basinGstoke G olf Courselandatb ¢â‚¬› wp-content ¢â‚¬› ... basinGstoke G olf Course The Site Basingstoke

  • View
    1

  • Download
    0

Embed Size (px)

Text of basinGstoke G olf Courselandatb ¢â‚¬› wp-content...

  • b a s i n G s t o k e G o l f C o u r s e

    Who we are

    The Bloor Group began building houses 50 years ago. Today it is one of the largest privately-owned house building groups in the UK, building more than 3,500 new homes each year from apartments to 2, 3, and 4 bed family housing.

    Bloor are supported on this project by a team of professional consultants covering a number of disciplines including:

    • Master Planning – Boyer

    • Transport – Odyssey

    • Landscape – FPCR

    • Planning – Boyer

    • Drainage & Utilities – Odyssey

    • Ecology – EPR

    • Noise – Sound Advice

    • Engagement & Communication – PD&i

    W e l c o m e

    on display today are our emerging proposals for a residential led mixed-use development on land at Basingstoke Golf course.

    Bloor Homes are working closely with Basingstoke and Deane Borough Council to deliver a new residential community, in line with their adopted Local Plan. The redevelopment of the Golf Course will form the final stage of the planned south-west expansion of Basingstoke.

    The Council are preparing a Development Brief for the site which will be prepared alongside the planning application process. This Development Brief will be a Supplementary Planning Document against which the planning application will ultimately be determined.

    We are currently working towards preparing an Outline Planning Application in Spring 2019 and today’s event will enable you to:

    • Gain an understanding of our vision and aspirations for the site;

    • Provide us with your views and observations;

    • Meet the project team and ask us questions

    Once you have reviewed the material on display today, please take the time to complete a feedback form: www.LandatBasingstokeGolfCourse.co.uk.

    Thank you for taking the time to attend our event.

    1

    N

    Aerial Map of the site and surrounding area

    Hounsome Fields Scheme

    Beggarwood

    Beggarwood Park

    Arcadia Park

    M3

    Kennel Farm

    (A 30

    ) W inc

    he ste

    r R oa

    d

    Peak Copse

    M3 Junction 7

    KeY

    Site Boundary

    Basingstoke

    THE SITE

    Reading

    Winchester

    M3

    M4

    Alton BASINGSToKe GolF coURSe

    North Wessex

    KeY

    Site

    Major cities and villages

    Motorways

    Major roads

    Major parks and AONBs

    Site location plan

  • b a s i n G s t o k e G o l f C o u r s e

    The Site

    Basingstoke Golf Course comprises approximately 44.5 hectares and is located 2.5 miles south west of Basingstoke Town Centre. The Site is well contained with existing residential development to the east and the M3 and woodland to the south and south-east, and the A30 to the west.

    On the opposite side of the A30 are new and planned residential communities known as Hounsome Fields and Longacre (formerly Kennel Farm).

    Basingstoke Golf Club is in negotiations to relocate to Dummer Golf Club.

    Planning Policy

    Bloor Homes are seeking outline planning permission for the principle of a residential-led mixed use-development in accordance with the adopted Local Plan which will make a valuable contribution to delivering the Council’s housing need.

    The application will be in outline form, with all matters reserved except for access. The exact location of new homes and community infrastructure, plus the housing layout and design of new homes will be subject to separate reserved matters planning applications once outline planning permission has been granted.

    Basingstoke and Deane local Plan (2016) allocates Basingstoke Golf Course under Policy SS3.11 that will deliver a high-quality mixed-use development that, in summary, sets out the following provision:

    • Approximately 1,000 new dwellings comprising a mix of sizes and types;

    • A proportion of self-build units and pitch/plot provision for accommodation needs of Gypsies, Travellers and Travelling Showpeople;

    • Social and physical infrastructure including a community centre, local shopping facilities, and sports facilities including playing pitches to meet the needs of Hounsome Fields and Basingstoke Golf Course;

    • Improvements to the A30 corridor;

    • All-purpose vehicular access from (A30) Winchester Road and Beggarwood Lane;

    • Provision of internal walking and cycling routes linked to external routes, the Public Rights of Way network, and the Strategic Cycle Network;

    • Provision of Public Transport;

    • Appropriate open space / green infrastructure, including allotments;

    • Noise mitigation measures; and

    • Renewable and low carbon energy technologies.

    Plan showing the allocation site (Policy SS3.11) in context with other Local Plan allocations

    N

    Pedestrian path along Squirrel Drive

    Kennel Farm new development to the north-east of the Site

    Local centre - Beggarwood

    B A c K G R o U N D2

  • b a s i n G s t o k e G o l f C o u r s e

    Plan showing existing site features, landscape buffers and local infrastructure

    existing site features

    The project team have carried out a number of surveys and technical assessments of the site which have identified important opportunities and constraints to help inform the master planning process.

    E= 168.40

    top of drain= 140.55

    top of drain= 140.83

    E= 16

    4.1 8

    E= 167.76

    E= 170

    .63

    E= 1

    61 .6

    7

    E= 167.07

    E= 167.07

    E= 168.80

    TP

    TP

    TP

    TP

    TP

    TP

    R= 172.58

    R= 170.41

    R = 171.73

    R = 170.57

    R= 174

    .07

    R= 170.93

    R = 169.80 R= 169.90

    R =

    16 3.

    78

    R= 163.75

    R= 170.47

    W

    W

    W

    W

    W

    W

    W W

    SV

    SV

    SV

    SV

    RS

    MH C/L 162.86

    MH C/L 163.75

    irritation

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LPLP

    LP

    LP

    LP

    LP

    LP

    LP

    MHC C/L 148.64

    MHC C/L 164.33

    RS RS

    RS

    RS

    bollard

    RS

    RS

    RS

    RS

    RS

    bollard

    RS

    bollard

    bollard

    MH C/L 165.84

    MH C/L 165.93

    MH C/L 165.75

    MH C/L 165.74

    MH C/L 165.64

    MH C/L 165.58

    MH C/L 166.00

    MH C/L 165.90

    MH C/L 165.97

    MH C/L 166.19

    MH C/L 166.18

    MH C/L 166.26

    MH C/L 166.14

    MH C/L 165.72

    traffic

    MH C/L 157.04

    MH C/L 157.94

    MH C/L 157.96

    MH C/L 157.98

    MH C/L 153.77

    MH C/L 153.42

    MH C/L 152.65

    MH C/L 152.44

    MH C/L 152.22

    MH C/L 152.33

    MH BLOCKED C/L 152.39

    MH dia 150m C/L 152.48

    MH C/L 152.71

    MH C/L 152.78

    MH C/L 153.22

    MH C/L 153.48

    MH C/L 154.48

    MH C/L 154.62

    MH C/L 154.49

    MH C/L 160.26

    MH C/L 158.84

    MH C/L 158.48

    MH C/L 157.63

    MH C/L 157.38

    MH C/L 156.77

    MH C/L 156.58

    MH C/L 156.05

    MH C/L 155.84

    MH C/L 155.20

    MH C/L 154.88

    MH C/L 162.84

    MH C/L 162.29

    MH C/L 163.96

    MH dia 200m C/L 161.97

    MH C/L 163.32

    MH C/L 163.36

    MH C/L 165.66

    MH C/L 165.67

    MH no lift C/L 164.83

    MH C/L 164.85

    RI MH soakaway C/L 164.28

    GAS

    MH C/L 164.57

    MH C/L 164.89

    MH C/L 164.17

    electrical

    EMH CL= 167.947 m

    CATV

    CATV

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS

    RS RS

    RS

    RS

    RS

    bollard

    RS

    bollard

    RS

    RS

    RS

    MHC C/L 164.94

    MH C/L 155.56

    MH C/L 164.49

    MH C/L 164.52

    MH C/L 162.87

    MH C/L 167.88

    MH C/L 167.86

    MH C/L 167.93

    MH C/L 167.93

    MH C/L 167.88

    MH C/L 167.90

    MH C/L 167.88

    MH C/L 167.86

    MH C/L 167.77

    MH C/L 167.65

    MH C/L 167.46

    MH C/L 167.40 MH

    C/L 167.59

    MH C/L 168.16

    MH C/L 166.25

    MH C/L 165.70

    MH C/L 164.87

    163.78

    145.28

    147.65

    163.34

    163.07

    163.11

    163.17

    164.00

    164.14

    164.18

    164.00

    163.88

    164.55

    164.57

    164.54

    164.51

    164.57

    164.58

    164.59

    164.54

    164.51 164.53

    164.56

    164.60

    164.64 164.62

    164.61

    164.59 164.65

    164.55 164.51

    164.62 164.62

    164.65

    164.65

    164.85

    164.42 164