66
Annual Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental and Social Performance Report August 2017 IND: Mundra Ultra Mega Power Project Prepared by ARCADIS India Private Limited

Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Embed Size (px)

Citation preview

Page 1: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Monitoring Report (April 2016 to March 2017)

The Environmental and Social Performance Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Environmental and Social Performance Report August 2017

IND: Mundra Ultra Mega Power Project

Prepared by ARCADIS India Private Limited

Page 2: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Inc. Langdon & Seah | Hyder Consulting | EC Harris

ENVIRONMENT & SOCIAL PERFORMANCE REPORT

Annual Report (April 2016 to March 2017) Costal Gujarat Power Limited (CGPL), Mundra, Gujarat APRIL 2017

Page 3: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

CONTACTS

MAINAK HAZRA Head of Environment, India

dd +91 120 4368 400 df +91 120 4368 401 m +91 98108 81710 e [email protected]

ARCADIS India Private Limited 3rd Floor, Tower B, Logix Techno Park, Sector 127, Noida – 201 304, India

QUALITY ASSURANCE

Issue

Number

/Status

Date Prepared By Quality Review

001 18/04/2017 Shubhangi Jadhav

Sr. Consultant Manish Pandya

Sr. Consultant Dr. Rajani Iyer

Sr. Consultant

Dr Dibyendu Banerjee

Associate Director

Page 4: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

2

ABBREVIATIONS

ADB Asian Development Bank

BDL Below Detectable Limit

CGPL Coastal Gujarat Power Limited

CPCB Central Pollution Control Board

CSR Corporate Social Responsibility

CTE Consent to establish

CTO Consent to operate

E&S Environment and Social

EHS Environment Health and Social

EMS Environment Management System ESDD Environmental and social due diligence

ESIA Environment and Social Impact Assessment

ESMS Environmental and Social Management System

ESS Environment and Social Screening

ETP Effluent treatment plant

FI Finance Intermediaries

GIIP Good International Industry Practice

GPCB Gujrat Pollution Control Board GRM Grievance Redress Mechanism

H&S Health & Safety

HR Human Resources

IFC International Finance Corporation

ISO International Organization for Standardization

GPCB Gujarat Pollution Control Board

MoEF Ministry of Environment and Forest

MoM Minutes of Meeting

MW Mega watt NDA Non-disclosure agreement

NOCs No Objection Certificate

O&M Operation & Maintenance

OEM Original Equipment Manufacturer

OHS Occupational Health and Safety

OHSAS Occupational Health and Safety Management Systems

P.F Provident Fund

Page 5: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

PS Performance Standards

SEHS Social Environment Health and safety

SPCB State Pollution Control Board

SPS Safeguard Policy Statements

STP Sewage Treatment plant

UMPP Ultra-Mega Power Plant

Page 6: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

4

CONTENTS 1 Introduction ..................................................................................................... 1

1.1 Background ................................................................................................................................ 1

1.2 Objective ..................................................................................................................................... 1

2 Environment & Social Management .............................................................. 2

2.1 Environmental Management Plan & Social Management Plan Implementation ................. 2

3 Compliance with CGPL Environmental, Health & Safety Requirements .... 3

3.1 Compliance to IFC & ADB Requirements................................................................................ 3

3.2 Environmental Performance ..................................................................................................... 3

3.2.1 Environment Organization Structure & Capacity Building ...................................................... 3

3.2.2 Integrated Management System (IMS) Development ............................................................. 3

3.2.3 Consent Management ............................................................................................................. 3

3.2.4 Coal Quality & Consumption ................................................................................................... 3

3.2.5 Fly Ash Management .............................................................................................................. 3

3.2.6 Ash Pond – Structural Integrity & Leachate Collection ........................................................... 4

3.2.7 Hazardous Waste Management.............................................................................................. 4

3.2.8 Management of Cooling Water Discharge .............................................................................. 4

3.2.9 Performance of Waste Water Treatment Facilities ................................................................. 4

3.2.10 Flue Gas Emission & ESP Performance ................................................................................. 4

3.2.11 Ground Water Monitoring ........................................................................................................ 5

3.2.12 Ambient Air & Noise Quality Monitoring .................................................................................. 5

3.2.13 Green Belt Development & Mangrove Afforestation ............................................................... 5

3.3 Health & Safety Performance ................................................................................................. 12

3.3.1 HSE Management System .................................................................................................... 12

3.3.2 Safety Awareness Programs/Plans....................................................................................... 12

3.3.3 Health & Safety Incidents ...................................................................................................... 13

3.3.4 Safety Inspection Programmes ............................................................................................. 13

3.4 Compliance by CGPL with Social Requirements ................................................................. 17

3.4.1 Compliance to IFC & ADB Requirements ............................................................................. 17

3.4.2 Community Relations Organization Structure & Capacity Building ...................................... 17

3.4.3 Grievance Redressal Mechanism ......................................................................................... 17

3.4.4 Stakeholder Engagement Plan ............................................................................................. 17

3.4.5 Community Development Plan .............................................................................................. 18

4 Compliance with Country Requirements .................................................... 28

Page 7: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

LIST OF TABLES Table 3-1: Environmental Aspects .......................................................................... 6

Table 3-2: Health & Safety Compliance Assessment & Findings ...................... 15

Table 3-3: Social Compliance Assessment & Findings ...................................... 19

Table 4-1: Health & Safety and Contract Welfare Aspects ................................. 28

LIST OF PHOTO Photo 3-1: Storage of Oily Rags with Municipal Waste ...................................... 26

Photo 3-2: Oil Storage without Secondary Containment – Dozer Maintenance Area 26

Photo 3-3: Water Seepage – Ash Pond Slopes .................................................... 26

Photo 3-4: Improper stacking of Oxygen Cylinder near Fabrication Yard ........ 27

APPENDICES Appendix 1: Persons Interviewed

List of Persons Interviewed

Appendix 2: Quality of Blended Coal Used

Blended Coal Used Quality from April 2016 to March 2017

Appendix 3: Hazardous Waste Returns Records

Sample Copy of Hazardous Waste Manifest During April 2016 to March 2017

Appendix 4: Cooling Water Temperature Records – Graph

Manual Cooling Water Temperature Difference from April 2016 to March 2017

Appendix 5: Cooling Water Temperature Records – Details

Manual Cooling Water Temperature Difference from April 2016 to March 2017

Appendix 6: Stack - Manual Monitoring – Statistical Data Analysis (2016-17)

Manual Stack Emission Records from April 2016 to March 2017

Appendix 7: ETP Effluent Monitoring Details

ETP Effluent Monitoring Records from April 2016 to March 2017

Appendix 8: STP Treated Water Monitoring Results & Analysis (2016-17)

STP at Project Site - Water Monitoring Records from April 2016 to March 2017

Page 8: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

6

Appendix 9: Ash Pond Bore Well Monitoring – Average

Average Ash Pond Bore Well Monitoring Records from April 2016 to March 2017

Appendix 10: AAQ NETWORK

Project Site and AAQ Network

Appendix 11: AAQ Monitoring Results – PM10

Graphical Representation of AAQ Monitoring Results – PM10 from April 2016 to March 2017

Appendix 12: AAQ Monitoring Results – PM2.5

Graphical Representation of AAQ Monitoring Results – PM2.5 from April 2016 to March 2017

Appendix 13: AAQ Monitoring Results – SO2

Graphical Representation of AAQ Monitoring Results – SO2 from April 2016 to March 2017

Appendix 14: AAQ Monitoring Results – NOX

Graphical Representation of AAQ Monitoring Results – NOX from April 2016 to March 2017

Appendix 15: Ambient Noise Monitoring Results at Project Site

Ambient Noise Monitoring Results at Project Site – Graphical Plot from April 2016 to March 2017

Appendix 16: Ambient Noise Monitoring Results at Villages

Ambient Noise Monitoring Results at Villages – Graphical Plot from January 2016 to March 2017

Appendix 17: Safety Performance Data

Safety Performance Monitoring Data from April 2016 to March 2017

Page 9: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

1

1 INTRODUCTION

1.1 Background

Coastal Gujarat Power Limited (CGPL), a wholly owned subsidiary of the Tata Power Company Limited builds, own and operate an ultra-mega power plant at Mundra in Gujarat. The plant includes five supercritical units of 800 MW each, with total capacity of 4000 MW. The plant is using imported coal as fuel, and sea water for once through cooling of condensers. Power is being evacuated through six 400 KV power lines to benefits the states of Gujarat, Maharashtra, Punjab, Haryana and Rajasthan.

The project has started in September 2007 with commercial production commenced from 2012 onwards with all five units in operation since March 2013. CGPL has sought financial loans from several international banks including the International Finance Corporation (IFC) and Asian Development Bank (ADB). As per the common term schedule to loan agreement between CGPL and the Lenders; Tata Power has entrusted ARCADIS India Private Limited to carry out Environment Health Safety and Social (EHSS) compliance audits on a quarterly and annual basis both during the construction and operational period.

1.2 Objective

The purpose of this Annual Environmental & Social Performance Report (ESPR) is to report on CGPL’s

compliance with the Environmental and Social Performance Requirements of IFC/ADB (including implementation of the Environmental Management Plan and the Social Management Plan) for operations and to assess any corrective actions implemented/proposed. The ESPR encompasses implementation by CGPL of all phases of the Project & O&M, which includes:

Contact information for responsible individuals; Compliance by CGPL with environmental and social requirements for the Project; Environmental and social aspects of the Project under implementation; Occupational health and safety performance and significant incidents; and Sustainable development initiatives and community relations.

Page 10: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

2

2 ENVIRONMENT & SOCIAL MANAGEMENT

2.1 Environmental Management Plan & Social Management Plan Implementation

The following groups of the Tata Power Corporate Office and CGPL’s on-site team are responsible for EMP and SMP implementation:

Tata Power Corporate Office: Sustainability & SHE Group; HR - Land Acquisition, R&R, CSR; and

On-site team at Mundra: Safety & Environment; HR – Labour & Health; CSR.

The list of individuals contacted during the site visit is given in Appendix 1.

Page 11: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

3

3 COMPLIANCE WITH CGPL ENVIRONMENTAL, HEALTH & SAFETY REQUIREMENTS

3.1 Compliance to IFC & ADB Requirements

This section in brief outlines the environmental performance of the project for the period FY 2016-17 in consistent with the IFC Performance Standards & EHS Guidelines, ADB Summary Environmental Impact Assessment including Environmental Management Plan developed for the project. The assessment and findings matrix has been presented in Table 3-1 for necessary reference.

3.2 Environmental Performance

3.2.1 Environment Organization Structure & Capacity Building

In FY 2016-17, CGPL has engaged Mr. Arunachal Mudgirkar as Chief Sustainability Officer (CSO) after earlier CSO left the organisation. CSO’s main role is to drive onsite Environment & Social initiatives and drive overall performance. Both CSR and Environment Department is currently reporting to the CSO.

CGPL has outsourced monthly environmental monitoring to third party agency namely M/s. Kadam Environmental Consultants, Gujarat from August’16 onwards. The agency is NABL accredited and recognized by MoEF&CC.

3.2.2 Integrated Management System (IMS) Development

CGPL in coordination with an external consultant has prepared the IMS and has obtained certification for its Integrated Management System (IMS) in July 2014. The incorporation of applicable legal (CTO, EC, etc.) and funding agency requirements (IFC Performance Standards, IFC EHS Guidelines, etc.) in the legal register and their references in the relevant environmental procedures and SOP is done. The same is updated as per procedural or legal requirement.

3.2.3 Consent Management

CGPL has valid environmental permits/consents for project operations, hazardous and biomedical waste management from Gujarat Pollution Control Board, MoEF and is carrying out periodic compliance reporting to these regulatory authorities as required under specific consent conditions.

CGPL has received revised renewed Consolidated Consent and Authorization (CC&A) from GPCB with validity upto 17/05/2021. The emission limits for SO2 and NOx have been removed from the CC&A.

3.2.4 Coal Quality & Consumption

CGPL is currently utilizing blended coal (Melawan with Ecocoal) for operation of all the 5 units. Review of the coal quality and consumption records for the period 2016-17 reveal compliance to Environmental Clearance (EC) requirement to this aspect (ash content ≤10% and sulphur content ≤1%).

CGPL to continue periodically monitoring the consumption and quality of coal.

3.2.5 Fly Ash Management

Review of fly ash generation and utilization records for the period 2016-17 reveals that over the period of this one year, fly ash utilization has reached around 98%. The fly ash is mainly sent to Sanghi and Binani cement. CGPL’s discussions with overseas companies on fly ash export are in progress.

Page 12: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

4

CGPL need to continue the implementation of fly ash utilization option to achieve requirement of Fly Ash Notification dated 2009 and also periodically update the lenders/stakeholder on the overall implementation status.

3.2.6 Ash Pond – Structural Integrity & Leachate Collection

Based on the various observations made in 2016-17, CGPL had undertaken various activities related to ash pond like: cleaning of toe drains, maintenance of vertical drains, clarifier and slurry pipeline, etc. Garlanding of discharge pipe inside dyke to uniformly fill the ash, regular maintenance works related to clarifier and slurry pipeline to facilitate reuse of overflow for preparation of slurry has been undertaken thus fulfilling the EMP requirement to implement an Ash Water Recycling System (AWRS) to optimize water usage.

CGPL has formulated Cross Functional Team (CFT) for monitoring progress of the ash pond works and the same regularly visits ash pond area and monitor/assess work undertaken/required work.

CGPL had test planted samplings of Salvadora perica plant species for stabilization of ash pond slope. But the results were not satisfactory over the period of time. CGPL team is working with their in house ecology experts on exploring other flora species which could be used for plantation on ash pond slope, which needs to be undertaken on fast track basis.

Some of the areas on ash pond showed seepage. Reportedly CGPL is working with its Cross Functional Team (CFT) for assessing this issue.

3.2.7 Hazardous Waste Management

CGPL possess valid hazardous waste authorization from GPCB as occupier of the facility generating the following hazardous wastes viz. used oil, discarded chemical containers, spent ion exchange resins, chemical sludge from waste treatment, waste residue containing oil, spent solvents etc. CGPL is continuing with the submission of annual returns specifying details of hazardous waste disposal to GPCB in prescribed format along with maintenance of manifest for hazardous waste disposed. For the period 2016-17, used oil and discarded containers were disposed through authorized waste recycler.

3.2.8 Management of Cooling Water Discharge

Review of manual monitoring undertaken by CGPL of cooling water at final discharge point (near retaining wall of outfall channel) for the period 2016-17 indicated that an average temperature difference of 3.6 ºC indicating conformance to the temperature difference standard of 7ºC at the cooling water discharge point specified by the MoEF EC Amendment dated 5th April’07.

3.2.9 Performance of Waste Water Treatment Facilities

Review of the monitoring records of the treated water quality for the plant STP at the project site indicated satisfactory performance as per CC&A limits. Review of monitoring records for ETP effluent for the period 2016-17 reveal compliance with WB norms.

Monitoring of ash pond effluent for the parameters viz. pH, suspended solids and oil & grease as specified in the CC&A was found to be within limits expect for pH which was observed slightly more than 8.5 limit on few days.

3.2.10 Flue Gas Emission & ESP Performance

Page 13: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

5

CGPL performs regular monitoring of flue gas emissions through manual monitoring to check conformance with the emission standards specified by World Bank Group Guidelines for Thermal Power Plants at same time evaluating the performance of electrostatic precipitators (ESPs) and low NOx burners installed as air pollution control devices.

Statistical analysis of manual monitoring results in all cases reveals compliance to the World Bank emission standards for PM10, PM2.5, SO2 and NOX along with compliance to CC&A limit for PM10.

3.2.11 Ground Water Monitoring

The quality of ground water near ash pond area is being assessed by CGPL through regular monitoring of the bore wells installed within the project site. Fluoride values generally varied within 2.9-3.4 mg/l. Total Dissolved Solids (TDS) values generally varied within 788.8-19928 mg/l. Heavy metals like Cd, Cr, Pb, Hg were found to be below detectable limit (BDL).

3.2.12 Ambient Air & Noise Quality Monitoring

CGPL continues to assess the potential impacts of the project operations on ambient environment through monthly monitoring of air and noise quality at various receptor locations. The receptor locations have been selected based on their proximity to the project facilities viz. coal conveyor, coal stockpile, etc. and predominant wind direction and topography.

Review of village and project level ambient air quality monitoring data reveals compliance to National Ambient Air Quality Standards (NAAQS) except for PM10 which is found to exceed the standard (100 µg/m3). This is typical for coastal locations in this region and also attributed due to the proximity of some villages viz. Vandh to the coal conveyors of Adani and CGPL thermal power plants.

Majority of day time noise levels monitored at the receptor locations were found to be in compliance with the day time noise standards except for few exceptions in villages like Vandh, Siracha and Moti Khakhar on few occasions. For night time the noise level were observed to be higher than night time noise standards at majority of occasions. In view of this CGPL has already adopted necessary control measures viz. pipe conveyor near Vandh village, peripheral green belt development etc. and is also carrying out periodic monitoring to assess the efficiency of the management measures and plan necessary intervention, as may be required. For noise monitored within project premises all values were found to be complying with the day and night time noise standard specified in the CC&A.

3.2.13 Green Belt Development & Mangrove Afforestation

Green belt development program has been implemented by CGPL throughout the project site. For the period 2016-17, in line with EC requirement, 417.89 Ha area has been covered under green belt and thus 1/3rd of the total project area (1242 ha) is covered under green belt. Till March’15, around

10,44,728 saplings have been planted. For any saplings mortality, double no. of saplings are planted by CGPL. Currently CGPL is facing issue of damage of plantation by wildlife (Blue bull and Wild Boar) which are predominant in the area.

CGPL need to sustain the green belt development to ensure compliance with the EC condition and also to maintain heterogeneity of plant species being used and further improve upon the species survival rate.

In addition to green belt development, CGPL has completed mangrove afforestation along with Gujarat Ecological Commission and Kantiyajal Tavar Vikas Samiti (KTVS) at coastal village of Kantiyajal encompassing 1000 ha of land thereby complying with the CRZ clearance requirement.

Page 14: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

6

Table 3-1: Environmental Aspects

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

1. Old Green Belt Development

417.89 Ha area has been covered under green belt and thus 33% of the total project area (1242 ha) is covered under green belt with around 10,44,728 saplings planted. For any saplings mortality, double no. of saplings are being planted by CGPL. Currently CGPL is facing issue of damage of plantation by wildlife (Blue bull and Wild Boar) which are predominant in the area.

At least 33% of total project area to be maintained by CGPL. CGPL to maintain the inventory of the plantation done, mortality rate, etc. and continue with plantation to maintain green belt.

To sustain --

2. Old Integrated Management System (IMS) Development

CGPL has obtained certification for its Integrated Management System (IMS) in July 2014. Applicable procedural changes and legal requirements are incorporated in IMS as per need.

Any amendment in existing rules or regulations or implementation of new rule shall be incorporated in IMS on regular basis.

To sustain --

3. Old Quality of Blended Coal

In order to meet the challenges associated with the increase in imported coal prices, CGPL is presently utilizing blended coal (Melawan with Ecocoal). Review of quality reports for coal consumed during the period 2016-17 reveal ash and sulphur content in range of 0.0% - 9.8% and 0% - 0.57% respectively. Sulphur content was found to be in overall compliance and ash content in most of the cases with the EC condition which require ash and sulphur content in coal to be ≤10% and ≤1% respectively. Unit wise details of the quality of blended coal used have been presented in Appendix 2.

- To sustain --

4. Old Blended Coal Consumption

With all 5 units in operation the coal utilization records for the period Apr’16 to Mar’16 reveals coal utilisation as 10.56 million tonnes which is in compliance to the annual consumption limit (12 million tonnes) specified in the project EC.

CGPL to periodically monitor the consumption of coal to ensure that the threshold consumption limit is maintained.

To sustain --

5. Old Fly Ash Utilization

CGPL has been constantly putting efforts for utilisation on fly ash through various cement manufacturing organisations. The overall ash utilization was observed to reach 98%. As reported by CGPL, fly ash is being sent to nearby cement industries such as Sanghi, Binani cement, Ultratech cement. In addition to above, CGPL is also exploring ways to utilize bottom fly ash and is in talks with companies in middle east for the same.

Continue efforts on the implementation of fly ash utilization options and periodically update the lenders and related stakeholders on the status of the implementation of the options/proposals.

To sustain --

Page 15: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

7

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

6. Old Hazardous Waste Management (Permit Requirements)

CGPL has obtained renewed CC&A wherein ETP sludge has been removed from hazardous waste category. Closed --

7. Old Hazardous Waste Management (Storage)

Hazardous waste inventory is being maintained in Form 3 along with hazardous waste manifest Form 13. During the Site visit, it was observed that non-hazardous solid waste was stored with oily cotton rags (hazardous wastes) in plastic drum at Dozer Maintenance area and contractor yard. Waste oil drums were stored near dozer maintenance area and contractor yard without secondary containment.

CGPL shall ensure that all the hazardous wastes generated at the site shall be separately and shall not be mixed with non-hazardous wastes. Waste oil drums to be stored on paved area with secondary containment and spill kit

Open To be Planned (TBP)

8. Old Hazardous Waste Management (Disposal)

Hazardous waste generation & disposal records were maintained at site. Hazardous Waste manifests – Form 13 indicate that used oil and drums were disposed through authorised hazardous waste dealers. Latest records/copies of Hazardous Waste Manifest are presented Appendix 3.

CGPL to continue maintaining hazardous waste manifests along with maintaining inventory of Hazardous waste generated and disposed.

To sustain --

9. Old Cooling Water Discharge

Manual monitoring undertaken by CGPL of cooling water at final discharge point (near retaining wall) indicates an average temperature difference of 3.6ºC. The values are found to be in conformance to the temperature difference standard of 7ºC at the cooling water discharge point specified by the MoEF EC Amendment dated 5th April’07. The cooling water temperature values for the period 2016-17 has been presented in Appendix 4 and Appendix 5.

- To sustain On going

10. Old Flue gas emission

Statistical interpretation of manual monitoring of flue gas for the period 2016-17 was found meet the World Bank standards for the following pollutants: PM (31.2 - 44.4 mg/Nm3), NOx (174 – 330 ppm) and SO2 (618 – 834 ppm). PM values were within limit given in CC&A issued by GPCB. The statistical analysis of manual monitoring data for 2016-17 is presented in Appendix 6 respectively. CGPL has displayed online data outside the main factory gate about the stack emissions. As per the latest notification dated December 7, 2015 issued by MoEF, thermal power plant commissioned after 1st Jan 20013 and up to 31st December 2016, following emission norms needs to be complied.

Since new notification issued by MoEF & CC will be applicable from 7th December 2017, CGPL to plan the activities for compliance to this new notification.

To sustain --

Page 16: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

8

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

SPM: 50 mg/Nm3; SO2: 600 mg/Nm3 (Units smaller than 500 MW); SO2: 200 mg/Nm3 (Units of size 500 MW and above); NOx : < 300 mg/Nm3; and Mercury: 0.03 mg/Nm3.

11. Old Ash Pond – Structural Integrity and Leachate Collection

Based on the various observation made in 2016-2017, it is noted that CGPL has undertaken various maintenance activities related to ash pond. CGPL has formulated Cross Functional Team (CFT) which audits ash pond area and issues related to same are identified and addressed. During last quarter and thus quarter visit, some damp patches were observed along ash pond slopes. CGPL maintenance team informed regular maintenance is done at ash pond but the reason for dampening will further investigated on priority.

CGPL to identify the reason for damp patches on ash pond slope.CGPL to identify suitable plant species for carry out plantation along ash pond slope for stabilization of the same on fast track.

Open TBP

12. Old Ash Pond Effluent Management

CGPL is carrying out monitoring of ash pond effluent for the parameters viz. pH, suspended solids and oil & grease as specified in the CC&A and is found to be within limits expect for pH which was observed to slightly exceed 8.5 on few days.

CGPL to continue monitoring of ash pond effluent To sustain

13. Old ETP Operation Review of monitoring records for ETP effluent for the period FY 2016-17 reveal (Refer Appendix 7) reveal compliance to the WB effluent standards.

-- To sustain

14. Old STP Operation

Review of the monitoring records of the treated water quality for the STP at the project site indicated satisfactory performance with CC&A limit. The monitoring result of STP treated water for the period FY 2016-17 is presented in Appendix 8.

-- To sustain

15. Old Ground Water Monitoring near Ash Pond

CGPL continues to carry out with the monitoring of bore wells installed near ash pond. Review of the analytical results for 5 bore wells for the period 2016-17 reveals: Fluoride values generally varied within 2.9-3.4 mg/l Total Dissolved Solids (TDS) values generally varied within 788.8-

19928 mg/l;

CGPL to continue ground water monitoring near ash pond. To sustain -

Page 17: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

9

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

Heavy metals like Cd, Cr, Pb, Hg were found to be below detectable limit (BDL)

Turbidity was observed with values ranging with 7.4-70.4 NTU. Coliforms were below detectable limit. The average monitoring results of the bore well water has been statistically presented in Appendix 9.

16. Old Ambient Air Quality Monitoring

Review and interpretation of village and project level ambient air quality monitoring data (FY 2016-17) reveals compliance to National Ambient Air Quality Standards (NAAQS) except for PM10 which is found to exceed the standard (100 µg/m3). PM10 values were within NAAQS in July to Aug’16 which was probably due to wind and rains in the area. The AAQ network on Google image is given in Appendix 10 and the average ambient air quality monitoring results for said period both at village locations and project site have been graphically presented in Appendix 11 to 14.

CGPL to continue ambient air quality monitoring. To sustain -

17. Old Noise Monitoring

The noise monitoring reveals compliance to the day time noise standard (55 dBA) except for villages like Vandh, Siracha and Moti Khakhar prominently. The night time noise levels at the village locations exceeding the night time noise standards of 45 dB(A) except for villages Vandh, Siracha and Moti Khakhar prominently and for all villages during April to June’16. Proximity of Vandh village to the coal conveyors of both Adani and CGPL can possibly contributing to these noise levels. In view of this CGPL has already implemented appropriate control measures and management programs viz. use of closed conveyors, monthly monitoring of noise at nearby villages, green belt development along the conveyor belt, implementation of a grievance register to address community concerns on project EHS aspects etc. For noise monitored within project premises all values were found to comply with the day time (75 dB) and night time (70 dB) noise limits specified in the CC&A. The graphical presentation of day and night time noise levels recorded at village and within project premises has been presented in Appendix 15 & 16.

- To sustain On going

Page 18: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

10

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

18. New Environmental Incidents No environmental incidents have been recorded by CGPL during the quarter. -- -- --

19. Old Consent/ Permit Management

CGPL has received revised renewed Consolidated Consent and Authorization (CC&A) from GPCB with validity upto 17/05/2021. The emission limits for SO2 and NOx have been removed from the CC&A Periodic compliance reporting of project EC and CC&A conditions to regulatory authorities’ (MoEF and GPCB) and submission of annual returns as required under Hazardous and Bio-Medical Waste Rules is being continued by CGPL. Additionally ambient air quality pollutants concentration are being electronically displayed at the CGPL main gate and monitoring data uploaded at the Tata Power website as part of CGPL environmental compliance reports.

-- -- --

20. New Regulatory/Stakeholder Visit

Visits had been undertaken by the Gujarat Pollution Control Board (GPCB) and ADB but no minutes of meeting were issued. -- -- --

Good Initiatives

21. New Piped Conveyor for coal transport

The work for pipe conveyor system is completed and pipe conveyor has been operated under test runs. --- --- ---

22. Old Biodiversity Conservation Initiatives

CGPL is working with an organisation in Kutch – Sahajeevan by providing support for species conservation which is spread over in Kutch district. Under which 20 species (comprising of flora and fauna) are being targeted in around 20 villages in 3 tehsils in Kutch. In the initial phase, biodiversity conservation of a bird species - White-Naped Tit (Machlolophus nuchalis) and plant species - Olex nana is targeted. With the aid of this biodiversity conservation initiatives increase in White-Naped Tit species was observed in target villages and nearby areas. As part of this initiative around 850 samplings of Olex nana plant species were planted in various villages in Kutch. CGPL has engaged IUCN for conducting biodiversity study of plant and adjacent areas. Under this initiative a workshop was organised which was attended by CGPL and Tata group companies in Gujarat and Jamshedpur.

--- To sustain ----

23. New Solid waste management

CGPL is at advanced stage of engaging a private organisation from Ahmedabad for solid waste management at Plant. The organisation

--- --- ---

Page 19: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

11

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative Closure Date

will do the overall management of solid waste – collection, segregation, sorting, disposal, etc. It will also train employees on proper solid waste management. This initiative has potential to help CGPL in improving solid waste management at plant.

Page 20: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

12

3.3 Health & Safety Performance

With the augmentation in safety staffing by CGPL, proper implementation of specific plan and procedures, communication between the contractor workers, safety training and awareness, incident reporting, visual aids etc. CGPL continues to demonstrate considerable improvement of onsite health and safety performance. The detailed assessment of the annual health and safety performance is presented in Table 3-2 while subsequent sections provide a brief overview of the same.

3.3.1 HSE Management System

CGPL has adopted the health and safety system (with guidance form Dupont) that includes well defined performance standards, procedures and guidelines (HIRA, SCAR, etc.), safety awareness programs (Safety Time Out) and establishing key performance indicators (e.g. lost time incidents, severity rate, near miss etc.), which are used to track compliance with Health and Safety (H&S) targets. Subsequently CGPL has obtained certification for Integrated Management System (IMS) in July 2014. Based on review of the Standard Operating Procedures (SOPs) and other procedures prepared by CGPL indicates that the CGPL has incorporated all permitting requirements and compliance to applicable regulations such as Gujarat Factories Rules, Petroleum Rules etc.

HSE Organizational Structure

With project now in full scale operation CGPL has in place a dedicated O&M team comprising of Dept. Heads, Line Managers, and Operational Contractor taking care of O&M as well as balance construction activities.

Fire Tender Upgradation

Upgradation of fire tender, purchase of additional water bowser, up grounding of fire water network, new hydrant system for warehouses, 5S achieved for CGPL Fire station and it is adjudged best Gamba by ED & COO Tata Power. Fire System (Hydrants, Deluge Valves, Hydrant Riser Lines, Isolation Valves, Fire Pumps and Booster Pumps) are working in healthy condition without isolation/breakdown.

3.3.2 Safety Awareness Programs/Plans

Specific health and safety plans and onsite emergency plan have been developed & augmented on regular basis by CGPL and communicated to contractors including the operations team. The plans outline the policies and strategies, the organization, resources and documentation required, the HS risk management principles, and reporting requirements.

With project under operation potential health and safety risks is currently limited to activities like switchyard “hot line washing”, insulation, floor grating etc. for which necessary work permits are being

issued, audited and activities supervised by a dedicated project O&M team. Various plans/initiatives viz. Safety Intervention Audits, Process Safety Management System, implementation of safety time out program & PSUSR checklist etc. have been implemented by CGPL to ensure continual improvement in project operations as well.

In addition to the above, efforts have been made by CGPL to enhance safety related awareness both at village and project level through organization of training programs, competitions and screening safety awareness related audio-visuals. Following programmes has been organized during this fiscal year by CGPL:

Executive Director (ED) Safety Town hall is conducted at plant where ED & CEO interacs with employees on issues and concerns related to safety;

Senior Leadership Team (SLT) audits are carried out regularly where members of SLT visits the plant Site and shares their observations with the team for compliance and improvement in safety. These audits are focused on housekeeping, safety and fire issues;

High Visibility Audit carried out by Chief of other division of Tata Power to undertand, share and implement good practices of other plants;

Page 21: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

13

“Aakar” – a Non-Government Organization (NGO) was engaged for bringing progressive behavioural change among workmen. Total of 823 Business Associates were given “Suraksha

Samvadd” behaviour based training and 179 in Workmen Development Program (WDP) for frontline supervisors/gang leaders who are very critical for safety implementation.

Tata Power Skill Development Institute (TPSDI) was started at CGPL Mumdra premises in line with the Primme Minister’s Vision for skill India. Air of this institute is to train workers, supervisors, engineers and local community in power sector skills, safety critical skill e.g. fitter, rigger, grinder, welder etc. are given practical and skill development training. Basic L1 level safety training is imparted to 1300 workers;

Tata Power Suraksha Mobile App was developed and observations are reported by employees online in SAP system. This has led to more observations such as unsafe act and unsafe condition reporting and compliance was tracked for closure. It has resulted in achieving greater safety compliance and achievement of 11.98 safe million man-hours;

Road safety initiatives were taken in Aashiyana Township such as fixing of convex mirrors, fixing of cat-eye on the road, fixing of bollards at pedestrian walkway and awareness & training programs on road safety were organized at township;

Safety Awareness Training such as road safety awareness, fire and emergency training were provided to nearby schools in Tunda, Vand, Kandagara, Nanabhadia and Motabhadia;and

CGPL has established a special training room with drinking water, air coolers and fans with accommodating capacity of 60 people near material gate. CGPL has made Safety induction training is mandatory for employees, business associates and for visitors. Total 746 business associates were given safety induction training during the outage.

3.3.3 Health & Safety Incidents

There was a fatality at Boiler #4 Lift on May 5th, 2015 of Contractor workers – M/s Metro Elevator Company Private Limited. As per the discussion with Mr. Pramod Kumar – Head, Safety, CGPL, it was understood that Mr. Raju Kumar Nakum, employee of M/s Metro Elevator Company Limited was working for the maintenance of the Boiler #4 lift and due to man-made mistake, heavy weight of the lift has fallen on Mr. Raju’s head. He was immediately moved to nearby hospital at Adipur. However, he

was declared dead by the by the hospital at Adipur. CGPL has immediately informed to Deputy Director, Industrial Health & Safety, Adipur, Kutch on May 5th, 2015 through letter no. CGPL/2015/HR/A-47 and submitted the Form-21 along with the letter. CGPL has provided compensation as required under the Factories Act, 1948.

No other major incidents occurred during the FY 2015 - 2016.

3.3.4 Safety Inspection Programmes

CGPL has started inspection programs for business associates and tools & tackels used in the critical activities. Some of the inspection programmes organized by CGPL is as per below:

Skill test of business associated is checked/assessed by team comprising of engineer from CGPL or contractors. The team has assessed contractors’ execution and assess the skill sets

of engineer and safety engineer for safety critical trades like scaffolder, grinder, fitter, welder, rigger etc. CGPL has established a process that only competent person will get the gate pass and will allowed to perform the jobs. This has helped them to screen out the skilled and non-skilled workmen based on their competency;

Tool Box Talk/Meetings were conducted by contractor’s supervisors and also CGPL engineers to appraise workers on hazards and their control measures;

CGPL has developed a process to inspect lifting tools & tackles on quarterly basis and ensure that all tools have proper color coding. This color coding helps in identifying whether lifting tools & tackles are used at the Site are inspected and fit for use;

Electrical equipment such as distribution boards, welding machnes, grinding machines and other electrical hand tools are inspected/tested and inspection sticker is pested only when fir for use. These stickers are valid for 3 months and they have to be recertified after 3 months.

Page 22: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

14

Equipment without sticker is not entertained at the Site and consequence management is applied if any violation is observed;

Page 23: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

15

Table 3-2: Health & Safety Compliance Assessment & Findings

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative

Closure Date

1 Old Health & Safety Management System

As discussed in Sl. No. 2 of Table 3-1 CGPL have obtained certification for its IMS in July 2014. Applicable all legal (license for storage of HFO, hydrogen cylinders etc.) are incorporated in the legal register and their references in the relevant health and safety procedures is completed larger extent.

Any amendment in existing rules or regulations or implementation of new rule shall be incorporated in IMS on regular basis.

To sustain On going

2 Old HSE Organizational Structure

CGPL has a dedicated O&M team assigned with the responsibility of managing operational health and safety risks of the project and is currently being provided handholding supporting by the constructions HSE team. The overall HSE organizational structure has therefore been assessed to be adequate in order to meet the project health and safety commitments.

- To sustain On going

3 New Permitting/Licensing requirements

CGPL has been assessed to possess valid license under the Factories Act, Contract Labour Act, Building & Other Construction Workers Act with annual returns found to be submitted for the period 2016-17 under the provisions of the Act

-

To sustain On going

4 Old Safety Performance Monitoring

CGPL continues to monitor safety performance of its project through constant supervision of contractors by dedicated and qualified health and safety personnel and documenting the same in the form of monthly SHE report. Further targets set as part of the Annual Safety Action Plan are assessed for each quarter to evaluate safety performance in terms of actual progress/achievement. The status of safety performance indicators for the period 2016-2017 is presented in Annexure 17. In Further efforts has been made by CGPL to enhance safety related awareness both at village and projet level through implementation of various safety related programs and inititatives viz. fire safety week, employee fire safety awareness programmes, rewards & recognition etc. In addition to above, CGPL has formed a central Safety Committee in consistent with the provision of the Factories Rules to assess and evaluate the safety performance of both CGPL and contractors.

- To sustain On going

5 Old Health & Safety Incidents

CGPL has developed Tata Power Suraksha Mobile Application to upload and track safety related observation. This has led to more

- To sustain On going

Page 24: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

16

Sr.

No. Item Aspect Assessment Recommendations Status

Tentative

Closure Date

observation (unsafe act and conditions) reporting and compliance was traced for closure. It has resulted in achieving greater safety compliance and achievement of 11.98 safe million man-hours. No lost time injury or fatality were occurred during this fiscal year.

6 New Work Zone Monitoring

Currently, CGPL undertaking work zone emission level at three (3) locations namely coal yard area, boiler area and fly ash silo area as required under Gujarat Factories Rules, 1963. As suggested during Q1 audit, Turbine area monitoring also been initiated by CGPL

- Closed To sustain

7 Old Chemical Storage & Handling

During this fiscal year, Arcadis observed the storage of chemical drums without provision of secondary containment, display of material safety data sheets (MSDS), weather protection and spill prevention kits at fabrication yard and dozer maintenance area.

CGPL shall ensure that all chemical drums shall have secondary containment. CGPL shall also prepare a spill prevention control plan.

Open TBP

8 New Storage of Gas Cylinders

Oxygen cylinders observed to be stored without hook in rack and improperly stacked near fabrication yard.

CGPL shall ensure that all the cylinders shall be store as per the Gas Cylinder Rules 2004

Open TBP

9 Old Contractor Management

A contract labour management plan has been developed and implemented by CGPL HR department. As communicated, the plan is being shared will all new and existing contractors to ensure compliance with the applicable labour laws and policies. Further periodic training is imparted by CGPL for contractors’ on-Site to ensure labour welfare. CGPL has also implemented procedure to check all contractor compliance on monthly basis during their bill clearance. Review of contractor plan also indicates the provision of the inter State Migrant Workmen (Regulations of employment and Conditions of Services) Act, 1978 as there are more than 100 migratory workmen are deployed at the Site.

- On-going To sustain

10 New Lifting Tools & Tackles

Site is undertaking testing of all lifting tools and tackles through a third party competent person as required under Factories Act, 1948. However, no identification mark was observed on the lifting rope located in fabrication yard.

CGPL shall develop a system for identification of all the tools and tackles specifically used by contractors.

Open TBP

Page 25: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

17

3.4 Compliance by CGPL with Social Requirements

A brief summary of the social performance of the project for the period 2016-17 consistent with IFC & ADB requirements and applicable legislations which is to be supported by detailed assessment and findings in table format is provided in Table 3-3.

3.4.1 Compliance to IFC & ADB Requirements

The social performance of the project is briefly outlined in this section for the period 2016-17 consistent with the IFC Performance Standards. The matrix of assessment and findings is presented below in Table 3-3 for necessary reference.

3.4.2 Community Relations Organization Structure & Capacity Building

The CR Department consists of nine staff members from Tata Power Community Development Trust (TPCDT) who are involved in implementing CSR activities at CGPL. Chief Sustainability Officer has been appointed to overlook the sustainability programme of CGPL. There has been a considerable effort put in the planning and implementing of new activities in line with their Strategic Intent of CGPL.

CSR activities are implemented directly and indirectly by CGPL, CSR activities have been implemented jointly with through TPCDT and specialized project partners such as Pratham, Utthan, Helpage, Swadeep, Kutch Nav Nirman Abhiyan, NDDB, Sahjeevan, Parjanya Ecology, Geoscience and ACT, GGRC (Gujarat Green Revolution Company), FISHMarc, MGLI, etc. Studies have also been carried out to assess the health scenario in identified villages, fishermen’s.

3.4.3 Grievance Redressal Mechanism

A commitment was made by CGPL to improve the GRM through the implementation of an online computerized Grievance Redressal Management System which is now under implementation. Tbits has been implemented and been continued since the past few years. GRM currently being followed is thus stronger previously followed mechanism. Oral feedback or replies are made to the person raising the grievance. Documentation is available for the same.

Most of the issues raised through Tbits are related to requests for procurement opportunities and CSR interventions.

3.4.4 Stakeholder Engagement Plan

A dedicated coordinator is placed in the Community Information Centre (CIC) which is functioning under the aegis of Community Relations (CR)-CGPL. CIC is one of those aspects, where the community comes with their suggestions and/or complaints.

Documentation and reporting is being prepared and maintained. Reports including Social Audit Reports, Project reports from partner NGOs, internal reports, Pamphlets of CSR activities for advocacy and awareness campaign, Minutes of meetings, photo documentation, Annual Project Report from the partner NGOs etc. are prepared, printed and maintained regularly as per requirement. Wherever required, handouts and short notes are also prepared in local language for distribution during stakeholder meetings.

CIC role is also being revised and enhanced to meet requirements of CGPL for stakeholder communication and stakeholder engagement.

Documentation does not reflect with engagement undertaken with various stakeholders including the communities, Government departments, project partners, FOKIA, other industries, Gaushala trust and others. Short documentaries showcasing the CSR activities has been made and uploaded on the website and is available on Utube. Additionally, short publications on CSR is required which can be distributed during various meetings and programmes attended and held by CSR Officials. Website link

Page 26: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

18

for various CSR documentaries can be provided to enable people to access the same. Print documents should also be prepared for distribution during trainings, meetings, workshops and other activities.

The documentation process should be strengthened with more dissemination tools adopted for various levels.

3.4.5 Community Development Plan

CGPL, for its internal requirements and compliance, prepares an Annual Business Plan for its CSR programmes and activities. Total expenses for the preceding year is also prepared based on the actual expenditure. CSR Policy and Strategic Intent for CSR Sustainability Programmes has been prepared for CGPL. This is the basis for the community development CSR activities to be carried out. Broader aspects of the community development plan is addressed within the Strategic intent document.

Taking inspiration from the Tata Power’s commitment to the ‘triple bottom line’ concept, CGPL has

weaved in environmental balance, culture, social inclusion and economic growth into its sustainability strategy.

CSR (Social Development), Environment and Biodiversity will be the 3 intrinsic components of the sustainability functions of CGPL. Apart from meeting the core expectations of stakeholders in an inclusive manner, the company will also strive to achieving excellence through meeting global benchmarks and reporting standards. Similarly, CGPL will abide by all environmental norms and aspire to achieve benchmark standards in its operations. The sustainability framework will advocate a wider synchronization of sustainability in all core operations and stakeholder engagements of CGPL.

Strategic Intent for CSR Sustainability Programmes states that CGPL’s CSR activities will be reviewed

from time to time by different Evaluation Teams and Advisory Committee to ensure that the programme is following the right direction and achieving the avowed objectives. There is both internal and external monitoring of CSR activities.

Based on the inputs from these various consultations, the thematic areas of significance, identified for CGPL’s intervention are,

Livelihood linked biodiversity/ ecology, Basic Needs issues at the community level; and Social Capital and Infrastructure combined with structured communication channels across

stakeholders. The CSR policy of CGPL will have a broad alignment with the five core thrust areas identified by Tata Power. Programmes as per the immediate local needs will be allocated 20% of the CSR planned allocation. The remaining 80% will be as per the thematic areas emerging from the strategic intent. These thrust areas are also aligned with the schedule VII activities as per CSR outcomes of the Companies Act 2013 and CSR Rules 2014.

The identified areas in the schedule VII are key social issues where national level gaps have been reported and are mostly aligned with MDG (2015) or the recently defined Sustainable Development Goals (2030). Tata Power’s core thrust areas are outlined below:

Augmenting rural primary education Building and strengthening healthcare facilities Enhancing programs on livelihood & employability Building social capital and infrastructure Nurturing sustainability for through rural energy solutions, etc.

The Annual Business Plan for CGPL for the year 2016-17 has been drafted and is under review by CSR committee for CGPL and Tata Power.

Page 27: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

19

Table 3-3: Social Compliance Assessment & Findings

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

I Livelihood Linked Biodiversity/ Ecology

A Animal Husbandry and Related Activities – Project Partner Kutch Nav Nirman Abhiyan and NDDB

1

Brucellosis Control Project – Project Partner Kutch Nav Nirman Abhiyan (Knna)

In 2016-17, details of 10491 Vaccinated Calves have already entered in software of INAPH, NDDB. The project has been extended by 5 years. 100 % Calves vaccination has been reported for 7 villages. And 79 % eligible calf vaccination in 22 villages has been achieved. 1400 cattle vaccinations have been conducted. Documentary has been made about the project with interviews from local farmers. This documentary is currently in the process of being converted into what sup version to improve reach for awareness campaign to farmers and involve their participation in the project.

Ensure coverage of Gaushala beneficiaries under the project. On-going Long Term

2 Fodder Distribution and supporting animal husbandry

The “Kanthi” livelihood program is continuing as a mitigating measure for loss of grazing land acquired for project. For fulfilment of the commitment, number of activities have been undertaken including formation of trust, management of gaushala, fodder support for drought, overall reduction of fodder waste through efficient and scientific management. KALP especially fodder distribution is one of the main activities under CSR both in terms of budgetary allocation and expenditure and manpower. In the FY 2016-17, savings in fodder with better methods and daily monitoring has resulted in fodder distribution for additional two months during drought situation in 2016. Efforts made to address fodder cultivation in the region since 2015-16 includes identification of best possible variety and type of fodder which can be cultivated in the region, fodder demonstration in demonstration plots within CGPL boundary, technological innovations for fodder cultivation to address concerns related to wildlife, water, etc, and encourage farmers to cultivate fodder, distribution of slips of identified variety of fodder.

A long-term initiative is required to make the Gaushala completely independent and/or sustainable. Gaushala Trusts has been formed. The trusts need to be strengthened so as to take over the day to day functioning of the Gaushala completely. CGPL and TPCDT staff should work on options such as establishment of a corpus fund for managing the expenses for fodder distribution, better management of livestock at household level, establishment of any commercial activity to enable the gaushala to operate through the use of profits, return of gauchar land or similar land purchased for the purposes, setting of upper limit of number of animals per household, charges based on the sale of milk and maximum number of animals to be levied per household, processing of milk into higher value dairy products such as organic products, cheese, butter, etc.

On-going Long Term

Page 28: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

20

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

Dry and green fodder is now being procured directly from the farmers. About 171 farmers have been given slips for fodder cultivation Software has been introduced for digitization of gaushala related activities. Currently it is operating on a limited access model as the data is being compiled, added and other aspects like weigh bridge software integrated in the software for automatic update of vendor, vehicle and fodder details is being prepared. Presentation on Fodder Security has been given in Kutch Corporate Social responsibility KCSR Conclave, 2017. Two industries are also initiating CSR interventions for fodder development in Kutch under an agreement of intent with CGPL.

B Agricultural Extension

1

Seed Bank under fodder demonstration – Project Partner Prajanya Ecology Pvt. Ltd.

Programme aims at only the rain fed farmers. Original seeds have been collected from eight farmers. The seeds were used in the demonstration plots and about 500 kgs of seeds are available for distribution to other traditional farmers. 5 to 10 kgs of seeds will be distributed to about 100 farmers. A total of about 500 farmers are expected to be reached through this programme.

The rainfall has been less than average, since the last two years, which has affected agriculture and related activities.

On-going Sustain

2

Micro Irrigation system / Drip Irrigation – Project Partner Gujarat Green Revolution Company (GGRC) through TPCDT

The programme has been extended to 263 farmers and 503 hectares brought under drip irrigation in 9 villages. The average land per farmers is about 1.63 hectares.

The actual savings in terms of water and other resources using drip irrigation must be documented along with comparison for non- drip irrigation cultivation. Coverage of land with the same quantum of water under drip and non-drip conditions will help in estimating the production per unit of water.

On-going Sustain

C Participatory Ground Water Management (PGWM) - Project partners Arid Communities and Technologies & Geo Sciences Services

1

Participatory Ground Water Management (PGWM) - Project partners Arid Communities and

The project covers about 21 villages. CGPL organized a one day workshop in September 2016, on participatory groundwater management for Kankavati sandstone. The workshop was conducted at the block level by Tata Power Community Development Trust (TPCDT) in

Good practice. Process recording is required for all long term projects in order to understand the process and engagement with various stakeholders to improve efficacy and ownership of the programme. While some documents and

On-going Long term

Page 29: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

21

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

Technologies & Geo Sciences Services

association with Arid Communities and Technologies (ACT), Geo-Science Services (GSS), and NGO called Arogyam. Presentation was also made in FOKIA. Two other industries are replicating the project in their areas of influence and interest. An agreement of intent has been signed to that effect. Rainfall has been less than average and therefore major impact cannot be seen post monsoon.

recordings are available this entire process should be captured and published in various forms to enable learning and replicability by other industries, government bodies and NGOS. The project would be unique project in terms of the partnership and stakeholders involved in the process such as villages/communities, industries, federation of industries and government nodal departments. A pre and post process recording in documentation or photo documentation of the farmers current farming practices, water use, method of cultivation and cropping pattern and change anticipated in the next 5 years.

2

Water Conservation and Harvesting structures – Project partner Geo Science Services through TPCDT

Structures such as Ponds, dams, check dams, wells and have been deepened, renovated or repaired. Gabions have also been constructed for one of the small streams for recharging ground water. Villages where work was observed included Faradi dam, Nana Bhadia, Mota Kandagra, Gundiyali, Tragadi and others. Presentation about the programme was made in a conference organised by the Central Groundwater board. Success of the programme will be noticeable after a longer time period as the last two years the rainfall was lower than average.

Community engagement for various works taken is not reflected in the currently maintained records. There has been a democratic and participatory process in planning and carrying out various activities under the programme. This need to be recorded as a reflection of the community participation, engagement and democratic institutional mechanism which ensures inclusive growth.

Sustain Long term

D Engagement with fishing communities Project Partners Swadeep, Utthan (Prawn Farming) Through TPCDT

1

Sagarbandhu–Project Partners Swadeep, Utthan (Prawn Farming) Through TPCDT

Continuation of the “Sagarbandhu” programme to develop fishermen community at Tragadi, Modhva and Tragadi Bunder. For 2016-17 CSR activities extended to Tragadi bunder include health camps, supply of drinking water tank, solar lights, mobile sanitation units, formation of VDACs and microfinance. Eco friendly temporary structures are used for school, Fishermen Information Centre and toilets. The number of families in the beginning of the season is now 121. Earlier 100 families would be observed in the bunder at the close of the season.

Chronology of events detailing key events should be done for all groups of fishermen and all activities. Extent and impact of interventions is not reflected in the current database. The integrated planning and implementation of a sustainable perspective for the fishermen both, settled and transitory should be shared through good documentation in the form of narratives, Life stories/life history/Oral history, etc. This should be in written or documentary form which record and report the fishermen’s’

On-going Long term

Page 30: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

22

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

Children staying at the bunder with their families are now attending school. The children have become regular in school compared to previous years when they used to be involved in the fish related business such as sorting, drying etc. Software/apps has been installed in fishermen’s basic /smart phone to enable them to access information about tide timings, potential fishing zones, etc. Additional activities include case study was conducted on fish sorting equipment’s to enable faster and larger amounts of sorting of fish in the season, distribution of 118 sieves for sorting to fisher families, exposure visit to research station of fisheries, distribution of health kit, survey of households, street light installation, learning camps with Sagarshala students, distribution of community utensils and cultural activities. Livelihood Improvement plan has been completed. Fund allocated for health and education have not been utilized due to lack of specific need by the Pagadiyas. Reports and documentation is maintained for the activities including VDAC proceedings, MOM, meeting reports, etc.

efforts along with CGPL to make a difference in their lives.

2 Microfinance

Micro finance has been initiated for 4 groups of fishermen at Tragadi bunder in continuation of same activity in YR 2015-16. A total amount of Rs. 2745906 has been extended to 4 fishermen group members of which Rs. 1550364 is repaid and Rs. 1195542 is pending roughly 58 % has been repaid for two years. In one of the groups the recovery is almost 73 % and in another recovery is 69%. In two groups the average recovery is 45 %.

Year wise analysis should be done to analyse and understand the recovery for the first year and the second year. If intergroup comparison is possible then the difference between the repayments of various groups should be examined.

On-going To be decided

3 Prawn cultivation

Prawn cultivation as a new activity is proposed to be undertaken for livelihood interventions for the year 2016-17 which is delayed due to pending approvals from Fisheries department. Certain activities has been initiated under the programmes which includes capacity building of the participants, NGO partners and government line departments, strengthening of VDAC and communities for undertaking prawn cultivation, formation of producer

Documentation of the preliminary support and necessary permissions and approvals required from concerned dept. is needed for replication of the activity by other stakeholders. Keeping in mind the cumulative impact on the coastline due to natural factors and industrial development and Kandla Port, Prawn cultivation can be considered as a major non

Yet to be initiated To be decided

Page 31: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

23

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

company for forward linkages, Supporting the process of Master Mapping of identified areas for Tragadi and Modhva, follow up of the documentation process with the concerned government departments, etc. The work has been delayed due to the requirement of necessary approvals from concerned Depts. namely Fisheries Departments at Gandhinagar.

land livelihood option by industries in their area of influence or by Fisheries Dept.

II Basic Needs ( Health & Nutrition, Education, Public Health - Drinking Water, Sanitation, Solid Waste Management)

1 Education – Project Partner Pratham

CGPL has through its education programme with Pratham - has worked with students, communities, teachers, parents and others. The focus is now on the teachers as groups that needs to ensure that the training imparted to them is used for classroom and real time teaching. CGPL has set up a Science Centre to enable children from the schools to attend and understand science in a practical, do it yourself method. A mega Science Fair has also been organized in this regard.

To ensure that teachers are using new methods imparted through training, peer groups role should be examined. Quarterly interschool fest, competitions or other programmes can be organised focussing on the teacher role in imparting education. Activating communities or panchayat groups within the villages to ensure that the focus remains on teachers and schools.

To sustain On going

2

Solid waste management – Project partner Sahjeevan Through TPCDT

Waste Management related work is almost completed in 6 villages. In one village, it is expected to start within the month of April 2017. Tricycles have been given for waste collection, segregation centres are completed or being constructed. Clean Street campaign was initiated in 5 villages in March 2017. Since women play an important role in managing waste at household level, a competition was organised named as ‘Swachchh Faliya Swachchh Gamm competition’. Women from 22 SHGs participated in the 10-day long competition. On 8th of March, Judges visited each village and streets which had been cleaned and decorated with traditional rangoli patterns by the village women. Village Maska was awarded the best village awarded. Feedback has been very positive and more villages are getting motivated and eager to participate in such activities.

Focus on waste management is a good initiative. The programme aims to empower the Village panchayats and communities to build their capacities to address village level issues of waste management. Documentation is required to see the process of change and community participation. In some of the State’s, funds have been released under PRI and NREGA for sanitation related works and wages. The same can be explored for the villages under SWM in Gujarat.

On-going

Long Term

Page 32: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

24

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

3 Promoting and Providing Sanitation Facilities

Mandvi block has been declared ODF. Block authorities and Panchayat of various villages have appreciated CGPL’s efforts in contributing to the mission.

CGPL to replicate the same in the villages of influence or impact area in Mundra. On-going Long Term

4

Building and Strengthening Healthcare facilities

This has been one of the good initiatives as a preventive health care intervention. Other programmes under this includes Mobile Medical Unit (Medical Van) which has been initiated, Gynaecology and orthopaedic camps and school medical camps. Age related issues are also addressed relating to diet and nutrition. CGPL also does referrals to other medical services such as government health services and Adani health services. Study has also been conducted for assessing the health situation in identified areas. The study found a comparable situation which reflects the current pattern of diseases and medical issues as reflected in the diagnosis and treatment by MMU.

CGPL to continue these programs and improve them based on feedback obtained through systematic surveys planned by CGPL through external agencies, and CGPL’s interactions with the communities. Documentation of impact of the services provided in terms of improving health, reduction in health problems related to quality of water, reduction in the number of days of sickness or ill health in the household, reduction of expenditure on medical treatment, etc. Focus or emphasis should be on preventive health care for communities.

Ongoing Long Term

III Building Social Capital

1

Women Empowerment: Creation of new and continuation of existing SHGs to cater to empowerment and financial literacy of rural women, nurturing sustainability for inclusive growth

A long-term study is under progress for the assessment of the WSHGs. The study has been conducted by NGO Sadhikarata Foundation also known as APMAS. The first draft of the study has been submitted to CGPL and in under review by concerned officials.

CGPL to include interventions related to WSHGs as a major thrust area since they are working in sectors such as SWM, health, education, BCP and PGWM which require the active participation of women as a critical stakeholder for achieving inclusive growth.

Ongoing Long term

IV Strengthening and Building Infrastructure

Page 33: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

25

Sr.

No.

Activities/ Sub-

activities Assessment Recommendations Status

Tentative

Closure Date

1

Civil Infrastructure: infrastructure is being created through 5 different programs

Civil infrastructure has been created on the needs and demands of the communities. This includes construction of community halls, boundary walls for crematorium, sanitation units, RO installation, CC and earthen roads, drainage lines or nallas, SWM structure such as segregation centres, renovation and construction of water harvesting structures (included in separate section), interpretation centre, community hall, etc.

Civil infrastructure has been planned as per Annual Business Plan (of CR Dept.), for 2017-18 and integrate through the feedback received through stakeholder interactions and monitoring & evaluation of community development programs.

On going To be Decided

Page 34: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

26

Photo 3-1: Storage of Oily Rags with Municipal Waste

Photo 3-2: Oil Storage without Secondary Containment – Dozer Maintenance Area

Photo 3-3: Water Seepage – Ash Pond Slopes

Page 35: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

27

Photo 3-4: Improper stacking of Oxygen Cylinder near Fabrication Yard

Page 36: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

28

4 COMPLIANCE WITH COUNTRY REQUIREMENTS

This section describes compliance of the project with respect to regulatory requirements as specified in the permit/consent documents and their amendments viz. environmental clearance (EC), CRZ Clearance and Consolidated Consent & Authorization (CC&A).

Inspection or review of CGPL’s environmental and safety compliance provisions for the project does

not reveal any non-compliance. Preliminary assessment does not indicate any significant deviations / non-compliance with respect to national laws on social issues. No other regulatory compliances have been assessed to be required for implementing EMP. With all units currently under operation the key EC, CRZ and CC&A conditions have been reviewed in terms of its environmental and social implication with its compliance and/or action status being outlined in the Table 4-1 below.

Table 4-1: Health & Safety and Contract Welfare Aspects

Sr.

No. Summary of Key Condition Compliance/Action Status

A. Environmental Clearance dated 2nd March 2007 & Corrigendum dated 26th April 2011

A.1

Imported coal consumption shall not exceed 12 million tons per annum and ash and Sulphur content in the coal to be used in the project shall not exceed 10% and 1 % respectively

Refer to Sl.No. 3 & 4 of Table 3-1 for details.

A.2

One tri-flue and one bi-flue stacks of 275 m each shall be provided with continuous online monitoring equipment’s. Exit velocity of 25 m/sec shall be maintained.

One tri-flue and bi-flue chimney have been erected and has been operational from August and December 2011 respectively. Manual monitoring results for the period 2016-17 for indicates that average flue gas velocity was less than 25 m/sec which is found to be closely meeting the velocity specified in the EC.

A.3 High efficiency ESPs with efficiency not less than 99.9% shall be installed to ensure that PM emission does not exceed 100 mg/Nm3.

ESP erection commenced and completed for Unit#1, 2, 3, 4 & 5. Interpretation of manual monitoring data recorded for all 5 units during 2016-17 reveals exceedance to NOx emission standard specified in EC (Refer Appendix 6).

A.4

Adequate dust extraction and dust suppression system such as bag filters and water spray systems in dusty such as coal and ash handling areas shall be provided.

Fixed water sprinklers have been provided and operated near coal stockpile area to control fugitive dust generation. Dry fogging system and water sprinklers have been installed at coal conveyor and at junction towers to control fugitive emissions. Fugitive emissions at ash handling areas viz. ash silo is being controlled through installation of bag filters. Additionally to control fugitive emissions from coal stockpile and conveyor the following measures has been implemented: Construction of wind barrier along the

facility boundary wall near the coal conveyor.

Installation of physical barriers along coal conveyor.

Development of green belt at the ICHS area

Page 37: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

29

Sr.

No. Summary of Key Condition Compliance/Action Status

A.5

Fly Ash shall be collected in dry form and shall be used in a phased manner as per provision of the notification on Fly Ash Utilization issued by the Ministry III September, 19991 and its amendment. By the end of 9th year full fly ash utilization should be ensured. Unutilized ash shall be disposed-off in the ash pond in the form of High Concentration Slurry.

Refer Sl.No.5 of Table 3-1 for details with respect to fly ash utilization.

A.6

Rain water harvesting shall be practiced. A detailed scheme for the rain water harvesting to recharge the ground water aquifer shall be prepared in consultation with Central ground water Authorities/ state ground water board and a copy of the same shall be submitted within three months to the ministry.

Rain Water Harvesting plan has been approved by CGWB.

A.7 The treated effluents shall conform to the prescribed standards before discharge

Regular monitoring of ETP treated effluent is being carried out by CGPL for parameters specified in the World Bank EHS Guidelines, 1998. For further details please refer to Sl. No. 12 and 13 of Table 3-1.

A.8 Regular monitoring of ground water in and around the ash pond shall be carried out and records maintained

Regular monitoring of ground water is being carried out by CGPL from bore wells located near the ash pond area and records maintained. For further details please refer to Sl. No. 15 of Table 3-1.

A.9 Ash pond shall be lined with impervious lining The ash pond has been provided with impervious lining comprising of HDPE and reinforced concrete.

A.10

Suitable system shall be provided to reduce water temperature at the final discharge point so that the resultant rise in the temperature of receiving water does not exceed 7°C over and above the ambient temperature of the receiving water body.

Refer to Sl. No.9 of Table 3-1 for further details related to cooling water discharge temperature.

A.11

Criteria pollutant levels including NOx, RSPM (PM10 & PM2.5), SOx (from stack and ambient air) shall be regularly monitored and results displayed in your website and also at the main gate of the power plant.

Monthly ambient air quality monitoring of criteria pollutants is already under progress at the project site and nearby villages. The air quality data so obtained is being electronically displayed at the main gate of the plant while the six monthly compliance reports bearing both ambient has been uploaded at the Tata Power website.

A.12

Conservation and development of mangroves species found in this area shall be taken up with a conservation plan duly approved by State Forest Department.

The “Mangrove Afforestation Program” has been undertaken and completed by CGPL in collaboration with Gujarat Ecological Commission (GEC) and Kantiyajal Tavar Vikas Samiti (KTVS) from Oct’10 and has been effectively implemented in ~1000 ha land in the coastal village of Kantiyajal, Bharuch district thereby complying with the EC condition.

A.13 A 100 m wide green belt will be developed all around the plant, ash pond and township

In line with EC requirement, 417.89 Ha area has been covered under green belt and thus 1/3rd of the total project area (1242 ha) is covered under

1 The 1999 Notification has been amended by Fly Ash Notification 2003 by which 100% utilization of fly ash need to be ensured from 4th year onward instead of 9th year as per the earlier notification.

Page 38: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

30

Sr.

No. Summary of Key Condition Compliance/Action Status

covering 1/3rd of the total project area under green belt development

green belt. For further details please refer to Sl. No. 1 of Table 3-1.

A.14 Leq noise level should be limited to 75 dB(A) and regular maintenance of equipment to be undertaken.

Regular monitoring of Leq noise level is being carried out by CGPL both at various location within project and village areas to check conformance with noise standard specified for both industrial and residential area. Review of results obtained for the project site locations for the period 2016-17 reveals compliance to both day (75 dBA) and night time noise (70 dBA) standard specified for industrial area. Refer Sl. No. 17 of Table 3-1.

A.15

It shall be ensured that an in-built monitoring mechanism for the schemes identified under CSR activities are in place and annual social audit shall be got done from the nearest government institute of repute. The project proponent shall also submit the status of implementation of the scheme from time to time.

In house monitoring mechanism for CSR activities is in place. Social Audit being undertaken and the report shall be submitted to MoEF.

Consolidated Consent & Authorization

B.1 Install online opacity meter and online monitoring facility and operate regularly and maintain the record on daily basis

Refer to section A.2 and A.3

B.2

Provide centralize dusting facility as well as enclosed system to belt conveyer to control fugitive emission in the premises as well as surrounding area.

Coal is being evacuated from West Port to the ICSH area through ~9km long enclosed belt conveyor equipped with water sprays to control fugitive emission.

B.3 No ground water shall be used for the project coming under dark zone even in lean season without permission of competent authority

Sea Water Reverse Osmosis (SWRO) has been commissioned and operated by CGPL since Sep’11 to meet the water requirement.

B.4

Adequate dust extraction system such as cyclones/bag filter and water spray system in dusty areas such as in coal handling, ash handling and other places shall be provided to control fugitive emission.

Refer to section A.4.

B.5 Provide suitable system at the intake water line and outlet of the sea discharge and maintain the record for the same on regular basis.

Water meters have been installed at appropriate locations to monitor cooling water intake and outfall discharges rates on a continuous basis.

B.6

The generation and discharge of industrial effluent from the manufacturing process and other ancillary industrial operations after addition of Phase IV and Phase V shall not exceed 14992500.00 KL/Day

Discharges through the outfall channel are being regularly monitored by CGPL. The average discharge rate for the period 2016-17 is found to be in compliance with threshold limit specified for such discharges in the Consolidated Consent issued by GPCB.

B.7

The discharge from the project activities i.e. final treated effluent shall not exceed the temperature more than 7°C than the intake water temperature.

Refer section A.10

B.8

On line monitoring shall be adopted and continuous display of the temperature of the return effluent before disposal into the sea shall be made at all appropriate places including the gate of the power plant.

Online monitoring of cooling water temperature is being carried out throughout the outfall channel at specific locations and records maintained. CW temperature details being displayed on the display board along with ambient air and flue gas emission information

Page 39: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

31

Sr.

No. Summary of Key Condition Compliance/Action Status

B.9 The quantity of the domestic waste water (Sewage) after addition of Phase IV and Phase V shall not exceed 535 KL/Day.

Review of domestic sewage treatment record for the period 2016-17 reveals generation in conformance to the limit specified in the CTO.

B.10

The treated effluent from the manufacturing and other ancillary operation shall conform to the following standards: Condensate Cooling Water: pH (6.5 to

8.5) and Free Available Chlorine (0.5 mg/l) Ash Pond Effluent: pH (6.5-8.5); TSS (100

mg/l) and Oil & Grease (20 mg/l)

Review of analytical results of condensate cooling water for the period 2016-17 reveals compliance. Refer to Sl.No.12 of Table 3-1 for details on ash pond effluent.

B.11

The quality of the sewage shall conform to the following standards BOD 5 days at 20°C (20 mg/l); TSS (30 mg/l); and Residual Chlorine (minimum 0.5 ppm).

Refer to Sl.No.14 of Table 3-1 for further details related to STP treated water quality.

B.12

The final treated effluent conforming to the above standards shall be disposed into the deep sea by the discharge point as per the recommendation and suggestion given by NIO.

The project has been designed based on once through cooling system with the cooling being discharged into the sea through a 7.3 long outfall channel. Further such cooling water discharge location has been selected based on the thermal and salinity dispersion modeling undertaken by NIO.

B.13

The following shall be used as fuel after addition of Phase IV and Phase V in the boiler/ furnace / Thermic fluid Heater / DG Sets as following rates: Imported Coal: 14,13,600 MT/month Fuel Oil: 6000 MT/month LDO: 45 KL/month

Review of the monthly consumption records of coal, HFO and LDO for the period 2016-17 indicates compliance with coal & fuel oil monthly consumption. LDO values exceed on few occasions mainly during start up activities. Monthly consumption details have been provided below: Coal (MT/month):

April 2016 – 702795.28 MT May 2016 – 778529.27 MT June 2016 – 639139.63 MT July 2016 – 6,60,461.46 MT August 2016 – 10,91,339.82 MT September 2016 – 10,76,668.00 MT October 2016 – 989,824.00 MT November 2016 – 771,552.00 MT December 2016 – 747,794.00 MT January 2017 – 1013444 MT February 2017 – 954591 MT March 2017 – 1130795 MT Fuel Oil (MT/month):

April 2016 – 325.88 MT May 2016 – 431.81 MT June 2016 – 520.27 MT July 2016 – 1,229.76 MT August 2016 – ---- MT September 2016 – 3.72 MT

Page 40: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

32

Sr.

No. Summary of Key Condition Compliance/Action Status

October 2016 – 169.76 MT November 2016 – 1,177.17 MT December 2016 – 1,051.34 MT January 2017 – 431.5MT February 2017 – 262.3 MT March 2017 – 129.1 MT

LDO (KL/month):

April 2016 – 61.18 KL May 2016 – 46.65 KL June 2016 – 32.84 KL July 2016 – 165.65 KL August 2016 – ---- KL September 2016 – ----- KL October 2016 – 14.80 KL November 2016 – 89.23 KL December 2016 – 32.46 KL January 2017 – 17.6 KL February 2017 – 27.5 KL March 2017 – 17.5 KL Exceedance was due to startup related activities.

B.14

The applicant shall install & operate air pollution control system after addition of Phase IV and Phase V in order to achieve flue gas emission norms as prescribed below: PM – 50 mg/Nm3

Refer to Sl.No.10 of Table 3-1 for further details.

B.15

The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75dB(a) during day time and 70 dB (A) during night time.

Refer to section A.14

B.16

The concentration of the air pollutant parameters in the ambient air within the premises of the industry shall not exceed the limits specified as per national Ambient Air Quality Emission Standards issued by Ministry of Environment and Forest dated 16th November-2009.

Monthly ambient air quality is being regularly monitored at 3 locations within the project site viz labour colony, CGPL hostel and near the main gate of the project site. Interpretation of monitoring results of ambient at the aforesaid locations for 2016-17 revealed conformance to National Ambient Air Quality Standards (NAAQS) except for the average concentration of PM10. This can be possibly attributed to arid climatic conditions.

B.17

Records of waste generation, its management and annual return shall be submitted to Gujarat Pollution Control Board in Form-4 by 31st January of every year.

Refer to Sl.No.7 & 8 of Table 3-1 for further details.

B.18

Industry shall have to display the relevant information with regard to hazardous waste as indicated in the Hon Supreme Court's order in W.P. No.657 of 1995 dated 14th October 2003.

CGPL has displayed hazardous waste details at gate.

Page 41: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

33

Sr.

No. Summary of Key Condition Compliance/Action Status

B.19

Industry shall have to display on-line data outside the main factory gate with regard to quantity and nature of hazardous chemicals being handled in the plant, including wastewater and air emissions and solid hazardous waste generated within the factory premises.

Online display board has been installed at the main gate and details regarding ambient air, air emission and waste water quality are displayed.

B. CRZ clearance dated 25th April 2007 and amendment dated 9th March 2010

C.1 Regular monitoring of thermal dispersion to be carried out and report submitted to the Ministry

Model conformity study conducted and submitted to relevant stakeholders.

C.2

The fishing activities and movement of fishermen on the coast should not be affected. Appropriate measure such as bridges or walkways over the channel should be provided.

Constructed access road as alternate road for Tragadi harbor from Balaji Salt pan Bund.

C.3 No Objection Certificate from the Gujarat State Pollution Control Board should be obtained before starting the project

Consent to Establish (NOC) obtained by CGPL on 17th July, 2007.

C.4

It shall be ensured that the cooling water before discharge shall confirm to the standards laid down by Gujarat State Pollution Control Board and Central Pollution Control Board.

Refer section A.10.

C.5 Continuous monitoring of the temperature at the discharge point should be provided.

Regular online monitoring of cooling water temperature is being carried out at the bridge constructed over the outfall channel near the ash pond area. In this regard CGPL has also engaged a monitoring agency to undertake regular monitoring of cooling water discharge parameters near outfall point from Apr’12 onwards. For further details please refer to Refer to Sl. No. 9 of Table 3-1.

C.6 The canal should be constructed in such a manner that no percolation takes place to the ground water.

The outfall channel of total length 7.3 Km is lined with impervious material to prevent any cooling water percolating to ground water aquifers.

C.7

The end of discharge weir shall be designed to ensure that the tidal water does not find its way into the pre-cooling channel. Further, it shall be ensured that the hot water discharge is uniformly spread over the radial region in front and mixing of warm water with the ambient receiving water is maximum.

Specification in the procurement order was verified to be in compliance with these requirements and meet the required standards. This is further substantiated by the cooling water temperature recorded for the period 2016-17.

Page 42: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

34

APPENDIX 1: PERSONS INTERVIEWED

List of Persons Interviewed

Sr. No. Name Designation

1. Mr. Arunachal Mudgirkar Sustainability Head

2. Dr. Amit Kumar Tyagi Group Head - Environment

3. Mr. Tejas Khadse Lead Associate

4. Mr. Pradeep Ghoshal Group Head - Community Relation

5. Mr. Saurabh Sharma Lead Associate - CR

6. Mr. Asif Pathan Specialist - TPCDT

7. Mr. Shyam Choudhury Head - HR

8. Mr. Pramod Singh Head - Fire & Safety

Page 43: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report

35

APPENDIX 2: QUALITY OF BLENDED COAL USED

Blended Coal Used Quality from April 2016 to March 2017

Month Unit # 10 Unit # 20 Unit # 30 Unit # 40 Unit # 50

Sulphur Content

April 2016 0.47% 0.48% 0.47% 0.46% 0.48%

May 2016 0.48% 0.48% 0.46% 0.46% Under Maintenance

June 2016 0.49% 0.44% 0.44% 0.45% Under Maintenance

July 2016 0.50% 0.50% 0.49% 0.49% 0.49%

August 2016 0.47% 0.48% 0.50% 0.46% 0.49%

September 2016 0.50% 0.50% 0.51% 0.47% 0.50%

October 2016 0.55% 0.55% 0.57% 0.54% 0.55%

November 2016 0.54% 0.49% 0.52% 0.49% 0.49%

December 2016 0.51% 0.47% 0.46% 0.46% 0.49%

January 2017 0.45% 0.46% 0.39% 0.39% 0.46%

February 2017 0.45% 0.44% 0.40% 0.39% 0.40%

March 2017 0.48% 0.47% 0.43% 0.43% 0.42%

Ash Content

April 2016 8.72% 9.77% 9.55% 8.01% 9.50%

May 2016 8.88% 9.27% 9.20% 7.66% Under Maintenance

June 2016 8.88% 9.27% 9.20% 7.66% Under Maintenance

July 2016 5.89 5.91 5.87 5.85 5.86

August 2016 6.31 6.9 8.01 5.84 7.65

September 2016 7.46 7.42 8.36 5.96 7.35

October 2016 7.29% 7.60% 8.52% 6.21% 7.05%

November 2016 9% 6.37% 7.85% 5.98% 5.96%

December 2016 8.67% 6.61% 5.94% 6.42% 7.76%

January 2017 8.50% 8.87% 5.53% 5.58% 8.72%

February 2017 8.09% 7.97% 6.27% 5.81% 6.09%

March 2017 8.71% 8.10% 6.13% 5.80% 5.41%

Page 44: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

36

APPENDIX 3: HAZARDOUS WASTE RETURNS RECORDS

Sample Copy of Hazardous Waste Manifest During April 2016 to March 2017

Page 45: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report

37

APPENDIX 4: COOLING WATER TEMPERATURE RECORDS – GRAPH

Manual Cooling Water Temperature Difference from April 2016 to March 2017

APPENDIX 5: COOLING WATER TEMPERATURE RECORDS – DETAILS

Manual Cooling Water Temperature Difference from April 2016 to March 2017

Date Intake Channel

(°C)

Retaining Wall of

Outfall Channel

(°C)

Average Temperature Difference

between Intake & Outfall Channel

(°C)

1-Apr-16 28.5 33.3 4.8

3-Apr-16 28.1 32.7 4.6

5-Apr-16 28.6 32.2 3.6

7-Apr-16 28.9 32 3.1

9-Apr-16 28.1 31.7 3.6

11-Apr-16 28 32.1 4.1

13-Apr-16 28.3 32.5 4.2

15-Apr-16 28.6 32.2 3.6

17-Apr-16 28.4 31.9 3.5

19-Apr-16 28.2 31.7 3.5

21-Apr-16 28.9 31.9 3

23-Apr-16 29.1 32.2 3.1

25-Apr-16 28.7 32.6 3.9

27-Apr-16 29 32.5 3.5

Page 46: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

38

Date Intake Channel

(°C)

Retaining Wall of

Outfall Channel

(°C)

Average Temperature Difference

between Intake & Outfall Channel

(°C)

29-Apr-16 29.1 33.4 4.3

1-May-16 29.6 33.4 3.8

3-May-16 29.9 33.7 3.8

5-May-16 29.7 33.2 3.5

7-May-16 30.1 33.9 3.8

9-May-16 29.9 34.2 4.3

11-May-16 30.3 34.1 3.8

13-May-16 30.1 34.2 4.1

15-May-16 30.6 34.2 3.6

17-May-16 31 34.1 3.1

19-May-16 30.9 34.5 3.6

21-May-16 30.9 34.6 3.7

23-May-16 31.5 34.8 3.3

25-May-16 31.8 35.2 3.4

27-May-16 32 35.4 3.4

29-May-16 31.9 35.2 3.3

31-May-16 31.6 35 3.4

2-Jun-16 31.4 36.2 4.8

4-Jun-16 31.8 35.7 3.9

6-Jun-16 31.7 35.9 4.2

8-Jun-16 32 36.1 4.1

10-Jun-16 31.5 35.4 3.9

12-Jun-16 31.8 35 3.2

14-Jun-16 31 34.6 3.6

16-Jun-16 31 34.9 3.9

18-Jun-16 30.8 34.5 3.7

2-Jul-16 31.7 33.8 2.1

4-Jul-16 31.9 34.2 2.3

6-Jul-16 31.6 34 2.4

8-Jul-16 31.3 33.9 2.6

10-Jul-16 31.2 34.1 2.9

12-Jul-16 30.8 33.9 3.1

14-Jul-16 30.7 34.3 3.6

16-Jul-16 31 34.1 3.1

18-Jul-16 30.9 34 3.1

30-Aug-16 29.6 33.9 4.3

1-Sep-16 29.8 34.8 5

Page 47: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report

39

Date Intake Channel

(°C)

Retaining Wall of

Outfall Channel

(°C)

Average Temperature Difference

between Intake & Outfall Channel

(°C)

3-Sep-16 29.4 34.5 5.1

5-Sep-16 30.3 34.9 4.6

7-Sep-16 29.9 34.6 4.7

9-Sep-16 30.4 35.3 4.9

11-Sep-16 30.7 35.7 5

13-Sep-16 29.9 35.1 5.2

15-Sep-16 30.2 35 4.8

17-Sep-16 29.6 34.9 5.3

19-Sep-16 30.2 35.4 5.2

1-Oct-16 29.8 32.8 3

3-Oct-16 29.5 32.9 3.4

5-Oct-16 29.2 32.2 3

7-Oct-16 29.4 32 2.6

9-Oct-16 29.4 33.2 3.8

11-Oct-16 29.3 32.4 3.1

13-Oct-16 29.4 32.7 3.3

15-Oct-16 29.2 32.8 3.6

17-Oct-16 29.2 32.8 3.6

19-Oct-16 29.3 32.5 3.2

21-Oct-16 28.5 32.1 3.6

23-Oct-16 28.7 32.2 3.5

25-Oct-16 28.9 32.4 3.5

27-Oct-16 28.8 32.5 3.7

29-Oct-16 28.7 32.3 3.6

31-Oct-16 29.1 32.3 3.2

2-Nov-16 28.7 32.1 3.4

4-Nov-16 28.8 31.9 3.1

6-Nov-16 29 31.5 2.5

8-Nov-16 28.8 31.3 2.5

10-Nov-16 28.5 31 2.5

12-Nov-16 28.1 30.2 2.1

14-Nov-16 28.5 30.7 2.2

16-Nov-16 28.4 30.9 2.5

18-Nov-16 27.9 30.5 2.6

20-Nov-16 27.8 30.5 2.7

22-Nov-16 27.4 30.1 2.7

24-Nov-16 26.9 29.9 3

Page 48: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

40

Date Intake Channel

(°C)

Retaining Wall of

Outfall Channel

(°C)

Average Temperature Difference

between Intake & Outfall Channel

(°C)

26-Nov-16 26.9 29.8 2.9

28-Nov-16 27.1 30 2.9

30-Nov-16 27.1 30.1 3

2-Dec-16 27.3 29.9 2.6

4-Dec-16 27 29.6 2.6

6-Dec-16 27 29.5 2.5

8-Dec-16 25.9 29.2 3.3

12-Oct-16 25.7 29.3 3.6

12-Dec-16 25.5 29.2 3.7

14-Dec-16 25 29.3 4.3

16-Dec-16 24.7 28.7 4

18-Dec-16 24.1 28.2 4.1

1-Jan-17 24.2 27.9 3.7

3-Jan-17 24 28.1 4.1

5-Jan-17 23.9 27.8 3.9

7-Jan-17 23.6 27.3 3.7

9-Jan-17 23.7 27.1 3.4

11-Jan-17 23.3 27.1 3.8

13-Jan-17 23.1 26.8 3.7

15-Jan-17 23.1 26.9 3.8

17-Jan-17 23 26.7 3.7

19-Jan-17 23.2 26.4 3.2

21-Jan-17 23.1 26.8 3.7

23-Jan-17 23 26 3

25-Jan-17 23.2 26.1 2.9

27-Jan-17 23.1 26 2.9

29-Jan-17 22.2 25.7 3.5

31-Jan-17 22.9 26.5 3.6

2-Feb-17 23 26.8 3.8

4-Feb-17 22.9 27.1 4.2

6-Feb-17 23.6 27.8 4.2

8-Feb-17 23.4 27.3 3.9

10-Feb-17 24 27.8 3.8

12-Feb-17 24.2 28.2 4

14-Feb-17 24.6 29.1 4.5

16-Feb-17 25.7 29.7 4

18-Feb-17 25.6 29.5 3.9

Page 49: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report

41

Date Intake Channel

(°C)

Retaining Wall of

Outfall Channel

(°C)

Average Temperature Difference

between Intake & Outfall Channel

(°C)

20-Feb-17 25.2 29 3.8

22-Feb-17 24.8 28.7 3.9

24-Feb-17 24.7 28.3 3.6

26-Feb-17 24.9 28.4 3.5

28-Feb-17 25.1 28.8 3.7

2-Mar-17 24.9 28.7 3.8

4-Mar-17 24.8 28.2 3.4

6-Mar-17 24.5 28.5 4

8-Mar-17 24.6 28.9 4.3

10-Mar-17 25.2 29 3.8

12-Mar-17 25.5 28.7 3.2

14-Mar-17 25.7 28.9 3.2

16-Mar-17 26 29 3

18-Mar-17 25.8 29.1 3.3

Page 50: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

42

APPENDIX 6: STACK - MANUAL MONITORING – STATISTICAL DATA ANALYSIS (2016-17)

Manual Stack Emission Records from April 2016 to March 2017

Month Unit # 10 Unit # 20 Unit # 30 Unit # 40 Unit # 50

Particulate Matter (PM) in mg/Nm³

April 2016 39.8 37.6 33.7 35.3 Shut Down

May 2016 41.2 38.3 36.3 43.1 Shut Down

June 2016 Shut Down 37.8 40.1 38 Shut Down

July 2016 Shut Down Shut Down 36.6 33.1 39.1

August 2016 44.4 37.5 41.6 34.9 33.7

September 2016 38.3 32.7 36.9 33.2 34.4

October 2016 -- 33.9 36 34.1 34.6

November 2016 37.2 34.1 38.5 33.2 --

December 2016 36 35.5 35.7 34.5 36.3

January 2017 34.1 32.6 -- -- --

February 2017 35.1 34.6 37.2 35.4 33.5

March 2017 38.8 34 36.7 37.4 31.2

Average 38.3 35.3 37.2 35.7 34.7

GPCB Limit 50 50 50 50 50

World Bank Limit 50 50 50 50 50

Sulphur Dioxide (SO2) in mg/Nm³

April 2016 773 751 705 795 Shut Down

May 2016 804 790 748 802 Shut Down

June 2016 Shut Down 763 710 799 Shut Down

July 2016 Shut Down Shut Down 683 771 618

August 2016 805 770 755 787 701

September 2016 783 743 704 754 724

October 2016 -- 733 713 749 756

November 2016 753 746 738 759 --

December 2016 762 750 743 776 748

January 2017 771 727 -- -- --

February 2017 781 769 756 789 767

March 2017 818 824 810 834 775

Average 783.3 760.5 733.2 783.2 727.0

World Bank Limit

2000 2000 2000 2000 2000

Page 51: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

43

Month Unit # 10 Unit # 20 Unit # 30 Unit # 40 Unit # 50

Nitrogen Oxide (NOx) in mg/Nm³

April 2016 245 238 212 236 Shut Down

May 2016 248 282 244 272 Shut Down

June 2016 Shut Down 238 236 249 Shut Down

July 2016 Shut Down Shut Down 255 271 174

August 2016 255 278 240 253 290

September 2016 252 258 239 241 249

October 2016 -- 251 247 243 248

November 2016 257 241 252 247 --

December 2016 238 254 264 244 248

January 2017 273 271 -- -- --

February 2017 261 259 254 263 257

March 2017 328 311 330 313 244

Average 261.9 261.9 252.1 257.5 244.3

World Bank Limit

750 750 750 750 750

Page 52: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

44

APPENDIX 7: ETP EFFLUENT MONITORING DETAILS

ETP Effluent Monitoring Records from April 2016 to March 2017 D

ate

/Pa

ram

ete

r

pH

(a

t 2

5 °

C)

To

tal

Su

sp

en

de

d

So

lid

s

Oil

& G

rea

se

To

tal

Dis

so

lved

So

lid

s

To

tal

Co

pp

er

(as

Cu

)

Hex

av

ale

nt

Ch

rom

ium

(as

Cr)

To

tal

Ch

rom

ium

(as

Cr)

Zin

c (

as

Zn

)

Ph

os

ph

ate

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L

2-Apr-16 8.7 21 0.056 1257 0.056 BDL BDL 0.15 0.72

9-Apr-16 7.9 24 0.055 1247 0.055 BDL BDL 0.12 0.85

16-Apr-16 8.2 20 0.53 1308 0.53 BDL BDL 0.16 0.77

23-Apr-16 8.9 22 0.059 1320 0.059 BDL BDL 0.16 0.76

30-Apr-16 7.2 24 0.054 1222 0.054 BDL BDL 0.12 0.83

7-May-16 8.7 21 0.057 1373 0.057 BDL BDL 0.17 0.81

17-May-16 8.8 25 0.051 1237 0.051 BDL BDL 0.09 0.82

21-May-16 8.6 24 0.055 1198 0.055 BDL BDL 0.12 0.81

28-May-16 8.5 21 0.058 1346 0.058 BDL BDL 0.17 0.79

4 June 16 8.8 25 0.052 1212 0.052 BDL BDL 0.09 0.8

11-Jun-16 8.5 22 0.06 1294 0.06 BDL BDL 0.16 0.74

18-Jun-16 8.6 26 0.056 1276 0.056 BDL BDL 0.15 0.76

2-Jul-16 7.5 23 1.6 1359 0.063 BDL BDL 0.17 0.78

9-Jul-16 8.1 27 1.55 1340 0.059 BDL BDL 0.16 0.8

16-Jul-16 8 25 1.76 1258 0.058 BDL BDL 0.13 0.85

4-Aug-16 8.74 41 1.01 1240 BDL BDL BDL 0.044 0.86

12-Aug-16 8.69 30 1.41 1385 BDL BDL BDL 0.058 0.72

Page 53: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

45

Date

/Pa

ram

ete

r

pH

(a

t 2

5 °

C)

To

tal

Su

sp

en

de

d

So

lid

s

Oil

& G

rea

se

To

tal

Dis

so

lved

So

lid

s

To

tal

Co

pp

er

(as

Cu

)

Hex

av

ale

nt

Ch

rom

ium

(as

Cr)

To

tal

Ch

rom

ium

(as

Cr)

Zin

c (

as

Zn

)

Ph

os

ph

ate

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L

19-Aug-16 8.54 28 1.07 1374 BDL BDL BDL 0.061 0.71

27-Aug-16 8.65 35 0.98 1399 BDL BDL BDL 0.038 0.75

3-Sep-16 8.52 40 1.22 1262 BDL BDL BDL 0.051 0.7

10-Sep-16 8.22 31 1.12 1314 BDL BDL BDL 0.055 0.65

17-Sep-16 8.4 32 1.02 1288 BDL BDL BDL 0.068 0.81

24-Sep-16 8.8 31 0.86 1401 BDL BDL BDL 0.026 0.69

1-Oct-16 9 38 1.1 1224 BDL BDL BDL 0.048 0.72

8-Oct-16 8.6 29 1.06 1327 BDL BDL BDL 0.048 0.58

22-Oct-16 7.8 35 1.11 1352 BDL BDL BDL 0.032 0.81

29-Oct-16 7.7 36 0.98 1402 BDL BDL BDL 0.038 0.89

5-Nov-16 7.7 33 1.15 1368 BDL BDL BDL 0.031 0.79

12-Nov-16 8 32 1.21 1328 BDL BDL BDL 0.059 0.68

19-Nov-16 7.9 30 1.05 1410 BDL BDL BDL 0.063 0.74

26-Nov-16 7.6 31 1.01 1323 BDL BDL BDL 0.03 0.75

3-Dec-16 7.5 34 0.99 1389 BDL BDL BDL 0.032 0.86

10-Dec-16 7.9 36 1.04 1249 BDL BDL BDL 0.028 0.69

17-Dec-16 8.1 31 1.14 1312 BDL BDL BDL 0.049 0.62

7-Jan-17 7.8 35 1.14 1288 BDL BDL BDL 0.027 0.76

14-Jan-17 8.2 32 1.17 1356 BDL BDL BDL 0.053 0.66

21-Jan-17 7.6 31 1.01 1431 BDL BDL BDL 0.032 0.69

Page 54: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

46

Date

/Pa

ram

ete

r

pH

(a

t 2

5 °

C)

To

tal

Su

sp

en

de

d

So

lid

s

Oil

& G

rea

se

To

tal

Dis

so

lved

So

lid

s

To

tal

Co

pp

er

(as

Cu

)

Hex

av

ale

nt

Ch

rom

ium

(as

Cr)

To

tal

Ch

rom

ium

(as

Cr)

Zin

c (

as

Zn

)

Ph

os

ph

ate

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L

28-Jan-17 7.9 34 0.98 1361 BDL BDL BDL 0.035 0.76

4-Feb-17 7.5 31 1.06 1375 BDL BDL BDL 0.034 0.82

11-Feb-17 8.2 35 1.22 1406 BDL BDL BDL 0.063 0.71

18-Feb-17 7.6 31 1.05 1385 BDL BDL BDL 0.058 0.63

25-Feb-17 7.8 36 1.1 1384 BDL BDL BDL 0.036 0.58

4-Mar-17 8 31 0.88 1394 BDL BDL BDL 0.031 0.68

11-Mar-17 7.9 34 1.11 1467 BDL BDL BDL 0.031 0.85

18-Mar-17 7.9 39 0.89 1419 BDL BDL BDL 0.061 0.68

Page 55: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

47

APPENDIX 8: STP TREATED WATER MONITORING RESULTS & ANALYSIS (2016-17)

STP at Project Site - Water Monitoring Records from April 2016 to March 2017

Date

Sewage Treatment Plant at Project Site

Suspended Solids BOD 3 days at 27ºC Residual Chlorine

mg/l mg/l ppm

1-Apr-16 16 14 40

16-Apr-16 18 19 37

1-May-16 18 13 38

16-May-16 17 15 41

1-Jun-16 17 15 42

16-Jun-16 18 13 39

1-Jul-16 19 14 -

16-Jul-16 18 16 -

5-Aug-16 11 14 0.44

26-Aug-16 12 13 0.34

1-Sep-16 14 15 0.4

16-Sep-16 11 15 0.47

1-Oct-16 16 14 0.38

16-Oct-16 10 15 0.51

1-Nov-16 15 13 0.41

16-Nov-16 10 12 0.42

1-Dec-16 12 14 0.35

16-Dec-16 11 13 0.51

1-Jan-17 14 14 0.55

16-Jan-17 12 14 0.56

1-Feb-17 12 15 0.58

16-Feb-17 14 15 0.59

1-Mar-17 13 14 0.61

16-Mar-17 12 13 0.61

Page 56: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

48

APPENDIX 9: ASH POND BORE WELL MONITORING – AVERAGE

Average Ash Pond Bore Well Monitoring Records from April 2016 to March 2017

Parameter Unit Bore Well No. 5 Bore Well No. 6 Bore Well No. 7 Bore Well No. 8 Bore Well No. 10

pH (at 25 °C) - 8.8 8.4 8.2 8.2 8.5

Electrical Conductivity µS/cm 3107.3 1339.3 31517.6 23917.9 14913.1

Turbidity NTU 13.0 7.4 11.0 56.3 70.4

Total Dissolved Solids mg/l 1789.8 788.8 19928.4 14308.9 8904.1

Total Suspended Solids mg/l 9.5 6.2 11.2 181.4 95.0

Total Hardness (as CaCO3) mg/l 158.0 110.5 2294.2 2349.0 666.0

Total Alkalinity mg/l 616.0 116.0 716.6 1306.0 1053.1

Nitrate (as NO3) mg/l 1.3 3.1 1.4 1.6 1.5

Phosphate (as PO4) mg/l 0.2 3.1 0.2 0.3 0.3

Fluoride (as F) mg/l 3.0 2.9 3.3 2.3 3.4

Chloride (as Cl) mg/l 673.5 226.9 10836.4 4391.1 2717.7

Sulphate (as SO4) mg/l 149.8 114.9 1985.2 306.7 81.1

Sodium (as Na) mg/l 627.5 200.1 6528.2 4071.3 1563.4

Potassium (as K) mg/l 7.7 8.1 79.3 84.7 107.8

Calcium (as Ca) mg/l 22.4 24.2 236.2 271.9 66.1

Magnesium (as Mg) mg/l 24.3 11.7 412.8 406.1 120.7

Oil & Grease mg/l 1.0 1.8 BDL 2.1 2.1

Iron (as Fe) mg/l 0.2 0.1 BDL BDL 0.1

Manganese (as Mn) mg/l 0.1 BDL BDL BDL BDL

Copper (as Cu) mg/l 0.4 BDL BDL BDL 0.2

Zinc (as Zn) mg/l 0.0 BDL BDL BDL 0.1

Page 57: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

49

Parameter Unit Bore Well No. 5 Bore Well No. 6 Bore Well No. 7 Bore Well No. 8 Bore Well No. 10

Phenolic Compounds (as C6H5OH) mg/l BDL BDL BDL BDL BDL

Colour Hazen 4.8 4.8 5.6 5.6 6.9

Cadmium (as Cd) mg/l BDL BDL BDL BDL BDL

Total Chromium (as Cr) mg/l BDL BDL BDL BDL BDL

Cyanide (as CN) mg/l BDL BDL BDL BDL BDL

Lead (as Pb) mg/l BDL BDL BDL BDL BDL

Mercury (as Hg) mg/l BDL BDL BDL BDL BDL

Arsenic (as As) mg/l BDL BDL BDL BDL BDL

Total Coliform Bacteria MPN/100ml BDL BDL BDL BDL BDL

Carbonate (as CaCO3) mg/l 53.8 47.5 47.5 46.3 53.8

Page 58: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

50

APPENDIX 10: AAQ NETWORK

Project Site and AAQ Network

Page 59: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

51

APPENDIX 11: AAQ MONITORING RESULTS – PM10

Graphical Representation of AAQ Monitoring Results – PM10 from April 2016 to March 2017

Page 60: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

52

APPENDIX 12: AAQ MONITORING RESULTS – PM2.5

Graphical Representation of AAQ Monitoring Results – PM2.5 from April 2016 to March 2017

Page 61: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

53

APPENDIX 13: AAQ MONITORING RESULTS – SO2

Graphical Representation of AAQ Monitoring Results – SO2 from April 2016 to March 2017

Page 62: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

54

APPENDIX 14: AAQ MONITORING RESULTS – NOX

Graphical Representation of AAQ Monitoring Results – NOX from April 2016 to March 2017

Page 63: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

55

APPENDIX 15: AMBIENT NOISE MONITORING RESULTS AT PROJECT SITE

Ambient Noise Monitoring Results at Project Site – Graphical Plot from April 2016 to March 2017

Page 64: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Annual Environment & Social Performance Report FY 2016-17

56

APPENDIX 16: AMBIENT NOISE MONITORING RESULTS AT VILLAGES

Ambient Noise Monitoring Results at Villages – Graphical Plot from January 2016 to March 2017

Page 65: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

Environment & Social Performance Report FY 2016-17

57

APPENDIX 17: SAFETY PERFORMANCE DATA

Safety Performance Monitoring Data from April 2016 to March 2017

Sr.

No.

Performance

Indicators Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17

1 Induction Training Attendees 2066 1199 662 1010 669 836 269 270 270 538 707 915

2 Lost Time Frequency Rate (LTI-FR) 0.00 2.19 1.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 First Aid Cases 16 7 5 5 8 4 3 3 3 3 2 6

4 Medical Treatment Cases (MTC) 0 2 1 3 0 2 1 1 1 0 0 0

5 Safe Man Hours Worked till last fatality/LWDC

830576 1745472 2471288 3030384 3589480 4141776 4529896 4923080 5330648 5719048 6083464 6491032

6 Total Person Hours Worked 830576 1745472 2471288 3030384 3589480 4141776 4529896 4923080 5330648 5719048 6083464 6491032

7 Total Recordable Injury Frequency Rate (TRI-FR)

0.00 2.19 1.38 1.38 0.00 3.62 0.00 2.54 2.54 0.00 0.00 0.00

8 Severity Index 2.90 2.88 2.81 2.80 2.80 2.76 2.79 2.88 2.73 2.73 2.83 2.70

9 Fire Cases 0 0 0 0 0 0 0 0 0 0 0 0

10 Near Misses 65 48 48 42 35 40 33 13 23 20 9 15

11 Fatality 0 0 0 0 0 0 0 0 0 0 0 0

12 No of Incidents Investigated 81 57 54 50 43 46 37 17 27 23 11 21

Page 66: Annual Environment & Social Monitoring Report … Environment & Social Monitoring Report (April 2016 to March 2017) The Environmental and Social Performance Report is a document of

ARCADIS India Private Limited

3rd Floor, Tower B, Logix Techno Park, Sector 127, Noida

T: +91 120 4368 400

arcadis.com