1C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb- 16.doc TENDER MADHYA GUJARAT VIJ COMPANY LIMITED SARDARNAGAR ROAD CITY DIVISION NADIAD – 387 002 ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT NADIAD RURAL SUB DIVISION. T. N.NO: 02/16 Tender issued To _________________________________________ ________________________________________________________ Tender fee Rs. 500/- paid vide R.No.___________ Date________ EMD Rs. 5000/- paid vide Rec. No. ___________Date_________

ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

Embed Size (px)

Citation preview

Page 1: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

1C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

TENDER

MADHYA GUJARAT VIJ COMPANY LIMITED SARDARNAGAR ROAD

CITY DIVISION NADIAD – 387 002

ARC FOR LAYING OF UNDERGROUND XLPE CABLE

AT NADIAD RURAL SUB DIVISION. T. N.NO: 02/16

Tender issued To _________________________________________

________________________________________________________

Tender fee Rs. 500/- paid vide R.No.___________ Date________

EMD Rs. 5000/- paid vide Rec. No. ___________Date_________

Page 2: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

2C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

MADHYA GUJARAT VIJ COMPANY LIMITED

NADIAD CITY DIVISION OFFICE, SARDARNAGAR ROAD, NADIAD – 387 002 Web Site : www.mgvcl.com E-mail : [email protected]

Ph. No-0268-2532906, Fax No : 0268 - 2556188

Sub: - ARC for laying underground XLPE cable at Nadiad Rural Sub Division. T.N. No: 02/16

1 Earnest Money

Rs. 5000/- by cash or by DD in the Name of MGVCL in local bank Cheque will not be accepted.

2 Security deposit 5 % of the order value

3 Last date and time of issue

tender.

19/02/2016 Time 12:00hrs.

4 Last date and Time of receiving of tender by RPAD

29/02/2016 Time: 15:00hrs.

5 Date & Time of Opening of

Tender ( If possible)

29/02/2016 Time: 16:00hrs.

6 Tender fee (Not refundable) Rs. 500/- ( by post Rs. 50/- Extra)

7 Time Limit One Year

8 Page No. 1 to 3 & Schedule “B”

9 Estimated Cost Rs.5,00,000/-

Issue to……………..…………………………………………………………………………

……………...Tender Fee Rs………500/-...……….Paid vide R. No…………………….

Date…………………..Emd Paid Rs ….....5000/-.........R. No………………..……………

Date…………………

Superintendent (Exp) City Dn. Nadiad

Page 3: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

3C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

Scope of work & General Terms & Conditions

(To be submitted in Technical Bid Cover in physical form & it is mandatory)

For every item in the Price Bid Schedule –B, sub-order will be issued as and when required for any Sub division office under MGVCL Nadiad city Division Office for any Schemes. For Schedule-B: Work of underground cable lying shall be executed as per MGVCL standard terms and conditions & as per Approved Drawing under the supervision of Dy./ Jr. Engineer of concerned Sub-Division / Division which also includes following:

1. Work shall be required to be executed under any Sub-Division of Nadiad City Division Office under any scheme.

2. Any amount of sub-order for any Sub-Division will be issued by Division office which shall be acceptable to the contractor and accordingly work shall be done within the time frame for which no excuse will be acceptable by MGVCL.

3. Execution Permission from all local govt./pvt./concerned departments will be in the scope of contractor.

4. No damages shall be done to any existing utilities having already executed / laid underground equipment / pipes / cables etc. i.e. Water/ Telephone/ OFC/Gas/Drainage/TV Channel Cable of other departments otherwise necessary claim charges shall be borne and settled by contractor.

5. All required materials including Cable drums from MGVCL will be issued from any stores of MGVCL for which no extra payment towards transportation will be made to the contractor.

6. Necessary shutdown for connection/jumpering of UG cable with existing network will be provided as per availability or convenience of the MGVCL which shall be acceptable to the contractor & contractor shall try to complete the work in minimum time. .

7. All erection shall be done properly in good alignment with details marked on it correctly.

8. Work may be required to be executed in any 66/132/220KV Sub-Stations also. 9. Utilization of material procured by contractor must of ISI mark/ standard when no ISI /

BIS certification available & must be got examined from the Engineer In charge before utilization.

10. All cables before lay shall be tested with megger. The cable cores shall be tested for continuity absence of cross phasing, insulation resistance between conductor to earth/sheath/armour and insulation resistance between conductors.

11. Length quantity and distance mentioned may vary site to site. The scope of work at site in all respects as per Schedule -B / Sub work order.

12. All safety precautions shall be taken while working by your personnel / supervisor/ any staff / labours, to avoid any accident at site.

13. Contractor shall deploy qualified Engineer and Supervisors at site during execution of work at site for day-today coordination with the MGVCL Engineer’s.

14. Only experience labour shall be deployed by contractor at site. 15. Required machinery shall be used for execution of work. 16. D.E. /J.E of MGVCL will inspect the work at site 17. Time limit extension for delay in work will be granted on the basis of genuine reason only.

Page 4: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

4C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

18. Bill/Inventory sheet for work completed shall be submitted within 01 week from the date

of completion along with all required materials issued / used - Inventory, quantity, MR/CR details etc. as per procedure and requirement at the office of concerned sub-division. 19. All records of daily progress shall be maintained as per instructions. 20. No excess work shall be carried out without prior approval of the competent authority. 21. All materials shall be of good quality to be procured for execution of work at site. 22. Cables shall be charged satisfactorily after completion of work. 23. Any delay on account of Contractor penalty will be imposed by MGVCL 24. Delay on account of getting permission from any department no extra charges will be

paid by MGVCL. 25. Any claim arising due to accident at site will be borne and settled by contractor. No

claim will be entertained by MGVCL. 26. For Cable kit Make (Brand) you have to submit C.P.R.I. Lab Type test certificate not

older than five years and as per IS 13573:2011.For End termination & St. through jointing work, Certificate of cable jointing person from manufacture of cable kit for this type of job is mandatory, Site in charge will asked copy of certificate before taking up cable jointing work.

27. For Live Electric line crossing &on the line work, work should be carried-out after Power Cut-off and both side earthing of line & under supervision of local S/Dn staff only & follow all safety measures.

28. Madhya Gujarat Vij. Co. Ltd does not bind itself to accept first lowest offer from the bidder. 29. In case of any ambiguity, discrepancy or dispute the decision of Chief Engineer (T&O),

MGVCL, Vadodara will be final and shall be binding to the tenderer. 30. Cable markers as per statutory requirement shall be provided all along the route at a

maximum distance of 50 meters and other important locations. Also the location of underground cable shall be clearly indicated on the marker.

31. The end of cut pieces of cables left out during executions shall be sealed to prevent Ingress of any moisture in the cable before handing over to consignee. 32. Any other items not specifically mentioned in the specifications but which are required

for installation, testing, commissioning and satisfactory operation of the cable as per Indian standards / IE Rules / IE Act and local authority regulations are deemed to be included in the scope of the specification and no deviation in this regard shall be accepted.

33. The Contractor shall also be responsible for the overall co-ordination with internal / external agencies, project management, training of Company’s manpower, loading, unloading, handling, moving to final destination for successful erection, testing and commissioning of the 11 KV cable.

34. Contractor will have to provide complete technical supervision during installation of cables right from transport up to testing and commissioning. The contractor shall arrange for the services of fully qualified and competent supervisors / engineers for monitoring the whole job. Competent and well versed Semi skill laborers shall be deployed for execution.

35. All statutory clearances and permissions from various statutory bodies/Govt. authorities Like forest Department, Railway, Aviation Authority, Maritime Board, National highway Authority, Municipal Corporation, Gram Panchayat (if any), PWD, Telecom Department, right of way and way leave etc. wherever required along the entire route of the cable lines shall be arranged.

36. Laying and Installation:-

Page 5: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

5C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

The sealing of cable ends during the storage, execution till jointing work is completed,shall be in the scope of Contractor. In no circumstances, the cable ends shall be kept open. The damages done because of water / moisture ingress or penetration in the cables / conductors during execution shall be recovered from the Contractor. It will be the responsibility of the Contractor to make them good or replace free of cost without affecting the completion schedules.

The cables shall be completely surrounded by a layer of sand having low thermal

Resistivity (selected sand) about 250 mm over & below the cable surface throughout the width of cable Trench as per Drawings of MGVCL. The new cable end seals shall be applied before starting of laying cable and shall be

checked after laying and if found damaged shall immediately be resealed. Sufficient number of heat shrinkable cable end sealing caps shall be stocked at site stores for testing and jointing work. Cable end caps shall be in the scope of the Contractor. The Contractor shall have total responsibility for the entire materials stored, loose,

Semi assembled and/or erected by him at site in his custody. The Contractor shall make suitable security arrangements at his own cost to ensure the protection of all materials, equipment and works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to arrange for security till the works are finally taken over by the Company.

37.TRENCHING:-

The trench excavation and filling–in shall be so executed that all walls, roads, sewers, drains, pipes, cables, structures, places and things shall be reasonably secured against risk of injury and shall be carried out to the satisfaction of the authorities concerned. However, if any, damages to existing services made, Contractor shall arrange and pay for any necessary repair, to make good the damages.

The excavated material shall be properly stored to avoid obstruction to public and traffic movement. Where, owing to traffic or for reasons of safety the excavated material shall be removed from the site and returned for refilling the trench on completion of lying. The contractor at his own cost shall dispose off surplus material.

The bottom of the excavated trench should be levelled flat and free from any object, which would damage the cables. Any gradient encountered shall be gradual.

When the excavation of the trenches has been accurately executed, the contractor shall inform engineer in-charge for approval. Lying of cables shall not be started until engineer in-charge approves the trench.

38. REINSTATEMENT:-

A pre-warning PVC yellow tape 8 Inch wide and 300 microns thick (LDPE) shall also be laid as per the Drawing. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS GUJARATI) as “CAUTION: 11000 VOLTS MGVCLCABLE” and to be placed at about 300 mm To 450 mm depth from ground level along the route of cable.

39. CABLE ROUTE/JOINT MARKER/IDENTIFICATION:-

Permanent means of indicating the position of joints and cable route shall be Supplied and laid as per Schedule-B. Pre –cast RCC markers shall be placed as per the field requirement, if the route passes through open fields, markers

Page 6: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

6C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

should be conspicuously visible and above ground surface. The marker should incorporate the following relevant information:

1) The name of the owner – MGVCL. 2) Voltage – 11 KV Cable 3) Distance of cable from the marker.

The interval should be maximum 50 meters between two markers. It should be put

at bends, curves, road crossing, etc. of cable route. 40. TESTS AFTER INSTALLATION:- Pre-commissioning tests on site, to be undertaken by the successful tenderer

shall include the following: a) Insulation Resistance of each cable drum length after laying and before jointing. b) Tests for detection of damage to outer sheath, if any. c) Serving insulation resistance after laying each cable length shall withstand a voltage

of 10kv DC for one minute between each reinforcement and external conducting surface; In addition, the serving insulation resistance shall be measured and checked with the values obtained during routine factory tests.

d) On completion of the cable laying and jointing work, the complete installation shall be checked with a D.C. voltage of 3 KV applied for 15 minutes between each conductor and sheath.

e) Conductor resistance of each cable of each complete circuit. f) Test for 5 min. with system voltage applied between the conductor and the screen. g) Test for 24 hours with normal operating voltage of the system. h) Continuity & Phase confirmation.

NOTE: The pre-commissioning test at (f) or (g) at site to be undertaken as an alternative to the test (d).

41. JOINTING AND TERMINATION OF CABLES:-

The joint bay should be of sufficient dimensions to allow jointers to work with as much freedom of movement and comfort as possible.

An enclosure or suitable protection cover shall be used in all circumstances wherever jointing work is carried out in the open irrespective of the weather conditions. The joint shall be in dust free, moisture free and clean atmosphere.

If the cable ends seals or cable ends are found to have suffered damage the cable should not be jointed, without tests and rectification.

Sufficient length of spare cable shall be left in the ground, for future needs. The cable shall be fixed properly using non-metallic clamps. All the pre commissioning tests shall be carried out by the Bidder If any

abnormality found during testing, bidder will have torectify the same at no extra costs.

42. Contractor has to carry the work anywhere under Subdivision of Nadiad City Division. Sub

Divisions under Nadiad City Division are Nadiad East/ Nadiad West /Nadiad Rural/Vaso/Chaklasi.

43. Bidder has to offer full Quantity.

Page 7: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

7C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

COMMERCIAL TERMS AND CONDITIONS: 1. SECURITY DEPOSIT: (SD): The successful bidder will be required to pay an amount equivalent to 5% of the value of the Order as a Security Deposit for satisfactory performance of the execution of Contract. If the full Security Deposit amount is not paid within 07 (Seven) days after the receipt of the order, then the order will be out rightly cancelled at the risk & cost of the Bidder (at the discretion of MGVCL) and EMD amount paid will be forfeited without entering into any correspondences and this will be binding on the Bidder and MGVCL will take action against bidder as per tender condition stated here under. Such Security Deposit will be payable either by/ D.D. / Bank Guarantees. Security Deposit if paid will be returned on successful execution of contract. 2. PENALTY FOR DELAY IN COMPLETION OF CONTRACT: In case of delay, penalty shall be levied at 0.5(Zero Point Five) % of contract value per week with maximum 10(TEN) % ceiling of contract value per week. This will be deducted from your bill payable either from this contract or from any other contract with the Company or from EMD or Security deposit amount. 3. CONTRACT AGREEMENT: Successful bidder shall have to execute the contract agreement on non judicial stamp paper of Rs. 100.00 & the cost of the same will be borne by the bidder. 4. TAX: The prices should be inclusive of all applicable taxes excluding prevailing service-tax. 5. INSURANCE: It will be the responsibility of bidder / contractor to cover sufficient amount of insurance of their personnel involved in the erection work of tender item/s during execution of works. MGVCL shall in no way be responsible for any injury, damages, accident etc. to their personnel execution / erection work, supervision etc. under the contract. 6. OTHER CONDITIONS OF SUPPLY: The MGVCL General Conditions of Contract will apply to all Supplies and Contracts and you will deemed to be fully aware of the this General Conditions of Contract for the supply of Materials particularly in respect of Security Deposit, Terms of Payment, Penalty for late delivery etc. and any ignorance of these Conditions will not exempt you from liability to abide by the same. 7. FAILURE TO EXCEUTE THE CONTRACT: On failure to execute the order placed on successful bidder, under the terms & conditions set forth therein, to the satisfaction of MGVCL, the contractor will be liable to make good the loss sustained by MGVCL. Under such circumstances, MGVCL shall cancel the order and forfeit the SD. MGVCL may also go for fresh order on other party at the risk & cost of successful tendered or may carry out departmentally, debiting the cost to the successful bidder / contractor. 8. TERMINATION OF CONTRACT: The MGVCL, upon written notice of default to the contractor, shall terminate in the circumstances detailed as under: If, in the opinion of the MGVCL, the contractor fails to complete the work specified in the scope of works given in Schedule-B within the time specified for the same in the contract or within the period for extension has been granted by MGVCL to the contractor.

Page 8: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

8C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

If, in the opinion of the MGVCL, the contractor fails to comply with any of the other provision of the contract The MGVCL shall also be empowered to cancel the contract, if any deficiency in erection work and or bad performance is noticed. the work specified in the scope of works given in Schedule -A within the time specified for the same in the contract or within the period for extension has been granted by MGVCL to the contractor. 9. CHANGE AND QUANTITIES: The MGVCL shall have the rights to make any changes /addition / deletions or modification in any terms / conditions of the tender and / or specifications as may be deemed necessary by MGVCL at its sole discretion at any time before the due date of opening of the tender. The quantities mentioned in the accompanying Schedule are only approximate. Actual quantities may increase or decrease according to the requirements. The Company reserves the right of revising or deleting any of the quantities to be executed against the contract and final quantities actually executed by the contractor will be calculated and paid at the rate given in contract schedule of rates. 10. The erection work shall be carried out strictly as mentioned in Schedule-B and as per standard specification relevant IS & approved by MGVCL authority & Concern authority i.e. PWD, NHAI, Western-Railway, BSNL, Local Gram Nagar Panchayat Municipality, etc. 11. MGVCL reserves the right to cancel any or all the offer / bids or to accept any offer without assigning any reasons. MGVCL reserves the right to place the order by splitting the tender items / quantity by awarding to more than one contractor. 12. JURISDICTION: All questions, disputes or differences arising under out of or in connection with the Tender / Contract if concluded shall be subject to the exclusive jurisdiction of the court under whose jurisdiction the place from which the tender / Acceptance of tender is issued, is situated i.e. Nadiad 13. MGVCL as well as supplier / contractor will be bound by rules and regulation of Indian Contract act. 14. Income Tax (TDS) whenever applicable will be deducted / recovered as per Govt. rules and regulation 15. Contractors must have valid solvency as per Company’s rules. Bank Solvency, Registration of line / cable laying work & Experience certificate to be attached as per requirement of tender. 16. Contractors will have to submit full documents set of all the legal papers required for the purpose with rates quoted by them 17. Bidder shall mention Registered Service Tax No., E.P.F. & I.T. Dept Pan-Card, VAT, CST etc in his offer and submit the photocopy of certificate of each, otherwise Tender shall not be considered in competition. 18. No tools will be supplied by the department. The work if found inferior and not up to standard of the Company’s is liable to be rejected at the risk and cost of the contractor. Any

Page 9: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

9C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

expenditure incurred for rectification work carried out departmentally or by employing hangami labor will be recovered from his R.A bills, if the contractor fails to rectify the inferior work done by him in spite of the instructions to rectify the same.So long as the line is not handed over to the company, the responsibility of its safe custody and of all fixture and materials etc. lying with that of the contractor. 19. PERIOD OF CONTRACT: The contract will be remained in force for period of 12 Month. The contractor shall call / indent the required material from S/dn / Dn Store in advance & on completion of the work, prepare and render the final detailed material account of the received by him from the SDn./Dns store within one month from the date of completion of work. If however, the contractor does not render the material account, notice will be issued to the contractor to render the material account within 10 days from the date of notice, failing which the material account, will be finalized and recoveries will be made as per the MGVCL’s procedure which shall have to be accepted by the contractor and dispute if any raised shall not be entertained. 20.GUARANTEE: If during 12 Calendar months from the date of handing over charge after completion of work, the works are found defective in any way the same should be rectified by the contractor free of cost. If any joints / cable box supplied by the contractor, fails within guarantee period of 12 months due to substandard quality, the same will have to be replaced free of cost by the contractor. 21. INDEMITY BOND: The contractor will have to executed an indemnity bond on stamp paper of Rs.100/- at his cost before commencement of work stating the matter conversing that for any accident to the contractor’s staff/equipment or any person, either fatal or non fatal, due to non observing of safety measures, MGVCL, shall not be responsible. 22. CONTRACTOR LIABILITY: For any accident either fatal or non-fatal to the workers due to non observances of the safety measures as per rules or due to lack of proper care by the contractor’s labor, MGVCL shall not be responsible. 23. VALIDITY: All offers should be kept valid for acceptance for a period 120(One Hundred Twenty) days from the date of opening of tender. Offers with short validity will be liable for rejection without any correspondence. 24. Contractor shall submit the bill of work at regular period of time i.e. 1 Month Interval. 25. STATUTORY VARIATION: Any statutory increase or decrease in the taxes subsequent to contractor / bidder offer if it takes place within the original contractual delivery date will be to MGVCL account subject to the claim being supported by documentary evidence. However, if any decrease takes place after the contractual delivery date, the advantage will have to be passed on to MGVCL. 26. PAYEMET TERMS: Payment of works shall be made in 30 Days after scrutinizing of Bill submitted by contractor if found in order. 27. PERFORMANCE GUARANTEE: The security deposit will be converted into performance Guarantee on completion of execution of order of 12 Months. However performance Guarantee/Warranty of the work shall be for 12 months on completion/execution of last date

Page 10: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

10C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

of work completed & accordingly the performance Guarantee will be valid up to 12 Months on completion of work. 28. REPEAT ORDER / ADDITIONAL ORDER: MGVCL reserves the right to place repeat orders / additional orders on the successful contractor up to 25% of the original quantity of the A/T at the same prices terms and conditions stipulated in the original contract during contractual period. In special circumstances MGVCL will reserve the right to place repeat order / additional order up to 100% quantity mutually agreed upon. 29. The contractor has to store all the allotted materials in safe custody on their end. The allotted materials by MGVCL should be insured at their cost towards theft, loss, damaged etc. The contractor is fully responsible for storing of all the materials allotted by MGVCL for the works under contract. 30. MGVCL shall issue the required materials under the contract from any store of MGVCL and the contractor has to carry out all the transportation at their cost up to the site/s. 31. MGVCL reserves the right to cancel any or all the offer/bids or to accept any offer without assigning any reasons. MGVCL reserves the right to place the order by splitting the tender items/quantity by awarding to more than one contractor.

Executive Engineer MGVCL, Nadiad City Division

Agreed with Terms & Conditions (Name of Contractor with Signature duly stamped

Page 11: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

11C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

Page 12: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

12C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

\

Page 13: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

13C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

Schedule – B Name of Work : ARC for Laying of underground XLPE cable under Nadiad Rural Sub Division under

IPDS and Other scheme.

Sr. No.

Iteam code No. Description Unit Rate

1 9913000036

Excavation of trench 0.5mtr wide and 1mtr deep for laying of HT/LT underground cable of size up to 300sq.mm PILC or XLPE .(The cable should be laid on bed sand and to cover cable with half round RCC pipe 6" internal dia and length of one meter along with each bottom and top.) The entire trench there after should be refilled with earth dully rammed up to ground level As per Drg. No MGVCL/Tech/UG Cable/01/2012-13

MTR 87

2 9913000037

Excavation of trench 0.75mtr wide and 1mtr deep for laying of double HT/LT underground cable of size upto 300sq.mm PILC or XLPE .(The cable should be laid on bed sand and to cover cable with half round RCC pipe 6" internal dia and length of one meter along with each bottom and top.) The entir trench there after should be reffiled with earth dully rammed up to ground level as per Drg. No MGVCL/Tech/UG Cable/02/12-13

MTR 130

3 9913000038 Laying/relaying of cable in cable trench and from ground level to pole structure for providing outdoor cable joints.

MTR 36

4 9913000039 Laying /Relaying oXLPE/PILC cable by digging of pits, removal of old cable and laying of new cable on sand bad as per item no.1 above.

MTR 108

5 9913000040 Widening & refilling with earth dully rammed the tranch for laying additional No. of cable . For item no. 1 above.

MTR 36

6 9913000020 Add: charges for digging of tar road for laying of cables over and and above digging of pit in normal soil as per Sr. No. 1.

MTR 29

7 9913000042

laying of U/G 11KV XLPE Cable by push & Pull method (Manual) thru with HDPE pipe 140mm diameter, 6mm thichness or 6" or 4" diameter GI Pipe without damaging surface of the road by horizontal boring/ drilling method (Excluding cost of HDPE pipe or 6" or 4" GI pipe ) as per drawing and specification.

MTR 361

8 9913000043

laying of U/G 11KV XLPE Cable by push & Pull method (By Horizontal Directional Machine) thru with HDPE pipe 140mm diameter, 6mm thichness or 6" or 4" diameter GI Pipe without damaging surface of the road by horizontal boring/ drilling method (Excluding cost of HDPE pipe or 6" or 4" GI pipe ) as per drawing and specification.

MTR 450

9 9902050002 Moulding of cable joint (St.joint, indoor and outdoor) for XLPE Cable -labour charges for urban area.

No. 2024

10 9902050001 Moulding of cable joint (St.joint, indoor and outdoor) for XLPE Cable -labour charges for Rural area.

No. 2458

11 9902050005 Moulding of cable joint (St.joint, indoor and outdoor) for LT PVC Cable.

No. 651

12 9913000010 Preparing of Cable route drawing narrating road center level incl. jointing locations etc; for cable laid route in 6 (Six) sets.

No. 868

Page 14: ARC FOR LAYING OF UNDERGROUND XLPE CABLE AT … MGVCL... · ARC FOR LAYING OF UNDERGROUND XLPE CABLE ... details etc. as per procedure and requirement at the office of ... route of

14C:\Users\dzmeda6557\Desktop\NIVIDA NO.02.16 NADIAD (CITY)\11 XLPE Under Ground Cable For NDR Sdn Feb-16.doc

Sr. No.

Iteam code No. Description Unit Rate

13 0302000077 Supply of HDPE pipe for laying 11KV XLPE cable 100mm diameter & 6mm thichness as per IS:4985

RMTR 232

14 0302000078 supply of half round RCC hume pipe 6" internal dia & length of 1Mtr. No. 100

15 0302000081 supply of medium grade GI Pipe of size 4" dia ( Including Clmaping the cable with pole.)

RMTR 685

16 9913000049 Supply of sand 0.300X0.500X1.00mtr (Layer at bottom of cable trench apprx. 0.15cmt) as per Drg. No. MGVCL/Tech/UG Cable/01/12-13

RMTR 106

17 9913000050 Supply of sand 0.300X0.750X1.00mtr (Layer at bottom of cable trench apprx. 0.225cmt) as per Drg. No. MGVCL/Tech/UG Cable/02/12-13

RMTR 159

18 1599000011 Providing and supplying, fixing route makker of 150mm X 150mm concrete stone ( MGVCL Marked) embedded in earth at lWest 300mm below the G.L. & 450mm above G.L. at distance approx. 100mtr. Along the length of cable.

No. 119

19

Supply & Laying of Warning LDPE YELLOW colour tap 8" Eight inch width of 300 micron thick (LDPE) shall be laid. Warning tap shall be printed in RED letter in english as "CAUTION : 11000 VOLTS MGVCL CABLE " and to be placed at about 300 mm to 450 mm depth from ground level aiong the route of cable during excavation work as per instruction of Engineer In Charge.( Rs9/- Per Mtr Material cost + Rs2.50per Mtr F.O.R. Site Carting & laying labour charge above cable in ex cavated trench = Rs.11.50 per meter

RMTR 11.50

20 0411000058 Supply of 11KV Out door Cable Box for XLPE 240 mm2 Cable No. 1480

21 0411000006 Supply of 11KV Out door Cable Box for XLPE 185 mm2 Cable No. 1475

22 0411000057 Supply of 11KV Out door Cable Box for XLPE 95 mm2 Cable No. 1350

23 0411000060 Supply of 11KV Straight through joints for XLPE 240 mm2 Cable No. 4150

24 0413000020 Supply of 11KV Straight through joints for XLPE 185mm2 Cable No. 3950

25 0411000059 Supply of 11KV Straight through joints for XLPE 95mm2 Cable No. 3850

Total 500000

Note: As per site situation /T. S. some item may or may not be required to carry out the work. I am ready to work ……….. % below / above or at company’s rate. Contractor Signature and Seal Executive Engineer MGVCL, Nadiad City Division