AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017 ISLAND / REGION REGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS POTENTIAL CAPACITY (MW) INSTALLED CAPACITY (MW) Luzon CAR & I Benguet & Ilocos Sur Bakun & Cervantes Hedcor, Inc. Mankayan 2 Non-compliant with: -PERFORMANCE BOND -RESHERR -WORK PROGRAM 20.30 CAR Benguet Ambuklao SN Aboitiz Power - Benguet, Inc. Ambuklao 104.55 Bakun Hedcor, Inc. Ampohaw Non-compliant with: • RESHERR 8.00 F. L. Singit Non-compliant with: • RESHERR 5.90 Lon-oy Non-compliant with: • RESHERR 3.60 Lower Labay Non-compliant with: • RESHERR 2.40 Bakun & Mankayan Hedcor, Inc. Mankayan 1 Non-compliant with: RESHERR , Work Program, PB 12.70 Bokod & Kabayan Hedcor Benguet, Inc. Kabayan-Bokod Non-compliant with: PB, RESHERR, WP 27.00 Buguias Benguet Electric Cooperative, Inc. Man-asok Compliant with: -Work Plan - Performance Bond Non-compliant with: - RESHERR 3.00 Buguias & Kabayan Hedcor Benguet, Inc. Kabayan 1 Compliant with: PB, WP, RESHERR 20.00 Itogon Hedcor, Inc. Sal-angan Non-compliant with: • RESHERR 2.40 SN Aboitiz Power - Benguet, Inc. Binga 140.00 Strategic Power Development Corp. San Roque Lower East Pumped-Storage Compliant with: -Work Program -Posting of performance bond -RESHERR 400.00

AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

  • Upload
    lamdat

  • View
    227

  • Download
    5

Embed Size (px)

Citation preview

Page 1: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR & IBenguet & Ilocos

SurBakun & Cervantes Hedcor, Inc. Mankayan 2

Non-compliant with:

-PERFORMANCE BOND

-RESHERR

-WORK PROGRAM

20.30

CAR Benguet AmbuklaoSN Aboitiz Power -

Benguet, Inc.Ambuklao 104.55

Bakun Hedcor, Inc. Ampohaw Non-compliant with:

• RESHERR8.00

F. L. Singit Non-compliant with:

• RESHERR5.90

Lon-oy Non-compliant with:

• RESHERR3.60

Lower Labay Non-compliant with:

• RESHERR2.40

Bakun & Mankayan Hedcor, Inc. Mankayan 1 Non-compliant with:

RESHERR , Work Program, PB12.70

Bokod & Kabayan Hedcor Benguet, Inc. Kabayan-Bokod Non-compliant with:

PB, RESHERR, WP27.00

BuguiasBenguet Electric

Cooperative, Inc.Man-asok

Compliant with:

-Work Plan -

Performance Bond

Non-compliant with:

- RESHERR

3.00

Buguias & Kabayan Hedcor Benguet, Inc. Kabayan 1Compliant with:

PB, WP, RESHERR 20.00

Itogon Hedcor, Inc. Sal-angan Non-compliant with:

• RESHERR2.40

SN Aboitiz Power -

Benguet, Inc.Binga 140.00

Strategic Power

Development Corp.

San Roque Lower East

Pumped-Storage

Compliant with:

-Work Program

-Posting of performance bond

-RESHERR

400.00

Page 2: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Benguet ItogonStrategic Power

Development Corp.

San Roque Upper East

Pump Storage

Compliant with:

Work Program, Posting of Performance

Bond

Non-compliant with:

RESHERR

600.00

San Roque West Pump

Storage

Compliant with:

RESHERR , Work Program, PB 400.00

Kabayan Hedcor Kabayan, Inc. Kabayan 2

Non-compliant with:

- Work Plan

-Performance bond

-RESHERR

52.00

Kapangan and

Kibungan

Cordillera Hydro Electric

Power CorporationKapangan

Compliant with:

-RESHERR

-PERFORMANCE BOND

Non-compliant with:

-WORKPLAN

60.00

KibunganCoheco Badeo

CorporationKibungan Pumped-Storage

Compliant with:

PB

Non-compliant with:

RESHERR, WP

500.00

Kibungan Hydropower

CorporationKibungan

Non-compliant with:

Work Program RESHERR 1,000.00

La Trinidad Hedcor, Inc. Bineng 1-2B Combination Non-compliant with:

PB, RESHERR, 19.00

Bineng 3 Non-compliant with:

• RESHERR4.50

Sablan Hedcor, Inc. Bagulin 1 10.00

TubaAV Garcia Power

Systems Corp.Abdao

Compliant with:

-RESHERR

Non-compliant with:

-Work Plan

-Performance bond

2.00

Page 3: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Benguet TubaAV Garcia Power

Systems Corp.Abdao 2

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

3.00

Goldlink Global Energy

CorporationKanggas

Non-compliant with:

Performance Bond; Work Plan; RESHERR3.00

Tadiangan

Non-compliant with:

PB, Progress Reports, RESHERR, Work

Program

4.70

Hedcor, Inc. Irisan 1 Compliant with:

Work Plan; RESHERR 3.80

Irisan 3 Non-compliant with:

• RESHERR1.20

Tublay AT Dinum Company Tublay 2

Compliant with:

WP, PB

Non-compliant with:

RESHERR,

6.00

Tublay 3

Compliant with:

-PERFORMANCE BOND

Non-compliant with:

-WORK PROGRAM

-RESHERR

1.00

Tublay & La Trinidad AT Dinum Company Tublay 1

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-RESHERR

0.90

Ifugao AsipuloIfugao Electric

Cooperative, Inc.Likud 2

Compliant with:

-Work Program

Non-compliant with:

-RESHERR -

Performance Bond

0.60

Asipulo & KianganProvincial Government

of IfugaoLikud

Non-compliant with:

RESHERR0.82

Page 4: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Ifugao IlaganSN Aboitiz Power -

Ifugao, Inc.Olilicon

Non-compliant with:

PB, WP10.00

KianganEnerhighlands

CorporationIbulao 2

Non-compliant with:

-WORKPLAN

-RESHERR

-PERFORMANCE BOND

8.80

Kiangan Mini Hydro

CorporationAsin

Compliant with:

WP, Progress Reports, Performance Bond

Non-compliant with:

RESHERR

7.04

Hungduan

Compliant with:

WP, Progress Reports, Performance Bond

Non-compliant with:

RESHERR

4.04

Ibulao 1

Compliant with:

-Work Plan

Non-compliant with:

-RESHERR -

Performance bond

6.75

Provincial Government

of IfugaoAmbangal

Non-compliant with:

RESHERR0.20

Lagawe Hydrocore, Inc. Ibulao

Compliant with:

- RESHERR

- Performance bond

Non-compliant with:

- Work Plan

4.50

SN Aboitiz Power -

Ifugao, Inc.Alimit

Non-compliant with:

PB100.00

Lagawe & MayoyaoSN Aboitiz Power -

Ifugao, Inc.Alimit-Pumped Storage

Non-compliant with:

PB240.00

Page 5: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Ifugao LamutEnerhighlands

CorporationLamut

Compliant with:

Work Plan; Performance Bond

Non-compliant with:

RESHERR

6.00

RamonSN Aboitiz Power -

Magat, Inc.Maris Main Canal 2

Compliant with:

RESHERR

Non-compliant with:

PB, Progress Report, WP

1.75

TinocPhilnew Hydro Power

CorpTinoc 4

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

5.00

Philnewriver Power

Corp.

Tinoc 5 (Lower Luhong)

HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

6.90

Tinoc 6 (Wangwang) HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

8.00

Quadriver Energy

CorporationTinoc 1

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

4.10

Tinoc 2

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

11.00

Tinoc 3

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

8.00

Kalinga BalbalanBiyao Hydro Power

CorporationBiyao

Non-compliant with:

RESHERR , Work Program, PB0.80

Page 6: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Kalinga Pasil I-Magat Renewable

Energy CorporationPasil B

Compliant with:

-PERFORMANCE BOND

Non-compliant with:

-WORK PROGRAM

-RESHERR

14.00

Pasil C

Compliant with:

-PERFORMANCE BOND

Non-compliant with:

-WORK PROGRAM

-RESHERR

11.00

Markham Resources

CorporationPasil 3 10.00

Tapao

Non-compliant with:

WP, RESHERR, PB

10.00

TabukDPJ Engineers and

ConsultantsBulanao

Non-compliant with:

RESHERR 1.00

San Lorenzo Ruiz

Builders & Developers

Group, Inc.

Chico River

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-RESHERR

45.00

TinglayanPan Pacific Renewable

Power Philippine Corp.Tinglayan

Compliant with:

- Work Program - RESHERR

Non-compliant with:

• RESHERR

4.32

San Lorenzo Ruiz Piat

Energy & Water, Inc. Chico

Compliant with:

WP 150.00

ApayaoCabarroguis &

Nagtipunan

Pan Pacific Renewable

Power Philippine Corp.Gened 1

Compliant with:

-Work Program -

Performance Bond -

RESHERR

600.00

Page 7: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Apayao ConnerStrategic Power

Development Corp.Nabuangan River

Compliant with:

-Work Program

-Posting of performance bond

-RESHERR

10.00

Abra Lagayan Sta. Clara Power Corp. Tineg Non-compliant with:

RESHERR , Work Program, PB16.00

Manabo Sta. Clara Power Corp. Three Rivers Non-compliant with:

RESHERR , Work Program, PB10.00

Tineg & LagayanFirst Gen Mindanao

Hydro Power Corp.Binongan-Tineg

Compliant with:

WP, PB, RESHERR 175.00

Tubo Sta. Clara Power Corp. Amtuagan Non-compliant with:

RESHERR , Work Program, PB8.50

Gayaman (Tubo)

Non-compliant with:

-WORKPLAN

-PERFORMANCE BOND

-RESHERR

8.50

Mt. Province BaukoKadipo Bauko Hydro

Power Corp.Ampassit

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

1.20

Boga

Compliant with:

-WORK PROGRAM

Non-compliant with:

-PERFORMANCE BOND

-RESHERR

1.00

Enodey 1A

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

1.80

Lower Chico

Compliant with:

-Work Program

Non-compliant with:

-RESHERR -

Performance Bond

3.40

Page 8: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Mt. Province BaukoKadipo Bauko Hydro

Power Corp.Upper Chico

Compliant with:

-Work Program

Non-compliant with:

-RESHERR -

Performance Bond

2.10

Kadipo Bauko

Hydropower Corp.Enodey-Abit 1

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

2.00

Enodey-Abit 2

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.20

Enodey-Abit 3

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

2.00

Besao

BIMAKA Renewable

Energy Development

Corporation (BREDCO)

Besao 1

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

5.00

Besao 1A

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

2.30

Besao 1B

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.70

Besao 2

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

7.00

Besao 2A

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.50

Besao 3

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

4.50

Page 9: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Mt. Province Bontoc

Mountain Province

Electric Cooperative,

Inc.

Talubin Non-compliant with:

PB, RESHERR4.90

Natonin

Asiapac Green

Renewable Energy

Corporation

Lower Siffu

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

8.00

Upper Siffu

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

8.00

Southeast Asia

Renewable Power

Corporation

Malecom

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

0.80

Malig

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

1.10

Pantor

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

1.20

Sabangan Hedcor Sabangan, Inc. Sabangan Compliant with:

Work Plan; RESHERR 14.00

Tadian

Asiapac Green

Renewable Energy

Corporation

Dicapan

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

3.00

I Ilocos Sur AlilemLuzon Hydro

CorporationBakun AC 70.00

Philnewriver Power

Corp.Alilem HEP

Non-compliant with:

Performance Bond (PB), RESHERR,

Progress Reports, Work Program

16.20

Page 10: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon I Ilocos Sur QuirinoPhilnewriver Power

Corp.Quirino HEP

Compliant with:

'• Submitted Construction Environmental

Safety and Health Program in compliace to

RESHERR requirement on Oct. 6, 2010

Non-compliant with:

• Performance Bond

11.50

San Emilio Sta. Clara Power Corp. Matibuey

Compliant with:

- Work Program

- Posting of performance bond

- RESHERR

16.00

Sigay & SuyoMarkham Resources

CorporationSigay 2

Non-compliant with:

progress report, RESHERR, PB

10.00

SugponPhilnewriver Power

Corp.Danac HEP

Non-compliant with:

PB, WP13.20

SuyoSatrap Power

CorporationSuyo 2

Compliant with:

PB

Non-compliant with:

RESHERR, WP

3.00

La Union Bagulin

Team (Philippines)

Renewable Energy

Corporation

Baroro 1

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

1.00

Baroro 2

Non-compliant with:

-WORKPROGRAM

-PERFORMANCE BOND

-RESHERR

3.00

Baroro 3

Non-compliant with:

- Work Program

- RESHERR

-Performance bond

1.50

Page 11: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon I La Union NaguilianNaguilian Mini-Hydro

Electric CorporationNaguilian

Compliant with:

Performance Bond; Work Program

Non-compliant with:

RESHERR

6.10

San GabrielMarkham Resources

CorporationBaroro

Non-compliant with:

WP, RESHERR, PB

6.00

TubaoTubao Mini Hydro-

Electric CorporationTubao

Compliant with:

Work Program

Non-compliant with:

Posting of Performance Bond, RESHERR

1.50

Ilocos Norte DumalnegPhildane Resources

CorporationBulo 2

Non-compliant with:

PB, RESHERR, WP

5.00

II Cagayan PeñablancaSunwest Water &

Electric Company, Inc.Pinacanauan River

Non-compliant with:

Work Plan, Posting of Performance Bond,

RESHERR

6.00

Isabela Alicia

Ganano Energy &

Environment Electric

Cooperative

Ganano River 50.00

Cordon PhilCarbon Inc. Magat F Non-compliant with:

PB, RESHERR, WP0.60

EchagueIsabela Power

CorporationIlaguen 3

Compliant with:

• Work Program

• Posting of performance bond

• Complied RESHERR requirements on Feb

7, 2017

11.00

Ilaguen 4

Compliant with:

• Work Program

• Posting of performance bond

• Complied RESHERR requirements on Feb

7, 2017

10.00

Page 12: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon II Isabela Ilagan

Trans-Asia Oil and

Energy Development

Corp,

Ilagan

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

10.00

Lagawe & MayoyaoGreenpower Resources

CorporationAbuan River 1

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

10.80

NagtipunanIsabela Power

CorporationIlaguen 2

Compliant with:

• Work Program

• Posting of performance bond

14.00

RamonI-Magat Renewable

Energy CorporationMagat A

Non-compliant with:

Non submission of Quarterly report, PB,

WP, and RESHERR

1.30

Magat B

Non-compliant with:

Non submission of Quarterly report, PB,

WP, and RESHERR

1.00

SN Aboitiz Power -

Magat, Inc.Maris Main Canal 1

Compliant with:

RESHERR, WP, Progress Reports

Non-compliant with:

PB

6.00

San AgustinGreenpower Resources

CorporationDibuluan

Compliant with:

-Performance bond

Non-compliant with:

-Work Plan

-RESHERR

5.00

Ilaguen 5

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Program RESHERR

8.60

San MarianoGreenpower Resources

CorporationCatalangan North 4.40

Catalangan South 6.50

Page 13: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon II Isabela San MarianoGreenpower Resources

CorporationDisabungan

Compliant with:

-Performance bond

Non-compliant with:

-Work Plan

-RESHERR

4.80

San Mariano & San

GuillermoIsabela Power Corp. Ilaguen

Compliant with:

- Posting of performance bond

Non-compliant with:

- Work Plan

-RESHERR

19.00

San Mateo National Irrigation

AdministrationLateral B

Non-compliant with:

RESHERR0.05

San PabloGreenpower Resources

CorporationSan Pablo

Compliant with:

PB

Non-compliant with:

RESHERR, Progress Report

8.00

San Pablo Site 2

Compliant with:

PB

Non-compliant with:

RESHERR, Progress Report

3.00

TumauiniPhilnew Hydro Power

CorpTumauini (Upper Cascade)

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

14.00

Quadriver Energy

CorporationTumauini (Lower Cascade)

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

7.80

Nueva Vizcaya Alfonso CastañedaJRV Renewable Energy

CorporationDenip

Non-compliant with:

Work Program; RESHERR; Performance

Bond

2.30

United Hydro Power

BuildersMangayngay

Non-compliant with:

RESHERR , Work Program, PB1.60

AmbaguioAurora All Asia Energy

CorporationMatuno 2 15.00

Page 14: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon II Nueva Vizcaya AmbaguioSmith Bell Mini-Hydro

Corp.Matuno 1

Non-compliant with:

-WORKPLAN

-PERFORMANCE BOND

-RESHERR

7.40

BambangEpower Technologies

Corp.Matuno

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

8.00

Smith Bell Mini-Hydro

Corp.Matuno 2

Non-compliant with:

-WORKPLAN

-PERFORMANCE BOND

-RESHERR

7.90

Dupax del Norte and

Alfonso Castañeda

JRV Renewable Energy

CorporationCasignan

Non-compliant with:

Work Program; RESHERR; Performance

Bond

5.00

Dupax del SurJRV Renewable Energy

CorporationAbaca

Non-compliant with:

Work Program; RESHERR; Performance

Bond

3.20

Kasibu AT Dinum Company Didipio 1 Non-compliant with:

WP, RESHERR, PB, Progress Report2.10

Edralin

Compliant with:

-Work Program -

Posting of performance bond

Non-compliant with:

RESHERR

1.20

Namanaan

Compliant with:

-Performance bond

Non-compliant with:

- Work Program

-RESHERR

0.60

Kasibu & Nagtipunan Alimit Hydro Corp. Didipio 2 Non-compliant with:

WP, RESHERR, PB, Progress Report9.40

SolanoSmith Bell Mini-Hydro

Corp.Commonal-Uddiawan

Non-compliant with:

RESHERR 1.80

Page 15: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon II Quirino AglipayQuirino Power Energy

CorporationAddalam

Compliant with:

• Work Program

Non-compliant with:

• RESHERR

3.80

CabarroguisQuirino Resources

Development Corp.Addalam

Compliant with:

Work Plan, Posting of Performance Bond

Non-compliant with:

RESHERR

14.20

MaddelaGreenpower Resources

CorporationDibuluan 2

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

3.20

NagtipunanAsiapacific Renewables

CorporationDakgan 1

Non-compliant with:

-Work Program

-Performance bond

RESHERR

9.00

Dakgan 2

Non-compliant with:

-Work Program

-Performance bond

RESHERR

12.00

Gawagan Hydro Power

Corp.Gawagan 1

Non-compliant with:

RESHERR, Work Program, PB4.30

Gawagan 2 Non-compliant with:

RESHERR, Work Program, PB2.60

Geblem 1 Non-compliant with:

RESHERR, Work Program, PB0.70

United Hydro Power

BuildersDagkan

Non-compliant with:

RESHERR , Work Program, PB142.00

Isabela IlaganGreenpower Resources

CorporationAbuan 2

Compliant with:

-PERFORMANCE BOND 8.10

RamonSN Aboitiz Power -

Magat, Inc.Magat 360.00

Page 16: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon II Isabela San PabloGreenpower Resources

CorporationSan Pablo Site 3

Compliant with:

PB

Non-compliant with:

RESHERR, Progress Report

4.90

Isabela &

Quirino

San Agustin &

Maddela

Greenpower Resources

CorporationDabubu

Compliant with:

-Performance bond

Non-compliant with:

- Work Program -RESHERR

4.50

III Aurora Dinalungan PTC Energy, Inc. Talaytay

Non-compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

1.45

Dingalan PTC Energy, Inc. Davildavilan

Compliant with:

RESHERR

Non-compliant with:

PB, Work Program

1.00

Strategic Power

Development Corp.Dingalan Pumped-Storage

Compliant with:

-Work Program

-Posting of performance bond

-RESHERR

500.00

San Luis PTC Energy, Inc. Diteki

Non-compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

1.67

Nueva Ecija GabaldonConstellation Energy

CorporationDupinga

Non-compliant with:

Performance Bond; Work Plan; RESHERR3.00

General Tinio LGU of Gen. Tinio Rio Chico Non-compliant with:

Performance Bond; Work Plan; RESHERR2.00

PantabanganFirst Gen Hydro Power

CorporationMasiway

Compliant with:

RESHERR 12.00

PantabanganCompliant with:

RESHERR 120.80

Page 17: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon III Nueva Ecija PantabanganFirst Gen Prime Energy

Corporation

Pantabangan (Pump

Storage) HEP

Compliant with:

-Work Program -

Perfromance Bond -RESHERR

300.00

San Lorenzo Ruiz

Builders & Developers

Group, Inc.

Sampaloc 14.00

United Hydro Power

BuildersDiaman

Compliant with:

Work Program

Non-compliant with:

RESHERR; Performance Bond

1.80

RizalPNOC-Renewables

CorporationPrismc 1.00

San JosePNOC-Renewables

CorporationSDC

Compliant with:

-RESHERR

-Performance bond

Non-compliant with:

- Work Program

0.50

Bataan Mariveles

Southeast Asia

Renewable Power

Corporation

Mariveles

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

1.10

Morong Sta. Clara Power Corp. Morong 2.00

Tarlac MayantocNorthgreen Energy

CorporationCamiling 1

Compliant with:

- Posting of performance bond

Non-compliant with:

RESHERR, Work Program

5.40

Camiling River 3

Compliant with:

Work Program, Progress Reports,

Performance Bond.

Non-compliant with:

RESHERR

3.40

Page 18: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon III Zambales IbaMarkham Resources

CorporationIba 2

Non-compliant with:

progress report, RESHERR, PB

5.00

Masinloc AT Dinum Company Coto 3

Compliant with:

Posting of Performance Bond

Non-compliant with:

RESHERR

2.20

Coto Hydro Corp. Coto 1 Non-compliant with:

RESHERR6.50

Coto 2 Non-compliant with:

RESHERR2.80

Pangasinan San Quintin

Power Beacon

Renewable Solutions,

Inc.

Dipalo

Compliant with:

PB

Non-compliant with:

WP, RESHERR

2.50

Nueva Ecija /

AuroraGabaldon / San Luis

United Hydro Power

BuildersLingod River 2.50

IV-A Bulacan NorzagarayStrategic Power

Development Corp.Angat Run-of-River

Compliant with:

PB, WP

Non-compliant with:

RESHERR

10.00

Quezon General NakarLaguna Hydroenergy

CorporationUmiray 1

Compliant with:

Performance Bond

Non-compliant with:

Work Program; RESHERR

6.00

Umiray Site 2 River

Compliant with:

Work Program; Performance Bond

Non-compliant with:

RESHERR

3.90

Umiray Site 4 River

Compliant with:

Work Program; Performance Bond

Non-compliant with:

RESHERR

2.80

Page 19: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-A Quezon LucbanRenesons Energy

CorporationMaapon

Compliant with:

- Work Plan

- RESHERR

Non-compliant with:

-Performance bond

2.60

MaubanAurora All Asia Energy

CorporationMauban

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

10.00

Enervantage Supplier's

Co., Inc.

(Laguio) Laginbayan

Malaki 2

Compliant with:

-Work Plan

Non-compliant with:

-RESHERR -

Performance bond

3.10

Laguio (Laginbayan)

Malaki 1

Compliant with:

-Work Plan

Non-compliant with:

-RESHERR -

Performance bond

1.60

RealAurora All Asia Energy

CorporationTignoan

Non-compliant with:

Performance Bond; Work Program;

RESHERR

20.00

Tignoan (Lower) 8.00

Enervantage Supplier's

Co., Inc.Lubayat River 3.50

Municipality of Real,

QuezonKinanliman

Non-compliant with:

- Work Program

- Posting of performance bond

- RESHERR

1.60

Repower Energy

Development

Corporation

Labayat River (Lower

Cascade)

Compliant with:

-WORKPLAN

-RESHERR

Non-compliant with:

-PERFORMANCE BOND

1.40

Page 20: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-A Quezon Real

Repower Energy

Development

Corporation

Labayat River (Upper

Cascade)

Compliant with:

WP, RESHERR, Progress Reports,

Performance Bond

3.00

Lalawinan

Compliant with:

- Work Program - Posting of performance

bond

Non-compliant with:

• RESHERR

3.00

Piapi River

Compliant with:

-WORKPLAN

-RESHER

Non-compliant with:

-PERFORMANCE BOND

3.30

Tibag

Compliant with:

- Work Program - Posting of performance

bond

Non-compliant with:

• RESHERR

4.40

Tignoan River (Upper

Cascade) 1.50

Rizal Jala-Jala Citicore Power, Inc. Jala-Jala Pumped Storage 750.00

Jala-Jala Pumped Storage

Site 4 300.00

Jala-Jala Pumped Storage

Site 5 300.00

Pililla

Trans-Asia Oil and

Energy Development

Corp,

Pililia Pumped Storage

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

300.00

RodriguezOlympia Violago Water

& Power, Inc.Wawa Pumped Storage 1

Compliant with:

Work Program, PB

Non-compliant with:

RESHERR

500.00

Page 21: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-A Rizal RodriguezOlympia Violago Water

& Power, Inc.Wawa Pumped Storage 2

Compliant with:

Work Program, PB

Non-compliant with:

RESHERR

100.00

Wawa Pumped Storage 3 50.00

LagunaCalauan and San

Pablo City

Philippine Power and

Development CompanyPalakpakin 1.00

Kalayaan Citicore Power, Inc. Kalayaan Pumped Storage 600.00

MajayjayAurora All Asia Energy

CorporationUpper Botocan River

Non-compliant with:

Performance Bond; Work Program;

RESHERR

8.64

Majayjay Hydropower

Company, Inc.Majayjay

Compliant with:

WP, RESHERR, Progress Reports

Non-compliant with:

Performance Bond

3.00

Majayjay &

Magdalena

Repower Energy

Development

Corporation

Balanac (Middle)

Compliant with:

RESHERR

Non-compliant with:

Work Program; Performance Bond

5.00

NagcarlanPhilippine Power and

Development CompanyBalugbog 0.70

Paete Citicore Power, Inc. Paete Pumped Storage 350.00

Pangil Belisama Hydropower

CorporationDambo Pumped Storage

Compliant with:

-Work Program

-Posting of performance bond

Non-compliant with:

-RESHERR

800.00

San PabloPhilippine Power and

Development CompanyCalibato 0.22

Page 22: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-A CaviteIndang &

MaragondonEnergywise Corporation Indang

Compliant with:

Work Program

Non-compliant with:

Posting of Performance Bond, RESHERR

1.50

Laguna &

Quezon

Pangil & Real &

Mauban

Sierra Madre Water

CorporationSiniloan

Non-compliant with:

-Performance bond

-Work Program

- RESHERR

35.00

IV-BOriental

MindoroBaco

Alpaparay Resort &

Development

Corporation

San Ignacio

Non-compliant with:

- Work Program

- Posting of performance bond -

RESHERR

0.50

Oriental Mindoro

Electric Cooperative,

Inc.

*Linao-Cawayan (Lower

Cascade) 2.10

Linao-Cawayan (Upper

Cascade)

Compliant with:

RESHERR; Work Plan 2.10

PNOC - Renewables

Corp.Dulangan

Compliant with:

-RESHERR

Non-compliant with:

-Performance bond

-Work Program

8.25

Bansud & GloriaSunwest Water and

Electric Co., Inc.Bansud

Compliant with:

PB

Non-compliant with:

RESHERR, Work Program

1.50

Bongabong S&B Power Corporation Bongabong 2.60

NaujanCatuiran Hydro Power

Corp.Catuiran

Compliant with:

RESHERR , Work Plan, PB 8.00

Philnew Hydro Power

CorpCatuiran (Upper Cascade)

Non-compliant with:

RESHERR , Work Program, PB8.00

Page 23: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-BOriental

MindoroSan Teodoro

Constellation Energy

CorporationAlag Tributary 1

Compliant with:

-Posting of performance bond

Non-compliant with:

- RESHERR

-Work Program

2.80

Alag Tributary 2 Non-compliant with:

WP, RESHERR2.80

Mindoro Grid

Corporation

Linao Cawayan Phase 2

(Tail-End)

Compliant with:

Work Program

Non-compliant with:

Posting of Performance Bond, RESHERR

1.00

Ormin Power, Inc Inabasan

Compliant with:

RESHERR

Non-compliant with:

Work Plan, Performance Bond

10.00

San Teodoro &

Puerto GalleraOrmin Power, Inc. Inabasan Phase II

Non-compliant with:

Non submission of Quarterly report, PB,

WP, and RESHERR

10.00

Palawan Alfonso ListaAlternergy Viento

Partners CorporationBulalakao 1 North River

Compliant with:

- Work Program

- Posting of performance bond -

RESHERR

0.34

Bataraza AQA Global Power Inc. Marangas River

Non-compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

12.00

Brooke's Point AQA Global Power Inc. Sologon River HEP Non-compliant with:

RESHERR, WP, PB12.00

Busuanga AQA Global Power Inc. Busuanga River 1 HEP

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

8.00

Page 24: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-B Palawan El NidoAlternergy Viento

Partners CorporationBulalakao 2 South River

Compliant with:

- Work Program

- Posting of performance bond -

RESHERR

0.44

Narra AQA Global Power Inc. Bato-Bato (Kaliwa) HEP

Non-compliant with:

Work Program; RESHERR; Performance

Bond

12.00

Estrella River HEP Non-compliant with:

Work Program; RESHERR8.00

Malasgao (Kaliwa) HEP

Non-compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

10.00

Langongan Power

CorporationBatang-Batang

Non-compliant with:

- Work Plan

-Performance bond

- RESHERR

9.00

Puerto PrincesaLangongan Power

CorporationLangogan

Non-compliant with:

Performance Bond; Work Plan; RESHERR6.80

Puerto Princesa AQA Global Power Inc. Inaguan River HEP Non-compliant with:

RESHERR, WP, PB12.00

Rizal AQA Global Power Inc. Culasian River HEP

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

10.00

Romblon CajidiocanRomblon Electric

Cooperative, Inc.Agbalit 0.89

Lumbang 0.49

Silum 1.52

San FernandoRomblon Electric

Cooperative, Inc.*Cantingas

Non-compliant with:

RESHERR0.90

Page 25: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon IV-B Quezon General NakarEnergy World Kanan

River, Inc.Kanan B-1

Non-compliant with:

last submission of progress report June

2016.Non submission of Quarterly report,

WP, and RESHERR

150.00

Oriental

MindoroNaujan

Philippine Hybrid Energy

Systems, Inc.Mag-asawang Tubig B

Non-compliant with:

PB, Progress report, WP, RESHERR1.00

V Camarines Sur BuhiNASCENT Technologies

Corp.Barit Irrigation Discharge

Non-compliant with:

Performance Bond; Work Plan; RESHERR0.40

People's Energy Services

Inc.Barit 1 1.80

Barit 2

Compliant with:

Work Program, Posting of Performance

Bond

Non-compliant with:

RESHERR

0.60

Goa & TigaonClean and Green Energy

Solutions, Inc.Ranggas

Compliant with:

Work Plan, RESHERR, Progress Reports

Non-compliant with:

Performance Bond

1.50

Catanduanes CaramoranSunwest Water &

Electric Company, Inc.*Hitoma 1

Compliant with:

RESHERR 1.50

San MiguelSunwest Water &

Electric Company, Inc.

*Solong Hydroelectric

Powr Plant

Compliant with:

RESHERR; Work Plan 2.10

Kapipian

Non-compliant with:

- Work Plan

-RESHERR

-Performance bond

2.40

Page 26: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon V Camarines Norte BasudLevan Marketing

CorporationSan Pascual

Compliant with:

-Work Program

-Posting of performance bond

Non-compliant with:

-RESHERR

1.40

Mercedes

Colasi Mini Hydro

Electric Power Plant

Corporation

Colasi

Non-compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

0.96

San VicenteMingeophil

Meadowland, Inc.Mananap River 1.00

Sorsogon SorsogonSunwest Water and

Electric Co., Inc.Cawayan 2

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

0.99

Sunwest Water and

Electric Co., Inc. -

Sorsogon II Electric

Cooperative, Inc.

(SUWECO-SORECO II)

Upper Cawayan (Cawayan

1)

Compliant with:

Work Program

Non-compliant with:

• RESHERR

0.60

Visayas VI Aklan LibacaoSunwest Water &

Electric Company, Inc.Main Aklan

Non-compliant with:

Work Plan; RESHERR; Performance Bond15.00

Madalag

Oriental Energy and

Power Generation

Corporation

Timbaban

Compliant with:

-Performance Bond

-RESHERR

Non-compliant with:

-Work plan

18.00

MalayStrategic Power

Development Corp.Aklan Pumped-Storage

Compliant with:

Work Program; Performance Bond;

RESHERR

300.00

Antique BugasongSunwest Water &

Electric Company, Inc. 2Villasiga

Compliant with:

Work Plan

Non-compliant with:

RESHERR

8.00

Page 27: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VI Antique BugasongSunwest Water and

Electric Co., Inc.Villasiga 2

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

9.40

San RemigioCentury Peak Energy

CorporationManinila (Lower Cascade)

Non-compliant with:

RESHERR , Work Program, PB4.50

Maninila (Upper Cascade) Non-compliant with:

RESHERR , Work Program, PB3.10

Sibalom (LowerCascade)

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

3.30

Sibalom (Middle Cascade)

Non-compliant with:

-Work Plan

-Performance bond

-RESHERR

4.00

Sibalom (Upper Cascade) Non-compliant with:

Work Plan, PB, RESHERR4.20

SebasteAntique Electric

Cooperative, Inc.Caro-an

Non-compliant with:

-Work Plan -RESHERR

-Performance Bond

0.84

Ipayo

Non-compliant with:

-Work Plan -RESHERR

-Performance Bond

0.84

Iloilo IgbarasCentury Peak Energy

CorporationIgbulo (Bais)

Non-compliant with:

RESHERR, PB , UPDATING OF WORK PLAN,

FS NEW CAPACITY

5.10

Negros

OccidentalBago & Murcia

Alsons Energy

Development

Corporation

Bago 4

Compliant with:

Work Plan, Progress Reports

Non-compliant with:

RESHERR, Performance Bond

11.00

Page 28: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VINegros

OccidentalKabankalan

Century Peak Energy

Corporation

Hilabangan ( Lower

Cascade)

Non-compliant with:

-Work Plan -

Posting of performance bond -

RESHERR

3.00

Hilabangan ( Upper

Cascade)

Non-compliant with:

-Work Plan -

Posting of performance bond -

RESHERR

4.80

Sagay City LGU of Sagay Lower Himogaan

Non-compliant with:

Work Plan, Posting of Performance Bond,

RESHERR

4.00

San Carlos City

Alsons Energy

Development

Corporation

Bago 1

Compliant with:

WP

Non-compliant with:

RESHERR, PB

4.00

Bago River Hydro Power

CorporationBago Prosperidad 2

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-RESHERR

3.50

Initihan

Compliant with:

WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-RESHERR

3.50

San Carlos City &

Murcia

Alsons Energy

Development

Corporation

Bago 2

Compliant with:

Performance Bond

Non-compliant with:

Work Program; RESHERR

10.00

Silay & E. B

Magalona

Vivant-Malogo

Hydropower, Inc.Malogo Phase 3

Compliant with:

-Posting of performance bond

-Work Program

2.00

Page 29: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VINegros

OccidentalSilay City

Vivant-Malogo

Hydropower, Inc.Malugo

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Plan, RESHERR

6.00

Victorias and CadizVivant-Malogo

Hydropower, Inc.Malogo Phase 2 5.00

VII Bohol BatuanGeohydro Power

CorporationBatuan 0.68

DanaoQuadriver Energy

CorporationCantakoy

Non-compliant with:

Work Plan, Posting of Performance Bond,

RESHERR

8.00

Loboc Sta. Clara Power Corp. Loboc 2

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.20

Sta. Clara Power

CorporationLoboc

Non-compliant with:

RESHERR 1.20

SevillaBOHECO 1 Sevilla Mini

Hydro Corp.Sevilla

Non-compliant with:

RESHERR2.50

Cebu AlegriaT.A.G Mineral

Resources, Inc.Compostela

Non-compliant with:

RESHERR, Progress Report, Performance

Bond, WP

0.50

ArgaoUniversal

Hydrotechnologies, Inc.Argao

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

0.80

Badian Rapids Innoenergy, Inc. Basak II Non-compliant with:

Work Plan; RESHERR; Performance Bond0.50

Negros

OccidentalIsabela

888 Blue Energy

CorporationLimalima-Sacop Phase 1

Non-compliant with:

-Work Program

-RESHERR

-Performance Bond

2.00

Page 30: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VIINegros

OccidentalIsabela

888 Blue Energy

CorporationLimalima-Sacop Phase 2

Non-compliant with:

-Work Program

-RESHERR

-Performance Bond

8.00

Negros Oriental AmlanAmlan Hydroelectric

Power CorporationAmlan

Non-compliant with:

RESHERR0.80

Natural Power Sources

Intergration,Inc.Amlan (Plant A)

Non-compliant with:

- Work Plan

-Performance bond

- RESHERR

3.20

Amlan (Plant B)

Non-compliant with:

Non submission of Quarterly report, PB,

WP, and RESHERR

1.50

Amlan (Plant C)

Non-compliant with:

- Work Plan

- Posting of performance bond

- RESHERR

0.80

La LibertadPNOC - Renewables

Corp.Pacuan-Guinobaan

Non-compliant with:

Work Plan; Performance Bond; RESHERR13.80

Mabinay

Trans-Asia Oil and

Energy Development

Corp,

Ilog

Compliant with:

PB

Non-compliant with:

RESHERR

21.60

Siaton Orbysy Holdings, Inc. Canaway 1

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

1.60

Canaway 2

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

-RESHERR

1.40

Siquijor Lazi AQA Global Power Inc. Gabangan Non-compliant with:

RESHERR, Work Program, PB4.14

Page 31: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VII Siquijor Lazi AQA Global Power Inc. Senona

Non-compliant with:

RESHERR; Work Program and Performance

Bond

3.20

VIII Eastern Samar LawaanSan Lorenzo Ruiz Samar

Energy and Water, Inc.Pumped Storage Bolusao

Non-compliant with:

WP, PB, RESHERR300.00

Run-of-River Bolusao

Compliant with:

Work Program

Non-compliant with:

• Performance Bond

• RESHERR

12.00

MaslogIraya Energy

CorporationMaslog 40.00

Upper Maslog 9.00

Maydolong Vivant Energy Corp. Buhid

Compliant with:

PB

Non-compliant with:

RESHERR

20.20

Leyte InopacanLeyte IV Electric

Cooperative, Inc.Caminto River

Non-compliant with:

WP, RESHERR, Progress Reports,

Performance Bond

0.50

Jaro & Pastrana

Engineering &

Development

Corporation of the

Philippines

Binaha-an River

Compliant with:

RESHERR

Non-compliant with:

Work Program; Performance Bond

2.20

Southern Leyte St. BernardSouthern Leyte Electric

Cooperative, Inc.Hinabian

Non-compliant with:

• RESHERR0.81

Leyte Kananga

Leyte V Electric

Cooperative, Inc

(LEYECO V)

Bao

Non-compliant with:

- Work Program

- RESHERR

-Performance bond

1.50

Western Samar Calbayog CityClean and Green Energy

Solutions, Inc.Bugtong Falls

Non-compliant with:

WP RESHERR PB1.80

Page 32: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VIII Western SamarCalbiga &

Pinabacdao

Meadowland

Developers, Inc.Calbiga

Compliant with:

-Work Plan

Non-compliant with:

-RESHERR -

Performance bond

15.00

Mindanao IXZamboanga del

SurBayog

Global Sibagat Hydro

Power Corp.Bayog

Non-compliant with:

RESHERR, Work Program, PB6.00

Dumingag &

Midsalip

Alsons Energy

Development

Corporation

Sindangan 4 Non-compliant with:

WP, PB, RESHERR8.00

Zamboanga CityMeadowland

Developers, Inc.Saaz

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

1.00

Zamboanga del

NorteLeon Postigo

Euro Hydro Power (Asia)

Holdings, Inc.Polandoc

Non-compliant with:

• Performance Bond

• RESHERR

• Annual and Quarterly Progress Reports

• NWRB, LGU Permit

5.70

MutiaEuro Hydro Power (Asia)

Holdings, Inc.Dapitan River (Middle)

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-RESHERR

3.60

Dapitan River (Upper)

Compliant with:

-WORK PROGAM -

PERFORMANCE BOND

Non-compliant with:

-RESHERR

3.60

Sergio Osmeña Sr.,Clean and Green Energy

Solutions, Inc.Salug-Daku 2

Compliant with:

WP

Non-compliant with:

RESHERR

3.20

Page 33: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao IX Zamboanga City Zamboanga City PhilCarbon Inc. Pasonanca

Non-compliant with:

Work Program; Performance Bond;

RESHERR

0.05

Pasonanca (Upstream)

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.00

Everhydro Corporation Alimpaya

Compliant with:

-Performance bond

-RESHERR

Non-compliant with:

-Work Program

1.20

Ayala

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

1.00

Patalon

Compliant with:

PB

Non-compliant with:

Work Plan, RESHERR

0.50

Tagpangi

Compliant with:

- RESHERR

Non-compliant with:

- Postng of performance bond

-Work Program

0.50

(blank) Zamboanga City Everhydro Corporation Curuan 0.70

X Bukidnon BaungonBubunawan Power

Company, Inc.Bubunawan

Non-compliant with:

RESHERR7.00

Rio Verde Water

Constortium, Inc.Rio Verde Inline (Phase I)

Compliant with:

-Work Program -Posting of

performance bond -RESHERR

0.50

Baungon and LibonaFGEN Bubunawan

Hydro CorporationBubunawan

Compliant with:

RESHERR; Performance Bond

Non-compliant with:

Work Plan

23.00

Page 34: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao X Bukidnon Cabanglasan

Repower Energy

Development

Corporation

Katipunan River

Compliant with:

WP, RESHERR, Progress Reports

Non-compliant with:

Performance Bond

6.20

Dancagan Hedcor Bukidnon, Inc. Kitaotao 1

Compliant with:

-Posting of performance bond

Non-compliant with:

-Work Program

-RESHERR

70.00

ImpasugongGerphil Renewable

Energy, Inc.Atugan 1 River

Non-compliant with:

- Work Program

- Posting of performance bond

- RESHERR

2.40

Atugan 4

Non-compliant with:

- Work Program

- Posting of performance bond

- RESHERR

3.50

Panoon Non-compliant with:

RESHERR, Generation Reports0.22

LGU of Impasugong Gakaon

Non-compliant with:

- Work Program

-Performance bond

- RESHERR

2.23

Impasugong and

Sumilao

FGEN Tagoloan Hydro

CorporationTagoloan

Compliant with:

Posting of performance bond, RESHERR

Non-compliant with:

Work Plan

39.00

Kalilangan & WaoBukidnon Maladugao

Hydro Power Corp.

Maladugao River (Lower

Cascade)

Compliant with:

-PERFORMANCE BOND

Non-compliant with:

-WORKPLAN

-RESHERR

15.70

Page 35: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao X Bukidnon LibonaMeadowland

Developers, Inc.Umalag 2

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

2.50

Malaybalay

Repower Energy

Development

Corporation

Sawaga

Compliant with:

WP, RESHERR, Progress Reports

Non-compliant with:

Performance Bond

4.50

Sta. Clara Power Corp. Middle Canayan

Non-compliant with:

-RESHERR -Work

Program -Posting of PB

3.00

MalitbogPhilnewriver Power

Corp.Malitbog HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan, RESHERR

3.40

Silo-o HEP

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

3.29

Manolo FortichFG Bukidnon Power

Corp.Agusan River

Compliant with:

RESHERR; Work Plan 1.60

Oriental Energy and

Power Generation

Corporation

Culaman

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Plan, RESHERR

10.00

Philnewriver Power

Corp.Mangima HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan; RESHERR

10.00

MaramagMaramag Mini-Hydro

CorporationMaramag

Non-compliant with:

RESHERR , Work Program, PB4.40

Page 36: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao X Bukidnon Maramag

Repower Energy

Development

Corporation

Pulangui IV

Compliant with:

-Work Program

-Performance bond

- RESHERR

10.00

Santiago Hedcor Bukidnon, Inc. Manolo Fortich 1Compliant with:

Work Plan - RESHERR 43.40

Manolo Fortich 2Compliant with:

Work Plan - RESHERR 25.40

Talakag Markham Resources

CorporationTalakag 3 12.00

ValenciaBukidnon II Electric

Cooperative, Inc.Upper Manupali

Compliant with:

-PERFORMANCE BOND

-RESHERR

Non-compliant with:

-WORKPLAN

4.40

Matic Hydropower

CorporationManupali

Non-compliant with:

Non submission of Quarterly report, PB,

WP

9.00

WaoUPHC Bukidnon Hydro

Power I Corp.

Maladugao River (Upper

Cascade)

Compliant with:

-PERFORMANCE BOND

Non-compliant with:

-WORKPLAN

-RESHERR

8.40

Repower Energy

Development

Corporation

Pulanai River

Compliant with:

WP, RESHERR, Progress Reports

Non-compliant with:

Performance Bond

10.60

Misamis

OccidentalCagayan de Oro City

Meadowland

Developers, Inc.Umalag 1

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

1.80

Turbines Resource &

Development Corp.Limbatangon HEP

Non-compliant with:

RESHERR, PB ,WP9.00

Page 37: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XMisamis

OccidentalCalamba

Kaltimex Langaran

Hydro Inc.Langaran

Compliant with:

Work Program

Non-compliant with:

- Posting of performance bond -

RESHERR

3.60

ClarinPhilnew Hydro Power

CorpClarin

Compliant with:

• Submitted Construction Environmental

Safety and Health Program in compliace to

RESHERR requirement on Oct. 6, 2010

5.00

Misamis Oriental ClaveriaMindanao Energy

Systems, Inc.Cabulig

Non-compliant with:

RESHERR 8.00

Philnewriver Power

Corp.Mat-i 2 HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan; RESHERR

1.60

Mat-i 3 HEP

Compliant with:

RESHERR

Non-compliant with:

Performance Bond; Work Plan

3.25

Gingoog CityJE Hydropower

Ventures, Inc.Odiongan River A

Non-compliant with:

RESHERR, PB, Work Program0.25

Oriental Energy and

Power Generation

Corporation

Odiongan (Lower Cascade)

Compliant with:

Performance Bond

Non-compliant with:

RESHERR; Work Program

9.00

Odiongan (Middle

Cascade)

Compliant with:

Performance Bond

Non-compliant with:

RESHERR; Work Program

10.00

Odiongan (Upper Cascade)

Compliant with:

Performance Bond

Non-compliant with:

RESHERR;Work Program

3.00

Page 38: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao X Lanao del Norte BacolodLiangan Power

CorporationLiangan

Non-compliant with:

• RESHERR11.90

Iligan CityBukidnon Hydro Energy

CorporationBulanog-Batang

Compliant with:

-Work Program

Non-compliant with:

-RESHERR

-Performance bond

150.00

Euro Hydro Power (Asia)

Holdings, Inc.Bayug HEP

Non-compliant with:

PB,WP, RESHERR17.81

Lower Bayug

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

4.00

Upper Bayug

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

3.30

First Gen Mindanao

Hydro Power Corp.Cagayan 1N

Compliant with:

WP, PB, RESHERR 160.00

KolamboganEuro Hydro Power (Asia)

Holdings, Inc.Titunod HEP

Non-compliant with:

PB, WP, RESHERR3.60

Cagayan de Oro ClaveriaPhilnew Hydro Power

CorpMat-I 1

Compliant with:

• Submitted Construction Environmental

Safety and Health Program in compliace to

RESHERR requirement on Oct. 6, 2010

Non-compliant with:

• Performance Bond

4.85

X/ARMM

Lanao del

Norte/Lanao del

Sur

Pantar &

Baloi/SaguiaranMaranao Energy Corp. Agus III

Compliant with:

RESHERR

Non-compliant with:

Work Plan, PB

225.00

XI Davao del Sur Davao City Hedcor, Inc. Talomo 1Compliant with:

RESHERR 1.00

Page 39: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XI Davao del Sur Davao City Hedcor, Inc. Talomo 3 Compliant with:

RESHERR 1.92

Davao City Hedcor, Inc. Talomo 2ACompliant with:

RESHERR 0.65

Talomo 2BCompliant with:

RESHERR 0.30

Digos CityDavao de Sur Electric

Cooperative, Inc.Ruparan

Compliant with:

- RESHERR

Non-compliant with:

- Posting of performance bond -Work

Program

5.00

Goa & TigaonEuro Hydro Power (Asia)

Holdings, Inc.Guma

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

1.70

MalitaLGU of Malita, Davao

del SurMalita

Non-compliant with:

RESHERR , Work Program, PB2.50

Sta. CruzEuro Hydro Power (Asia)

Holdings, Inc.Napon River

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

2.50

Hedcor Sibulan, Inc . Sibulan ACompliant with:

RESHERR 16.50

Sibulan BCompliant with:

RESHERR 26.00

Tudaya 1 Compliant with:

Work Plan - RESHERR 6.60

Hedcor Tudaya, Inc. Tudaya 2 Compliant with:

RESHERR 7.00

Compostela

ValleyMaco Sta. Clara Power Corp. Hijo River I

Non-compliant with:

- Work Program

-Performance bond

- RESHERR

3.00

Hijo River II

Non-compliant with:

- Work Program

- Posting of performance bond

- RESHERR

3.00

Page 40: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XICompostela

ValleyMaco Sta. Clara Power Corp. Mt. Leonard

Non-compliant with:

PERFORMANCE BOND

-WORK PROGRAM

-RESHERR

2.00

Tagum R

Compliant with:

- Work Plan

- Performance bond

Non-compliant with:

- RESHERR

2.60

MaragusanVolga Power

CorporationCaraga 1 4.00

Caraga 2 15.00

New BataanEuro Hydro Power (Asia)

Holdings, Inc.New Bataan HEP

Compliant with:

WP, RESHERR, Progress Reports

Non-compliant with:

PB

2.40

Page 41: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XI Davao Oriental BagangaFirst Gen Mindanao

Hydro Power Corp.Cateel

Compliant with:

WP, PB

Non-compliant with:

RESHERR

17.50

Global Sibagat Hydro

Power Corp.Baganga River

Compliant with:

RESHERR; Performance Bond

Non-compliant with:

Work Program

11.00

Cateel

Compliant with:

Performance Bond

Non-compliant with:

Work Program; RESHERR

16.00

CaragaLGS Renewable Energies

CorporationCaraga 4

Non-compliant with:

RESHERR, Work Program, PB35.00

Manorigao Non-compliant with:

RESHERR, Work Program, PB17.00

Volga Power

CorporationCaraga A1

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Program, RESHERR

6.50

Caraga A2

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Program, RESHERR

7.00

Caraga A3

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Program, RESHERR

4.50

Governor GenerosoLGS Renewable Energies

CorporationOsmena

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

2.00

Tibanban Non-compliant with:

RESHERR, Work Program, PB2.00

Page 42: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XI Davao Oriental Governor GenerosoVolga Power

CorporationMagdao

Compliant with:

Posting of Performance Bond

Non-compliant with:

Work Program, RESHERR

2.00

Lupon

Alsons Energy

Development

Corporation

Sumlog 1

Compliant with:

Work Plan, Progress Reports

Non-compliant with:

RESHERR, Performance Bond

8.00

Lupon & Mati

Alsons Energy

Development

Corporation

Sumlog 2 Non-compliant with:

WP, PB, RESHERR15.00

ManayGlobal Sibagat Hydro

Power Corp.Casauman

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

34.00

(blank) Davao CityApo Agua

Infrastructura, Inc.Apo Agua

Compliant with:

PB

Non-compliant with:

RESHERR

2.20

Hedcor, Inc. Talomo 2Compliant with:

RESHERR 0.60

Davao City

San Lorenzo Ruiz

Olympia Energy &

Water, Inc.

Davao Non-compliant with:

WP, PB, RESHERR140.00

Compostela

Valley / Davao

Oriental

Maragusan / CaragaVolga Power

CorporationCaraga 3 16.00

XII North Cotabato AlamadaEuro Hydro Power (Asia)

Holdings, Inc.Alamada HEP

Compliant with:

Work Plan; RESHERR

Non-compliant with:

Performance Bond

2.84

Magpet Universal

Hydrotechnologies, Inc.Magpet 1

Compliant with:

Work Program

Non-compliant with:

• Performance Bond

• RESHERR

9.80

Page 43: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XII North Cotabato Magpet Universal

Hydrotechnologies, Inc.Magpet 2

Non-compliant with:

- Work Program

- Posting of performance bond

- RESHERR

1.30

MakilalaUniversal

Hydrotechnologies, Inc.Makilala-1

Non-compliant with:

Work Program; RESHERR & Performance

Bond

2.00

Sultan Kudarat Isulan

Engineering &

Development

Corporation of the

Philippines

Kabulnan 4 10.00

Philnewriver Power

Corp.Kabulnan 2 HEP

Non-compliant with:

Non submission of Quarterly report, PB,

WP, and RESHERR

110.00

Sen. Ninoy Aquino

Engineering &

Development

Corporation of the

Philippines

Kabulnan 3 5.00

Sarangani AlabelEuro Hydro Power (Asia)

Holdings, Inc.Lun River 2.82

Maasim

Alsons Energy

Development

Corporation

Siguil

Compliant with:

-Work Program

Non-compliant with:

-RESHERR

15.10

Maitum

Alsons Energy

Development

Corporation

Kalaong 1

Compliant with:

-WORK PLAN

Non-compliant with:

-PERFORMANCE BOND

-RESHERR

7.40

Kalaong 2

Compliant with:

-Work Plan

Non-compliant with:

-RESHERR -

Performance Bond

4.80

Page 44: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XII Sarangani Maitum

Alsons Energy

Development

Corporation

Kalaong 3

Compliant with:

Work Plan, Progress Reports

Non-compliant with:

RESHERR, Performance Bond

4.00

Malungon

Kiblat Malandag Royeca

Mini-Hydro Power

Project

Kiblat-Royeca Malandag

Power House 1-A

Non-compliant with:

WP,PB, RESHERR

1.46

Kiblat-Royeca Malandag

Power House 2

Non-compliant with:

WP,PB, RESHERR

0.80

South CotabatoKoronadal &

Tampakan

Euro Hydro Power (Asia)

Holdings, Inc.Marbel 1

Non-compliant with:

RESHERR, Work Program, PB0.50

Lake SebuEuro Hydro Power (Asia)

Holdings, Inc.Laconon

Compliant with:

Performance Bond; RESHERR

Non-compliant with:

Work Program

4.85

Lanon (Lam-alu) Non-compliant with:

RESHERR , Work Program, PB9.50

South Cotabato I

Electric Cooperative,

Inc.

Takbo

Non-compliant with:

Work Program; RESHERR; Performance

Bond

15.00

XIIIAgusan del

NorteButuan City

Equi-Parco Construction

Co.Taguibo 1

Non-compliant with:

- Posting of performance bond

- RESHERR -Work Program

2.00

Taguibo 2

Non-compliant with:

Work Program; RESHERR; Performance

Bond

2.00

Global Sibagat Hydro

Power Corp.Bugsukan

Non-compliant with:

Work Program, Posting of Performance

Bond, RESHERR

5.00

CabadbaranFGEN Cabadbaran

Hydro CorporationCabadbaran

Non-compliant with:

-Work Plan

-RESHERR -

Performance bond

9.75

Page 45: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XIIIAgusan del

NorteJabonga

Agusan Power

CorporationLake Mainit

Compliant with:

- Work Plan

- RESHERR

- Posting of performance bond

25.00

FGEN Puyo Hydro

CorporationPuyo

Compliant with:

- Performance bond

Non-compliant with:

-RESHERR

-Work Plan

30.00

SantiagoAsiga Green Energy

CorporationAsiga

Non-compliant with:

RESHERR, PB8.00

Surigao del Sur CantilanMeadowland

Developers, Inc.Lower Carac-an

Non-compliant with:

RESHERR, Performance Bond, WP5.00

Carrascal and

Cantilan

Hydro Link Projects

CorporationCarac-an

Non-compliant with:

-RESHERR -Work

Program

25.00

San Miguel

Surigao del Sur II

Electric Cooperative,

Inc.

Carromata Non-compliant with:

PB, Progress Reports , RESHERR5.60

Sagbayan 0.64

Tandag City and San

Miguel

Surigao del Sur II

Electric Cooperative,

Inc.

Calatngan 3.60

Agusan Del Sur SibagatEqui-Parco Construction

Co.Wawa 1

Non-compliant with:

- Work Program

- Posting of performance bond -

RESHERR

7.70

Wawa 2

Compliant with:

-WORK PROGRAM

-PERFORMANCE BOND

Non-compliant with:

-REHERR

7.00

Wawa 3

Non-compliant with:

- Performance bond

- RESHERR

5.60

Page 46: AWARDED HYDROELECTRIC POWER PROJECTS as of · PDF fileAWARDED HYDROELECTRIC POWER PROJECTS as of June 30, ... Kibungan Hydropower ... 1,000.00 La Trinidad Hedcor, Inc. Bineng 1-2B

AWARDED HYDROELECTRIC POWER PROJECTS as of June 30, 2017

ISLAND /

REGIONREGION PROVINCE MUNICIPALITY COMPANY NAME NAME OF PROJECT STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao XIII Agusan Del Sur Sibagat

Global Sibagat

Hydropower

Corporation

Managong

Non-compliant with:

RESHERR; Performance Bond; Work

Program

6.00

Wawa

Compliant with:

Performance Bond; Work Program

Non-compliant with:

RESHERR

13.00

Sta. Clara Power Corp. Hilong-hilong 4 5.00

ARMM Lanao del Sur Malabang AQA Global Power Inc. Matadi River HEP

Compliant with:

• Work Program

• Posting of performance bond

• RESHERR

• Posted Performance Bond for Year 2 on

July 5, 2016 under Pacific Union Insurance

Co., Inc. covering the period from July 7,

2016 to July 7, 2017.

Non-compliant with:

• Work Plan

• Performance Bond

• RESHERR

27.00

Malabang & Tubaran AQA Global Power Inc. Maitling River HEP Non-compliant with:

WP, RESHERR50.00

Pualas & Ganassi AQA Global Power Inc. Lake Dapao HEP

Compliant with:

PB

Non-compliant with:

RESHERR , Work Program

50.00

Grand Total 13,419.73 965.04