APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE FORM IM & PRE-FEASIBILITY REPORT FOR BUILDING STONE QUARRY OF M/s. BLACK DIAMOND ROCK PRODUCTS LLP (Category B2) AT AYYAMPUZHA VILLAGE ALUVA TALUK, ERNAKULAM DISTRICT KERALA STATE Mining permit area: 0.9886 Hectares Proposed production: 1,08,187 TPA Proponent Mr. George V Mangaly, Managing Partner M/s. Black Diamond Rock Products LLP “Mangaly House, Manjapra, Aluva, Ernakulam, Kerala State. Prepared By Ramachandra K.T, RQP ULTRA-TECH Environmental Consultancy and Laboratory Door No. 27/2957 A1, Vaniampilly K.P Vallon Road, Kadavanthra Eranakulam-682020

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

  • Upload
    others

  • View
    23

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

APPLICATION FOR

PRIOR ENVIRONMENTAL CLEARANCE

FORM – IM

&

PRE-FEASIBILITY REPORT FOR

BUILDING STONE QUARRY

OF

M/s. BLACK DIAMOND ROCK PRODUCTS LLP (Category – B2)

AT

AYYAMPUZHA VILLAGE

ALUVA TALUK, ERNAKULAM DISTRICT

KERALA STATE

Mining permit area: 0.9886 Hectares

Proposed production: 1,08,187 TPA

Proponent

Mr. George V Mangaly, Managing Partner

M/s. Black Diamond Rock Products LLP

“Mangaly House, Manjapra,

Aluva, Ernakulam, Kerala State.

Prepared By

Ramachandra K.T, RQP

ULTRA-TECH

Environmental Consultancy and Laboratory

Door No. 27/2957 A1, Vaniampilly

K.P Vallon Road, Kadavanthra

Eranakulam-682020

Page 2: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

APPENDIX VIII

(See paragraph 6)

Form 1M

APPLICATION FOR MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND

EQUAL TO FIVE HECTARE.

(II)Basic information

(Viii) Name of the Mining Permit site “Building stone quarry BLACK DIAMOND

ROCK PRODUCTS LLP of Mr. George V

Mangaly”

Sy.No:294/3-1, 294/8, 294/11, Mangaly House,

Manjapra, Aluva Taluk, Ernakulam District,

Kerala State

(ix) Location/site (GPS Co-ordinates) Point Latitude Longitude

01 N : 10° 13’ 48.39’’ E : 76° 27’ 32.32’’

02 N : 10° 13’ 48.46’’ E : 76° 27’ 33.64’’

03 N : 10° 13’ 48.49’’ E : 76° 27’ 34.56’’

04 N : 10° 13’ 48.66’’ E : 76° 27’ 35.79’’

05 N : 10° 13’ 49.99’’ E : 76° 27’ 35.57’’

06 N : 10° 13’ 51.67’’ E : 76° 27’ 35.30’’

07 N : 10° 13’ 51.44’’ E : 76° 27’ 32.28’’

08 N : 10° 13’ 51.40’’ E : 76° 27’ 31.79’’

09 N : 10° 13’ 50.80’’ E : 76° 27’ 31.84’’

10 N : 10° 13’ 49.56’’ E : 76° 27’ 32.09’’

(x) Size of the Mining

Permit(Hectares)

0.9886 Hectares

(xi) Capacity of Mining Permit(TPA) 1,08,187 TPA

(xii) Period of Mining permit Applied for 5 years

(xiii) Expected cost of the project 45 Lakhs

(xiv) Contact information Mr. George V Mangaly

Mangaly House, Manjapra

Aluva Taluk, Ernakulam District

Kerala State

Mob: +91 9747955333

Email ID: [email protected]

Page 3: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

Form 1M is Prepared by Ramachandra K.T, RQP

Environmental Sensitivity

SI.No Areas Distance in Kilometer/Details

1. Distance of project site from

nearest rail or road bridge over

the concerned River, Rivulet,

Nallah etc.

Manjapra-Chully road crosses over the canal at

an aerial distance of 1 km SW

2. Distance from infrastructural

facilities

Canal at an aerial distance of 0.13 km SW

Canal road at an aerial distance of 0.14 km SW

Mukkudai Thodu at an aerial distance of 0.63 km

SW

Panchayat Road at an aerial distance of 0.10 km

SW

Aqueduct at an aerial distance of 0.23 km W

Water tank at an aerial distance of 0.75 km S

Public road at an aerial distance of 0.24 km N

Railway Line The nearest rail line is Ernakulam-Shornur line.

Railway Nearest Railway station is at Karukutty,

which is at a distance of 9.3 km approximately

National Highway NH-544 – 8.7 km

State Highway SH 21- 7.1 km

Major District Road Main Central Road 7.2 km

Mookkannur- Ezhattumugham Road- 4.1 km

Any other Road Panchayat Road- 0.10 km

Canal Road-0.14 km

Public road- 0.24 km N

Amalapuram church road- 0.77 km

Manjapra- Chulli road- 0.95 km

Manjapra- Ayyampuzha-Plantation Road- 0.95

km

Plantation Road- 2.3 km

Angamaly- Manjapra road- 3.3 km

Anappara-Thuravoor Road- 2.5 km

Angamaly-Manjapra Road- 2.9 km

Electric Transmission line pole or

tower

Electrical Transmission line is passing at an

aerial distance of 0.70 km SW

Canal or check dam or reservoirs

or lake or ponds

Canal at an aerial distance of 0.13 km SW

Mukkudai Thodu at an aerial distance of 0.63 km

Page 4: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

SW

In take for Drinking water pump

house

Kodanad pump house- 7..4 km SE

KWA pump house- 7.6 km S

Intake for irrigation canal pumps Arattupuzha lift irrigation pump house- 6 km SW

3. Areas protected under

international conventions,

National or Local legislation for

their ecological, landscape,

cultural or other related value.

None within 15 km radius

4. Areas which are important or

sensitive for ecological reasons-

wetlands, watercourses or other

water bodies, coastal zone,

biospheres, mountains, forests.

Malayattoor Forest – ~ 1.3 km SE

Chalakudy River- 7.7 km N

Periyar River- 5.3 km S

Sholayar reserve forest boundary- 6.4 km E

5. Areas used by protected,

important or sensitive species of

flora or Fauna for breeding,

nesting, foraging, resting, over

wintering, migration.

None within 15 km radius

There are no areas protected, important or

sensitive species of flora or fauna for breeding,

nesting, foraging, resting, over wintering,

migration is involved for quarry area.

6. Inland, Coastal, Marine or

underground waters.

Chalakudy River- 7.7 km N

Periyar River- 5.3 km S

Canal -0.13 km SW

Mukkudai Thodu -0.63 km SW

7. State, National boundaries. None within 10 km radius

8. Routes of facilities used by the

public for access to recreation or

other tourist, pilgrim areas.

None within 10 km radius

9. Defense installations None within 10 km radius

No defense installations near the project site.

10. Densely populated or build up

area, distance from nearest

human habitation

Manjapra at an aerial distance of 2.5 km

11. Areas occupied by sensitive man-

made land

uses(Hospitals,school,places of

worship, community facilities)

Church

1.Infant Jesus chapel- 0.31 km

2.St.Thomas church-0.67 km

3.St.Joseph church, Amalapuram- 0.71 km

4. Infant Jesus church0.97 km

5. St.Sebastian church- Mary giriroad- 1 km

6. St.George jacobite Syrian church,manjapra- 3

km

7. Bharatha rani church- 3.5 km

Page 5: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

8. St.Antony chapel church,Angamaly- 3.8 km

9. St.Joseph church,kokkunnu-4 km

10. St.John vaptist church- 5.1km

11. St.Joseph church,kottamam-6 km

12. St.Xaviers forance church,karukutty- 8.2 km

13. Kidangoor Christian vrethrem assembly- 6.3

km

14. Our lady of Dolors church- Kaladi- 6.3 km

15. St.Marys Jacobite Syrian church,azhakom-

6.3 km

16. Infant Jesus church- Kidangoor- 6.7 km

17. St.George Basilica, angamaly- 9.39 km

18. St.Stephen marthoma church, angamaly-10.3

km

19. St.Marys forance church, kizhakkumbagam-

10.5

km

20. St.Sebastian church,angamay- 10.6 km

21. St.Joseph church,Mambra- 12 km

22. St.Marys church,Mullussery- 13.7 km

Temples

1. Puthurpilly Srikrishna Swamy Temple at 2.3

km

2. Karpillikkavu Sri Mahadeva temple at 3.4 km

3. Thalakkottaparam bu Devi Temple at 4 km

4. Srikrishna temple, Kalady at 7 km

Mosque

1. Juma Masjid at 6.1 km

2. Edavoor Mosque 6.9 km

Hospitals

1. MAGJ Hospital at 5.2 km

2. KG Hospital at 7.6 km

3. Little Flower hospital at 8.8 km

4. Madonna Hospital at 9.7 km

Schools

1. Govt L P School, Manjapra at 2.2 km

2. Jyothis Central School at 2.3 km

3. St Patrick’s Academy at 3.6 km

4. Sacred Heart Public School at 4.9 km

12. Areas containing important, high

quality of scarce

Athirampally Waterfalls -13.5 km

Dream World Water Theme Park- 10 km

Page 6: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

resources(ground water

resources, surface resources,

forestry, agriculture, fisheries

tourism, minerals)

Silver stormat – 7.5 km

Sholayar reserve forest boundary- 6.4 km E

13. Areas already subjected to

pollution or environmental

damage(those where existing

legal environmental standards are

exceeded)

Quarrying for building stone is being conducted

since many years.

14. Areas susceptible to natural

hazard which could cause the

project to present environmental

problems(earthquakes,

subsidence, landslides, erosion,

flooding or extreme or adverse

climatic conditions)

No, permit area is not susceptible to natural

hazard, as there is no history of such incidents.

15. Is proposed mining site located

over or near fissure/fracture for

ground water recharge.

No geological disturbances are observed, The

quarry will act as a reservoir &shall help in

ground water recharging

16. Whether the proposed involves

approval or clearance under the

following regulations or acts,

namely

No

a)The Forest

(Conservation)Act,1980;

b)The

Wildlife(protection)Act,1972;

c)The Coastal Regulation Zone

Notification,2011,if yes details of

the same and their status to be

given

17. Forest land involved(Hectares) No forest is involved

18. Whether there is any litigation

pending against the project and /or

land in which the project is

proposed to be set up?

Yes, litigation pending against the project

a)Name of the Court High court of Kerala

Page 7: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

b)Case No. WPC 23565/2017 & APPEAL 2388/2017

c) Orders of directions of the

court, if any, and its relevance

with the proposed project.

The court ordered to submit a fresh EC

application and hence this application is made.

Page 8: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility
Page 9: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

PRE FEASIBILITY REPORT

1. EXECUTIVE SUMMARY

Mr. George V Mangaly is the Managing Partner of “M/s Black Diamond Rock Products LLP

(Quarry)” residing at Mangaly House, Manjapra, Aluva Taluk, Ernakulam District, Kerala. Mr.

George V Mangaly was granted Granite quarrying permit over an area of 0.9886 Hectares of Private

Patta land in Sy. No 294/3-1, 294/8, 294/11 of Ayyampuzha Village, Aluva Taluk of Ernakulam

District , Kerala State under 3(1) and 9 of rule Kerala Minor Mineral Concession Rule2015..

• Mr. George V Mangaly is the proprietor of the quarry permit area.

• Mr. George V Mangaly is the Authorized signatory for the Quarry operation.

• Prefeasibility report is prepared by Ramachandra K.T, RQP

Quarry Permit details:

• Extent of quarry area: 0.9886 Hectares

• Type of mine permit area: Private Patta Land.

• Quarry Plan Approved by Department of Mines and Geology on 24/03/2018.( Vide Letter

DOE/711/E2/2018

2. INTRODUCTION OF THE PROJECT/BACK GROUND INFORMATION

The applicant has to be obtain Environmental Clearance for Granite building stone quarry owned by

Mr. George V Mangaly. The permit area is situated in Sy.No:294/3-1, 294/8, 294/11 Ayyampuzha

Village, Aluva Taluk, Ernakulam District, Kerala state.

The subject land is Private Patta Land and does not belong to government or reserved for any other

purpose. The subject area is also not fit for agriculture and is away from public properties and there

is no objection of the public or any litigation.

The Quarrying plan is being prepared under 3(1) and 9 of rule Kerala Minor Mineral Concession

Rule 2015” & the same is approved by the office of the Department of Mining and Geology,

Ernakulam. The applicant has to obtain Environmental clearance in accordance with EIA Notification

2006 and its amendments thereafter, from DEIAA, constituted in accordance with the notification

dated January 15th

2016 by Ministry of Environment &Forest, Govt. of India.

The area is found to have prominent exposure of building stone covering most of permit area.

Detailed study of the area has been done by the applicant by sampling exposed blocks of building

stone and depth of the surrounding working pit. In view of the proposal for development and

production of building stone ,the applicant intends to produce with a maximum capacity of 1,08,187

Page 10: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

TPA by carrying out medium scale quarrying by engaging semi mechanized Open cast method of

quarrying. The quarrying plan is prepared for an extent of 0.9886 Hectares and the application for

Environmental clearance along with this report is herewith submitted to DEIAA constituted by

MOEF for obtaining Environmental clearance.

Present Proposal:

The present proposal is submitted to the District Level Environmental Impact Assessment Authority,

notified by ministry of Environment & Forest under the EIA Notification 2006 as per the orders of

the honorable Supreme Court dated 27.02.2012 directing that leases of Minor Minerals including

their renewal for an area of less than 5.0 ha be granted/renewed after getting Environmental

Clearance from MOEF and recent Notification of January 15, 2016 of MoEF, Govt of India.

Need for the project:

Rapid industrialization and growth in infrastructure has made global as well as domestic demand for

building stone. So number of building stone manufacturing quarries &crushing units with

manufactured-sand Units (industries) are coming up in this sector. Building stone is the chief raw

material in this sector, for building constructions &road formations. The size &quality parameters for

supply of the mineral will be as per the requirements of the user industry.

Based on the demand, the applicant intends to produce the required quantum of building stone for the

developmental projects. As per EIA notification 2006 project proponent is submitting the proposal to

get clearance for production capacity of 1,08,187 tonnes /annum from District Level Environmental

Appraisal committee/District level Environmental Impact Assessment Authority of Kerala constituted

by MOEF, GOI for the purpose of grant quarry permit for which notification for grant is issued. The

extent of the area is small and shall be worked by semi mechanized method.

Employment potential:

The proposed Manpower is around 40 including technical & professional competent staff experienced

in quarrying &allied activities. The employees will be assigned job relating to drilling, the handling

of the building stone and waste &other routine works in the quarry. The quarry shall provide direct

employment to 40 people. The working hours at the quarry will be 8 hours/day for 300days/year

3. PROJECT DESCRIPTION

The site is geographically located between North Latitude 10° 13’ 48.39’’to 10° 13’ 51.67’’ and East

longitude 76° 27’ 31.79’’, to 76° 27’ 35.79’’.The project site and buffer zone falls in the Survey of

India Toposheet No.58/B/8. In the field studies it is observed that the quarry permit area is falling in

uncultivable waste lands, non-forest. The area is essence consists of stone/rocky ridges and

slope/gradient in all directions. The highest elevation is 115m and lowest elevation is 100m above

MSL.

Page 11: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The other details are given below:

Toposheet No. 58/B/8

Quarry Plan approval

details

DOE/711/E2/2018dated 24/03/2018

Latitudes 10° 13’ 48.39’’to 10° 13’ 51.67’’

Longitudes 76° 27’ 31.79’’, to 76° 27’ 35.79’’

Elevation of permit area Highest elevation is 115m and lowest elevation is 100 m above MSL

Survey No.&Villages 294/3-1, 294/8, 294/11, Ayyampuzha Village

Taluk&District Aluva Taluk & Ernakulam District

Extent Area 0.9886 Hectares

Type of Land Private Patta Land

Road Connectivity Trivandrum- Angamaly State High Way-1 is passing at a distance of

7.5 km

Manjapra- Chulli road- 1 km

Angamaly- Manjapra road- 3.3 km

Nearest Railway Station The nearest rail head on Broad Gauge is Angamaly railway station, which is at a distance of 10 km approximately

Method of Quarrying Semi mechanized method of open cast quarrying(category-B2)

Geology of the Area

Most of the area is covered by Charnockite, (commercially known as Granite). Charnockite is well

exposed in the old quarry pit which is located on the southern side of the proposed quarry area. The

top soil and weathered Charnockite is having a depth persistence varying from 0.5 m to1.0 m.

The geological parameters / features of the ore body as obtained from the field mapping and

exploration studies reveal the following.

General strike : N- S with local variation of 100 - 150 on either side.

Dip : 75 - 80° dipping easterly.

Length of the ore body : 220-250 m.

Width of the ore body : 120-150m

Depth of the ore body : 50.00 m

Exploration &Reserves

The area proposed for grant of quarry permit is exposed with Charnockite outcrop at places in the

south of the proposed area, a quarry was working for a long time and exposes the formation quite

well. On the northern side of the plot also, there are worked out pits which exposes the geological

cross section. Hence the deposit in the plot is well known. No explorations in the form of bore holes

are carried out as it is in the proposed area. Moreover, Charnockite is a Plutonic Igneous Rock which

is deep seated, and hence no exploration is required.

Page 12: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The said permit area is proposed for Granite Building Stone quarry. Charnockite is exposed in the

quarry pit and Charnockite boulder outcrops with 0.5 to 1.5 m thin layer of top soil and weathered

Charnockite. The reserve is calculated for 3 categories

1. Geological reserves, ie, total reserves available in the entire area

2. Minable reserves available with the ultimate pit limit after leveling the bench

width and height

3. Blocked reserves, reserves are blocked due to bench formation and boundary

constraints and in buffer zone area. In minable reserves 95% is saleable and rest

5% will be waste.

Accordingly the reserves have been estimated and the details of the same are given below

Insitu reserves Unit : in MT

Category R O M Salable Waste Rock

Geological reserves 8,08,062 7,67,660 40,402

Blocked reserves 4,04,437 3,84,215 20,222

Mineable reserves 4,03,625 3,83,445 20,180

A copy of the area, volume and tonnage calculation of reserves is enclosed as Annexure 9 in the

approved Mining Plan

Cross

Section

Between

Unit : in MT

Building Stone

R O M Salable Waste rock

A-A! 2,25,500 2,14,226 11,274

B-B ! 1,78,125 1,69,219 8,906

Total 4,03,625 3,83,445 20,180

The estimation of ore reserves is made by conventional parallel cross section method using geological

cross-section. The 2 numbers of geological cross sections (A-A! and B-B!) are prepared at a regular

interval of 50 m across the strike of the ore body. The area of individual litho units in each and every

cross section is calculated separately. The volume between the cross- section is arrived on the basis of

the average area of parallel cross section, ie, ((S1+S2)/2) and multiplying sectional interval volume in

m3 is arrived. Tonnage is arrived by multiplying by its bulk density.

Category of ore Bulk density Recovery %

Charnockite (Granite Building Stone)

2.50 95%

Top Soil 2.00 Nil

Page 13: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

Production &Development

The production and overburden during the plan period is 4,03,625 tonnes and 20,180 cum

respectively with waste in the form of mining losses/voids etc., and is detailed below:

Permit Year ROM Salable Waste Top Soil

1st Year 99,188 94,228 4,960 4,575

2nd Year 1,08,187 1,02,779 5,408

3rd Year 93,125 88,469 4,656

4th year 68,125 64,719 3,406

5th year 35,000 33,250 1,750

Total 4,03,625 3,83,445 20,180 4,575

Method of Quarrying

The quarry will be working with conventional open cast mechanized method. Based on the mode and

method so adopted and taking into the consideration of geological parameters of the granite /

Charnockite body, the quarry pit is so designed such that the height of the bench is kept about 5.0 m

and the width is also kept min. 5.0 m, maintaining 65o pit slope.

Mode of operation (quarrying) will be semi mechanized open cast

Drilling will be done by using Jack hammer drills of 32 mm dia holes

For blasting, Nitrate Mixture type of explosives (Class 2) will be used

Initial bench height will be 2.5 m, at the final (ultimate) stage bench height, it

will be maintained 5.0 m and bench width will be narrowed to absolute

necessity

At final stage the slope of the bench will be maintaining 65o slope. (Since

granite is hard rock)

Boulders so generated subsequent to the blasting, this will be broken with the

help of the rock breakers

Loading of fragmented material into the Tippers with the help of Excavators.

Drilling & Blasting

Since the bench height needs to be maintained 5.0 m, blast hole will be by jack hammer where the

diameter is normally 32 mm and the depth of the hole is 2.5 to 2.6 m. Blasting pattern is generally

square or staggered with burden ranging from 0.75 to 1.00 meters and spacing of 1.0 to1.2 meters.

Usually single / double row of holes is blasted along free face to achieve optimum powder factor, best

Page 14: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

fragmentation and minimized adverse impacts on account of blasting. Maximum holes blasted per day

are 30 to 40 with normal delay detonators to mitigate adverse impacts such as air blast, throw and the

ground vibration.

Holes are electrically detonated using electric detonators.

Nitrate mixture (Class-2) types of explosives are used for blasting with 20 to 25 percent, proportion of

primer/ booster cartridges and rest as column charge. About 2 to 3 kg of explosives are loaded in 32

mm diameter holes. And powder factor ranging between 7 to 8 tonnes per kg of explosives is achieved

Lessee is having the Explosive license. A copy of the explosive license is enclosed as Annexure 6 in

the Approved Mining Plan.

Loading and Hauling:

Loading of the building stone blocks will be done mechanically to tippers of 10 tonnes capacity and

transported from the quarry to the stockyard and mineral rejection/waste will also be handled

mechanically. In the quarry the road will be maintained with 1 in 16 gradients. Sufficient number of

bunds and parapet walls will be made all along the quarry haulage roads wherever necessary in order

to maintain safe working conditions by using the waste generated during the course of quarry

operations.

Solid waste Management:

Over burden and Intercalated waste is to be handled during the quarrying operations is less as the

entire area is almost a rocky terrain. An estimated quantity of around 20,180 MT is required to be

handled during the proposed plan period to temporarily accommodate this waste material, non-

mineralized 7.5m safety zone of the permit boundary same will be utilized for formation of safety

bunds all along the 7.5m safety zone, internal road maintenance &green belt works.

Hydrology:

The general ground water table in this area is 10 – 15 m below the general ground level during the

summer and around 8 - 15 m during monsoon. Since the quarry falls on the hillock, and the ground

water table is 10 -15 m below the general ground level, none of the quarry workings will touch the

water table. The workings are very much above the ground water table. Water resources in this area

are ground water and rainwater. The area receives copious amount of rainfall 3,000 – 4,000 mm

annually on an average. The level of water table in the open wells is shallow i.e. about 10 – 15 m

depth during the summer and 8 – 15 m during monsoon from the general ground level. There are no

perennial water courses / bodies within the permit hold area, entire storm water flows through the

minor watercourses and joins the adjoining seasonal nallahs. The drainage pattern in this area is

dendritic in nature.

Page 15: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

4. SITE ANALYSIS

Connectivity

The quarry permit area is easily accessible in all seasonal conditions. The quarry permit area is

around 33 kms aerial distance from Ernakulam via Selam-Kochi-Kanyakumari high way to

Angamaly .The quarry location is 7.5km from Main Central road(State Highway) and 9 km from NH-

47. The nearest rail head on Broad Gauge is Angamaly railway station, which is at a distance of 10

km approximately and the nearest Air port is Cochin International Air Port (Cochin) about 11 kms

and Harbour is Kochi, which is about 36 km from the site

The proposed 0.9886 Hectares of area consists of Sheet rock, Non forest lands, agricultural and

grazing lands marks the general topography of the region. The proposed land use pattern of the core

zone is given below:

Precise area required at the end of plan period:

Description Area in ha

Quarry area retained as water pond 0.1000

Green Belt 0.2714

Quarry area remains as pit 0.6072

Back filling ***

Area remains as Road 0.0100

Total 0.9886

TOPOGRAPHY

A view at Topo sheet No 58/B/8 following topographic features can be observed.

The permit area is a Private Patta land.

The terrain is a small low level flat area.

There are no major roads pass through the permit area.

No human settlements within or in the vicinity of the applied area. The nearest village

Ayyampuzha is about 2 kms towards N from the quarry permit area.

The drainage pattern of the buffer zone is dendritic to sub-dendritic in nature. No perennial

nallahs or streams are seen within the area.

The highest elevation in south and lowest elevation in north within the area are having an

elevation difference of 15m (i.e.115m and 100m respectively).

Present land use pattern:

Page 16: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The present land use and terrain patterns of the study area can be observed as follows:

Description Total

Area under Quarry pit -

Area for overburden dumps -

Area for roads -

Buffer zone/ Green belt 0.2714

Area for future use / undisturbed. 0.7172

Total 0.9886

The proposed area to be worked during the first five year is shown in the year wise Production

&Development plan. The future proposed reclamation is by suitably sloping the quarry benches at the

end of quarry permit period of the quarry and by way of afforestation on the dumps and open places

outside the working and permit areas.

Existing Infrastructure:

The construction of temporary structures for quarry office, Rest shelter, First aid station, sanitation

&etc., are proposed to be provided in the non mineralized area of Quarry permit.

The details are collected for the core and buffer zone of the quarry permit. The drinking water,

electricity and primary education facilities are available in almost all the villages. The police station,

post offices, dispensary facilities, phones, college and railway station are present in district

headquarters of Ernakulam. There is good approachable weather roads present in the buffer zone of

the area. State highway is passing through major towns and nearby villages. There are no sensitive

areas for ecological reasons. Necessary precautionary measures in the form of infrastructure shall be

provided during the course of quarry operations. A parapet/retaining wall as a fence shall be

constructed all along the permit boundary to avoid trespassing of men &animals.

5. PLANNING BRIEF

Conceptual Quarry Plan:

The permit period of the Building Stone/M-Sand quarry will expire at the end of this plan period. As

per guidelines, the conceptual plan period is to be prepared only up to the end of permit period in case

of B category quarry.

Population Projection

The man power of quarry includes Quarry manager/Foreman, Mine mate supervisors, skilled and

unskilled labours and other staff etc. As far the socio-economic is concerned from the quarry activity

Page 17: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

nearby villagers shall get 40 direct employments. The proposed quarry activities also shall bring the

positive change in the villages as the quarry shall provide socio- economic activities in the region.

Land use planning

The Land use and land cover for the ensuing plan period and conceptual period.

Unit: Ha

Description As on date Plan period Permit period

Area under Quarrying - 0.7072 0.7072

Water Pond - - -

Roads ( part of quarry) - 0.0100 0.0100

Buffer Zone/Green belt 0.2714 0.2714 0.2714

Back filling - ***

Area for future use / undisturbed 0.7172 - -

Total 0.9886 0.9886 0.9886

Green Belt Development

It is proposed to develop a green belt outside the permit area. In addition, the place around the haul

road outside the permit area after obtaining necessary permissions from concerned authorities. It is

proposed to carry out afforestation by planting 100 saplings per year. Proper care will be taken for

projection & growth of these saplings.

The afforestation to be taken up provides the requisite floral biodiversity. At the end of the plan period

non rocky area if any will be afforested and wherever possible and along roadsides afforestation will

be proposed of area is earmarked for afforestation during the proposed plan period.

During the afforestation work, the combination of different species shall be done. This selection shall

be made on the basis of the local plant growth in this surrounding area. It is always better to plant

mixed species together. Guidance from the local forest department shall be taken in the selection of

species and their maintenance. The plantation work requires considerable quantities of seeds, seedlings

and saplings of different species: Nursery stock for this plantation will be available from the local

forest and Horticulture department.

Plantation crops like Rubber, Pepper, Arecanut, Coconut, fruit bearing trees like Mango, other plants

such as Mahagoni, Rain tree, Bougainvillea, Red Palm and local species with thick foliage to arrest

dust dispersion due to movement of vehicles will be planted

Assessment of Infrastructure Demand:

Page 18: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The existing road network will be sufficient to meet the proposed capacity; however required

infrastructure for transport within the permithold area will be further strengthened and improved. No

new routes or alternations are required in this regards.

Amenities/Facilities

Applicant proposes to employ about 40 persons. This employment has a positive impact on the socio-

economic conditions of the surrounding as most of the work force employed will be from the nearby

areas. Local persons will be hired for meeting the requirement of truck loading, plantation,

construction of check dams, retaining walls etc.

The benefits due to quarry to the local population will be in the form of Direct and indirect

employment opportunities.

6. PROPOSED INFRASTRUCTURE

The extent of permit area 0.9886 Hectares of Private Patta land is recommended for grant and is under

process at the Department of Mines &Geology. The proposed method of quarry operation will be semi

mechanized method of opencast Quarry with jackhammer drilling &blasting with tipper/tractors for

internal transport. The permit area does not have any public roads, railway lines, telephone lines,

public buildings etc.

Present infrastructure will meet the requirement of the project. The conditions of the roads in the

buffer zone are unlikely to be impacted due to the proposed medium scale expansion. The project

authorities in association with the adjacent quarry owners &district administration will also contribute

to development &maintenance of roads.

Social Infrastructure

The quarry permit area is easily accessible in all seasonal conditions. The quarry permit area is around

33 km aerial distance from Ernakulam via Selam-Kochi-Kanyakumari high way to Angamaly .The

quarry location is 7.5km from Main central road(State Highway) and 9 km from NH-47. The nearest

rail head on Broad Gauge is Angamaly railway station, which is at a distance of 10 km approximately

and the nearest Air port is Cochin International Air Port (Cochin) about 11 km and Harbour is Kochi

at a distance of 36 km.

Drinking Water Management

There are no Water courses within or adjacent to the quarry permit and hence there is no possibility of

disturbance &rainwater will continue to flow in the same direction as it is in existence. Since the water

is not withdrawn (from any source outside the permit area) for quarry purposes for quarrying

operations no adverse impact is foreseen on the existing water regime. The rainwater stored in the pits

shall be utilized for mitigating dust and other activities.

Page 19: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The surface water in the buffer zone is in the form of seasonal rainfall and the ground water bodies

encountered below 20-25 depth in the area from the surface level. The area is small; so far no report

on hydrological studies has been carried out in the area under question. There is no potential of acid

mine drainage. The drinking water is available from nearby bore wells and water can be stored into

sintex tanks. During the course of quarry operation no diversion of water course is considered as it

doesn’t exists.

Sewage System

The existing watercourses shall not be disturbed and rain water will continue to flow in the same

direction. Check dams shall be constructed in the nallahs of the buffer zone and retain walls

constructed by the side of the O.B.Dumps, water will percolate in the premises of the quarry area.

There is no generation of domestic sewage.

Industrial Waste Management

There is no generation of affluent/toxic substance; hence treatment of quarry water doesn’t arise.

Solid Waste management

Over burden and Intercalated waste is to be handled during the quarrying operations is less as the

entire area is almost a rocky terrain. An estimated quantity of around 20,180 MT is required to be

handled during the proposed plan period to temporarily accommodate this waste material, non-

mineralized 7.5m safety zone of the permit boundary same will be utilized for formation of safety

bunds all along the 7.5m safety zone, internal road maintenance &green belt works.

Power requirement and supply

There will not be any requirement of power supply to the project site. The quarry activities are

envisaged to be carried out only during day time for drilling, loading, unloading by excavators & with

tippers for transport & all the equipment shall be operated with diesel as motive power. For operation

of the quarry no power supply is required as the HEMMs will be operated by HSD. The power supply

which will be required for office and work shop will be met through Kerala State Electricity Board.

7. REHABILITATION AND RESETTLEMENT PLAN

Surface Quarry will make alteration in the area by way of excavation and surface dumps. This will

lead to water pollution, silting of agricultural lands; air pollution etc if proper care is not taken. The

primary objectives of reclamation are to restore the affected area to the original state as near as

possible.

Page 20: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

The various reclamation proposals planned during the plan period as well rest of the quarry periods

such as road working benches with safe angle of slope, installation of effective drainage system,

prevention of erosion and excessive run off &re-vegetation or afforestation.

As far as quarry area is concerned, so far none of the proposed quarry area is matures or completely

exhausted as this is a new permit in the process of grant. Hence, the measures like retention walls,

drainage system and afforestation works etc., shall be taken up.

ENVIRONMENTAL PROTECTIVE MEASURES

Year No.of Plants Type of Species

1st Year 100 Rubber, Bougainvillea, Coconut, Red

palm, Mahogany etc however local

forest advice will be taken while

selecting the species for plantation.

2nd

Year 100

3rd

Year 100

4th Year 100

5th Year 100

Total 500

8 .PROJECT SCHEDULE AND COST ESTIMATE

The estimated total cost of the project is Rs.45 Lakhs. The land is Private Patta land including the cost

of the machinery and additional preliminary works and working capital i.e. for the application and

processing fee,etc.,

The return on the investment is by way of sale of mineral(Building stone/M-sand).All the minerals

shall be marketed. The machinery is of the company and additional required if any shall be on hire

basis as per the requirement for production.

The proposed production of Building Stones: 1,08,187MT Cost of the project: Rs.45 Lakhs

EMP BUDGET/COST

Sl.

No

Activity Quantity Initial cost in

Rupees

Recurring Cost/

Yr in Rupees

1 Afforestation works within

& outside the quarrying

permit area(Proposed)

100 saplings/ year -- 1,50,000

2 Barbed wire Fencing 390 m X 300 1,17,000 --

Page 21: APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCEenvironmentclearance.nic.in/writereaddata/District/pfr/29032018MW… · application for prior environmental clearance form – im pre-feasibility

3 Peripheral Garland Drain 390 m (Rs 200/ m3) 78,000 --

4 Gully Plugs 2 nos ( each Rs. 25,000) 50,000 --

5 Dust Suppression, Green

belt and Drinking

2.5 kLD (Rs. 500/kLD) Water

obtained from site

itself

--

6 Environmental Monitoring Yearly -- 40,000

7 Medical Aid facility Yearly -- 60,000

8 Retention wall 100 m (Rs 200/m) 20,000

9 Fire Protection Yearly -- 50,000

10 CSR Program Yearly -- 2,00,000**

Total 2,65,000 5,00,000

The total estimated cost of the project is rupees 45 Lakhs. The quarry permit area is Private Patta land.

Cost of Production

The maximum proposed production of Building Stone during the five year plan is around 1,08,187

tonnes per annum.

The cost of the production includes the following components.

Parameters:

Total reserves : 8,08,062 MT

Nature of Mineral : Granite Building Stone/M-Sand

Production Building Stone : 1,08,187 tonnes/annum

Mineable reserves : 4,03,625 MT

Nature of Mineral : Granite Building Stone

Ore to waste ratio : 1:0.05

Capital cost Rs.45 Lakhs (for 4,03,625 MT) : Rs.11/-

Total pit head realization per ton of Building Stone/M-Sand : Rs 350/-

Pit head realization per ton of Building Stone/M-Sand : Rs 484/-

Profit/ton : Rs.134/-

Gross profit/annum for 1,08,187 : Rs 1.44 crores

Net profit after taxation@35% : Rs.94,23,087/-

Profit/Ton : Rs.87/-