bab elektrik: suatu pengenalan

Embed Size (px)

Citation preview

  • 7/30/2019 bab elektrik: suatu pengenalan

    1/82

    BEE2922

    INDUSTRIALINDUSTRIAL

    INSTALLATIONINSTALLATION

  • 7/30/2019 bab elektrik: suatu pengenalan

    2/82

    Syllabus

    1. Electrical Power Supply (T) Institution of Electrical Engineers

    (IEE)regulation Power Distribution

    2. Main Switch Board-MSB (T) Power factor correction Switchgear and protective devices-

    RCCB,ACB,VCB Over current protective devices-CT ratio,

    TMS(time multiply setting) , relays Standby generator

  • 7/30/2019 bab elektrik: suatu pengenalan

    3/82

    3. Sub-Switch Board-SSB (T) Feeder pillar Choose of cable size

    Switchgear and protective devices-MCCB,ACB,fuses

    Meters

    4. Distribution Board-DB (T) Current carrying capacity Cable sizing Circuit breaker rating

    Three phase and single phasesupply

    Assessment

  • 7/30/2019 bab elektrik: suatu pengenalan

    4/82

    5. Loads (T) Total Connected Load(TCL) Current carrying capacity Voltage drop Sensitivity Balanced three phase circuit Maximum demand Tariffs

    6. Project (P) Configuration of tools and equipment Schematic drawing-assignment Conduit and trunks Installation and wiring

    Cables - Armoured cable Inspection and Testing- Condition of equipment

    and materials, continuity, insulation,termination, earth electrode

  • 7/30/2019 bab elektrik: suatu pengenalan

    5/82

    LEARNING OUTCOMES

    This subject introduces student to three phase wiring.The students will learn how to do electrical wiringinvolving three phase supply and also the safety

    measures required.

    The students should be able to:i. Differential between domestic and Industrial wiring

    ii. Demonstrate the component and function ofdistribution board

    iii. Explain the flow of distribution power system.

    iv. Practice right installation and wiring technique.

  • 7/30/2019 bab elektrik: suatu pengenalan

    6/82

    CHAPTER 1

    ELECTRICAL POWER SUPPLY

    IEEPOWER DISTRIBUTION

  • 7/30/2019 bab elektrik: suatu pengenalan

    7/82

    IEE REGULATION

    The 16th IEE regulation (Institution ofElectrical Engineers) currently isused in commenwealth countries

    It must be follow as practically inorder to achieve/fulfill the safety andrule requirement

  • 7/30/2019 bab elektrik: suatu pengenalan

    8/82

    ELECTRICAL REGULATION1994

    The rule to describe how theactivities in generation, transmission,distribution, consuming, supervising,

    handling, license, competent person,importing, manufacturing, upgrading,etc is applied

  • 7/30/2019 bab elektrik: suatu pengenalan

    9/82

    COMPETENT PERSON

    Pendawai Elektrik (Wireman), PW1 to PW6

    Penjaga Jentera Elektrik (Chargeman), A0 to A4

    Penyelia Elektrik (Electrical Supervisor)

    Pencantum Kabel (Cable Jointer) Jurutera Elektrik Kompeten (Competent Engineer)

    Jurutera Elektrik Perkhidmatan (Servising Engineer)

    Jurutera Elektrik Kompeten Residen (Competent

    Resident Electrical Engineer)

  • 7/30/2019 bab elektrik: suatu pengenalan

    10/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    11/82

    POWER STATION

  • 7/30/2019 bab elektrik: suatu pengenalan

    12/82

    ALTERNATOR

  • 7/30/2019 bab elektrik: suatu pengenalan

    13/82

    Main intake substation

  • 7/30/2019 bab elektrik: suatu pengenalan

    14/82

    POWER GENERATIONTNB 33kV/11kV

  • 7/30/2019 bab elektrik: suatu pengenalan

    15/82

    11kV/433kV substation

  • 7/30/2019 bab elektrik: suatu pengenalan

    16/82

    TRANSMISSION and DISTRIBUTION

  • 7/30/2019 bab elektrik: suatu pengenalan

    17/82

    CHAPTER 2

  • 7/30/2019 bab elektrik: suatu pengenalan

    18/82

    CHAPTER 2 :POWER DISTRIBUTION

    TNBSUBSTATION

    MAIN SWITCH BOARD

    SUB SWITCH BOARD

    DISTRIBUTIONBOARD

    LOAD

    11 kV

    415V

    415/240V

    415/240V

  • 7/30/2019 bab elektrik: suatu pengenalan

    19/82

    POWER DISTRIBUTION

    MSB

    (415V)

    SSB415V

    SSB415V

    SSB)415V

    STANDBY GENSET

  • 7/30/2019 bab elektrik: suatu pengenalan

    20/82

    MSB

    SSB SSB SSB SSB

    DB DB DB DB

  • 7/30/2019 bab elektrik: suatu pengenalan

    21/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    22/82

    INSIDE SUBSTATION

    Ring Main Unit (RMU) /Ring Main Unit (RMU) /

    Switchgear 11kVSwitchgear 11kV

    Transformer (11/0.415kV)Transformer (11/0.415kV) MSBMSB

    Feeder pillarFeeder pillarHigh voltage & low voltage cableHigh voltage & low voltage cable

  • 7/30/2019 bab elektrik: suatu pengenalan

    23/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    24/82

    2.0:MAIN SWITCH BOARD(MSB)

  • 7/30/2019 bab elektrik: suatu pengenalan

    25/82

    2.1 CAPACITOR BANK power factor

    correction

  • 7/30/2019 bab elektrik: suatu pengenalan

    26/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    27/82

    RESIDUAL CURRENT CIRCUITBREAKER (RCCB)

    Automatic CircuitBreaker for currentleakage to earth

    Current rating:40A and60/63A

    Sensitivity of currentleaking :10mA, 30mA,

    100mA, 300mA Three phase and single

    phase type

  • 7/30/2019 bab elektrik: suatu pengenalan

    28/82

    2.3 AIR CIRCUIT BREAKER

    Current rating 600A and above

    Add - Current

    Transformer, relayand shunt trip coilfor operation

    Current trip beadjusted

  • 7/30/2019 bab elektrik: suatu pengenalan

    29/82

    2.3 CT, TMS, RELAY

  • 7/30/2019 bab elektrik: suatu pengenalan

    30/82

    CURRENT TRANSFORMER(CT)

  • 7/30/2019 bab elektrik: suatu pengenalan

    31/82

    2.4 STANDBY GENSET

  • 7/30/2019 bab elektrik: suatu pengenalan

    32/82

    3.0SSB

    3.1SWITCH GEAR PROTECTION

    3.2 RCCB, ACB, VCB

  • 7/30/2019 bab elektrik: suatu pengenalan

    33/82

    Type of protection

    Over current (short circuit) overload

    earth fault earth leakage lightning Overheating unbalance phase reverse phase sequence

    3 0 SUB SWITCH BOARD (SSB)

  • 7/30/2019 bab elektrik: suatu pengenalan

    34/82

    3.0 SUB SWITCH BOARD (SSB)

  • 7/30/2019 bab elektrik: suatu pengenalan

    35/82

    EARTH FAULT RELAY

  • 7/30/2019 bab elektrik: suatu pengenalan

    36/82

    MOULDED CASE CIRCUIT BREAKER(MCCB)

    Function=MCB

    For 60A and above usage

    For three phase power supply Replace switch fuse and fuse switch

    ON- after Short circuit and over

    loading Easy to operate

  • 7/30/2019 bab elektrik: suatu pengenalan

    37/82

    3 PHASE ELCB CONSTRUCTION

    R Y B N

    Perintang uji

    Punatekan uji

    Teras besi

    ( Gelung secondary )

    PLBB Tiga Fasa

    Elemen sensitif

    Suis 4 kutub jenis link

    BEBAN

  • 7/30/2019 bab elektrik: suatu pengenalan

    38/82

    BALANCE CONDITION

    R Y B N

    BEBAN

    20A 20A 20A

    20A

  • 7/30/2019 bab elektrik: suatu pengenalan

    39/82

    UNBALANCE CONDITION

    R Y B N

    bocor ke bumi

    BEBAN

    20A 20A 20A

    10A

  • 7/30/2019 bab elektrik: suatu pengenalan

    40/82

    3.2 FEEDER PILLAR

  • 7/30/2019 bab elektrik: suatu pengenalan

    41/82

    CABLE CONSTRUCTION

    conductor Aluminium/Copper

    insulator Paper, PVC,XLPE

    Lembar (strand) helaianpaling kecil

    core himpunan helaian Perisai (armour)

    perlindungan mekanikal Salut (sheath) kemasan

    luaran Pengisi (filler) mengisi

    ruang kosong Screen (thin copper foil)

    stress uniformity Pengalas (bedding) alas

    antara bahagian keras dgnbahagian lembut

    PILCDSTAS CABLE(PAPER CABLE)

  • 7/30/2019 bab elektrik: suatu pengenalan

    42/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    43/82

    VARIOUS TYPE OF CABLES

    KABEL

  • 7/30/2019 bab elektrik: suatu pengenalan

    44/82

    KABELPVC/SWA/PVC

  • 7/30/2019 bab elektrik: suatu pengenalan

    45/82

    02/19/10 [email protected] 45

  • 7/30/2019 bab elektrik: suatu pengenalan

    46/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    47/82

    3.3 CABLE SIZE vs CURRENT RATING

    mm SQUAREmm SQUARE CURRENT (A)CURRENT (A)

    11 13.513.5

    1.51.5 17.517.5

    2.52.5 2424

    44 3232

    66 4141

    1010 5757

    1616 7676

    2525 101101

    3535 125125

    5050 1511517070 192192

    9595 232232

    120120 269269

    150150 300300

    3 4 METERS

  • 7/30/2019 bab elektrik: suatu pengenalan

    48/82

    3.4 METERS

    kWhour meter

    CT meter

  • 7/30/2019 bab elektrik: suatu pengenalan

    49/82

    4.0 DB

  • 7/30/2019 bab elektrik: suatu pengenalan

    50/82

    CURRENT CARRYING CAPACITYFUSE/MCB (Amp)FUSE/MCB (Amp) CABLE SIZE (mmCABLE SIZE (mm)) MAX POWER(watt)MAX POWER(watt)

    5/65/6 1.51.5 1000/12001000/1200

    1515 2.52.5 1 x 13A s/s/o1 x 13A s/s/o

    2020 2.52.5 2 x 13A s/s/o2 x 13A s/s/o

    30 (gelang)30 (gelang) 2.52.5 10 x 13A s/s/o10 x 13A s/s/o

    30 (jejari)30 (jejari) 4.04.0 6 X 13A s/s/o6 X 13A s/s/o

    1515 2.52.5 1 x cooker 3 kW1 x cooker 3 kW

    3030 4.04.0 1 x cooker 8 kW1 x cooker 8 kW

    1515 4.04.0 1 x heater 1.5kW1 x heater 1.5kW

    1515 4.04.0 1 x 1.5 HP air cond1 x 1.5 HP air cond

    3030 6.06.0 1 x 2.5 HP air cond1 x 2.5 HP air cond

    6363 16/2516/25 Kabel masuk utamaKabel masuk utama

  • 7/30/2019 bab elektrik: suatu pengenalan

    51/82

    4.0:DB-SINGLE PHASE

    CONTENT:

    ISOLATOR (63A)

    ELCB -4 pole

    LIVE TERMINAL

    NEUTRAL TERMINAL

    EARTH TERMINAL

    MCB

  • 7/30/2019 bab elektrik: suatu pengenalan

    52/82

  • 7/30/2019 bab elektrik: suatu pengenalan

    53/82

    CABLE SIZING

  • 7/30/2019 bab elektrik: suatu pengenalan

    54/82

    CABLE SIZING

    1.25 / 1.5 mm square (lamp/fan circuit)

    2.5 mm square (socket 13A, radial) 4.0 mm square (socket 13A, ring)

    6.0 mm square (socket 13A, ring)

    10.0 mm square (main cable)

    16.0 mm square (main cable)

    25 mm square (main cable)

    35 mm square (main cable)

    50 mm square (main cable) 70 mm square( main cable)

    MCB

  • 7/30/2019 bab elektrik: suatu pengenalan

    55/82

    MCB

  • 7/30/2019 bab elektrik: suatu pengenalan

    56/82

    Cable sizingsizesize No of core/No of core/

    CoreCore

    size(diametersize(diameter

    ))

    LOadLOad voltagevoltage

    ratingratingSize of cableSize of cable

    (diameter)(diameter)

    1.25 mm1.25 mm22 (7/0.53 mm)(7/0.53 mm) lamp circuitlamp circuit 300/500300/500

    voltvolt2.5 mm2.5 mm

    1.5 mm1.5 mm22 (3/0.737 mm)(3/0.737 mm) lamp circuit/lamp circuit/

    heaterheater300/500300/500

    voltvolt3.0 mm3.0 mm

    2.5 mm2.5 mm22 (7/0.67 mm)(7/0.67 mm) PowerPower

    circuit/watercircuit/waterheater 5kW-heater 5kW-

    20A20A

    400/750400/750

    voltvolt

    3.7 mm3.7 mm

    4 mm4 mm22 (7/0.85 mm)(7/0.85 mm) water heaterwater heater

    7kW- 30A7kW- 30A400/750400/750

    voltvolt4.2 mm4.2 mm

    INTERNAL MCB

  • 7/30/2019 bab elektrik: suatu pengenalan

    57/82

    INTERNAL MCBCOMPONENT

    MCB i t l d i

  • 7/30/2019 bab elektrik: suatu pengenalan

    58/82

    MCB-internal design

    Earth chamber & earth

  • 7/30/2019 bab elektrik: suatu pengenalan

    59/82

    Earth chamber & earthelectrode

    Earth chamber & earth electrode

  • 7/30/2019 bab elektrik: suatu pengenalan

    60/82

    Earth chamber & earth electrode

    EARTH RESISTANCE

  • 7/30/2019 bab elektrik: suatu pengenalan

    61/82

    EARTH RESISTANCEMEASUREMENT

    The grounding system is an essential element for theelectrical system security and it is required to:

    Allow for protective devices activation when there is aninsulation fault.

    Equalize the potential of conductive parts that can be

    accessed simultaneously, with the potential in thesurrounding soil in order to prevent people from beingexposed to hazardous voltages.

    Allow the lightning strike energy to be safely dissipated.

    Reduce electromagnetic interferences.

    02/19/10 [email protected] 61

    h l d

  • 7/30/2019 bab elektrik: suatu pengenalan

    62/82

    Earth electrode Standard Earth

    Electrode 6 incheslength

    Galvanised Iron (G.I)hollow pipe withdiameter 2 in

    Wire mesh

    Max resistance-fordomestic wiring=1 ohm

    Max resistance-forlightning=10 ohm Down conductors

    Air terminal

  • 7/30/2019 bab elektrik: suatu pengenalan

    63/82

    5.1:total connected load

    TCL is a total load ineach electricalequipment it is needsupply for project orinstallation

    These equipment lamp, fan, powerpoint, lift, waterpump, and electrical

    equipment Exp:

    loadload raterate

    1 x 18 W1 x 18 W 30W30W

    1 x 36 W1 x 36 W 50W50W

    Ceiling fanCeiling fan 65W65W

    EmergencyEmergencylamplamp

    20W20W

    SocketSocketoutlet 13Aoutlet 13A

    250 W250 W

    SocketSocket 500 W500 W

  • 7/30/2019 bab elektrik: suatu pengenalan

    64/82

    VOLTAGE DROP

    IEE regulation- Voltage drop4% from voltage source

    EXAMPLE :VOLTAGE SOURCE= 240V

    MAXIMUM VOLTAGE DROP =240 X 4% = 9.6V

    VOLTAGE SOURCE =415V

    MAXIMUM VOLTAGE DROP=415 X 4% = 16.6V

    CHAPTER 6: size of trunks

  • 7/30/2019 bab elektrik: suatu pengenalan

    65/82

    CHAPTER 6: size of trunks

    cable sizecable size Cable factorCable factor

    1.5 mm1.5 mm 8.18.1

    2.5 mm2.5 mm 11.411.4

    4 mm4 mm 15.415.4

    6 mm6 mm 22.922.9

    10 mm10 mm 36.336.3

    Trunks factor

    Trunks size (mm)Trunks size (mm) factorfactor

    50 x 3850 x 38 767767

    50 x 5050 x 50 10371037

    75 x 2575 x 25 738738

    75 x 3875 x 38 11461146

    75 x 5075 x 50 15551555

    75 x 7575 x 75 23712371

    100 x 25100 x 25 99.399.3

    100 x 38100 x 38 15421542

    100 x 50100 x 50 20912091

    100 x 75100 x 75 31893189

    100 x 100100 x 100 42524252

  • 7/30/2019 bab elektrik: suatu pengenalan

    66/82

    example Calculate the size of trunks to carried the cable size as below:a. 12 x 1.5mmb. 16x2.5mm

    c. 8 x 4mm

    d. 4x6mm

  • 7/30/2019 bab elektrik: suatu pengenalan

    67/82

    solution

    define the cable factor:a. 12 x 1.5mm =12 x 8.1=97.2

    b. 16x2.5mm=16 x 11.4=182.4

    c. 8 x 4mm=8 x 15.4= 123.2

    d. 4x6mm= 4 x 22.9= 91.6

    494.4

    Trunks size=75 x 25 mm

    FLAXIBLE CONDUIT

  • 7/30/2019 bab elektrik: suatu pengenalan

    68/82

    FLAXIBLE CONDUIT

  • 7/30/2019 bab elektrik: suatu pengenalan

    69/82

    TYPE OF TRUNKING

  • 7/30/2019 bab elektrik: suatu pengenalan

    70/82

    STARTING

    4 cm

    X

    X

  • 7/30/2019 bab elektrik: suatu pengenalan

    71/82

    TRUNKING -90

    XX

    X

    20cm 5cm5cm

    X

    XX

    X

    X

  • 7/30/2019 bab elektrik: suatu pengenalan

    72/82

    TRUNKING 45 -1

    XX

    X

    X

    45

    2cm 2cm

    20 cm

    20cm

    X X

    X

    X

  • 7/30/2019 bab elektrik: suatu pengenalan

    73/82

    TRUNKING 45 -2

    X

    X

    X

    45

    2cm 2cm

    X

    =28.5cm

    X

    X

  • 7/30/2019 bab elektrik: suatu pengenalan

    74/82

    ENDING

    5 cm

    X

    X

  • 7/30/2019 bab elektrik: suatu pengenalan

    75/82

    CAP

    5 cm 5 cm20 cm

    X

    X

    X

    X

    X

    90

    2 cm2 cm

    2 cm 2 cm

    X

    45-2

    45-1

    20 cm

  • 7/30/2019 bab elektrik: suatu pengenalan

    76/82

    DOL

    TO MOTOR

    MCB 32 A

    O/L

    CONTACTOR

    Inside DB (Three Phase)

  • 7/30/2019 bab elektrik: suatu pengenalan

    77/82

    Inside DB (Three Phase)

    MCCB(40A)

    ELCB(40A)

    CON(32A)

    10A

    20A

    20A

    32A

    32A

    TO DOL

    TO SOCKET OUTLET

    SPARE

    SPARE

    EN

    INCOMING FROMISOLATOR

    E/S

    CABLESIZE:4mm

    A1

    A2

    SPARE

    RING CIRCUIT

  • 7/30/2019 bab elektrik: suatu pengenalan

    78/82

    RING CIRCUIT

    S/O 2S/O 1

    S/O 3

    MCB (20A)E N

    Cable size:2.5mm

  • 7/30/2019 bab elektrik: suatu pengenalan

    79/82

    OVERALL LAYOUT

  • 7/30/2019 bab elektrik: suatu pengenalan

    80/82

    OVERALL LAYOUT

    TRUNKING (2X2)

    CONDUIT(3/4)

    DB

    DOL

    S/O 1

    S/O 3

    S/O 2

    E/S

    45

    45

    90

    90

    12

    77

    9

    9

    10

    1016

    12

    10

    10

    45

    45

    Practical FLOW WORK

  • 7/30/2019 bab elektrik: suatu pengenalan

    81/82

    Practical FLOW WORK

    START

    CONDUIT-measurement, cutting,bending and threading

    TRUNKING (body & cap)measurement, cutting,hole

    Conduit fitting-clip

    TRUNKING FITTING-screwing

    WIRING

    TESTING

    TEORI

    ASSESSMENT

  • 7/30/2019 bab elektrik: suatu pengenalan

    82/82

    ASSESSMENT

    Quizzes (5%)

    Test (10%)

    Practical (35%)