ANGLO AMERICAN PLATINUM CORPORATION LIMITED

RUSTENBURG

ANALYST AND FUND MANAGER VISIT

18 November 2004

Agenda

• Location

• Safety

• Strategy

• Geology

• Resources and reserves

• Shaft and project status

• Production

• Working cost and capital expenditure

Page 2: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Location

LIMPOPO PROVINCE

LYDENBURG

MAANDAGSHOEK FARM

ZEERUST

RUSTENBURG

NORTH WEST PROVINCE

MOKOPANE

WITBANK

WARMBATHS

PRETORIA

BARPLATS

KENNEDY VALE

MPUMALANGA

GAUTENG

BOTSWANAN

RPM. RUSTENBURG

NORTHAM

RPM. UNION

PP RUST

LEBOWA

RPM. AMANDELBULT

IMPALA

WESTERN ANDEASTERN PLATS

BARPLATSCROCODILE RIVER

BAFOKENG

Bushveld Complex

Anglo Platinum Mines

Implats Mines

Lonmin Mines

Northam Mine

2 5 O

25 O

Republic

of

South Africa

Page 3: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Mine

P/KRAALP/KRAAL

FRANKFRANK

WATERVALWATERVAL

TURFFONTEINTURFFONTEIN

BRAKSPRUITBRAKSPRUITBLESKOPBLESKOP

PSAPSA

TOWNLANDS& BOSCHFONTEIN

TOWNLANDS& BOSCHFONTEIN

Shafts

Concentrators

Smelter

Refineries

Legend

Frank Concentrator

Waterval Smelter

Wval Concentrators

RBMR

PMR

WLTR

Klip Conc

SAFETY

Page 4: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Section FIFR – 2000 to 2003

0.00

0.01

0.02

0.03

0.04

0.05

0.06

Year

Rat

e

FIFR 0.05 0.04 0.04 0.03

2000 2001 2002 2003

Rustenburg Section LTIFR – 2000 to 2003

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

Year

Rat

e

LTIFR 3.03 1.32 1.36 0.83

2000 2001 2002 2003

Page 5: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

SHE Strategy

• Total integration of Safety, Health (Occupational

Hygiene and Medicine) in terms of

– Systems

– People

– Effort

• Continue with the OTTO campaign

• Behaviour based safety campaign

• Total integrated Risk approach in terms of

– Risk profile management

– Enterprise wide risk management

Mining Strategy

Page 6: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Section

Rustenburg SectionEquivalent Refined Pt Ounces

-

100

200

300

400

500

600

700

800

900

Year

Pt

oz

pa

(000

)

UG2 52 57 138 221 127

Merensky 573 632 635 605 289

2000 2001 2002 2003 H2004

• Rustenburg is One Mine

• Merensky is primary ore body

• UG2 is secondary ore body

Rustenburg Strategy

Page 7: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Mining Strategy

A member of the Anglo American plc group

• Maximise value from ore-body

• NPV, ROCE, cash margin and earnings growth

• Short-term - Maximise Merensky

- Maximise value adding UG2

• Long-term - Access deeper Merensky

- Balanced transition to UG2

• Appropriate mining method per area and ore type

• Maintain flexibility to adjust to macroeconomics

Rustenburg – Merensky 5 & 20 yr Plan

Merensky115 mil tons

UG2384 mil tons

Ore Reserves _

Legend5 Year20 Year

Page 8: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg – UG2 5 & 20 yr Plan

Legend5 Year20 Year

Management Structure

Organization structure supports strategy

• Fewer management levels

• Split mining and processing

• One Mine Manager for Lower Mine -

predominantly Merensky

• One Mine Manager for Upper Mine -

predominantly UG2

Page 9: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Geology

• Increased knowledge of the ore body from an extensive exploration program

• Merensky and UG2 geozones have been clearly delineated

Ore Body Knowledge

Page 10: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

LEGEND.

Areas where the Merensky Reef is affected by Pegmatite

Areas where the Merensky Reef is affected by rolling Reef and is highly geologically disturbed

Areas, with thick MerenskyReef, varying from 0,8 to 2,0m in thickness.

Areas where normal MerenskyReef is being mined.

Townlands BA Paardekraal BA Frank BA Turffontein BA

Potholes on the

farm Hoedspruit

East BA

The Merensky Ore Body

DRILLING CURRENTLY IN PROGRESS

PLANNED FUTURE DRILLING

Exploration Program 2004

Page 11: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Merensky Depth Results – Total Area

Eastern Area

Western Area

Rustenburg Aeromag

Page 12: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

• 3D Seismics provided valuable orebodyinformation. – F1 fault provides natural boundary between

intermediate and deeper area – Large potholes identified – Graben feature identified

• Extensive exploration drilling is in progress to validate the seismic information

• Aeromag interpretation completed and has been integrated into structure model

Exploration Program

Resources – 31 December 2003

Resources – 31 December 2003

Ore Body Category Tonnage (Mt) 4E Grade (g/t)Merensky Measured - -

Indicated - -Inferred 111.6 6.28Total 111.6 6.28

Ore Body Category Tonnage (Mt) 4E Grade (g/t)UG2 Measured 13.1 5.92

Indicated 7.2 5.73Inferred 285.1 4.69Total 305.4 4.76

Ore Body Category Tonnage (Mt) 4E Grade (g/t)Tailings Indicated 140.6 1.03

Page 13: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Reserves – 31 December 2003

Reserves – 31 December 2003

Ore Body Category Tonnage (Mt) 4E Grade (g/t)Merensky Proved 19.3 5.56

Probable 14.3 5.55Total 33.6 5.56

Ore Body Category Tonnage (Mt) 4E Grade (g/t)UG2 Proved 26.9 4.22

Probable 115.7 4.10Total 142.6 4.12

Prill Splits

Prill Splits Merensky UG24E Platinum 63.00% 53.67%4E Palladium 28.05% 32.83%4E Rhodium 4.10% 9.28%4E Gold 4.91% 0.74%

Page 14: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Shaft and

Project Status

Townlands and Boschfontein

Page 15: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Townlands and Boschfontein

Merensky

Townlands and Boschfontein

UG2

Page 16: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Townlands and Boschfontein

• A successful business model – balanced Merensky and UG2 mining

• Applied lessons learnt from UG2• Smooth change over from Merensky to UG2

in medium to long term• Life of Shaft Merensky 10 years• Life of Shaft UG2 42 years

Paardekraal Shaft

Page 17: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Paardekraal Shaft

Merensky

Paardekraal Shaft

UG2

Page 18: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Paardekraal Shaft

• Paardekraal extension to 28 level under way

• Planning in place for Paardekraal 2 Shaft

• Below 28 level Paardekraal strike extends to Townlands western boundary

• Paardekraal to increase Merensky and to supplement with UG2 to fill shaft at 200 ktpm

Paardekraal 2 Planned New Shaft

Phase 1

Phase 2

Merensky Reef Horizon

50 Level

41 Level

32 Level

40 Level

-Install mid-shaft loading-Connect to vent #

Connect Clusters through to PK 28 Level

View: West to East

Commission shaft

Page 19: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Frank Shaft

Frank Shaft

Merensky

Page 20: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Frank Shaft

UG2

Frank Shaft

• Extend Merensky mining to 37 level

• Merensky mining layout changed from Down dip to Breast

• Merensky Replacement Shaft – pre-feasibility complete

• UG2 mining layout changed from Bord and Pillar to Hybrid

• Reduced UG2 production to 40 ktpm because of increase in Merensky production

Page 21: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Planned New Frank Vent Shaft

Phase 1

Phase 2

Merensky Reef Horizon

50 Level

42 Level

32 Level

41 Level

Connect to main #

View: West to East

Shaft holing

37 Level

36 Level

Turffontein Shaft

Page 22: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Turffontein Shaft

Merensky

Turffontein Shaft

• Has highest Merensky in situ grade at Rustenburg

• Planned reduction in half levels to optimiseproduction and to reduce cost

• Turffontein 2 Shaft planned as a medium to long term project

Page 23: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

East Mine Option 1

Shaft system situated in block G10

TURFFONTEIN INCLINE

36 LEVEL37 LEVEL 38 LEVEL

39 LEVEL40LEVEL

44LEVEL

45LEVEL

46LEVEL47LEVEL

48LEVEL49LEVEL

50LEVEL

MAIN SHAFTVENT SHAFT

PHASES 1&2

PHASE 3

Planned Turffontein 2 Shaft

Brakspruit Shaft

Page 24: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Brakspruit Shaft

Merensky

Brakspruit Shaft

UG2

Page 25: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Brakspruit Shaft

• Mine more Merensky in short term

• Life of Merensky is less than 2 years

• Merensky from pothole area

• Merensky and UG2 is mixed, no separate storage facility

• UG2 reserves for medium to long term

• Push Merensky to gain time to develop concentrated UG2

Bleskop Shaft

Page 26: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Bleskop Shaft

UG2

Bleskop Shaft

• Change from mechanized bord and pillar to hybrid mining layout

• Conversion to new layout almost complete

• Change over to conventional intended to reduce unit cost and improve head grade

Page 27: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Waterval Mine

Waterval Mine

UG2

Page 28: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Waterval Mine

• Need to optimize Decline spacing

• Board and Pillar mining layout with a T-cut implemented

• XLP project in progress showing positive results to further reduce dilution

Rustenburg SectionRustenburg Average Tons per Month Milled

per Business Area

-

200

400

600

800

1,000

1,200

2002 2003 2004

Year

Ave

rag

e T

on

s p

er M

on

th M

ille

d (

000)

Brakspruit Bleskop Turffontein Paardekraal Townlands Frank Waterval

Page 29: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Project update

Comments:

• Dilution of head grade due to safety standards

• Ore sorting plant being commissioned

Capex (Rm):

Announced (2003 money) 1,500

Spent to end 2003 (actual) 1,325Remaining (2004 money) 25

Forecast production profile:

Tons milled per month 400,000

Pt oz per annum 360,000Pd oz per annum 210,000

Steady state in 2007

Rustenburg UG2 Phase 1

FEBRUARY 2004

Comments:• Need for second concentrator being investigated• Included in overall review of Rustenburg production• Boschfontein East development slowed down

Capex (Rm):Announced (2003 money) 3 700Spent to end 2003 (actual) 775Remaining (2004 money) 3 150

Forecast production profile:Tons milled per month 400 000Pt oz per annum 306 000Pd oz per annum 167 000

Steady state in 2009

Rustenburg UG2 Phase 2

FEBRUARY 2004

Page 30: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

• UG2 Phase 1

• Announced in September 2000

• Brakspruit, Bleskop, Paardekraal 200 ktpm

• Waterval mine 200 ktpm

• 395 000 Pt oz pa revised to 360 000 Pt oz pa

• Currently UG2 Brakspruit 36 ktpm

• Bleskop 78 ktpm

• Paardekraal 83 ktpm

• Waterval 210 ktpm

• Currently UG2 300 000 Pt oz pa

Project Background and Status

UG2 Phase 2

• Announced in December 2002

• Frank and Townlands 150 ktpm

• Boschfontein East & West 245 ktpm

• 306 000 Pt oz pa by 2007 (Under review)

• Currently UG2 Frank 38 ktpm

• Townlands/Boschfontein 68 ktpm

• Currently UG2 100 000 Pt oz pa

Project Background and Status

Page 31: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Major Projects

• Current strategy alters nature of UG2 phase 1

and Phase 2 projects as announced

• Capital focus on concentrating flexibility and

infrastructure utilisation

• Some UG2 volume growth

• Decisions on capex and volume composition

after 2006 not final

PRODUCTION

Page 32: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Section

Rustenburg SectionTons Milled

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Year

To

ns

Mil

led

pa

(000

)

UG2 1,065 1,255 3,836 5,453 2,703

Merensky 6,150 6,478 6,981 6,774 3,358

2000 2001 2002 2003 H2004

• Sustained production level planned at 1,1m tpm

Rustenburg Section

Rustenburg Section

Head Grade

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Year

Hea

d G

rad

e (g

/t)

Rustenburg Section 5.32 5.38 5.31 5.17 5.06

UG2 Project 3.24 3.38 3.69

2000 2001 2002 2003 H2004

Page 33: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Section

Rustenburg SectionEquivalent Refined Pt Ounces

-

100

200

300

400

500

600

700

800

900

Year

Pt

oz

pa

(000

)

UG2 52 57 138 221 127

Merensky 573 632 635 605 289

2000 2001 2002 2003 H2004

• Sustained production level planned at 900-1 000 koz pa from 2006

Operating Costs

Page 34: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Rustenburg Section

Rustenburg SectionCash On-mine Cost

per Ton Milled

0

50

100

150

200

250

300

350

400

Year

R/t

Mil

led

Steady State 264 286 296 316 348

UG2 Project 221 252 276

Rustenburg 270 286 312

2000 2001 2002 2003 H2004

Rustenburg Section

Rustenburg Section

Cash On-mine Costper Equivalent Refined Ounce

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Year

R/o

z eq

uiv

. R

efin

ed P

t o

z

Steady State 3,055 3,206 3,400 3,604 3,863

UG2 Project 5,205 5,647 5831

Rustenburg 3,776 4,234 4,549

2000 2001 2002 2003 H2004

• Planned overall cost profile for Rustenburg flat in real terms

Page 35: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Cash On Mine Cost

Rustenburg Section

Contractors7%

Labour45%

Stores25%

Utilities6%

Sundries10%

Amortisation7%

Contractors Labour Stores Utilities Sundries Amortisation

Cash On Mine Cost 2003

Rustenburg Section

RPM Total Capex Profile

0

500

1000

1500

2000

2500

2000 2001 2002 2003 2004 2005 2006

Year

Cap

ex R

m

Page 36: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Capex• Ongoing capex R800m - R1bn pa

• 2004 - 2006

– Concentrating upgrade R1050m

– Capacity

– Cost efficiency

– Recovery

– Flexibility

– Boschfontein UG2 R600m

– Turffontein Merensky R400m

Note: Concentrating upgrade removes need for additional400 ktpm UG2 concentrator.

Key Business Issues

• Improved Safety performance

• Unit cost reduction

• Maximize value of UG2 & Merenskyproduction

Page 37: ANGLO AMERICAN PLATINUM CORPORATION …/media/Files/A/Anglo...Smelter Refineries Legend Frank Concentrator Waterval Smelter Wval Concentrators RBMR PMR WLTR Klip Conc SAFETY Rustenburg

Questions?