ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon, Phase I Package B 1501 W. Charleston Boulevard 1505 W. Charleston Boulevard 1217 Richards Court 1225 Richards Court 1301 Richards Court 1305 Richards Court 1205 Charmast Lane 1213 Charmast Lane 1520 Ellis Avenue Las Vegas, Nevada Prepared for: Nevada Department of Transportation Environmental Services Division 1263 South Stewart Street, Room 104A Carson City, NV 89712-5229 Converse Project No: 12-43224-01 May 26, 2014

ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

  • Upload
    ngonga

  • View
    223

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT

Project Neon, Phase I

Package B

1501 W. Charleston Boulevard 1505 W. Charleston Boulevard

1217 Richards Court 1225 Richards Court 1301 Richards Court 1305 Richards Court 1205 Charmast Lane 1213 Charmast Lane

1520 Ellis Avenue Las Vegas, Nevada

Prepared for:

Nevada Department of Transportation Environmental Services Division

1263 South Stewart Street, Room 104A Carson City, NV 89712-5229

Converse Project No: 12-43224-01

May 26, 2014

Page 2: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Converse Consultants Over 60 Years of Dedication in Geotechnical Engineering and Environmental Sciences

731 Pilot Road, Suite H, Las Vegas, Nevada 89801 Telephone: (702) 263-7600 Facsimile: (702) 269-8353 email: [email protected]

May 26, 2014 12-43224-10

Mr. Rob Piekarz State of Nevada Nevada Department of Transportation Environmental Services Division 1263 South Stewart Street, Room 104A Carson City, NV 89712-5229

Subject: Asbestos Air Monitoring and Site Closure Report Project Neon, Package B 1501 W. Charleston Boulevard

1505 W. Charleston Boulevard 1217 Richards Court 1225 Richards Court 1301 Richards Court 1305 Richards Court 1205 Charmast Lane 1213 Charmast Lane 1520 Ellis Avenue

Las Vegas, Nevada

Dear Mr. Piekarz:

Converse Consultants (Converse) is pleased to present this report containing documentation of air monitoring and project oversight completed during demolition activities for Project Neon. Services were performed in accordance with the Nevada Department of Transportation Service Agreement P-217-12-013 dated October 5, 2012.

Visual clearance inspections were conducted after abatement activities. All mandatory ACMs, including all associated debris, were removed per specifications. Visual inspection methods were models from ASTM Designation: E1368-90. Perimeter monitoring was conducted during the removal of the swimming pool at 1301 Richards Court. Abatement and demolition activities began in April 2014 and were completed in May 2014.

If you have any questions concerning information contained in this report, please contact us at your convenience.

Respectfully submitted, CONVERSE CONSULTANTS Philip Childers, CEM Asbestos and Lead Manager

Page 3: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Asbestos Air Monitoring and Site Closure Report

Contents

Page

1.0 Introduction and Summary ..................................................................................................................... 1

2.0 Purpose and Scope of Work ............................................................................................................... 1

3.0 Methodology ................................................................................................. 1

3.1 Air Sample Collection ............................................................................................................. 1

3.2 Air Sampling Analysis ............................................................................................................. 2

4.0 Findings ............................................................................................................................................................... 2

5.0 Closure and Limitations .......................................................................................................................... 2

Appendix A – Visual Clearance Letters

Appendix B – Laboratory Results, Air Monitoring During Pool Removal and

Field Reports

Appendix C – Waste Tickets

Page 4: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Asbestos Air Monitoring Report 1.0 Introduction and Summary In April 2014, Silver State Construction Technologies began the removal of Regulated Asbestos Containing Material (RACM) materials from the following buildings: 1217 Richards Court; 1225 Richards Court; 1301 Richards Court; 1305 Richards Court; 1213 Charmast Lane; and 1520 Ellis Avenue (there were no ACMs identified at 1205 Charmast Lane, 1501 W. Charleston Boulevard and 1505 W. Charleston Boulevard). Visual clearance inspections were conducted by Converse after abatement activities were completed in each building; the visual clearance letters are included in Appendix A. As allowed by EPA and Clark County Department of Air Quality (DAQ) regulations, selected Category II non-friable ACM materials were left in place during demolition. Lead containing paints on the building exterior was scraped and stabilized before demolition work began at 1213 Charmast Lane. Work was completed in May 2014 and was performed in accordance with the Nevada Department of Transportation Service Agreement P-217-12-013 dated October 5, 2012. This report summarizes the results of the asbestos oversight and air monitoring conducted by Converse during the building demolition activities. Included in the appendices are the visual clearances, laboratory results for air samples collected during air monitoring, daily logs, and waste manifest.

2.0 Purpose and Scope of Work The purpose of our work was to 1) conduct visual inspections after abatement activities, 2) monitor the perimeter of the regulated area for airborne fiber release during the demolition of the swimming pool and 3) supervise the stabilization of lead containing paint before demolition activities occurred. Our scope of work included project oversight, visual inspections, air sample collection, laboratory analyses, and report preparation.

3.0 Methodology

3.1 Air Sample Collection The perimeter air monitoring was conducted using high volume pumps. Calibration of the pumps was conducted using a calibrated secondary

Page 5: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Neon, Package B, Final Report For Demolition Oversight

Page 2

calibrator (i.e., Rotometer). The sampling media (cassettes) consisted of 25-millimeter (mm) diameter mixed cellulose ester filters (MCEF) with a 0.8-micron pore size. All pumps were calibrated with in-line cassettes on-site. Airflow rates between 2.5 and 10 liters per minute were used during the monitoring conducted during the swimming pool demolition monitoring. Samples were transferred to an analytical laboratory with appropriate chain-of-custody documentation.

3.2 Air Sample Analysis Samples were analyzed by EMLab P&K of Irvine, California by Phase Contrast Microscopy (PCM) using National Institute of Occupational Safety and Health (NIOSH) Method Number 7400. EMLab P&K is accredited under the American Industrial Hygiene Association (AIHA) Industrial Hygiene Laboratory Accreditation Program (IHLAP) for PCM airborne asbestos analysis. Laboratory reports are included in Appendix B.

4.0 Findings There are no national ambient air quality standards for asbestos. Therefore, Converse compared the results to the OSHA permissible exposure limits (PEL) of 0.1 fibers per cubic centimeter (f/cc). The samples collected were well below the PEL.

5.0 Closure and Limitations This report is for the use of the Nevada Department of Transportation as it applies to Project Neon structural demolition. Converse is not responsible for any claims or damages associated with interpretation of available information. This report should not be regarded as a guarantee that future exposure to airborne asbestos fibers will not occur.

Page 6: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Neon, Package B, Final Report For Demolition Oversight

Page 3

We thank you for the opportunity to be of service. If you have any questions regarding this correspondence or the enclosed information, please contact us at your convenience. Respectfully submitted, CONVERSE CONSULTANTS Philip S. Childers Asbestos and Lead Program Manager Certified Environmental Manager No. 1952 Nevada Asbestos Abatement Consultant License No. IM 1692 Certified EPA Lead Inspector and Risk Assessor No. NV-R-128380-1

Page 7: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Appendix A

Visual Clearance Letters

Page 8: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

Apri Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremmateplaccont

Co Geot

elephone: (775)

l 29, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1213Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. No tractor is to

m possible r

visual inommendatioTM) E1368oved from erial, and b

ce and matainment zo

onvertechnical Engi

4840

) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P3 CharmastVegas, Nevect # 12-43

arz:

st and authofollowing

ding matera.

s from Conon of asbesding was a

s for the substos debrisfinal cleara

o encapsulare-entry.

nspection wons specifie8-99 standa

1213 Chablack floorinay be demones within

rse Coineering, Envi

0 Mill Street, S

Facsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A t Lane vada 224-01

orization, Cinformatio

rials (ACMs

nverse perfostos abatemassessed fobject resides were fouance testinate the con

was condued in the Aard. As marmast Lanng mastic. molished in

the subjec

onsulironmental & G

Suite 5, Reno, N

75) 856-3513

on

04A

Converse Con regardin

s) from 121

ormed a vment activitior signs of ential buildiund within ng will be ntainment a

ucted in aAmerican Smarked on ne includedNormalized place. T

ct building a

tantsGroundwater

Nevada 89502

email: reno@

onsultants ng the aba3 Charmas

visual inspeies. The cof visible ACng. No reathe conta

performed areas and

a manner Society for the asbestd sprayed d joint comThis reportat the time o

Science, Insp

@conversecons

(Converse)atement ofst Lane loc

ection of thontainment

CM debris. adily identifainment zo

on this bto secure t

consistenTesting antos survey,on acoust

pound <1%t applies oof our inspe

pection & Test

sultants.com

) is pleasedf asbestos

cated in Las

he structurearea of the Our visuafiable visuaones in theuilding, thethe building

nt with thend Materials the ACMstical ceiling

% was left inonly to theection.

ting Services

d -s

e e al al e e g

e s s g n e

Page 9: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjApriPage Thisas itLane Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12il 29, 2014e 2

s report is ft applies to e in Las Ve

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

4

for the use the contain

egas, Nevad

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

of the Statnment zoneda.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

te of Nevades in the str

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

da Departmructure loca

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

ment of Traated at 1213

ages assoshould not bfibers will n

ase contact

s

nt LLC:

ansportation3 Charmas

ciated withbe regardednot occur.

t us at you

n st

h d

r

Page 10: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 11: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

Apri Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremjointthe s

Co Geot

elephone: (775)

l 29, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1217Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. No tractor is to

m possible r

visual inommendatioTM) E1368oved from t compoundsubject bui

onvertechnical Engi

4840

) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P7 Richard CVegas, Nevect # 12-43

arz:

st and authofollowing

ding matera.

s from Conon of asbesding was a

s for the substos debrisfinal cleara

o encapsulare-entry.

nspection wons specifie8-99 standa1217 Richad taping. Tlding at the

rse Coineering, Envi

0 Mill Street, S

Facsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A Court vada 224-01

orization, Cinformatio

rials (ACMs

nverse perfostos abatemassessed fobject resides were fouance testinate the con

was condued in the Aard. As mard Court inhis report a

e time of ou

onsulironmental & G

Suite 5, Reno, N

75) 856-3513

on

04A

Converse Con regardins) from 121

ormed a vment activitior signs of ential buildiund within ng will be ntainment a

ucted in aAmerican Smarked on ncluded waapplies onlyr inspection

tantsGroundwater

Nevada 89502

email: reno@

onsultants ng the aba17 Richard

visual inspeies. The cof visible ACng. No reathe conta

performed areas and

a manner Society for

the asbestall and hardy to the conn.

Science, Insp

@conversecons

(Converse)atement ofd Court loca

ection of thontainment

CM debris. adily identifainment zo

on this bto secure t

consistenTesting antos survey,

d-ceiling surntainment z

pection & Test

sultants.com

) is pleasedf asbestosated in Las

he structurearea of the Our visuafiable visuaones in theuilding, thethe building

nt with thend Materials, the ACMsrfacing, andzones within

ting Services

d -s

e e al al e e g

e s s d n

Page 12: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjApriPage Thisas itCou Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12il 29, 2014e 2

s report is ft applies to

urt in Las Ve

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

4

for the use o the contaiegas, Neva

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

of the Statinment zon

ada.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

te of Nevades in the s

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

da Departmstructure loc

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

ment of Tracated at 12

ages assoshould not bfibers will n

ase contact

s

nt LLC:

ansportation217 Richard

ciated withbe regardednot occur.

t us at you

n d

h d

r

Page 13: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 14: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

Apri Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremhardmate

Co Geot

elephone: (775)

l 14, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1225Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. No ftractor is to

m possible r

visual inommendatioTM) E1368oved from

d ceiling suerials were

onvertechnical Engi

4840

) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P5 Richard CVegas, Nevect # 12-43

arz:

st and authofollowing

ding matera.

s from Conon of asbesding was a

s for the substos debris

final air cleo encapsulare-entry.

nspection wons specifie8-99 standa1225 Richa

urfacing, joe not left i

rse Coineering, Envi

0 Mill Street, S

Facsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A Court vada 224-01

orization, Cinformatio

rials (ACMs

nverse perfostos abatemassessed fobject resides were fouarance tesate the con

was condued in the Aard. As mard Court inint compoun place an

onsulironmental & G

Suite 5, Reno, N

75) 856-3513

on

04A

Converse Con regardins) from 122

ormed a vment activitior signs of ential buildiund within ting will bentainment a

ucted in aAmerican Smarked on ncluded Acund, and snd the bui

tantsGroundwater

Nevada 89502

email: reno@

onsultants ng the aba25 Richard

visual inspeies. The cof visible ACng. No reathe conta

e performedareas and

a manner Society for

the asbestcoustic ceiliheet floor lding was

Science, Insp

@conversecons

(Converse)atement ofd Court loca

ection of thontainment

CM debris. adily identifainment zod on this bto secure t

consistenTesting antos survey,ng surfacincovering. not monito

pection & Test

sultants.com

) is pleasedf asbestosated in Las

he structurearea of the Our visuafiable visuaones in thebuilding, thethe building

nt with thend Materials, the ACMsng, wall and

Non-friableored during

ting Services

d -s

e e al al e e g

e s s d e g

Page 15: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjApriPage dembuild Thisas itCou Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12il 14, 2014e 2

molition. Thiding at the

s report is ft applies to

urt 303 in La

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

4

s report aptime of our

for the use o the contaias Vegas, N

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

pplies only tinspection

of the Statinment zonNevada.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

to the conta.

te of Nevades in the s

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

ainment zo

da Departmstructure loc

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

ones within

ment of Tracated at 12

ages assoshould not bfibers will n

ase contact

s

nt LLC:

the subjec

ansportation225 Richard

ciated withbe regardednot occur.

t us at you

ct

n d

h d

r

Page 16: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 17: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

Apri Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremhardSou

Co Geot

elephone: (775)

l 14, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1301Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. No tractor is to

m possible r

visual inommendatioTM) E1368oved from

d ceiling suthern Neva

onvertechnical Engi

4840

) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P1 Richard CVegas, Nevect # 12-43

arz:

st and authofollowing

ding matera.

s from Conon of asbesding was a

s for the substos debrisfinal cleara

o encapsulare-entry.

nspection wons specifie8-99 standa1301 Richarfacing, joinada Health

rse Coineering, Envi

0 Mill Street, S

Facsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A Court vada 224-01

orization, Cinformatio

rials (ACMs

nverse perfostos abatemassessed fobject resides were fouance testinate the con

was condued in the Aard. As mard Court innt taping coh Departme

onsulironmental & G

Suite 5, Reno, N

75) 856-3513

on

04A

Converse Con regardins) from 130

ormed a vment activitior signs of ential buildiund within ng will be ntainment a

ucted in aAmerican Smarked on ncluded Acompound, aent miscell

tantsGroundwater

Nevada 89502

email: reno@

onsultants ng the aba01 Richard

visual inspeies. The cof visible ACng. No reathe conta

performed areas and

a manner Society for

the asbestcoustic ceiliand sheet fllaneous no

Science, Insp

@conversecons

(Converse)atement ofd Court loca

ection of thontainment

CM debris. adily identifainment zo

on this bto secure t

consistenTesting antos survey,ng surfacinooring. As

on-friable m

pection & Test

sultants.com

) is pleasedf asbestosated in Las

he structurearea of the Our visuafiable visuaones in theuilding; thethe building

nt with thend Materials, the ACMsng, wall ands allowed bymaterials in

ting Services

d -s

e e al al e e g

e s s d y n

Page 18: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjApriPage goodthe c Thisas itCou Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12il 14, 2014e 2

d conditioncontainmen

s report is ft applies to

urt in Las Ve

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

4

have beennt zones wi

for the use o the contaiegas, Neva

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

n left in placthin the sub

of the Statinment zon

ada.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

ce (pool plabject buildin

te of Nevades in the s

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

aster). Thisng at the tim

da Departmstructure loc

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

s report appme of our in

ment of Tracated at 13

ages assoshould not bfibers will n

ase contact

s

nt LLC:

plies only tonspection.

ansportation301 Richard

ciated withbe regardednot occur.

t us at you

o

n d

h d

r

Page 19: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 20: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

Apri Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremhard

Co Geot

elephone: (775)

l 29, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1305Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. No tractor is to

m possible r

visual inommendatioTM) E1368oved from

d ceiling su

onvertechnical Engi

4840

) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P5 Richard CVegas, Nevect # 12-43

arz:

st and authofollowing

ding matera.

s from Conon of asbesding was a

s for the substos debrisfinal cleara

o encapsulare-entry.

nspection wons specifie8-99 standa1305 Richa

urfacing, sh

rse Coineering, Envi

0 Mill Street, S

Facsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A Court vada 224-01

orization, Cinformatio

rials (ACMs

nverse perfostos abatemassessed fobject resides were fouance testinate the con

was condued in the Aard. As mard Court inheet flooring

onsulironmental & G

Suite 5, Reno, N

75) 856-3513

on

04A

Converse Con regardins) from 130

ormed a vment activitior signs of ential buildiund within ng will be ntainment a

ucted in aAmerican Smarked on ncluded acg, and floo

tantsGroundwater

Nevada 89502

email: reno@

onsultants ng the aba05 Richard

visual inspeies. The cof visible ACng. No reathe conta

performed areas and

a manner Society for

the asbestcoustic ceilioring mastic

Science, Insp

@conversecons

(Converse)atement ofd Court loca

ection of thontainment

CM debris. adily identifainment zo

on this bto secure t

consistenTesting antos survey,ng surfacinc. This rep

pection & Test

sultants.com

) is pleasedf asbestosated in Las

he structurearea of the Our visuafiable visuaones in theuilding, thethe building

nt with thend Materials, the ACMsng, wall andport applies

ting Services

d -s

e e al al e e g

e s s d s

Page 21: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjApriPage onlyinsp Thisas itCou Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12il 29, 2014e 2

y to the copection.

s report is ft applies to

urt in Las Ve

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

4

ontainment

for the use o the contaiegas, Neva

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

zones with

of the Statinment zon

ada.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

hin the sub

te of Nevades in the s

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

bject buildin

da Departmstructure loc

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

ng at the t

ment of Tracated at 13

ages assoshould not bfibers will n

ase contact

s

nt LLC:

time of ou

ansportation305 Richard

ciated withbe regardednot occur.

t us at you

r

n d

h d

r

Page 22: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 23: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Te

May Mr. StatNevEnv1263Cars Sub Dea At yto scontVeg Philuporesidinspsignbuildcontfrom The reco(ASTremhardcont

Co Geot

elephone: (775

y 13, 2014

Rob Piekarte of Nevadvada Departironmental 3 South Steson City, N

bject: FinaProje1520Las VProje

ar Mr. Pieka

your requessubmit the taining builas, Nevada

ip Childersn completiodential buil

pection wasns of asbeding. Sincetractor is to

m possible r

visual inommendatioTM) E1368oved from

d ceiling sutainment zo

onvertechnical Engi

48405) 856-3833

rz da tment of TrServices D

ewart StreeV 89712-5

l Visual Insect Neon, P0 Ellis AvenVegas, Nevect # 12-43

arz:

st and authofollowing

lding matera.

s from Conon of asbesding was a

s for the substos debrise no final co encapsulare-entry.

nspection wons specifie8-99 standa1520 Ellis

urfacing, aones within

rse Coineering, Envi

0 Mill Street, SFacsimile: (77

ransportatioDivision et, Room 105229

pection Phase I-A nue vada 224-01

orization, Cinformatio

rials (ACM

nverse perfostos abatemassessed fobject resides were foulearance teate the con

was condued in the Aard. As mAvenue in

nd joint cothe subjec

onsulironmental & G

Suite 5, Reno, N75) 856-3513

on

04A

Converse Con regardins) from 15

ormed a vment activitior signs of ential buildiund within esting will bntainment a

ucted in aAmerican Smarked on ncluded acoompound. ct building a

tantsGroundwater

Nevada 89502 email: reno@

onsultants ng the aba520 Ellis A

visual inspeies. The cof visible ACng. No reathe conta

be performeareas and

a manner Society for

the asbestoustic ceilin

This repoat the time o

Science, Insp

@conversecons

(Converse)atement of

Avenue loca

ection of thontainment

CM debris. adily identifainment zoed on this bto secure t

consistenTesting antos survey,ng surfacinrt applies of our inspe

pection & Test

sultants.com

) is pleasedf asbestosated in Las

he structurearea of the Our visuafiable visuaones in thebuilding, thethe building

nt with thend Materials, the ACMsg, wall andonly to the

ection.

ting Services

d -s

e e al al e e g

e s s d e

Page 24: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

NevProjMayPage Thisas iAve Coninteras a If yoconv Sinc CON

PhilEnvAsb Enc Dist

ada Deparject No. 12y 13, 2014 e 2

s report is ft applies tonue in Las

nverse is nrpretation oa guarantee

ou have anvenience.

cerely,

NVERSE C

ip Childers ironmental estos Abate

l: Asbesto

by E-mail:

rtment of T-43224-10

for the use o the contaVegas, Ne

not responof available e that future

y questions

CONSULTA

Scientist ement Con

os Abateme

AddreDwaydwilkGlen gpetrMorgmorg

Transportat0

of the Statainment zovada.

nsible for information

e exposure

s regarding

ANTS

sultant Lice

ent Consulta

essee: rpieyne Wilkensinson@dotPetrenko, N

[email protected] Baldwinan@baldw

tion

te of Nevadones in the

any claimsn. This assto airborne

g this inform

ense IM-16

ant License

[email protected], NDOT.state.nv.usNDOT: .state.nv.usn, Baldwin Dinlv.com

da Departme structure

s or damasessment se asbestos f

mation, plea

692

e

state.nv.usT: s

s Developme

ment of Tralocated at

ages assoshould not bfibers will n

ase contact

s

nt LLC:

ansportationt 1520 Ellis

ciated withbe regardednot occur.

t us at you

n s

h d

r

Page 25: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 26: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

No asbestos abatement was required at 1205 Charmast Lane , 1501 W. Charleston Blvd. and 1505 W. Charleston Blvd.

Page 27: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Appendix BLaboratory Results, Air Monitoring

During Pool Removal and Field Reports

Page 28: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Approved by:

Technical ManagerMiguel Ines

Report for:

Mr. Philip ChildersConverse Consultants, Las Vegas731 Pilot RoadSuite HLas Vegas, NV 89119-4429

Regarding: Project: 12-43224-10; Project Neon PH IIEML ID: 1197569

All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the items tested.

EMLab P&K ("the Company") shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.

Dates of Analysis:Asbestos-airborne fiber count (NIOSH 7400): 04-22-2014

Service SOPs: Asbestos-airborne fiber count (NIOSH 7400) (01260)AIHA-LAP, LLC accredited service, Lab ID #178697

EMLab ID: 1197569, Page 1 of 2EMLab P&K, LLC

Page 29: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

EMLab P&K17461 Derian Ave, Suite 100, Irvine, CA 92614

(800) 651-4802 Fax (623) 780-7695 www.emlab.comClient: Converse Consultants, Las VegasC/O: Mr. Philip ChildersRe: 12-43224-10; Project Neon PH II

Date of Sampling: 04-17-2014Date of Receipt: 04-17-2014Date of Report: 04-22-2014

ASBESTOS AND OTHER FIBERS BY PCM: NIOSH 7400 METHODLab ID-Version‡ Volume (liters) Fibers Detected Fields Read Fibers/mm² 95% UCL* Fibers per CC

Location: 6031, North Wall Comments: 5436089-1 611.25 < 5.5 100 < 7 < 0.004 (Sr = N/A) < 0.004

Location: 6176, E of Pool Comments: 5436090-1 553 < 5.5 100 < 7 < 0.005 (Sr = N/A) < 0.005

Location: 5864, South Wall Comments: 5436091-1 542.5 < 5.5 100 < 7 < 0.005 (Sr = N/A) < 0.005

Location: 6019, W of Pool Comments: 5436092-1 620 < 5.5 100 < 7 < 0.004 (Sr = N/A) < 0.004

Location: 6165, Open Comments: 5436093-1 0 < 5.5 100 < 7 N/A (Sr = N/A) N/A

Location: 5923, Closed Comments: 5436094-1 0 < 5.5 100 < 7 N/A (Sr = N/A) N/A

EMLab ID: 1197569, Page 2 of 2EMLab P&K, LLC

Interpretation is left to the company and/or persons who conducted the field work. Field blank, if submitted with the project, has been used to correct the data.Reporting limit is calculated using a minimum detection limit of 7 fibers/mm2.* Upper 95% Confidence Limit for fibers/cc, calculated using a relative standard deviation value (Sr) mentioned above..‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".

Page 30: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 31: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 32: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,

Appendix CWaste Ticket

Page 33: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 34: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 35: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 36: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 37: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 38: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 39: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 40: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 41: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,
Page 42: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT …ndotprojectneon.com/Archives/reference_information_documents/... · ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT Project Neon,