16
Application References Lifts and Escalators Site Lifts Material Hoists Lifts Escalators

Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

  • Upload
    others

  • View
    22

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

Application References Lifts and Escalators

Site LiftsMaterial HoistsLifts Escalators

Page 2: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

ref.:rev. no.:date:page:

product information

information produit

FMC715

TIRAK/TIRFOR référencesreferences TIRAK/TIRFORelevators, ascenseurs,escalators escaliers roulants

Austria / Autriche:Freissler-Otis, WienKone Elevators, AustriaKone Sowitch, WienThyssen, Graz

Belgium / Belgique:Ascenseurs Electro-Mécaniques, JambesAsmolift, BruxellesCoopman, KuurneDumon, BruggeGenorif, EeklooKone Belgium S.A., AwansKone, BruxellesKone RCS, LiègeLiften Daelemans, AntwerpOtis, BruxellesSchindler, BruxellesThiery Liften, AntwerpThyssen, AntwerpThyssen, Bruxelles

Brazil / Brésil:Kone, Rio de JaneiroSchindler, Rio de JaneiroVillares, Rio de Janeiro

Canada:Ascenseurs Labadie, MontrealMontgomery-Cone, Toronto

Denmark / Danemark:Kone, Copenhague

Dubai:Otis, DubaiMitsubishi-Dubai, Dubai

France:Camus, PoitiersKone, ParisOtis, ParisSacamas, ParisSchindler-RCS, VelizySoretex/Thyssen, ParisSoulier, Paris

Finland / Finlande:Kone Elevators, FinlandKone oy Hissit, Helsinki

Germany / Allemagne:Aufzug- und Fördertechnik, WuppertalBauer Aufzugsfabrik, AugsburgBeneke Aufzugsbau, WeidenElektronic-Lift Thoma, FrankfurtHagman, KölnHaushahn & Co., StuttgartKone Aufzug, BerlinKone Sander Aufzug, BerlinKone Selzer Aufzüge, BerlinKone Aufzug, BremenKone Aufzug, DresdenKone Aufzug, DüsseldorfKone Aufzug, FrankfurtKone Aufzug, Glatzel & Rieser, KoblenzKone Aufzug, Hannover

M-043204/981/2

Kone Aufzug, LeipzigKone Aufzug, MagdeburgKone Aufzug, MünchenKone Aufzug, StuttgartKone Aufzug, VelimarKone Aufzug, WalterslebenLippert, GelsenkirchenOtis GmbH, Bad ReichenhallOtis GmbH, Berlin M-242Otis GmbH, BremenOtis GmbH, DresdenOtis GmbH, LeipzigOtis GmbH, StadthagenPGH-Aufzugdienst, ReichenbachSchindler, BerlinSchindler, Frankfurt M-108Schindler, Hamburg M-074Thyssen, HamburgThyssen, HolzwickedeThyssen, MannheimThyssen, Stuttgart-Neuhausen M-073/M-565Usto Aufzuge, Enningerloh

Hong-Kong:Kone, Marryat & Scott, Hong-KongKone Elevator, Thai Lift Building, BangkokOtis, Hong-Kong

Italy / Italie:Kone Ascensori, PeroStigler-Otis, MilanoSchindler, Milano

Lebanon / Liban:Otis, Beiruth

Luxembourg:General Technic, Luxembourg M-074

Malaysia / Malaisie:Hitachi, Kuala Lumpur

Poland / PologneKone Elevators, Poland

Singapour:Hitachi, SingapourOtis, SingapourSchindler, Singapour

Spain / Espagne:Eguren Kone, BilbaoKone Elevadores, AlicanteKone Elevadores, AndoraKone Elevadores, BarcelonaKone Elevadores, CorvadoKone Elevadores, MadridKone Elevadores, Rigonza S.A., MallorcaKone Elevadores, SabadellKone Elevadores, TenerifeKone Elevadores, ValenciaMacosa Elevacion, BarcelonaOrenstein & Koppel, MadridOrona, San SebastianSchindler, ZaragozaThyssen Boetticher, MadridZardoya Otis, Madrid

Page 3: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

ref.:rev. no.:date:page:

product information

information produit

FMC715

TIRAK/TIRFOR référencesreferences TIRAK/TIRFORelevators, ascenseurs,escalators escaliers roulants

M-043204/982/2

Sweden / SuèdeKone Hissar AB, KistaKone Hissar AB, Frölunda

The Netherlands / Pays-Bas:Kone Starlift B.V.Otis Liften Nederland, AmsterdamSchindler Nederland, Den HaagV. Swaay & Scheeres, Den HaagThyssen Nederland, AlkmaarThyssen Nederland, Amsterdam

Turkey / TurquieKone Asansör, Istanbul

U.K. / Grande Bretagne:Express Lifts, NorthamptonKone, HounslowKone, Lifts Ltd., MiddlesexOtis, LondonSchindler Lifts, Cheltenham

USA / Etats Unis:Armour Elevators, LouisvilleOtis, ChicagoOtis, New York

Page 4: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

Application: Installation of lifts.Site: EUROCENTER, Neuss/Germany.Contractors:

Bast Bauunternehmen, D-ErkrathThyssen Aufzüge, D-Stuttgart-Neuhau-

senEquipment:

3 compact frames with TIRAK T-1000and wire rope reelers,3 MINIFOR powered hoists.

The compact frames, mounted at the top ofthe building in the machine rooms, areused for operating the working platformssuspended inside the lift shafts.

The first phase of the construction coversthe installation of 8 lifts in 2 separate buil-dings. Height: 46 m, 11 floors.

productinformation

ref.:rev. no.:date:page:

M-565

08/931/2

MC1258

Equipment supplied by GREIFZUG GmbH,D-Bergisch Gladbach.

RO-114.2

RO-114

installation of lifts

Page 5: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

productinformation

ref.:rev. no.:date:page:

M-565

08/932/2

MC1258

The MINIFOR powered hoists, anchored to the compact frames,are used for lifting and positioning the lift doors.

RO-114.7

RO-114.6

installation of lifts

Page 6: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC690

ref.:rev. no.:date:page:

productinformation

M-073110/941/1

installationof lifts

1 2

4

6

4

7

TIRAK

5

3

1 - Slewing guide sheave 5 - Parachute release wire rope2 - Limit switch 6 - Elevator cabin guide rails3 - Frame with TIRAK hoist 7 - Reversing sheave4 - Release mechanism for parachute with counterweight

Application: Installation of liftsCustomer: Thyssen-Aufzüge,

Stuttgart-Neuhausen/GermanyEquipment: TIRAK T-1000 hoist on frame

Description of application:In order to carry out installation work inside the lift shaft,the working platform, i.e. the lift cabin, is operated bya TIRAK (2) placed at the top of the shaft.

The wire rope is guided by a sheave (1) fixed near theTIRAK with the end anchored at the top.

A counterweight is suspended by means of a sheaveblock (7) to the loopformed.

In this case the use of a BLOCSTOP on an additionalsafety wire rope is not necessary, since there is alreadythe parachute safety device (4) for the elevator.

RO/66

Page 7: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

MC389

ref.:rev. no.:date:page:

productinformation

M-240110/941/1

installationof lifts

Application: Installation of liftsCustomer: Thinet-Dumez, Jeddah/Saudi-ArabiaEquipment: 1 special ALTA platform 2 x 1.70 m, equipped

with TIRAK T-1000 and automatic BLOCSTOPBS 15-301 safety device on a separate safetywire rope.

automaticBLOCSTOP 15.301

TIRAK T-1000

guide roller

safety wire rope

suspensionwire rope

Page 8: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC779

ref.:rev. no.:date:page:

productinformation

M-108110/941/1

installationof lifts

Application: Installation of liftsCustomer: Schindler, Frankfurt/GermanyActivity: Lift manufacturerEquipment: Special stirrup with aluminium

platforms fitted with TIRAK hoist andautomatic BLOCSTOP device.

Description of application:Raising of working platform for installation work inlift shaft.The working platform is made of a special 2-meterhigh stirrup on which are fitted aluminium platformsof 3 different widths (0.8 m, 1.2 m and 1.6 m)depending on the size of the elevator shaft. Theplatform is equipped with 8 telescopic guide rollerassemblies.

automatic BLOCSTOP

TIRAK

PA/93

telescopicguide roller

stirrup

suspension wire rope

safety wire rope

Page 9: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC691

ref.:rev. no.:date:page:

productinformation

M-074110/941/1

installationof lifts

Application: Installation of liftsCustomer: a) Schindler, Hamburg/Germany

b) General Technic, LuxembourgEquipement: TIRAK T-1000 with BLOCSTOP safety device,

mounted on a special stirrup.

Description of application:Raising of a working platform inside an elevator shaft (upto 90 m height) for the installation of slides and landing doors.The platform is equipped with a special stirrup designed formounting the TIRAK on the main wire rope and a BLOCSTOPon the safety wire rope.The TIRAK is reeved to obtain a capacity of 1 ton for manriding.

RO/65

PA/66.2

TIRAK

standardcabine frame

BLOCSTOP

guides

suspensionstirrup

level 1

level 2

suspensionwire rope

safety wire rope

Page 10: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

MC710

ref.:rev. no.:date:page:

productinformation

M-241110/941/1

liftingelevator driving mechanism

Application: Lifting elevator driving mechanismSite: Colonia residential building,

Cologne/GermanyEquipment: 4 hydraulic TIRFOR TU-16H machines,

2 electric-hydraulic power packs

Description of application:

Problem:The Colonia Building in Cologne is a 45 storey high residentialtower. Four elevator drive mechanisms had to be installedon the 45th floor. These mechanisms weighing 4.2 tonseach, were raised by a crane up to the 42nd floor and hadto be brought up, from there, to the top floor.

Solution:The problem was solved by using 4 TIRFOR TU-16H unitsof 1600 kg capacity each, motorised by hydraulic rams.These hydraulic TU-16H machines were operated in pairby means of 2 portable electro-hydraulic power packs. Thespeed of each TU-16H could, at all times, be individuallycontrolled from 0 to 2 meters per minute max. The TIRFORwere fixed to a ceiling beam above the machine shop floor.The wire ropes were dropped down through an aperture, tothe 42nd floor where they were attached by means ofshackles to the 4 corners of the driving mechanisms.The operator then only had to use the control valves toensure a precise and gentle lifting of the load.

TIRFORTU-16H

546

546

electro-hydraulicpower pack

42nd floor

43nd floor

44nd floor

45nd floor

Page 11: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC692

ref.:rev. no.:date:page:

productinformation

M-075110/941/1

site elevators

Application: Personnel hoistCustomer: Focant Marble Yard, Franchimont/BelgiumActivity: QuarrySite: Rochefontaine quarryEquipment: – 1ALTA-Mono platform 2 m long

– 1 TIRAK T-1000 winch– 1 BLOCSTOP BS 20.321– 4 wire ropes 45 m long– 1 DELTA III special suspension jib

Description of application:

The suspended platform serves to lower personnel to awork level (depth: 40 meters). Since it travels along a quarryface slightly inclined to the vertical, it is guided sideways by2 wire ropes.To protect personnel against folling rock, a roof has beenfitted on the platform. It is further equipped with a lockingdevice which allows it to be locked in the high position andaffords the required stability when the personnel leave theplatform.

PA/69

counterweight

suspension and safety wire rope

guide wire rope

stretcher

stretcher

support roller

guide

TOP VIEW

access ladder

counterweight

Special DELTA IIIsuspension

GUIDE WIRE ROPE SUPPORTING BEAM

Page 12: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

MC833

Application: Emergency rescue platform in household wastedisposal plant.

Site: Household waste disposal plant,Kassel/Germany

Customer: Steingass & Sohn, Solingen/GermanyEquipment: 1 ALTA mono suspended platform, fitted with

TIRAK T-500 hoist, BLOCSTOP safety device, 2wire rope reelers and a TIRFOR hand operatedmachine.

Description of application:

As the unloading ramp for the refuse lorries is not protected bya guard rail, it could hapen that a person or even a vehicle couldfall into the dump.

To meet any such eventuality, the management have installedan emergency rescue platform, suspended from an overheadmonorail system and allowing fast access to the bottom of thedump.

A stretcher arrangement is fitted under the floor panel of thecradle to rescue the injured person in case of a seriousaccident.

Even in the event of a power failure, the system can still beoperated, using the hand operated TIRFOR suspended cradleequipment, with which the cradle is also fitted.

Equipment supplied by GRIFZUG GmbH, Bergisch Gladbach.

ref.:rev. no.:date:page:

productinformation

M-313110/941/1

emergencyrescue

PA/240

Page 13: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

MC700

Application: Lift for shaftsSite: LEP worksite (Electron Positron Accelerator)

built by European CERN Organization at theFrench/Swiss border, near Geneva

Customerr: EUROLEP CompanyEquipment: 8 suspension systems each fitted with:

– 1 cradle dim. 2.50 x 1.20 m,capacity 660 kg or 6 people;

– 2 TIRAK T-1000 winches,capacity 800 kg, speed 18 m/min;

– 2 x 2 BLOCSTOP safety devices.

Description of application:

The suspension systems and the cradle are used aselevators for the personnel in the different shafts whichhave a depth of approx. 100 to 150 m.Each suspension system consists of 2 suspension lines,with the TIRAK winches and two overspeed BSO-1000BLOCSTOP, as well as 2 safety lines, with twoelectromagnetic BLOCSTOP. These are controlled bymercury switches placed on the cradles. All wire ropes arewound onto motorised reelers.

ref.:rev. no.:date:page:

productinformation

M-229110/941/1

site elevators

PA177.4

PA177

Page 14: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC/725

ref.:rev. no.:date:page:

productinformation

M-258112/881/1

Application: Materials hoistsSite: Oran University, AlgeriaCustomer: E.R.C.O., Bir El Djir, OranEquipment: – 1 materials hoist TIRALIFT 25 M,

cap. 1400 kg, lifting height 60 m– 10 materials hoist, as above, but with

lifting height 25 m.

Description of application:

Following an international bid, we secured animportant order for the supply of 11 materials hoiststo be erected on the ORAN University Site in Algeria.

They were used over heights of up to 60 meters for thesupply of internal building materials like sanitary,plumbing, electrical and flooring goods.

These machines offer an unusual loading surface (6 m x1.20 m). The platform is lifted by two TIRAK T-1000 Mmachines placed on ground level and guided by twomasts.

The controls use micro-processors and have a digitalfloor-level display.

materials hoist

PA/195.2

PA/195 PA/195.3

Page 15: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

FMC/699

ref.:rev. no.:date:page:

productinformation

M-082112/881/1

Application: Vertical materials hoistCustomer: "Parc de l'Europe",

Dommeldange/LuxembourgSite: Residential building "Parc de l'Europe",

Dommeldange

Equipment: - TIRAK T-820M with wire rope reeler- 1 wire rope 16 m long- 2 control panels, 0 level and -8- 1 vertical tower with platform and guide pulleys.

Description of application:

TIRAK, reeved, used as winch for a materials hoist, capacity500 kg, 8 m height of lift, lifting speed 5 m/min. in a residentialbuilding.TIRAK is placed at top level. The free end of the wire ropeis wound onto a reeler.

materials hoist

RO/53.1

RO/53

RO/53.2

Pit

GROUND FLOOR

TIRAK

2000

3000

800

8000

controlbox

latice-workdoors

Wire ropereeler

800

BASEMENT

Page 16: Application References Lifts and Escalators · 2006-11-15 · Kone Aufzug, Leipzig Kone Aufzug, Magdeburg Kone Aufzug, München Kone Aufzug, Stuttgart Kone Aufzug, Velimar Kone Aufzug,

MC711

Application: Installation of 7 escalators,weight 9 tons,

Site: Department store, Berlin/GermanyCustomer: OTIS GmbH, Berlin

The installation of this elevators offered a splendid opportunityfor demonstrating the versatility and advantages of themotorised TIRFOR TU-16H.The escalators were delivered by special trucks and unloadedby crane. As each escalator was unloaded, guide wheels werefitted to it for ease of manoeuverability. The escalator was thenhung by its motorised end at the top from four pulleys, raisedslightly, and tensioned by means of a reeved manually operatedTIRFOR attached to its lower end to guard against excessloading. In this way the escalator assembly could be gentlymoved, in a horizontal position, into the shaft.Once in the shaft, two motorised TU-16H's were attached to setthe escalator at the right angle and then hoist the wholestructure to a point just higher than its final mountings. It wasthen possible to position the escalators precisely, withoutchanging the rams. This operation was repeated for each ofascending escalators.To install the 3 descending escalators in the same shaft, but ina vertical plane parallel to the first, all that was required was tomove the motorised TU-16H's and snatch blocks to newposition. Once the new anchorage points had been established,this second part of the operation was carried ou as quickly andsimply as the first.The operation as a whole was a difficult one, involving precisetiming and co-ordination between the operators. However, byusing motorised TIRFOR TU-16H machines, the total installa-tion time was cut by half, and only two men were required tooperate the hoists. Furthermore, as there was no undue fatigue,the work schedule was uninterrupted.Large escalator installers throughout the world use motorisedTIRFOR (see reference list M-043).

ref.:rev. no.:date:page:

productinformation

M-242111/941/1

escalators

554

2 TIRFORTU-16H

4th floor

3rd floor

2nd floor

1st floor

ground floor

2 TIRFORTU-16H

manual TIRFOR

2 anchorage points

2 anchorage points

(motor) top endweight: 6 tons

lower endweight: 3 tons