APS Overview v8.1

Embed Size (px)

Citation preview

  • 8/6/2019 APS Overview v8.1

    1/59

    Advanced Planning

    Presenters NamePresenters Title

    Enabling the demand driven adaptive planning process platform

  • 8/6/2019 APS Overview v8.1

    2/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    The following is intended to outline our generalproduct direction. It is intended for informationpurposes only, and may not be incorporated into anycontract. It is not a commitment to deliver anymaterial, code, or functionality, and should not berelied upon in making purchasing decisions.The development, release, and timing of anyfeatures or functionality described forOracles

    products remains at the sole discretion ofOracle.

    Safe HarborStatement

  • 8/6/2019 APS Overview v8.1

    3/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Globally

    #1 in Database

    #1 in Supply Chain Mgmt

    #1 in Customer Relationship Mgmt

    #1 in Human Capital Mgmt

    #1 in Industries

    - Retail

    - Communications

    - Public Sector

    - Professional Services

    - Financial Services

    275,000 total customers

    220,000 database customers

    30,000 applications customers

    19,000 SMB apps customers

    30,000 middleware customers

    17,700 partners

    60,000 employees 14,000 developers

    7,000 support staff

    Founded in 1977. Headquarters in Redwood Shores,CA with operations in 145 countries.

    Oracle At-a-Glance

  • 8/6/2019 APS Overview v8.1

    4/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    EVOLVING CHALLENGES IMPACTS TOSUPPLY CHAIN

    A Changing Global Landscape

    Globalization and global sourcing -leaner supply networks, increaseddemand variability, cost volatility

    Increased customer expectations - fasterproduct life cycles with local marketrequirements

    Mergers and acquisitions, and continued

    consolidation of suppliers andcustomers

    Increasing compliance requirementssuch as Sarbanes-Oxley

    Capture demand signals more frequently and closer to the point ofsale drive to consensus demand number

    Shape your demand with profitability and capacity as key drivers

    Implement real-time and collaborative sales and operationsplanning process

    Older business models are challengedby the new decentralized globalnetwork model

    Move from static demand planning to demandsensing and shaping

    Introduces new challenges and

    focus areas:

    Materials and logistics are both primary constraints

    Cross-enterprise synchronized view of demand signalencompassing both supply and demand visibility

    More scrutiny of material liability

    Multi-tier decision support instead of enterprise plans

    Analyze optimal flows for market response, changing geo-political situations, and unplanned events

    Rationalize suppliers to minimize risk

    Determine postponement strategies

    Conduct cost-to-serve and product portfolio analysis

    Focus on more frequent supply network flow analysis

    Business trends forcing you to move to demand driven adaptive planning

  • 8/6/2019 APS Overview v8.1

    5/59

    CONFI NTI : ll iliti t r f r l i r l t i tr t

    SenseDemand

    Respond toDemand

    S

    hapeDemand

    Demand Driven Adaptive PlanningTh riv r r l-ti i f r ti

  • 8/6/2019 APS Overview v8.1

    6/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Demand Driven leaders have:

    15% less inventory

    17% stronger order fulfillment

    35% shorter cash-to-cash cycle times

    Which translates to: 60% better profit margins

    65% better EPS

    2-3X the ROA

    0

    50

    100

    150

    200

    250

    300

    350

    Strong Weak

    Perfect Order Inventory

    Cash-to-Cash SCM Costs

    Source: AMR Benchmark Analytix

    Why Is Demand Driven Important?Tangible benefits!

  • 8/6/2019 APS Overview v8.1

    7/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Long planning cycles

    Supply PlanningDemand Planning

    Distributionplans

    Sales

    Marketing

    Mfg.

    Response 1:

    Maintain excess inventory

    Response 2:Reserve production capacity

    Response 3:

    Expedite everything!

    Fax

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

    Supply Chains built onINVENTORY

    Productionplans

    Manufacturingplans

    Paper Paper

    ?

    ManualReconciliationDifferent one

    number

    Cannot Enable with Disconnected Systems

  • 8/6/2019 APS Overview v8.1

    8/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Better ApproachDemand driven adaptive planning process platform

    Real-time end demand visibility Quickly sense and respondto demand changes

    Shape demand and alignbusiness plans quickly

    Manage your business withreal-time sales and operationsplanning

    Monitor performance to drivecontinuous improvement

    Supply Chains built onINFORMATION instead of

    Inventory

    Consensus demand andproduction plan

    Holistic Supply Planning

    Demand Hub & Multi-dimensional analysis

    Automated Exceptions

    Real-Time S&OP

    Singleholistic plan

    Embedded Analytics

    Sales

    Marketing

    Mfg.

    Manufacturing

    PortalPortal

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

  • 8/6/2019 APS Overview v8.1

    9/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Intersil reduced inventory by 50%, reduced response time for criticalproducts from 336 to 24 hours, 246% ROI

    Xilinx achieved a 98% delivery performance to promise date

    Alcatel eND moved to virtual supply chain model and reduced inventory bymore than 65%

    Anugrah Argon Medica improved on-time delivery to 98%

    TEC Electronics improved inventory turns by 37%

    VTech reduced order fill rate from 55% to 95%, increase inventory turns by100%, reduced price protection claims by 40%

    Dow Chemical reduced inventories by $350M, rationalized carriers from200 to 12

    GrafTech reduced inventories by 40% and lead times by 20%

    Customers Achieving Significant Benefits

  • 8/6/2019 APS Overview v8.1

    10/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    How

    Delivers

  • 8/6/2019 APS Overview v8.1

    11/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Oracle Advanced Planning Solution

    Future *

    IntegratedPlanningFunctions

    Products

    Platform

    E1 EBS Legacy

    ERP* *

    Real-TimeSales and

    OperationsPlanning

    DemandManagement

    and AdvancedForecasting

    PredictiveTrade

    Planning andOptimization

    InventoryOptimization

    AdvancedSupplyChain

    Planning

    ProductionScheduling

    GlobalOrder

    Promising

    CollaborativePlanning

    WFLCommon planning

    data model

    Connectors

    NetworkDesign Demand Sensing

    And Shaping PostponementOptimization Holistic

    SupplyPlanning

    Promise,Distribute, and

    ReplenishExecute to plan

    EmbeddedAnalytics

    Role-based Portals

    PreconfiguredWorksheets andWorkbenches

    OperationalExcellence

    Real-TimeS&OP

    Demand drivenadaptive planning

    Multi-EnterpriseCollaboration

    Trading Partners

    Best in classBusinessProcesses

    StrategicNetwork

    Optimization

    Supply ChainRisk Management

    Complete, best-in-class e-business planning process platform

  • 8/6/2019 APS Overview v8.1

    12/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Demand driven adaptive planning Sense demand better through advanced analytics, improved consensus forecasting,

    and real-time visibility to demand events

    Shape demand by enabling real-time sales and operations planning, and promotionsplanning and optimization

    Respond faster to demand through holistic supply planning, cross-enterprise

    collaboration, and demand-driven VMI

    Global supply chain design and risk management Design your network holistically

    Account for variability in your hedging strategy

    Incorporate flexibility to enable fault tolerant supply networks

    Drive operational excellence Improve demand fulfillment through real-time distributed global order promising

    Improve shop floor efficiency with real-time production scheduling

    Drive continuous improvement with embedded analytics

    Enables leading edge and transformational business processesOracle Advanced Planning

  • 8/6/2019 APS Overview v8.1

    13/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Oracle Advanced Planning

    Enables leading edge and transformational business processes

    Demand driven adaptive planning

    Global supply network design and risk management

    Drive operational excellence

  • 8/6/2019 APS Overview v8.1

    14/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Get real-time visibility to all demand signals Sales, marketing, manufacturing, customers, suppliers multiple

    units of measure and currencies

    Include point of sale information in real time

    Move from a regimented periodic to a continuous demandplanning process

    Leverage advanced analytics to accurately

    predict demand Use any combination of quantitative or qualitative data to establish

    your base line forecast

    High precision statistical forecasting, no statistical backgroundrequired Superior Bayesian-Markov forecast analytics

    Forecast based on attributes and characteristics

    Get quickly to an improved consensus

    number Use multi-dimensional analysis to adjust, allocate, and rollup Collaborate with internal and external constituents

    Workflow driven forecasting exceptions ensures responsiveness

    Support for flexible formulaic expressions

    Supports assumption based forecasting

    Automatically sync when working in offline mode

    Improved demand management The first step to demand drivenSense Demand Accurately Predict Demand

  • 8/6/2019 APS Overview v8.1

    15/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Easily navigate

    through userdefined hierarchies

    Configurable worksheets

    display the data eachuser needs to his job

    Configurable reports,charts and graphs canbe displayed anywhere

    Color coding providesvisibility to exceptions andareas of interest

    Productivity enhancing UISense Demand Accurately Predict Demand

  • 8/6/2019 APS Overview v8.1

    16/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Live on Demantra Demand Management

    DeRoyal Industries

    Company Leading manufacturer of medical devices

    Manufactures more than 25,000 SKUs and operating from 25 plants and office aroundthe world

    Planning problem solved Aligned customer demand with supply chain planning

    Unique aspects of implementation Integrated with JD Edwards ERP

    Supports the companies many new product introductions with improved forecastaccuracy

    Increased forecast accuracy by 5-10%

    Increased customer service levels

    Reduced inventory by 8%

    Enabled a comprehensive S&OP process

  • 8/6/2019 APS Overview v8.1

    17/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    What is my most profitable product mix?

    What incremental volume will result from amarketing program?

    How will it impact the sales of other products?

    What were the indirect effects such ascannibalization and consumer stockpiling?

    Do I have enough material and capacity to satisfythe promotion demand?

    Where do I have excess capacity and how can Iinfluence demand to consume that excess?

    How does a marketing program at a brand orproduct family level impact a specific SKU?

    d eriod

    Cannibal i at ion

    re and post e ffects

    Co mpe titi e s itc ingCa te go ry gr o t

    aseline

    Actual

    eriod eriod

    eriod

    ases

    Cannibali

    ation

    re and post effects

    Competit i

    e s

    itc

    ing

    Category gro

    t

    aseline

    Actual

    Past Future

    Shape DemandUnderstand the financial and operational impacts of promotions and salesincentives

  • 8/6/2019 APS Overview v8.1

    18/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Establish promotionobjectives (incl. ROI)

    Createoffer

    Extendoffer toPartner

    Conduct activities

    Review /accept offer

    - Manage displays- Advertise- Sell product

    Create &approve

    budget

    Allocatebudget

    Accrue asliabilities

    Coordinate trade promotions withconsumer marketing programs

    Simulate scenarios to determineachievable sales and ROI goals

    Create reconciled plans at

    corporate, account, category, andproduct levels

    Allocate trade funds and otherresources

    Calculate anticipated sales liftfor including in sales forecasts

    Enable field sales to adjustprojected account-level salesforecasts

    Retailer /Channel PartnersManufacturer

    Shape Demand Predictive Trade Planning

  • 8/6/2019 APS Overview v8.1

    19/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Shape Demand Promotions Optimization

    Accurately estimate base volume andcomponents of promotional lift Provides decomposition of incremental volume from advertising,

    promotions, or sales incentives

    Granular lift analytics

    Incremental volume lift coefficients maintained at lowest level

    Promotion optimization Simulate volume and profitability of future promotions

    Perform what-if analysis to understand the impact of varyingpromotional tactics and price points

    Optimize promotional events based on goals and constraints -profit, revenue, units and constraints - budget, timing, margin

    Decompose lift to understand cannibalization, pantry loading, andhalo effect

    Baseline

    Incremental Long-TermGrowth

    Pre and PostPromotion

    Effect

    Cross productCannibalization

    Typical Demantra

    Baseline

    CompetitiveSwitching

    Select the most profitable promotion

  • 8/6/2019 APS Overview v8.1

    20/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Calculate promotion spend,profitability, and ROI

    Attribute incremental salesto individual promotions

    Use metrics to determinecause of deductions

    Review completed promotionsto identify success factors

    !

    Shape Demand Promotions OptimizationDrive future improvements based on past promotions performance

  • 8/6/2019 APS Overview v8.1

    21/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Shape Demand New Product Introduction

    Chain and view demand of comparable products

    Automatically identify comparable products based on characteristics

    Automatically detect outliers

    Align forecast based on actual demand

    Accurately forecast demand for new products based on existing data

  • 8/6/2019 APS Overview v8.1

    22/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    View promotion detailsand lift decompositionin a single screen

    View base, incremental volume,history, projected, and promotionGantt in a single screen

    Shape Demand Promotions Optimization

  • 8/6/2019 APS Overview v8.1

    23/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Company Leading producer of juices and jams

    Planning problem solved

    Promotion planning synchronized with demand planning

    Unique aspects of implementation Sales reps drive forecasting process from trade promotion planning process

    What-if scenario planning enables sales reps to test promotion before selecting it

    Increased forecast accuracy at SKU level

    Enables trade promotion planning to be integrated with RT S&OP

    Reduced supply chain costs

    Improved HQ and sales planning productivity

    Live on Demantra Promotion Planning

    Welchs

  • 8/6/2019 APS Overview v8.1

    24/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Shape Demand Real-Time S&OP

    Identify financial and revenue goals

    Analyze demand and develop sales

    forecast

    Synchronize plan across Finance,Sales, Marketing, and Supply Chain

    Determine potential market variables

    Review supply and demand plans

    Develop constrained plan

    Monitor results and respond todeviations

    Create promotions and incentivesto shape demand and close gaps

    Marketing

    Manufacturing

    Finance

    Executives

    ProductDevelopment

    Strategic plans Profitability

    Promotional andvolume plans

    Service levels

    Demand plans Inventory levels

    Capacity plans Promotioneffectiveness

    Phase in and phaseout products

    Plan accuracy

    Strategic

    TacticalDecisions

    Sales

    Make demand and supply decisions simultaneously

  • 8/6/2019 APS Overview v8.1

    25/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Multiple, low accuracy forecasts anddepartmental plans

    Execution to multiple plans withconflicting goals

    Critical planning done from isolatedspreadsheets

    Many faces to the customer

    Stale reports used to monitorKPIs

    Missed service and revenue targets

    Demand decisions made before supplyimpacts are evaluated

    Profitability implications are notconsidered

    A single, high precision forecast generatedfrom very granular data more frequently

    Consider all your production and logisticsconstraints when determining your supply plan

    Determine the most profitable use of yourbottleneck resources

    One-number plan monitored and maintainedcollaboratively

    All planning done from one source of truth

    All customer facing programs (VMI, CPFR,allocations) managed in the S&OP process

    Alerts generated from predictive monitoring

    Respond quickly to prevent missed goals

    Shape Demand Real-Time S&OPLeverage best-in-class Sales and Operations Planning from Demantra

    Typical With Oracle Demantra Real-Time S&OP

  • 8/6/2019 APS Overview v8.1

    26/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Shape Demand Real-Time S&OP

    Analytics-based demand management Capture all demand data in a central place

    Use analytics and intelligence to develop a bottom-up forecast

    Move to weekly forecasting

    Workflow-driven collaborative planning Enable a workflow driven multi-disciplinary collaborative process that

    includes Manufacturing, Finance, Sales, Marketing, and externalstakeholders

    Configurable planning platform adapts to business process

    Web-based portal support internal and external collaboration

    Profitably balance supply, demand, and budgets Make allocation decisions while trading off service levels and cost

    Balance needs of many customers in different channels

    Examine throughput on the most critically constrained resources andprofitability by product family

    Exception-based performance monitoring Adjust demand or supply plan as conditions change

    Drive continuous improvement

    Create incentives and promotions to close gaps

    Decisions drive ERP and supply chain execution Integrate with EBS, E1, third party ERP

    Leverage best-in-class Sales and Operations Planning from Demantra

  • 8/6/2019 APS Overview v8.1

    27/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Shape Demand Real-Time S&OP

    Measure internal inputs

    andprovide incentives togenerate better inputs

    Improve demand visibilitywith customercollaboration

    All the detailedinformation you need

    to make theRIGHT decisions

    Automatically detectoutliers while

    forecasting for newproduct introductions

    Leverage best-in-class Sales and Operations Planning from Demantra

  • 8/6/2019 APS Overview v8.1

    28/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Company $1 billion in revenues, operating worldwide

    Manufacturing plants in China

    Leading provider of cordless phones and electronic childrens toys

    Planning problem solved Real-time S&OP process driven by one demand number

    Unique aspects of implementation Generates forecasts from customer POS data

    Compares customer and generated forecasts and routes exceptions to planner,sales representative, or customer

    Increased order fill rate from 55% to 95%

    Increased inventory turns by 100%

    Reduced price protection claims by 40%

    Reduced logistics costs by 65%

    Live on Demantra Real-Time S&OP

    VTech

  • 8/6/2019 APS Overview v8.1

    29/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Supply Chain and Distribution Planning Product family and item level planning

    Alternate components, resources, processes, suppliers,

    facilities, and ship methods End-item substitution

    Critical items and resources; aggregate resources

    Bills of distribution and transfer rules

    Circular sourcing, load consolidation, allocation rules

    Include customer and supplier facilities

    Manufacturing Planning Sequence dependent setups/changeovers

    Simultaneous resources

    Batch resources

    Alternate resources

    Minimum transfer quantities

    Complex, network routings

    By-products and co-products

    Line rates and takt times

    Suppliers Transportation Manufacturing Transportation Transportation CustomersDistributors

    Respond Holistic Supply PlanningOne solution for supply chain, distribution, and manufacturing planning

  • 8/6/2019 APS Overview v8.1

    30/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Respond Holistic Supply Planning

    Make better decisions faster Level load

    Choose alternatives

    Make/buy decisions

    Late demand diagnosis

    Out-of-the-box optimization

    Use costs or decision rules Enforce due dates or capacity

    Start quickly Planners define the problem to solve

    Flexible defaulting

    Reduce planner workload Personal queries Automated exception management

    Complete, best-in-class e-business planning process platform

  • 8/6/2019 APS Overview v8.1

    31/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Adaptable Segment the Problem As Needed

    Adapts to your currentbusiness model Single plan or multiple plans

    Evolve planning model at your

    own pace Re-configure easily by modifying

    plan options instead of re-implementing or re-modeling

    Multiple models can co-exist

    One holistic plan for distributors

    One DPP, multiple MRP

    DPP for all Distribution Centers

    MRP Org 1 MRP Org 2 MRP Org 3

    Supply chain planningfor all Organizations

    Multiple Distribution Plans

    MPS forBU 1

    MRPOrg 1

    MRPOrg 2

    MRPOrg 3

    MPS forBU 2

    MRPOrg 4

    MRPOrg 5

    MRPOrg 6

  • 8/6/2019 APS Overview v8.1

    32/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Interceramic 91 Distribution centers, stores, and franchises

    4 Plant warehouses

    7 Manufacturing plants

    3000 BOMs, 100,000 SKUs

    Run DRP, constrained MPS, and rawmaterial MRP

    Knowles Electronics Global planning instance

    2 Locations in the US

    1 Location in Europe

    5 Locations in Asia

    Mixed mode manufacturing Make to stock

    Make to order

    Configure to order

    Global order promising against 1 central plan

    Knowles Electronics hasreduced inventory by $1M permonth after implementingAdvanced Planning

    SuppliersManufacturing

    plantsDistribution

    chain Customers

    ConstrainedSC plan

    DRP plan

    ConstrainedMPS plan for

    all facilities

    Collaborativedemand

    plan

    Inventorypostponement

    plan

    Live on Advanced Supply Chain Planning

    CustomerExamples

  • 8/6/2019 APS Overview v8.1

    33/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Plan your extended supply chain Share forecasts and supply commits with customers

    and suppliers

    Get visibility to supplier capacity

    Reallocate key components

    Make alternate sourcing decisions

    Reduce inventory cost and improvefulfillment Suppliers manage your inventory

    Manage your customers inventory

    React quickly to supply chain

    exceptions Waterfall analysis

    User-configurable exceptions

    Automated exception handling via workflow

    Run plan

    Optional

    Forecast memory

    Supply commit

    boards

    Supply commit memory

    Demand boards

    Run plan

    Demandsystems

    Supplyforecast

    Consensusforecast

    SUPPLIERCUSTOMER YOUCONTRACT

    MANUFACTURER

    Cross-enterprise synchronized view of supply and demandRespond Multi-Enterprise Collaborative Planning

  • 8/6/2019 APS Overview v8.1

    34/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Receive items

    Pay on receipt/use

    Check

    inventorystatus

    Ship items

    VMI Agreement(with supplier)

    VMI AgreementVMI Agreement

    Receive items

    Pay on receipt/useShip items

    VMI Agreement(with customer)

    Send consumptionadvice

    CUSTOMER YOU SUPPLIER

    Generate ship-tolevel forecast and

    replenishment plan

    Real-time POS driving adaptive forecasting and replenishmentRespond Demand Driven VMI

  • 8/6/2019 APS Overview v8.1

    35/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Company Global leader in telecommunications and Internet technology; Alcatel is a global 500

    company that operates in 130 countries

    Designs and builds IP Communications products and solutions that supports theborderless enterprise

    Planning problem solved Enabled 100% virtual enterprise and implemented direct order fulfillment mode

    Unique aspects of implementation Implemented in less than 1 year while taking company 100% virtual

    Maintains >60 DOS supply chain visibility on Oracle

    Reduced inventory by more than 65%

    Reduced material liability by 80%

    Reduced planning cycle time by 75%

    Projected annual savings of $15M

    Live on ASCP, DP, and CP since 2002

    Alcatel eND

  • 8/6/2019 APS Overview v8.1

    36/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Oracle Advanced Planning

    Enables leading edge and transformational business processes

    Demand driven adaptive planning

    Global supply network design and risk management

    Drive operational excellence

  • 8/6/2019 APS Overview v8.1

    37/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Answer the tough questions: What impact do changing costs have on my sourcing

    strategy?

    What is the real total cost of outsourcing including theimpact on working capital and cash flow?

    Where should my point of postponement be?

    Where should I hold how much inventory, when?

    How could I react to a disruption in supply due tounforeseen events? Should I multi-source?

    What are my most profitable channels or products toinvest in?

    What is the impact of mergers and acquisitions on my

    supply network and capital asset budget?

    Design Resilient Supply NetworksEnable agile supply networks, aligned with your postponement strategy

  • 8/6/2019 APS Overview v8.1

    38/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Leverage resiliency in your supply chain for tactical responses

    Design Resilient Supply Networks

    Network modeling and alternates

    Sourcing strategy

    Cost modeling

    Asset rationalization

    Safety stock strategy

    What-if simulations

    Risk related to unplanned events

    Design supply chains that are resilient

    Strategic Network Optimization (SNO)

    Network modeling and alternates

    What-if simulations

    Cost modeling Asset rationalization

    Risk related to

    unplanned events

    Inventory Optimization (IO)

    Model distribution of variability(demand, supply, lead time)

    Budget and capacity constraints

    Time-phased min,

    max, and target

    service levelsInventory policies

    Target inventory levels

    Identification of point of postponement

    Network structure

    Sourcing rules

    Suppliers and CMs

    Mfg and Dis facilities

    Shipment methods

    Manage supply chain risk with profitability and postponement in mind

  • 8/6/2019 APS Overview v8.1

    39/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Key to perform more frequently Merger and acquisitions are more common

    Rapidly changing fuel costs

    Outsourcing strategies more prevalent

    Need to consider competitor strategies when introducing new products

    Consider the entire global virtual network All manufacturing and distribution facilities including outsourced operations

    All geographies and markets All sources and modes of transport

    Evaluate sourcing strategies in the context of netdelivered cost Analyze the effect on working capital and cash flow of increased lead times

    due to outsourcing and off-shoring

    Determine single versus multi-sourcing strategy

    Consider the increased buffer stock needed to hedge against increasedvariability

    Rationalize your asset strategy for profitability Determine right number of assets in supply chain and best locations

    Consider all costs: opening and closing costs, inflows from salvage, fixedand variable costs

    Design Your Network HolisticallyIts important to do this more frequently

  • 8/6/2019 APS Overview v8.1

    40/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Capacity Constraints (Hard and Soft)

    Supply constraints

    Manufacturing constraints Transportation constraints Storage and inventory constraints Target service levels Dynamic safety stock

    Costs ($): Real and Penalty , Variable and Fixed

    Transportation (inbound, outbound)

    Storage and inventory carrying costs Fixed costs (startup, shutdown, operating costs) Material supply Manufacturing and labor Price (for profit optimization)

    Suppliers Transportation Manufacturing Transportation Transportation CustomersDistributors

    Consider All Costs That Impact The Decisions

  • 8/6/2019 APS Overview v8.1

    41/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Account For All Variability

    Make better inventoryinvestment decisions byincluding variability Demand variability

    Supply variability

    Lead time variability

    Supplier lead time variability

    Manufacturing lead time variability

    In-transit lead time variability

    Account for the realities of yoursupply chain Capacity and lead time constraints

    Alternate sources Inventory budget constraints

    Fulfillment lead times

    Varying service levels per product, customer,geography

    Least RiskInventory

    InvestmentStrategy

    Demand Variability

    Supply Variability

    Lead TimeVariability

    ServiceLevels andBudgets

    Take all variability and realities of your supply chain into consideration

  • 8/6/2019 APS Overview v8.1

    42/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Account ForVariability

    Local supplier: more dependable, shorter lead time Less hedge inventory

    Offshore supplier: increased lead time and variability More hedge inventory

    Increased inventory carrying cost may offset savings in total landed cost

    Regional DC Customers

    Transfer LT = 3 d + 1 d

    Processing LT = 4 d

    Mexico Plant US DC

    Transfer LT = 4d

    US Regional DC Customers

    Regional DC Customers

    Processing LT = 4 d

    China Plant US DC

    Transfer LT = 4d

    US Regional DC Customers

    Transfer LT = 30 d + 6 d

    Make profitability decisions based on total net delivered cost

  • 8/6/2019 APS Overview v8.1

    43/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Determine risk mitigation strategies

    Easily specify potential unplanned events andevaluate their impact on their supply chain

    Understand the cost and disruption caused bythese events

    Determine the best way to mitigate the impact atlowest cost

    Incorporate contingency plans into the standardplanning process to ensure quick response

    Simulate unplanned events

    Failures: suppliers, plants, warehouses, lines,transport

    Costs: increases and decreases in costs of labor orresources

    Prices: increases and decreases in price due tocompetitive activity, market conditions, or currencyfluctuations

    Natural disasters: Hurricanes, port closures,earthquakes

    Suppliers Transportation Manufacturing Transportation Transportation CustomersDistributors

    Enable Fault Tolerant Supply NetworksSimulate planned and unplanned events

  • 8/6/2019 APS Overview v8.1

    44/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Pillsbury Foods Project to rationalize distribution centers during

    merger of Pet Foods and Pillsbury Foods

    Reduced warehouses from 23 to 9

    Held service levels constant despite reduction infacilities

    Significantly reduced transportation costs

    Alcoa Primary Metals Profit optimized mix of products to produce on

    bottleneck equipment

    Significant reductions in transportation costs

    Improved management of risks due tocommodity market price fluctuations

    Increased profitability of products produced insmelters

    Agilent Technologies Deployed for one product family (700 products, 5000 items)

    since May 2006

    Multi-echelon supply chain network (14 levels deep)

    Improved forward visibility and understanding of impact ofinventory on service level

    Part of S&OP process: quantitative understanding ofinventory investment to achieve sales upside

    20-30% improvement in service level for the same inventoryinvestment

    Panduit Plans inventory at warehouses to meet service level

    commitments to customers (48 hour fulfillment lead time)

    Multi-echelon inventory planning reduces overall inventoryinvestment, improved visibility of buffer inventory in thesupply chain

    Anticipates further reduction in inventory when includingmanufacturing facilities to leverage opportunities topostpone inventory holding to shared raw materials andsub-assemblies

    Live on Strategic Network Optimization, Inventory Opt.

    CustomerExamples

  • 8/6/2019 APS Overview v8.1

    45/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Oracle Advanced Planning

    Enables leading edge and transformational business processes

    Demand driven adaptive planning

    Global supply network design and risk management

    Drive operational excellence

  • 8/6/2019 APS Overview v8.1

    46/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Drive Operational Excellence

    Improve demand fulfillment through real-time distributed global order promising

    Improve shop floor efficiency with real-time production scheduling

    Drive continuous improvement with embedded analytics

    Sense and Shape Demand

    Network Design and Risk Management Operational ExcellenceNetwork, inventory policiesDemand Production plan, actual ordersDemand

    Targetservicelevels

    Builtcapacity

    Better execute to demand signals and measure improvements

  • 8/6/2019 APS Overview v8.1

    47/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Promise orders based on: Material availability

    Manufacturing capacity

    Transportation capacity

    Supplier capacity

    Global statement of availability All facilities, material, resources, and suppliers

    Drive fulfillment decisions based ondemand and supply plans Promise based on optimal supply decisions

    Allocate available supply and capacity By channel, customer, or product

    Priority and stealing rules

    Manage commitments to key customers Re-schedule and re-sequence your backlog

    Improve demand fulfillment through 24x7 constraint based order promisingReal-Time Distributed Order Promising

  • 8/6/2019 APS Overview v8.1

    48/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Agilent Technologies Performing multi-level capable-to-promise

    Greatly reduced expedite orders with accurateorder promising dates

    Moved from batch to online order promising

    Increased customer satisfaction of key strategiccustomers by using allocated ATP

    24x7 worldwide order operation with zerodowntimeCTP

    Meet customer requirement by utilizingsubstitute components

    Cisco Every order for every router sold worldwide goes

    through GOP

    Complex order promising problem Product and channel allocation rules

    Extensive use of ship sets in an assembly to order

    environment High volumes

    Intersil Using material and resource constraints (CTP)

    across virtual supply chain

    Sales people promise orders online in seconds

    Live on Global Order Promising

    CustomerExamples

  • 8/6/2019 APS Overview v8.1

    49/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Maximize production throughput Optimize your shop floor; detect floating bottlenecks

    Reduce WIP inventory by rapidly synchronizing multi-stageproduction schedules

    Account for complex setup and change-over scenarios,machine breakdown, supply and resource shortages, co- andby-products, alternate resources, routings, and operations

    Model all elements of your shop floor Work centers, resources and resource groups, shift capacity,

    operating costs

    Lead times: setup, change-over, and run

    Sequence dependent setups, contiguous operations, productioncampaigns, batching

    Implement most optimal schedule seamless integration with Oracle EBS Output best schedule for process (OPM), discrete MFG), and

    semi-conductor (OSFM) manufacturing

    Improve shop floor efficiencyReal-Time, Interactive Production Scheduling

  • 8/6/2019 APS Overview v8.1

    50/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    GEEnergy Improved schedule accuracy and confidence by

    reflecting real time shop floor constraints

    Finite machine, crew and tool resourceconstraints

    Floating resource bottlenecks due to demand

    mix variability Operation sequence dependent setup times

    Operation buffering to avoid intermittent glue gunusage

    Alternate resources with preferences

    Simulations of hot order impact on existingschedule

    Complex demand priorities

    Toyota Racing Division (TRD) Reduced schedule creation from 3 weeks to < 2 hours

    Support re-planning based on constant design changesduring production

    Respect for crew specialization

    Optimized use of un-manned operations during

    downtime

    Nampak Reduction in time lost due to sequence dependent

    press setups for container styles and sizes

    Live on Production Scheduling

    CustomerExamples

  • 8/6/2019 APS Overview v8.1

    51/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Drive continuous improvement Enable plan-execute-measure-improve process

    Proactive intelligence when youneed it Role-based task-oriented dashboards

    Out-of-the-box key performance indicators andreports

    Summary to detailed transaction drilldown built in

    Drive off a single source of truth Global visibility to all performance metrics and

    enterprise targets

    Analysis and comparison of performance trends

    Embedded Supply Chain AnalyticsDrive continuous improvement - Closed-loop performance management

  • 8/6/2019 APS Overview v8.1

    52/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Momentum

  • 8/6/2019 APS Overview v8.1

    53/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    1500+ Advanced Planning customers

    Both new installs and upgrades, several legacy system deployments

    50% same instance, 50% distributed architecture

    Broad use of modules

    Worldwide deployments US, Brazil, Mexico, UK, France, Italy, Spain, Switzerland, Belgium, Turkey,

    Israel, South Africa, Singapore, Japan, India, Taiwan, Indonesia, Australia,New Zealand, Korea, China, Malaysia, Netherlands, Denmark,

    Large-scale, complex deployments across all industries

    Ongoing Momentum, Large Install Base

  • 8/6/2019 APS Overview v8.1

    54/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Intersil ASCP, DP, GOP

    Fuji Xerox Asia Pacific ASCP, DP Agere Systems ASCP, DP, CP, GOP

    NCR ASCP, DP

    Namitech ASCP, GOP

    Emerson ASCP, DP

    VTechDemantra RT S&OP

    BMW SNO

    Xilinx ASCP

    Sony SNC ASCP, DP, GOP

    Agilent ASCP, GOP, DP, IO

    Panduit IO

    Dover El. - Knowles Electronics ASCP, GOP

    Matsushita Panasonic ASCP

    Honeywell S&C ASCP, DP

    Embraer CP, DP

    Tube Investments ASCP

    Toyota Racing Division PS

    Eaton Trucks ASCP

    Kyocera ASCP

    Nampac PS, SNO

    Pillsbury Foods SNO

    DeRoyal Industries Demantra DM

    Applica Demantra DM, ASCP Welchs Demantra PTP, TPO

    Alcoa ASCP, DP, GOP, SNO

    Acuity Lighting Demantra DM, ASCP

    Johnson & Johnson SNO

    Canon Virginia ASCP, CP

    GE Energy / Power Systems ASCP, GOP, PS

    GE Transportation Avionics ASCP

    Motorola BCS ASCP, DP, GOP

    Avago ASCP, DP, GOP

    Qualcomm ASCP, DP, CP

    McGraw-Hill ASCP, DP

    Alcatel eND ASCP, DP, CP

    Intersil ASCP, DP, GOP

    Cervecera Quilmes SNO

    GrafTech International SNO

    Boeing ASCP

    Anugra Argon Medica ASCP, DP

    Cochlear ASCP, DP

    Inventec ASCP, GOP, CP

    Dow Chemical SNO, PS

    A Few Live Customers

  • 8/6/2019 APS Overview v8.1

    55/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Summary

  • 8/6/2019 APS Overview v8.1

    56/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Oracle Advanced Planning Solution

    Future *

    Integrated

    PlanningFunctions

    Products

    Platform

    E1 EBS Legacy

    ERP* *

    Real-TimeSales and

    OperationsPlanning

    DemandManagement

    and AdvancedForecasting

    PredictiveTrade

    Planning andOptimization

    InventoryOptimization

    AdvancedSupplyChain

    Planning

    ProductionScheduling

    GlobalOrder

    Promising

    CollaborativePlanning

    WFLCommon planning

    data model

    Connectors

    NetworkDesign Demand Sensing

    And ShapingPostponement

    Optimization HolisticSupply

    PlanningPromise,

    Distribute, andReplenish

    Execute to plan

    EmbeddedAnalytics

    Role-based Portals

    PreconfiguredWorksheets andWorkbenches

    OperationalExcellence

    Real-TimeS&OP

    Demand drivenadaptive planning

    Multi-EnterpriseCollaboration

    Trading Partners

    Best in classBusinessProcesses

    StrategicNetwork

    Optimization

    Supply ChainRisk Management

    Complete, best-in-class e-business planning process platform

  • 8/6/2019 APS Overview v8.1

    57/59

    Oracle Advanced Planning

    Demand driven adaptive planning

    Global supply network design and risk management

    Drive operational excellence

    Enables leading edge and transformational business processes

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

  • 8/6/2019 APS Overview v8.1

    58/59

    CONFIDENTIAL: All capabilities and dates are for planning purposes only and may not be used in any contract

    Proven, best in class planning solution Many live customers on multiple products, across a wide variety of industries

    Large-scale, complex, worldwide deployments

    For Planners, Not Programmers - Out-of-the-box optimization and predictive analytics

    Superior architecture - scalable, database-driven demand and supply planning; common data modelacross all engines, shared with execution

    Provides significant value Enables real-time demand driven dynamic supply planning

    Enables customers to implement best practices such as RT S&OP, VMI, CPFR, Supply Chain RiskManagement, Inventory Postponement

    Proven reductions of inventory and increases in forecast accuracy, customer service levels

    Progress at your own pace, transition gradually Quickly start with the most important problem

    Integrated platform enables crawl-walk-run approach

    Leverage out-of-the-box integration to rapidly extend planning footprint

    Low risk, high value transition to a best-in-class planning solutionKey Takeaways

  • 8/6/2019 APS Overview v8.1

    59/59

    CO