10
ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI WADUK SUKAWANA - SUNGAI CIMAHI TESIS Karya tulis sebagai salah satu syarat untuk memperoleh gelar Magister dari Institut Teknologi Bandung Oleh: AZMERI NIM: 25002022 INSTITUT TEKNOLOGI BANDUNG 2004

ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi

  • Upload
    vutram

  • View
    229

  • Download
    16

Embed Size (px)

Citation preview

Page 1: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi

ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASIWADUK SUKAWANA - SUNGAI CIMAHI

TESISKarya tulis sebagai salah satu syaratuntuk memperoleh gelar Magister dari

Institut Teknologi Bandung

Oleh:AZMERI

NIM: 25002022

INSTITUT TEKNOLOGI BANDUNG2004

Page 2: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 3: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi

ABSTRAK

ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI WADUKSUKAWANA - SUNGAI CIMAHI

Oleh:Azmeri

Departemen Teknik SipilInstitut Teknologi Bandung

Metode simulasi dan optimasi merupakan dua metode yang sering digunakan dalam pengelolaan sumberdayaair. Dalam penulisan tesis ini metode tersebut digunakan untuk memperoleh suatu metode pemanfaatansumberdaya air dari Waduk Sukawana pada Sungai Cimahi - Jawa Barat.Metode simulasi yang digunakan adalah untuk mencoba berbagai pemanfaatan kebutuhan air diantaranya airminum, irigasi, industri dan PLTMH mulai dari tahun 2003 sampai 2028. Dari simulasi neraca air untuk 2 (dua)alternatif yaitu untuk Q80 diperoleh volume tampungan waduk untuk tahun 2003 (25,847x106 m3), tahun 2008 (25,665 x106 m3), tahun 2018 (26,277 x106 m3) dan tahun 2028 (41,284 x106 -m3). Sedangkan untuk Q50 diperolehvolume tampungan waduk untuk tahun 2003 (17,506 x106 m3), tahun 2008 (17,325 x106 m3), tahun 2018 (17,936x106 m3) dan tahun 2028 (20,784 x106 m3).Dari optimasi dengan program linier untuk fungsi tujuan memaksimalkan release dan keuntungan menghasilkankeuntungan untuk tahun 2003 (Rp.4.124.350.084), tahun 2008 (Rp. 4.312.249.136), tahun 2018 (Rp. 4.918.472.622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi waduk dengan program dinamik deterministikmenghasilkan pola operasi untuk waduk Sukawana. Pada tahun basah, normal dan keying, storage bulanJanuari dan Desember berada pads elevasi maksimum 1475m. Pada bulan Mei sampai September terjadipenurunan elevasi air di waduk. Taraf muka air normal dijadikan pedoman dalam menjalankan operasi waduk.Taraf muka air normal yang ditentukan sebagai permulaan adalah pads bulan Mei, dimana tinggi air wadukdiusahakan mencapai elevasi maksimum Untuk mencegah bahaya banjir, muka air waduk antara bulan Oktobersampai dengan bulan April diusahakan di bawah elevasi maksimum.

Page 4: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi

ABSTRACT

THE AVAILIBILITY OF WATER ANALYSIS AND OPERATING SYSTEMOF SUKAWANA RESERVOIR — CIMAHI RIVER

By:Azmeri

Civil Engineering DepartmentInstitut Teknologi Bandung

Simulation and optimation methods is often used in management of water resources. In this thesis, the methodsare used to get method exploiting of water resources from accumulating Sukawana reservoir at River of Cimahi -West Java.Method Simulation is used to try various exploiting of amount of water required among others drinking water,irrigation, industrial and PLTMH start from year 2003 until 2028. From balance simulation for two alternativies thatis for Q80 obtained by volume accomodate accumulating reservoir for year 2003 ( 25,847x106 m), year 2008 ( 25,665 x106 m), year 2018 ( 26,277 x106 m3) and year 2028 (41,284 x106 m3). For Q50 obtained by volumeaccomodate accumulating basin for year 2003 (17,506x106m3), year 2008 ( 17,325 x106 m), year 2018 (17,936x106m3) and year 2028 (20,784 x106 m).From optimation method with linear program to target function of maximizing advantage and release yieldadvantage for year 2003 (Rp. 4.124.350.084), year 2008 (Rp.4.312.249.136), year 2018 ( Rp. 4.918.472.622) andyear 2028 ( Rp. 5.751.875.883). From optimation operate for accumulating reservoir with program of dinamicdeterministic yield pattern operate for accumulating Sukawana reservoir. Wet in the year, dry and normal, Januarymonth moon storage capacity and December at maximum elevation 1475m. In May until September happeneddegradation of elevasi in accumulating basin. Normal water level which determined as start is in May, where ishigh of accumulating basin water laboured to reach maximum elevation. To prevent effect of floods, hence waterlevel of accumulating basin during the month October up to April under of highest maximum elevation.

Page 5: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 6: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 7: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 8: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 9: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi
Page 10: ANALISIS KETERSEDIAAN AIR DAN SISTEM OPERASI …digilib.itb.ac.id/files/JBPTITBSI/disk1/1/jbptitbsi-gdl-s2-2005... · 622) dan tahun 2028 (Rp. 5.751.875.883). Dari optimasi operasi