3
Ongoing Activities 06/03/19 - 06/07/19 Project Overview Safety Sector Elevator Install Complete South Playground Installation Cafeteria VCT Installation VCT / Carpet Install 3 rd Level Precast Stair Tread install at Gym Stairs Metal Panel Install at elevation I, J, F, L Curtain Wall Installation South Stair Tower Cafeteria ACT Install Northside Sidewalk and Stair Install Electrical Protection Devices Upcoming Activities Play Field Turf Installation Door Installation 2 nd Level East Polished concrete at Lower Level Construction Clean at Main and 2 nd West Markerboard and Tackboard Installation North View from East to West The project has now transitioned from temporary to permanent power inside the building. JE Dunn requires all Trade Partners to use GFCI line cords when using equipment on permanent power. This measure protects the electronic equipment inside of the building. APS Tuskegee Airmen Global Academy Project Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a diverse and innovative learning environment, allowing students' minds to soar. Financial & Schedule Status Current GMP = $27.6M Bill to Date = $22,916,635 Start Date: July 2, 2018 Current Completion Date: July 10, 2019

APS Tuskegee Airmen Global Academy · APS Tuskegee Airmen Global Academy Project Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APS Tuskegee Airmen Global Academy · APS Tuskegee Airmen Global Academy Project Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

Ongoing Activities06/03/19 - 06/07/19

Project Overview

Safe

tySe

cto

r

• Elevator Install Complete • South Playground Installation• Cafeteria VCT Installation • VCT / Carpet Install 3rd Level• Precast Stair Tread install at Gym Stairs • Metal Panel Install at elevation I, J, F, L• Curtain Wall Installation South Stair Tower • Cafeteria ACT Install • Northside Sidewalk and Stair Install

Electrical Protection Devices

Upcoming Activities• Play Field Turf Installation • Door Installation 2nd Level East• Polished concrete at Lower Level • Construction Clean at Main and 2nd West• Markerboard and Tackboard Installation

North View from East to West

The project has now transitioned from temporary to permanent power inside the building. JE Dunn requires all Trade Partners to use GFCI line cords when using equipment on permanent power. This measure protects the electronic equipment inside of the building.

APS Tuskegee Airmen Global AcademyProject Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

diverse and innovative learning environment, allowing students' minds to soar.

Financial & Schedule Status

Current GMP = $27.6MBill to Date = $22,916,635

Start Date: July 2, 2018Current Completion Date: July 10, 2019

Page 2: APS Tuskegee Airmen Global Academy · APS Tuskegee Airmen Global Academy Project Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

APS Tuskegee Airmen Global AcademyProject Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

diverse and innovative learning environment, allowing students' minds to soar.

North East Stairs and Sidewalk Install

South Stair Tower Metal Panel and Curtain Wall

Playground Turf Material Delivery

Dumpster Pad and Generator Hardscapes

South Bus Canopy Ramp Hardscapes

South Playground Installation in Progress

Page 3: APS Tuskegee Airmen Global Academy · APS Tuskegee Airmen Global Academy Project Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

APS Tuskegee Airmen Global AcademyProject Purpose Statement: To build a new elementary school for Atlanta Public Schools that will create a

diverse and innovative learning environment, allowing students' minds to soar.

VCT and Accent Wall Paint Installed 3rd

level West

Media Center 320 Storefront Glazing Elevator Door Installation 3rd Level

ACT Installed at 2nd Level East Classrooms

Millwork and VCT Installed 2nd Level West

Cafeteria VCT Installation