AVIMET Meeting topics

EUMETNET: The Network of European Meteorological Services

Page 2: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

Contents

• Report of the chairman:

– ICB meetings & workshops

– Other European issues

– Global issues

• SES2+ issues• SESAR issues• EASA issues

Page 3: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

Report of the Avimet chairman

Page 4: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

ICB meetings & workshops (1)

• ATM Masterplan update => update published in October 2012MET included in Masterplan in limited way:

1) use of enhanced MET data by ATSPs for SESAR

2) dedicated MET related standards to be developed for SESAR

• Draft ESO Mandate for Community Specifications

=> ICB recommendation: MET related CSs not yet to be developed because no mature technical information available yet (to be aligned with SESAR WP11.2 activities)

Page 5: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

ICB meetings & workshops (2)

• RP2 & update of Performance & Charging Regulations

• SJU Extension

• Pilot Common Project (PCP) for SESAR Deployment• Guidance Material for Common Projects - including role of

SESAR Deployment Manager (SDM)• Funding for SES (in particular for SESAR deployment)

Page 6: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

Other European issues (1)

• Coordination with Eurocontrol:– AVIMET chairman had an informal meeting with Eurocontrol with

regards to service provision to the Network Manager

– It was not yet decided at that time if there would be an open tender launched in 2013 for such a service provision or that the current status would remain and that a tender would be postponed until development in SESAR would be finished.

– Eurocontrol requested more information on the status of the OPERA weather radar composite service provision.

– EUMETNET ED now in contact with Eurocontrol on weather radar composite service

Page 7: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

Other European issues (2)

• WEZARD:– WEZARD project near completion

– Identification for a need to continue the work on Volcanic Ash with the focus on Research and development of existing, new and evolving volcanic ash observing technologies and dissemination systems to underpin the future successful realization of an integrated (space-based, airborne and ground-based) European volcanic ash observing system

– On 4 February 2013, a joint Eumetnet-WEZARD project delegation went to a bilateral meeting with the European Commission to lobby for funding

Page 8: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

Global issues (1)

• Coordination Europe-US:– On 23 & 24 April 2013 the yearly Technical Interchange Meeting (TIM)

concerning coordination on MET between US (FAA) and Europe (Eurocontrol) will take place.

– With respect to the coordination between EUMETNET and NOAA-NWS as an Annex to the SESAR-NextGen cooperation:

• EUMETNET has send a draft for review end September 2012

• Feedback has been received in February 2013

• Finalization planned end of April (aligned with TIM)

• Coordination with WMO:– WMO CAeM questionnaire: 27/28 AVIMET members did respond

– No official analysis of the questionnaire available yet

– AVIMET has received an initial analysis of WMO RA VI area

Page 9: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SES 2+ issues

Page 10: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SES 2+ issues (1)

• SES2+ (consultation that ended 13 December 2012)– Eumetnet response for consolidated MET positionSimplification of current IR/CS development should be

envisaged Reservations to further opening the market for MET

service provision; States have already the possibility to take this decision

MET competency in PRB should be enhanced

Page 11: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SES 2+ issues (2)• Update of Performance & Charging Regulations:

(Still under discussion in Single Sky Committee (MS)

–Performance scheme impact on MET:PRB will get more "power" in monitoring investments of ANSPs (thus also of METSPs)Member states have to set up performance plans at FAB level as well (this might thus include MET PIs)

–Charging scheme impact on MET:Possibility for a State to open Terminal Air navigation services & Ancillary services to market conditions (up to a State to decide)Possibility to include major investments in line with the ATM Masterplan (thus including SESAR deployment investments) as eligible costs

Page 12: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SES 2+ issues (3)

• Reference Period 2 Target Setting:

Page 13: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SES 2+ issues (4)

EUMETNET member of ICB, not of PRBOfficial feedback possible via public consultation (May-

June 2013) & from October 2013 onwards

Page 14: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues

Page 15: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues (1)

• R&D phase:– WP11.2 recognized as a federating project since

December 2012 (i.e. more important role)– Eumetnet plans to hold the first annual internal

workshop on 11 & 12 April 2013 to inform all Eumetnet members.

Page 16: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues (2)

• SJU extension public consultation (ended 17 october):– Eumetnet response for consolidated MET position:Eumetnet supports the extension of the SJU mandateThe role of Eumetnet within the SESAR project should

be better recognized, also in view of SESAR deployment later on

• Current consensus of stakeholders is:– SJU extension supported– Only for extension in time of planned activities– No extension foreseen in scope of activities

Page 17: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues (3)

• SESAR Deployment:– ICB SESAR Deployment Task Force (SDTF) discussions:

• SESAR Deployment Manager: scope & set up• Review of guidance material for common projects• Funding and financing of SESAR Deployment

– EC activities:• Drafting guidance material for common projects (remains rather

vague on some specific points); • Pilot Common project (PCP) development:

– task given to SJU– EUMETNET involved in Expert Group 6 (via Thales) –

involves budget estimations for implementation

Page 18: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues (4)

• SESAR Deployment:– The recognition of the MET community as a necessary stakeholder

in the SESAR Deployment Manager (SDM) with respect to implementation of MET projects remains a continuous battle

Lobbying via SSC members has provided the following answer of the European Commission: “the term ANSP in the Common Project guidance includes METSP”

Call for Deployment manager, based on the Pilot Common project is foreseen early 2014

Page 19: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

SESAR issues (5)

• SESAR Deployment:– Funding via Connecting Europe Facility (CEF):

• European Parliament regulation indicating foreseen funding for SESAR deployment is very limited (nowhere near the requested funding), in particular for airspace users

• Preliminary conclusion of ICB: “If this (funding) ceiling is accepted and no other means on funding and financing are made available then deployment of SESAR will be impossible for airspace users and SESAR, and the SES as a whole, will fail”

Page 20: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

EASA issues

Page 21: AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services

EASA issues (1)

• Transposition of ICAO Annex 3 in terms of Organizational Requirements (OR) : Work of the MET rulemaking group has been completed

• Transposition of ICAO Annex 3 in terms of Technical Requirements (TR): work of the MET rulemaking group has started

• It has been agreed between EASA and Eumetnet that official exchange of information will be done through the members of AVIMET within the EASA rulemaking group.