Analisis Report Pole 21M HD

Embed Size (px)

Citation preview

Page 1: Analisis Report Pole 21M HD

 

 

 

 

 

 

  

    

   

   

0  27  

Rev 

ANA

June  2014 

Date 

ALYS

POL

 

 

First 

 

SIS R

E 21M

      

Issue 

REPO

M HD

Descrip

ORT

ption 

Page 2: Analisis Report Pole 21M HD

CONTENTS      

SUMMARY ANALYSIS 

DESIGN CRITERIA 

TOWER ANALYSIS 

TOWER OUTLINE 

 

 

                    

Page 3: Analisis Report Pole 21M HD

SUMMARY ANALYSIS  

 1. Loading  

   

Standard  EIA/TIA‐222‐F 

Survival Wind Speed   120  Km/h 

Operational Wind Speed   80.64  Km/h 

No.  Antenna Type  Quantity  Elevation 

1  RF Antenna SF  3  + 17.0 

2  RF Antenna TSEL  3  + 20.0 

3  RF Antenna HCPT  3  + 15.0 

4  MW Ø0.6 M  1  + 21.0 

5  MW Ø0.6 M  1  + 15.0 

6  RRU  3  + 14.5 

7  RRU  3  + 14.0 

8  Lamp  2  + 9.0 

9  BTS SF  1  + 5.0 

10  BTS TSEL  1  + 5.0 

11  BTS HCPT  1  + 4.0 

12  Rectifier TSEL  1  + 4.0 

13  Rectifier HCPT  1  + 4.0 

14  KWH  1  + 4.0 

 

 2. Pole Analysis 

Description  Value  Limits  Remarks 

120 kph as maximum wind speed 

Stress Ratio Leg  0.787  ≤   1.0  OK  ! 

80.64 kph as service wind speed 

Twist   0.0011  deg  ≤   1.0 deg  OK  ! 

Sway  0.7960  deg  ≤   1.0 deg  OK  ! 

Displacement  20.81    cm  ≤   18 cm  OK  ! 

Support Reaction 

Compress  35.814  kN   

Shear  17.975  kN   

Moment  227.558  kN.m   

 

 

 

 

Page 4: Analisis Report Pole 21M HD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. DESIGN CRITERIA

Page 5: Analisis Report Pole 21M HD

DESIGN STANDARD

The design of the tower applied is EIA standard EIA-222-F “Structural standards

for Antenna Tower and Supporting Structure”.

Material strengthen : BJ37 with Fy = 245 kg/cm2 and Fu = 370 kg/cm2

The fabrication and materials of the tower will be according to the relevant

Indonesia Standard and/or Japanese Industrial standard.

Software : MSTOWER version v6.0

TOWER ANALYSIS CONDITION

1. Tower Height: 9 m

2. Maximum wind velocity (V)

In the design of tower structure, a basic wind speed is taken:

V = 120 km/hour =33.3 m/sec

3. Operational wind velocity

for displacement analysis, a basic wind speed is taken:

V = 84 km/ hour = 23.3 m/sec

4. Displacement = H/100

LOADS

1. Dead Load Dead load is the weight of tower, splitzen, net load etc :

Weight Sector antenna = 30 kg

Weight MW antenna = 20 kg

Weight Ladder = 5 kg/m

2. Wind Load on tower Structure Wind load calculation method on the tower and

appurtenance are according to EIA-222-F.

The pressure to the tower varies as a function of height.

a. Wind load calculation method on the tower and appurtenance are as follow:

F = qz . GH . CF . AE and not exceed 2. qz . GH . AG

qz = 0.613 . Kz . V2 Kz = [z/10]2/7 GH = 1.69

Cf = 4.0 e2 – 5.9 e + 4.0 ( Square cross section)

Cf = 3.4 e2 – 4.7 e + 3.4 ( TriangularSquare cross section)

E = AF / AG

AE = DF.AF

Page 6: Analisis Report Pole 21M HD

b. Wind load calculation method on the parabolic antenna

Fa = Ca * A *Kz * GH * V2

Fs = Cs * A * Kz * GH * V2

M = Cm * D * A * Kz * GH * V2

Ha = √(Fa2 + Fs2)

Mt = Fa * X + Fs * Y + M

3. Load Combination

According to EIA Standard EIA-222-F, only the following load combination shall be

investigated when calculating the maximum member stresses and structure

reaction: 1.0 DL + 1.0 WL

4. Materials

Steel Steel materials to be used for the tower and appurtenance conform to the

relevant Indonesian standard and or Japanese Industrial standard :

Concrete

Design compressive of concrete (fc’) at 28 days : K-175 fc’ = 175 kg/cm2

.

Material Standard Grade Fy (MPa) Fu (MPa)

Pipe (Leg) ASTM A53 SCH40 245 400

Angle (Support) ASTM A53 SS400 245 400

Bolt (Connection) ASTM A325/JIS B1180 8.8 800

Anchor ASTM A307 240 400

ANALYSIS

Pole structure will be modeling by software MSTOWER v6.0. Structure modeled as 3D

space frame. This parameter to check the result of Structure analysis:

1. Maximum Wind Speed (120 kph)

‐ Stress Ratio, with maximum limit 1.0

2. Service Wind Speed (80.64 kph)

‐ Sway, with maximum limit 1.0 degrees

‐ Twist, with maximum limit 1.0 degrees

‐ Displacement, with maximum limit H/100, where H is height of tower

Page 7: Analisis Report Pole 21M HD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. POLE ANALYSIS

Page 8: Analisis Report Pole 21M HD

XY

Z

theta: 300 phi: 30

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

27 Jun 201409:51 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

Page 9: Analisis Report Pole 21M HD

XY

Z

theta: 180 phi: 0

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

27 Jun 201409:51 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

Page 10: Analisis Report Pole 21M HD

X

Y

Ztheta: 0 phi: 90

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

27 Jun 201409:52 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

Page 11: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Page 1 of 127 Jun 2014

9:52 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.td

Page 12: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Page 1 of 327 Jun 2014

9:52 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

Page 13: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Page 2 of 327 Jun 2014

9:52 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

Page 14: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Page 3 of 327 Jun 2014

9:52 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

Page 15: Analisis Report Pole 21M HD

XY

Z

theta: 300 phi: 30

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

27 Jun 201409:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

Design Ratios - % of Code Capacity: <= 50 <= 95 <= 100 <= 105 <= 110 > 110

Page 16: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 1 of 527 Jun 2014

9:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

L O A D C A S E S

Page 17: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 2 of 527 Jun 2014

9:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

L O A D C A S E S

Page 18: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 3 of 527 Jun 2014

9:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 19: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 4 of 527 Jun 2014

9:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 20: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 5 of 527 Jun 2014

9:53 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 21: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 1 of 227 Jun 2014

9:55 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

I N P U T / A N A L Y S I S R E P O R T

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

Page 22: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 2 of 227 Jun 2014

9:55 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

N O D E D I S P L A C E M E N T S

Page 23: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 1 of 227 Jun 2014

9:55 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

I N P U T / A N A L Y S I S R E P O R T

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

Page 24: Analisis Report Pole 21M HD

DEMONSTRATION SOFTWARE Job: Pole 21M HD okPT. IBS POLE 21M

Page 2 of 227 Jun 2014

9:55 PM

MStower [V6.02.011: ] D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

S U P P O R T R E A C T I O N S

Page 25: Analisis Report Pole 21M HD

DIAMETER QTY DIAMETER THICK THICK QTY HEIGHT1 18 M16 6 452 MM PLT 12 PLT 8 6 75 MM2 15 M16 6 452 MM PLT 12 PLT 8 6 75 MM3 12 M16 8 508 MM PLT 15 PLT 8 8 75 MM4 9 M16 8 508 MM PLT 18 PLT 8 8 75 MM5 6 M20 8 597 MM PLT 20 PLT 8 8 100 MM6 3 M20 8 597 MM PLT 22 PLT 8 8 100 MM7 0 M24 10 680 MM PLT 26 PLT 10 10 150 MM

RESUME ANALYSIS FLANGE POLE 21M HD

BOLT STIFFNERFLANGENO ELV

Page 26: Analisis Report Pole 21M HD

PERHITUNGAN BASE PLATE (EL. +0.0)POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN ANCHOR BOLT

1) Maximum force in column :

- compression = 4 278 kg P= 41 945 kN

B

- compression = 4,278 kg P= 41.945 kN- tension = 28,954 kg T= 283.866 kN- shear = 2,400 kg X= 23.528 kN

Y= 0.000 kNS = 23.528 kN

2) Allowable tensile stress of anchor bolt

TRY 10 - O 22 mmASTM A - 325ASTM A - 325A = 10 x 3.80285714 = 38.03 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 2,400 / 38.03 = 63.11 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 63 11 = 4610 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 63.11 = 4610 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 28,954 / 38.03 = 761 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.04 + 0.23 = 0.26 < 1 ....... OK

Perhitungan Anchor Bolt dan Base plate Page1

Page 27: Analisis Report Pole 21M HD

3) Required embeded length of anchor bolt

a. Fcv = 0.53 x V 225 = 7.95 kg/cm2

Perhitungan Anchor Bolt dan Base plate Page2

a. Fcv 0.53 x V 225 7.95 kg/cm2 Le = 28,954 ( 7.95 x 10 x 2.2 x 3.14) = 52.72 cm

b. Le = 2 ( 0.02 Ab Fy/Vfc') = 747 mm

c. Le = 2 ( 0.06 db Fy) = 615 mm

USE 10 - O 22 mm x 1000 mm

B. PERHITUNGAN BASE PLATE

1) Steel SS - 400 Fy = 2500 kg/cm2

2) Concrete K - 225Fp = 0.35 x 225 = 78.75 kg/cm2

A = 4,278 / (1.33 x Fp) = 40.84869316 cm2

B = V A = 6.39129824 cm

L = 45.7 cm (diameter pipa)

t = 1.43 cm (tebal pipa)

Bmin = 48.56 cm

Use B = 68 cm or A = 3629.84 cm2

fp = 4,278 / 3629.84 = 1.178671787 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.19 cm

Tf = 28,954 / 10 = 2895.43 kg

b = 5 cm (jarak pusat baut ke muka kolom)

M = 2895.43 x 5 = 14477.17 kgcm

= 36 deg

d = 16.36982 cm (jarak antara pusat baut)

tp = 2.53 cm

Design Base plate 680 mm x 25.3 mmUsed base plate 680 mm x 26.0 mmStiffner 10 x PLT 10

Perhitungan Anchor Bolt dan Base plate Page2

Page 28: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +3.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 2 997 kg P= 29 385 kN

B

- compression = 2,997 kg P= 29.385 kN- tension = 21,457 kg T= 210.366 kN- shear = 1,897 kg X= 18.595 kN

Y= 0.000 kNS = 18.595 kN

2) Allowable tensile stress of anchor bolt

TRY 8 - O 20 mmASTM A - 325ASTM A - 325A = 8 x 3.14285714 = 25.14 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 1,897 / 25.14 = 75.44 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 75 44 = 4590 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 75.44 = 4590 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 21,457 / 25.14 = 853 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.04 + 0.25 = 0.30 < 1 ....... OK

USE bolt : 8 - O 20 mmUSE bolt : 8 - O 20 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 29: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 45.6 cm (diameter pipa)

t = 1.43 cm (tebal pipa)

Bmin = 62.46 cm

Use B = 65 cm or A = 3316.625 cm2

fp = 2,997 / 3316.625 = 0.903710851 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.16 cm

Tf = 21,457 / 8 = 2682.17 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 2682.17 x 5 = 13410.83 kgcm

= 45 deg

d = 19.66 cm (jarak antara pusat baut)

tp = 2.22 cm

Design Base plate 650 mm x 22.2 mmUsed base plate 650 mm x 22.0 mmStiffner 8 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 30: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +6.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 2 160 kg P= 21 180 kN

B

- compression = 2,160 kg P= 21.180 kN- tension = 16,025 kg T= 157.112 kN- shear = 1,590 kg X= 15.587 kN

Y= 0.000 kNS = 15.587 kN

2) Allowable tensile stress of anchor bolt

TRY 8 - O 20 mmASTM A - 325ASTM A - 325A = 8 x 3.14285714 = 25.14 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 1,590 / 25.14 = 63.23 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 63 23 = 4610 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 63.23 = 4610 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 16,025 / 25.14 = 637 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.04 + 0.19 = 0.23 < 1 ....... OK

USE bolt : 8 - O 20 mmUSE bolt : 8 - O 20 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 31: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 45.6 cm (diameter pipa)

t = 1.43 cm (tebal pipa)

Bmin = 62.46 cm

Use B = 65 cm or A = 3316.625 cm2

fp = 2,160 / 3316.625 = 0.651373007 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.14 cm

Tf = 16,025 / 8 = 2003.18 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 2003.18 x 5 = 10015.89 kgcm

= 45 deg

d = 19.66 cm (jarak antara pusat baut)

tp = 1.92 cm

Design Base plate 650 mm x 19.2 mmUsed base plate 650 mm x 20.0 mmStiffner 8 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 32: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +9.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 1 677 kg P= 16 444 kN

B

- compression = 1,677 kg P= 16.444 kN- tension = 11,256 kg T= 110.355 kN- shear = 1,490 kg X= 14.604 kN

Y= 0.000 kNS = 14.604 kN

2) Allowable tensile stress of anchor bolt

TRY 8 - O 16 mmASTM A - 325ASTM A - 325A = 8 x 2.01142857 = 16.09 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 1,490 / 16.09 = 92.57 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 92 57 = 4563 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 92.57 = 4563 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 11,256 / 16.09 = 700 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.06 + 0.21 = 0.26 < 1 ....... OK

USE bolt : 8 - O 16 mmUSE bolt : 8 - O 16 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 33: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 40.6 cm (diameter pipa)

t = 1.27 cm (tebal pipa)

Bmin = 54.34 cm

Use B = 50 cm or A = 1962.5 cm2

fp = 1,677 / 1962.5 = 0.854669045 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.16 cm

Tf = 11,256 / 8 = 1407.03 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 1407.03 x 5 = 7035.13 kgcm

= 45 deg

d = 17.89 cm (jarak antara pusat baut)

tp = 1.68 cm

Design Base plate 500 mm x 16.8 mmUsed base plate 500 mm x 18.0 mmStiffner 8 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 34: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +12.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 1 142 kg P= 11 192 kN

B

- compression = 1,142 kg P= 11.192 kN- tension = 6,633 kg T= 65.029 kN- shear = 1,205 kg X= 11.816 kN

Y= 0.000 kNS = 11.816 kN

2) Allowable tensile stress of anchor bolt

TRY 8 - O 16 mmASTM A - 325ASTM A - 325A = 8 x 2.01142857 = 16.09 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 1,205 / 16.09 = 74.90 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 74 90 = 4591 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 74.90 = 4591 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 6,633 / 16.09 = 412 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.04 + 0.12 = 0.17 < 1 ....... OK

USE bolt : 8 - O 16 mmUSE bolt : 8 - O 16 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 35: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 40.6 cm (diameter pipa)

t = 1.27 cm (tebal pipa)

Bmin = 54.34 cm

Use B = 50 cm or A = 1962.5 cm2

fp = 1,142 / 1962.5 = 0.581698854 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.13 cm

Tf = 6,633 / 8 = 829.12 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 829.12 x 5 = 4145.60 kgcm

= 45 deg

d = 17.89 cm (jarak antara pusat baut)

tp = 1.29 cm

Design Base plate 500 mm x 12.9 mmUsed base plate 500 mm x 15.0 mmStiffner 8 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 36: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +15.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 694 kg P= 6 805 kN

B

- compression = 694 kg P= 6.805 kN- tension = 3,027 kg T= 29.672 kN- shear = 743 kg X= 7.284 kN

Y= 0.000 kNS = 7.284 kN

2) Allowable tensile stress of anchor bolt

TRY 6 - O 16 mmASTM A - 325ASTM A - 325A = 6 x 2.01142857 = 12.07 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 743 / 12.07 = 61.56 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 61 56 = 4613 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 61.56 = 4613 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 3,027 / 12.07 = 251 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.04 + 0.07 = 0.11 < 1 ....... OK

USE bolt : 6 - O 16 mmUSE bolt : 6 - O 16 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 37: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 35.6 cm (diameter pipa)

t = 0.953 cm (tebal pipa)

Bmin = 48.706 cm

Use B = 55 cm or A = 2374.625 cm2

fp = 694 / 2374.625 = 0.292302995 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.09 cm

Tf = 3,027 / 6 = 504.42 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 504.42 x 5 = 2522.12 kgcm

= 60 deg

d = 19.75 cm (jarak antara pusat baut)

tp = 0.96 cm

Design Base plate 550 mm x 9.6 mmUsed base plate 550 mm x 12.0 mmStiffner 6 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 38: Analisis Report Pole 21M HD

PERHITUNGAN FLANGE EL. +15.0POLE 21M HD

Perhitungan Anchor Bolt dan Base plate Page1

t

bm

Bolt

D

d

A. PERHITUNGAN BOLT

1) Maximum force in column :

- compression = 308 kg P= 3 016 kN

B

- compression = 308 kg P= 3.016 kN- tension = 998 kg T= 9.788 kN- shear = 444 kg X= 4.356 kN

Y= 0.000 kNS = 4.356 kN

2) Allowable tensile stress of anchor bolt

TRY 6 - O 16 mmASTM A - 325ASTM A - 325A = 6 x 2.01142857 = 12.07 cm2

Ft = 3059.149 kg/cm2Fv = 1529.574 kg/cm2Fy = 2330 kg/cm2

fv' = 444 / 12.07 = 36.82 kg/cm2 < Fv ..........OK Fv = Fv x 1.3333 = 1683 kg/cm2 Ft = Ft x 1.3333 = 3365 kg/cm2

Fts = 1 4 x Ft - 1 6 x 36 82 = 4652 t/cm2 > Ft OK Fts = 1.4 x Ft - 1.6 x 36.82 = 4652 t/cm2 > Ft ..... OK

Fts = Ft = 3365 kg/cm2

ft' = 998 / 12.07 = 83 kg/cm2 < Ft ...........OK

fv'/Fv + ft' / Ft = 0.02 + 0.02 = 0.05 < 1 ....... OK

USE bolt : 6 - O 16 mmUSE bolt : 6 - O 16 mm

Perhitungan Anchor Bolt dan Base plate Page1

Page 39: Analisis Report Pole 21M HD

B. PERHITUNGAN FLANGE

F 2500 k / 2

Perhitungan Anchor Bolt dan Base plate Page2

Fy = 2500 kg/cm2

L = 35.6 cm (diameter pipa)

t = 0.953 cm (tebal pipa)

Bmin = 48.706 cm

Use B = 55 cm or A = 2374.625 cm2

fp = 308 / 2374.625 = 0.129549718 kg/cm2

m = 5 cm (jarak pusat baut ke tepi base plate)

tp = 0.06 cm

Tf = 998 / 6 = 166.40 kg

b 5 cm (jarak pusat baut ke muka kolom)b = 5 cm (jarak pusat baut ke muka kolom)

M = 166.40 x 5 = 831.98 kgcm

= 60 deg

d = 19.75 cm (jarak antara pusat baut)

tp = 0.55 cm

Design Base plate 550 mm x 5.5 mmUsed base plate 550 mm x 12.0 mmStiffner 6 x PLT 8

Perhitungan Anchor Bolt dan Base plate Page2

Page 40: Analisis Report Pole 21M HD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. TOWER OUTLINE

Page 41: Analisis Report Pole 21M HD