of the total fixed charges incurred.

2. Telescopic Tariff – Domestic sector:

BESCOM has proposed telescopic tariff in respect of domestic

consumers as follows:

1. Rs.2.70 per unit up to 30 units.

2. Rs.3.50 for all the units consumed in the month, if the consumption

exceeds 30 units and up to 50 units.

3. Rs.4.80 for all the units consumed in the month, if the consumption

exceeds 50 units and up to 200 units.

4. Rs.5.40 for all the units consumed in the month, if the consumption

exceeds 200 units and up to 300 units.

5. Rs.5.75 for all the units consumed in the month, if the consumption

exceeds 300 units and up to 400 Units.

6. Rs.5.95 for all the units consumed in the month, if the consumption

exceeds 400 units and up to 500 Units.

7. Energy charges of Rs.6.10 per unit for consumption exceeding 500

units in a month.

Commission’s Analysis and decisions:

The Commission in its preliminary observations had sought the details of

the financial implication of the proposal and directed BESCOM to seek

the opinion of other ESCOMs on the proposal. BESCOM has not furnished

the details of the financial implication and thereby has not justified the

Page 144: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxliv

proposal. The other ESCOMs have not submitted any such proposal in

their applications. Further, the Commission is of the view that, any

change in approach on fixation of tariff for any particular category,

should not result in tariff shock to the consumers. Hence, the Commission

is unable to accept the proposal of BESCOM to introduce telescopic tariff

to the domestic consumers and decides to retain the existing tariff

structure.

3. Voltage class-wise Tariff for HT consumers:

BESCOM has proposed to introduce voltage class -wise tariff for HT

consumers by increasing the demand charges by to Rs.250 per KVA for

all HT categories and by Rs.10 per KW/HP for all LT categories and

reducing the energy charges correspondingly. It was stated that this will

enable BESCOM to increase the sales and revenue.

The Commission in its preliminary observations had sought the details of

the financial implication on the proposal. But BESCOM has not furnished

the required information and also has not justified the proposal. Hence,

in the absence of any scientific study to justify the proposal and also in

the absence of the required information, the Commission is unable

accept the proposal of BESCOM.

Page 145: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlv

4. Billing on KvAH basis to EHT/HT consumers:

BESCOM has proposed to introduce KvAH billing in place of the present

system of billing on KWH basis in respect of EHT and HT consumers with a

view to reduce the distribution losses encourage efficient consumption

of electricity by consumes, lower electricity bill of the consumers and

reduce BESCOM’s energy requirement.

In order to estimate the category-wise KvAh consumption and its impact

on revenue/ consumer tariff/ cross subsidy, the Commission, in its

preliminary observations, requested BESCOM to furnish the KvAh

consumption data of all its HT consumers for FY13 to FY15 and FY16 up to

November, 2015 and to rework the financial implication for FY17, on the

proposed billing on KvAh basis for all the HT consumers. This data was

sought to analyse the impact of proposal both on the revenues of the

licensee as well as the monthly bills of the consumers. However, the

required information has not been furnished by BESCOM. Hence, in the

absence of any scientific study and failure on the part of BESCOM to

furnish the required data along with the financial implications, the

Commission is unable to take any decision in the matter and hence

decides to continue the existing Kwh billing system, for all the HT

consumers.

5. Introduction of morning peak from 6 AM to 10 AM under ToD billing

BESCOM has proposed to introduce ToD billing for morning peak

between 6 AM to 10AM, to consumers currently covered under the ToD

system of billing. The Commission, while communicating its preliminary

observations, had sought the details of the revenue impact of the

existing ToD billing and also by inclusion of the proposed morning peak

period. BESCOM has not furnished the required data/ revenue impact as

required by the Commission.

Page 146: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlvi

Hence, in the absence of data and analysis of revenue impact to justify

the proposal, the Commission is unable accept the proposal of BESCOM.

6. Other proposals:

BESCOM has made the following other proposals:

a) Charge higher tariff to Kalyana Mantapas, where luxurious and

expensive marriages are taking place.

b) Extend concessional tariff to RO drinking water supply units.

c) Withdraw Solar Rebate.

d) Gateway charges for online payment to be borne by BESCOM for the

bill amounts up to Rs.10,000.

The Commission has examined the above proposals and notes that the

new proposals are not properly justified with financial implications and

hence, decides not to accept the proposals made.

6.5 Revenue at existing tariff and deficit for FY17:

The Commission in its preceding Chapters has decided to carry forward

the gap in revenue of Rs.11.21.Crores of FY15 to the ARR of FY17. The

gap in revenue for FY17 is proposed to be filled up by revision of Retail

Supply Tariff, as discussed in the following paragraphs of this Chapter.

Considering the approved ARR for FY17 and the revenue as per the

existing tariff, the gap in revenue for FY17 is as follows:

Page 147: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlvii

TABLE – 6.1

Revenue Deficit for FY17

Amount Rs. in Crores

Particulars Amount

Approved Net ARR for FY17 including gap of FY15 15764.97

Revenue at existing tariff 14497.35

Surplus / deficit (1267.62)

Additional Revenue to be realised by Revision of

Tariff

1267.62

Accordingly, in this Chapter, the Commission has proceeded to

determine the Retail Supply Tariff for FY17. The category-wise tariff as

existing, as proposed by BESCOM and as approved by the Commission is

as follows:

1. LT-1 Bhagya Jyothi:

The existing tariff and the tariff proposed by BESCOM are given below:

Sl.

No

Details Existing as per 2015

Tariff Order

Proposed by BESCOM

1 Energy charges

(including recovery

towards service main

charges)

559 Paise / Unit Subject

to a monthly minimum

of Rs.30 per installation

per month.

661 Paise / Unit Subject

to a monthly minimum

of Rs.30 per installation

per month.

Commission’s Views/ Decision

The Government of Karnataka has continued its policy of providing free

power to all BJ/KJ consumers, whose consumption is not more than 18

units per month. Based on the present average cost of supply, the tariff

payable by these BJ/KJ consumers is revised to Rs.5.96 per unit.

Further, the ESCOMs have to claim subsidy for only those consumers who

consume 18 units or less per month per installation. If the consumption

Page 148: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlviii

exceeds 18 units per month or any BJ/KJ installation is found to have

more than one out- let, it shall be billed as per the Tariff Schedule LT 2(a).

The Commission determines the tariff (CDT) in respect of BJ / KJ

installations as follows:

LT – 1 Approved Tariff for BJ / KJ installations

Commission determined Tariff Retail Supply Tariff

determined by the

Commission

596 paise per unit,

Subject to a monthly minimum of

Rs.30 per installation per month.

-Nil-

Fully subsidized by GoK

*Since GOK is meeting the full cost of supply to BJ / KJ, the Tariff payable by these

Consumers is shown as nil. However, if the GOK does not release the subsidy in

advance, a Tariff of Rs.5.96 per unit subject to a monthly minimum of Rs.30 per

installation per month shall be demanded and collected from these consumers.

Note: If the consumption exceeds 18 units per month or any BJ/KJ

installation is found to have more than one light point being used,

it shall be billed as per Tariff Schedule LT 2(a).

2. LT2 - Domestic Consumers:

LT2 (a) Domestic Consumers:

BESCOM’s Proposal:

The details of the existing and proposed tariff under this category are

given in the Table below:

Page 149: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxlix

Proposed Tariff for LT-2 (a)

LT-2 a (i) Domestic Consumers Category

Applicable to areas coming under Bruhat Bangalore Mahanagara Palike

(BBMP), Municipal Corporations and all Urban Local Bodies

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed Charges

per Month

For the first KW Rs.25 For the first KW Rs.25

For every additional KW Rs.35 For every additional KW Rs.35

Energy

Charges

0-30 units

(life line

Consumption )

0 to 30 units:270 paise/unit 0 to 30 units: 372 paise/unit

Energy

Charges

exceeding 30

units per month

31 to 100 units:400 paise/unit 31 to 100 units: 502 paise

/ unit

101 to 200 units:540 paise

/unit

101 to 200 units:642 paise

/unit

Above 200 units:640 paise

/unit

Above 200 units:742 paise

/unit

LT-2(a) (ii) Domestic Consumers Category

Applicable to Areas under Village Panchayats

Details Existing as per 2015 Tariff Order

Proposed by BESCOM

Fixed charges per

Month

For the first KW Rs.15 For the first KW Rs.15

For every additional KW

Rs.25

For every additional

KW Rs.25

Energy Charges

0-30 units ( life line

Consumption )

0 to 30 units:260 paise

/unit

0 to 30 units:362 paise

/unit

Energy Charges

exceeding 30 Units

per month

31 to 100 units:370 paise

/ unit

31 to 100 units:472 paise

/ unit

101 to 200 units: 510 paise

/unit

101 to 200 units: 612 paise

/unit

Above 200 units: 590 paise

/unit

Above 200 units:692 paise

/unit

Commission’s decision

Page 150: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cl

The Commission decides to continue the two tier tariff structure in

respect of the domestic consumers as shown below:

(i) Areas coming under Bruhat Bangalore Mahanagara Palike (BBMP)

Area, Municipal Corporations and all Urban Local Bodies.

(ii) Areas under Village Panchayats.

The Commission approves the tariff for this category as follows:

Approved Tariff for LT 2 (a) (i) Domestic Consumers Category:

Applicable to Areas coming under Bruhat Bangalore Mahanagara

Palike (BBMP) Municipal Corporations and all Urban Local Bodies

Details Tariff approved by the

Commission

Fixed charges per Month For the first KW: Rs.30/-

For every additional KW Rs.40/-

Energy Charges up to 30 units per

month (0-30 units)-life line consumption.

Upto 30 units: 300 paise/unit

Energy Charges in case the

consumption exceeds 30 units per

month

31 to 100 units:440 paise/unit

101 to 200 units:590 paise/unit

Above 200 units: 690 paise/unit

Approved Tariff for LT-2(a) (ii) Domestic Consumers Category:

Applicable to Areas under Village Panchayats

Details Tariff approved by the Commission

Fixed Charges per Month For the first KW: Rs.20/-

For every additional KW Rs.30/-

Energy Charges up to 30

units per month (0-30 Units)-

Lifeline Consumption

Upto 30 units: 290 paise/unit

Energy Charges in case the

consumption exceeds 30

units per month

31 to 100 units: 410 paise/unit

101 to 200 units: 560 paise/unit

Above 200 units: 640 paise/unit

LT2 (b) Private and Professional Educational Institutions & Private Hospitals

and Nursing Homes:

BESCOM’s Proposal:

Page 151: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cli

The details of the existing and the proposed tariff by BESCOM under this

category are given in the Table below:

LT 2 (b) (i) Applicable to areas under BBMP, Municipal Corporations

Areas and all urban Local Bodies

Details Existing as per 2015 Tariff Order Proposed by BESCOM

Fixed

Charges per

Month

Rs.35 Per KW subject to a

minimum of Rs.65 per month

Rs.35 Per KW subject to a

minimum of Rs.65 per

month

Energy

Charges

For the first 200 units 600

paise per unit

For the first 200 units 702

paise per unit

For the balance units 720

paise per unit

For the balance units 822

paise per unit

LT 2 (b)(ii) Applicable to Areas under Village Panchayats

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed

Charges per

Month

Rs.25 per KW subject to a

minimum of Rs.50 per Month

Rs.25 per KW subject to a

minimum of Rs.50 per Month

Energy

Charges

For the first 200 units: 550

paise per unit

For the first 200 units:652

paise per unit

For the balance units: 670

paise per unit

For the balance units:772

paise per unit

Commission’s decision

As in the previous Tariff Order the Commission decides to continue the

two tier tariff structure as below:

(i) Areas coming under BBMP, Municipal Corporation and all urban local

bodies.

(ii) Areas under Village Panchayats.

Approved Tariff for LT 2 (b) (i) Private Professional and other private

Educational Institutions, Private Hospitals and Nursing Homes

Applicable to areas under BBMP, Municipal Corporations and all other

urban Local Bodies.

Details Tariff approved by the Commission

Fixed Charges per Month Rs.45 per KW subject to a minimum of Rs.75

Page 152: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clii

per Month

Energy Charges 0-200 units: 625 paise/unit

Above 200 units: 745 paise/unit

Approved Tariff for LT 2 (b) (ii) Private Professional and other private Educational

Institutions, Private Hospitals and Nursing Homes

Applicable in Areas under Village Panchayats

Details Tariff approved by the Commission

Fixed Charges per Month Rs.35 per KW subject to a minimum of Rs.60 per

Month

Energy Charges 0-200 units: 570 paise/unit

Above 200 units: 690 paise/unit

Page 153: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cliii

3. LT3- Commercial Lighting, Heating & Motive Power:

BESCOM’s Proposal:

The existing and proposed tariff is as follows:

LT- 3 (i) Commercial Lighting, Heating & Motive Power

Applicable in Areas coming under BBMP, Municipal Corporation

and urban local bodies

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Rs.40 per KW Rs.40 per KW

Energy Charges For the first 50 units:695

paise per unit

For the first 50 units:797 paise

per unit

For the balance units: 795

paise per unit

For the balance units: 897

paise per unit

Demand based tariff (optional) where sanctioned load is above 5 KW but

below 50 KW.

Details Existing as per 2015 Tariff Order Proposed by BESCOM

Fixed

charges

Rs.55 per KW Rs.55 per KW

Energy

Charges

For the first 50 units:695 paise

per unit

For the first 50 units: 797 paise

per unit

For the balance units:795 paise

per unit

For the balance units: 897

paise per unit

LT-3 (ii) Commercial Lighting, Heating & Motive

Applicable in areas under Village Panchayats

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed Charges per

Month

Rs.30 per KW Rs.30 per KW

Energy Charges For the first 50 units:645

paise per unit

For the first 50 units:747

paise per unit

For the balance units:745

paise per unit

For the balance units:847

paise per unit

Page 154: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cliv

Demand based tariff (optional) where sanctioned load is above 5 KW but

below 50 KW

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed Charges

per Month

Rs.45 per KW Rs.45 per KW

Energy Charges For the first 50 units:645

paise per unit

For the first 50 units:747

paise per unit

For the balance

units:745 paise per unit

For the balance units:847

paise per unit

Commission’s Views/ Decision

As in the previous Tariff Order, the Commission decides to continue to

two tier tariff structure as below:

(i) Areas coming under BBMP, Municipal Corporations and other

urban local bodies.

(ii) Areas under Village Panchayats.

Approved Tariff for LT- 3 (i) Commercial Lighting, Heating& Motive

Applicable to areas under BBMP, Municipal Corporations and other

Urban Local Bodies

Details Approved by the Commission

Fixed Charges per Month Rs.50 per KW

Energy Charges For the first 50 units: 715 paise/ unit

For the balance units: 815 paise/unit

Approved Tariff for Demand based tariff (Optional) where sanctioned

load is above 5 kW but below 50 kW

Details Approved by the Commission

Fixed Charges per

Month

Rs.65 per KW

Energy Charges For the first 50 units: 715 paise /unit

For the balance units: 815 paise/unit

Approved Tariff for LT-3 (ii) Commercial Lighting, Heating and Motive Applicable to areas under Village Panchayats

Details Approved by the Commission

Fixed charges per

Month

Rs.40 per KW

Energy Charges For the first 50 units: 665 paise per unit

Page 155: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clv

For the balance units: 765 paise per unit

Approved Tariff for Demand based tariff (Optional) where sanctioned

load is above 5 kW but below 50 kW

Details Approved by the Commission

Fixed Charges per

Month

Rs.55 per KW

Energy Charges For the first 50 units: 665 paise per unit

For the balance units: 765 paise per unit

4. LT4-Irrigation Pump Sets:

BESCOM’s Proposal:

The existing and proposed tariff for LT4 (a) is as follows:

LT-4 (a) Irrigation Pump Sets

Applicable to IP sets up to and inclusive of 10 HP

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Nil Nil

Energy charges CDT 238 paise per unit Free (In case GoK does not

release the subsidy in

advance, CDT of 340 paise

per unit will be demanded

and collected from

consumers)

Page 156: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clvi

Commission’s Decision

The Government of Karnataka has extended free supply of power to

farmers as per Government Order No.EN 55 PSR 2008 dated 04.09.2008.

As per this policy of GoK, the entire cost of supply to IP sets up to and

inclusive of 10 HP is being borne by the GoK through tariff subsidy. In view

of this, all the categories under the existing LT-4a tariff are covered under

free supply of power.

Considering the cross subsidy contribution from categories other than IP

Sets and BJ/KJ Categories, the Commission determines the tariff for IP

Sets under LT4(a) category as follows:

Approved CDT for IP Sets for FY17

Particulars BESCOM

Approved ARR in Rs. Crore 15764.97

Revenue from other than IP & BJ/KJ

installations in Rs. Crore 13808.27

Amount to be recovered from IP &

BJ/KJ installations in Rs. Crore 1956.70

Approved Sales to BJ/KJ installations in

MU 49.15

Revenue from BJ/KJ installations at

Average Cost of supply in Rs. crore 29.29

Amount to be recovered from IP Sets

category in Rs. crore 1927.41

Approved Sale to IP Sets in MU 6739.18

Commission Determined Tariff (CDT) for

IP set Category for FY17 in Rs/Unit 2.86

Accordingly, the Commission decides to approve tariff of Rs.2.86 per unit

as CDT for FY17 for IP Set category under LT4 (a). In case the GoK does

not release the subsidy in advance, a tariff of Rs.2.86 per unit shall be

demanded and collected from these consumers.

Approved by the Commission

Page 157: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clvii

LT-4 (a) Irrigation Pump Sets

Applicable to IP sets up to and inclusive of 10 HP

Details Approved by the Commission

Fixed charges per Month

Energy charges

Nil*

CDT (Commission Determined Tariff):

286 paise per unit

* In case the GoK does not release the subsidy in advance, a tariff of

Rs.2.86 per unit shall be demanded and collected from these

consumers.

PAYMENT OF SUBSIDY BY GOVERNMENT OF KARNATAKA FOR FY17:

Several consumers and stakeholders who participated in the Public

Hearing held by the Commission have expressed that the ESCOMs may

be showing part of their technical losses against IP set consumption by

inflating the number of live pump sets, in order to report technical losses

lower than the actual losses prevailing in the distribution system. Further,

they have also expressed that there are many defunct, non-working/idle

IP sets provided to both open wells and bore wells which have dried up

and the same have not been identified / deleted from the ledger

accounts by the ESCOMs and that the ESCOMs, however, are treating

these IP sets as live IP set installations and claiming subsidy from the

Government, which needs to be stopped immediately. They have

requested the Commission to direct the ESCOMs to take up enumeration

of IP sets in their jurisdiction to identify defunct/dried up wells and un-

authorized IP sets in the field and take necessary action to arrive at the

correct number of IP sets in their account on the basis of the

enumeration report. The Commission is also of the view that IP sets of

defunct /dried up wells should be deleted in the accounts of the

ESCOMs in order to reflect exact numbers of live IP sets and its usage for

claiming subsidy from the Government and more importantly to assess

the performance of the ESCOMs.

The Commission has approved in respect of all the ESCOMs, a total ARR

of Rs.31,917.59 Crores for the FY17, which includes estimated revenue of

Page 158: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clviii

Rs.8,571.08 Crores against supply of 19,505.96 MU of power to 25,64,999

number of IP sets (excluding HRECS). The Commission is of the view that

the actual number of IP set installations would be far less than 25,64,999

approved for the FY17, if proper enumeration is carried out to ascertain

the correct number of IP sets by the ESCOMs. Therefore, the ESCOMs

need to immediately take up enumeration of IP sets to arrive at the

exact number of IP sets in use. The ESCOMs should note that the

quantum of sales to IP sets approved in ARR for FY17 is subject to APR

and the Commission will not accept such sales without being

substantiated in the manner specified by it.

The Commission has been issuing directives to ESCOMs for conducting

Energy Audit at the Distribution Transformer Centre (DTC)/feeder level to

enable detection and prevention of commercial losses. In view of

substantial progress in implementation of feeder segregation under NJY

scheme, the ESCOMs were also directed to submit IP set consumption on

the basis of the meter readings of the 11 kV feeders at the substation

level duly deducting the energy losses in 11kV lines, distribution

transformers & LT lines, in order to compute the consumption of power by

IP sets accurately. In this regard, the Commission has noted that the

ESCOMs have complied partly with these directions and they have

initiated measures to achieve full compliance. The ESCOMs need to

ensure full compliance as this has direct impact on their revenues and

tariff payable by other categories of consumers.

For the forgoing reasons, the Commission directs the ESCOMs as follows:

1) The ESCOMs shall manage supply of power to the IP sets for the FY17,

so as to ensure that it is within the quantum of subsidy committed by

the GoK. They shall procure power which is proportional to such

supply. In case the ESCOMs opt to supply power to the IP sets in

excess of the quantum corresponding to the amount of subsidy the

GoK has assured to be released for FY17, the difference in the

amount of subsidy relating to such supply shall be claimed from the

Page 159: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clix

GoK. If the difference in subsidy is not paid by the GoK, the same has

to be collected from the IP set consumers.

2) The ESCOMs shall, immediately take up enumeration of IP sets, 11kV

feeder wise by capturing the GPS co-ordinates namely longitude,

latitude and altitude of each live IP set in their jurisdiction and

complete this process within six months from the date of this Order

and submit the list of 11 kV feeder-wise IP sets’ census with GPS co-

ordinates to the Commission, on or before 15th October, 2016. The

Commission would accordingly revise the number of IP sets and its

consumption for the FY17.

3) The ESCOMs shall compute the specific consumption and total sale of

energy to IP sets considering the month-wise energy input to 11 kV

segregated agricultural feeders at the substation duly deducting the

energy losses prevailing in 11 kV lines, DTCs & LT Lines and submit to

the Commission, the monthly DTC wise/ feeder-wise energy audit

reports regularly in the formats prescribed by the Commission, before

15th of succeeding month.

Pending compliance of the directives contained in (2) and (3) above,

the Commission hereby advises the Government to release only 90% of

the subsidy allocated for FY17. The Commission will advise the

Government, in the last quarter of the financial year to release the

balance 10% of subsidy for the year, on satisfactory compliance of the

above directives.

LT4 (b) Irrigation Pump Sets above 10 HP:

BESCOM’s Proposal

The Existing and proposed tariff for LT-4(b) is as follows:

Page 160: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clx

LT-4 (b) Irrigation Pump Sets:

Applicable to IP Sets above 10 HP

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Rs.30 per HP Rs.30 per HP

Energy charges for

the entire

consumption

240 paise per unit 342 paise per unit

The existing and proposed tariff for LT4(c) is as follows:

LT-4 (c) (i) Irrigation Pump Sets:

Applicable to Private Horticultural Nurseries, Coffee, Tea & Rubber

plantations up to & inclusive of 10 HP

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Rs.20 per HP Rs.20 per HP

Energy charges for

the entire

consumption

240 paise per unit 342 paise per unit

LT-4 (c) (ii) Irrigation Pump Sets:

Applicable to Private Horticultural Nurseries, Coffee, Tea & Rubber

plantations above 10 HP

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Rs.30 per HP Rs.30 per HP

Energy charges for

the entire

consumption

240 paise per unit 342 paise per unit

Page 161: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxi

Approved Tariff:

The Commission decides to revise the tariff in respect of these categories

as shown below:

LT-4 (b) Irrigation Pump Sets:

Applicable to IP Sets above 10 HP

Fixed charges per Month Rs.40 per HP

Energy charges for the entire

consumption

280 paise/unit

LT4(c) (i) Irrigation Pump Sets:

Applicable to Horticultural Nurseries,

Coffee, Tea & Rubber plantations up to & inclusive of 10 HP

Fixed charges per Month Rs.30 per HP

Energy charges 280 paise / unit

LT4 (c)(ii) Irrigation Pump Sets

Applicable to Horticultural Nurseries, Coffee, Tea& Rubber plantations

above 10 HP

Fixed charges per Month Rs.40 per HP

Energy charges 280 paise/unit

5. LT5 Installations-LT Industries:

BESCOM’s Proposal:

The existing and proposed tariffs are given below:

LT-5 (a) LT Industries:

Applicable to Bruhat Bangalore Mahanagara Palike (BBMP) and

Other Municipal Corporation areas

i) Fixed charges

Details Existing as per 2015 Tariff Order Proposed by BESCOM

Fixed

charges

per Month

i) Rs. 30 per HP for 5 HP &

below

ii) Rs. 30 per HP for above 5 HP

& below 40 HP

iii) Rs. 40 per HP for 40 HP &

above but below 67 HP

iv)Rs. 110 per HP for 67 HP &

above

i) Rs. 30 per HP for 5 HP & below

ii) Rs. 30 per HP for above 5 HP &

below 40 HP

iii) Rs. 40 per HP for 40 HP &

above but below 67 HP

iv)Rs. 110 per HP for 67 HP &

above

Demand based Tariff (Optional)

Details Description Existing Tariff as per

2015 Tariff Order

Proposed by

BESCOM

Fixed

Charg

Above 5 HP and less

than 40 HP

Rs.50 per KW of billing

demand

Rs.50 per KW of

billing demand

Page 162: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxii

es per

Month

40 HP and above but

less than 67 HP

Rs.70 per KW of billing

demand

Rs.70 per KW of

billing demand

67 HP and above Rs.160 per KW of

billing demand

Rs.160 per KW of

billing demand

ii) Energy Charges

Details Existing as per 2015

Tariff Order

Proposed by BESCOM

For the first 500 units 490 paise per unit 592 paise/ unit

For the balance

units

600 paise per unit 702 paise /unit

LT-5 (b) LT Industries:

Applicable to all areas other than those covered under LT-5(a)

i) Fixed charges

Demand based Tariff (optional)

Details Description Existing Tariff as per

2015 Tariff Order

Proposed by

BESCOM

Fixed Charges per Month

Above 5 HP and

less than 40 HP

Rs.45 per KW of

billing demand

Rs.45 per KW of

billing demand

40 HP and above

but less than 67 HP

Rs.60 per KW of

billing demand

Rs.60 per KW of

billing demand

67 HP and above Rs.150 per KW of

billing demand

Rs.150 per KW of

billing demand

ii) Energy Charges

Details Existing as per 2015

Tariff Order

Proposed by BESCOM

For the first 500 units 470 paise per unit 572 paise/ unit

For the next 500

units

550 paise per unit 652 paise/ unit

For the balance

units

580 paise per unit 682 paise/ unit

Details Existing as per 2015 Tariff Order Proposed by BESCOM Fixed Charges per Month

i)Rs.25 per HP for 5 HP &

below

ii) Rs.30 per HP for above 5 HP

& below 40 HP

iii) Rs.35 per HP for 40 HP &

above but below 67 HP

iv)Rs.100 per HP for 67 HP &

above

i) Rs.25 per HP for 5 HP

& below

ii) Rs.30 per HP for

above 5 HP &

below 40 HP

iii) Rs.35 per HP for 40 HP

& above but below

67 HP

iv)Rs.100 per HP for 67

HP & above

Page 163: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxiii

Existing ToD Tariff for LT5 (a) & (b): At the option of the consumers

ToD Tariff

Time of Day Increase (+ )/ reduction (-) in energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-) 125 paise per unit

06.00 Hrs to 18.00 hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 paise per unit

Proposed ToD Tariff for LT5 (a) & (b): At the option of the consumers

ToD Tariff

Time of Day Increase (+ )/ reduction (-) in energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-) 125 paise per unit

06.00 Hrs to 18.00 hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 paise per unit

Commission’s Decision:

Time of the Day Tariff:

The decision of the Commission in its earlier Tariff Orders, providing for

mandatory Time of Day Tariff for HT2(a), HT2(b) and HT2(c) consumers

with a contract demand of 500 KVA and above is continued. The

optional ToD will continue as existing for HT2(a), HT2(b) and HT2(c)

consumers with contract demand of less than 500 KVA. Further, for LT5

and HT1 consumers, the optional ToD is continued as existing.

The Commission has decided to continue with two tier tariff structure

introduced in the previous Tariff Orders, which are as follows:

i) LT5 (a): For areas falling under BBMP and Municipal Corporations

ii) LT5 (b): For areas other than those covered under LT5 (a) above.

Approved Tariff:

The Commission approves the tariff under LT 5 (a) and LT 5 (b) as given

below:

Approved Tariff for LT 5 (a):

Applicable to areas under BBMP and other Municipal Corporations

Page 164: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxiv

i) Fixed charges

Details Approved by the Commission

Fixed

Charges per

Month

i) Rs.35 per HP for 5 HP & below

ii) Rs.35 per HP for above 5 HP & below 40 HP

iii) Rs.45 per HP for 40 HP & above but below 67 HP

iv) Rs.110 per HP for 67 HP & above

Demand based Tariff (optional)

Fixed

Charges per

Month

Above 5 HP and less than 40

HP

Rs.55 per KW of billing

demand

40 HP and above but less

than 67 HP

Rs.75 per KW of billing

demand

67 HP and above Rs.160 per KW of billing

demand

ii) Energy Charges

Details Approved by the Commission

For the first 500 units 510 paise/unit

For the balance units 630 paise/ unit

Approved Tariff for LT 5 (b):

Applicable to all areas other than those covered under LT-5(a)

i) Fixed charges

Details Approved Tariff

Fixed

Charges

per Month

i) Rs.30 per HP for 5 HP & below

ii) Rs.35 per HP for above 5 HP & below 40 HP

iii) Rs.40 per HP for 40 HP & above but below 67 HP

iv)Rs.100 per HP for 67 HP & above

ii) Demand based Tariff (optional)

Details Description Approved Tariff

Fixed Charges per

Month

Above 5 HP and

less than 40 HP

Rs.50 per KW of billing

demand

40 HP and above

but less than 67 HP

Rs.65 per KW of billing

demand

67 HP and above Rs.150 per KW of billing

demand

iii) Energy Charges

Details Approved tariff

For the first 500 units 485 paise/ unit

Page 165: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxv

For the next 500 units 570 paise/ unit

For the balance units 600 paise/unit

Approved ToD Tariff for LT5 (a) & (b): At the option of the consumers

ToD Tariff

Time of Day Increase (+ )/ reduction (-) in energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-)125 paise per unit

06.00 Hrs to 18.00 hrs 0

18.00 Hrs to 22.00 Hrs (+)100 paise per unit

Page 166: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxvi

6. LT6 Water Supply Installations and Street Lights:

BESCOM’s Proposal:

The existing and the proposed tariffs are given below:

LT-6(a) : Water Supply

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges per

Month

Rs.35/HP/month Rs.35/HP/month

Energy charges 340 paise/unit 442 paise/unit

LT-6 (b) : Public Lighting

Details Existing as per 2015 Tariff

Order

Proposed by BESCOM

Fixed charges

per Month

Rs.50/KW/month Rs.50/KW/month

Energy charges 500 paise/unit 602 paise/unit

The Commission approves the tariff for these categories are as follows:

Tariff Approved by the Commission for LT-6 (a): Water supply

Details Approved Tariff

Fixed Charges per

Month

Rs.45 /HP/month

Energy charges 390 paise/unit

Tariff Approved by the Commission for LT-6 (b): Public Lighting

Details Approved Tariff

Fixed charges per

Month

Rs.60 /KW/month

Energy charges 550 paise/unit

Energy charges

for LED / Induction

Lighting

450 paise/unit

7. LT 7- Temporary Supply & Advertising Hoardings:

BESCOM’s Proposal:

The existing rate and the rate proposed are given below:

Page 167: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxvii

Temporary Supply

a) Less than 67

HP:

Energy charge at 900

paise per unit subject

to a weekly minimum

of Rs.160 per KW of

the sanctioned load.

Energy charge at 1002 paise

per unit subject to a weekly

minimum of Rs.160 per KW of

the sanctioned load.

TARIFF SCHEDULE LT-7(b)

Applicable to Hoardings & Advertisement boards

a) Less than 67

HP:

Energy charge at 900

paise per unit subject

to a weekly minimum

of Rs.40 per KW/

month of the

sanctioned load.

Energy charge at 1002 paise

per unit subject to a weekly

minimum of Rs.40 per KW/

month of the sanctioned load.

Commission’s decision

As decided in the previous Tariff Order, the tariff specified for installations

with sanctioned load / contract demand above 67 HP shall be covered

under the HT temporary tariff category under HT5.

With this, the Commission decides to approve the tariff for LT-7 category

as follows:

Details Existing as per 2015

Tariff Order

Proposed by BESCOM

Details Existing as per 2015

Tariff Order

Proposed by BESCOM

Page 168: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxviii

TARIFF SCHEDULE LT-7(a)

Applicable to Temporary Power Supply for all purposes.

LT 7(a) Details Approved Tariff

Temporary Power

Supply for all

purposes.

Less than 67 HP:

Energy charges at 950 paise / unit

subject to a weekly minimum of Rs.170

per KW of the sanctioned load.

TARIFF SCHEDULE LT-7(b)

Applicable to Hoardings & Advertisement boards, Bus Shelters with

Advertising Boards, Private Advertising Posts / Sign boards in the interest

of public such as Police Canopy Direction boards, and other sign boards

sponsored by Private Advertising Agencies / firms on permanent

connection basis.

LT 7(b) Details Approved Tariff

Power supply on

permanent

connection basis

Less than 67 HP:

Fixed Charges at Rs.50 per KW / month

& Energy charges at 950 paise / unit

H.T. Categories:

Time of Day Tariff (ToD)

The Commission decides to continue the mandatory Time of Day Tariff

for HT2 (a), HT (b) and HT2(c) consumers with a contract demand of 500

KVA and above. Further, the optional ToD will continue as existing for

HT2 (a), HT (b) and HT2 (b) consumers with contract demand of less than

500 KVA. The details of ToD tariff are indicated under the respective

tariff category.

8. HT1- Water Supply & Sewerage

BESCOM’s Proposal:

The existing and proposed tariff are as given below:

The Existing and the proposed tariff – HT-1 Water Supply and Sewerage

Installations

Sl. Details Existing tariff as per 2015 Proposed Tariffs

Page 169: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxix

No. Tariff Order

1 Demand

charges

Rs.180 / kVA of billing

demand / month

Rs.180 / kVA for billing

demand / month

2 Energy charges 410 paise per unit 512 paise per unit

Existing ToD tariff to HT-1 tariff to Water Supply & Sewerage installations at the option of the consumer

22.00 Hrs to 06.00 Hrs next day (-) 125 Paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 Paise per unit

Proposed ToD Tariff to HT-1

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs next day (- ) 125 Paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 Paise per unit

Commission’s decision:

The Commission approves the tariff for HT 1 Water Supply & Sewerage category as below:

Details Approved Tariff for HT 1

Demand

charges

Rs.190 / kVA of billing demand / month

Energy charges 450 paise/ unit

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

Page 170: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxx

Approved ToD tariff to HT-1 tariff to Water Supply & Sewerage

installations at the option of the consumer

22.00 Hrs to 06.00 Hrs next day (-)125 paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+)100 paise per unit

9. HT2 (a) – HT Industries & HT 2(b) – HT Commercial

BESCOM’s Proposal:

The existing and proposed tariff are as given below:

Existing & proposed tariff – HT – 2 (a) (i) – HT Industries

Applicable to Bruhat Bangalore Mahanagara Palike (BBMP) & Municipal

Corporation area

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs. 180 / kVA of billing

demand / month

Rs. 180 / kVA of billing

demand / month

Energy charges

(i) For the first one

lakh units

(ii) For the

balance units

590 paise per unit

630 paise per unit

692 paise per unit

732 paise per unit

Existing & proposed tariff – HT – 2 (a) (ii) - HT Industries

Applicable to areas other than those covered under HT-2(a)(i)

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs. 170 / kVA of billing

demand / month

Rs. 170 / kVA of billing

demand / month

Energy charges

(iii) For the first one

lakh units

(iv) For the

balance units

585 paise per unit

615 paise per unit

687 paise per unit

717 paise per unit

Railway traction and Effluent Plants {both Under HT2 (a)(i) & HT2a(ii)}

Details Existing tariff as per Tariff

order 2015

Proposed by BESCOM

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

Page 171: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxi

Demand charges Rs. 180 / kVA at billing

demand / month

Rs. 180 / kVA of billing

demand / month

Energy charges 555 paise per unit for all the

units

657 paise per unit for all

the units

Existing ToD Tariff for HT-2(a)

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs next day (- )125 Paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 Paise per unit

Proposed ToD Tariff for HT-2(a)

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs next day (- ) 125 Paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 Paise per unit

Tariff for Metro Rail Corporation

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs. 180 / kVA of billing

demand / month

Rs. 180 / kVA of billing

demand / month

Energy charges 535 paise per unit for all the

units

637 paise per unit for all

the units

Page 172: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxii

Commission’s Decision:

Approved Tariff for HT – 2 (a) (i) :

The Commission approves the tariff for HT 2(a) category as below:

i) Approved Tariff for HT2(a)(i)

Applicable to areas under BBMP and Municipal Corporations

Details Tariff approved by the Commission

Demand charges Rs.190 / kVA of billing demand / month

Energy charges

For the first one lakh units 625 paise/ unit

For the balance units 675 paise/ unit

ii) Approved Tariff for HT – 2 (a) (ii)

Applicable to areas other than those covered under HT-2(a) (i)

Details Approved Tariff

Demand charges Rs.180 / kVA of billing demand / month

Energy charges

For the first one lakh units 620 paise/ unit

For the balance units 660 paise/ unit

iii) Railway Traction & Effluent Treatment Plants applicable to both HT2a(i) &

HT2 a(ii)

Details Tariff approved by the Commission

Demand charges Rs. 190 / kVA of billing demand / month

Energy charges 590 paise / unit for all the units

iv) Approved Tariff for Metro Rail Corporation

Details Tariff Approved by the Commission

Demand Charges Rs.190 per KVA of the billing

demand

Energy Charges for entire

consumption

570 paise per unit

Page 173: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxiii

10. HT-2 (b) HT Commercial

BESCOM’s Proposal:

The existing and proposed tariff are as given below:

Existing and proposed tariff HT – 2 (b) (i) HT Commercial

Applicable to BBMP & Municipal Corporation Area

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs.200 / kVA of billing

demand / month

Rs.200 / kVA of billing

demand / month

Energy charges

(i) For the first two

lakh units

755 paise per unit

857 paise per unit

(ii)For the balance

units

785 paise per unit 887 paise per unit

Existing and proposed tariff HT – 2 (b) (ii) HT Commercial

Applicable to areas other than those covered under HT-2(b) (i)

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs.190 / kVA of billing

demand / month

Rs.190 / kVA of billing

demand / month

Energy charges

(i) For the first two

lakh units

735 paise per unit

837 paise per unit

(ii)For the balance

units

765 paise per unit 867 paise per unit

Commission’s Decision

The Commission approves the following tariff for HT 2 (b) consumers:

Approved tariff for HT – 2 (b) (i)

Applicable to areas under BBMP & Municipal Corporations

Details Tariff approved by the Commission

Demand charges Rs.210 / kVA of billing demand / month

Energy charges

(i) For the first two lakh units 805 paise per unit

(ii) For the balance units 835 paise per unit

Approved tariff for HT – 2 (b) (ii) - HT Commercial

Applicable to all areas other than those covered under HT-2(b) (i) above

Page 174: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxiv

Details Tariff approved by the Commission

Demand charges Rs.200 / kVA of billing demand / month

Energy charges

(i) For the first two lakh units 785 paise per unit

(ii) For the balance units 815 paise per unit

Note: The above tariff under HT2 (b) is not applicable for construction of new

industries. Such power supply shall be availed under the temporary

category HT5.

11. HT – 2 (c) – Applicable to Hospitals and Educational Institutions:

The existing and proposed tariff are given below:

Existing and proposed tariff for HT – 2 (c) (i)

Applicable to Government Hospitals & Hospitals run by Charitable Institutions & ESI

Hospitals

and

Universities, Educational Institutions belonging to Government, Local Bodies and Aided

Institutions and Hostels of all Educational Institutions

Details Existing tariff as per Tariff

Order 2015

Proposed by BESCOM

Demand charges Rs.170 / kVA of billing

demand / month

Rs.170 / kVA of billing demand /

month

Energy charges

(i) For the first one

lakh units

560 paise per unit 662 paise per unit

(ii) For the balance

units

610 paise per unit 712 paise per unit

Page 175: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxv

Existing and proposed tariff for HT – 2 (c) (ii) –

Applicable to Hospitals and Educational Institutions other than those covered under

HT2(c) (i)

Details Existing tariff as per

Tariff Order 2015

Proposed by

BESCOM

Demand charges Rs. 170 / kVA of

billing demand /

month

Rs. 170 / kVA of

billing demand /

month

Energy charges

(i) For the first one lakh units 660 paise per unit 762 paise per unit

(ii) For the balance units 710 paise per unit 812 paise per unit

Commission’s Decision:

The Commission approves the following tariff for HT2(c) consumers.

Approved tariff for HT – 2 (c) (i)

Applicable to Government Hospitals, Hospitals run by Charitable Institutions, ESI

Hospitals,

Universities and Educational Institutions belonging to Government & Local Bodies, Aided

Educational Institutions and Hostels of all Educational Institutions

Details Approved Tariff

Demand charges Rs.180/ kVA of billing demand / month

Energy charges

(i) For the first one lakh units 600 paise per unit

(ii) For the balance units 650 paise per unit

Approved tariff for HT – 2 (c) (ii)

Applicable to Hospitals/Educational Institutions other than those covered under HT2(c)

(i)

Details Approved Tariff

Demand charges Rs.180 / kVA of billing demand / month

Energy charges

(i) For the first one lakh units 700 paise per unit

(ii) For the balance units 750 paise per unit

Approved ToD Tariff to HT-2(a), HT-2(b) and HT2(c)

Time of day Increase (+) / reduction (-) in the energy

charges over the normal tariff applicable

Page 176: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxvi

22.00 Hrs to 06.00 Hrs next day (- )125 Paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs (+) 100 Paise per unit

12. HT-3(a) Lift Irrigation Schemes under Government Departments /

Government owned Corporations/ Lift Irrigation Schemes under Pvt

./Societies:

The existing and proposed tariff are given below:

Existing and proposed tariff for HT – 3 (a) –Lift Irrigation Schemes

HT 3(a) (i) Applicable to LI Schemes under Government Departments /

Government owned Corporations

Details Existing charges as per Tariff

Order 2015

Proposed charges by

BESCOM

Energy

charges/

Minimum

charges

170 paise / unit

Subject to an annual minimum

of Rs.1000 per HP / annum

272 paise / unit

Subject to an annual

minimum of Rs. 1000

per HP / annum

HT 3(a) (ii) Applicable to Pvt. LI Schemes and Lift Irrigation Societies:

Fed through Express / Urban feeders

Details Existing Tariff as per Tariff

Order 2015

Proposed by BESCOM

Fixed charges Rs. 30 / HP / Month of

sanctioned load

Rs. 30 / HP / Month of

sanctioned load

Energy charges 170 paise / unit 272 paise / unit

HT 3(a) (iii) Applicable to Pvt. LI Schemes and Lift Irrigation Societies:

other than those covered under HT-3 (a)(ii)

Details Existing Tariff as per Tariff

Order 2015

Proposed by BESCOM

Fixed charges Rs.10 / HP / Month of

sanctioned load

Rs.10 / HP / Month of

sanctioned load

Energy charges 170 paise / unit 272 paise / unit

Commission’s Decision:

The Commission approves the following tariff for HT3(a) consumers:

Approved tariff for HT 3 (a) (i)

Applicable to LI schemes under Govt. Dept. / Govt. owned Corporations

Energy charges /

Minimum charges

200 paise/ unit

subject to an annual minimum of Rs. 1120

per HP / annum

Page 177: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxvii

Approved tariff for HT 3 (a) (ii)

Applicable to Private LI Schemes and Lift Irrigation Societies fed through

express / urban feeders

Fixed charges Rs.40 / HP / Month of sanctioned load

Energy charges 200 paise / unit

Approved tariff for HT 3 (a) (iii)

Applicable to Private LI Schemes and Lift Irrigation Societies other

than those covered under HT 3 (a) (ii)

Fixed charges Rs.20 / HP / Month of sanctioned load

Energy charges 200 paise / unit

13. HT3 (b) Irrigation & Agricultural Farms, Government Horticulture farms,

Private Horticulture Nurseries, Coffee, Tea, Coconut & Arecanut

Plantations:

BESCOM’s Proposal:

The existing and the proposed tariff are given below:

HT3 (b)- Irrigation & Agricultural Farms, Government Horticulture farms,

Private Horticulture Nurseries, Coffee, Tea, Coconut & Arecanut

Plantations:

Details Existing Tariff Order 2015 Proposed tariff by BESCOM

Energy charges /

minimum

charges

370 paise / unit

subject to an annual

minimum of Rs.1000 per HP

of sanctioned load

472 paise / unit

subject to an annual

minimum of Rs.1000 per HP

of sanctioned load

Commission’s Decision

The Commission approves the tariff for this category as indicated below:

Approved Tariff

HT3 (b)- Irrigation & Agricultural Farms, Government Horticulture farms,

Private Horticulture Nurseries, Coffee, Tea, Rubber, Coconut & Arecanut

Plantations:

Details Approved Tariff

Energy charges /

minimum charges

400 paise / unit

subject to an annual minimum

of Rs.1120 per HP of sanctioned

Page 178: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxviii

load

14. HT4- Residential Apartments/ Colonies:

BESCOM’s Proposal:

The existing and the proposed tariff for this category are given below:

Existing and proposed tariff for HT – 4 - Residential Apartments/ Colonies HT – 4 Applicable to all areas.

Details Existing Tariff Order 2015 Proposed tariff by BESCOM

Demand charges Rs.100 / kVA of billing

demand

Rs.100 / kVA of billing

demand

Energy charges 550 paise per unit 652 paise/ unit

Commission’s Decision

The Commission approves the tariff for this category as indicated below:

Approved tariff

HT – 4 Residential Apartments/ Colonies Applicable to all areas

Demand charges Rs.110 / kVA of billing demand

Energy charges 585 paise/ unit

15. TARIFF SCHEDULE HT-5

BESCOM’s Proposal:

The existing and the proposed tariffs are given below:

HT – 5 – Temporary supply

67 HP and above: Existing Proposed

Fixed charges /

Demand Charges

Rs.210/HP/month for the

entire sanction load /

contract demand

Rs.210/HP/month for the

entire sanction load /

contract demand

Energy Charge 900 paise / unit (weekly

minimum of Rs.160/- per

KW is not applicable)

1002 paise / unit (weekly

minimum of Rs.160/- per

KW is not applicable)

Commission’s Views/Decisions:

TARIFF SCHEDULE HT-5

(i) As approved in the Commission’s Tariff Order dated 6th May, 2013,

this Tariff is applicable to 67 HP and above hoardings and

Page 179: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxix

advertisement boards and construction power for industries

excluding those category of consumers covered under HT2 (b)

Tariff schedule availing power supply for construction power for

irrigation and power projects and also applicable to power supply

availed on temporary basis with the contract demand of 67 HP

and above of all categories.

Approved Tariff for HT – 5 – Temporary supply

67 HP and above: Approved Tariff

Fixed Charges /

Demand Charges

Rs.220 /HP/month for the entire sanction load /

contract demand

Energy Charges 950 paise / unit

(ii) The Commission in its Order dated 21st January, 2016 in OP

No.43/2015 has decided to allow HT temporary power supply to

Bangalore International Exhibition Centre on single part tariff of

Rs.10.00 per unit subject to a weekly minimum of Rs.200 per HP.

Now, in the present Tariff Order, the Commission decides to

continue the same under the new tariff schedule namely, HT-5 (a)

as detailed below:

TARIFF SCHEDULE HT-5 (a)

Applicable to power supply availed on temporary basis with the

contract demand of 67 HP and above by Bangalore International

Exhibition Centre.

Approved Tariff for HT-5(a) – Temporary supply

67 HP and above: Approved Tariff

Fixed Charges /

Demand Charges

Not Applicable

Energy Charges 1050 paise / unit

The Approved Tariff schedule for FY17 is enclosed in Annex – IV of this

Order.

6.6 Other Issues:

Page 180: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxx

6.6.1 Tariff for Green Power:

In order to encourage generation and use of green power in the State,

the Commission decides to continue the existing Green Tariff of 50 paise

per unit as the additional tariff over and above the normal tariff to be

paid by HT-consumers, who opt for supply of green power from out of

the renewable energy procured by distribution utilities over and above

their Renewable Purchase Obligation (RPO).

6.6.2 Determination of wheeling charges for FY17:

BESCOM in its tariff filing has proposed the wheeling charges

depending upon the point of injection and point of drawal, as

indicated below:

Injection Point HT LT

Drawal Point

HT 15.63 [3.79%] 52.12 [9.54%]

LT 52.12 [9.54%] 36.48 [5.75%]

Note: Figures in brackets are applicable loss.

BESCOM has stated that the above wheeling charges be made

applicable to all the Open Access/Wheeling transactions for using their

network, except for energy wheeled from NCE sources to the consumers

in the State.

Further, BESCOM in its tariff filing had requested the Commission not to

allow banking during summer months as the State is facing severe crisis

during summer months and the licensee is unable to mitigate the peak

demand. Under the above circumstances BESCOM has requested that

banking facility must not be extended for more than a month. The

Commission in its preliminary observations had directed BESCOM to

furnish necessary data in support of its proposal.

Page 181: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxi

BESCOM in their replies has stated that the issue was discussed in the

meeting held with Chairman, BESCOM, wherein it was informed that

drawing energy banked in other seasons during summer months will

burden BESCOM network to supply power to its own consumers and

therefore it has placed the above point before the Commission.

The Commission notes that BESCOM’s request to do away with banking

during summer months is not supported by any data analysis showing

financial impact or technical constraints. As such the Commission is

unable to consider the request of BESCOM in the matter.

The approach of the Commission regarding wheeling & banking charges

is discussed in the following paragraphs:

The Commission has considered the approved ARR pertaining to

distribution wires business and has proceeded to determine the wheeling

charges as detailed below:

6.6.3 Wheeling within BESCOM Area:

The allocation of the distribution network costs to HT and LT networks for

determining wheeling charges is done in the ratio of 30:70, as was being

done earlier. Based on the approved ARR for distribution business, the

wheeling charges to each voltage level is worked out as under:

TABLE – 6.2

Wheeling Charges

Distribution ARR-Rs. Crs 1221.06

Sales-MU 26472.74

Wheeling charges- paise/unit 46.13

Paise/unit

HT-network 13.84

LT-network 32.29

In addition to the above, the following technical losses are applicable to

all open access/wheeling transactions:

Loss allocation % loss

HT 3.68

LT 8.24 Note: Total loss is allocated to HT, LT & Commercial loss based on energy flow

diagram furnished by BESCOM.

Page 182: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxii

The actual wheeling charges payable (after rounding off) will depend

upon the point of injection and point of drawal as under:

paise/unit

Injection point

Drawal point

HT LT

HT 14[3.68%] 46 [11.92 %]

LT 46 [11.92%] 32 [8.24 %] Note: Figures in brackets are applicable loss

The wheeling charges as determined above are applicable to all the

open access or wheeling transactions for using the BESCOM network,

except for energy transmitted or wheeled from Renewable sources to

the consumers in the State.

6.6.4 WHEELING OF ENERGY USING TRANSMISSION NETWORK OR NETWORK OF

MORE THAN ONE LICENSEE

In case the wheeling of energy [other than RE sources wheeling to

consumers in the State] involves usage of Transmission network or

network of more than one licensee, the charges shall be as indicated

below:

i. If only transmission network is used, transmission charges

determined by the Commission shall be payable to the

Transmission Licensee.

ii. If the Transmission network and the ESCOMs’ network are used,

Transmission Charges shall be payable to the Transmission

Licensee. Wheeling Charges of the ESCOM where the power is

drawn shall be shared equally among the ESCOMs whose

networks are used.

Illustration:

If a transaction involves transmission network & BESCOM’s network and

100 units is injected, then at the drawal point the consumer is entitled for

Page 183: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxiii

85.03 units, after accounting for Transmission loss of 3.47% and BESCOM’s

technical loss of 11.92%.

The Transmission charge in cash as determined in the Transmission Tariff

order shall be payable to KPTCL and Wheeling charges of 46 paise per

unit shall be payable to BESCOM. In case more than one ESCOM is

involved the above 46 paise shall be shared by all the ESCOMs involved.

iii. If ESCOMs’ network only is used, the Wheeling Charges of the

ESCOM where the power is drawn is payable and shall be shared

equally among the ESCOMs whose networks are used.

Illustration:

If a transaction involves injection to MESCOM’s network & drawal at

BESCOM’s network, and 100 units is injected, then at the drawal point

the consumer is entitled for 88.08 units, after accounting BESCOM’s

technical loss of 11.92%.

The Wheeling charges of 46 paise per unit applicable to BESCOM shall

be equally shared between MESCOM & BESCOM.

6.6.5 CHARGES FOR WHEELING OF ENERGY BY RE SOURCES (NON-REC ROUTE )

TO CONSUMERS IN THE STATE

The separate orders issued by the Commission from time to time in the

matter of wheeling and banking charges for RE sources (non-rec route )

wheeling energy to consumers in the State shall be applicable.

6.6.6 CHARGES FOR WHEELING ENERGY BY RE SOURCS WHEELING ENERGY

FROM THE STATE TO A CONSUMER/OTHERS OUTSIDE THE STATE AND FOR

THOSE OPTING FOR RENEWABLE ENERGY CERTIFICATE[REC]

In case the renewable energy is wheeled from the State to a consumer

or others outside the State, the normal wheeling charges as determined

in para 6.6.3 and 6.6.4 of this order shall be applicable. For Captive RE

generators including solar power projects opting for RECs, the wheeling

Page 184: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxiv

and banking charges as specified in the orders issued by the

Commission from time to time shall be applicable.

6.7 Other tariff related issues:

i) CROSS SUBSIDY SURCHARGE:

BESCOM’s PROPOSAL:

BESCOM in its tariff petition has stated that the Cross Subsidy surcharge

has been worked out as per the MYT Regulations. Further, it is stated that

after considering +/- 20% over average cost of supply, the surcharge is

worked out at 80% as indicated below:

Paise/unit Voltage Level HT-2a HT-2b HT-2C HT-4 HT-5

66KV & above 151.32 300.59 158.79 64.33 456.90

HT level-

11KV/33KV

84.98 234.25 92.45 0 390.56

The determination of cross subsidy surcharge by the Commission is

discussed in the following paragraphs: -

The Commission in its MYT Regulations has specified the methodology for

calculating the cross subsidy and surcharge. Based on the above

methodology, the category-wise cross subsidy will be as indicated

below:

Particulars

HT-1

Water

Supply

HT-2a

Industries

HT-2b

Commercial

HT-2

(C)

HT3 (a)

Lift

Irrigation

HT3 (b)

Irrigation &

Agricultural

Farms

HT-4

Residential

Apartments

HT5

Temporary

Average Tariff-

Paise/unit 498.81 721.70 902.87 735.25 181.60 398.01 625.67 1509.97

Cost of supply

at 5% margin

@ 66 kV and

above level

565.04 565.04 565.04 565.04 565.04 565.04 565.04 565.04

Cross subsidy

surcharge

paise/unit @ 66

kV & above

level

-66.23 156.66 337.83 170.21 -383.44 -167.03 60.63 944.93

Cost of supply

at 5% margin

@ HT level

607.04

607.04 607.04 607.04 607.04 607.04 607.04 607.04

Cross subsidy

surcharge

paise/unit @ HT

level

-108.22 114.66 295.83 128.21 -425.44 -209.03 18.63 902.94

For the categories where the surcharge is negative, the surcharge is

made zero at the respective voltage level. For the remaining

Page 185: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxv

categories, the Commission decides to determine the surcharge at 75%

(instead of the 80% considered in its Tariff Order dated 02.03.2015) of the

cross subsidy amount as worked out above, as the cross subsidy

surcharge has to be gradually reduced. Thus, the cross subsidy

surcharge is determined as under rounding off to the nearest paise:

Paise/unit

Voltage

level

HT-1 HT-2a HT-2b HT-2c HT-3a HT-3b HT-4 HT-5

66 kV &

above

0 118 253 128 0 0 45 709

HT level-11

kV/33kV

0 86 222 96 0 0 14 677

The Cross Subsidy Surcharge (CSS) determined in this order shall be

applicable to all open access/wheeling transactions in the area coming

under BESCOM. However, the above CSS shall not be applicable to the

captive generating plant of a consumer for carrying electricity to the

destination of his own use and for those renewable energy generators

who have been exempted from CSS by the specific orders of the

Commission.

The Commission directs the Licensees to account the transactions under

open access separately. Further, the Commission directs the Licensees

to carry forward the amount realized under Open Access/wheeling to

the next ERC, as it is an additional income to the Licensees.

ii) Rebate for use of Solar Water Heater:

The Commission has decided to retain the existing rebate of 50 paise

per unit subject to a maximum of Rs.50 per installation per month for use

of solar water heaters.

iii) Prompt payment incentive:

The Commission had approved a prompt payment incentive (i) in all

cases of payment through ECS; and (ii) in the case of monthly bill

exceeding Rs.1,00,000/- (Rs.One lakh). The earlier rate of incentive was

Page 186: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxvi

0.25 % of the bill amount. The Commission decides to continue the

same.

iv) Relief to Sick Industries:

The Government of Karnataka has extended certain reliefs for

revival/rehabilitation of sick industries under the New Industrial Policy

2001-06 vide G.O. No. CI 167 SPI 2001, dated 30.06.2001. Further, the

Government of Karnataka has issued G.O No.CI2 BIF 2010, dated

21.10.2010. The Commission, in its Tariff Order 2002, had accorded

approval for implementation of reliefs to the sick industries as per the

Government policy and the same was continued in the subsequent

Tariff Orders. However, in view of issue of the G.O No.CI2 BIF 2010, dated

21.10.2010, the Commission has accorded approval to the ESCOMs for

implementation of the reliefs extended to sick industrial units for their

revival / rehabilitation on the basis of the orders issued by the

Commissioner for Industrial Development and Director of Industries &

Commerce, Government of Karnataka.

v) Power Factor:

The Commission in its previous order had retained the PF threshold limit

and surcharge, both for LT and HT installations at the levels existing as in

the Tariff Order 2005. The Commission has decided to continue the same

in the present order as indicated below:

LT Category (covered under LT-3, LT-4, LT-5 & LT-6 where motive power is

involved): 0.85

HT Category: 0.90

vi) Rounding off of KW / HP:

In the Tariff Order 2005, the Commission had approved rounding off of

fractions of KW / HP to the nearest quarter KW / HP for the purpose of

billing and the minimum billing being for 1 KW / 1HP in respect of all the

categories of LT installations including IP sets. This shall continue to be

followed. In the case of street light installations, fractions of KW shall be

Page 187: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxvii

rounded off to the nearest quarter KW for the purpose of billing and the

minimum billing shall be for a quarter KW.

vii) Interest on delayed payment of bills by consumers:

The Commission, in its previous Order had approved interest on delayed

payment of bills at 12% per annum. The Commission decides to

continue the same in this Order also.

viii) Security Deposit (3 MMD/ 2 MMD):

The Commission had issued K.E.R.C. (Security Deposit) Regulations, 2007

on 01.10.2007and the same has been notified in the Official Gazette on

11.10.2007. The payment of security deposit shall be regulated

accordingly, pending orders of the Hon’ble High Court in WP

No.18215/2007.

ix) Mode of Payment by consumers:

The Commission, in its previous Order had approved revenue payment

in cash/cheque/DD of amounts up to and inclusive of Rs.10,000/- and

payment of amounts above Rs.10,000 to be made only through cheque.

The consumers can also make payment of power bills through Electronic

Clearing System((ECS)/ Credit card/ online E-payment up to the limit

prescribed by the RBI.

BESCOM in its application had proposed to consider the collection of

power supply bills above One lakh rupees, through RTGS/NEFT. The

Commission has examined the request of BESCOM, and decides to

approve the payment of power supply bills above One lakh rupees,

through RTGS/NEFT, at the option of the consumer.

6.8 Cross Subsidy Levels for FY17:

The Hon’ble Appellate Tribunal for Electricity (ATE), in its order dated 8th

October, 2014, in Appeal No.42 of 2014, has directed the Commission to

clearly indicate the variation of anticipated category wise average

revenue realization with respect to overall average cost of supply in

Page 188: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxviii

order to implement the requirement of the Tariff Policy that tariffs are

within ±20% of the average cost of supply, in the tariff orders being

passed in the future. It has further directed the Commission to also

indicate category-wise cross subsidy with reference to voltage-wise cost

of supply so as to show the cross subsidies transparently.

In the light of the above directions, the variations of the anticipated

category-wise average realization with respect to the overall average

cost of supply and also with respect to the voltage-wise cost of supply of

BESCOM and the cross subsidy thereon, is Indicated in ANNEXURE - III of

this Order. It is the Commission’s endeavour to reduce the cross subsidies

gradually as per the Tariff policy.

6.9 Effect of Revised Tariff:

As per the KERC (Tariff) Regulations 2000, read with the MYT Regulations

2006, the ESCOMs have to file their applications for ERC/Tariff before 120

days of the close of each financial year in the control period. The

Commission observes that the ESCOMs have filed their applications for

revision of tariff on 15th December, 2015 (within the time extended by the

Commission). As the tariff revision is effective from 1st April, 2016

onwards, ESCOMs would be recovering revenue for eleven months of

the Financial Year.

A statement indicating the proposed revenue and approved revenue is

enclosed vide Annexure III and detailed tariff schedule is enclosed vide

Annexure IV.

6.10 Summary of the Tariff Order:

The Commission has approved an ARR of Rs.15764.97 Crores for FY17

which includes the deficit for FY15 of Rs.11.21 Crores and the

Regulatory Asset of Rs.541.97 Crores with a total gap in revenue of

Rs.1267.62 Crores as against BESCOM’s proposed ARR of Rs.17556.47

Crores.

The Commission has allowed recovery of entire gap in revenue with

additional revenue of Rs.1267.62 Crores on Tariff Revision as against

Page 189: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

clxxxix

the additional revenue of Rs.2810.01 Crores proposed by BESCOM for

FY17.

BESCOM had proposed an increase of 102 paise per unit for all

categories of consumers resulting in average increase in retail supply

tariff by 19.05%. The Commission has approved an average increase

of 48 paise per unit. The average increase in retail supply tariff of all

the consumers for FY17 is 9%.

The Commission has allowed for recovery of additional revenue

partly by increase in fixed charges ranging from Rs.5 per

KW/HP/KVA to Rs.10 per KW/HP/KVA.

The Commission has allowed for recovery of additional revenue

partly by increase in the energy charges in the range of 15

paise per unit to 50paise per unit.

The increase in energy charge for commercial category is 20

paise per unit for LT industries category is in the range of 15

paise per unit to 30 paise per unit and for other categories is in

the range of 20 paise per unit to 50 paise per unit.

Time of the day tariff which was made mandatory in the previous Tariff

Orders for installations under HT2 (a), HT2 (b) and HT2(c) with contract

demand of 500KVA and above is continued in this Order.

Green tariff of additional 50 paise per unit over and above the

normal tariff which was introduced in the previous tariff order

for HT industries and HT commercial consumers at their option,

to promote purchase of renewable energy from ESCOMs, is

continued in this Order.

As in the previous Orders, the Commission has continued to

provide a separate fund for facilitating better Consumer

Relations /Consumer Education Programmes.

Page 190: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxc

The cap on cost of short-term power purchase to meet shortfall

in supply is continued at Rs.4.50 per unit.

6.11 Commission’s Order

1. In exercise of the powers conferred on the Commission under

Sections 62, 64 and other provisions of the Electricity Act, 2003, the

Commission hereby determines and notifies the retail supply tariff of

BESCOM for FY17 as stated in Chapter-6 of this Order.

2. The tariff determined in this order shall be applicable to the

electricity consumed from the first meter reading date falling on or

after 1st April 2016.

3. This Order is signed dated and issued by the Karnataka Electricity

Regulatory Commission at Bengaluru this day, the 30th March, 2016.

Sd/-

(M.K.Shankaralinge Gowda)

Chairman

Sd/-

(H.D.Arun Kumar)

Member

Sd/-

(D.B.Manival Raju)

Member

Page 191: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxci

APPENDIX

ISSUE OF NEW DIRECTIVES AND

REVIEW OF COMPLIANCE OF DIRECTIVES ISSUED BY THE

COMMISSION

1. The following new directive is issued by the Commission

Directive on Energy Conservation:

In view of the increase in cost of electricity and the constraints in

capacity additions to generate additional power to meet the increase

in demand, it is imperative that all the consumers use energy efficient

equipment and adopt energy conservation measures, in their daily

activities to conserve electricity. To achieve this, the Commission has

notified the Demand Side Management Regulations, 2015, on

28.07.2015. As per these Regulations, the ESCOMs have to implement

Demand Side Management (DSM) and Energy Efficiency (EE)

programmes in their jurisdiction, to mitigate peak and energy shortages

by adoption of conservation technologies for more efficient use of

electricity. The objective is to flatten the load curve by reducing the

loads in their respective areas leading to reduction in system peak load.

The Commission has noted that the ESCOMs have already initiated the

DELP (Domestic Efficient Lighting programme) for supplying/distributing 9

watts capacity LED bulbs to the consumers at a subsidised price. This

initiative will certainly help conserve substantial quantum of energy used

for domestic lighting, provided all the consumers accept and adopt it.

In addition to the above initiative, the Commission notes that there is a

scope for energy conservation in use of equipment like Air Conditioners,

Fans, Refrigerators etc., in domestic/ commercial and industrial

Page 192: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcii

installations. Also, use of LED lamps/energy efficient lamps like induction

lamps in all the streetlight installations including high mast street light

installations should be considered so as to make energy conservation

measures more broad based across wider range of consumers.

Therefore, the Commission hereby directs the ESCOMs to service all the

new installations only after ensuring that the BEE ***** (Bureau of Energy

Efficiency five star rating) rated Air Conditioners, Fans, Refrigerators, etc.,

are being installed in the applicant consumers’ premises.

Similarly, all new streetlight/high mast installations including extensions

made to the existing streetlight circuits shall be serviced only with LED

lamps/energy efficient lamps like induction lamps.

Further, the Commission directs the ESCOMs to take up programmes to

educate all the existing domestic, commercial and industrial consumers,

through media and distribution of pamphlets along with monthly bills,

regarding the benefits of using five star rated equipment certified by the

Bureau of Energy Efficiency in reduction of their monthly electricity bills

and conservation of precious energy.

2. Review of Compliance of Existing Directives:

The Commission had in its earlier tariff orders and other communications

issued several directives for compliance by the BESCOM. While

reproducing such directives, the compliance of the directives as

reported by the BESCOM is analysed in this Section.

i. Directive on implementation of Standards of Performance (SoP)

The directive was:

“The BESCOM is directed to strictly implement the specified Standards of

Performance while rendering services related to supply of power as per

the KERC (Licensee’s Standards of Performance) Regulations, 2004.

Further, the BESCOM is directed to display prominently in both Kannada

Page 193: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxciii

& English languages, the details of various critical services such as

replacing the failed transformers, attending to fuse off call / line

breakdown complaints, arranging new services, change of faulty energy

meters, reconnection of power supply, etc., rendered by it as per

Schedule-1 of the KERC (Licensee’s Standards of Performance)

Regulations, 2004 and Annexure-1 of the KERC (Consumer Complaints

Handling Procedure) Regulations, 2004, on the notice boards in all the O

& M sections and O & M sub-divisions in its jurisdiction for the information

of consumers as per the following format.

Nature of Service

Standards of

performance

(indicative

minimum time

limit for rendering

services)

Primary

responsibility

centers where to

lodge complaint

Next higher

Authority

Amount payable

to affected

consumer

The BESCOM shall implement the above directives within one month

from the date of this order and report compliance to the Commission

regarding the implementation of the directives”.

Compliance by the BESCOM:

The BESCOM vide letter No: BC-26/F-2411/2009-10/517, dated 14.08.2015,

has submitted the compliance to the Commission, in respect of the

directive on the Standards of Performance. That per the directions of the

Commission, the details of the specified Standards of Performance in

accordance with the KERC (Licensee’s Standards of Performance)

Regulations, 2004 and the KERC (Consumer Complaints Handling

Procedure) Regulations, 2004, have been displayed in both Kannada

and English on the notice boards in all the O&M section and subdivision

offices.

Page 194: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxciv

Commission’s Views:

The Commission notes that the BESCOM has complied with the directive

by displaying the details of specified Standards of Performance both in

Kannada and English on the notice boards in all its O & M sections and

subdivision offices for the information of the consumers. The Commission

directs the BESCOM to adhere to the specified standards of performance

while rendering services to ensure that consumer complaints are

attended to in a time bound manner.

The Commission reiterates its directive to the BESCOM to continue to

strictly implement the specified Standards of Performance while

rendering services related to supply of power as per the KERC (Licensee’s

Standards of Performance) Regulations, 2004. Compliance of the same

shall be submitted to the Commission on a quarterly basis regularly.

ii. Directive on use of safety gear by linemen

The directive issued was:

“The Commission directs the BESCOM to ensure that all the linemen in its

jurisdiction are provided with proper and adequate safety gear and also

ensure that the linemen use such safety gear provided while working on

the network. The BESCOM should sensitise the linemen about the need

for adoption of safety aspects in their work through suitably designed

training and awareness programmes. The BESCOM is also directed to

device suitable reporting system on the use of safety gear and mandate

supervisory/higher officers to regularly cross check the compliance by

the linemen and take disciplinary action on the concerned if violations

are noticed. The BESCOM shall implement this directive within one month

from the date of this order and submit compliance report to the

Commission.”

Page 195: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcv

Compliance by the BESCOM:

The BESCOM vide letter No: BC-26/F-2411/2009-10/517, dated 14.08.2015

has submitted the compliance on use of safety gear by linemen.

Safety tools such as safety gloves, earthing rods, safety helmets, belts,

cutting plies, LT tester etc., have already been provided to all the field

staff and action is being initiated to procure new safety materials like

safety shoes, helmets with electronic induction tester, safety belts, fiber

ladder and safety goggles to all the field staff.

Further, the following safety measures are implemented:

i. Instructions are issued from corporate office to follow the safety

protocol at work.

ii. Instructions are issued to field staff to sign the checklist provided

before attending to any kind of work. The concerned section officer

has to check whether the staff has carried to the work, all the safety

tools provided to them.

iii. Surprise inspection of works is being carried out to check whether the

safety materials are used, safety zone is created etc., as per the

check list provided. Casual leave for one day is deducted if any of

the staff is found not using the safety tools provided to them.

iv. Once a week, usually on every Monday morning before the start of

work, the section officer explains about safety aspects and use of

safety gadgets during the work, to all the linemen under his

jurisdiction. The section officer also instructs the linemen not to take

up the work without availing line clear/ work permit and creating

safe working zone. Further, all the linemen take safety pledge.

v. The BESCOM has imparted safety training at HRD Centre, BESCOM for

1,286 linemen, during the FY15 and 298 linemen during the FY16.

Commission’s Views:

Page 196: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcvi

The Commission notes that the BESCOM has provided safety gadgets to

all of its linemen and also taken action to provide additional safety tools

required in the field. It is important that the BESCOM should continue to

focus on safety aspects to reduce the electrical accidents occurring due

to negligence on the part of the field staff and also non adherence of

safety procedures by them while working on the network. It is also

important that the frequency of imparting training to linemen should be

increased so that adherence to safety aspects becomes part of their

routine.

The Commission reiterates its directive that the BESCOM shall ensure that,

all the linemen in its jurisdiction are provided with proper and adequate

safety gear and the linemen use such safety gear provided while working

on the network. The compliance in this regard shall be submitted once in

a quarter to the Commission regularly.

iii. Directive on providing Timer Switches to Street lights by the

ESCOMs

The directive issued was:

“The Commission directs the BESCOM to install timer switches using own

funds to all the street light installations in its jurisdiction wherever the local

bodies have not provided the same and later recover the cost from

them. The BESCOM shall also take up periodical inspection of timer

switches installed and ensure that they are in working conditions. They

shall undertake necessary repairs / replacement work, if required and

later recover the cost from local bodies. The compliance regarding the

progress of installation of timer switches to street light installations shall be

reported to the Commission within three months of the issue of the

order.“

Compliance by the BESCOM:

Page 197: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcvii

The BESCOM vide letter No: BC-26 /F-2411/2009-10/517, dated

14.08.2015, has submitted the compliance on the directive:

The progress of timer switches installed in the BESCOM is furnished below:

Zone

No. of

street light

ckts.

existing as

on Nov-15

No. of timer

switches fixed as

on Nov-15

No. of timer

switchers in working

condition as on

Nov-15.

BMAZ 19510 14340 11692

BRAZ 19072 341 341

CTAZ 14198 137 76

Total 52,780 14,818 12,109

Further, the Government of Karnataka has initiated a new programme

“Nagara Jyothi” through M/s EESL, a Joint venture of the MoP, GoI, for

replacement of SV/MV/FL streetlight fixtures by energy efficient LED

lamps with provision of smart timer switches in urban local bodies vide

Govt. Order No: EN/52/ VSC/2015, dtd:17.06.2015. In this scheme, the

initial cost will be borne by M/s EESL under an ESCO model. The

finalization of agreement under an ESCO model between the GoK and

M/s EESL is in process. The BESCOM is coordinating for the above project.

Since the initiative is being taken by the Government in parallel, it is

requested to kindly exclude the above directive from the Commission.

Commission’s Views

The Commission notes that the BESCOM has provided timer switches to

around 28 per cent of the total streetlight installations, of which around 18

per cent of them are not functioning. The BESCOM is required to move

the concerned authorities for taking up necessary action for

repair/replacement of the non working timer switches in its jurisdiction to

ensure that illumination time of streetlights is properly regulated avoiding

wastage of electricity.

Page 198: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcviii

Further, providing timer switches to streetlight installations under “Nagara

Jyothi” programme through M/s EESL needs to be earnestly pursued by

the BESCOM to ensure installation of timer switches covering all street light

installations. The progress /status in this regard shall be reportd to the

Commission on a quarterly basis, regularly.

The Commission reiterates that the streetlight installations should be

provided with timer switches for enabling them to be automatically

switched on only during the scheduled time. This measure would not

only save significant quantum of energy that is currently wasted

because of inefficient and unreliable manual operation of the switches

which allow them to be lit unnecessarily even during day time, but also

ensure that streetlights are lit during the scheduled dark hours when the

general public require them. As directed earlier the BESCOM should

install the timer switches at their cost and later recover it from the local

bodies. Persuading the local bodies to fix timer switches at their own

cost availing funds / grants received from Government and other

agencies for such programmes / works should also be explored seriously.

The Commission further directs the BESCOM that henceforth, the new

streetlight installations and any extension/modification to be carried out

to the existing streetlight installations shall be serviced only with timer

switches.

iv. Directive on load shedding:

The Commission had directed that:

1) Load shedding required for planned maintenance of transmission /

distribution networks should be notified in daily newspapers at least

24 hours in advance for the information of consumers.

2) The ESCOMs shall on a daily basis estimate the hourly requirement of

power for each sub-station in their jurisdiction based on the seasonal

conditions and other factors affecting demand.

Page 199: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cxcix

3) Any likelihood of shortfall in the availability during the course of the

day should be anticipated and the quantum of load shedding

should be estimated in advance. Specific sub-stations and feeders

should be identified for load shedding for the minimum required

period with due intimation to the concerned sub-divisions and sub-

stations.

4) The likelihood of interruption in power supply with time and duration

of such interruptions may be intimated to consumers through SMS

and other means.

5) Where load shedding has to be resorted to due to unforeseen

reduction in the availability of power, or for other reasons, consumers

may be informed of the likely time of restoration of supply through

SMS and other means.

6) Load shedding should be carried out in different sub-stations /

feeders to avoid frequent load shedding affecting the same sub-

stations / feeders.

7) The ESCOMs should review the availability of power with respect to

the projected demand for every month in the last week of the

previous month and forecast any unavoidable load shedding after

consulting other ESCOMs in the State about the possibility of inter-

ESCOM load adjustment during the month.

8) The ESCOMs shall submit to the KERC their projections of availability

and demand for power and any unavoidable load shedding for

every succeeding month in the last week of the preceding month for

approval.

9) The ESCOMs shall also propose specific measures for minimizing load

shedding by spot purchase of power in the power exchanges or

bridging the gap by other means.

10) The ESCOMs shall submit to the Commission sub-station wise and

feeder wise data on interruptions in power supply every month

before the 5th day of the succeeding month.

The Commission had directed that the ESCOMs shall make every effort

to minimize inconvenience to consumers strictly complying with the

Page 200: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cc

above directions. The Commission had indicated that it would review

the compliance of directions on a monthly basis for appropriate orders.

Compliance by the BESCOM:

The prevailing power supply arrangements in the BESCOM, is

submitted as follows:

a) Load Restriction:-

Domestic / residential feeders in Bangalore City: 2 to 4 hours

Commercial feeders: 2 hours

Staggering of holidays for industrial feeders

Town feeders (other than Bangalore City): 2 to 6 hours

NJY feeders: 2 to 6 hours

b) Hours of power supply for agriculture feeders:-

Rural mixed feeders : 3 phase: 4 to 5 hours; single phase: 7 to 8

hours

Exclusive agriculture feeders : 3 phase: 4 to 5 hours; single

phase: 4 hours

The above power supply restrictions were imposed due to shortage in

availability of power, consequent to less than 50 per cent water storage

in Linganamakki, Supa & Mani major Hydel power plants, resulting in

Hydel generation being restricted to 5 MU per day at these power

plants.

However, to meet the deficit of power, the following measures have

been taken by the BESCOM:

Purchase of power to an extent of 645 MW under STOA and

power purchase under Section 11.

Purchase of power to an extent of 450 MW from Damodar Valley

Corporation through PPA.

Utilizing 92 MW additional power allocated from the CGS share

(unallocated share).

Hydro generation will be increased during ensuing summer and

school examinations.

Page 201: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cci

However, at present, consequent to reduction in demand due to wide

spread rainfall in the BESCOM’s jurisdiction, there is no power cut in the

BESCOM.

At present, the BESCOM has developed a web based SDRA application

which utilizes the SCADA data and generates MIS reports on power

supply position, performance of feeders and also hours of power supply

in geographical area wise, pubic constituency wise and also the

BESCOM O&M unit wise. Using this software messages through SMS are

being sent to public representatives. As regards sending of SMSes about

load shedding to the public / consumers, the same is in process. Also,

integration of this application with computers of station log book

application developed by the KPTCL, to fill up the gaps in the data

acquired through SCADA, is in progress.

As of now, the BESCOM is furnishing day ahead requirement to the SLDC

for the requirement of power and based on the requirement and

availability, the SLDC is allocating power. In future, the BESCOM will

furnish the projected requirement on month ahead basis to the

Commission.

Commission’s Views:

The Commission observes that the BESCOM is not submitting its

projections of availability and demand for power and any unavoidable

load shedding for every succeeding month in the last week of the

preceding month to the Commission regularly. The BESCOM shall

henceforth submit the same regularly to the Commission. The

Commission also notes that the BESCOM has not expedited the

‘application software’ which it has been developing through

Consultants for integration with the SCADA data to enable providing

information to the consumers through SMSes regarding the time and

duration of probable interruptions. This has to be expedited as the

consumers need to be informed through SMSes regarding both

Page 202: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccii

scheduled and un-scheduled load shedding due to reasons such as

system constraints, breakdowns of lines/equipment, maintenance etc.,

This would address significantly the consumers’dissatisfaction on this

issue.

Further, it is also necessary to avoid load shedding involving the same

sub-stations/feeders; the same should be done on rotation basis to avoid

inconvenience to consumers/public.

The Commission reiterates that the BESCOM shall comply with the

directive on load shedding and submit monthly compliance reports to

the Commission regularly.

v. Directive on Establishing a 24x7 Fully Equipped Centralized

Consumer Service Center for Redressal of Consumer

Complaints:

The directive was as under:

“The BESCOM is directed to put in place a 24x7 fully equipped

Centralized Consumer Service Center at its Headquarters with a state of

the art facility/system for receiving consumer complaints and monitoring

their redressal so that electricity consumers in its area of supply are able

to seek and obtain timely and efficient services in the matter of their

grievances. Such a Service Center shall have adequate desk operators

in each shift so that the consumers across the jurisdiction of the BESCOM

are able to lodge their complaints to this Centre.

Every complaint shall be received on helpline telephone number by the

desk operator and registered with a number which shall be intimated to

the Consumer. In turn the complaints shall be transferred online to the

concerned field staff for resolving the same. The concerned O&M/local

service station staff shall visit the complainant’s premises at the earliest to

attend to the complaints and then inform the Centralized Service Centre

that the complaint is attended. Then, the desk operator shall also call

the complainant and confirm with him whether the complaint has been

Page 203: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cciii

attended. The complaints shall be closed only after receiving

consumer’s confirmation. Such a system should also generate daily

reports indicating the number/nature of complaints received,

complaints attended, complaints pending and reasons for not attending

to the complaints along with the names of the officers responsible with

remarks be placed before the Managing Director on the following day

for his attention who would review and take corrective action in case of

any pendency/delay in attending to the complaints.

The BESCOM shall publish the details of complaint handling procedure/

Mechanism with contact numbers in the local media or in any other

form periodically for the information of the consumers. The compliance

of the action taken in the matter shall be submitted to the Commission

within two months from the date of this Order.

Further, the Commission directs the BESCOM to establish/strengthen 24x7

service stations, equipping them with separate vehicles & adequate line

crew, safety kits and maintenance materials at all its sub-divisions

including the rural areas for effective redressal of consumer complaints.

The Commission also directs the BESCOM to hold Consumer Interaction

Meetings in each O&M sub-division once in every two months according

to a published schedule and invite consumers in advance to participate

in such meetings to facilitate them sort out their grievances. Such

meetings shall be chaired by officers of the level of the Superintending

Engineers and attended by the concerned divisional and sub-divisional

Engineers. The BESCOM shall submit compliance of the same to the

Commission once in a quarter”.

Compliance by the BESCOM:

The BESCOM has issued necessary instructions to all the field officers to

reduce the complaint downtime and to ensure reliable and quality

power supply to all the consumers. The replacements of faulty

Page 204: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cciv

transformers are being carried out effectively in both urban and rural

areas. It is ensured that the faulty transformers are being replaced well

within the specified time without any delay. In urban areas, the

complaints pertaining to failure of transformers are being attended to

within 24 hours and in rural areas within 72 hours without fail. In case of

any delay, the concerned officers are being penalized for the lapses.

Time and again the field officers are being sensitized about their

responsibility with regard to rendering of prompt and efficient services to

ensure consumer satisfaction.

As directed, the customer interaction meetings are being publicized by

communicating to the consumers through e-mails, letters, pamphlets

etc. The concerned CEs, SEs and EEs have been instructed to be present

at the customer interaction meetings held at the subdivision offices as

per the scheduled timings to redress the grievances of consumers. Also,

the photographs/videos taken at such meetings are being uploaded in

the BESCOM’s website.

The BESCOM has been publicizing the Helpline number “1912” in every

possible way, regularly without fail, for the information of the public. Also,

the Helpline number is posted on the website and Facebook. In all the

advertisements and electricity related correspondences, this number is

being displayed for the information of the customers. It is ensured that all

the complaints are getting registered through this centralized Helpline

only.

Further, all the consumer complaints are being registered in the web

enabled PGRS (Public Grievance Redressal System) application.

Whenever any consumer registers his complaint, he is provided with a

docket number, using which the consumer can track the status of his

complaint through Helpline or the BESCOM website. Further, for the

speedy redressal of complaints, the BESCOM has established Circle

Control Rooms in all the O&M Circles. The executives in the Circle Control

Page 205: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccv

Rooms follow up of complaints pertaining to their Circles till they are

resolved.

The BESCOM has established full fledged service stations at subdivision

/section levels. All the existing service stations have been provided with

adequate men, branded vehicles, necessary equipment and

maintenance materials time to time, in order to attend to the consumer

complaints well within the specified time.

The details of number of consumer complaints received and attended

within time limit from April to November, 2015, is as hereunder:

Month

Total

complaints

received

Total

complaints

attended

Total

complaints not

attended

April 15 1,23,168 1,23,167 1

May 15 1,07,835 1,07,833 2

June 15 84,732 84,720 12

July 15 84,207 84,195 12

August 15 86,282 86,251 31

September 15 96,109 96,087 22

October 15 82,579 82,537 42

November 15 83,363 83,298 65

Total 7,48,275 7,48,088 187

Commission’s Views

The Commission appreciates that the BESCOM has taken adequate

measures aimed at effective redressal of consumer complaints in its

jurisdiction. The BESCOM is directed to continue to focus on improving

the consumer services and further reduce the consumer complaint

downtime to ensure prompt services to them. The BESCOM should ensure

prompt response to consumer complaints about interruptions in power

Page 206: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccvi

supply due to breakdown of lines/equipment, replacement of faulty

transformers etc. The BESCOM should sensitize its field staff in this regard.

The BESCOM shall continue to ensure that the higher officers are present

in the conumer interaction meetings at the subdivisions to effectively

redress the grievances of the consumers.

The Commission reiterates its directive to the BESCOM to publish the

complaint handling procedures / contact number of the Centralized

Consumer Service Centre regularly in the local media and other modes

periodically for the information of public and ensure that all the

complaints of consumers are registered only through the centralized

consumer service centre for proper monitoring of disposal of complaints

registered.

The compliance in the matter shall be submitted to the Commission

once in a quarter regularly.

vi. Directive on Energy Audit

The Commission had directed the BESCOM to prepare a metering plan

for energy audit to measure the energy received in each of the

Interface Points and to account for the energy sales. The Commission

had also directed the BESCOM to conduct energy audit and chalk out

an action plan to reduce distribution losses to a maximum of 15 per cent

wherever it was above this level in towns/ cities having a population of

over 50,000.

The Commission had earlier directed all the ESCOMs to complete

installation of meters at the DTCs by 31st December, 2010. In this regard

the ESCOMs were required to furnish to the Commission the following

information on a monthly basis:

a) Number of DTCs existing in the Company.

b) Number of DTCs already metered.

Page 207: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccvii

c) Number of DTCs yet to be metered.

d) Time bound monthly programme for completion of the work.

Compliance by the BESCOM:

DTC Metering and Energy Audit:

1. The BESCOM has taken all measures for conducting energy audit in

RAPDRP and non-RAPDRP areas. However, the reports generated are

not consistent due to incomplete consumer indexing. Tagging of

feeders to DTCs and DTCs to respective consumers in non-RAPDRP

area is in progress. It was found that the consumer indexing was not

proper, due to which the DTC wise energy audit was not depicting

the true picture. The BESCOM has taken measures from 1st

December. 2015, in all sub-divisions to properly tag all DTCs so that

the energy audit reports reflect true picture. The process is going on,

and it will be completed by the end of January 2016. In the month of

February 2016, the BESCOM will be in a position to give a system

generated energy audit reports. After this, feeder wise/ DTC wise loss

reports will be generated and the same will be submitted to the

Commission for the month of February 2016. Also, the remedial

measures will be initiated to reduce the losses in those DTCs which

have higher energy losses.

2. DTC metering including installation of Modems in all 24 towns of

RAPDRP area is completed and the data is to be integrated with

RAPDRP system. This process will be completed by December, 2015,

and after this activity, the DTC wise energy audit can be generated.

3. In Bangalore, only 660 DTCs have to be provided with meters. Out of

42,976 DTCs, Modems have been installed for 9,054 DTCs and the

remaining is expected to be completed before the January, 2016.

The energy audit reports of 24 towns for the month of September 2015

are given below:

Page 208: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccviii

Town Name Net Input

Energy MU

Energy

Sales MU

Losses

MU

T&D

Loss%

Demand

(Crs.)

Collection

(Crs.)

Billing

Efficiency

Collection

Efficiency

Baseline

ATC Loss

Data (%)

AT&C

Loss %

Anekal 3.21 2.91 0.29 0.09 1.67 1.34 90.82 80.01 30.30 27.34

Bangarapaete 2.82 2.41 0.40 0.14 1.46 1.25 85.65 85.96 28.90 26.37

Challekere 1.93 1.71 0.22 0.11 1.03 0.98 88.65 95.07 23.34 15.72

Channapattana 3.17 2.93 0.24 0.08 1.70 1.30 92.40 76.37 32.84 29.43

Chickaballapur

a 2.90 2.51 0.39 0.14 1.52 1.34 86.49 88.15 25.44 23.76

Chinthamani 3.27 2.80 0.48 0.15 1.45 1.40 85.42 96.97 30.53 17.17

Chitradurga 4.46 4.04 0.42 0.10 2.57 2.47 90.49 96.20 19.51 12.95

Davangere 16.88 15.79 1.09 0.06 10.16 9.39 93.55 92.33 20.50 13.62

Doddaballapur

a 4.08 3.93 0.15 0.04 2.25 2.31 96.21 102.54 19.60 1.35

Gowribidnur 2.17 1.78 0.39 0.18 0.98 0.84 82.13 85.26 27.15 29.97

Harappanahalli 1.08 0.97 0.12 0.11 0.55 0.49 89.13 89.78 17.85 19.98

Harihara 3.35 2.98 0.36 0.11 1.90 1.66 89.16 87.59 18.04 21.90

Hiriyur 2.11 1.93 0.18 0.09 1.19 0.70 91.40 59.36 33.44 45.74

Hosakote 2.98 2.70 0.28 0.09 1.45 1.33 90.66 91.71 31.92 16.86

K.G.F 4.67 3.89 0.78 0.17 2.11 1.74 83.23 82.57 31.13 31.28

Kanakapura 2.13 1.80 0.33 0.15 1.00 1.05 84.54 104.93 23.57 11.29

Kolar 5.80 4.97 0.83 0.14 4.72 4.44 85.64 94.05 32.20 19.45

Kunigal 1.39 1.34 0.04 0.03 0.80 0.58 96.79 72.95 28.83 29.39

Mulabagilu 1.53 1.35 0.18 0.12 0.77 0.61 88.34 78.20 38.83 30.92

RamaNagara 4.64 4.24 0.40 0.09 2.31 2.22 91.35 95.87 28.64 12.43

Shidlagatta 1.98 1.63 0.36 0.18 0.96 0.92 82.01 95.93 24.19 21.33

Shira Town 1.68 1.34 0.35 0.21 0.85 0.76 79.44 89.62 26.71 28.81

Tiptur 2.99 2.38 0.61 0.20 1.52 1.40 79.70 91.98 22.81 26.69

Tumkur 20.80 19.46 1.34 0.06 12.80 11.87 93.57 92.77 21.14 13.20

4. The energy audit reports in cities / towns for the period from April to

October, 2015, are enclosed at Annexure-6. It can be noted that the

average energy loss is around 13.15 per cent and the action will be

taken to reduce the loss levels in towns where it is more than 15 per

cent with the following measures:

To meter all installations including IP sets coming under town

/ city feeders.

To carry out more stringent vigilance activity to prevent

commercial losses.

To conduct stringent validation of data and analysis.

To strengthen the distribution system under IPDS including

replacement of old mechanical meters by high precision electro

static meters.

Commission’s Views:

The Commission notes that the BESCOM has not submitted regularly the

monthly analysis of energy audit conducted in cities/towns. As seen from

Page 209: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccix

the consolidated energy audit statement for the period from April to

October, 2015, submitted to the Commission during the validation

meeting, 9 of the 24 towns have AT&C losses more than the mandated

15 per cent. Similarly, as per the energy audit statement for Septemeber,

2015, as many as 18 towns have AT&C loss levels more than the

mandated 15 per cent with the Hiriyur topping the list with the highest at

45.74 per cent. The distribution losses are more than the permissible limit

of 10 per cent in 16 out of 24 feeders. There is also no mention of action

initiated to reduce the technical losses and improviving collection

efficiency to achieve the mandated A T & C Losses of less than 15 per

cent. This calls for taking urgent steps on the part of the BESCOM to bring

down the loss figures well below the targeted levels. The BESCOM is

directed to initiate suitable measures to further bring down the loss

levels.

The Commission further notes that the DTC metering is completed in all

the 24 towns where RAPDRP scheme is taken up. But, despite

completing the metering of the DTCs, the BESCOM has not taken up

comprehensive DTC wise energy audit, reportedly due to incompletion

of tagging of consumer installations with the concerned feeders/DTCs.

There has been an inordinate delay in tagging of consumer details with

the feeders/DTCs by the BESCOM. In fact the BESCOM during the

ESCOMs’ Review meetings held in the Commission had committed to

complete this exercise before August 2014, but the progress achieved is

not satisfactory.

The BESCOM is directed to take up energy audit of DTCs for which meters

have already been installed and to initiate corrective measures for

reducing distribution losses wherever they are above the targeted level.

The compliance in respect of DTC wise energy audit conducted with

analysis and the remedial action initiated to reduce loss levels shall be

submitted every month regularly to the Commission.

Page 210: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccx

Further, the BESCOM is directed to submit to the Commission the

consolidated energy audit report for the FY16, as per the formats

prescribed by the Commission, vide its letter No: KERC/D/137/14/91

dated 20.04.2015, before 15th May 2016.

vii. Directive on Implementation of HVDS:

In view of the obvious benefits in the introduction of HVDS in reducing

distribution losses, the Commission had directed the BESCOM to

implement High Voltage Distribution System in at least one O & M division

in a rural area in its jurisdiction by utilizing the capex provision allowed in

the ARR for the year.

Compliance by the BESCOM:

1. The BESCOM has complied with the Commission’s directives to

identify the feeders having high LT/HT ratio and high distribution losses

and only such feeders are considered for implementation of HVDS

scheme. The BESCOM will submit the loss analysis report of all the

completed feeders to the Commission at the earliest.

2. The BESCOM has taken note of the directives of the Commission and

has initiated suitable action to reduce/minimize the estimate cost of

Kanakapura taluk duly considering the revised guidelines issued by

the Commission for implementation of HVDS and the feeders

selected are also having higher distribution losses.

The BESCOM has reduced the overall DPR cost of implementation of

HVDS scheme in Kanakapura taluk from Rs.174 Crores to Rs.137

Croores. In this regard, a letter already has been addressed to the

Commission on 9th April, 2015. Further, replies to the Commission’s

observations dated 13.05.2015 have been submitted vide letter

No.BESCOM/GM (Proj) / DGM (HVDS)/BE-14/15-16/3660-61, dated

08.01.2016.

Page 211: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxi

3. Further, BESCOM states that, it is bound to implement the HVDS

scheme in Kanakapura taluk as per the directions of the GoK.

4. The BESCOM has followed the guidelines for implementation of HVDS

scheme in rural subdivision division-2 of Tumakuru, which is an ongoing

scheme, as per the directions of the GoK.

5. As per the original award, eight feeders were awarded to M/s Asian

Fab Tech., Bengaluru, through rate contract on 08.05.2013 and the

time frame fixed was two years. Accordingly, work in respect of these

eight feeders was completed well before the targeted date on

31.08.2014. Only in respect of 15 feeders which were re-designated

from Doddaballapura and Kengeri to Tumkur RSD-2 on 02.08.2014,

works will be completed by the end of June 2016.

Sl.

No.

Name of the

sub-division

No. of

feeders

propos

ed for

HVDS

originall

y

Projec

t cost

in Rs.

Cr.

No. of

feeders

revised

in order

to take

up one

taluk as

pilot

project.

Re-

designa

ted

feeders

from

D.B.

Pura &

Kengeri

Revised

project

cost in

Rs. Cr.

No. of

Feeders

’ Work

comple

ted

No. of feeders

commissioned

No. of

feeders

work

under

progress

Expen

diture

incurre

d in

crores.

1 Tumkur RSD 1 17 146.2

5

25 8

246.01

17 17 8 144.86

2 Tumkur RSD 2 8 23 15 8 8 15

3 Kyathsandra 0 0 5 5 0 0 5 0

4 Chikkaballap

ura

6 34.8 6 0 74.62 6 6 0 51.7

5 Doddaballa

pura

31 193 9 -22 81.37 9 9 0 87.64

6 kengeri 6 34.8 0 -6 0 0 0 0 0

Total 68 408.8

5

68 0 402 40 40 28 284.2

6. Post evaluation analysis will be entrusted to a third party, after

completion of all the feeders and benefits accrued will be submitted

after its evaluation.

Page 212: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxii

Commission’s Views:

The Commission notes that out of the 68 feeders taken up for

implementation of HVDS in Tumakuru RSD 1 & 2, Chikkaballapura and

Doddaballapura subdivisions, 40 feeders have been so far commissioned,

which means that analysis can be carried out in respect of completed

feeders. The BESCOM is directed to take up analysis of the completed

feeders, to evaluate the benefits accrued to the system after

implementation of HVDS in these subdivisions vis-à-vis the objectives

envisaged in the DPR. Further, the BESCOM needs to expedite

implementation of HVDS in its jurisdiction by drawing up an action plan

for timely completion and to derive the envisaged benefits on

implementation of the scheme. The BESCOM is also directed to expedite

commissioning of 28 balance feeders and furnish the loss analysis in

respect of all the commissioned feeders to the Commission.

Further, the Commission with a view to minimize the cost has issued

revised guidelines for implementation of HVDS in sub-divisions/feeders

having highest distribution losses, so that a higher loss reduction could be

achieved on implementation of HVDS at a reasonable cost. The

BESCOM is directed to follow these guidelines to reduce the cost of

implementation of HVDS.

As regards the implementation of HVDS in Kanakapura sub-division, the

Commission had directed the BESCOM to get the cost estimates

prepared keeping in view the objective of bringing down the overall

costs of the project and thereafter seek separate approval from the

Commission before taking up the proposed work. On scrutiny of the DPR

of Kanakapura Urban & Rural, Harohall and Sathanur subdivisions of

Kanakapura Division and Kunigal rural subdivision of Tumkur division,

submitted to the Commission, by the BESCOM, the Commission has

noted many observations including the discrepancies in provision of

materials, released materials, credit values of released materials,

computation of energy loss reduction and techno-economicaal non-

Page 213: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxiii

viability issues. These observations were communicated to the BESCOM

for necessary action.

The Commission directs the BESCOM to follow the revised guidelines

issued by the Commission and implement HVDS programme in Tumakuru

rural sub-division1 & 2 as reported by it and submit the

progress/compliance thereon once in a quarter to the Commission

regularly . The Commission further directs the BESCOM to furnish the

feeder-wise post analysis of all the HVDS works executed and completed.

viii. Directive on NirantharaJyothi – Feeder Separation:

The ESCOMs were directed to furnish to the Commission the programme

of implementing 11 KV taluk wise feeders’ segregation with the following

details:

a) Number of 11 KV feeders considered for segregation.

b) Month wise time schedule for completion of envisaged work.

c) Improvement achieved in supply after segregation of feeders.

Page 214: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxiv

Compliance by the BESCOM:

Out of the 271 feeders taken up for segregation under phase-1, all the

feeders have been commissioned. Out of 281 feeders proposed in

phase-2, 271 feeders have been commissioned. The project is

scheduled for a total completion by December, 2015. For

NirantharaJyothi feeders, 20-22 hours of three phase power supply is

being arranged as envisaged under the DPR. The limiting number of

hours of power supply to IP sets i.e., for agriculture feeders is 7 hours at

three phases as per the decision of GoK.

Further, a total of 380 feeders are proposed under phase-3 of

Niranthara Jyothi to extend the Niranthara Jyothi scheme to the left out

villages and the areas earliar covered under RLMS scheme at a total

cost of Rs. 703 crore.

M/s MECON Limited, a Government of India undertaking has been

entrusted with pre and post analysis of feeders commissioned under

Niranthara Jyothi phase-1 and concurrent analysis of feeders

commissioned under phase-2 as follows:

1. Bangalore Rural : 24 feeders

2. Kolar : 08 feeders

3. Tumkur : 40 feeders

4. Davanagere : 28 feeders

M/s MECON has submitted a report in respect of feeders identified in

Davangere and Kolar Circles and which is validated by the concerned

superintending engineers (Ele.,). Further, M/s PRDCL has also evaluated

the pre and post analysis of feeders commissioned under Niranthara

Jyothi phase-1 in Harpanahalli Taluk, in Davanagere circle.

Page 215: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxv

The agencies have submitted a detailed report separately for each of

the feeders on which the analysis was carried out. The reports show

that the Niranthara Jyothi Yojane has benefited the rural population to

a considerable extent through better quality of power supply and in

providing 24 x7 power to the rural non agricultural loads. The

consumers are happy and satisfied with the better power supply

conditions prevailing after the implementation of Niranthara Jyothi

Yojane.

The benefits derived from Niranthara Jyothi Yojane scheme is noted

below:

24x7 power supply to villages:

The main purpose envisaged in the implementation of Niranthara

Jyothi Yojane is to arrange 24x7 uninterrupted power supply to the

villages. As seen from the vital statistics of the sub-stations feeding

the area, these villages which were having intermittent power

supply earlier, are now having continuous 3 phase power supply

and the BESCOM is not resorting to load shedding, which was the

case earlier. But, in few cases there have been continued

interruptions due to system constraints, line clear issues and

unforeseen faults. But, now after implementation of NJY, the

BESCOM is able to supply continuous uninterrupted quality power

supply for longer duration during morning and evening peak hours.

Energy input from sub-stations:

There is increase in consumption of both the metered category

installations and IP sets. However, the increase in IP consumption is

attributed to the increase in number of IP sets due to regularization

of unauthorized IP sets.

Increase in metered consumption:

The energy consumption of metered category installations has

Page 216: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxvi

shown an increase of about 25 to 30 per cent after the

implementation of NJY. In some of the cases where the exact

feeder-wise metered consumption was not furnished due to

change in billing software and non availability of previous data, a

sample of energy consumption of a few installations selected at

random in various villages fed from the feeder over a period of 6

months before and after the implementation of NJY, as extracted

from the sub-divisional DCB was analyzed. This also indicates the

increasing trend of consumption of metered installations. However,

it can be safely assessed that there is an increase of 25% to 30% in

metered energy consumption.

Unmetered consumption:

As compared with earlier period, there is a considerable increase in

the IP consumption post implementation of NJY. The total

unmetered consumption of IP sets in respect of the combined IP

feeders has shown an increasing trend as compared with the IP set

consumption before implementation of NJY. This is due to increase

in number of IP sets serviced under regularization and also due to

mix up of feeder loads during rearrangement of feeders envisaged

in the project. However, IP consumption, which was hitherto being

assessed based on assumptions, can now be measured more

accurately, as there is a total exclusive feeder with metering

facilities at station end, for calculating feeder-wise total daily and

monthly IP consumption.

Rate of failure of transformers:

After the implementation of NJY, the failure rate of transformers in

both the IP feeders as well as NJY feeders has reduced significantly

as compared to the failure rate of transformers before

implementation of NJY.

Page 217: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxvii

Better consumer satisfaction:

As per the opinion obtained from the consumers, in different

villages fed by NJY feeders, it is evident that the consumers are

happier with the better power supply conditions after introduction

of NJY.

Results of the socio economic survey carried out for the

beneficiaries of the NJY Project:

A survey was conducted on the effectiveness of the project by

obtaining opinion from a cross section of people in different

villages fed by NJY feeders the results are as follows. About 85% to

95% of the respondents have agreed on the following

improvements in availability of power 24X7, after implementation

of NJY.

Improvement in quality of power supply viz., less voltage

fluctuations, reduction in interruptions/ better tail end

voltages.

Improved standards of living.

Increase in level of literacy/education.

Improvement in basic amenities such as drinking water

supply, improved services in Primary Health Centers.

Development of small scale industries leading to local

employment and increased job opportunities.

Further, the BESCOM has ensured that the illegal tapping of NJY

feeders is curbed and wide publicity has been given through media,

highlighting the punishments laid down under the law for power theft

or illegal hooking. Paper notifications issued in this regard are enclosed

for the commission’s perusal.

Page 218: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxviii

The BESCOM will furnish the total IP set consumption monthly to the

Commission on the basis of data obtained from agricultural feeders’

energy meters.

Following are the observations pertaining to 36 NJY feeders covering

Davanagere and Kolar Circles:

Sl

No Parameter Before bifurcation

After bifurcation

NJY non-agri feeder

After bifurcation

agri feeder Conclusion

1 Total No. of

installations

Domestic lighting and

water supply – 48,720

numbers & IP Sets –

9,340 numbers

Domestic lighting and

water supply – 52,445

numbers

IP Sets – 11,150

numbers

Increase in installations

after bifurcation is

about 9.6%

2

Total

connected

load

12,60,500 KW

(Domestic and IP load

cannot be segregated

since the connected

load is based on

installed tranformer

capacity)

Domestic Lighting and

Water Supply

2,36,000 kW

IP Sets

11,85,000 kW

Increase in connected

load after bifurcation is

about 12.2%

3

Total energy

sent out from

substation

(kWh)

Domestic lighting and

water supply - 38,28,650

kWh &

IP Sets - 1,39,45,000 kWh

Domestic lighting and

water supply

56,57,600 kWh

IP Sets

92,65,500 kWh

Decrease in energy sent

out from the substations

after bifurcation is

about 16%

4

Total

metered

energy

consumption

(kWh)

Domestic lighting and

water supply - 31,57,600

kWh &

IP Sets -Realized about

88,30,000 kWh

50,06,300 kWh

It is assumed that

the entire energy

consumed by the

bifurcated Agri

feeders is assessed

and will be

realized from the

Govt. at a later

date

Increase in metered

energy consumption after

bifurcation is

about 19%

5

Average

technical

loss

17.5% 11.5%

Not possible to

evaluate AT&C for

a pure Agricultural

feeder since the

realization is an

assumed value of

100%

Reduction in technical loss

is

about 5.5%

6

Average

Commercial

loss

6% 5.5%

Reduction in commercial

loss is

about 0.5%

7

Aggregate

Technical

and

commercial

loss

23.50% 17% Reduction in AT&C loss is

about 6.5%

8 Transformer

Failure rate 14% 16% 17.5%

Even though the number

of failure of transformers

has reduced, the

percentage failure rate for

the bifurcated non-Agri

NJY feeder has increased

marginally by about 2%.

This may be attributable to

high service period of

about 20 to 22 hours a day

as compared to earlier 8 to

10 hours a day

9

Voltage

Regulation

(HT)

7% 4.50% 9.50%

Even with this improvement

for the non Agricultural NJY

feeder, the regulation is

above the acceptable

range of + 2.5% (upto

transformer) as per REC

Page 219: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxix

guidelines. This may be

attributable to higher line

lengths

10 Peak Load 140A to 200A about 45 A 120 to 135 A

This has led to improved

quality of power supply

viz., good tail end voltage

at the consumer end. This is

evident from the survey

carried out of the

consumers.

Following are the observations pertaining to Socio-Economic Survey

carried out for the Beneficiaries of NJY scheme (36 NJY feeders) of

Davanagere and Kolar Circles of BESCOM. A survey was carried out

covering 5 villages per feeder and 6 respondents per village:

Circle:

Davanagere No of

sub-divisions : 8 No of feeders for evaluation: 28

Circle:

Kolar No of

sub-divisions: 2 No of feeders for evaluation: 8

Sl No Parameter Response

1 Voltage Measured at consumer

premises

Within acceptable value

2 Is the respondent aware of NJY

scheme (Yes/ No)

No (80%)

However the surveyor has appraised the

respondent about the scheme

3 Availability of power 24x7 after NJY

(Yes/ No)

Yes (93%)

> 20 Hrs a Day

4

Improvement in Quality of power viz.

less voltage fluctuations after NJY (Yes

/ No)

Yes (86%)

5 Reduction in power Interruptions after

NJY (Yes / No)

Yes (73%)

6

Whether satisfied with quality and

duration of power supply for IP sets

(Yes/ No) if applicable

No (73%)

7

Respondents perception(Yes/No) on

whether implementation of NJY has

led to

a) Improvement in standard of living Yes (87%)

b) Increase in level of literacy/

education levels Yes (97%)

c) Improvement in basic ameneties

such as drinking water supply,

improved services in Primary Health

Centers

Yes (83%)

d) Development of Small Scale

Industries leading to local employment

and increased job opportunities

Yes (77%)

e) Reduction in migrant population to

urban areas

No (87%)

Page 220: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxx

8

Overall satisfaction level about the

project

(Good/ Average/Needs further

improvement)

Average

Commission’s Views:

The Commission notes that the BESCOM is yet to commission 10 feeders

in phase-2, whereas, it has commissioned all the 281 feeders taken up

under phase-1 long back. The progress achieved in implementing the

works under NJY phase-2 is not satisfactory, as it has taken one long year

to commission only 10 feeders out of 20 remaining feeders as at the end

of last year. The delay in implementation of NJY works by the BESCOM

has resulted in non-realization of envisaged benefits set out in the DPR

when the project was initiated.

BESCOM is hereby directed to commission the balance feeders’

expediously and to carry out the performance analysis of those feeders

to ensure that the objectives set out as per DPR are accomplished.

Further, the Commission, has noted that the BESCOM has carried out the

the performance analysis of feeders commissioned under NJY indicating

the benefits accrued to the system in terms of reduction in failures of

distribution transformers, improvement in tail-end voltage and

improvement in supply/reduction in interruptions and increase in

metered consumption. The analysis reveals that there is overall

improvement in supply condition after implementation of NJY besides

benifiting the consumers in rural area resulting in a positive socio-

economic impact. The analysis also reveals that the consumers are

happy post implementation of NJY as the number of hours of quality

power availability has increased.

The BESCOM is directed to expedite execution of NJY works under

phase-2 and report compliance thereon to the Commission. Further, the

BESCOM shall ensure that NJY feeders are not tapped illegally for

Page 221: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxi

running IP sets which would defeat the very purpose of feeder

separation scheme undertaken at huge cost.

Further, it is noted that the BESCOM has already segregated almost all

the feeders taken up both under phase1&2 works and consequently

agricultural feeders are exclusive from rural loads and the energy

consumed by the IP sets could be more accurately measured at the 11

KV feeder level at the sub-stations after duly allowing for distribution

losses in 11 KV lines, distribution transformers and LT lines. The BESCOM is

directed to report every month, specific consumption and the total IP

sets consumption only on the basis of data from agricultural feeder

energy meters as per the formats prescribed by the Commission, before

15th May 2016.

The Commission reiterates its directive to the BESCOM to continue to

furnish feeder-wise IP set consumption based on feeder energy meter

data to the Commission every month in respect of agriculture feeders

segregated under NJY.

ix. Directive on Demand Side Management in Agriculture:

In view of the urgent need for conserving energy for the benefit of the

consumers in the State, the Commission had directed the BESCOM to

take up replacement of inefficient Irrigation Pumps with energy efficient

Pumps approved by the Bureau of Energy Efficiency, at least in one sub-

division in its jurisdiction and report compliance thereon.

Compliance by the BESCOM:

A brief note on solar water pumping system “Surya Raitha Scheme” is as

under:

Introduction:

Page 222: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxii

In September 2014, the GoK envisaged a sustainable solution to the

problem of agricultural power by way of the Surya Raitha Scheme. This

scheme proposes to provide net metered solar water pumps and earn a

tariff for net energy exported thereby completely eliminating energy

usage for agriculture in the converted pumps.

Surya Raitha, pilot project:

The BESCOM has initiated to arrange power supply to 310 IP sets on

Harobele 11kV feeder of Kanakapura sub-division on a pilot basis. The

project provides for energizing the IP Sets with solar power by replacing

existing inefficient pump sets with efficient pumpsets and feed in excess

energy to the grid on net-metering basis. The excess energy fed into the

grid will be paid back to the farmers as per the tariff fixed by the KERC

resulting in additional income to the farmers apart from the income

earned through crops.

The scheme will be financed by a combination of farmer’s investment,

GoK subsidy, MNRE subsidy and BESCOM’s investment through soft loans

that will be repaid by the farmer through his net metering tariff revenues

in initial years. The net meting revenues will be deposited into an

ESCROW account and will be diverted first to service the loan corpus

fund as per the tariff of Rs.7.20 fixed by the KERC for SRTPV / small solar

projects, out of which Rs.1/- will be paid as generation based incentive

to farmers through farmer’s co-operative society and Rs. 0.20 will be paid

to the Co-operative Society for its maintenance.

Payback period is estimated as 10-12 years based on the solar

generation and utilization factor of the pumpset.

To enable a self-sufficient system and to recover the loan at the earliest,

the PV panel is oversized by 50 per cent, so that the additional power will

always feed power to the grid even while the solar water pumps are in

use. The feeder will be kept on from 6 am to 6 pm during day time for

Page 223: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxiii

injecting excess energy to the grid. Typically 66 per cent of energy is fed

to the pump and 33 per cent to the grid.

The breakup cost of the project is as below:

Particulars

5 HP

capacity per

IP set

7.5 HP

capacity per

IP Set

Total cost for 310

pump programme

Total cost of system, Rs. 678342 908342 0

Number of pumps installed, Nos 223 87 310

GoK contribution, Rs. 58000 169000 Rs. 2.76 Cr

MNRE contribution, Rs. 162000 162000 Rs. 5.02 Cr

Interest free loan from BESCOM,

Rs.

408342 502342 Rs. 14.43 Cr

Upfront payment by farmer, Rs. 50000 75000 Rs. 1.77 Cr

Total cost of the project Rs. 23.98 Cr

Benefits from the net-metering programme for GoK:

Permanent stoppage of subsidized energy to agricultural customers

with an opportunity to deploy in other revenue generating

segments.

Energy saved from agricultural customers and delivered from net-

metering can be used to bridge energy deficit in the State.

Improved ground water ecology and agricultural output.

Benefits to the BESCOM:

Reduction in peak load and energy consumption.

Reduction of T &D losses.

Save on infrastructure cost.

Improvement in fiscal deficits.

Reduction in failure of DTCs.

Page 224: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxiv

Save on high cost enrgy.

Benefits to farmers:

Increased agricultural productivity.

Improvement of water table.

Enhanced quality of irrigation.

Assured day time power supply.

Steady income from solar generation.

Source of income during drought years.

Progress of the Project:

Work award is issued on 07.09.2015 to M/s. Sun Edison Solar Power

India Pvt., Ltd., at a cost of Rs.19.5 Crores for Design, Supply, Testing,

Installation, Commissiong, Repair and Maintenance for a period of 10

years for 250 numbers of grid tied Solar PV based irrigation pump sets

on net metering basis under “Surya Raitha Scheme” on 11 kV

Haroblele F2 feeder in Kanakapura Taluk.

The BESCOM Board has approved for 310 IP sets at a cost of

Rs.23,98,25,112/-.

The Govt has released subsidy to an extent of Rs. 2.2 crore for 250

numbers of IP sets. The GoK will be requested for additional subsidy

for 60 IP sets and MNRE for sanctioning subsidy.

Co-operative Society in the name of “Surya Raitha Krushi Vidyuth

Balekedarara Sahakara Sangha Niyamitha” at Harobele is registered

on 19.08.2015.

Detailed survey has been conducted and work is in progress.

A demo has been installed at Harobele on 24th September, 2015, and

it is running successfully.

Street plays are conducted to create awareness among the farmers

about the scheme.

The work is expected to complete by 28.02.2016.

Page 225: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxv

Commission’s Views:

The Commission notes that the BESCOM is implementing DSM in

agriculture in Kanakapura taluk. It is also noted that the Surya-Raitha

scheme is in an advanced stage of completion. It is important to see that

all the balance works relating to this project are expedited so that the

work is completed in time and the farmers are able to avail the benefits

of this scheme. Further, the BESCOM should give emphasis on

implementation of DSM measures in the other parts of its jurisdiction in

order to conserve energy and also precious water for the benefit of

farmers. The BESCOM should focus its attention on implementation of DSM

measures by necessary co-ordination with all the stakeholders concerned

to arrive at an early agreement on crucial measurement and verification

methodology to move forward and scale up this programme in its entire

jurisdiction.

The Commission during its review meetings with ESCOMs held in the

Commission has been directing them to initiate DSM measures in any one

sub-division/taluk in order to assess the results of such measures before

scaling up in whole of its jurisdiction. The BESCOM is directed to expedite

the implementation of DSM measures in 11kV Harobele feeder in

Kanakapura taluk and report compliance thereon to the Commission

within three months from the date of this order.

x. Directive on Lifeline Supply to Un-Electrified households:

The Commission had directed the ESCOMs to prepare a detailed

and time bound action plan to provide electricity to all the un-

electrified Villages, Hamlets and Habitations in every taluk and to

every household therein. The action plan was required to spell out

the details of additional requirement of power, infrastructure and

manpower along with the shortest possible time frame (not

exceeding three years) for achieving the target in every taluk and

Page 226: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxvi

district. The Commission had directed that the data of un-

electrified households could be obtained from the concerned

Gram Panchayaths and the action plan be prepared based on

the data of un-electrified households.

Compliance by the BESCOM:

Initially DPRs under RGGVY XII Plan was prepared for five districts namely,

Bangalore Rural, Kolar, Ramanagara, Chikkaballapura and Davanagere

districts, where 60,531 BPL households were identified for electrification.

The same has been approved by the REC and the work awards have

been issued to the successful bidders during the month of January, 2015.

For the remaining three districts i.e., Chitradurga, Tumkur and Bangalore

Urban (Anekal taluk), the DPRs for electrification of 76,309 BPL

households were prepared under RGGVY XII Plan and submitted to REC

for sanctioning. Since, the Govt. of India has introduced new scheme

called “Deena Dayal Upadyaya Grama Jyothi Yojana (DDUGJY)” in

which all the villages having population less than 100 shall also be

covered under the scheme.

Hence, the proposal for electrification of BPL households in RGGVY XII

plan was dropped and it was proposed to include the same under

DDUGJY scheme. DPRs for the above said three districts along with

remaining five districts (BPL households which are not covered under

RGGVY XII plan) as per the guidelines of DDUGJY have been prepared

for electrification of 1,06,472 households and submitted to REC for

acceptance. After final acceptance of supplementary DPRs by

competent authority of REC, the work will be awarded.

Physical progress of electrification of BPL households under RGGVY XII

plan is as follows:

Sl.

No. Name of District

No. of BPL

households

identified for

electrification under

Month wise Progress

Total

progress

Progress

in % July-15 Aug-15 Sep-15 Oct-15 Nov-15

Page 227: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxvii

RGGVY XII Plan

1 Bangalore Rural 6167 157 485 923 11 574 2150 34.86%

2 Davanagere 21294 1256 907 2455 446 3436 8500 39.92%

3 Kolar 13041 902 1653 1549 759 1511 6374 48.88%

4 Chikkaballapura 15460 1436 1536 2564 1438 653 7627 49.33%

5 Ramanagara 4569 1319 1056 1275 581 1069 5300 116.00%

Total 60531 5070 5637 8766 3235 7243 29951 49.48%

As per REC guidelines, the work shall be completed within 24 months

from the date of issue of work award to the Agency. The BESCOM is

committed to complete the project within stipulated time fixed by the

REC in all aspects and the monthly progress will be submitted to the

Commission hereafter.

Further, M/s REC has sanctioned and allocated Rs.1,754.54 Crores for all

the ESCOMs in Karnataka, as against the proposal submitted by the

ESCOMS for Rs.4,947 Crores. As per the sanction, the cost for RE

component and system strengthening work was reduced whereas, for

other works complete sanctioning is given, as per the proposal

submitted.

Further, the Additional Chief Secretary, Energy Department, GoK has

given the revised allocation for DDUGJY sanctioned projects. The

Executive Director, REC, New Delhi, is requested by the BESCOM to re-

allocate / re-appropriate the funds for varying from one component to

another as detailed under:

Page 228: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxviii

Sl.

No. Name of the Work

DPRs

submitted

by

BESCOM

DPRs

sanctioned

by M/s

REC

Revised

allocation

by the

GoK

Re-

allocation

rquestted

1 Feeder separation (DTCs) in

Rs crore 88.71 88.71 88.71 0

2

Rural Electrification

(electrification BPL

households including creation

of infrastructure) in Rs crore

95.94 7.75

41.86

95.94

3 System strengthening in Rs

crores 193.54 15.55 86.79

4 SAGY in Rs crore 38.51 38.81 38.51 38.51

5 Metering in Rs crore 14.12 14.12 66.28 14.12

Total 430.82 164.64 235.36 235.36

DPRs are required to be re-cast duly conducting the field survey by PMA

and the same is to be uploaded on the DDUGJY website, which is in

progress.

After final acceptance of supplementary DPRs by competent authority

of REC, the tender will be floated.

Commission’s Views:

The Commission notes that only 49.48 per cent progress is achieved in

electrification of BPL households under RGGVY XII plan by the BESCOM.

The BESCOM needs to expedite electrification of BPL households with the

seriousness this matter deserves. The electrification of households has

remained stagnant for the last many years leaving vast numbers of

households in the remote areas remain without electricity. The

programme should be implemented within in a time frame to ensure that

the people are provided with the basic need of electricity. The

Commission, while reviewing the status of compliance of its directives

during the ESCOMs’ Review meetings, has been stressing upon ESCOMs

to initiate necessary action to provide electricity to the un-electrified

households with funding arrangement by RGGVY or any other source.

Page 229: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxix

The BESCOM shall come out with an action plan to implement the

directive of the Commission for providing electricity to the un-

electrifiedhouseholds in its jurisdiction and submit compliance/progress

achieved monthly to the Commission.

Further, the Commission concerned with the slow pace of progress of this

programme, in its previous Tariff Order had directed the BESCOM to

cover electrification of 5 per cent of the total identified un-electrified

households every month beginning from April, 2015 so as to complete

this programme in about twenty months. There is not much progress in

these aspects. The BESCOM is directed to expedite action to provide

electricity to the unelectrified households covering all the remaining

households within the targeted time and report compliance to the

Commission regarding the monthly progress achieved from May, 2016

onwards. In the event of non-compliance, the Commission may be

constrained to initiate penalty proceedings under section 142 of the

Electricity Act, 2003.

xi. Directive on sub-division as Strategic Business Units (SBU):

The present organizational set up of the ESCOMs at the field level

appears to be mainly oriented to maintenance of power supply without

a corresponding emphasis on realization of revenue. This has resulted in

a serious mismatch between the power supplied, expenditure incurred

and the revenue realized in many cases. The continued viability of the

ESCOMs urgently calls for a change of approach in this regard, so that

the field level functionaries are made accountable for ensuring

realization of revenues corresponding to the energy supplied in their

jurisdiction.

The Commission had therefore directed the BESCOM to introduce the

system of Cost-Revenue Centre Oriented sub-divisions at least in two

divisions in its operational area and report results of the experiment to

the Commission.

Page 230: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxx

Compliance by the BESCOM:

For effective implementation of SBU as per concept paper of consultants

contains several measures such as

Autonomy of operations

Develop and Manage network

Customer relationship management

Supporting systems

Sustainability

For putting the concept of SBU in place, functional autonomy is very vital

but practically deriving the functional independency on Chandapura

and Indiranagar is proving non-functional since the present situation and

system is not ready of carving out functionalities of financial autonomy

and operational autonomy distinctively confining to those two divisional

boundaries only as it involves the following autonomy:

Financial independence

Sustainability and ability of operations

Time block wise data from SLDC for understanding the load

pattern, duration of load etc., across feeders

Network status – identifying congestion, bottlenecks, areas of

growth in demand, deterioration of older assets in the network

(emergency, short term and long term interventions required),

input and DTC metering, consumer metering, requirement of

capex and the benefit-cost analysis for such interventions

Full consumer database including indexing

Customer charters in place and means of implementing the same

Support systems – employees, IT etc.

Cash flow monitoring methodology

Overheads

Page 231: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxi

As can be seen above, in the present scenario, all the above activities

are centrally managed by the Corporate level departments manning

those major activities of Revenue, Finance, Borrowings, transfer of fund

on the Finance side and also various schemes / projects involved for

developing infrastructure for technical maintenance and efficiency is

interdependent on various factors and managed by Corporate Office

only. Delegating powers and responsibilities to those two divisional

office Managers may not suffice the needs and prerequisites to run

the division independently on all core aspects. Also, the autonomy

involves the following sub activities.

Autonomy of operations

Ring fencing of SBU area to understand the nature of business

Planning and forecasting of demand

Delegated authority for actual power scheduling and drawing in a

particular time block or day or month

Monitor the sales, revenue and collection

Powers to manage short term liquidity issues by borrowing

from HO or others

Develop and manage network

Planning for consumer demand

Identifying the required capex and source of financing

Procurement of capex – turnkey or partial turnkey execution

Customer relationship management

Acquisition of new customers ensuring adherence to ‘supply all

consumers’ in the area of supply

Setting service standards and achieving the same

Retention of existing customers i.e. warding of OA consumers

leaving the grid

Page 232: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxii

Supporting systems

Human Resources

Mapping and matching objective of organization and skills of

employees

Recruitment and training

Methods to incentivize and improve productivity

Sustainability

Identify clearly the cost and revenue chain

Monitoring viability of operations

In the present system, all the above are interdependent and Central

office is dealing with major aspects of power purchase, subsidy

accounting and borrowings and dissection of these major expenses

which involves high cost purchase / short term purchases etc, also

dissection of subsidy / grants / capex and borrowing agaist this two

divisions may not happen logically unless and otherwise system is in

place. Hence, SBU conceptualizatation is dispensed with.

Commission’s Views:

The Commission notes that, the ESCOMs have expressed their difficulty in

introduction of SBU concept in their O & M divisions / sub divisions due to

implementation issues in the field. The Commission recongises the

problems associated with implementation of SBU concept. As an

alterantive, the Commission had instituted a study to make field

formations of the ESCOMs financially accountable without any

modification in their existing administrative set up. The Commission has

forwarded a report prepared by the consultants M/s PWC regarding

implementation on Financial Management Framework for distribution

utilities to take further action to implement a model suggested by the

consultant, in their jurisdiction to bring in accountability on the

Page 233: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxiii

performance of the divisions / sub-divisions in relation to the quantum of

energy received, sold and its cost so that they conduct their business on

commercial principles.

The BESCOM is therefore, directed to implement this financial

management framework model and report compliance thereon within

three months from the date of issue of this Order.

xii. Directive on Prevention of Electrical Accidents:

The directive was as follows:

“The Commission has reviewed the electrical accidents that have

taken place in the State during the year 2014-15 and with regret

noted that as many as 564 people and 514 animals have died

due to these accidents.

From the analysis, it is seen that the major causes of these

accidents are due to snapping of LT/HT lines, accidental contact

with live LT/HT/EHT lines, hanging live wires around the electric

poles /transformers etc., in the streets posing great danger to

human lives.

Having considered the above matter, the Commission hereby

directs the BESCOM to prepare an action plan to effect

improvements in its distribution network and implement safety

measures to prevent electrical accidents. A detailed division wise

action plan shall be submitted by the BESCOM to the

Commission”.

Compliance by the BESCOM:

1. Hazardous locations are identified and measures are taken to rectify

the same on top priority.

2. LT spacers have been procured and are being installed wherever

Page 234: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxiv

required.

3. Tenders have been invited to procure new safety materials like safety

shoes, helmets with electronic induction tester, safety belts, fibre

ladder and safety goggles to all the field staff.

4. Safety tools like safety gloves, earthing rods, safety helmets, belts,

cutting pliers, LT tester etc., have already been already been

provided to all field staff.

5. Field staff are directed to rectify the dangling wires on

transformers/poles, raise the aerial fuse boards to safe height, prune

the trees along the HT/LT lines, clean the transformer/ RMU

surroundings, maintain feeder pillar boxes, LTD boxes etc.

6. Instructions are issued to follow the safety protocol at work.

7. On every Monday, the section officer conducts a safety meeting

before starting the work and Safety Mantra to all field staff is being

preached.

8. Field staff is directed to sign the checklist provided to them before

attending to any kind of work. It is also the duty of the concerned

section officer to check whether the staff has carried all the safety

equipment, read the check list and signed.

9 The number of hazardous installations identified and rectified in FY16

up to November, 2015, is shown below:

Number of hazardous installations identified for FY16: 2100

Number of hazardous installations rectified during October, 2015:

242

Number of hazardous installations rectified during November, 2015:

353

Balance number of hazardous installations to be rectified: 1,400

Commission’s Views:

The Commission observes that despite the BESCOM taking various

remedial measures including rectification of hazardous installations in its

network, the number of fatal electrical accidents involving both human

Page 235: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxv

and livestock has only increased which is of a serious concern. This

indicates that identification and rectification of all hazardous

installations is not completed. The BESCOM should make more

concerted efforts for identification and rectification of all the hazardous

installations prevailing in the distribution system particularly in densely

populated areas & public places. The BESCOM also needs to take up

with the concerned local bodies for rectification of the hazardous

streetlight installations and other electrical works under their control to

ensure safety of the public. It also necessary that the BESCOM creates

awareness through visual/print media continuously about safety aspects

among public to ensure that the attention on safety aspects is

maintained.

The Commission, during the Review meetings held with the ESCOMs has

been prompting the ESCOMs to take up periodical preventive

maintenance works, install LT protection to distribution transformers,

conduct regular awareness programme for public on electrical safety

aspects in use of electricity and also ensure use of safety tools and

tackles by the field staff besides imparting necessary training to the field

staff at regular intervals. The BESCOM shall take effective steps to

achieve these.

Further, the BESCOM shall adhere to the best construction practices as

per the standards on construction/expansion of the distribution network

so that no maintenance is required for such network for a reasonably

long period of time. The BESCOM shall also conduct safety audit and

carryout preventive maintenance works as per schedule to keep the

network equipment in healthy condition.

The Commission has already forworded the Safety Technical Manual

prepared by a sub-Committee comprising of experts from the Advisory

Committee constituted by the Commission which should serve as a

useful guide for the field engineers to record all the technical

deficiencies prevalent in the distribution network and enable them to

Page 236: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxvi

take remedial action on the basis of the audit. In the Safety Technical

Manual, detailed account of the steps to be taken on each element of

the distribution system is enumerated which would help the field

engineer in attending to the defects. The ESCOMs are required to

circulate Safety Technical Manual among their field staff for necessary

guidance and also to continuously monitor the implementation of the

suggestions / recommendations contained in the reports.

The Commission therefore reiterates its directive that the BESCOM shall

continue to take necessary measures to identify and rectify all the

hazardous locations/installations prevalent in its distribution system and to

provide LT protection to distribution transformers under an action plan to

prevent and reduce the number of fatal electrical accidents occurring in

the distribution system. The compliance regarding the same shall be

submitted to the Commission every month regularly.

Page 237: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxvii

APPENDIX-1

Statement showing the objection of the consumers/public, BESCOM’s response and the

Commission’s Views.

1. Objections relating to Tariff Issues:

Objections Replies by BESCOM 1. The application is not maintainable as it is not

filed 120 days before the commencement of

the next financial year as required under the

MYT Regulations.

The BESCOM was compelled to

seek extension of time limit due

to un-availability of accurate

power purchase details. The

BESCOM has submitted its filing

within the extended time

allowed by the Commission.

Commission's Views: BESCOM has filed its petition for truing-up for FY15 and

determination of Annual Revenue Requirement for FY17, FY18 and FY19 on 15th

December, 2015, within the time limit extended by the Commission. The Hon’ble

Appellate Tribunal for Electricity (ATE), in the Case reported in 2010 ELR (APTEL)

0175 has held that “if the Licensee is unable to file ARR petition due to some

reasons, it will not be proper to say that the application has to be rejected. What

could be done in such a situation is that the carrying cost can be denied and not

the revenue recoverable for the period of delay”. In the present case, the

revenue requirement sought is from 1st April, 2016 up to 31st March 2019, and

therefore, the time taken by BESCOM for filing the application will not adversely

affect the consumers’ interest and hence, the petition is maintainable.

2. Objectors' views should be considered while

issuing the Tariff Order.

The Commission is regularly

conducting Public hearing

before issuing the Tariff Order

and uploading it on its website.

Commission's Views: Section 64(3) of the Electricity Act, 2003 mandates that a

State Commission shall issue a Tariff Order after considering all suggestions and

objections received from the public. Accordingly, the Commission had directed

the BESCOM to publish the summary of the Revised ARR and Tariff proposals in the

newspapers calling for objections, if any, from interested persons. The BESCOM

was also directed to communicate its replies to the objections raised to the

objectors. Further, the Commission had invited interested persons to submit their

objections in person, during the public hearing held on 26th February, 2016 in the

Court Hall of the Commission in Bengaluru. Their objections were heard and the

BESCOM representative was given an opportunity to give replies based on the

above proceedings and its decision on the issues raise, Commission is issuing the

Page 238: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxviii

Tariff Order.

3. The proposed hike of 102 paise per unit is

objectionable. Tariff hike of 102 paise per

unit has been sought for all categories

except BJ/KJ and IP sets.

The main reason for revision in

tariff is that, the approved

average rate of realisation is not

being realised due to change in

consumer mix as well as HT

consumers leaving the grid for

Open Access. The average

power purchase cost is Rs.3.97

per unit as against the

approved purchase cost of

Rs.3.90 per unit for FY15. Tariff

hike of 102 paise per unit has

been sought for all categories

including BJ/KJ and IP sets.

Commission's Views: As required under the Electricity Act, 2003, after examining

all aspects, the Commission has allowed an appropriate tariff increase, striking a

balance between the interest of the ESCOMs and the consumers.

4. The tariff is higher in Karnataka as

compared to other States, inspite of major

generation in Karnataka is through hydel.

Tariff of other States cannot be

compared with that of

Karnataka, as each State has its

own energy profile and energy

consumption. Different states

adopt different methods of

charging consumers. However,

it is mandatory to all the

DISCOMs to file their ARR before

the Commission for tariff

determination.

Commission’s Views: The Reply furnished by the BESCOM is acceptable. 5. As per the Tariff Policy the tariff should be

within +20% of the Cost to Serve.

Accordingly the tariff of HT2(a) should be

brought down by 50%.

Hon'ble ATE in Appeal

No.42/2014, directed all the

State Commissions to indicate

category-wise cross-subsidy with

reference to voltage-wise cost

of supply. This is only to

transparently indicate the levels

of cross subsidy in respect of

Page 239: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxxxix

different categories of

consumers. However, for

industrial consumers, the cross

subsidy level of +20% of Average

Cost of Supply is already

achieved in the earlier Tariff

Orders. BESCOM has furnished

the data on voltage wise cross-

subsidy, in its petition for all

categories of consumers.

Commission's Views: As directed by the Hon’ble ATE, the Commission has

endeavored to reduce the cross subsidy gradually which is reflected in the

current order as well. The voltage wise cross subsidy levels have also been

indicated in the tariff order, as directed by the Hon’ble ATE.

6. BESCOM has failed to achieve designing of

tariff at ± 20 % of the average cost of

supply. BESCOM is cross-subsidising

Industrial consumers for the power used by

the IP sets, though the Government is

committed to provide power to IP sets.

Section 61 of the Electricity Act,

2003 emphasises lower tariff for

poorer sections of the society. In

accordance with the Tariff

Policy, the tariff for IP sets falls

within +20% of the average cost

of supply. The Commission has

approved the industrial rate

within the range of +20% of

average cost of supply. Actual

realisation of cross-subsidy from

the industrial sector is between

11% to 13%.

Commission's Views: The matter is appropriately dealt in the Tariff Order 7. The deficit of Rs.722.47 Crores for FY15

should not be considered for truing-up and

it should be removed from the proposed

deficit for FY17.

There is a gap of Rs.722 Crores

for FY15 as against the

approved figures. Average

power purchase cost is. Rs.3.97

per unit as against approved

power purchase cost of Rs.3.90

per unit for FY15. For FY15, the

Commission has approved Rs.16

Crores as regulatory asset and

carrying cost of Rs.138 Crores, at

Page 240: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxl

the rate of 12% on the

regulatory asset is also

considered. This amount is also

part of Rs.722 Crores.

Commission’s Views: The Commission has suitably dealt with this issue in this Order.

8. Revenue receipts from the sale of power to

the tune of Rs.13479.80 Crores as submitted

in its 'Notes to the financial Statements'

should be considered as against

Rs.13075.20 Crores, as proposed for the

purpose of truing-up for FY15.

Expenditure is not the main

cause for increase in the deficit

year on year, but it is the

receipts. The average realization

works out to Rs.5.36 per unit as

against the approved tariff of

Rs.5.48 per unit. It is placed

before the Commission, that

owing to apparent errors in the

accounts, it is not right to

consider the receipts as per final

accounts of the BESCOM.

Commission’s Views: The Commission has appropriately dealt with this issue in this

Order. 9. Regulatory asset of Rs.541.97 Crores for

FY13, should not be recovered after a gap

of four years in FY17. Carrying cost

pertaining to the part of amount to be

recovered from the consumers should be

allowed as against a carrying cost on the

total regulatory asset for FY13.

The Regulatory asset was

Rs.1151.65 Crores for FY13, out of

which Rs.524.53 Crores was to

be collected from Government

of Karnataka as additional

subsidy. The balance is Rs.627.13

Crores was to be passed in the

tariff for FY15. But, Commission

has considered only Rs.16 Crores

for FY15 and passed on Rs.611

Crores as regulatory asset to be

recovered from tariff during FY16

and FY17 with 12% carrying cost.

On both the counts deficit of

Rs.1151.65 Crores for FY13 has

not been realized up to FY16.

Hence, BESCOM has considered

the carrying cost of Rs.138.2

Crores for FY15 at the rate of

Page 241: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxli

12% on Rs.1151.65 Crores. There

is a gap of Rs.722.5 Crores for

FY15, since the average power

purchase cost is Rs.3.97 per unit

as against the approved

purchase cost of Rs.3.90 per

unit.

Commission’s Views: The Commission in its Order dated 12th May, 2014, decided

to treat Rs.627.27 Crores, out of a total deficit of Rs.1151.65 Crores for FY13, as

Regulatory Asset. The Commission has allowed only Rs.16 Crores to be recovered

in FY15 and passed on Rs.611 Crores as regulatory asset to be recovered from

tariff during FY16 and FY17. As per the Orders of the Hon’ble ATE in OP No.1/2011

dated 11.11.2011, the Regulatory Asset can be carried forward for a maximum of

three years. After undertaking the Annual Performance Review (APR) for FY15,

based on audited accounts, the net deficit has been carried forward to the ARR

of FY17 and its recovering has been appropriately considered.

10. An additional subsidy of Rs.131.74 Crores

should be borne by the State Government for

additional quantum of 247.57 MU supplied to

IP Sets and BJ/KJ Consumers at an average

cost of supply of Rs.5.32 per unit for FY15. The

BESCOM has not indicated how much arrears

are to be recovered from local bodies.

The GOK is yet to release the

additional subsidy which is

approved by the Commission.

The receivable from Urban Local

Bodies and Zilla Panchayat is to

the tune of Rs.2330.75 Crores

The deficit of Rs.722 Crores is

arrived after considering this

amount as a part of revenue

demand. Hence, recovery of

arrears from local bodies

mitigating the revenue gap for

FY15 is not justifiable.

Commission’s Views: The reply furnished by the BESCOM is acceptable. However,

BESCOM shall endeavour to recover the arrears of subsidy and other receivables

from the Government and others to mitigate cash flow problems and to reduce

the cost of borrowing to meet the deficit. The Commission ensures that such cost

does not exceed the normative expenditure approved by it.

11. The BESCOM should furnish subsidy allocation

letters. The BESCOM has not indicated the

details of subsidy given by the GoK. The

The BESCOM is claiming subsidy

in advance, quarterly. The

Subsidy allocation letter is not

Page 242: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlii

Subsidy paid to KPCL is also not indicated.

Subsidies are not recovered by proper

persuasion with the Government. There is

discrepancy in the subsidy funds released to

BESCOM from the Government. Further, under

BJ/KJ category, the GoK has paid a subsidy of

Rs.1118.94 Crores as against the dues of

Rs.1400.23 Crores Thus, the amount of subsidy

short received from GoK is Rs.281.29 Crores

required as bills towards supply

of power to BJ/KJ and IP sets are

raised on quarterly basis and the

Government is releasing the

amount accordingly. The GOK is

reimbursing the Commission

determined tariff (CDT) to those

it wants to provide electricity at

its cost. Since the accounts

drawn are under accrual basis,

the depiction of payment by

the GoK either directly or by

clearing the bills of KPCL as

adjustment does not arise.

Subsidies are being accounted

on accrual basis not on cash

basis. The subsidy amount of

Rs.41.4 Crores for BJ/KJ and

Rs.1358.83 Crores for IP sets have

been demanded by the

BESCOM and the same has

been considered as receipt for

truing up for FY15. Hence, the

question of subsidy short

received does not arise.

Commission’s Views: The accumulation of arrears from Urban Local Bodies and

Zilla Panchayat does not affect the working results of the Company. However,

timely recovery of these arrears will result in better cash flows, enabling the

Company to discharge its current liabilities. Nevertheless, the Commission notes

with concern raised by the objectors and directs the BESCOM to pursue the

matter with the Government to recover the arrears at the earliest.

12. The expenditure estimated for FY17 is

disproportionate. The BESCOM has estimated

the expenditures for the coming years i.e.,

FY17 to FY19 based on Tariff Order issued in

2013 instead of considering the Commission's

Tariff Order 2014. Hence, the estimations are

Commission has fixed Rs.542

Crores and its interest Rs.127.90

Crores as regulatory asset for

FY17 and it is estimated around

9.09%. As per the MYT

Regulations of Commission, the

Page 243: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxliii

invalid. estimated expenditure in the

coming years i.e., FY17 to FY19

are made by considering the

estimated expenditure of FY16

as a base year and also based

on previous two years actual

expenditures as per audited

accounts. Therefore, objector’s

statement is not correct.

Commission’s Views: The Commission has appropriately dealt with this issue in this

Order. 13. Revenue from the sale of power works out to

be Rs.14917.92 Crores as against Rs.14746.46

Crores. The tariff revision for FY16 is not

reflected in the revenue computation for FY16

and FY17.

The main reason for not

achieving the approved level of

average rate is due to change

in the slab-wise consumption,

introduction or deletion of new

tariff category, reclassification,

merger of tariff and not

achieving the targeted sales.

There is no significant impact on

revenue due to revision of tariff

for FY16.

Commission’s Views: The existing revenue against the approved sales for FY17, is

considered by the Commission, based on the tariff for FY16. The revenue

computation for the FY16 would be necessary for the APR of FY16 and not now.

14. Industrial consumers account for about 28% of

the total energy sales and contribute about

40% of the total revenue.

Actual industrial consumption is

decreasing year on year and for

FY15, it is at 24%. Reasons have

been explained in the tariff

application.

Commission’s Views: The Commission determines the tariff for different categories

of consumers keeping in view the norms specified in the Electricity Act, 2003, the

policies and the Regulations issued thereunder.

15. The BESCOM has purchased1133.63 MU less

energy as against the approved figures

amounting to Rs. 232.54 Crores, which should

be deleted from its deficit for FY15.

The BESCOM was not supplied

with the approved level of

energy from KPCL thermal, CGS

and major IPPs. Thus, the

company had to purchase

Page 244: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxliv

more quantum of short-term

power which resulted in

increase in power purchase cost

for FY15.

Commission’s Views: The reply furnished by the BESCOM is acceptable. 16. The average power purchase prices from

various sources projected for FY17 does not

correspond to the recent decreasing trends in

fuel prices. Linear increase in the power

purchase cost has been considered without

accounting for the distinct nature of fixed and

variable charges. The BESCOM has erred in

considering the capacity charges from the

CGS plants based on the tariff petitions filed by

them before the CERC for the control period

2014-19.

Thermal source of power

purchase constitutes 52% of the

total purchase and rest is from

other sources. Hence, the

average power purchase cost is

not only dependent on the

price of the coal but varies on

the source wise energy mix

purchased. Further, analysis of

power purchase cost from

different sources shows that

there is a consistent increase in

the cost from all sources except

for hydel. Increase in capacity

charges is due to commissioning

of new power projects, which

are in pipe-line such as, BTPS-

Unit-3, Yermarus 1 and 2,

Damodar Valley Corporation &

other projects.

Commission’s Views: The BESCOM’s reply is acceptable. 17. An average increase in the range of 13.47% to

18.18% has been considered for KPCL and

CGS stations over the values of FY15 for

projecting for FY17. Prudence check should be

done on projected power purchase cost for

FY17.

Increase in power purchase cost

is attributed to annual increase

of 7% to 8% in inflation rate and

increase in interest rate. Besides,

loyalty charges, secondary

energy charges, incentives are

considered for the projection.

The projected power purchase

cost works out to 3.10% increase

for two years resulting in annual

growth rate of 1.55%.

Commission’s Views: The payment for power purchase is based on the

Page 245: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlv

Regulations issued by the CERC and also by the Commission. They are based on

norms stipulated under the said Regulations.

18. The BESCOM should enter into long-term PPA

with the generators through competitive

bidding, instead of continuing with

short/medium term PP agreements.

Short-term power purchase is

done through tendering and the

price is discovered. The BESCOM

is purchasing short term power

after due approval by the KERC.

Power purchase from August

2013 to June 2016 is discovered

through tender process at

Rs.4.85 per unit in the case of

Global Energy.

Commission's views: The reply furnished by BESCOM does not answer the issues

raised. The BESCOM should through PCKL make efforts for entering into a long-

term PPAs through competitive bidding to reduce its power purchase costs.

19. High cost energy has been allocated to the

BESCOM

The BESCOM is consuming 51%

of the State consumption to

provide continuous power

supply to its consumers.

Accordingly, the consumers of

the BESCOM has to pay the

purchase cost of power

Commission's views: The power allocation to the ESCOMs is being done by the

GoK, who is the owner of the ESCOMs. With a large and varied consumer mix, the

BESCOM is able to absorb the high cost power allocated to it. There is no case for

any intervention by the Commission.

20. The BESCOM has submitted an increase in

transmission cost by Rs.10.05 Crores.

The increase in transmission cost

by Rs.10.05 Crores is due to

transmission availability

incentive.

Commission’s Views: The matter is appropriately dealt in KPTCL’s Order. 21. BESCOM has incurred capital expenditure of

Rs.1474.58 Crores as against the approved

capital expenditure of Rs.763 Crores

The BESCOM has incurred

excess capital expenditure of

Rs.234.42 Crores towards

implementation of E&I works,

Ganga kalyana and drinking

water supply works, local

planning works and

Page 246: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlvi

replacement of faulty

transformers by new

transformers. Further, the

BESCOM has incurred excess

capital expenditure of Rs.477.17

Crores towards providing

infrastructure to un-authorised IP

sets, Niranthara Jyothi Yojana,

implementation of DAS

programme, HVDS system and

RGGVY programme. Capital

expenditure for FY15 was

planned during FY13 and due to

Government initiative to

complete providing

infrastructure to unauthorised IP

sets and Niranthara Jyoti Yojana

in a faster pace, more amount

was incurred towards the said

works.

Commission’s Views: Though the BESCOM has explained the reasons for incurring

capex over and above the approved amounts, there should be prior approval for

the capex being incurred exceeding the approved capex as it has an impact on

determination of tariff. Commission is subjecting capex to prudence check to

ensure that is for improving the delivery of service to consumers by BESCOM using

more efficient system.

22. The interest and depreciation incurred on the

excess capital expenditure should not be

passed on to the consumers.

Not Replied

Commission’s Views: The BESCOM has submitted the reasons for the variations in

actual Capex as against approved figures in its reply to the Commission’s

preliminary observations on the BESCOM’s tariff application. Further, the

Commission is conducting prudence check of the capex before allowing interest

and depreciation on the capitalized assets so as to avoid passing of any

unnecessary expenditure to the consumers thereon tariff.

23. The BESCOM should work out realistic capital

investment budget and should execute the

Not Replied

Page 247: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlvii

projects timely. The BESCOM should seek prior

approval of the Commission in case of

deviations.

Commission’s Views: The BESCOM has submitted the reasons for the variations in

actual Capex as against approved figures in its reply to the Commission’s

preliminary observations on the BESCOM’s Tariff application. Further, the

Commission is conducting prudence check of the capex before allowing interest

and depreciation on the capitalized assets so as avoid passing if any unnecessary

expenditure to the consumers through tariff.

24. Loan addition of Rs.1245 Crores as proposed

for FY17 is more than the proposed capital

expenditure during the same year.

For FY17, capex planned is

Rs.1529 and borrowing is

planned at 70% which works out

to Rs.1245 Crores.

Commission’s Views: This issue has been appropriately dealt with in this Tariff

Order. 25. The BESCOM has considered an interest rate of

12.50% as against an interest rate of 11.75%

while computing the interest on new loans.

Further, the interest during construction has

been considered on an ad-hoc basis. Interest

capitalised as well as expenses capitalised

ought to be linked with the capital

expenditure being undertaken.

Error in computation at 12.5% is

regretted. The capital plan

envisaged is mainly dependent

on the loans and interest subsidy

provided by the Central/State

Government. The loan

sanctions are linked with

conditions. Hence, interest

during construction is provided

on ad-hoc basis.

Commission’s Views: This issue has been appropriately dealt with in this Tariff

Order. 26. Increase in long-term borrowing and other

long term liabilities will result in huge interest

liabilities.

Long term borrowings have

increased due to increase in the

capital expenditure.

Commission’s Views: The BESCOM’s reply is acceptable. 27. The BESCOM has claimed the Interest on

Working Capital on normative basis, without

sharing any gains. Further, the consumer

security deposit has been utilised as working

capital and thus, the consumers have been

deprived of a reduction in the ARR through

interest earning on the security deposits. The

security deposits should be subtracted from

Regulations 3.11.2 of the KERC

MYT Regulations, specifies the

rate of Interest on Working

Capital (IoWC) and the

amended version specifies the

sharing of savings on IoWC.

Estimations are proposed

considering the normative IoWC

Page 248: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlviii

the working capital being allowed while

computing Interest on Working Capital.

and the BESCOM is yet to

recover from the accumulated

losses. The proposal is made as

per the norms and any sharing

of saving is the outcome of

truing up exercise.

Commission's views: The Commission is allowing the interest on working capital, as

per the norms prescribed in the MYT Regulations, which take into account the

issue raised by the objector.

28. The BESCOM should clarify as to why interest

on consumers' deposit is to be recovered

through tariff.

As per the Electricity Act 2003,

security provided by the

Consumer is eligible for interest

as per the Commissions

approved rates. Commission

approved the rate of interest

payable on this deposit at the

Bank rates of RBI existing at the

beginning of the financial year.

Commission's Views: Section 47(4) of the Electricity Act 2003 specifies that the

distribution licensee shall pay interest equivalent to the bank rate or more, as

may be specified by the concerned State Commission on the security. The

Commission has been consistently allowing interest paid on consumers' deposit

as per the existing Regulations. Any prudent expenditure incurred by a

distribution licensee in the course of its business has to be passed on to the

consumers through ARR.

29. The Commission is requested to consider

Interest on Security Deposits at 7.75% as

published by the RBI on its website as against

9% as claimed by BESCOM for FY17 in

consonance with the Clause 3.1 of the KERC

(Interest on Security Deposit) Regulations, 2005

which provides for considering the bank rate

as on 1st April of the relevant financial year.

Section 47 (4) of the Act, 2003

specifies payment of interest

equivalent to the bank rate or

more. Hence the existing rate

proposed for deposit is 9%.

However, rate of interest will be

paid as per prevailing bank rate

at the beginning of the financial

year.

Commission's Views: The interest on security deposit of consumers is being

allowed as per the provisions of the Electricity Act, 2003 and the Regulations

issued by the Commission.

Page 249: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxlix

30. The BESCOM is not giving Interest on

consumer security deposit quarterly. Electricity

bill of the BESCOM does not indicate the

amount of deposit paid by consumers. The

BESCOM is not giving interest as per bank rate

as notified by the RBI.

BESCOM is paying Interest on

security deposit in accordance

with the KERC (Interest on

Security Deposit) Regulations

2005. The BESCOM is paying

Interest on Security Deposit at

the bank rate prevailing as on

1st April of the financial year for

which interest is due.

Commission’s Views: The BESCOM’s reply is acceptable. However, the BESCOM

shall examine the feasibility of indicating the amount of deposit in the bill.

31. Huge receivables outstanding from different

categories of consumers, KPCL and other

ESCOMs indicate lower collection efficiency

and reduced cash flow. The BESCOM has not

furnished any details regarding their collection

efficiency

For FY-15, collection efficiency is

97.99%. There is a 2.4% increase

in collection efficiency over the

previous year as stated at page

3 of the BESCOM filing. Formats

D-18 and D-18A consists of

details pertaining to demand,

collection and efficiency for

FY15.

Commission’s Views: Though the collection efficiency is good, the recovery of

arrears and the recovery of subsidy and Government dues should be given

priority by pursuing the matter with the respective departments of the

Government.

32. Losses of Rs.14.10 Crores relating to Fixed

Assets should not be loaded on to the

consumers.

Assets created will be

depreciated at 90% of its value

over the period of life of asset.

Residual value is only 10%. Any

asset after completion of its life

will be asset of the consumer.

Hence, any gain or loss out of

sale proceedings is attributable

to the consumers. For FY15,

Rs.14.10 Crores is shown as net

loss.

Commission’s Views: The matter is appropriately dealt in the Tariff Order. 33. Any short term/medium term power purchase

over and above the approved quantum and

Reduction of availability from

the designated source resulted

Page 250: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccl

purchased at rates exceeding the ceiling rate

should be disallowed. The BESCOM has

projected short-term energy procurement of

442.34MU at 508 paise per unit and 248.88 MU

at 485 paise/unit for FY17-19. Whereas the

short-term energy is available at a cheaper

price at the exchanges.

in increase in short term

procurement. Short-term power

purchase is done through

tendering after due approval

from KERC and the price is

discovered. Power purchase

from August 2013 to June 2016 is

discovered through tender

process at Rs.4.85 per unit in

case of Global Energy. For

projections, the BESCOM cannot

consider IEX rate since BESCOM

will be in a awkward position if it

unable to get the power at the

said price.

Commission’s Views: The State has faced shortage of power due to reduction of

availability from the expected sources, resulting in increase in the quantum of

short-term power purchase. These purchases are being made through

competitive bidding, duly complying with the provisions of the Electricity Act 2003.

The Commission also notes that PCKL is indeed procuring power at exchange at

lower prices.

34. Interest on delayed payments should not be

passed on to the consumers.

BESCOM is not seeking for the

same in its tariff filing.

Commission’s Views: The Commission is not allowing any interest on the delayed

payment of power purchases in the ARR.

35. BESCOM has made huge payments towards

the leave encashment.

For FY15, leave encashment for

working employees and

retired/deceased is Rs.35 Crores

and Rs.16 Crores respectively.

Similarly for FY14, leave

encashment for working

employees and

retired/deceased is Rs.24 Crores

and Rs.12.02 Crores respectively.

The total employee cost for FY15

and FY14 is Rs.802 Crores and

Rs.753 Crores respectively. The

Page 251: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccli

percentage of leave

encashment in employees cost

is 4.8% for FY14 and 6.4% for

FY15.

Commission’s Views: The matter is appropriately dealt in the Tariff Order. 36. The Commission has rejected additional

expenditures like employees’ bonus,

employees’ welfare fund and BESCOM's

contribution towards pension fund. Passing on

these expenditures on to the consumers by

BESCOM is objectionable.

Commission has allowed

employees expenses and O&M

expenses after duly considering

the annual weighted rate of

consumer price index and WPI.

Commission’s Views: The issue of allowable O&M expenses are discussed by the

Commission in detail in the relevant chapters of this order.

37. The BESCOM has inadvertently, added the

consumer contribution in the GFA, while

projecting the depreciation for FY17. The

BESCOM has considered a lower depreciation

rate of 4.87% for FY17 inspite of the fact that

the actual depreciation rate on assets created

out of consumer contributions was 6.45% for

FY15.

Major part of consumer

contribution assets are

transformers, cables and Lines.

The average depreciation

provided for FY-15 is 4.87% which

is well within the limit of

weighted average depreciation

rate of 5.04%. The depreciation

withdrawn as per AS-12 is 6.45%.

The depreciation for the

consumer contribution assets

(For AS-12) is made considering

the average life of all the assets

created as per the existing

policy. It is proposed to retain

the average rate of

depreciation for the consumer

assets subject to change in the

existing policy. Hence, average

depreciation is considered for

estimations of FY-17.

Commission’s Views: The Depreciation claims are being regulated as per the

existing MYT Regulations, also keeping in view the Orders of the Hon’ble ATE on

this issue.

38. The BESCOM has sought approval for O&M The BESCOM has trued up the

Page 252: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclii

cost of Rs.1084.80 Crores on normative basis as

against an actual O&M expenses of Rs.1054.60

Crores. The O&M expenses of Rs.1013.25 Crores

and Rs.1028.63 Crores may be considered as

against Rs.1084.83 Crores and Rs.1308.12

Crores claimed for FY15 and FY17 respectively.

O&M cost to Rs.1084.83 Crores,

as against the approved O&M

cost of Rs.1110.95 Crores. The

O&M Expenses of Rs.1084.8

Crores have been calculated

on normative basis, as stipulated

in the MYT Regulations 2006

Commission’s Views: The Commission has appropriately dealt with this aspect in

this Tariff Order.

39. Weighted inflation index of 7.20% as against

8.47% for FY15 and 7.22% as against 8.34% for

FY17 should be considered.

Weighted inflation index of 7.2%

and 7.22% for FY15 and for FY17

respectively is not in line with the

CERC method of computation,

as computation of inflation

index for truing up is different

from estimation of inflation index

for future years. For truing up,

inflation rates are computed by

using statistical method

considering monthly actual

inflation rates of the previous

twelve calendar months. While

computing the CPI and WPI

numbers by the BESCOM, an

error has crept in for the years

2011 to 2013. For FY15, twelve

months data as per the CERC

method is considered.

Composite series is computed

duly taking 76% of CPI being the

employee cost to the total O&M

expenses and 24% WPI as per

the actual cost of Repair and

Maintenances cost to the total

O&M expenses. For estimation

of FY-17, past twelve calendar

years inflation data is

Page 253: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccliii

considered which works out to

8.16%.

Commission’s Views: The Commission has suitably dealt with this aspect in this

Tariff order, in terms of the MYT Regulations.

40. Rs.134.31 Crores has been booked under

employee costs for FY15 on ad-hoc basis

without any actuarial valuation report to

support the claim of expenses. Further, pension

and gratuity contribution of Rs.50.08 Crores,

out of Rs.134.31 Crores remains unpaid and

thus, there has been a cash outgo of only

Rs.84.23 Crores.

P&G contribution constitutes

about 10% of employees cost

and thus, cannot be construed

as an independent expenditure.

Out of Rs.50.08 Crores provision

of Rs.0.27 Crores only relates to

P&G trust for March’15 and

Rs.17.61 Crores were provided

for FY-15, for payment of earned

leave encashment and Rs.32.74

Crores for liability due from the

Company for the fund created

under “Employees benefit

fund”. However, addition of

other liabilities related to

employees benefit under this

provision is regretted.

Commission's Reply: The Commission is allowing the O & M expenses which

includes employee cost, as per the provisions of the MYT Regulations after due

verification of BESCOM’s claims.

41. Interest earned by investing Pension and

Gratuity Fund has not been accounted for.

All the employees of the

erstwhile KEB/KPTCL are on

deputation to BESCOM. The

BESCOM is contributing its share

of pension contribution for its

employees to KPTCL. The KPTCL

has constituted a Pension &

Gratuity Trust and this Trust is

looking into the issue of terminal

benefits of all the employees of

BESCOM. This is a totally

independent transaction, where

BESCOM will only contribute its

Page 254: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccliv

share as per statutory

requirements. Hence, the

question of interest on the P&G

contribution does not arise.

Commission’s Views: The responsibility of dispersal of pension to all the employees

of the erstwhile KEB/KPTCL, as on the date of transfer of assets and liabilities and

employees of KPTCL to the ESCOMs and the employees who retire while working

in BESCOM lies with the Pension & Gratuity Trust, which is an independent

institution. After receiving the contributions from the Government, KPTCL and

ESCOMs, the Trust is managing the dispersal of the pension and Gratuity to the

retiring employees. As such KPTCL and ESCOMs have no role in the investments

made by the Trust or any interest / returns earned on such investment.

42. The insurance fees of Rs.2 Lakh is meagre

amount compared to the huge distribution

system in place. BESCOM should clarify:

(1) The major infrastructure, installation and

system are under insurance cover; (2) If the

public is covered under third party insurance

against accidents due to unsafe installations.

Proper insurance coverage will result in

financial security and will also lead to

periodical system audit by the insurance

agencies which will result in better

organisational performance.

An amount of Rs.5 lakhs paid

towards property tax by

Nelamangala division has been

wrongly classified as

insurance/fee as per accounts.

Commission’s Views: The reply is limited to misclassification of the expenditure and

does not clarify the issues raised. The BESCOM should come out with a policy in

these issues.

43. As the O&M expenses for EHV/HV/LT

installations are non-uniform, different O&M

cost indexes for different voltage level needs

to be worked out as against application of

gross consumer growth at 5.83%. Only the

average (50%) of the annual growth should

be applied on the previous annual cost to

work out the escalation. O&M expenses

needs to be justified based on the industry

standard and as a percentage of the total

5.83% consumer growth is the

average one year growth rate.

The formula approved by the

Commission for computing O&M

expenses is universally

accepted. Hon’ble Appellate

Tribunal for Electricity has upheld

the decision of the State

Regulatory Commission

regarding approving O&M

Page 255: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclv

capital installations in place. expenses linked with inflation

index, consumer growth rate

and efficiency parameters.

Commission’s Views: The Commission is arriving at the O & M expenses for the

Company as a whole based on the indices notified by the CERC. Hence the

voltage wise O & M cost indices are uniform. There is no case for modification of

this methodology.

44. It needs to be checked whether Rs.341.15

Crores drawn from PFC towards APDRP is a

grant.

Rs.341.15 Crores drawn from PFC

towards APDRP is a loan.

Commission’s Views: The reply furnished by BESCOM is acceptable. 45. Incentive of Rs.141.29 Crores for FY15, earned

due to timely payment of bills to the

generating stations, should not be covered

under "non-tariff income". Accordingly, it

should be reduced from the power purchase

expenses.

Interest charges on the delayed

payments are not a pass

through. Paying PP bills in

advance and earning incentive

for advance payment is an

efficient financial management.

Commission’s consideration for

giving 10% as an efficient

financial management is not

encouraging the efficiency and

the objector’s contention for not

allowing the incentive is totally

against the objective set in the

preamble of the Electricity Act,

2003.

Commission’s Views: The incentive earned on timely payment of power purchase

dues is treated as other income and deducted out of the total ARR. Hence the

benefit is passed on to the consumers. However, to encourage the ESCOMs to

pay the power purchase claims on time, a reasonable 10% of the incentive is

allowed to be retained by them.

46. Non-tariff income projected for FY17 may be

considered to increase over FY15 actual levels

by the weighted inflation index.

The estimation of non-tariff

income is based on the other

miscellaneous recoveries.

Commission’s Views: This issue has been dealt with suitably in the Tariff Order. 47. The demand charges should be retained at

the present level.

The BESCOM has proposed

increase in fixed charges vide

page No.218 to 222 duly stating

Page 256: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclvi

reasons.

Commission’s Views: This matter has been dealt with suitably in the Tariff Order. 48. As capital cost of meters has been accounted

for in capital expenditure, meter rental

charges may be disallowed.

Any rental received will

definitely account as other

income.

Commission’s Views: Any income received by way of rentals, is rightly accounted

as other income and the consequent reduction in ARR passed on to the

consumers,

49. Interest rate on late payment surcharge and

interest rate on advance payment should be

fixed at a rate equivalent to the interest rate

on working capital.

The proposal made on advance

payment refers to advance

payment before due date.

Commission’s Views: The payment of interest by BESCOM is being regulated as

per the provisions of the MYT Regulations.

50. Since FY06, the BESCOM has made the

payment of energy charges including interest

of other ESCOMs of the State without getting

timely payments from them. As such the

interest incurred should not be passed on to

the consumers.

Expenditure made towards

other ESCOMs is treated as

receivables by respective

ESCOMs and the interest on

working capital as proposed by

BESCOM, is admitted by the

Commission under normative

basis. Therefore, these

transactions are not reflected in

the proposed tariff revision and

hence, the burden on

consumers does not arise.

Commission’s Views: The Commission is allowing interest on working capital as per

the norms prescribed in the MYT Regulations and no interest is being allowed

towards belated power purchase payments.

51. BESCOM has claimed RoE for FY15 and FY17

only on the opening balance of paid-up share

capital without considering the negative net-

worth and negative reserves and surplus.

Equity induced in the middle of

the year or incremental internal

resources accrued in the month

and invested during the year

should also earn the returns. If

the RoE allowed for the equity

held at the beginning of the

year, it will not give any returns

Page 257: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclvii

on the equity induced during

the year. The principal

difference between the debts

and equity is the earlier one is

secured and the later one is not

secured. Hence the second one

has preferential treatment.

Hence BESCOM requested the

Commission to allow return on

the closing balance of the

equity.

Commission’s Views: This issue is suitably dealt with by the Commission in this Tariff

Order.

52. The energy charges collected from the

Government for BJ/KJ installations are much

higher than the actual energy consumption.

BJ/KJ installation bills are

prepared on the basis of meter

readings obtained.

Commission’s Views: Reply furnished by the BESCOM is in Order.

53. Tariff applicable to MSME should not be

revised.

The tariff applicable to industries

is lower than that of

commercial.

Commission’s Views: The increase in the average cost of supply has to be borne

by all the consumers, in order to recover the costs.

2. Objections relating to Quality of Service:

Objections Replies by Licensee

54. The BESCOM should provide 3-phase power

supply to IP sets consumers during day time

instead of night hours.

The BESCOM is adhering to the

directions given by the GoK

regarding duration of power

supply to the IP set consumers.

Commission’s Views: The Reply furnished by the BESCOM is in order.

55. Steps taken for improving efficiency have not

been indicated. Further, gains due to

efficiency improvement which could have

been transferred to the consumers have not

been calculated.

Truing-up of FY15 is placed

before the Commission with

comparisons between the

approved figures versus actual

figures. Efficiency gains will be

measured by the Commission

Page 258: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclviii

and the Commission will take

care of sharing of gains due

considering the approved

targets.

Commission’s Views: The sharing of gains and losses have been dealt with

suitably in the Tariff Order.

56. The BESCOM should not claim the subsidy for

closed IP set installations from the

Government. Supply to unauthorised IP set

installations should be disconnected.

Permanent infrastructure is not yet established

for the unauthorised installations which are

regularised under Akrama/Sakrama scheme.

The BESCOM is adhering to the

GoK Orders from time to time

regarding unauthorised IP sets.

Regarding regularisation of

unauthorised pump sets,

BESCOM is following the

directions of the GoK from time

to time.

Commission’s Views: The reply furnished by BESCOM is in order. 57. Voltage fluctuations lead to burning of

transformers resulting in reduction in yield.

Specific incidents should be

brought to the notice of

BESCOM. If the request is not

considered, then the objector

can submit the complaint to

CGRF.

Commission’s Views: The reply furnished by BESCOM is in Order.

58. The following measures should be

implemented: (A) One representative from

consumers should be nominated for BESCOM

board member to have a financial discipline;

(B) Every district ombudsman shall appoint

members from agriculture consumers category

to obtain guidance and co-ordination; (C)

Advisory Committee to be created and in that

at least two members should be nominated

from agricultural consumers category. This

committee shall conduct monthly meeting to

reduce the financial losses of BESCOM; and (D)

Cancellation of few prevailing guidelines and

incorporation of few new guidelines.

BESCOM is a Government of

Karnataka undertaking and the

power of appointing of

members to the administrative

board is vested with GoK.

Further, district-wise CGRF is

already prevailing. One

Ombudsman is appointed for

entire State. Representative

from consumers has been

nominated as a member of

each district CGRF.

Appointment of advisor to

BESCOM is not in the scope of

the Commission. Objector has

not placed clarity regarding the

Page 259: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclix

cancellation of few prevailing

guidelines and incorporation of

few new guidelines. However,

BESCOM will accept all

guidelines which are helpful to

the consumers.

Commission’s Views: The reply furnished by BESCOM is in order.

59. Any residual energy that needs to be

accounted will be booked under IP set

consumption. Similarly T&D losses are also

booked under IP set consumption.

Lower IP set consumption is

advantageous to BESCOM as by

lowering the sales, the average

cost as supply will increase

which can be passed on to the

consumers through tariff.

Commission’s Views: The issue of distribution losses and IP set consumption has

been dealt with suitably in this Tariff Order.

60. The BESCOM has not furnished the number of

DTCs feeding the IP sets. The ESCOM has not

given the number of IP sets after enumeration

and BESCOM should submit to what extent

these numbers differ from DCB figures.

BESCOM should clarify whether enumerate

figures are incorporated in DCB and how it

effects the subsidy calculations. BESCOM has

not submitted the impact due to difference in

the figures. BESCOM is not serious about

regularisation of IP sets. The Commission should

direct BESCOM to complete metering by the

end of 2015. BESCOM should consider the

number of unauthorised IP sets while

calculating specific consumption of IP sets.

The BESCOM is calculating IP set

consumption based on the

Agricultural feeder exclusively

feeding IP sets in accordance

with the directions of the

Commission. The enumerated IP

set numbers are depicted in

monthly DCBs. Further, GoK in its

circular no. EN 41 VSC 2014 P1

dated 14.07.2014 has stated

that the unauthorised IP sets will

be treated at par with new IP

set connections. Further, the

BESCOM is recording monthly

progress of unauthorised IP sets.

The BESCOM is metering the

agricultural feeder which is

exclusively feeding the IP sets.

By taking up NJY Phase III,

BESCOM will be able to meter all

the agricultural feeders feeding

IP sets.

Page 260: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclx

Commission’s Views: The matter is appropriately dealt in the Tariff Order. Further

necessary directions have been issued to the BESCOM in the matter.

61. The BESCOM should submit the basis of arriving

at average IP set consumption at various

locations. The BESCOM should explain the

reasons for huge variation in the average

consumption of IP sets at different places.

Further, the BESCOM should explain the

reasons for huge variations in the average

consumption at same place in different

months. BESCOM should explain how the

consumption of remaining 2.5 lakh pump sets is

worked out. BESCOM should furnish the data of

number of existing pump sets and number of

pump sets which are in working condition.

The BESCOM is calculating IP

sets consumption based on the

agricultural feeder exclusively

feeding IP set. This is done as per

the direction of KERC. The

Commission has also prescribed

a format for computing the

sales of IP sets. The month wise IP

set details for FY-15 is furnished

during the validation meeting.

Commission’s Views: Reply furnished by the BESCOM is acceptable. Necessary

directions have been issued to the BESCOM in the matter.

62. The morning peak is attributed to domestic

and A.E.H consumers. The BESCOM has not

furnished any information regarding reduction

in the peak load due to implementation of

TOD. As such, the Commission may cancel

compulsory TOD and make it optional.

HT consumers consume 50% of

energy and domestic

consumers consume 25% of the

total energy. The domestic

consumers are bound to install

solar water heaters. Thus,

morning peak cannot be

attributed only to domestic

consumers. TOD metering is a

demand side measure to clip

the peak demand. As per the

existing TOD structure, penalty is

being levied for consumption

during 6 PM to 10 PM and

incentive is being extended for

consumption during 10 PM to 6

AM. Since, the time slots for

rewarding and penalising are

divided unequally, the HT

consumers stand to gain.

Page 261: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxi

Commission’s Views: It is noted that the ESCOMs are not measuring the impact of

the ToD tariff to know its advantages and disadvantages. The BESCOM is

therefore directed to report the impact of the ToD tariff and suggest whether any

changes are required in the current arrangement.

63. BESCOM is yet to install timer switches on the

street lights and thus, has failed to implement

Demand Side Management.

BESCOM has huge payable

from BBMP and other local

bodies to the tune of Rs. 824.35

Cr as on March 2015. BESCOM

cannot burden itself further by

providing timer switches to street

light.

Commission’s Views: In order to conserve energy, installation of timer switches has

been directed by the Commission. Issues relating to implementation of this

direction will be dealt with by the Commission separately.

64. The BESCOM has not yet replaced less efficient

pump sets with more efficient ones. The

BESCOM is still to provide solar powered IP sets

Demand side management in

agriculture for replacement of

less efficient pump-set by high

efficient pump sets is under

discussion with M/s. EESL to

come up with solution for

baseline study. BESCOM is

proposing to provide solar

power to 310 IP sets on pilot

basis. Work is under progress.

The tentative date for

completion of project is

31.03.2016.

Commission’s Views: The reply of the BESCOM is acceptable. Commission would

monitor the progress of the proposed scheme.

65. BESCOM has failed in providing any concrete

plan towards agricultural DSM instead focuses

solely on industrial DSM.

Demand side management is

required in all sectors of

consumers. Industrial consumers

are aware of the technology.

Commission’s Views: The reply of the BESCOM is acceptable. The Commission will

monitor implementation of DSM programmes under the DSM Regulations.

66. The BESCOM has not been able to implement Extent of implementation of

Page 262: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxii

HVDS in all the sub-divisions. The BESCOM

should submit the time frame for completion of

the remaining works.

HVDS system is narrated in the

Petition. HVDS project is being

implemented as per the policy

decision of the Government

and pilot project is under taken

based on the Commission’s

directions.

Commission’s Views: The reply of the BESCOM is acceptable. The Commission is

reviewing regularly the progress achieved under this programme.

67. Industries are suffering due to load shedding.

Independent feeders should be provided to

the industries for getting quality supply.

BESCOM is striving hard to

provide uninterrupted supply to

all its consumers. Any specific

issue may be brought to the

notice of BESCOM.

Commission’s Views: The reply furnished by BESCOM is acceptable. 68. The BESCOM has only been able to meter 56%

of the total 2,04,992 DTCs in the last four years.

DTC metering is important to calculate DTC

wise line losses.

BESCOM has decided to

embark upon metering of all

DTCs during FY17. Once, the

metering is completed the DTC

wise line losses will be worked

out.

Commission’s Views: The reply of the BESCOM is acceptable. The Commission is

regularly reviewing the compliance of the BESCOM in the matter.

69. BESCOM has not submitted existing HT/LT ratio.

Further, BESCOM should furnish the efforts

taken to reduce the HT:LT ratio.

In page no 1 of chapter- 1, the

details are depicted on the ratio

of the HT and LT line as on 30th

September 2015.

Commission’s Views: The reply of the BESCOM is acceptable. 70. BESCOM has not furnished the details of

distribution transformers failures. Further, the

BESCOM has not submitted the expenditure

incurred in repairing the failed transformers

and proposal to reduce the failure in future.

The details of transformer failure

rate are graphically represented

in page 13 of the Petition.

Commission’s Views:. The issue is discussed in the Tariff Order.

71. Consequent to poor quality of repair works

carried out in transformer repair centres, the

frequency of failure of repaired good

Replacement of failed

transformer works is carried out

in BESCOM as per the prevailing

Page 263: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxiii

transformers is increasing. standard of performance. Any

lapses in implementing the

same, if found by the objector

may be submitted to the CGRF.

Commission’s Views: The reply furnished by the BESCOM is acceptable. 72. The actual amount incurred on transformer

failures is 7 times more than the approved

figures.

The Commission has not

approved any amount to incur

transformer failures, rather only

approved the O&M cost on

normative basis where entire

Repair and Maintenance cost

(about 5%) is only a part of O&M

expenditure.

Commission’s Views: The O & M expenses approved by the Commission include

the repairs and maintenance to the distribution system. The Commission has

examined this issue in the Tariff Order.

73. The BESCOM is not disseminating information

regarding substation-wise and feeder-wise

interruptions every month. BESCOM has not

submitted the details of average number of

interruptions per consumer and average

duration of interruptions per consumer.

The BESCOM is providing feeder-

wise power supply details to the

Commission. Further, BESCOM is

furnishing the interruption

statement to the Commission

regularly.

Commission’s Views: The reply furnished by BESCOM is in order. The Commission is

regularly monitoring quality of power supply by the BESCOM.

74. BESCOM is resorting to load shedding without

making alternate arrangements for the

purchase of power from spot market.

Consumers are not being informed 24 Hr in

advance regarding the time and duration of

load shedding. Likely time of restoration is not

informed to the consumers. Unscheduled load

shedding and introduction of staggered

holidays have adversely affected the industrial

consumers.

BESCOM is striving hard to

provide uninterrupted power

supply to all its consumers. Any

specific issue may be brought to

the notice of BESCOM. Toll free

number 1912 has been

established for the consumers to

register their complaints.

BESCOM is being made

responsible for the scheduled

and un-scheduled interruptions

being carried out by KPTCL and

KPCL. Unavailability of the KPTCL

transmission system becomes a

Page 264: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxiv

part of BESCOM's interruptions.

Similarly, generating companies

also have their availability

norms.

Commission’s Views: The Commission has issued suitable directions to the

BESCOM in the matter of load shedding especially about advance

communication to the consumers through SMS etc. The Commission is also

reviewing regularly the reliability power supply by the BESCOM.

75. The directives of the Commission need to be

implemented regarding performance based

incentive, annual setting of KPIs for all divisions,

periodical measurement of performance,

reward and recognition system for outstanding

performances.

Corporate office is dealing with

major aspects of power

purchase, subsidy accounting

and borrowings and dissection

of these major expenses which

involves high cost

purchase/Short term purchases

etc. Also dissection of

Subsidy/Grants/Capex and

borrowing against the proposed

two divisions for SBU may not

happen logically. Hence, SBU

conceptualization is dispensed

with.

Commission’s Views: The Commission has directed all the ESCOMs to adopt

suitable methodology to ensure that their divisions and sub-divisions work on

commercial principle. The review of its implementation and achievement would

be taken up.

76. BESCOM is yet to achieve 100% metering. Metering to irrigation pump sets

is not achieved due to protest

from farmers.

Commission’s Views: The Commission in the Tariff Order has given suitable

directions for correct assessment of power consumption by IP Sets even where it is

not feasible to immediately install individual meters.

77. Hotline call-centres may be established for

reporting complaints and accidents for all

divisions. Multiple mobile service units may be

set up for attending faults and emergencies.

Call centre service is in place for

handling all kinds of complaints.

Additional 214 service stations

have been opened across

BESCOM, provided with men,

Page 265: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxv

vehicles and equipment.

Commission’s Views: The Commission is reviewing regularly the performance of

the BESCOM in handling these issues.

78. BESCOM should declare their performance

standards and KPIs. The compliance report

and supporting documents should be

submitted to the Commission for quarterly

review. Stringent penalty may be imposed for

non-compliance to the agreed level of

performance.

BESCOM is furnishing the details

of implementation of the

Standards of Performance, to

Commission on quarterly basis.

Commission’s Views: The reply furnished by the BESCOM is in order. 79. Automation project in Peenya and Electronic

City is not completed even after 15 years.

The likely date of completion of

Distribution Automation System is

during March, 2017.

Commission’s Views: There has been an abnormal delay in execution of this

programme. The BESCOM should ensure that it is completed within the time

indicated now.

80. BESCOM should submit in how many divisions

the instructions for implementation of Standard

of Performance (SOP) is displayed on Notice

board.

The SOP parameters are

displayed in all the sub-divisions

of BESCOM and the same is

reported to the Commission

Commission’s Views: The reply furnished by the BESCOM is acceptable. 81. BESCOM is not adhering to safety rules. Highest

number of accidents happened in FY15. Safety

standard of the electrical installations needs to

be improved.

The BESCOM’s replies on

prevention of electrical

accidents are narrated in page

no.193 of the Petition.

Budgetary provisions are made

for identification and

rectification of hazardous

locations for prevention of

accident.

Commission’s Views: The reply furnished by the BESCOM is acceptable. The

Commission apart from issuing suitable directions to the BESCOM on this issue, has

been reviewing regularly its compliances.

82. BESCOM should furnish the Reliability Index of

feeders. BESCOM should furnish for how many

feeders there is improvement in reliability

index.

Monthly reliability index is being

submitted to the Commission

and the same is available on

BESCOM's website.

Page 266: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxvi

Commission’s Views: The reliability indices, as submitted by the ESCOMs, are being

hosted on the Commission’s website and are also reviewed by the Commission.

83. Formation of TIC was not required since

research wing of BESCOM is carrying out

research on ways to reduce energy wastage,

inventory, etc.

BESCOM has no Research wing.

Hence, BESCOM has started the

Technology Innovation Centre.

Commission’s Views: The reply furnished by BESCOM is in order. 84. Unmetered agricultural connections lead to

anomalous figures of consumption. In absence

of metered data of agricultural consumption,

claims of BESCOM for government subsidy

need a thorough scrutiny. Metering to all

sectors may be made mandatory. Subsidy to

be disallowed without submission of metered

data. Direct cash subsidy to the farmers to be

implemented.

BESCOM is calculating IP sets

consumption based on the

agricultural feeder exclusively

feeding IP set. This is done as per

the direction of KERC. The

Commission has also prescribed

a format for computing the sales

of IP sets. The month wise IP set

details for FY-15 are furnished

during the validation meeting.

Commission’s Views: The matter is appropriately dealt in the Tariff Order. 85. BESCOM has failed to improve the efficiency of

its operations. The power supply quality in rural

areas has deteriorated during the current year.

Under Niranthara Jyothi Yojana

(NJY) all rural domestic,

commercial and industrial

consumers are getting power

supply as per the Govt.

notification. BESCOM is

supplying power to the IP set

consumers as per the Govt.

Order received from time to

time.

Commission’s Views: The reply furnished by the BESCOM is in order. 86. Consistent and reliable system should be

developed to ensure 100% compliance to the

directives of the Commission. The Commission

may seek for compliance report with

supporting periodical MIS data and analysis.

BESCOM has complied with

many of the directives of the

Commission, for a few directives

BESCOM seeks time extension to

comply with the same.

Commission’s Views: The Commission is regularly reviewing compliance of the

BESCOM to the Commission’s directives in the quarterly meetings of ESCOMs.

87. BESCOM has not furnished any plan for

introduction of pre-paid meters.

BESCOM is installing and

commissioning 3525 prepaid

Page 267: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxvii

meters on pilot basis to

temporary installations in

Indiranagar.

Commission’s Views: The reply furnished by the BESCOM is in order. The BESCOM

shall however, prepare a time bound plan to introduce pre paid meters to other

categories of consumers.

88. BESCOM has not implemented the directives

by CEA regarding harmonics to be maintained

within the specified limits.

BESCOM has not furnished reply

to this query.

Commission’s Views: The provisions are made in Karnataka Electricity Grid Code

and the Commission directs BESCOM to comply with the same.

89. The BESCOM should furnish the data regarding

the demand, availability and amount of

energy purchased from spot market on its

website.

The BESCOM is underway in

implementing SCADA data

reporting and analysis (SDRA)

software. This software comprises

of sending SMS to consumers on

power interruptions and

restoration, and hourly day-

ahead projections. The daily

interruption details, daily load

curve and availability are being

displayed on the BESCOM's

website.

Commission’s Views: The reply furnished by BESCOM is not relevant. Necessary

directions have been issued to the BESCOM in the matter.

90. Slab-wise sanctioned load, fixed charges,

energy charges, development charges

collected and consumption are not made

available by the BESCOM.

Desired information in the

Commission prescribed format

for tariff fixation is furnished to

the Commission.

Commission’s Views: The reply furnished by BESCOM is in order. 91. 92. BESCOM should furnish the empirical formula

and calculation sheet used for preparing load

forecast studies.

BESCOM has projected its load

forecast based on four years'

CAGR. The details of sales

forecast are explicitly explained

in tariff filing.

Commission’s Views: The matter is appropriately dealt in the Tariff Order.

92. BESCOM has not completed the consumer BESCOM has given the required

Page 268: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxviii

indexing and Geographical positioning system

of the consumers.

details in its reply to preliminary

observations. Further, time

schedule for completion of

Consumer indexing is submitted

to the Commission.

Commission’s Views: The BESCOM should adhere to the time schedule given and

complete the consumer indexing work and also submit the energy audit reports

regularly to the Commission.

93. The BESCOM should clarify as to why it has not

opted for the UDAY scheme for restructuring its

debts.

State Government has to take a

decision on UDAY Scheme.

Commission’s Views: The reply furnished by the BESCOM is in order.

94. BESCOM has not segregated the commercial

and technical losses as stipulated under the

Tariff Policy. Further, actual losses should be

automated as against simulation method to

determine losses.

Segregation of commercial and

technical losses is furnished in D-

19 formats. AT&C losses for FY15

as per accounts is16.76%. Further

reduction in this aspect depends

on the payment of dues from

the Urban and rural local bodies.

Commission’s Views: The reply furnished by the BESCOM on segregation of losses

is acceptable. 95. The break-up of losses at various voltage levels

needs to be analysed to identify the causes of

higher losses. Projected distribution losses are

much higher as compared to the other

distribution companies in the country. SCADA

should be used for identifying and reducing

losses. Stringent targets should be fixed to bring

down the loss percentage at par with the

average percentage losses recorded with the

five distribution companies in India with lowest

loss levels.

Distribution Loss involves both

technical and non-technical

loss. If only Bangalore

Metropolitan area is considered

then the distribution loss is

approximately 8%. BESCOM has

already reduced its distribution

loss from 20% in FY08 to 13.53% in

FY15. Further reduction in

distribution loss needs

participation from both BESCOM

and consumers.

Commission’s Views: BESCOM shall conduct suitable studies to correctly measure

the voltage wise losses and identify the high loss making feeders and take

remedial measures.

96. Reduction in distribution losses is very marginal. Distribution loss is within the

band width of KERC target.

Page 269: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxix

Commission’s Views: The matter has been dealt with suitably in the Tariff Order. 97. The number of cases booked under vigilance is

increasing every year. The BESCOM has not

submitted the amount of revenue realised from

the cases booked under vigilance.

Since the cases are in the

course of adjudication, revenue

will not be realised in the same

year.

Commission’s Views: The reply furnished by BESCOM is acceptable.

3. Specific Requests :

Objections Replies by Licensee

98. OA may be extended to consumers drawing

power below 1 MW.

BESCOM has not furnished any

reply.

Commission’s Views: The Commission has extended ‘Open Access’ only to

consumers with contract demand of 1-MW and above keeping the relevant

factors into consideration. Currently, there is no case for its review.

99. A ten year business plan with all projected

costs against the projected demands duly

evaluated by the Commission should be in

place.

Not replied.

Commission’s Views: The Commission has dealt with the BESCOM’s business plan

suitably in the Tariff Order.

100. BESCOM should establish single window

clearance system for getting new connections

along with Tatkal scheme.

BESCOM has taken note of the

proposal.

Commission’s Views: The Commission will consider any proposal of BESCOM on

this issue.

101. Energy audit to be made compulsory in all the

divisions by independent energy auditors.

BESCOM may be insisted upon complying with

the provisions of the Energy Conservation Act,

2001.

Two different software agencies

are working on consumer billing

system. Integration of these to

billing software to the network is

a herculean task. Modules are

being fixed to every meter and

consumer tapping is under

progress.

Commission’s Views: The BESCOM’s reply does not cover the suggestions made.

The Commission has directed the ESCOMs to carry out energy audit.

102. Energy audit of 24 towns shows the losses are BESCOM is providing the details

Page 270: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxx

more than 15% in 18 towns. The losses are as

high as 45.74%. BESCOM has not taken any

initiative to bring down these losses below 15%.

Further, energy audit at inter-phase points is

not done. BESCOM has not furnished data of

energy audit of 15 towns. BESCOM has not

furnished voltage-wise losses.

of Energy Audit of division,

towns, cities and DTCs to the

Commission regularly in the

format prescribed.

Commission’s Views: Though the details of energy audit are being furnished to the

Commission, it is observed that, there are several data inconsistencies, giving

inaccurate results. The BESCOM has been directed to rectify them and furnish

more consistent data compliance to these directions would be monitored by the

Commission.

103. LT2(b) tariff was extended to nursing homes

and hospitals in the previous Tariff Orders.

Since, the nursing homes and hospitals are

equipped with scanning and X-ray machines,

they are not eligible for LT2(b) tariff. Hence, the

Commission may insert the word "dispensary

and out-patient medical practitioner" instead

of nursing homes and hospitals.

The words which are not

specifically defined in the

Regulations should be read as

defined in the dictionary. The

dictionary meaning of 'Nursing

Home' is a 'small private

institution providing residential

accommodation with health

care, especially for elderly

people'. Or ' A privately

operated establishment

providing maintenance and

personal or nursing care for

persons who are unable to care

for themselves properly' and the

word 'hospital' means 'an

institution providing medical and

surgical treatment and nursing

care for sick or injured people'.

Commission’s Views: The Commission will consider the request appropriately. 104. As the Police Stations/offices do not carry out

any commercial activity, they may be re-

categorised under LT-2(a) i.e., domestic

category similar to fire service Stations as

against LT-3 applicable for commercial

category.

The purpose for which supply is

required by 931 police

stations/offices is to carry out

business, clerical or professional

activities. The dictionary

meaning of the word 'Office' is a

Page 271: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxi

room, set of rooms, or building

used as a place of business for

non-manual work. Hence, police

stations/offices are comparable

with BESCOM offices, post

offices, pvt. offices. Therefore,

they are billed under LT3 tariff.

On the contrary "Fire- service

Station" means a building where

fire fighting vehicles and

equipment are stationed and

where fire fighters on duty wait.

Accordingly, they are billed

under LT2(a) tariff. Hence, "Fire-

service Stations" are not

analogues to police stations. If

domestic tariff of Rs.4.71 per unit

is made applicable to police

stations, then some high-end

consumer has to bear the cross-

subsidy of 94 paise per unit.

High-end consumers are going

on Open Access to avoid the

tariff hike.

Commission’s Views: The reply furnished by the BESCOM is reasonable.

105. Demand-based tariff may be extended to LT 2,

LT 4, LT 6 and LT 7 categories. The consumers

will not have any unnecessary interference in

his installations and the exact load on

transformers can be calculated.

Demand based tariff is provided

to LT3 and LT5 category having

connected load of 5kW and

above. As per the provisions of

demand based tariff, the

consumers can have the load

more than the sanctioned load

in his premises. In case of LT2(a)

as per the Regulations, fixed

charges for domestic and A.E.H

category shall be based on the

sanctioned load, irrespective of

Page 272: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxii

the connected load, as long as

the load limiter is working in

good condition. Hence,

demand based tariff is not

suitable for this category. Other

categories such as LT2(b)

(except educational institutions),

LT4, LT6 and LT7 should not have

the load more than sanctioned

load. As, the meters fixed to

these categories of installations

have no option for recording

maximum demand.

Commission’s Views: The reply furnished by the BESCOM is acceptable. 106. The amount paid by the consumer towards

purchase of meters should be considered as

meter security deposit.

The contention of the consumer

is correct but this is the forum for

discussing tariff revision only.

Commission’s Views: The reply of the BESCOM is acceptable. 107. Under LT2(a) category, the MCB is provided as

per the sanctioned load. It is requested that

the MCBs should be supplied by the ESCOMs

to avoid conflict about the genuineness of the

MCB and the MCBs should be sealed along

with the meter during the service connection.

The Objector may look into the

amendments issued by the

Commission on 25th January,

2016. The amended Regulations

enable the licensee to bill the

installations on the MD recorded

or sanctioned load whichever is

higher for installations where

static meters are fixed.

Commission’s Views: The issue raised does not relate to tariff determination. 108. An appropriate roadmap for 100% metering

indicating incentives and disincentives should

be approved by the Commission.

The existing tariff is not

supporting the recovery of Cost.

Without any financial backbone

achieving the road map is very

difficult.

Commission’s Views: The issue does not relate to tariff determination.

109. The small scale industries may be exempted

from the tariff revision. There should be a

separate tariff for small scale industries, which

should be Re. 1 less than other categories.

The Commission judiciously fixes

differential tariff to the subsidised

consumers for different ESCOMs

and allocates the government

Page 273: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxiii

subsidy duly considering the

consumer mix of each ESCOMs

for having a uniform tariff. As

such uniform hike is proposed for

all category of consumers.

BESCOM is reeling under

financial crunch. BESCOM

cannot think of reducing the

tariff by Re. 1 for small scale

industries.

Commission’s Views: All categories of consumers need to share any revision in

tariff.

110. On certain occasions, there was no power

supply for seven days in Peenya, which

resulted in increase in the manufacturing cost.

For FY16, UPCL generator along

with RTPS unit failed. Hence,

BESCOM was not able to give

power supply.

Commission’s Views: This is not a tariff issue. 111. The BESCOM has not proposed a separate

tariff category of Objector's installation in

accordance with the KERC Order dated

21.01.2016 in O.P. No.43/2015, in case of Indian

Machine Tools Manufacturers' Association and

others Vs. BESCOM.

An exhibition is analogous to

kalyana mantapas and is

clustered under commercial

activity. If M/s. IMTMA if treated

as special case then other

dedicated permanent

consumer will take cognizance

and ask the Licensee to treat

them alike. As the objector has

been holding similar events for

the past few years, the objector

would have a reasonable

assessment of the probable

demand for power with enough

room for fluctuations. Further,

during registration process, the

objector is informed in advance

about the manner of

participation and details

thereof. This would also enable

the objector to assess the

Page 274: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxiv

approximate demand for

electricity during such events.

Further, Clause no.8 of the

‘General Terms and Conditions

of Tariff specifies that:

(8) Use of power for temporary

illumination in the premises

already having permanent

power supply for marriages,

exhibitions in hotels, sales

promotions etc., is limited to

sanctioned load at the

applicable permanent power

supply tariff rates. Temporary

tariff rates will be applicable in

case of load exceeds

sanctioned load as per the

Conditions of Supply of

Electricity of the distribution

licensees in the State of

Karnataka.

Thus, the Commission is

requested not to create a

distinct tariff for M/s. IMTMA

Commission’s Views: The Order of the Commission in OP No.43/2015 is considered

appropriately in the Tariff Order.

112. Rooftop solar may be encouraged with higher

incentives

GoK has mandated installation

of solar water heaters. Hence,

the question of rebate does not

arise.

Commission's Views: This is not a retail tariff related issue.

113. The Commission may direct BESCOM to have

its own generation to an extent of 2000MW

and thus, BESCOM will be able to supply

cheap power exclusively to its consumers.

BESCOM won't be able to fund

for installation of generation

facility.

Page 275: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxv

Commission’s Views: The suggestion made is not feasible.

114. The Commission should not allow cross-subsidy

in respect of un-metered category

Metering to irrigation pump sets

is not achieved due to protest

from farmers.

Commission’s Views: The issue of power supply to IP Sets eligible for subsidy from

Government is discussed in the Tariff Order.

115. A substantial reduction in tariff is required to

ensure survival of energy intensive industries in

Karnataka due to competition from

neighbouring States.

Electricity tariff in Karnataka

cannot be compared with that

of other States. As different

States adopt different method

of charging the consumers.

Commission’s Views: The reply of the BESCOM is acceptable.

116. 5 paise and 15 paise reduction given to rural

areas appears to be meagre. Further

reduction may be given.

The BESCOM has already

commenced Niranthara Jyothi

Yojana for providing better

supply to the rural areas. The

benefits are also detailed in

BESCOM’s filing.

Commission’s Views: Reply furnished by the BESCOM is acceptable. 117. The rebate on solar water heaters should be

increased to Rs.400 per month in view of the

energy saving and carbon credits earned.

Domestic category is subsidised

and the tariff is much lower than

the average cost of supply. The

net realisation rate is still lower

than the approved level. The

National Tariff Policy mandates

for reduction of cross-subsidy

gap over a period of time. The

alternatives available with the

Commission is to increase the

rates of domestic tariff or to insist

the domestic consumers to go

for other sources of energy i.e.,

solar or solar wind hybrid, for

reduction in cross-subsidy

component to other category of

consumers. Under the above

circumstances any single unit of

energy saving from the

Page 276: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxvi

domestic consumers will lessen

the burden of other consumers

and this will not yield any

revenue to BESCOM. To mitigate

the raise in power purchase cost

and to meet the demand-

supply gap GoK issued

notification for mandatory

installation of solar water heater

in 2007. Solar rebate is being

extended only to domestic

category consumers. The reason

being reduction in sales for

domestic category as well as

reduction in morning peak load

and increase in sales in other

categories. The GoK has notified

mandatory installation of solar

water heaters. Hence, the

question of rebate does not

arise. Thus, BESCOM proposes to

withdraw the solar rebate in

gradual manner.

Commission's views: The Commission, considers that there is no case for any

revision of the present rebate.

118. The BESCOM should furnish the timeframe for

completion of Bachat lamp Yojana

Bachat lamp Yojana is not

continued due to non-

participation of CFL firms. It is

Government of India project,

where BESCOM has least scope.

Commission's views: The BESCOM’s reply is acceptable. 119. BESCOM should furnish the number of LED

bulbs sold and savings thereof in MU.

Total number of LED lamps as on

19.02.2016 is 12,97,345.

Commission’s Views: The BESCOM’s reply is acceptable. 120. Time frame for completion of remaining

feeders in Phase II and Phase III of NJY scheme

should be indicated. Further, improvement in

power supply achieved in rural areas by

The detailed benefits derived

from Niranthara Jyothi project is

illustrated in page number 181-

186 of BESCOM’s filing. To

Page 277: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxvii

implementation of NJY scheme needs to be

quantified.

segregate the Irrigation pumps

from the existing rural feeders

with aim to provide 24 hours

supply to non-IP consumers. 3rd

party report on Nirathara Jyothi

is available in the filing is

attached a part of filing.

Commission’s Views: Reply furnished by the BESCOM is acceptable. The

Commission is reviewing the matter regularly in its review meeting.

121. Objections by BWSSB: The Power tariff at

present accounts for 64% of the revenue of

BWSSB and is the single largest item of

expenditure, and the proposed hike of 1.02

paise per unit in power tariff would result in

additional burden of Rs.100 Cr to BWSSB. The

nature and purpose for which the electricity

supply is required should be considered while

determining tariff as more than 35% of the

water is supplied to BPL and EWS consumers.

ESCOM has not furnished at least two years

data preceding the base year of the MYT

period. The BESCOM has not submitted any

perspective plan as required under the KERC

Regulations.

The average cost of supply for

FY15 stand at Rs.5.59 per unit

and is estimated to reach

Rs.5.68 and Rs.6.11 per unit for

FY16 and FY17. Hence, increase

in tariff is proposed. As per

Section 61 of the EA 2003, the

tariff progressively reflects the

cost of supply of electricity and

also reduces the Cross-subsidy.

The tariff fixed for HT-1 category

is 82% of the average cost of

supply. This category requires

18% cross-subsidy from other

consumers. BESCOM has

submitted the data in the

Commission specified format

which requires of two years of

audited data and current year

data and projection of the

Control period. BESCOM has

submitted the Perspective plan

to the Commission.

Commission’s Views: The reply furnished by the BESCOM is acceptable. 122. The objector requests the Commission that the

tariff of small horticultural nurseries shall be

equivalent to agricultural tariff.

At present the objectors are

paying Rs.2.40 per unit. The

average cost of supply during

the financial year FY15 was

Rs.5.65 per unit and it is

Page 278: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxviii

estimated that the avg. cost of

supply during FY17 will be

Rs.6.11per unit. Therefore,

objector has to pay Rs.3.42 per

unit which is 44% lesser and the

difference (i.e., Rs.2.69 per unit)

is to be paid by the other

category consumers as cross-

subsidy. Further, as per EA 2003,

KERC cannot impose more than

20% cross-subsidy to other

category consumers.

Commission’s Views: The matter is appropriately dealt in the Tariff Order.

Other Issues: Objections Replies by Licensee

123. Open Access consumers who are

purchasing wind power should be

exempted from imposition of Cross-subsidy

surcharge. Wind power should not be

considered as open access. Wind

generators should be treated at par with

solar energy generators and exempted

from levy of wheeling and banking

charges. The ESCOMs are claiming the

demand charges in the bills as well as

factoring in the ARR calculations. The

Demand charges so collected should be

refunded.

The BESCOM has to bear the

incidental costs due to

movement of OA consumers in

and out of the grid at the

instance of market. Owing to

the increase in fixed charges in

transmission and distribution

business, BESCOM had

requested the Commission to

reintroduce cross subsidy

surcharge during FY12. The cross

subsidy surcharge has been

calculated as per the formula

given in National Tariff Policy.

Hence, Open Access

Consumers who use the

transmission and distribution

network should bear the cost of

network plus losses besides

paying cross subsidy surcharge.

Any third party sale is Open-

Access. It is for the generator to

Page 279: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxix

enter into long term PPA if

situation is not favourable for

him. The Commission as per the

Tariff Policy, has exempted

cross-subsidy, wheeling and

banking charges only for solar

power.

Commission’s Views: The Commission is determining the cross subsidy surcharge

as per the methodology specified in the MYT Regulation.

124. Tax on captive power may be removed No comments.

Commission's Decision: The issue raised is not within the purview of the

Commission.

125. Bank Guarantee towards 2 MMD may be

accepted. Cash payment should not be

insisted.

Bank Guarantee in respect of 2

MMD is adjudicated before the

Hon'ble High Court. For other

payments bank guarantee is

accepted.

Commission's Decision: The BESCOM's reply is noted. 126. KPCL should reduce the cost of generation

from hydel plants which have been fully

depreciated. The PLF of the thermal stations

have come down to about 60% from 85%. The

Commission may address KPCL and State

Government for improvement of PLF.

Fixation of tariff is guided by the

Tariff Policy and other State

Policies. At present, allocation of

power from hydel and thermal

stations are done through GoK

Order which is accepted by the

Commission. The relevant data

seeking the tariff revision is

placed before the Commission.

Commission's Decision: The reply furnished by the BESCOM is not relevant. The

Commission has been advising KPCL suitably in the matter.

127. The BESCOM has suffered losses due to the

decision taken by the BESCOM administrative

board.

The Additional chief secretary

Energy Dept., GoK is the

chairman of BESCOM and the

Secretary Finance, GoK is the

other Member of BESCOM

Board. Therefore, all the

decisions of BESCOM are

collectively taken by the Board,

Page 280: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxx

which includes Government

functionaries. The Board reviews

the decision taken earlier and

corrective actions are taken to

prevent the Company from

incurring losses.

Commission’s Views: The reply furnished by BESCOM is noted.

128. BESCOM is requested to shift the overhead line

passing through the coconut and areca

gardens at its cost.

These objections are not related

to tariff determination exercise

Commission’s Views: The reply of the BESCOM is acceptable.

Page 281: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxi

ANNEXURE-1

ESCOMS’ TOTAL APPROVED POWER PURCHASE FOR FY17

NAME OF THE GENERATING STATION

ENERGY

ALLOWE

D (MU)

CAPACIT

Y

CHARGES

(RS Cr)

ENERGY

CHARG

ES (RS

Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7 (7x210) 7538.53 619.64 2327.80 2947.44 3.91

RAICHUR THERMAL POWER STATION_RTPS 8 (1x250) 1510.85 211.06 454.42 665.49 4.40

BELLARY THERMAL POWER STATIONS_BTPS-1 (1x500) 2823.10 295.60 1035.95 1331.55 4.72

BELLARY THERMAL POWER STATIONS_BTPS-2 (1x500) 3054.06 444.06 1014.43 1458.49 4.78

BELLARY THERMAL POWER STATIONS_BTPS-3 (1x700) 2720.23 0.00 849.12 849.12 3.12

TOTAL KPCL THERMAL 17646.77 1570.36 5681.72 7252.08 4.11

CGS SOURCES

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 3246.74 197.69 739.53 937.23 2.89

N.T.P.C-RSTP-III (1X500MW) 819.69 75.28 192.48 267.76 3.27

NTPC-Talcher (4X500MW) 2765.03 213.25 400.36 613.61 2.22

Simhadri Unit -1 &2 (2X500MW) 1490.74 226.09 363.15 589.24 3.95

NTPC Tamilnadu Energy Company Ltd (NTECL)_Vallur TPS Stage I

&2 &3 (3X500MW) 1081.78 174.91 222.18 397.09 3.67

Neyveli Lignite Corporation_NLC TPS-II STAGE I (3X210MW) 950.35 68.49 228.93 297.41 3.13

Neyveli Lignite Corporation_NLC TPS-II STAGE 2 (4X210MW) 1280.64 105.25 308.49 413.73 3.23

Neyveli Lignite Corporation_NLC TPS I EXP (2X210MW) 731.33 90.16 182.73 272.90 3.73

Neyveli Lignite Corporation_NLC TPS2 EXP (2X250MW) 865.82 111.21 199.16 310.37 3.58

NLC TAMINADU POWER LIMITED (NTPL) (TUTICORIN) (2X500MW) 1442.76 185.27 371.08 556.34 3.86

MAPS (2X220MW) 249.31 0.00 49.86 49.86 2.00

Kaiga Unit 1&2 (2X220MW) 922.44 0.00 274.89 274.89 2.98

Kaiga Unit 3 &4 (2X200MW) 1001.80 0.00 298.54 298.54 2.98

NPCIL-Kudan Kulam Atomic Power Generating Station (KKNPP)

(1X1000MW) 1527.09 0.00 455.07 455.07 2.98

DVC-Unit-1 &2 Meja TPS (2x500MW) 1574.83 274.91 360.39 635.30 4.03

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 1574.83 261.62 349.87 611.49 3.88

TOTAL CGS 21525.17 1984.13 4996.71 6980.84 3.24

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL (2x600) 7462.68 1325.73 1767.94 3093.67 4.15

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP (10x103.5+2x27.5) 4203.20 20.49 182.11 202.60 0.48

MAHATMA GANDHI HYDRO ELECTRIC POWER HOUSE_MGHE

(4x21.6+4x13.2) 180.68 2.32 17.79 20.11 1.11

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR) (4x60) 527.47 24.38 55.93 80.30 1.52

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 2923.95 19.16 229.11 248.27 0.85

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 1087.86 11.82 129.40 141.22 1.30

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 523.72 27.51 80.48 107.99 2.06

Page 282: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxii

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

((1x2+2x12)+(1x7.2+1x6)) 65.15 1.14 29.76 30.90 4.74

KADRA POWER HOUSE_KPH (3x50) 355.25 19.15 47.57 66.72 1.88

KODASALLI DAM POWER HOUSE_KDPH (3x40) 325.56 12.00 34.43 46.42 1.43

GHATAPRABHA DAM POWER HOUSE_GDPH (2x16) 91.67 1.96 14.77 16.74 1.83

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA (2x8.6) HYDRO

STATIONS_SHIVA & SHIMSHA 310.76 3.54 27.46 31.00 1.00

MUNIRABAD POWER HOUSE (2x9+1x10) 109.63 0.43 8.68 9.11 0.83

TOTAL KPCL HYDRO 10704.90 143.90 857.48 1001.38 0.94

OTHERS

PRIYADARSHINI JURALA HYDRO ESLECTRIC STATION (6x39) 111.61 65.09 0.00 65.09 5.83

TUNGABHADRA DAM POWER HOUSE_TBPH (4x9+4x9) 32.47 2.64 0.00 2.64 0.81

TOTAL OTHER HYDRO 144.08 67.73 0.00 67.73 4.70

SHORT TERM POWER

SHORT TERM POWER 1108.80 0.00 558.84 558.84 5.04

NON-CONVENTIONAL ENERGY SOURCES

WIND-IPPS 3826.75 0.00 1368.74 1368.74 3.58

KPCL-WIND (9x0.225+10x0.230) 12.86 0.00 4.32 4.32 3.36

MINI HYDEL-IPPS 1344.12 0.00 450.45 450.45 3.35

CO-GEN/CAPTIVE 172.09 0.00 65.02 65.02 3.78

BIOMASS 196.60 0.00 97.72 97.72 4.97

SOLAR-IPP 1261.40 0.00 784.50 784.50 6.22

SOLAR-KPCL (YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5) 32.89 0.00 19.63 19.63 5.97

TOTAL NCE 6846.71 0.00 2790.38 2790.38 4.08

TRANSMISSION CHARGES

PGCIL CHARGES 949.21 949.21 0.44

KPTCL CHARGES 3092.77 3092.77 0.47

SLDC & POSOCO CHARGES 19.99 19.99 0.003

TOTAL INCLUDING TRANSMISSION & LDC CHARGES 65439.11 5091.87 20715.0

2

25806.8

9 3.94

ESCOMS’ TOTAL APPROVED POWER PURCHASE FOR FY18

NAME OF THE GENERATING STATION

ENERGY

ALLOWED

(MU)

CAPACI

TY

CHARGE

S (RS Cr)

ENERGY

CHARGES

(RS Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7 (7x210) 6696.43 560.42 2109.13 2669.54 3.99

RAICHUR THERMAL POWER STATION_RTPS 8 (1x250) 1603.00 221.33 480.87 702.20 4.38

BELLARY THERMAL POWER STATIONS_BTPS-1 (1x500) 3241.00 330.35 1213.08 1543.43 4.76

BELLARY THERMAL POWER STATIONS_BTPS-2 (1x500) 3294.00 472.15 1116.01 1588.16 4.82

BELLARY THERMAL POWER STATIONS_BTPS-3 (1x700) 4489.07 459.67 1429.28 1888.95 4.21

TOTAL KPCL THERMAL 19323.50 2043.91 6348.37 8392.29 4.34

Page 283: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxiii

CGS SOURCES

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 3246.74 197.69 754.32 952.02 2.93

N.T.P.C-RSTP-III (1X500MW) 819.69 75.28 196.33 271.61 3.31

NTPC-Talcher (4X500MW) 2765.03 213.25 408.37 621.62 2.25

Simhadri Unit -1 &2 (2X500MW) 1490.74 226.13 370.41 596.55 4.00

NTPC Tamilnadu Energy Company Ltd (NTECL)_Vallur TPS Stage I

&2 &3 (3X500MW) 1081.78 176.33 226.63 402.96 3.72

Neyveli Lignite Corporation_NLC TPS-II STAGE I (3X210MW) 950.35 68.49 233.50 301.99 3.18

Neyveli Lignite Corporation_NLC TPS-II STAGE 2 (4X210MW) 1280.64 105.25 314.66 419.90 3.28

Neyveli Lignite Corporation_NLC TPS I EXP (2X210MW) 731.33 90.16 186.39 276.55 3.78

Neyveli Lignite Corporation_NLC TPS2 EXP (2X250MW) 865.82 111.21 203.14 314.36 3.63

NLC TAMINADU POWER LIMITED (NTPL) (TUTICORIN) (2X500MW) 1442.76 185.27 378.50 563.77 3.91

MAPS (2X220MW) 249.31 0.00 50.86 50.86 2.04

Kaiga Unit 1&2 (2X220MW) 922.44 0.00 280.39 280.39 3.04

Kaiga Unit 3 &4 (2X200MW) 1001.80 0.00 304.51 304.51 3.04

NPCIL-Kudan Kulam Atomic Power Generating Station (KKNPP)

(1X1000MW) 1527.09 0.00 464.17 464.17 3.04

DVC-Unit-1 &2 Meja TPS (2x500MW) 1574.83 274.91 367.60 642.51 4.08

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 1574.83 261.62 356.86 618.49 3.93

TOTAL CGS 21525.17 1985.60 5096.64 7082.24 3.29

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL (2x600) 7462.68 1325.73 1803.30 3129.03 4.19

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP (10x103.5+2x27.5) 5469.75 20.28 248.69 268.97 0.49

MAHATMA GANDHI HYDRO ELECTRIC POWER HOUSE_MGHE

(4x21.6+4x13.2) 195.03 2.32 20.00 22.32 1.14

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR) (4x60) 567.27 24.35 62.23 86.58 1.53

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 2987.82 18.88 245.91 264.79 0.89

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 1103.85 11.67 137.97 149.64 1.36

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 447.48 27.51 70.91 98.42 2.20

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

((1x2+2x12)+(1x7.2+1x6)) 63.36 1.14 30.59 31.73 5.01

KADRA POWER HOUSE_KPH (3x50) 355.41 19.15 49.59 68.74 1.93

KODASALLI DAM POWER HOUSE_KDPH (3x40) 330.66 12.00 36.43 48.43 1.46

GHATAPRABHA DAM POWER HOUSE_GDPH (2x16) 90.09 1.25 15.25 16.49 1.83

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA (2x8.6) HYDRO

STATIONS. 330.66 3.54 30.45 33.99 1.03

MUNIRABAD POWER HOUSE (2x9+1x10) 103.95 0.43 8.62 9.06 0.87

TOTAL KPCL HYDRO 12045.33 142.53 956.63 1099.16 0.91

OTHER HYDRO

PRIYADARSHINI JURALA HYDRO ESLECTRIC STATION (6x39) 111.61 68.99 0.00 68.99 6.18

Page 284: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxiv

TUNGABHADRA DAM POWER HOUSE_TBPH (4x9+4x9) 32.47 2.64 0.00 2.64 0.81

TOTAL OTHER HYDRO 144.08 71.64 0.00 71.64 4.97

NON-CONVENTIONAL ENERGY SOURCES

WIND-IPPS 3981.63 0.00 1424.99 1424.99 3.58

KPCL-WIND (9x0.225+10x0.230) 12.86 0.00 4.32 4.32 3.36

MINI HYDEL-IPPS 1344.81 0.00 450.68 450.68 3.35

CO-GEN/CAPTIVE 172.09 0.00 64.12 64.12 3.73

BIOMASS 262.15 0.00 135.15 135.15 5.16

SOLAR-IPP 2588.38 0.00 1314.95 1314.95 5.08

SOLAR-KPCL (YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5) 32.89 0.00 19.63 19.63 5.97

TOTAL NCE 8394.81 0.00 3413.83 3413.83 4.07

TRANSMISSION CHARGES

PGCIL CHARGES 958.70 958.70 0.45

KPTCL CHARGES 3171.28 3171.28 0.46

SLDC & POSOCO CHARGES 25.80 25.80 0.00

TOTAL INCLUDING TRANSMISSION & LDC CHARGES 68895.57 5569.41 21774.55 27343.96 3.97

ESCOMS’ TOTAL APPROVED POWER PURCHASE FOR FY19

NAME OF THE GENERATING STATION

ENERGY

ALLOWED

(MU)

CAPACI

TY

CHARGE

S (RS Cr)

ENERGY

CHARGES

(RS Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7 (7x210) 6696.43 579.68 2151.31 2730.99 4.08

RAICHUR THERMAL POWER STATION_RTPS 8 (1x250) 1603.00 219.91 490.49 710.40 4.43

BELLARY THERMAL POWER STATIONS_BTPS-1 (1x500) 3241.00 336.83 1237.34 1574.17 4.86

BELLARY THERMAL POWER STATIONS_BTPS-2 (1x500) 3294.00 464.75 1138.33 1603.09 4.87

BELLARY THERMAL POWER STATIONS_BTPS-3 (1x700) 4611.00 464.76 1497.46 1962.23 4.26

YERMARUS THERMAL POWER STATION_YTPS (2x800) 1547.46 204.23 413.13 617.36 3.99

TOTAL KPCL THERMAL 20992.89 2270.16 6928.07 9198.23 4.38

CGS SOURCES

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 3246.74 197.69 769.41 967.10 2.98

N.T.P.C-RSTP-III (1X500MW) 819.69 75.28 200.26 275.54 3.36

NTPC-Talcher (4X500MW) 2765.03 213.25 416.53 629.79 2.28

Simhadri Unit -1 &2 (2X500MW) 1490.74 226.13 377.82 603.96 4.05

NTPC Tamilnadu Energy Company Ltd (NTECL)_Vallur TPS Stage I

&2 &3 (3X500MW) 1081.78 176.33 231.16 407.49 3.77

Neyveli Lignite Corporation_NLC TPS-II STAGE I (3X210MW) 950.35 68.49 238.17 306.66 3.23

Page 285: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxv

Neyveli Lignite Corporation_NLC TPS-II STAGE 2 (4X210MW) 1280.64 105.25 320.95 426.20 3.33

Neyveli Lignite Corporation_NLC TPS I EXP (2X210MW) 731.33 90.16 190.12 280.28 3.83

Neyveli Lignite Corporation_NLC TPS2 EXP (2X250MW) 865.82 111.21 207.21 318.42 3.68

NLC TAMINADU POWER LIMITED (NTPL) (TUTICORIN) (2X500MW) 1442.76 185.27 386.07 571.33 3.96

MAPS (2X220MW) 249.31 0.00 51.88 51.88 2.08

Kaiga Unit 1&2 (2X220MW) 922.44 0.00 285.99 285.99 3.10

Kaiga Unit 3 &4 (2X200MW) 1001.80 0.00 310.60 310.60 3.10

NPCIL-Kudan Kulam Atomic Power Generating Station (KKNPP)

(1X1000MW) 1527.09 0.00 473.46 473.46 3.10

DVC-Unit-1 &2 Meja TPS (2x500MW) 1574.83 274.91 374.95 649.86 4.13

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 1574.83 261.62 364.00 625.62 3.97

TOTAL CGS 21525.17 1985.60 5198.58 7184.17 3.34

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL (2x600) 7462.68 1325.73 1839.36 3165.10 4.24

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP (10x103.5+2x27.5) 5469.75 19.16 260.88 280.04 0.51

MAHATMA GANDHI HYDRO ELECTRIC POWER HOUSE_MGHE

(4x21.6+4x13.2) 195.03 2.32 20.83 23.16 1.19

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR) (4x60) 567.27 24.35 64.43 88.78 1.57

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 2987.82 18.78 258.39 277.17 0.93

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 1103.85 9.89 144.98 154.87 1.40

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 447.48 27.36 73.19 100.54 2.25

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

((1x2+2x12)+(1x7.2+1x6)) 63.36 1.14 32.33 33.47 5.28

KADRA POWER HOUSE_KPH (3x50) 355.41 19.15 51.70 70.85 1.99

KODASALLI DAM POWER HOUSE_KDPH (3x40) 330.66 11.69 37.98 49.67 1.50

GHATAPRABHA DAM POWER HOUSE_GDPH (2x16) 90.09 0.39 16.02 16.41 1.82

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA (2x8.6) HYDRO

STATIONS_SHIVA & SHIMSHA 330.66 3.54 31.75 35.29 1.07

MUNIRABAD POWER HOUSE (2x9+1x10) 103.95 0.43 8.68 9.11 0.88

TOTAL KPCL HYDRO 12045.33 138.20 1001.17 1139.37 0.95

OTHERS

PRIYADARSHINI JURALA HYDRO ESLECTRIC STATION (6x39) 111.61 73.13 0.00 73.13 6.55

TUNGABHADRA DAM POWER HOUSE_TBPH (4x9+4x9) 32.47 2.64 0.00 2.64 0.81

TOTAL OTHERS 144.08 75.78 0.00 75.78 5.26

NON-CONVENTIONAL ENERGY SOURCES

WIND-IPPS 4649.94 0.00 1669.14 1669.14 3.59

KPCL-WIND (9x0.225+10x0.230) 12.86 0.00 4.32 4.32 3.36

MINI HYDEL-IPPS 1443.36 0.00 483.69 483.69 3.35

CO-GEN/CAPTIVE 172.09 0.00 64.12 64.12 3.73

BIOMASS 262.15 0.00 135.15 135.15 5.16

SOLAR-IPP 3692.28 0.00 2076.14 2076.14 5.62

Page 286: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxvi

SOLAR-KPCL (YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5) 32.89 0.00 19.63 19.63 5.97

NTPC- SOLAR 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 10265.57 0.00 4452.20 4452.20 4.34

TRANSMISSION CHARGES

PGCIL CHARGES 968.29 968.29 0.45

KPTCL CHARGES 3472.60 3472.60 0.48

SLDC & POSOCO CHARGES 27.85 27.85 0.00

TOTAL INCLUDING TRANSMISSION & LDC CHARGES 72435.72 5795.47 23888.11 29683.58 4.10

Page 287: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxvii

ANNEXURE-2

APPROVED POWER PURCHASE FOR BESCOM - FY17

NAME OF THE GENERATING STATION

% SHARE

OF

ENERGY

ALLOWED

ENERGY

ALLOWE

D (MU)

CAPACI

TY

CHARGE

S (RS Cr)

ENERGY

CHARGE

S (RS Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7

(7x210) 67.41 5081.98 417.72 1569.25 1986.97 3.91

RAICHUR THERMAL POWER STATION_RTPS 8

(1x250) 47.79 722.00 100.86 217.16 318.02 4.40

BELLARY THERMAL POWER STATIONS_BTPS-1

(1x500) 47.79 1349.10 141.26 495.06 636.32 4.72

BELLARY THERMAL POWER STATIONS_BTPS-2

(1x500) 47.79 1459.47 212.21 484.78 696.98 4.78

BELLARY THERMAL POWER STATIONS_BTPS-3

(1x700) 47.79 1299.94 0.00 405.77 405.77 3.12

TOTAL KPCL THERMAL 56.17 9912.49 872.05 3172.02 4044.07 4.08

CGS SOURCES

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 47.79 1551.55 94.47 353.41 447.88 2.89

N.T.P.C-RSTP-III (1X500MW) 47.79 391.71 35.97 91.98 127.96 3.27

NTPC-Talcher (4X500MW) 47.79 1321.35 101.91 191.32 293.23 2.22

Simhadri Unit -1 &2 (2X500MW) 47.79 712.39 108.04 173.54 281.59 3.95

NTPC Tamilnadu Energy Company Ltd

(NTECL)_Vallur TPS Stage I, 2 &3 (3X500MW) 47.79 516.96 83.59 106.18 189.76 3.67

Neyveli Lignite Corporation_NLC TPS-II STAGE I

(3X210MW) 47.79 454.15 32.73 109.40 142.13 3.13

Neyveli Lignite Corporation_NLC TPS-II STAGE 2

(4X210MW) 47.79 611.99 50.29 147.42 197.71 3.23

Neyveli Lignite Corporation_NLC TPS I EXP

(2X210MW) 47.79 349.49 43.09 87.32 130.41 3.73

Neyveli Lignite Corporation_NLC TPS2 EXP

(2X250MW) 47.79 413.76 53.15 95.17 148.32 3.58

NLC TAMINADU POWER LIMITED (NTPL)

(TUTICORIN) (2X500MW) 47.79 689.47 88.54 177.33 265.86 3.86

MAPS (2X220MW) 47.79 119.14 0.00 23.83 23.83 2.00

Kaiga Unit 1&2 (2X220MW) 47.79 440.82 0.00 131.36 131.36 2.98

Kaiga Unit 3 &4 (2X200MW) 47.79 478.74 0.00 142.66 142.66 2.98

NPCIL-Kudan Kulam Atomic Power Generating

Station (KKNPP) (1X1000MW) 47.79 729.76 0.00 217.47 217.47 2.98

DVC-Unit-1 &2 Meja TPS (2x500MW) 47.79 752.58 131.37 172.22 303.60 4.03

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 47.79 752.58 125.02 167.19 292.22 3.88

TOTAL CGS 47.79 10286.42 948.17 2387.82 3335.99 3.24

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL

(2x600) 47.79 3566.25 633.54 844.86 1478.40 4.15

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP

(10x103.5+2x27.5) 12.59 529.14 2.58 22.93 25.50 0.48

MAHATMA GANDHI HYDRO ELECTRIC POWER

HOUSE_MGHE (4x21.6+4x13.2) 47.79 86.34 1.11 8.50 9.61 1.11

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR)

(4x60) 47.79 252.07 11.65 26.73 38.38 1.52

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 47.79 1397.29 9.15 109.49 118.64 0.85

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 47.79 519.86 5.65 61.84 67.49 1.30

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 47.79 250.27 13.15 38.46 51.61 2.06

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

(1x2+2x12)+(1x7.2+1x6) 47.79 31.13 0.54 14.22 14.77 4.74

KADRA POWER HOUSE_KPH (3x50) 47.79 169.77 9.15 22.73 31.88 1.88

KODASALLI DAM POWER HOUSE_KDPH (3x40) 47.79 155.58 5.73 16.45 22.18 1.43

Page 288: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxviii

GHATAPRABHA DAM POWER HOUSE_GDPH

(2x16) 47.79 43.81 0.94 7.06 8.00 1.83

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA

(2x8.6) HYDRO STATIONS 47.79 148.51 1.69 13.12 14.81 1.00

MUNIRABAD POWER HOUSE (2x9+1x10) 47.79 52.39 0.21 4.15 4.35 0.83

TOTAL KPCL HYDRO 33.97 3636.16 61.56 345.67 407.23 1.12

OTHERs

PRIYADARSHINI JURALA HYDRO ESLECTRIC

STATION (6x39) 47.79 53.34 31.10 0.00 31.10 5.83

TUNGABHADRA DAM POWER HOUSE_TBPH

(4x9+4x9) 47.79 15.52 1.26 0.00 1.26 0.81

TOTAL OTHERs 47.79 68.85 32.37 0.00 32.37 4.70

SHORT TERM POWER 47.79 529.87 0.00 267.06 267.06 5.04

RENEWABLE SOURCES

WIND-IPPS

2278.15 0.00 815.89 815.89 3.58

KPCL-WIND (9x0.225+10x0.230)

12.86 0.00 4.32 4.32 3.56

MINI HYDEL-IPPS

478.60 0.00 160.50 160.50 3.35

CO-GEN/CAPTIVE

0.00 0.00 0.00 0.00 0.00

BIOMASS

70.93 0.00 36.28 36.28 5.11

SOLAR-IPP

656.24 0.00 406.94 406.94 6.20

SOLAR-KPCL

(YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5)

25.43 0.00 15.15 15.15 5.96

TOTAL RENEWABLE SOURCES

3522.21 0.00 1439.08 1439.08 4.09

TRANSMISSION CHARGES

PGCIL CHARGES 453.61 453.61 0.44

KPTCL CHARGES 1487.22 1487.22 0.47

SLDC CHARGES 9.17 9.17 0.00

TOTAL INCLUDING TRANSMISSION & LDC

CHARGES 47.79 31522.26 2547.69 10406.50 12954.19 4.11

APPROVED POWER PURCHASE FOR BESCOM - FY18

NAME OF THE GENERATING STATION

% SHARE

OF

ENERGY

ALLOWED

ENERGY

ALLOWED

(MU)

CAPACI

TY

CHARGE

S (RS Cr)

ENERGY

CHARGE

S (RS Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7

(7x210) 47.643 3190.373 266.999 1004.849 1271.847 3.987

RAICHUR THERMAL POWER STATION_RTPS 8

(1x250) 47.643 763.716 105.448 229.101 334.549 4.381

BELLARY THERMAL POWER STATIONS_BTPS-1

(1x500) 47.643 1544.106 157.387 577.947 735.334 4.762

BELLARY THERMAL POWER STATIONS_BTPS-2

(1x500) 47.643 1569.357 224.945 531.701 756.646 4.821

BELLARY THERMAL POWER STATIONS_BTPS-3

(1x700) 47.643 2138.723 219.001 680.951 899.952 4.208

TOTAL KPCL THERMAL 47.643 9206.275 973.780 3024.549 3998.329 4.343

CGS SOURCES

Page 289: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cclxxxix

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 47.643 1546.840 94.187 359.382 453.569 2.932

N.T.P.C-RSTP-III (1X500MW) 47.643 390.522 35.865 93.539 129.404 3.314

NTPC-Talcher (4X500MW) 47.643 1317.343 101.600 194.558 296.158 2.248

Simhadri Unit -1 &2 (2X500MW) 47.643 710.232 107.737 176.475 284.212 4.002

NTPC Tamilnadu Energy Company Ltd

(NTECL)_Vallur TPS Stage I &2 &3 (3X500MW) 47.643 515.392 84.009 107.972 191.981 3.725

Neyveli Lignite Corporation_NLC TPS-II STAGE I

(3X210MW) 47.643 452.772 32.629 111.248 143.877 3.178

Neyveli Lignite Corporation_NLC TPS-II STAGE 2

(4X210MW) 47.643 610.133 50.142 149.912 200.054 3.279

Neyveli Lignite Corporation_NLC TPS I EXP

(2X210MW) 47.643 348.427 42.956 88.801 131.757 3.781

Neyveli Lignite Corporation_NLC TPS2 EXP

(2X250MW) 47.643 412.502 52.984 96.784 149.768 3.631

NLC TAMINADU POWER LIMITED (NTPL)

(TUTICORIN) (2X500MW) 47.643 687.375 88.267 180.327 268.594 3.908

MAPS (2X220MW) 47.643 118.778 0.000 24.231 24.231 2.040

Kaiga Unit 1&2 (2X220MW) 47.643 439.478 0.000 133.584 133.584 3.040

Kaiga Unit 3 &4 (2X200MW) 47.643 477.284 0.000 145.075 145.075 3.040

NPCIL-Kudan Kulam Atomic Power Generating

Station (KKNPP) (1X1000MW) 47.643 727.548 0.000 221.145 221.145 3.040

DVC-Unit-1 &2 Meja TPS (2x500MW) 47.643 750.294 130.976 175.135 306.111 4.080

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 47.643 750.294 124.645 170.021 294.665 3.927

TOTAL CGS 47.643 10255.214 945.996 2428.188 3374.185 3.290

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL

(2x600) 47.643 3555.437 631.618 859.142 1490.760 4.193

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP

(10x103.5+2x27.5) 47.643 2605.948 9.664 118.483 128.147 0.492

MAHATMA GANDHI HYDRO ELECTRIC POWER

HOUSE_MGHE (4x21.6+4x13.2) 47.643 92.918 1.106 9.528 10.633 1.144

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR)

(4x60) 47.643 270.264 11.602 29.648 41.250 1.526

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 47.643 1423.484 8.996 117.157 126.153 0.886

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 47.643 525.906 5.561 65.731 71.292 1.356

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 47.643 213.192 13.107 33.783 46.891 2.199

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

((1x2+2x12)+(1x7.2+1x6)) 47.643 30.187 0.543 14.574 15.117 5.008

KADRA POWER HOUSE_KPH (3x50) 47.643 169.328 9.123 23.625 32.748 1.934

KODASALLI DAM POWER HOUSE_KDPH (3x40) 47.643 157.536 5.716 17.357 23.073 1.465

GHATAPRABHA DAM POWER HOUSE_GDPH

(2x16) 47.643 42.921 0.594 7.264 7.858 1.831

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA

(2x8.6) HYDRO STATIONS_SHIVA & SHIMSHA 47.643 157.536 1.688 14.506 16.195 1.028

MUNIRABAD POWER HOUSE (2x9+1x10) 47.643 49.525 0.205 4.109 4.315 0.871

TOTAL KPCL HYDRO 47.64 5738.74 67.91 455.76 523.67 0.91

OTHERs

PRIYADARSHINI JURALA HYDRO ESLECTRIC

STATION (6x39) 47.643 53.176 32.871 0.000 32.871 6.182

TUNGABHADRA DAM POWER HOUSE_TBPH

(4x9+4x9) 47.643 15.469 1.258 0.000 1.258 0.813

TOTAL OTHERs 47.643 68.645 34.129 0.000 34.129 4.972

Page 290: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxc

RENEWABLE SOURCES

WIND-IPPS 2314.510 0.000 828.160 828.160 3.578

KPCL-WIND (9x0.225+10x0.230) 12.860 0.000 4.320 4.320 3.56

MINI HYDEL-IPPS 478.600 0.000 160.500 160.500 3.354

CO-GEN/CAPTIVE 0.000 0.000 0.000 0.000 0.000

BIOMASS 70.930 0.000 36.280 36.280 5.115

SOLAR-IPP 1310.440 0.000 665.704 665.704 5.080

SOLAR-KPCL

(YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5)

25.430 0.000 15.150 15.150 5.958

TOTAL RENEWABLE SOURCES

4212.770 0.000 1710.114 1710.114 4.059

TRANSMISSION CHARGES

PGCIL CHARGES 456.752 456.752 0.445

KPTCL CHARGES 1622.580 1622.580 0.491

SLDC CHARGES 13.200 13.200 0.004

TOTAL INCLUDING TRANSMISSION & LDC

CHARGES 47.643 33037.09 2653.43 10570.29 13223.72 4.003

APPROVED POWER PURCHASE FOR BESCOM - FY19

NAME OF THE GENERATING STATION

% SHARE

OF

ENERGY

ALLOWED

ENERGY

ALLOWED

(MU)

CAPACI

TY

CHARGE

S (RS Cr)

ENERGY

CHARGE

S (RS Cr)

TOTAL

COST

(RS Cr)

PER UNIT

RATE

(RS/

Kwh)

KPCL THERMAL STATIONS

RAICHUR THERMAL POWER STATION_RTPS 1-7 (7x210) 47.831 3202.971 277.266 1028.993 1306.259 4.078

RAICHUR THERMAL POWER STATION_RTPS 8 (1x250) 47.831 766.732 105.186 234.606 339.792 4.432

BELLARY THERMAL POWER STATIONS_BTPS-1 (1x500) 47.831 1550.204 161.110 591.834 752.944 4.857

BELLARY THERMAL POWER STATIONS_BTPS-2 (1x500)

47.831 1575.554 222.297 544.477 766.773 4.867

BELLARY THERMAL POWER STATIONS_BTPS-3 (1x700) 47.831 2205.489 222.302 716.253 938.555 4.256

YERMARUS THERMAL POWER STATION_YTPS (2x800) 47.831 740.167 97.683 197.605 295.289 3.989

TOTAL KPCL THERMAL 47.831 10041.118 1085.843 3313.768 4399.611 4.382

CGS SOURCES

N.T.P.C-RSTP-I&II (3X200MW+3X500MW) 47.831 1552.948 94.559 368.017 462.576 2.979

N.T.P.C-RSTP-III (1X500MW) 47.831 392.064 36.007 95.786 131.793 3.362

NTPC-Talcher (4X500MW) 47.831 1322.545 102.001 199.232 301.234 2.278

Simhadri Unit -1 &2 (2X500MW) 47.831 713.036 108.162 180.716 288.878 4.051

NTPC Tamilnadu Energy Company Ltd (NTECL)_Vallur TPS

Stage I &2 &3 (3X500MW) 47.831 517.428 84.341 110.566 194.907 3.767

Neyveli Lignite Corporation_NLC TPS-II STAGE I (3X210MW) 47.831 454.560 32.758 113.921 146.679 3.227

Neyveli Lignite Corporation_NLC TPS-II STAGE 2 (4X210MW) 47.831 612.542 50.340 153.514 203.855 3.328

Page 291: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxci

Neyveli Lignite Corporation_NLC TPS I EXP (2X210MW) 47.831 349.803 43.125 90.935 134.060 3.832

Neyveli Lignite Corporation_NLC TPS2 EXP (2X250MW) 47.831 414.131 53.193 99.109 152.303 3.678

NLC TAMINADU POWER LIMITED (NTPL) (TUTICORIN)

(2X500MW) 47.831 690.089 88.615 184.660 273.275 3.960

MAPS (2X220MW) 47.831 119.247 0.000 24.813 24.813 2.081

Kaiga Unit 1&2 (2X220MW) 47.831 441.214 0.000 136.794 136.794 3.100

Kaiga Unit 3 &4 (2X200MW) 47.831 479.169 0.000 148.561 148.561 3.100

NPCIL-Kudan Kulam Atomic Power Generating Station

(KKNPP) (1X1000MW) 47.831 730.421 0.000 226.459 226.459 3.100

DVC-Unit-1 &2 Meja TPS (2x500MW) 47.831 753.257 131.493 179.343 310.836 4.127

DVC-Unit-7 & 8-KODERMA TPS (2x500MW) 47.831 753.257 125.137 174.106 299.243 3.973

TOTAL CGS 47.831 10295.712 949.732 2486.533 3436.265 3.338

TOTAL MAJOR IPPS

UDUPI POWER CORPORATION LIMITED_UPCL (2x600) 47.831 3569.477 634.112 879.786 1513.898 4.241

KPCL HYDEL STATIONS

SHARAVATHI VALLEY PROJECT_SVP (10x103.5+2x27.5) 47.831 2616.238 9.164 124.784 133.947 0.512

MAHATMA GANDHI HYDRO ELECTRIC POWER HOUSE_MGHE

(4x21.6+4x13.2) 47.831 93.285 1.110 9.966 11.076 1.187

GERUSOPPA_GPH (SHARAVATHI TAIL RACE_STR) (4x60) 47.831 271.331 11.648 30.818 42.466 1.565

KALI VALLEY PROJECT_KVP (2x50+5x150+1x135) 47.831 1429.105 8.981 123.591 132.572 0.928

VARAHI VALLEY PROJECT_VVP (4x115+2x4.5) 47.831 527.983 4.730 69.345 74.075 1.403

ALMATTI DAM POWER HOUSE_ADPH (1x15+5x55) 47.831 214.034 13.086 35.005 48.091 2.247

BHADRA HYDRO ELECTRIC POWER HOUSE_BHEP

((1x2+2x12)+(1x7.2+1x6)) 47.831 30.306 0.545 15.465 16.011 5.283

KADRA POWER HOUSE_KPH (3x50) 47.831 169.996 9.159 24.729 33.888 1.993

KODASALLI DAM POWER HOUSE_KDPH (3x40) 47.831 158.158 5.593 18.166 23.759 1.502

GHATAPRABHA DAM POWER HOUSE_GDPH (2x16) 47.831 43.091 0.186 7.661 7.847 1.821

SHIVASAMUDRAM (4x4+6x3) & SHIMSHAPURA (2x8.6) HYDRO

STATIONS_SHIVA & SHIMSHA 47.831 158.158 1.695 15.186 16.881 1.067

MUNIRABAD POWER HOUSE (2x9+1x10) 47.831 49.720 0.206 4.152 4.358 0.877

TOTAL KPCL HYDRO 47.831 5761.407 66.103 478.868 544.972 0.946

OTHERs

PRIYADARSHINI JURALA HYDRO ESLECTRIC STATION (6x39) 47.831 53.386 34.981 0.000 34.981 6.552

TUNGABHADRA DAM POWER HOUSE_TBPH (4x9+4x9) 47.831 15.530 1.263 0.000 1.263 0.813

TOTAL OTHERs 47.831 68.917 36.244 0.000 36.244 5.259

RENEWABLE SOURCES

WIND-IPPS 2342.770 0.000 840.870 840.870 3.589

KPCL-WIND (9x0.225+10x0.230) 12.860 0.000 4.320 4.320 0.000

MINI HYDEL-IPPS 478.600 0.000 160.500 160.500 3.354

CO-GEN/CAPTIVE 0.000 0.000 0.000 0.000 0.000

BIOMASS 70.930 0.000 36.280 36.280 5.115

SOLAR-IPP 1980.220 0.000 1005.952 1005.952 5.080

SOLAR-KPCL (YELESANDRA,ITNAL,YAPALDINNI,SHIMSHA)

(3x1+3x1+1x3x1x5) 25.430 0.000 15.150 15.150 5.958

TOTAL RENEWABLE SOURCES 4910.810 0.000 2063.072 2063.072 4.201

Page 292: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcii

TRANSMISSION CHARGES

PGCIL CHARGES 463.141 463.141 0.450

KPTCL CHARGES 1781.990 1781.990 0.514

SLDC CHARGES 14.290 14.290 0.004

TOTAL INCLUDING TRANSMISSION & LDC CHARGES 47.831 34647.44 2772.04 11481.45 14253.48 4.114

Page 293: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxciii

With ref. to

ACS

Sales-M URevenue Rs.

croresSales-M U

Revenue Rs.

crores

1 LT-1[fully subsidised

by GoK]*

Bhagya Jyothi/Kutir Jyothi

54.00 35.70 49.15 29.29 5.96 0.00 -3.87

2 LT-2(a)(i) Dom. / AEH - Applicable to Bruhat Bangalore

Mahanagara Palike(BBMP), Municipal

Corporations & all areas under Urban Local

Bodies . 6062.32 3475.95 5933.40 3093.34 5.21 -12.53 -15.91

3 LT-2(a)(ii) Dom. / AEH - Applicable to areas coming

under Village Panchayats 617.04 294.50 684.18 290.20 4.24 -28.83 -31.59

4 LT-2(b)(i) Pvt. Educational Institutions Bruhat Bangalore

Mahanagara Palike(BBMP), Municipal

Corporations & all areas under Urban Local

Bodies . 35.52 30.05 37.89 29.54 7.80 30.82 25.75

5 LT-2(b)(ii) Pvt. Educational Institutions Applicable to

areas coming under Village Panchayats 7.60 3.86 5.23 3.33 6.37 6.80 2.66

6 LT-3(i) Commercial - Application to Bruhat Bangalore

Mahanagara Palike(BBMP), Municipal

Corporations & all areas under Urban Local

Bodies . 1773.97 1623.19 1788.02 1572.54 8.79 47.57 41.85

7 LT-3(ii) Commercial - Applicable to areas coming

under Village Panchayats 178.23 158.30 154.42 125.76 8.14 36.64 31.35

8 LT-4(a)(i)* IP<=10HP

6932.30 2357.19 6739.18 1927.41 2.86 -52.01 -53.87

10 LT-4(b) IP>10HP3.95 3.05 2.88 1.19 4.13 -30.90 -33.58

11 LT-4 (c) (i) Pvt Nurseries, Coffee&Tea Plantations of

sanctioned load of 10 HP& below 5.17 1.85 6.07 2.23 3.67 -38.26 -40.65

12 LT-4 (c) (ii) Pvt Nurseries, Coffee&Tea Plantations of

sanctioned load above 10 HP. 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 LT-5(a) Industrial - Applicable to Bruhat Bangalore

Mahanagara Palike(BBMP), Municipal

Corporations 929.18 685.41 916.82 656.50 7.16 20.14 15.49

14 LT-5(b) Industrial - Applicable to all areas other than

those covered under LT5(a) 290.82 208.64 286.83 201.91 7.04 18.11 13.54

15 LT-6 Water supply 414.23 291.18 509.97 251.09 4.92 -17.39 -20.59

16 LT-6 Public lighting 370.38 254.60 370.38 241.60 6.52 9.45 5.21

17 LT-7 Temporary supply 185.94 201.32 185.94 213.88 11.50 93.00 85.53

17860.65 9624.79 17670.36 8639.82 4.89 -17.96 -21.14

1 HT-1 Water supply & sew erage 723.98 382.98 723.98 366.98 5.07 -14.95 -7.67 -11.97

2 HT-2(a)(i) Industrial - Applicable to Bangalore

Mahanagara Palike(BBMP) and Municipall

Corporation. 2432.03 1932.15 2442.89 1811.07 7.41 24.39 35.04 32.45

3 HT-2(a)(ii) Industrial - Applicable to areas other than

those under HT2(a) (i) 2300.00 1827.25 2300.58 1640.90 7.13 19.67 29.92 27.05

4 HT-2(b)(i) Commercial - Applicable to areas under

Bangalore Mahanagara Palike Municipal

Corporation. 2629.95 2481.94 2629.96 2383.23 9.06 52.04 65.06 61.59

5 HT-2(b)(ii) Commercial - Applicable to areas other than

those covered under HT2(b) (i) 204.06 192.58 204.05 185.35 9.08 52.41 65.46 61.83

6 HT-2( c) (i) Govt./ Aided Hospitals & Educational

Institutions 95.70 76.74 96.11 72.96 7.59 27.37 38.28 35.02

7 HT-2( c) (ii) Hospitals and Educational Institutions other

than covered under HT-2( c) (i) 144.58 115.94 144.17 107.38 7.45 24.97 35.67 33.38

8 HT-3(a)(i) Lift Irrigation - Applicable to Lift Irrigation

Schemes under Govt. Depts/ Govt. ow ned

Corporations. 51.63 14.32 74.11 14.82 2.00 -66.44 -63.57 -67.74

9 HT-3(a)(ii) Lift Irrigation - Applicable to Lift Irrigation

schemes Lift Irrigation Societies connected to

Urban/Express feeders. 1.54 1.25 2.21 0.73 3.30 -44.90 -40.19 -49.47

10 HT-3(a)(iii) Lift Irrigation - Applicable to Private lif t

irrigation schemes & L I societies other than

those covered under HT-3(a) (ii) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 HT - 3b Irrigation & Agriculture Farms,Govt.

Horticultural Farms, Pvt.Horticulture

Nurseries, Coffee, Tea,Cocanut & Arecanut 0.21 0.13 1.28 0.51 3.98 -32.89 -27.14 -29.79

12 HT-4(a) Residential Apartments - Colonies 104.50 73.93 104.50 65.25 6.24 4.76 13.73 11.16

13 HT-5 Temporary supply 78.53 86.39 78.54 114.37 14.56 144.33 165.25 162.47

Unbilled Revenue/ Additional Sales 913.00 595.84 0.00 0.00 0.00

9679.71 7781.44 8802.38 6763.56 7.68 28.92 39.96 36.85

27540.39 17406.22 26472.74 15403.38 5.82 -2.37

150.00 361.60

27540.39 17556.22 26472.74 15764.97 5.96 0.00

* Voltage w ise cost of supply per unit to: LT Rs: 6.20, HT Rs.5.49 & EHT- Rs.5.27 Page - 275

Level of

Cross

Subsidy in

% (EHT)

PROPOSED AND APPROVED REVENUE AND REALISATION AND LEVEL OF CROSS SUBSIDY FOR FY-17 OF BESCOM

With ref. to voltage

wise COS*

LT - TOTAL

shall raise demand & collect CDT of Rs.5.96/unit by BJ/KJ & Rs.2.86 /unit from IP set Consumers.

HT - TOTAL

TOTAL

Grand Total

* These categories are subsidised by GoK. In case subsidy is not released by the Gok in advance,BESCOM

Misc. Revenue

Level o f

C ro ss

Subsidy in %

Level of

Cross

Subsidy in

% (LT&HT)

Annexure- III

Sl No Category Description

Proposed by BESCOM Approved as per RST

Average

Realisation

in Rs. Per

Kwh

Page 294: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxciv

ANNEX - IV

ELECTRICITY TARIFF - 2017

K.E.R.C. ORDER DATED: 30th March 2016

Effective for the Electricity consumed from the first meter

reading date falling on or after 01.04.2016

Bangalore

Electricity Supply Company Ltd.,

Page 295: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcv

ELECTRICITY TARIFF-2017

GENERAL TERMS AND CONDITIONS OF TARIFF:

(APPLICABLE TO BOTH HT AND LT)

1. Supply of power is subject to execution of agreement by the

Consumer in the prescribed form, payment of prescribed deposits

and compliance of terms and conditions as stipulated in the

Conditions of Supply of Electricity of the Distribution Licensees in

the State of Karnataka and Regulations issued under Electricity

Act 2003 at the time of supply and continuation of power supply is

subject to compliance of the said Conditions of Supply /

Regulations as amended from time to time.

2. The tariffs are applicable to only single point of supply unless

otherwise approved by the Licensee.

3. The Licensee does not bind himself to energize any installation,

unless the Consumer guarantees the minimum charges. The

minimum charge is the power supply charges in accordance with

the tariff in force from time to time. This shall be payable by the

Consumer until power supply agreement is terminated,

irrespective of the installation being in service or under

disconnection.

4. The tariffs in the schedule are applicable to power supply within

the Karnataka State.

5. The tariffs are subject to levy of Tax and Surcharges thereon as

may be decided by the State Government from time to time.

6. For the purpose of these tariffs, the following conversion table would be

used:

1 HP=0.746 KW. 1HP=0.878 KVA.

Page 296: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcvi

7. The bill amount will be rounded off to the nearest Rupee, i.e., the bill

amount of 50 Paise and above will be rounded off to the next higher

Rupee and the amount less than 50 Paise will be ignored.

8. Use of power for temporary illumination in the premises already having

permanent power supply for marriages, exhibitions in hotels, sales

promotions etc., is limited to sanctioned load at the applicable

permanent power supply tariff rates. Temporary tariff rates will be

applicable in case the load exceeds sanctioned load as per the

Conditions of Supply of Electricity of the Distribution Licensees in the

State of Karnataka.

9. No LT power supply will be given where the requisitioned load is 50

KW/67 HP and above. This condition does not apply for installations

serviced under clause 3.1.1 of K.E.R.C. (Recovery of Expenditure for

supply of Electricity) Regulations, 2004 and its amendments from time to

time. The applicant is however at liberty to avail HT supply for lesser

loads. The minimum contract demand for HT supply shall be 25 KVA or

as amended from time to time by the Licensee with the approval of

KERC.

10. The Consumer shall not resell electricity purchased from the Licensee to

a third party except –

(a) Where the Consumer holds a sanction or a tariff provision for

distribution and sale of energy,

(b) Under special contract permitting the Consumer for resale of

energy in accordance with the provisions of the contract.

11. Non-receipt of the bill by the Consumer is not a valid reason for non-

payment. The Consumer shall notify the office of issue of the bill if the

same is not received within 7 days from the meter reading date.

Otherwise, it will be deemed that the bills have reached the Consumer

in due time.

12. The Licensee will levy the following charges for non-realization of each

Cheque.

Page 297: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcvii

1 Cheque amount upto

Rs. 10,000/-

5% of the amount subject to a

minimum of Rs100/-

2 Cheque amount of

Rs. 10,001/- and upto

Rs. 1,00,000/-

3% of the amount subject to a

minimum of Rs500/-

3 Cheque amount above

Rs. 1 Lakh:

2% of the amount subject to a

minimum of Rs3000/-

13. In respect of power supply charges paid by the Consumer through

money order, Cheque /DD sent by post, receipt will be drawn and the

Consumer has to collect the same.

14. In case of any belated payment, simple interest at the rate of 1 % per

month will be levied on the actual No. of days of delay subject to a

minimum of Re.1/- for LT installation and Rs.100/- for HT installation. No

interest is however levied for arrears of Rs.10/- and less.

15. All LT Consumers, except BhagyaJyothi and KutirJyothi Consumers, shall

provide current limiter/Circuit Breakers of capacity prescribed by the

Licensee depending upon the sanctioned load.

16. All payments made by the Consumer will be adjusted in the following

order of priority: -

(a) Interest on arrears of Electricity Tax

(b) Arrears of Electricity Tax

(c) Arrears of Interest on Electricity charges

(d) Arrears of Electricity charges

(e) Current month’s dues

17. For the purpose of billing,

(i) the higher of the rated load or sanctioned load in respect of LT

installations which are not provided with Electronic Tri-Vector

meter,

(ii) sanctioned load or MD recorded, whichever is higher, in respect of

installations provided with static meter or Electronic Tri-Vector

meter or static meter, will be considered.

Page 298: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcviii

Penalty and other clauses shall apply if sanctioned load is exceeded.

18. The bill amount shall be paid within 15 days from the date of

presentation of the bill failing which the interest becomes payable.

19. For individual installations, more than one meter shall not be provided

under the same tariff. Wherever two or more meters are existing for

individual installation, the sum of the consumption recorded by the

meters shall be taken for billing, till they are merged.

20. In case of multiple connections in a building, all the meters shall be

provided at one easily accessible place in the ground floor.

21. Reconnection charges: The following reconnection charges shall be

levied in case of disconnection and included in the monthly bill.

For reconnection of:

a Single Phase Domestic installations

under Tariff schedule LT 1 & LT2 (a)

Rs20/-per Installation.

b Three Phase Domestic installations

under Tariff schedule LT2 (a) and

Single Phase Commercial & Power

installations.

Rs50/-per Installation.

c All LT installations with 3 Phase supply

other than LT2 (a)

Rs100/- per Installation.

d All HT& EHT installations Rs. 500/-per

Installation.

22. Revenue payments up to and inclusive of Rs.10, 000/- shall be made by

cash or cheque or D.D and payments above Rs.10, 000/- shall be made

by cheque or D.D only. Payments under other heads of account shall

be made by cash or D.D up to and inclusive of Rs.10,000/- and

payment above Rs.10, 000/- shall be by D.D only.

Note: The Consumers can avail the facility of payment of monthly power

supply bill through Electronic clearing system (ECS)/ Credit cards / on

line E-Payment @ www.billjunction.com at counters wherever such

facility is provided by the Licensee in respect of revenue payments

up to the limit prescribed by the RBI.

Page 299: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccxcix

23. For the types of installations not covered under any Tariff schedules, the

Licensee is permitted to classify such installations under appropriate Tariff

schedule under intimation to the K.E.R.C.

24. Seasonal Industries

Applicable to all Seasonal Industries.

i) The industries that intend to avail this benefit shall have Electronic Tri-

Vector Meter installed to their installations.

ii) ‘Working season’ months and ‘off-season’ months shall be determined

by an order issued by the Executive Engineer of the concerned O&M

Division of the Licensee as per the request of the Consumer and will

continue from year to year unless otherwise altered. The Consumer

shall give a clear one month’s notice in case he intends to change his

‘working season’.

iii) The consumption during any month of the declared off-season shall

not be more than 25% of the average consumption of the previous

working season.

iv) The ‘Working season’ months and ‘off-season’ months shall be full–

calendar months. If the power availed during a month exceeds the

allotment for the ‘off-season’ month, it shall be taken for calculating

the billing demand as if the month is the ‘working season’ month.

v) The Consumer can avail the facility of ‘off-season’ up to six months in

a calendar year not exceeding in two spells in that year. During the

‘off-season’ period, the Consumer may use power for administrative

offices etc., and for overhauling and repairing plant and machinery.

25. Whether an institution availing Power supply can be considered as

charitable or not will be decided by the Licensee on the production

of certificate Form-12 A from the Income Tax department.

26 Time of the Tariff (ToD)

Page 300: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccc

The Commission as decided in the earlier tariff orders, decides to

continue compulsory Time of Day Tariff for HT2 (a) and HT2 (b) and HT2(c)

consumers with a contract demand of 500 KVA and above. Further, the

optional ToD will continue as existing for HT2 (a),HT2 (b) and HT 2(C)

consumers with contract demand of less than 500 KVA. Also the ToD for

HT1 consumers on optional basis would continue as existing earlier.

Details of ToD tariff are indicated under the respective tariff category.

27. SICK INDUSTRIES:

The Government of Karnataka has extended certain reliefs for

revival/rehabilitation of sick industries under the New Industrial Policy

2001-06 vide G.O. No. CI 167 SPI 2001, dated 30.06.2001. Further, the

Government of Karnataka has issued G.O No.CI2 BIF 2010, dated

21.10.2010. The Commission, in its Tariff Order 2002, has accorded

approval for implementation of reliefs to the sick industries as per the

Government policy and the same was continued in the subsequent

Tariff Orders. In view of issue of the G.O No.CI2 BIF 2010, dated

21.10.2010, the Commission has accorded approval to ESCOMs for

implementation of the reliefs extended to sick industrial units for their

revival / rehabilitation on the basis of the orders issued by the

Commissioner for Industrial Development and Director of Industries &

Commerce, Government of Karnataka.

28. Incentive for Prompt Payment / Advance Payment: An incentive at the

rate of 0.25% of such bill shall be given to the following Consumers by

way of adjustment in the subsequent month’s bill:

(i) In all cases of payment through ECS.

(ii) And in the case of monthly bills exceeding Rs.1, 00,000/- (Rs. one

lakh), if the payment is made 10 days in advance of the due

date.

(iii) Advance Payment exceeding Rs 1000/-made by the Consumers

towards monthly bills.

Page 301: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccci

29. Conditions of Supply of Electricity of the Distribution Licensees in the

State of Karnataka and amendments issued thereon from time to time

and Regulations issued under Electricity Act 2003 will prevail over the

extract given in this tariff book in the event of any discrepancy.

30. Self-Reading of Meters:

The Commission has approved Self-Reading of Meters by Consumers and

issue of bills by the Licensee based on such readings and the Licensee shall

take the reading at least once in six months and reconcile the difference, if

any and raise the bills accordingly. This procedure may be implemented by

the Licensee as stipulated under Section 26.01 of Conditions of Supply of

Electricity of the Distribution Licensees in the State of Karnataka.

---00---

Page 302: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccii

ELECTRICITY TARIFF - 2017

PART-1

HIGH TENSION SUPPLY

Applicable to Bulk Power Supply of

Voltages at 11KV (including 2.3/4.6

KV) and above at Standard High

Voltage or Extra High Voltages when

the Contract Demand is 50 KW / 67 HP

and above.

Page 303: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccciii

ELECTRICITY TARIFF –2017

PART-1

HIGH TENSION SUPPLY

Applicable to Bulk Power Supply at Voltages of 11KV (including 2.3/4.6

KV) and above at Standard High Voltage or Extra High Voltages when

the Contract Demand is 50 KW / 67 HP and above.

CONDITIONS APPLICABLE TO BILLING OF HT INSTALLATIONS:

1. Billing Demand

A) The billing demand during unrestricted period shall be the maximum

demand recorded during the month or 75% of the CD, whichever is

higher.

B) When the Licensee has imposed demand cut of 25% or less, the

conditions stipulated in (A) shall apply.

C) When the demand cut is in excess of 25%, the billing demand shall be

the maximum demand recorded or 75% of the restricted demand,

whichever is higher.

D) If at any time the maximum demand recorded exceeds the CD or the

demand entitlement, or opted demand entitlement during the period of

restrictions, if any, the Consumer shall pay for the quantum of excess

demand at two times the normal rate per KVA per month as deterrent

charges as per Section 126(6) of Electricity Act 2003. For over drawal

during the billing period, the penalty shall be two times the normal rate.

Page 304: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

ccciv

E) During the periods of disconnection, the billing demand shall be 75% of

CD, or 75% of the demand entitlement that would have been

applicable, had the installation been in service, whichever is less. This

provision is applicable only, if the installation is under disconnection for

the entire billing month.

F) During the period of energy cut, the Consumer may get his demand

entitlement lowered, but not below the percentage of energy

entitlement, (For example, in case the energy entitlement is 40% and the

demand entitlement is 80%, the re-fixation of demand entitlement

cannot be lower than 40% of the CD). The benefit of lower demand

entitlement will be given effect to from the meter reading date of the

same month, if the option is exercised on or before 15th of the month. If

the option is exercised on or after 16th of the month, the benefit will be

given effect to from the next meter reading date. The Consumer shall

register such option by paying processing fee of Rs.100/- at the

Jurisdictional sub-division office.

(i) The billing demand in such cases, shall be the “Revised (Opted)

Demand Entitlement” or, the recorded demand, whichever is higher.

Such option for reduction of demand entitlement, is allowed only

once during the entire span of that particular “Energy Cut Period”.

The Consumer, can however, opt for a higher demand entitlement

up to the level permissible under the demand cut notification, and

the benefit will be given effect to from the next meter reading date.

Once the Consumer opts for enhancement of demand, which has

been reduced under Clause (F), no further revision is permitted during

that particular energy cut period.

(ii) The opted reduced demand entitlement will automatically cease to

be effective, when the energy cut is revised. The facility for reduction

and enhancement can however be exercised afresh by the

Consumer as indicated in the previous paras.

G) For the purpose of billing, the billing demand of 0.5 KVA and above will

be rounded off to the next higher KVA, and billing demand of less than

0.5 KVA shall be ignored.

2. Power factor (PF)

Page 305: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccv

It shall be the responsibility of the HT Consumer to determine the

capacity of PF correction apparatus and maintain an average PF of not

less than 0.90.

(i) The specified P.F. is 0.90. If the power factor goes below 0.90 Lag,

a surcharge of 3 Paise per unit consumed will be levied for every

reduction of P.F. by 0.01 below 0.90 Lag.

(ii) The power factor when computed as the ratio of KWh / KVAh will

be determined up to 3 decimals (ignoring figures in the other

decimal places), and then rounded off to the nearest second

decimal as illustrated below:

(a) 0.8949 to be rounded off to 0.89

(b) 0.8951 to be rounded off to 0.90

In respect of Electronic Tri-Vector meters, the recorded average PF over

the billing period shall be considered for billing purposes. If the same is

not available, the ratio of KWh to KVAh consumed in the billing month

shall be considered.

3. Rebate for supply at high voltage:

If the Consumer is availing power at voltage higher than 13.2 KV, he will

be entitled to a rebate as indicated below:

Supply Voltage: Rebate

A) 33/66 KV 2 Paise/unit of energy consumed

B) 110 KV 3 Paise/unit of energy consumed

C) 220 KV 5 Paise/unit of energy consumed

The above rebate will be allowed in respect of all the installations of the

above voltage class, including the existing installations, and also for

installations converted from 13.2 KV and below to 33 KV and above and

also for installations converted from 33/66 KV to 110/220 KV, from the

next meter reading date after conversion / service / date of notification

of this Tariff order, as the case may be. The above rebate is applicable

only on the normal energy consumed by the Consumer including the

consumption under TOD Tariff, and is not applicable on any other

energy allotted and consumed, if any, viz.,

Page 306: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccvi

i) Wheeled Energy.

ii) Any energy, including the special energy allotted over and

above normal entitlement.

iii) Energy drawal under special incentive scheme, if any.

The above rebate is not applicable for Railway Traction.

4. In respect of Residential Quarters / Colonies availing Bulk power supply

by tapping the main HT supply, the energy consumed by such Colony

loads, metered at single point, shall be billed under HT-4 tariff schedule.

No reduction in demand recorded in the main HT meter will be allowed.

5. Energy supplied may be utilized for all purposes associated with the

working of the installations, such as, Office, Stores, Canteens, Yard

Lighting, Water Supply and Advertisements within the premises.

6. Energy can also be used for construction, modification and expansion

purposes within the premises.

7. Power supply under HT-4 tariff schedule may be used for Commercial

and other purposes inside the colony for installations such as Canteen,

Club, Shop, Auditorium etc., provided, this load is less than 10% of the

CD.

8. In respect of Residential Apartments, availing HT Power supply under HT-4

tariff schedule, the supply availed for Commercial and other purposes

like Shops, Hotels, etc., will be billed under appropriate tariff schedule

(Only Energy charges) duly deducting such consumption in the main HT

supply bill. No reduction in the recorded demand of the main HT meter is

allowed. Common areas shall be billed at Tariff applicable to that of the

predominant Consumer category.

9. Seasonal Industries

a. The industries, which intend to utilize seasonal industry benefit, shall

conform to the conditionalities under Para no. 24of the General terms

and conditions of tariff (applicable to both HT & LT).

b. The industries that intend to avail this benefit shall have Electronic Tri-

Vector Meter fitted to the installation.

Page 307: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccvii

c. Monthly charges during the working season, shall be the demand

charges on 75% of the contract demand, or the recorded maximum

demand during the month, whichever is higher, plus the energy

charges

d. Monthly charges during the off season shall be demand charges on

the maximum demand recorded during the month or 50% of the CD

whichever is higher plus the energy charges.

[

TARIFF SCHEDULE HT-1

Applicable to Water Supply, Drainage / Sewerage water treatment plant and

Sewerage Pumping installations, belonging to Bangalore Water Supply and

Sewerage Board, Karnataka Urban Water Supply and Sewerage Board, other

local bodies, State and Central Government.

[

RATE SCHEDULE

Demand charges Rs.190 /kVA of billing demand/month

Energy charges 450 paise/unit [

TOD Tariff at the option of the Consumer

Time of Day Increase (+) / reduction (-) in energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-) 125 paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs + 100 paise per unit

Note: Energy supplied to residential quarters availing bulk supply by the

above category of Consumer, shall be metered separately at a

single point, and the energy consumed shall be billed at HT-4

Tariff. No reduction in the demand recorded in the main HT meter

will be allowed.

TARIFF SCHEDULE HT-2(a)

Applicable to Industries, Factories, Workshops, Research & Development

Centres, Industrial Estates, Milk dairies, Rice Mills, Phova Mills, Roller Flour

Mills, News Papers, Printing Press, Railway Workshops/KSRTC Workshops/

Depots, Crematoriums, Cold Storage, Ice & Ice-cream mfg. Units,

Swimming Pools of local bodies, Water Supply Installations of KIADB and

other industries, all Defence Establishments. Hatcheries, Poultry Farm,

Museum, Floriculture, Green House, Bio Technical Laboratory, Hybrid

Seeds processing Units, Stone Crushers, Stone cutting, Bakery Product

Manufacturing Units, Mysore Palace illumination, Film Studios, Dubbing

Theatres, Processing, Printing, Developing and Recording Theaters, Tissue

Page 308: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccviii

Culture, Aqua Culture, Prawn Culture, Information Technology Industries

engaged in development of Hardware & Software, Information

Technology (IT) enabled Services / Start-ups (As defined in GOI

notification dated 17.04.2015) / Animation / Gaming / Computer

Graphics as certified by the IT & BT Department of GOK/GOI, Drug Mfg.

Units, Garment Mfg. Units, Tyre retreading units, Nuclear Power Projects,

Stadiums maintained by Government and local bodies, also Railway

Traction, Effluent treatment plants and Drainage water treatment plants

owned other than by the local bodies, LPG bottling plants, petroleum

pipeline projects, Piggery farms, Analytical Lab for analysis of ore metals,

Saw Mills, Toy/wood industries, Satellite communication centers, and

Mineral water processing plants / drinking water bottling plants.

RATE SCHEDULE

HT-2(a)(i): Applicable to Areas under Bruhat Bangalore Mahangara

Palike (BBMP) and Municipal Corporations

Demand charges Rs.190 /kVA of billing demand / month

Energy charges

For the first one lakh units 625 paise per unit

For the balance units 675 paise per unit

Railway Traction and Effluent Treatment Plants

Demand charges Rs.190/kVA of billing demand/month

Energy Charges 590 paise per unit for all the units

Tariff applicable to Bangalore Metropolitan Railway Corporations

Ltd., (BMRCL)

Demand charges Rs.190/kVA of billing demand/month

Energy Charges 570 paise per unit for all the units

HT-2(a)(ii): Applicable to Areas other than those covered under HT-2(a)(i)

Demand charges Rs.180/kVA of billing demand/month

Energy charges

For the first one lakh units 620 paise per unit

For the balance units 660 paise per unit

Page 309: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccix

Railway Traction and Effluent Treatment Plants

Demand charges Rs.190/kVA of billing demand/month

Energy Charges 590 paise per unit for all the units

TARIFF SCHEDULE HT-2(b)

Applicable to Commercial Complexes, Cinemas, Hotels, Boarding & Lodging,

Amusement Parks, Telephone Exchanges, Race Course, All Clubs, T.V.

Station, All India Radio, Railway Stations, Air Port, KSRTC bus stations, All

offices, Banks, Commercial Multi-storied buildings, APMC Yards, Stadiums

other than those maintained by Government and Local Bodies, Construction

power for irrigation, Power Projects and Konkan Railway Project, Petrol / Diesel

and Oil storage plants, I.T. based medical transcription centers, telecom, call

centers / BPO / KPO.

RATE SCHEDULE

HT-2 (b)(i): Applicable to Areas under Bruhat Bangalore Mahangara Palike

(BBMP) and Municipal Corporations.

Energy charges

For the first two lakh units 805 paise per unit

For the balance units 835 paise per unit

HT-2(b)(ii): Applicable to all areas other than those covered under HT-2(b)(i)

Energy charges

For the first two lakh units 785 paise per unit

For the balance units 815 paise per unit

TARIFF SCHEDULE HT-2(c)

RATE SCHEDULE

HT-2 (c) (i) - Applicable to Government Hospitals, Hospitals run by

Charitable Institutions, ESI hospitals, Universities and Educational Institutions

belonging to Government and Local bodies, Aided Educational Institutions

and Hostels of all Educational Institutions.

Demand charges Rs.210/kVA of billing demand/month

Demand charges Rs.200/kVA of billing demand/month

Page 310: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccx

Demand charges Rs.180/kVA of billing demand/month

Energy charges

For the first one lakh units 600 paise per unit

For the balance units 650 paise per unit

RATE SCHEDULE

HT-2 (c) (ii) -Applicable to Hospitals and Educational Institutions other than

those covered under HT-2 (c) (i).

Demand charges Rs.180/kVA of billing demand/month

Energy charges

For the first one lakh units 700 paise per unit.

For the balance units 750 paise per unit.

Note: Applicable to HT-2 (a), HT-2 (b)& HT-2(c) Tariff Schedule.

1. Energy supplied may be utilized for all purposes associated

with the working of the installation such as offices, stores,

canteens, yard lighting, water pumping and advertisement

within the premises.

2. Energy can be used for construction, modification and

expansion purposes within the premises.

TOD Tariff applicable to HT 2(a), HT2 (b) and HT2(c) category.

Time of Day Increase + / reduction (-) in energy charges over

the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-) 125 paise per unit.

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs + 100 paise per unit.

TARIFF SCHEDULE HT-3 (a)

Applicable to Lift irrigation Schemes/ Lift irrigation societies,

RATE SCHEDULE

HT-3 (a)(i): Applicable to LI schemes under Govt. Departments/

Govt. owned Corporations.

Energy charges/ Minimum Charges 200 paise per unit subject to an

annual minimum of Rs.1120 per

HP/Annum.

Page 311: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxi

HT-3(a)(ii): Applicable to Private LI schemes and Lift Irrigation societies fed

through express/ Urban feeders

Fixed Charges Rs.40 /HP/ per month of sanctioned

load

Energy charges 200 paise/unit

HT-3(a)(iii): Applicable to Private LI schemes and Lift Irrigation societies other

than those covered under HT-3 (a)(ii).

Fixed Charges Rs.20 /HP/ per month of sanctioned

load

Energy charges 200 paise/unit

TARIFF SCHEDULE HT-3 (b)

HT-3 (b): Applicable to Irrigation and Agricultural Farms, Government

Horticultural Farms, Private Horticulture nurseries, Coffee, Tea,

Rubber, Coconut & Arecanut Plantations.

RATE SCHEDULE

Energy charges / Minimum Charges 400 paise Per unit subject to an

annual minimum of Rs.1120/- per HP

of sanctioned load.

Note: These installations are to be billed on quarter yearly basis.

TARIFF SCHEDULE HT-4

Applicable to Residential apartments and colonies (whether situated outside or

inside the premises of the main HT Installation) availing power supply

independently or by tapping the main H.T. line. Power supply can be used for

residences, theatres, shopping facility, club, hospital, guest house, yard/street

lighting, canteen located within the colony.

RATE SCHEDULE

Applicable to all areas.

Demand charges Rs.110/- per kVA of billing demand/

month

Energy charges 585 paise/unit

Page 312: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxii

NOTE: (1) In respect of residential colonies availing power supply by tapping

the main H.T. supply,the energy consumed by such colony loads

metered at a single point, is to be billed at the above energy rate.

No reduction in the recorded demand of the main H.T. supply is

allowed.

(2) Energy under this tariff may be used for commercial and other

purposes inside the colonies, for installations such as, Canteens,

Clubs, Shops, Auditorium etc., provided, this commercial load is less

than 10% of the Contract demand.

(3) In respect of Residential Apartments, availing HT Power supply

under HT-4 tariff schedule, the supply availed for Commercial and

other purposes like Shops, Hotels, etc., will be billed under

appropriate tariff schedule (Only Energy charges), duly deducting

such consumption in the main HT supply bill. No reduction in the

recorded demand of the main HT meter is allowed. Common areas

shall be billed at Tariff applicable to the predominant Consumer

category.

TARIFF SCHEDULE HT-5

Tariff applicable to sanctioned load of 67 HP and above for hoardings

and advertisement boards and construction power for industries

excluding those category of consumers covered under HT2(b) Tariff

schedule availing power supply for construction power for irrigation and

power projects and also applicable to power supply availed on

temporary basis with the contract demand of 67 HP and above of all

categories.

[

HT – 5 – Temporary supply

RATE SCHEDULE

67 HP and above:

Fixed charges /

Demand Charges

Rs.220/HP/month for the entire sanction load /

contract demand

Energy Charge 950 paise / unit

HT-5 (a)- Temporary Supply

Applicable to power supply availed on temporary basis with the

contract demand of 67 HP and above by Bangalore International

Exhibition Centre.

Page 313: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxiii

RATE SCHEDULE

67 HP and above: Approved Tariff

Fixed Charges /

Demand Charges

Not Applicable

Energy Charges 1050 paise / unit

Note:

1. Temporary power supply with or without extension of distribution main

shall be arranged through a pre–paid energy meter duly observing the

provisions of Clause 12 of the Conditions of Supply of Electricity of the

Distribution Licensees in the State of Karnataka.

2. This Tariff is also applicable to touring cinemas having licence for

duration less than one year.

3. All the conditions regarding temporary power supply as stipulated in

Clause 12 of the Conditions of Supply of Electricity of the Distribution

Licensees in the State of Karnataka shall be complied with before

service.

---0---

Page 314: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxiv

ELECTRICITY TARIFF-2017

PART-II

LOW TENSION SUPPLY

(400 Volts Three Phase and

230Volts Single Phase Supply)

Page 315: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxv

ELECTRICITY TARIFF-2017

PART-II

LOW TENSION SUPPLY

(400 Volts Three Phase and

230Volts Single Phase Supply) CONDITIONS APPLICABLE TO BILLING OF LT INSTALLATIONS:

1. In case of LT Industrial / Commercial Consumers, Demand based Tariff at

the option of the Consumer, can be adopted. The Consumer is

permitted to have more connected load than the sanctioned load. The

billing demand will be the sanctioned load, or Maximum Demand

recorded in the Tri-Vector Meter during the month, whichever is higher. If

the Maximum Demand recorded is more than the sanctioned load,

penal charges at two times the normal rate shall apply.

2. Use of power within the Consumer premises for bona fide temporary

purpose is permitted, subject to the conditions that, total load of the

installation on the system does not exceed the sanctioned load.

3. Where it is intended to use power supply temporarily, for floor polishing

and such other portable equipments, in a premises having permanent

power supply, such equipments shall be provided with earth leakage

circuit breakers of adequate capacity.

4. The laboratory installations in educational institutions are allowed to

install connected machineries up to 4 times the sanctioned load. The

fixed charges shall however be on the basis of sanctioned load.

5. Besides combined lighting and heating, electricity supply under tariff

schedules LT2 (a) & LT2 (b), can be used for Fans, Televisions, Radios,

Refrigerators and other household appliances, including domestic water

pumps and air conditioners, provided, they are under single meter

connection. If a separate meter is provided for Air-conditioner load, the

Page 316: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxvi

Consumer shall be served with a notice to merge this load, and to have

a single meter for the entire load. Till such time, the air conditioner load

will be billed under Commercial Tariff.

6. Bulk LT supply

If power supply for lighting / combined lighting & heating {LT 2(a)}, is

availed through a bulk Meter for group of houses belonging to one

Consumer, (ie, Where bulk LT supply is availed), the billing for energy shall

be done at the slab rate for energy charges matching the consumption

obtained, by dividing the bulk consumption by number of houses. In

addition, fixed charges for the entire sanctioned load shall be charged

as per Tariff schedule.

7. A rebate of 25 Paise per unit will be given for the House/ School/Hostels

meant for Handicapped, Aged, Destitute and Orphans, Rehabilitation

Centres under Tariff schedule LT 2(a).

8. SOLAR REBATE: A rebate of 50 Paise per unit of electricity consumed

subject to a maximum of Rs. 50/- per installation per month will be

allowed to Tariff schedule LT 2(a), if solar water heaters are installed and

used. Where Bulk Solar Water Heater System is installed, Solar Water

Heater rebate shall be allowed to each of the individual installations,

provided that, the capacity of Solar Water Heater in such apartment /

group housing shall be a minimum capacity of 100 Ltr. per household.

9. A rebate of 20% on fixed charges and energy charges will be allowed in

the monthly bill in respect of public Telephone booths having STD/ISD/

FAX facility run by handicapped people, under Tariff schedule LT 3.

10. A rebate of 2 paise per unit will be allowed if capacitors are installed as

per Clause 23 of Conditions of Supply of Electricity of the Distribution

Licensees in the State of Karnataka in respect of all metered IP Set

Installations.

11. Power Factor (PF):

Page 317: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxvii

Capacitors of appropriate capacity of shall be installed in accordance

with Clause 23 of Conditions of Supply of Electricity of the Distribution

Licensees in the State of Karnataka, in case of installations covered

under Tariff category LT 3, LT4, LT 5, & LT 6, where motive power is

involved.

(i) The specified P.F. is 0.85. If the PF is found to be less than 0.85 Lag, a

surcharge of 2 Paise per unit consumed will be levied for every reduction

of P.F. by 0.01 below 0.85 Lag. In respect of LT installations, however, this

is subject to a maximum surcharge of 30 Paise per unit.

(ii) The power factor when computed as the ratio of KWh/KVA will be

determined up to 3 decimals (ignoring figures in the other decimal

places) and then rounded off to the nearest second decimal as

illustrated below:

(a) 0.8449 to be rounded off to 0.84

(b) 0.8451 to be rounded off to 0.85

(iii) In respect of Electronic Tri-Vector meters, the recorded average PF over

the billing period shall be considered for billing purposes.

(iv) During inspection, if the capacity of capacitors provided is found to be

less than what is stipulated in Conditions of Supply of Electricity of the

Distribution Licensees in the State of Karnataka, a surcharge of 30

Paise/unit will be levied in the case of installations covered under Tariff

categories LT 3, LT 5, & LT 6 where motive power is involved.

[

(v) In the case of installations without electronic Tri-vector meters even after

providing capacitors as recommended in Clause 23.01 and 23.03 of

Conditions of Supply of Electricity of the Distribution Licensees in the

State of Karnataka, if during any periodical or other testing / rating of the

installation by the Licensee, the PF of the installation is found to be lesser

than 0.85, a surcharge determined as above shall be levied from the

billing month following the expiry of Three months’ notice given by the

Licensee, till such time, the additional capacitors are installed and

informed to the Licensee in writing by the Consumer. This is also

applicable for LT installations provided with electronic Tri-vector meters.

12. All new IP set applicants shall fix capacitors of adequate capacity in

accordance with Clause 23 of Conditions of Supply of Electricity of the

Distribution Licensees in the State of Karnataka before taking service.

13. All the existing IP set Consumers shall also fix capacitors of adequate

capacity in accordance with Clause 23 of Conditions of Supply of

Page 318: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxviii

Electricity of the Distribution Licensees in the State of Karnataka, failing

which, PF surcharge at the rate of Rs.60/-per HP/ year shall be levied. If

the capacitors are found to be removed / not installed, a penalty at the

same rate as above (Rs. 60/-per HP / Year) shall be levied.

14. The Semi-permanent cinemas having Semi-permanent structure, with

permanent wiring and licence of not less than one year, will be billed

under commercial tariff schedule i.e., LT 3.

15. Touring cinemas having an outfit comprising cinema apparatus and

accessories, taken from place to place for exhibition of cinematography

films and also outdoor shooting units, will be billed under Temporary Tariff

schedule i.e., LT 7.

16. The Consumers under IP set tariff schedule, shall use the energy only for

pumping water to irrigate their own land as stated in the IP set

application / water right certificate and for bona fide agriculture use.

Otherwise, such installations shall be billed under appropriate Industrial /

Commercial tariff, based on the recorded consumption if available, or

on the consumption computed as per the Table given under Clause

42.06 of the Conditions of Supply of Electricity of the Distribution

Licensees in the State of Karnataka.

17. The water pumped for agricultural purposes may also be used by the

Consumer for his bona fide drinking purposes and for supplying water to

animals, birds, Poultry farms, Dairy farms and fish farms maintained by the

Consumer in addition to agriculture.

18. The motor of IP set installations can be used with an alternative drive for

other agricultural operations like sugar cane crusher, coffee pulping,

etc., with the approval of the Licensee. The energy used for such

operation shall be metered separately by providing alternate switch and

charged at LT Industrial Tariff (Only Energy charges) during the period of

alternative use. However, if the energy used both for IP Set and alternate

operation, is measured together by one energy meter, the energy used

for alternate drive shall be estimated by deducting the average IP Set

Page 319: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxix

consumption for that month, as per the IP sample meter readings for the

sub division, as certified by the sub divisional Officer.

19. The IP Consumer is permitted to use energy for lighting the pump house

and well limited to two lighting points of 40 Watts each.

20. Billing shall be made at least once in a quarter year for all IP sets.

21. In case of welding transformers, the connected load shall be taken as:

a) Half the maximum capacity in KVA as per the nameplate specified

under IS: 1851

OR

b) Half the maximum capacity in KVA as recorded during the rating by

the Licensee, whichever is higher.

22. Electricity under Tariff LT 3 / LT 5 can also be used for Lighting, Heating

and Air-conditioning, Yard-Lighting, water supply in the premises of

Commercial / Industrial Units respectively.

23. Fluorescent fittings shall be provided by the Licensee for the Streetlights

in the case of villages covered under the Licensee’s electrification

programme for initial installation.

In all other cases, the entire cost of fittings including Brackets, Clamps, etc.,

and labour for replacement, additions and modifications shall be met by the

organizations making such a request. Labour charges shall be paid at the

standard rates fixed by the Licensee for each type of fitting.

24. Lamps, fittings and replacements for defective components of fittings

shall be supplied by the concerned Village Panchayaths, Town

Panchayaths or Municipalities for replacement.

25. Fraction of KW / HP shall be rounded off to the nearest quarter KW / HP

for purpose of billing and the minimum billing being for 1 KW / 1HP in

respect of all categories of LT installations including I.P. sets. In the case

of street lighting installations, fraction of KW shall be rounded off to

nearest quarter KW for the purpose of billing and the minimum billing

shall be quarter KW.

Page 320: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxx

26. Seasonal Industries.

a) The industries who intend to utilize seasonal industry benefit, shall

comply with the conditionalities under Para no. 24of the General

terms and conditions of tariff (applicable to both HT & LT).

b) The industries that intend to avail this benefit shall have Electronic Tri-

Vector Meter fitted to their installation.

c) Monthly charges during the seasonal months shall be fixed charges

and energy charges. The monthly charges during the off seasonal

months shall be the energy charges plus 50% of the fixed charges.

TARIFF SCHEDULE LT-1

LT-1: Applicable to installations serviced under Bhagya jyothi and Kutira jyothi

(BJ/KJ) schemes.

RATE SCHEDULE

Energy charges

(including recovery towards

service main charges)

Nil*

Fully subsidized by the GOK

Commission Determined Tariff (CDT) for the above category i.e., LT-1 is Rs.5.96 per

unit.

*Since GOK is meeting the full cost of supply to BJ / KJ, the Tariff payable by these

Consumers is shown as Nil. However, if the GOK does not release the subsidy in

advance, CDT of Rs.5.96 per unit subject to monthly minimum of Rs.30/- per

installation per month shall be demanded and collected from these consumers.

Note: If the consumption exceeds 18 units per month or any BJ/KJ installation is

found to have more than one out let, it shall be billed as per Tariff

Schedule LT 2(a).

TARIFF SCHEDULE LT-2(a)

Applicable to lighting/combined lighting, heating and motive Power

installations of residential houses and also to such houses where a

portion is used by the occupant for (a) Handloom weaving (b) Silk

rearing and reeling and artisans using motors up to 200 watts (c)

Page 321: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxi

Consultancy in (i) Engineering (ii) Architecture (iii) Medicine (iv)

Astrology (v) Legal matters (vi) Income tax (vii) Chartered Accountants

(d) Job typing (e) Tailoring (f) Post Office (g) Gold smithy (h)

Chawki rearing (i) Paying guests/Home stay guests (j) personal

Computers (k) Dhobis (l) Hand operated printing press (m) Beauty

Parlours (n) Water Supply installations, Lift which is independently

serviced for bonafide use of residential complexes/residence, (o) Farm

Houses and yard lighting limiting to 120 Watts, (p) Fodder Choppers &

Milking Machines with a connected load up to 1 HP.

Also applicable to the installations of (i) Hospitals, Dispensaries, Health

Centers run by State/Central Govt. and local bodies. (ii) Houses, schools

and Hostels meant for handicapped, aged destitute and orphans (iii)

Rehabilitation Centres run by charitable institutions, AIDS and drug

addicts Rehabilitation Centres (iv) Railway staff Quarters with single

meter(v) fire service stations.

It is also applicable to the installations of (a) Temples, Mosques,

Churches, Gurudwaras, Ashrams, Mutts and religious/Charitable

institutions (b) Hospitals, Dispensaries and Health Centres run by

Charitable institutions including X-ray units (c) Jails and Prisons (d)

Schools, Colleges, Educational institutions run by State/Central

Govt.,/Local Bodies (e) Seminaries (f) Hostels run by the Government,

Educational Institutions, Cultural, Scientific and Charitable Institutions(g)

Guest Houses/Travellers Bungalows run in Government buildings or by

State/Central Govt./Religious/Charitable institutions (h) Public libraries (i)

Silk rearing (j) Museums (k) Installations of Historical Monuments of

Archaeology Departments(l) Public Telephone Booths without

STD/ISD/FAX facility run by handicapped people (m) Sulabh / Nirmal

Souchalayas (n) Viswa Sheds having Lighting Loads only.

Page 322: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxii

RATE SCHEDULE

LT-2(a)(i) : Applicable to areas coming under Bruhat Bangalore

Mahanagara Palike (BBMP), Municipal Corporations and

all other Urban Local Bodies.

Fixed charges per

month

For the first KW Rs.30/- per KW

For every additional KW Rs.40/- per KW

Energy charges

For 0 - 30 units (Lifeline

consumption)

300 paise/unit

31 to 100 units 440 paise /unit

101 to 200 units 590 paise /unit

Above 200 units 690 paise /unit

LT-2(a)(ii): Applicable to Areas under Village Panchayats

Fixed charges per

month

For the first KW Rs.20/- per KW

For every additional KW Rs.30/- per KW

Energy charges

For 0 - 30 units (Lifeline

consumption)

290 paise/unit

31 to 100 units 410 paise/unit

101 to 200 units 560 paise/unit

Above 200 units 640 paise/unit

TARIFF SCHEDULE LT-2(b)

Applicable to the installations of Private Professional and other Private

Educational Institutions including aided, unaided institutions, Nursing

Homes and Private Hospitals having only lighting or combined lighting &

heating, and motive power.

RATE SCHEDULE

LT-2(b)(i): Applicable to Areas under Bruhat Bangalore MahangaraPalike

(BBMP) and Municipal Corporations and all other urban Local Bodies.

Fixed charges Rs.45 per KW subject to a minimum of Rs.75 per

month

Energy charges

0 to 200 units 625 paise/unit

Above 200 units 745 paise/unit

LT-2(b)(ii): Applicable in Areas under Village Panchayats

Page 323: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxiii

Fixed charges Rs.35 per KW subject to a minimum of Rs.60 per

month

Energy charges

0 to 200 units 570 paise/unit

Above 200 units 690 paise/unit

Note: Applicable to LT-2 (a), LT-2 (b) Tariff Schedules.

1 A rebate of 25 paise Per unit shall be given for installation of a house/

School/ Hostels meant for Handicapped, Aged, Destitute and Orphans,

Rehabilitation Centres run by Charitable Institutions.

2 (a) Use of power within the consumer’s premises for temporary purposes

for bonafide use is permitted subject to the condition that, the total

load of the installation on the system does not exceed the sanctioned

load.

(b) Where it is intended to use floor polishing and such other portable

equipment temporarily, in the premises having permanent supply, such

equipment shall be provided with an earth leakage circuit breaker of

adequate capacity.

3 The laboratory installations in educational institutions are allowed to install

connected machinery up to 4 times the sanctioned load. The fixed

charges shall however be on the basis of sanctioned load.

4. Besides lighting and heating, electricity supply under this schedule can be

used for fans, Televisions, Radios, Refrigerators and other house-hold

appliances including domestic water pump and air conditioners,

provided, they are under single meter connection. If a separate meter is

provided for Air conditioner Load, the consumption shall be under

commercial tariff till it is merged with the main meter.

5. SOLAR REBATE: A rebate of 50 paise per unit of electricity consumed to a

maximum of Rs.50/- per installation per month will be allowed to Tariff

schedule LT 2(a), if solar water heaters are installed and used. Where Bulk

Solar Water Heater System is installed, Solar Water Heater rebate shall be

allowed to each of the individual installations, provided that, the capacity

of Solar Water Heater in such apartment / group housing shall be a

minimum capacity of 100 Ltr, per household.

TARIFF SCHEDULE LT-3

Page 324: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxiv

Applicable to Commercial Lighting, Heating and Motive Power

installations of Clinics, Diagnostic Centers, X-Ray units, Shops, Stores,

Hotels/Restaurants/Boarding and Lodging Homes, Bars, Private guest

Houses, Mess, Clubs, Kalyan Mantaps / Choultry, permanent Cinemas/

Semi Permanent Cinemas, Theatres, Petrol Bunks, Petrol, Diesel and oil

Storage Plants, Service Stations/ Garages, Banks, Telephone Exchanges.

T.V. Stations, Microwave Stations, All India Radio, Dish Antenna, Public

Telephone Booths/ STD, ISD, FAX Communication Centers, Stud Farms,

Race Course, Ice Cream Parlours, Computer Centres, Photo Studio /

colour Laboratory, Xerox Copiers, Railway Installation excepting Railway

workshop, KSRTC Bus Stations excepting Workshop, All offices, Police

Stations, Commercial Complexes, Lifts of Commercial Complexes,

Battery Charging units, Tyre Vulcanizing Centres, Post Offices, Bakery

shops, Beauty Parlours, Stadiums other than those maintained by Govt.

and Local Bodies.It is also applicable to water supply pumps and street

lights not covered under LT 6, Cyber cafés, Internet surfing cafés, Call

centers, I.T. based medical transcription centers, Private Hostels not

covered under LT -2 (a), Paying guests accommodation provided in an

independent / exclusive premises.

RATE SCHEDULE

LT-3 (i): Applicable in areas coming under Bruhat Bangalore Mahanagara

Palike(BBMP), Municipal Corporations and other urban local bodies

Fixed charges Rs.50 per KW

Energy charges

For 0 - 50 units 715 paise /unit

Above 50 units 815 paise /unit

Demand based tariff (optional) where sanctioned load

is above 5 KW but below 50 KW

Fixed charges Rs.65 per KW

Energy charges As above

Page 325: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxv

RATE SCHEDULE

LT-3 (ii): Applicable in Areas under Village Panchayats

Fixed charges Rs.40 per KW per month

Energy charges For 0 - 50 units 665 paise /unit

Above 50 units 765 paise /unit

Demand based tariff (optional) where sanctioned load

is above 5 KW but below 50 KW

Fixed charges Rs.55 per KW per month

Energy charges As above

Note: 1. Besides Lighting, Heating and Motive power, electricity supply under

this Tariff can also be used for Yard lighting/ air Conditioning/water

supply in the premises.

2. The semi-permanent Cinemas should have semi-Permanent Structure

with permanent wiring and licence for duration of not less than one

year.

3. Touring Cinemas having an outfit comprising Cinema apparatus and

accessories taken from place to place for exhibition of

cinematography film and also outdoor shooting units shall be billed

under LT- 7 Tariff.

4. A rebate of 20% on fixed charges and energy charges shall be

allowed in the monthly bill in respect of telephone Booths having STD

/ ISD/FAX facility run by handicapped people.

5. Demand based Tariff at the option of the consumer can be adopted

as per Para 1 of the conditions applicable to LT installations.

TARIFF SCHEDULE LT-4 (a), LT-4 (b) & LT-4(c)

Applicable to (a) Agricultural Pump Sets including Sprinklers (b) Pump sets used

in (i) Nurseries of forest and Horticultural Departments (ii) Grass Farms and

Gardens (iii) Plantations other than Coffee, Tea, Rubber and Private Horticulture

Nurseries.

TARIFF SCHEDULE LT-4 (a)

Applicable to I.P. Sets up to and inclusive of 10 HP

RATE SCHEDULE

Page 326: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxvi

Fixed charges Free

Energy charges

Commission Determined Tariff (CDT) for LT4 (a) category is 286 paise per unit

In case the GOK does not release the subsidy in advance in the manner specified

by the Commission in K.E.R.C. (Manner of Payment of subsidy) Regulations,

2008, CDT of 286 paise per unit shall be demanded and collected from these

consumers.

Note: This Tariff is applicable for Coconut and Arecanut plantations also.

TARIFF SCHEDULE LT-4 (b):

Applicable to IP sets above 10 HP

RATE SCHEDULE

Fixed charges Rs.40 per HP per month.

Energy charges 280 paise per unit

TARIFF SCHEDULE LT-4 (c) (i):

Applicable to Private Horticultural Nurseries, Coffee, Tea and Rubber

plantations of sanctioned load up to and inclusive of 10 HP.

RATE SCHEDULE

Fixed charges Rs.30 per HP per month.

Energy charges 280 paise per unit

TARIFF SCHEDULE LT-4 (c) (ii):

Applicable to Private Horticultural Nurseries, Coffee, Tea and Rubber

plantations of sanctioned load above 10 HP.

RATE SCHEDULE

Fixed charges Rs.40 per HP per month.

Energy charges 280 paise per unit

Note:

1) The energy supplied under this tariff shall be used by the consumers only for pumping water to irrigate their own land

as stated in the I.P. Set application / water right certificate and for bonafide agriculture use. Otherwise, such installations shall be billed under the appropriate Tariff (LT-3/ LT-5) based on the recorded consumption if available, or on the consumption computed as per the Table given under Clause 42.06 of the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka.

Page 327: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxvii

2) The motor of IP set installations can be used with an alternative drive for other agricultural operations like sugar cane crusher, coffee pulping, etc., with the approval of the Licensee. The energy used for such operation shall be metered separately by providing alternate switch and charged at LT Industrial Tariff (Only Energy charges) during the period of alternative use. If the energy used both for IP Set and alternate operation, is however measured together by one energy meter, the energy used for alternate drive shall be estimated by deducting the average IP Set consumption for that month as per the IP sample meter readings for the sub division as certified by the sub divisional Officer.

3) The Consumer is permitted to use the energy for lighting the pump house and well limited to 2 lighting points of 40 W each.

4) The water pumped for agricultural purposes may also be used by the Consumer for his bonafide drinking purposes and for supplying water to animals, birds, Poultry farms, Dairy farms and fish farms maintained by the Consumer in addition to agriculture.

5) Billing shall be made at least once in a quarter year for all IP sets.

6) A rebate of 2 paise per unit will be allowed if capacitors are installed as per Clause 23 of Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka in respect of all metered IP Set Installations.

7) Only fixed charges as in Tariff Schedule for Metered IP Set Installations shall be collected during the disconnection period of IP Sets under LT 4(a), LT 4(b) and LT 4(c) categories irrespective of whether the IP Sets are provided with Meters or not.

TARIFF SCHEDULE LT-5

Applicable to Heating & Motive power (including lighting) installations of

industrial Units, Workshops, Poultry Farms, Sugarcane Crushers, Coffee

Pulping, Cardamom drying, Mushroom raising installations, Flour, Huller &

Rice Mills, Wet Grinders, Milk dairies, Ironing, Dry Cleaners and Laundries

having washing, Drying, Ironing etc., Tailoring shop, Bulk Ice Cream and

Ice manufacturing Units, Coffee Roasting and Grinding Works, Cold

Storage Plants, Bakery Product Mfg. Units, KSRTC workshops/Depots,

Railway workshops, Drug manufacturing units and Testing laboratories,

Printing Presses, Garment manufacturing units, Bulk Milk vending Booths,

Swimming Pools of local Bodies, Tyre retreading units, Stone crushers,

Stone cutting, Chilly Grinders, Phova Mills, pulverizing Mills, Decorticators,

Iron & Red-Oxide crushing units, crematoriums, hatcheries, Tissue culture,

Saw Mills, Toy/wood industries, Viswa Sheds with mixed load sanctioned

under Viswa Scheme, Cinematic activities such as Processing, Printing,

Developing, Recording theatres, Dubbing Theatres and film studios,

Agarbathi manufacturing unit., Water supply installations of KIADB &

industrial units, Gem & Diamond cutting Units, Floriculture, Green House,

Biotech Labs., Hybrid seed processing units. Information Technology

industries engaged in development of hardware & Software, Information

Page 328: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxviii

Technology (IT) enabled Services / Start-ups (As defined in GOI

notification dated 17.04.2015)/ Animation / Gaming / Computer

Graphics as certified by the IT & BT Department of GOK/GOI, Silk filature

units, Aqua Culture, Prawn Culture, Brick manufacturing units, Silk /

Cotton colour dying, Stadiums maintained by Govt. and local bodies,

Fire service stations, Gold / Silver ornament manufacturing units, Effluent

treatment plants, Drainage water treatment plants, LPG bottling plants

and petroleum pipeline projects, Piggery farms, Analytical Lab. for

analysis of ore metals, Satellite communication centers, Mineral water

processing plants / drinking water bottling plants and soda fountain

units.

RATE SCHEDULE

LT-5 (a): Applicable to Bruhat Bangalore Mahanagara Palike and other

Municipal Corporation.

i.Fixed charges

Fixed charges per

month

i) Rs.35 per HP for 5 HP & below

ii) Rs.35 per HP for above 5 HP & below 40 HP

iii)Rs.45 per HP for 40 HP & above but below 67 HP

iv)Rs.110 per HP for 67 HP & above

ii. Demand based Tariff (optional)

Fixed

charges

per month

Above 5 HP and less than 40 HP Rs.55per KW of billing demand

40 HP and above but less than

67 HP

Rs.75 per KW of billing demand

67 HP and above Rs.160 per KW of billing

demand

Page 329: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxix

iii. Energy Charges

0 to 500 units 510 paise/unit

Above 500 units 630 paise/unit

RATE SCHEDULE

LT-5 (b): Applicable to all Areas other than those covered under LT-5(a).

i. Fixed charges

Fixed Charges

per Month

i) Rs.30 per HP for 5 HP & below.

ii) Rs.35 per HP for above 5 HP & below 40 HP.

iii) Rs.40 per HP for 40 HP & above but below 67 HP.

iv)Rs.100 per HP for 67 HP & above.

ii. Demand based Tariff (optional)

Fixed

Charges

per

Month

Above 5 HP and less than 40 HP Rs.50 per KW of billing demand

40 HP and above but less than 67

HP

Rs.65 per KW of billing demand

67 HP and above Rs.150 per KW of billing

demand

iii. Energy Charges

0 to 500 units 485 paise /unit

501 to 1000 units 570 paise /unit

Above 1000 units 600 paise/unit

TOD Tariff applicable to LT5 (a) & (b):At the option of the Consumer

Time of Day Increase + / reduction (-) in energy

charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs (-) 125 paise per unit

06.00 Hrs to 18.00 Hrs 0

18.00 Hrs to 22.00 Hrs + 100 paise per unit

Page 330: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxx

NOTE:

1. DEMAND BASED TARIFF

In the case of LT Industrial Consumers, Demand based Tariff at the option of

the Consumer can be adopted. The Consumer is permitted to have more

connected load than the sanctioned load. The billing demand will be the

sanctioned load or Maximum Demand recorded in the Tri-Vector Meter

during the month whichever is higher. If the Maximum Demand recorded is

more than the sanctioned load, penal charges at two times the normal rate

shall apply.

2. Seasonal Industries: The industries which intend to utilize seasonal industry

benefit shall comply with the conditionalities under para no. 24of general

terms and conditions applicable to LT.

3. Electricity can also be used for lighting, heating, and air-conditioning in the

premises.

4. In the case of welding transformers, the connected load shall be taken as (a)

Half the maximum capacity in KVA as per the name plate specified under-

IS1851 or (b) Half the maximum capacity in KVA as recorded during rating

by the Licensee, whichever is higher.

TARIFF SCHEDULE LT-6

Applicable to water supply and sewerage pumping installations and

also applicable to water purifying plants maintained by Government

and Urban Local Bodies/ Grama Panchayats for supplying pure drinking

water to residential areas Public Street lights/Park lights of village

Panchayat, Town Panchayat, Town Municipalities, City Municipalities /

Corporations / State and Central Govt. / APMC, Traffic signals,

Survelliance Cameras at traffic locations belonging to Government

Department, subways, water fountains of local bodies. Also applicable to

Streetlights of residential Campus of universities, other educational

institutions, housing colonies approved by local bodies/development

authority, religious institutions, organizations run on charitable basis,

industrial area / estate and notified areas, also applicable to water

supply installations in residential Layouts, Street lights along with signal

lights including the gateman’s shed with associated equipment

provided at the Railway level crossing.

Page 331: BESCOM - Karnataka · categories of consumers and details of Revenue for FY15 as filed by BESCOM 6 ... BESCOM Bangalore Electricity Supply Company BMP Bangalore Mahanagara Palike

cccxxxi

RATE SCHEDULE

Water Supply- LT-6 (a)

Fixed charges Rs.45/HP/month

Energy charges 390Paise/unit

Public lighting- LT-6 (b)

Fixed charges Rs.60/KW/month

Energy charges 550 Paise/unit

Energy Charges for LED/ Induction Lighting 450 paise/unit

TARIFF SCHEDULE LT-7

Temporary Supply and Permanent Supply to Advertising Hoardings

TARIFF SCHEDULE LT-7(a)

Applicable to Temporary Power Supply for all purposes.

LT 7(a) Details Approved Tariff

Temporary Power

Supply for all

purposes.

Less than 67 HP:

Energy charge at 950 paise / unit subject

to a weekly minimum of Rs.170 per KW of

the sanctioned load.

TARIFF SCHEDULE LT-7(b)

Applicable to Hoardings & Advertisement boards, Bus Shelters with

Advertising Boards, Private Advertising Posts / Sign boards in the interest

of public such as Police Canopy Direction boards, and other sign boards

sponsored by Private Advertising Agencies / firms on permanent

connection basis.

LT 7(b) Details Approved Tariff

Power supply on

permanent

connection basis

Less than 67 HP:

Fixed Charges at Rs.50 per KW / month

Energy charges at 950 paise / unit

Note:

1. Temporary power supply with or without extension of distribution main shall

be arranged through a pre–paid energy meter duly observing the provisions

of Clause 12 of the Conditions of Supply of Electricity of the Distribution

Licensees in the State of Karnataka.

2. This Tariff is also applicable to touring cinemas having licence for duration less

than one year.

3. All the conditions regarding temporary power supply as stipulated in Clause

12 of the Conditions of Supply of Electricity of the Distribution Licensees in

the State of Karnataka shall be complied with before service.

- O -