fia-i
Peel District School Board
Planning and Accommodation
Annual Planning Document 2014/15
BRAMPTONSAFETY COUNCIL
DATE;.
Enrolment Projections
New Schools
Additions
Boundaries
Community Maps
Information Items
Prepared by: Planning and Accommodation Support Services Staff
In collaboration with:
Instructional Support Services
Physical Planning and Building Committee Meeting October 20, 2014
Regular Meeting of the Board October 28, 2014
C*X~*L
Recommendations
1) New Schools for 2016 - 2025
It is recommended that
a) the capital plan for 2016 - 2025, subject to funding from the Ministry of Education, be received, and b) approval be given to seek Capital Priority Funding from the Ministryfor the following three schools.
PDSB EDU MRC Student Site Community /Project Name SOE TrusteeApp. Funding (Est.) Org.
Occupancy Status Municipality
1. Mount Pleasant # 8 P.S. No No 850 K-8 Sept-17 Own Mount Pleasant / B MH SN
2. Countryside Villages # 2 P.S. No No 850 K-8 Sept-17 Des Countryside Villages / B PN HS
3. Credit Valley Sub Area 1 # 1 P.S. No No 850 K-8 Sept-17 APS Credit Valley / B TB DG
2) Additions to Existing Schools
It is recommended that the following list of additions to existing schools be approved.
Projected Enrolment
2014/15 Estimated # of
#of Classrooms in
School Org. MRC Portables 2014 2019 Add'n SOE Trustee
1. Churchill Meadows P.S. K-5 651 9 771 790 8 PB ND
2. Hazel McCallion Sr. P.S. 6-8 (F.I.) 671 7 814 891 10 PG RC
3. Ruth Thompson M.S. 6-8 615 5 727 782 8 PB ND
4. Lougheed M.S. 6-8 744 5 784 842 6 PN JMa
5. SouthFields P.S. K-8 (F.I.) 763 7 860 1,414 8 JU SC
3) Accommodation Review Recommendations
It is recommended that:
a) the Board receive the following list of schools that are under 60% capacity, and b) no new Accommodation Review Committees be established at this time.
Ministry CapacityEnrolment Family of
School Rated Utilization Mun. SOE TrusteeSept. 5/14 Schools
Capacity (%)
1. Alton P.S. 245 106 43% Mavfield C JU SC
2. Clarkson P.S. 245 126 51% Clarkson M PR BM
3. Riverside P.S. 452 236 52% Port Credit M AE JMc/BM
4. Macville P.S. 309 180 58% Humberview C JU SC
5. T.L. Kennedy S.S.* 1,263 589 47% T.L. Kennedy M AE JMc/SL
Note: T.LKennedy S.S. MRC and Enrolment do not include DD students.
&L-3
4) Regular Track Boundary Changes
It is recommended that:
a) the proposed boundary changes for Brameast # 6 P.S. (new school boundary), Beryl Ford P.S., and Castlemore P.S. be approved;
b) the proposed boundary changes for Credit Valley Sub Area 3 # 2 P.S. (new school boundary) and Lorenville P.S., Huttonville P.S. and James Potter P.S. be approved;
c) the proposed boundary changes for Credit Valley Sub Area 5 # 1 P.S. (new school boundary) and Eldorado P.S and Huttonville P.S. be approved;
d) the proposed boundary changes for Credit Valley# 2 S.S. (new school boundary) and David Suzuki S.S., Fletcher's Meadow S.S. and Brampton Centennial S.S. be approved;
e) the proposed boundary changes for Mount Pleasant # 2 P.S. (new school boundary) and Mount Pleasant Village P.S. be approved;
Note: Regional Learning Choices Program boundary changes already approved by the Board and to be implemented September 2015 are included in Appendix A.
5) Regular Track Holding Boundaries
It is recommended that:
a) effective September 2015, students in the Mount Pleasant Holding Area be directed to Alloa P.S.
6) Regular Track Grade Re-organizations
It is recommended that:
a) effective September 2015, Cherrytree P.S. be organized as a K - 5 school, b) effective September 2015, Fletcher's Creek Sr. P.S. be organized as a 6 - 8 school, c) effective September 2015, Ray Lawson P.S. be organized as a K - 6 school, and d) effective September 2016, Huttonville P.S. be organized as a K - 8 school.
7) New French Immersion Centres
It is recommended that:
a) effective September 2015, Brameast # 6 P.S. be approved as a new Grade 1 - 8 French Immersion centre, commencing with Grades 1-3;
b) effective September 2015, Champlain Trail P.S. be approved as a new Grade 1-5 French Immersion centre, commencing with Grade 1;
c) effective September 2015, Nahani Way P.S. be approved as a new Grade 1 - 5 French Immersion centre, commencing with Grade 1;
d) effective September 2015, Credit Valley Sub Area 5 # 1 P.S. be approved as a new Grade 1 - 8 French Immersion centre, commencing with Grades 1-3;
e) effective September 2015, Riverside P.S. be approved as a new Grade 1-5 French Immersion centre, commencing with Grade 1, and
f) effective September 2015, Homelands Sr. P.S. be approved as a new Grade 6-8 French Immersion centre, commencing with Grade 6.
Ga-*
8) French Immersion Boundary Changes
It is recommended that:
a) the proposed F.I. boundary changes for Brameast # 6 P.S. (new F.I. centre boundary) and Walnut Grove P.S. be approved,
b) the proposed F.I. boundary changes for Champlain Trail P.S. (new F.I. centre boundary) and Edenrose P.S. be approved;
c) the proposed F.I. boundary changes for Nahani Way P.S. (new F.I. centre boundary), Edenrose P.S. and Barondale P.S. be approved,
d) the proposed F.I. boundary changes for Credit Valley Sub Area 5 # 1 P.S. (new F.I. centre boundary) and Ingleborough P.S. be approved,
e) the proposed F.I. boundary changes for Riverside P.S. (new F.I. centre boundary) and Whiteoaks P.S. be approved, and
f) the proposed F.I. boundary changes for Homelands Sr. P.S. (new F.I. centre boundary) and Hillcrest M.S. be approved.
9) Deferred Middle School French Immersion Boundary Changes
It is recommended that the Middle School French Immersion boundary changes, previously approved for Hazel McCallion Senior Public School and Tomken Road Middle School, effective September 2015, be deferred.
10) French Immersion Grade Re-Organization
It is recommended that effective September 2015, Sheridan Park P.S. be organized as a Grade 1-5 F.I. centre.
11) Schools with Grade 1 French Immersion Class Caps
It is recommended that effective September, 2015, a cap on the number of Grade 1 French Immersion classes, as indicated below, be placed at the following schools.
School 2014 # of Portables Proposed Gr. 1 F.I. Class Caps
1. Barondale P.S. 7 3
2. Brameast # 6 P.S. n/a 3
3. Bumhamthorpe P.S. 8 5
4. Champlain Trail P.S. 0 2
5. Corsair P.S. 1 10
6. Credit Valley Sub Area 5 # 1 P.S. n/a 3
7. Edenrose P.S. 11 5
8. Ingleborough P.S. 12 5
9. Nahani Way P.S. 0 2
10. Riverside P.S. 0 2
11. Walnut Grove P.S. 12 3
Ga-s
Enrolment
Projection Tables
1 &2
dGrades ^bccHp/fetf;, 1Rbrtables j Capacity'^ L^AlSltf
4*4t^ft*S^ ISO.'-. VVM
•=2018 . '•'•aoJe"" ry«o2oJ'-! ';:'.'•>. *-!:' ''•-.;: •'
2021 2022
• ; •- .'"'• 2023 2024
Fr. Imm. 1-5 492 507 507 515 519 525 523 522 5*9 517 517
Eng. K-5 7 216 213 220 220 220 250 270 305 311 317 325
Agnes Taylor Total 617 708 721 727 735 739 776 793 827 830 834 842
Allan A Martin 6-8 1 538 522 467 466 506 525 526 517 502 492 476 478
Ext. F.I. 7-8 90 93 90 84 84 80 82 91 81 72 59
Fr. Imm. 6-8 148 171 183 176 161 150 169 179 184 172 167 1
Eng. 6-8 350 336 319 322 298 330 327 333 303 282 274
Allan Drive Total 629 588 600 592 583 543 560 578 603 569 525 500
Alloa K-8 1 162 306 620 716 1,084 1,527 1,930 2,346 2,643 2,694 2.701 2.725
Aloma Crescent K-5 0 470 392 373 372 372 381 375 383 384 386 389 394
Alton K-6 0 245 106 96 82 73 74 70 74 79 87 93 99
Arnott Chariton K-5 0 760 554 537 523 513 502 487 474 467 463 459 457
Fr. Imm. 1-5 158 221 237 238 246 238 232 231 230 229 228
Eng. K-5 4 529 495 466 458 448 438 427 423 420 419 418
Artesian Drive Total 698 687 716 703 695 694 676 659 653 650 648 646
Fr. Imm. 70 104 120 136 171 186 201 194 197 192 190
Eng. 6-8 0 512 492 505 508 504 525 529 541 524 545 552
Balmoral Drive Total 693 582 596 624 644 675 711 729 735 721 736 741
Fr. Imm. 1-5 248 267 272 270 254 232 228 227 225 224 223
Eng. K-5 7 398 345 329 316 307 304 303 300 299 297 296
Barondale Total 444 646 612 601 586 561 536 530 528 524 521 519
Ext F.I. 80 78 76 75 77 76 75 74 73 72 72
Eng. 6-8 0 337 326 311 316 304 318 329 325 319 305 313
Beatty-Fleming Total 583 417 404 387 392 381 395 404 399 392 377 385
Belfountain K-6 0 199 159 142 126 119 110 108 104 93 94 97 99
Beryl Ford K-8 11 772 1.052 918 912 924 977 1,014 1.015 983 977 980 979
Birchbank K-5 0 413 368 369 365 371 373 374 410 406 404 401 399
Fr. Imm. 1-8 0 163 219 273 324 371 417 426 437 438 438
Eng. K-8 0 0 403 435 408 404 388 377 358 342 336 336
Brameast #6 Total 792 0 566 654 681 727 759 793 784 778 774 774
Brandon Gate K-5 0 540 436 445 455 467 482 497 503 500 495 491 489
Brian W. Fleming K-5 0 813 575 545 542 529 526 535 551 568 585 583 581
Gi-i
Proposed New Schools
and
Community Maps
Table 3 - New Schools
Project Name PDSB
App. EDU
Funding MRC
(Est.) Org. Student
Occupancy Site
Status
Project Status
Community / Municipality SOE Trustee
2015
1. Alloa P.S. (replacement) 2. Credit Valley Sub Area 5 # 1 P.S. 3. Mount Pleasant # 2 P.S.
4. Credit Valley Sub Area 3 # 2 P.S. 5. Brameast # 6 P.S.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
650
850
850
850
850
K-8
K-8
K-8
K-8
K-8
Mar-15
Sept-15 Sept-15 Sept-15 Sept-15
Own
Own
Own
Own
Own
UC
uc
UC
MA/FD
MA/FD
Caledon. NW Brampton /C,B Credit Valley / B
Mount Pleasant / B
Credit Valley / B Bram East / B
JU
TB
MH
TB
PD
SC
KM
KM
DG
HS
2016
6. Credit Valley # 2 S.S. 7. Mount Pleasant # 7 P.S.
8. Countryside Village P.S. 9. Bramwest Sub Area 3 # 1 P.S.
10. Credit Valley Sub Area 3 # 1 P.S. 11. Mount Pleasant # 1 S.S.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
1,500 9-12
850 K-8
850 K-8
850 K-8
850 K-8
1,500 9-12
Sept-16
Sept-16 Sept-16 Sept-16 Sept-16 Sept-16
APS
Own
Own
Neg Neg Neg
MA/FD
-
-
-
-
-
Credit Valley / B Mount Pleasant / B
Countryside Villages / B Bram West / B
Credit Valley / B
Mount Pleasant / B
TB
MH
PN
TB
TB
MH
DG
SN
HS
SN
DG
SN
2017
12. Mount Pleasant # 8 P.S.
13. Countryside Villages # 2 P.S.
14. Credit Valley Sub Area 1 # 1 P.S.
No
No
No
No
No
No
850 K-8
850 K-8
850 K-8
Sept-17 Sept-17 Sept-17
Own
Des
APS
-
-
-
Mount Pleasant / B
Countryside Villages / B Credit Valley / B
MH
PN
TB
SN
HS
DG
p
t
oO
2018
15. Vales of Humber#1 P.S.
16. Bramwest Sub Area 3 # 2 P.S.
17. Countryside Villages # 5 P.S. 18. Mount Pleasant # 3 P.S.
No
No
No
No
No
No
No
No
850
850
850
850
K-8
K-8
K-8
K-8
Sept-18 Sept-18 Sept-18 Sept-18
APS
Des
Des
APS
-
-
-
-
Vales of Number / B
Bram West / B
Countryside Villages / B Mount Pleasant / B
JU
TB
PN
MH
HS
SN
HS
SN
2019
19. Countryside Villages # 3 P.S. 20. Mount Pleasant # 4 P.S.
No
No
No
No
850
850
K-8
K-8
Sept-19 Sept-19
Des
Neg
-
-
Countryside Villages / B Mount Pleasant / B
PN
MH
HS
SN
2020
21. Mount Pleasant # 6 P.S.
22. Bramwest S.S.
No
No
No
No
850 K-8
1,500 9-12
Sept-20 Sept-20
APS
Des
-
-
Mount Pleasant / B
Bram West / B
MH
TB
SN
SN
2021
23. Countryside Villaqes # 4 P.S. 24. Countryside Villages S.S. 25. Mount Pleasant # 5 P.S.
No
No
No
No
No
No
850 K-8
1,500 9-12
850 K-8
Sept-21 Sept-21 Sept-21
Des
Des
Des
-
-
-
Countryside Villages / B Countryside Villages / B
Mount Pleasant / B
PN
PN
MH
HS
HS
SN
PDSB EDU MRC Student Site ProjectProject Name Org. Community / Municipality SOE Trustee
App. Funding (Est.) Occupancy Status Status
2022
26. Mount Pleasant # 9 P.S.
27. Mount Pleasant # 2 S.S.
No
No
No
No
850 K-8
1.500 9-12
Sept-22 Sept-22
Neg APS/Neg
-
-
Mount Pleasant / B
Mount Pleasant / B
MH
MH
SN
SN
2023
28. Mount Pleasant #10 P.S.
29. ValesofHumber#2P.S.
No
No
No
No
850
850
K-8
K-8
Sept-23 Sept-23
Des
Des
-
-
Mount Pleasant / B
Vales of Humber / B
MH
JU
SN
HS
2024
30. Mount Pleasant #11 P.S. No No 850 K-8 Sept-24 Neg - Mount Pleasant / B MH SN
2025
31. Castlemore East #1 P.S.
32. Huttonville North #1 P.S.
33. Mayfield West S.S.
No
No
No
No
No
No
850
850
1500
K-8
K-8
9-12
Sept-25
Sept-25 Sept-25
Des
Des
Des
-
-
-
Highway 427 Industrial / B Heritage Heights / B
Mayfield West / C
JU
MH
JU
HS
SN
SC
Notes: a) The organization listed doesnot indicate the future organization ofthe school. The organization ofnewschools will be detennined basedoncommunity need. b) SiteStatus abbreviations as follows: Own = Owned; APS =Agreement ofPurchase &Sale;Neg = Negotiating; Des =Designated c) Project Status abbreviations as follows: UC = Under Construction; MA/FD = Municipal Approvals Process orFinal Design; IP= In Process. d) These are geographic and construction "Project" names only. Naming ofnewschools is subject toPeelDistrict School Board policy #27- Naming ofSchools.
i
Ga-io
New Schools -2015
Prepared by: Peel Distrcit School Board Planning and Accommodation Support Services. Map Data Courtesy of the Region of Peel Planning Department, the City of Mississauga. the Cityof Brampton, and the Peel District School Board Planning and Accommodation Department.
October, 2014 o 2.5 5 • QG6I School Board •••••I^^^^^^Zn Kilometres sJV
£a- w
Proposed
Additions
Ga-ii
Proposed Additions
The following proposed additions were identified after a review of enrolment growth in excess of capacity. Boundary changes to balance enrolments are not feasible considering enrolment in excess of capacity at neighbouring schools. The size of each addition was based on the projected long-term enrolment at that school. The age and condition of Relocatable Classroom Modules (RCMs) were also factored into the priority order of school additions. Similar to the Planning principles for new schools, additions are based on the following:
enrolment in excess of capacity minimizing student transitions future enrolment growth reduced need for temporary accommodation (portables) organization of school that reflects community needs (e.g. K-5, 6-8, K-8, balanced calendar) transportation savings
Table 4 - Additions
Projected Enrolment
Estimated #
2014/15 of
PDSB EDU #ofRCM #of Classrooms
School App. Funding Org. MRC Classrooms Portables 2014 2019 in Add'n SOE Trustee
K-5 1 Bumhamthorpe P.S. Yes No (F.I.) 504 7 665 660* 6 IF SL, RW
6-8
2 Erin Centre M.S. Yes No (F.I.) 766 8 868 869 6 PB ND. BM
3 Esker Lake P.S. Yes No K-5 129 14 0 306 354 8 MH SN
K-8
4 Herb Campbell P.S. Yes No (F.I.) 616 2 4 716 896 2 JU SC
K-5
5 Oscar Peterson P.S. Yes No (F.I.) 832 7 928 991 4 PB ND
6 Churchill Meadows P.S. No No K-5 651 9 771 790 8 PB ND
6-8
7 Hazel McCallion Sr. P.S. No No (F.I.) 671 7 814 891 10 PG RC
8 Ruth Thompson M.S. No No 6-8 615 5 727 782 8 PB ND
9 Lougheed M.S. No No 6-8 744 5 784 842 6 PN HS
K-8
10 SouthFields P.S. No No (F.I.) 763 7 860 1,414 8 JU SC
* reflects proposed Gr. 1 F.I. class cap
Addition size will be confirmed following a review of sustained enrolment prior to construction.
Additions and/or renovations required to provide purpose-built teaching space at 32 Year 5 schools for the final year of implementation of the FDK program have been completed or are in progress. Upon completion of all Year 5 projects, any remaining FDK capital funding may be allocated, on a priority basis, to Year 1 schools which did not receive any capital improvements.
Ga-\5
Regular Track
Boundary Changes, Grade
Re-organizations
and Maps
(ki-m-
Regular Track Boundary Changes, Grade Re organizations and Maps
The following boundary changes are recommended for implementation. Community meetings will be scheduled to fully inform the community of the boundary changes and rationale for each.
Where possible, it is the Board's practice to allow students who are entering their graduating year to remain in their current school. For example, students entering grade 5 at an affected K-5 school will not be impacted by the boundary change.
Boundary Changes
a) Brameast # 6 P.S./Beryl Ford P.S./Castlemore P.S.
The Brameast community has experienced significant enrolment growth in both the regular track and French Immersion programs. Brameast # 6 P.S. is likely to be the last elementary school to be built in the Brameast community. This school will provide enrolment relief to Beryl Ford P.S. and Castlemore P.S. and better balance enrolments.
The following tables indicate the projected enrolment and organization as of September 2015.
WITHOUT BOUNDARY CHANGE
(STATUS QUO) Projected EnrolmentSept. 2014 Enrolment
School 2014 # of Capacity Grade 2015 2016 2017 2018 2019 Portables
F.I. 1 - 8
Brameast # 6 P.S. n/a 792 Eng. K - 8 n/a
Total n/a n/a n/a n/a n/a
Beryl Ford P.S. 11 772 K-8 1,052 1,080 1,104 1,126 1,192 1,241
Castlemore P.S. 20 678 K-8 963 1,014 1,030 1,032 1,054 1,062
WITH BOUNDARY CHANGE Projected Enrolment Sept. 2014
2014 # of EnrolmentSchool Capacity Grade 2015 2016 2017 2018 2019 Portables
F.I. 1 - 8 163 220 273 324 372
Brameast # 6 P.S. n/a 792 Eng. K - 8 n/a 403 435 408 404 388
Total 566 655 681 728 760
Beryl Ford P.S. 11 772 K-8 1,052 918 912 924 978 1,014
Castlemore P.S. 20 678 K-8 963 753 743 757 773 786
Note: September 2014 enrolment is as at Sept. 5, 2014.
Ga-i5
Brameast#6 P.S. (K-8) New School Boundary
It is proposed that effective September 2015, the boundary for Brameast # 6 P.S., phasing in commencing with K to Grade 7. will be as follows:
Commencing at the intersection of Castle Oaks Cross and Literacy Drive then east along Castle Oaks Cross to Clarkway Drive then south along Clarkway Drive to Daden Oaks Drive then west along Daden Oaks Drive to the watercourse then south along the watercourse to Cottrelle Boulevard then west along Cottrelle Boulevard to Thorndale Road then north along Thorndale Road to the point of commencement.
Beryl Ford P.S. (K-8) Boundary Change
It is proposed that effective September 2015, the K - 5 boundary for Beryl Ford P.S. will be as follows:
Commencing at the intersection of the watercourse and a line parallel to Daden Oaks Drive then east along a line parallel to Daden Oaks Drive to the intersection of Daden Oaks Drive and
Bellchase Trail
then east along Daden Oaks Drive to Clarkway Drive then south along Clarkway Drive to Bellchase Trail then east along Bellchase Trail to Highway 50 then south along Highway 50 to Cottrelle Boulevard then west along Cottrelle Boulevard to the watercourse then north along the watercourse to the point of commencement.
It is proposed that effective September 2015, the 6 - 8 boundary for Beryl Ford P.S., phasing in commencing with Grade 6-7. be as follows:
Commencing at the intersection of the watercourse and a line parallel to Daden Oaks Drive then east along a line parallel to Daden Oaks Drive to the intersection of Daden Oaks Drive and
Bellchase Trail
then east along Daden Oaks Drive to Clarkway Drive then south along Clarkway Drive to Bellchase Trail then east along Bellchase Trail to Highway 50 then south along Highway 50 to Queen Street East then west along Queen Street East to The Gore Road then north along The Gore Road to Cottrelle Boulevard then west along Cottrelle Boulevard to the watercourse then north along the watercourse to the point of commencement.
G»x-\l
Prepared by: Peel District School Board Planning &AccommodationApproved Boundary Change - September 2015
Map data courtesy of the Region of Peel Planning Department, the Brameast #6 P.S. (K-8) - New School Peel District School Board Planning Department, the City of
Beryl Ford P.S. (K-8) - Boundary Change n Brampton, the City of Mississauga and the Town of Caledon
Castlemore P.S. (K-8) - Boundary Change October. 2014 .peelBfik
£i-n
Castlemore P.S. (K - 8) Boundary Change
It is proposed that effective September 2015, the boundary for Castlemore P.S., phasing in commencing with K to Grade 7. be as follows:
Commencing at the intersection of Castlemore Road and the rear property line of 2 Julian Drive then east along Castlemore Road to the watercourse then south along the watercourse to Castle Oaks Cross then west along Castle Oaks Cross to Thorndale Road then south along Thorndale Road to Cottrelle Boulevard then west along Cottrelle Boulevard to The Gore Road then north along The Gore Road to the southern rear property line of Princess Andrea Court then west along the southern rear property line of Princess Andrea Court to the rear property lines
of Julian Drive
then north along the western rear property lines of Julian Drive to the point of commencement.
b) Credit Valley Sub Area 3 # 2 P.S./Huttonville P.S./James Potter P.S./Lorenville P.S.
The Bramwest/Credit Valley community continues to experience rapid enrolment growth. Credit Valley Sub Area 3 # 2 P.S. is the most recent school to be built in this community, and will provide enrolment relief to surrounding neighbourhood schools James Potter P.S., Lorenville P.S. and Huttonville P.S.
The following tables indicate the projected enrolment and organization as of September 2015.
WITHOUT BOUNDARY CHANGE (STATUS QUO) Sept. 2014 Projected Enrolment
School 2014 # of Capacity Grade Enrolment
2015 2016 2017 2018 2019 Portables
Credit Valley Sub Area 3#2 P.S.
n/a 804 K-8 n/a n/a n/a n/a n/a n/a
Huttonville P.S. 8 438 6-8 440 682 777 1,036 1,428 1.672
James Potter P.S. 0 749 K-5 658 1,003 1,151 1,269 1,324 1,321
Lorenville P.S. 2 804 K-8 724 950 1,040 1,117 1,194 1.242
WITH BOUNDARY CHANGE Projected Enrolment
Enrolment
Sept. 2014
2014#ofSchool Capacity Grade 2015 2016 2017 2018 2019 Portables
Credit Valley Sub Area n/a 804 K-8 n/a
3#2 P.S. 554 767 827 839 854
Huttonville P.S. 8 438 6-8 440 563 601 816 1174 1413
James Potter P.S. 0 749 K-5 658 869 979 1.063 1.120 1,122
Lorenville P.S. 2 804 K-8 724 553 710 784 808 816
Notes: 1) Portables allocated due to construction are not included. 2) September 2014 enrolment is as at Sept. 5, 2014.
&a-\a
French Immersion
New Centres, Boundary
Changes, Grade Re
organization, Grade 1 Class
Caps and Maps
(iz-n
French Immersion - New Centres, Boundary Changes, Grade Re-organization, Grade 1 Class Caps and Maps
The following new French Immersion (F.I.) centres are recommended for implementation effective September, 2015.
1. New Centres
a) Brameast # 6 P.S. (Grades 1 - 8) b) Champlain Trail P.S. (Grades 1 - 5) c) Nahani Way P.S. (Grades 1 - 5) d) Credit Valley Sub Area 5 # 1 P.S. (Grades 1 - 8) e) Riverside P.S. (Grades 1 - 5) f) Homelands Sr. P.S. (Grades 6-8)
Background
Six new French Immersion centres are recommended to be implemented effective September 2015. This will relieve accommodation pressure at existing centres. The new centres will become part of the F.I. information meetings scheduled for November 20, 2014. A comprehensive communication plan will notify the public of the F.i. parent information meetings for both existing and new F.I. centres.
Criteria for establishment of new F.I. program locations:
o better balancing of enrolments between F.I. and regular program enrolments within dual-track schools (recommended 60/40 split between the programs)
o establishment of new programs with a minimum of two Grade 1 classes to ensure viable classes at the junior grades (preference is for three classes)
o provide accommodation relief for current F.I. centres o efficient and effective use of existing space in neighbouring schools o align F.I. boundaries with regular program boundaries, wherever possible
Advantages:
o F.I. students are closer to their own resident communities
o greater numbers of students are able to walk to their F.I. school o better balance between F.I. and regular program enrolments o less disruption to existing programs as new programs are phased in over multiple years o better use of existing space o alignment of regular program and F.I. boundaries.
G,l-2-o
2. Boundary Changes
It is recommended the following boundaries and adjustments to existing F.I. boundaries be approved.
a) Brameast # 6 P.S. / Walnut Grove P.S. French Immersion
A new F.I. centre at Brameast # 6 P.S. will provide enrolment relief to Walnut Grove P.S. The following tables indicate enrolment and organization projected for September, 2015.
WITHOUT NEW CENTRE (STATUS QUO) September Projected Enrolment Portables
School Capacity Grades 2014
Enrolment 2015 2016 2017 2018 2019 2014 2019
1-8 F.I.
Brameast # 6 P.S. 792 K-8 Eng. n/a 0
Total n/a
1-8 F.I. 336 419 494 567 604 627
Walnut Grove P.S. 861 K-8 Eng. 641 646 651 650 634 614 12 23
Total 977 1.065 1,145 1,217 1,238 1,241
WITH NEW CENTRE Projected Enrolment PortablesSeptember
School Capacity Grades 2014
2015 2016 2017 2018 2019 2014 2019 Enrolment
1-8 F.I. 163 220 273 324 372
Brameast # 6 P.S. 792 K-8 Eng. 403 435 408 404 388 n/a 0
Total n/a 566 655 681 728 760
1-8 F.I. 336 278 320 360 366 360
Walnut Grove P.S. 861 12 12K-8 Eng. 641 646 651 650 634 614
Total 977 924 971 1,010 1,000 974
Notes: 1) Portables allocated due to construction are not included. 2) September 2014 enrolment is as at Sept. 5, 2014. 3) Portables for 2019 are estimated.
Brameast # 6 P.S. (Gr. 1 - 8) New F.I. Centre Boundary
It is proposed that effective September 2015, the F.I. boundary for Brameast # 6 P.S., phasing in commencing with Grades 1 - 3, be as follows:
Commencing at the intersection of Castlemore Road and the rear property line of 2 Julian Drive then east along Castlemore Road to Highway 50 then south along Highway 50 to The Gore Road then north along The Gore Road to the southern rear property line of Princess Andrea Court then west along the southern rear property line of Princess Andrea Court to the rear property lines
of Julian Drive
then north along the western rear property lines of Julian Drive to the point of commencement.
&1-2.I
Approved Fl Boundary Change - September 2015
Brameast #6 P.S. (Fl 1-8) - New Fl Centre Walnut Grove P.S. (Fl 1-8) - Boundary Change
Prepared by: Peel District School Board Planning & Accommodation
Map data courtesy of the Region of Peel Planning Department, the Peel District School Board Planning Department, the City of Brampton, the City of Mississauga and the Town of Caledon
rs , u om„ •peelSXSk**October, 2014 c>
(kl-ll
Information Items
Ga-2,3
Information Item 4
Status of Schools with Enrolment Caps
The following table lists schools with enrolment caps in place. Schools currently re-directing students are identified as "active". Schools that have not yet reached their cap are identified as "pending".
#of Status Schools to which #of
Schools with Portables September Students are Re Portables
Enrolment Caps Mun. MRC 2014 Cap 2014 directed 2014 S.O.E. Trustee
David Suzuki S.S. B 1,554 12 1,850 active Brampton Centennial S.S. 0 TB DG/KM/SN
Castlebrooke S.S. B 1,533 11 1,900 active Chinguacousy S.S. 0 PD HS/CA
Beryl Ford P.S. B 772 11 45 classes active Sir Isaac Brock P.S. 0 PD HS/CA
Copeland P.S. (K-5) 5 Eldorado P.S. B 792 12 47 classes active TB KM/SN/DG
Huttonville P.S. (6-8) 8
Sir Isaac Brock P.S. Walnut Grove P.S. B 861 12 45 classes pending 0 PD CA/HS
(regular track only)
David Suzuki S.S. will be relieved by Credit Valley # 2 S.S. when it opens in 2016. Credit Valley # 2 S.S. will open with Grades 9 and 10. It is expected that enrolment at David Suzuki S.S. will fall below the cap by September 2016.
Castlebrooke S.S. will be relieved by a boundary change with Chinguacousy S.S. which will begin phasing in with Grade 9 in September 2015. It is expected enrolment at Castlebrooke S.S. will fall below the cap by September 2016.
Beryl Ford P.S. will be relieved and no longer require a cap when Brameast # 6 P.S. opens in 2015.
Eldorado P.S. will be relieved and no longer require a cap when Credit Valley Sub Area 5 # 1 P.S. opens in 2015.
Walnut Grove P.S. will be relieved and no longer require a cap when Brameast # 6 P.S. opens in 2015.
G*x-m-
Information Item 6
Full-Day Kindergarten Schools Years 1-5
On October 27, 2009 the Ministry of Education announced the launch of the Early Learning Program, which provides Full-Day Kindergarten for four and five-year-olds. Years 1-5 of the Board's implementation plan are below.
Year 11mplementation 2010/11
Year of FDK School Superintendent Trustee
Implementation
1 Brandon Gate Yearl 2010/11 Daws Williams/Andrews
2 Brian W. Fleming Yearl 2010/11 Fournier Lawton
3 Brookmede Yearl 2010/11 Rossall MacDonald
4 Cooksville Creek Yearl 2010/11 Fournier Williams/Lawton
5 Dixie Yearl 2010/11 Fournier Lawton
6 Ellengale Yearl 2010/11 Moynihan Crocker/Lawton
7 Elmcrest Yearl 2010/11 Rossall MacDonald
8 Floradale Yearl 2010/11 Edwards McDougald
9 Hanover Yearl 2010/11 Courtin Andrews
10 Madoc Drive Yearl 2010/11 Mason Green
11 Marvin Heights Yearl 2010/11 Daws Williams/Andrews
12 Massey Yearl 2010/11 Courtin Andrews
13 Plowman's Park Yearl 2010/11 Grewal Dakroub
14 Queen Street Yearl 2010/11 Byers McDonald
15 Ridgeview Yearl 2010/11 Byers McDonald
16 Riverside Yearl 2010/11 Edwards McDougald/MacDonald
17 Sir Winston Churchill Yearl 2010/11 Mason McDonald
18 Springdale Yearl 2010/11 Noble Singh
19 Thorn Lodge Yearl 2010/11 Rossall MacDonald
20 Thorndale Yearl 2010/11 Daws Singh/ Andrews
Year 2 Implementation 2011/12
Year of FDK School Superintendent Trustee
Implementation
1 Clark Boulevard Year 2 2011/12 Courtin Andrews
2 Clifton Year 2 2011/12 Edwards McDougald
3 Macville Year 2 2011/12 Uniac Cameron
4 Mount Pleasant Village Year 2 2011/12 Haarmann Nurse
5 Sherwood Mills Year 2 2011/12 Moynihan Crocker
6 Silver Creek Year 2 2011/12 Edwards Lawton/McDougald
<kT--U&
Year 3 Implementation 2012/13
School Year of FDK
Implementation Superintendent Trustee
1 Aloma Crescent Year 3 2012/13 Courtin Andrews/McDonald
2 Arnott Charlton Year 3 2012/13 Mason Green
3 Beryl Ford Year 3 2012/13 Daws Singh/ Andrews
4 Birchbank Year 3 2012/13 Courtin Andrews/McDonald
5 Briarwood Year 3 2012/13 Edwards Lawton
6 Caledon Central Year 3 2012/13 Uniac Cameron
7 Cashmere Avenue Year 3 2012/13 Edwards McDougald 8 Clarkson Year 3 2012/13 Rossall MacDonald
9 Conestoga Year 3 2012/13 Haarmann Nurse
10 Corliss Year 3 2012/13 Daws Williams
11 Credit View Year 3 2012/13 Uniac Cameron
12 Deny West Village Year 3 2012/13 Moynihan Williams
13 Dorset Drive Year 3 2012/13 Courtin Andrews
14 Dunrankin Drive Year 3 2012/13 Daws Williams
15 Ellwood Memorial Year 3 2012/13 Uniac Cameron
16 Fallingdale Year 3 2012/13 Courtin Green
17 Glendale Year 3 2012/13 Byers Andrews
18 Grenoble Year 3 2012/13 Courtin Andrews
19 Hilldale Year 3 2012/13 Courtin Andrews
20 Ingleborough Year 3 2012/13 Byers Green
21 Janet I. McDougald Year 3 2012/13 Edwards McDougald
22 Maple Wood Year 3 2012/13 Grewal Dakroub
23 Miller's Grove Year 3 2012/13 Grewal Dakroub
24 Mineola Year 3 2012/13 Edwards McDougald 25 Morton Way Year 3 2012/13 Byers McDonald
26 Nahani Way Year 3 2012/13 Fournier Lawton/Williams
27 Northwood Year 3 2012/13 Byers Green
28 Owenwood Year 3 2012/13 Rossall MacDonald
29 Palgrave Year 3 2012/13 Uniac Cameron
30 Queenston Drive Year 3 2012/13 Moynihan Crocker/Lawton
31 Ray Underbill Year 3 2012/13 Grewal Crocker/Dakroub
32 Ridgewood Year 3 2012/13 Daws Williams
33 Shelter Bay Year 3 2012/13 Grewal Dakroub
34 Sir Wilfrid Laurier Year 3 2012/13 Mason McDonald/Williams
35 Somerset Drive Year 3 2012/13 Haarmann Nurse, Cameron
36 SouthFields Village Year 3 2012/13 Uniac Cameron
37 Springfield Year 3 2012/13 Moynihan Crocker/McDougald
38 Terry Fox Year 3 2012/13 Haarmann Nurse
39 Treeline Year 3 2012/13 Noble Singh
40 Westervelts Corners Year 3 2012/13 Byers Green
41 Whitehom Year 3 2012/13 Moynihan Crocker
42 Willow Glen Year 3 2012/13 Rossall MacDonald
G*1-2A*
Year 4 implementation 2013/14
School Year of FDK Superintendent Trustee
1 Agnes Taylor Year 4 2013/14 Mason Green
2 Artesian Year 4 2013/14 Bent Dakroub/MacDonald
3 Ashgrove Year 4 2013/14 Rossall MacDonald
4 Barondale Year 4 2013/14 Fournier Williams
5 Belfountain Year 4 2013/14 Uniac Cameron
6 Caledon East Year 4 2013/14 Uniac Cameron
7 Castlebridge Year 4 2013/14 Bent Dakroub
8 Cherrytree Year 4 2013/14 Mason McDonald
9 Credit Valley Year 4 2013/14 Bent MacDonald
10 Eastbourne Year 4 2013/14 Courtin Andrews
11 Eldorado Year 4 2013/14 Byers McDonaldNurse
12 Fairlawn Year 4 2013/14 Noble Singh
13 Forest Glen Year 4 2013/14 Fournier Lawton
14 Goldcrest Year 4 2013/14 Courtin Andrews
15 Harold F. Loughin Year 4 2013/14 Mason Green
16 Hawthorn Year 4 2013/14 Moynihan McDougald
17 Helen Wilson Year 4 2013/14 Mason McDonald
18 Hickory Wood Year 4 2013/14 Mason McDonald
19 James Bolton Year 4 2013/14 Uniac Cameron
20 Kindree Year 4 2013/14 Grewal Dakroub
21 Levi Creek Year 4 2013/14 Moynihan Crocker/Dakroub
22 Lorenville Year 4 2013/14 Byers Green
23 Lome Park Year 4 2013/14 Rossall MacDonald
24 McBride Year 4 2013/14 Moynihan Crocker
25 Meadowvale Village Year 4 2013/14 Moynihan Crocker
26 Middlebury Year 4 2013/14 Bent Dakruob/Crocker
27 Oakridge Year 4 2013/14 Rossall MacDonald
28 Oscar Peterson Year 4 2013/14 Bent Dakroub
29 Osprey Woods Year 4 2013/14 Grewal Dakroub
30 Parkway Year 4 2013/14 Mason McDonald
31 Plum Tree Year 4 2013/14 Grewal Dakroub
32 Ray Lawson Year 4 2013/14 Byers McDonald
33 Roberta Bondar Year 4 2013/14 Byers Nurse/McDonald
34 Russell D. Barber Year 4 2013/14 Courtin Andrews
35 Settler's Green Year 4 2013/14 Grewal Dakroub
36 Sheridan Park Year 4 2013/14 Rossall MacDonald
37 Sir Isaac Brock Year 4 2013/14 Daws Singh
38 Tecumseh Year 4 2013/14 Rossall MacDonald
39 Trelawny Year 4 2013/14 Grewal Dakroub
40 Westacres Year 4 2013/14 Fournier McDougald
41 Whiteoaks Year 4 2013/14 Rossall MacDonald
42 Willow Way Year 4 2013/14 Grewal Crocker
&1-V)
Year 5 implementation 2014/15
School Year of FDK Superintendent Trustee
1 Alloa Year 5 2014/15 Uniac Cameron, Nurse
2 Alton Year 5 2014/15 Uniac Cameron
3 Brisdale Year 5 2014/15 Haarmann Nurse
4 Britannia Year 5 2014/15 Moynihan Crocker, Williams
5 Bumhamthorpe Year 5 2014/15 Fournier Lawton, Williams
6 Burnt Elm Year 5 2014/15 Haarmann Nurse
7 Carberry Year 5 2014/15 Noble Singh
8 Castlemore YearS 2014/15 Daws Singh, Andrews
9 Champlain Trail Year 5 2014/15 Fournier Williams, Crocker
10 Chris Hadfield YearS 2014/15 Edwards McDougald
11 Churchill Meadows Year5 2014/15 Bent Dakroub
12 Claireville Year 5 2014/15 Daws Andrews
13 Copeland Year 5 2014/15 Byers McDonald
14 Countryside Village Year 5 2014/15 Noble Singh
15 Eagle Plains Year 5 2014/15 Noble Singh
16 Edenbrook Hill Year 5 2014/15 Haarmann Nurse
17 Edenrose Year 5 2014/15 Moynihan Crocker
18 Esker Lake YearS 2014/15 Haarmann Nurse
19 Fairview Year 5 2014/15 Edwards McDougald
20 Fernforest Year 5 2014/15 Noble Singh
21 Folkstone Year 5 2014/15 Courtin Andrews
22 Forest Avenue Year 5 2014/15 Edwards McDougald
23 Garthwood Park Year 5 2014/15 Rossall MacDonald
24 Great Lakes Year 5 2014/15 Uniac Singh
25 Herb Campbell Year 5 2014/15 Uniac Cameron
26 Hewson Year 5 2014/15 Noble Singh
27 Homestead Year 5 2014/15 Byers Green
28 Huntington Ridge Year 5 2014/15 Fournier Lawton
29 James Potter Year 5 2014/15 Byers Green
30 Jefferson Year 5 2014/15 Courtin Andrews
31 Kenollie Year 5 2014/15 Edwards McDougald
32 Kingswood Year 5 2014/15 Mason Green
33 Lancaster YearS 2014/15 Daws Williams, Andrews
34 Larkspur Year 5 2014/15 Noble Singh
35 McHugh Year 5 2014/15 Byers McDonald, Green
36 McKinnon Year 5 2014/15 Bent Dakroub
37 Mountain Ash Year 5 2014/15 Noble Singh
38 Mount Royal Year 5 2014/15 Noble Singh
39 Munden Park Year 5 2014/15 Edwards McDougald
40 Nelson Mandela Year 5 2014/15 Haarmann Nurse
41 Red Willow Year 5 2014/15 Daws Andrews
0*1-Z%
School Year of FDK Superintendent Trustee
42 Robert J. Lee YearS 2014/15 Noble Singh
43 Ross Drive Year 5 2014/15 Uniac Singh
44 Rowntree Year 5 2014/15 Haarmann Nurse
45 Sawmill Valley Year 5 2014/15 Rossall MacDonald
46 Shaw Year 5 2014/15 Noble Singh
47 Silverthorn Year 5 2014/15 Fournier Lawton
48 Stanley Mills Year 5 2014/15 Noble Singh
49 Thomwood Year 5 2014/15 Edwards Lawton
50 Vista Heights Year 5 2014/15 Grewal Crocker
51 Walnut Grove Year 5 2014/15 Daws Andrews
52 Worthington Year 5 2014/15 Haarmann Nurse, Green