All Saints Kingston plan
Citation preview
6501500
1500
930
1500
930
600
386
F O R i N F O R M A T I O N
DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECT'SAND ENGINEER'S CONTRACT DRAWING & SPECIFICATIONS.ANY DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THEARCHITECT IMMEDIATELY.THE CONTRACTOR MUST VERIFY ALL DIMENSIONS BY SITEMEASUREMENT BEFORE ORDERING MATERIALS OR MANUFACTURINGCOMPONENTS.SUBSTITUTE MATERIALS & PRODUCTS TO THOSE NAMED WILL BEACCEPTABLE IF PROVEN TO BE OF EQUAL OR HIGHER PERFORMANCEAND NOT IN CONFLICT WITH OTHER ELEMENTS.
DO NOT SCALE FROM THIS DRAWING
NOTES
CROSSINGNEW +8.26
NORTHTRANSEPT NEW +8.26
SOUTHTRANSEPTNEW +8.26
ORGAN
VICAR'SBURIAL
GROUND
HOLYTRINITYCHAPEL
VICAR'SVESTRY
CHOIRVESTRY/
EDUCATIONROOM
NEW +8.17NORTHPORCH+8.17
SOUTH AISLE
ELECTRICSCUPBOARD
OLDSANCTUARYEXISTG+8.26
NORTH AISLE
Existing internal porch remodeled to enableaxial view through crossing and enhanceappearance of openness to outside. Porchsize determined by Building Controlrecommendations
Rebuild of north wall of existingelectrican's cupboard with new door.Church boiler plant to be relocated instore, subject to confirmation byservices engineer
Boiler plantrelocated and northporch reopened
N
Relocation of altar enables Holy TrinityChapel to be re-established as area ofprivate prayer
Existing raised dais under crossing removed.Floor leveled and font repositioned on centrepoint of crossing
New north porch as per applicationref.xx.xx
NAVE
ALTAR
CHOIRNEW +8.25
STORAGENEW +8.25
CU
P'D
Altar relocated to centre of nave to enableimproved sight lines and involvement withcongregation
Existing internal glazedscreen remodeled aspossible new paintedsoftwood porch to enableaxial view through crossingand enhance appearance ofopenness to outside. Porchsize determined by BuildingControl recommendationsand panelling module
WC
Wheel chair accessibleand single WC provided informer store area,accessed via new openingin west wall of porch
Existing WC removed andlink opened up to connectchoir vestry with re-opennorth west porch
Existing door replaced withnew window with bench andstorage under, and southwall of link fitted out fullheight cupboards for choirmusic storage
Existing fibreglass opaque glazing to choirvestry/ education room replaced with newclear safety glass
Choir vestry roof to be re-newed externallyto combat existing leaks and failure.Internally upper parts of attractive roofstructure to be re-exposed and redecorated
STORAGE
EXTGSTORE
EXTGSTORE
East end of church redefined as morecoherent space, enabling more flexible useand also independent use from Nave ifrequired
Proposed new iron screens to enable eastend to be enclosed and better defined.Screen in front of sanctuary to be able to foldback to enable clear route through
SCALE
0 1m 2m 3m 4m 5m 6m 7m 8m 9m 10m
C A L V E R T S B U I L D I N G S52B BOROUGH HIGH STREET · LONDON SE1 1XNT E L : 0 2 0 7 3 7 8 7 7 1 4 F A X : 0 2 0 7 4 0 7 9 4 4 0E - M A I L : A D M I N @ P T O L E M Y D E A N . C O . U K
DATE
Ptolemy Dean Architects
DRAWING TITLE
DWG No
DRAWN BY
JOB No REV
JOB TITLE
ALL SAINTS CHURCHKINGSTON UPON THAMES
CHURCH GROUND FLOOR PLANAS PROPOSED
KUT RO-D02 B
HVF KR 100 200 07/10
SCALE SCALE@A1 @ A3
CHECKED BY
NOTE: 'COMMUNITY' PHASE FORNEW NORTH EXTENSION ANDASSOCIATED CHURCHYARDLANDSCAPING WORKS TO FOLLOWAS SEPARATE PROJECT
CU
P'D
23-29
RO16-20
12-15
21-22
NEW+8.24
NEW+8.17
SOUTHPORCH
NEW +8.25
NORTHPORCH
NEW +8.25
WESTPORCH
NEW +8.24
KITCHENETTE
RO
RO
RO
30RO
Existing concrete slab at east end replacedwith new stone flooring. Flooring pattern tobe agreed
DATEREV DESCRIPTION
RIBA STAGE E DRAWING ISSUEA 06/01/12CHECKED BY
PD
Surviving C19th pulpitfragments reconfigured toform new reduced pulpit tosuit reordered layout
WEST END CUPBOARDS, PORCHES,KITCHEN/SERVERY, SEATING LAYOUT,CHOIR BENCHES AND WCS UPDATED
B 06/02/12 PD