DAFTAR STANDARD ANALISASATUAN HARGA BAHAN DAN UPAH KERJAPT ( Persero ) PELABUHAN INDONESIA IWILAYAH SUMUT I( KP, UTPK, BLW, RSP, UGK, KTJ, PKL SUSU, TBA 5 % )

M E D A N 2 0 11

2

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR SATUAN UPAH KERJA HARIAN TAHUN 2011HARGA SATUAN ( Rp./Hari ) 5 50,000.00 HARGA SATUAN ( Rp./Jam ) 6 6,250.00

No 1 1.

JENIS TENAGA KERJA 2 PEKERJA

KODE 3 L01

SATUAN 4 Orang/Hari/jam

2.

TUKANG

L02

Orang/Hari/jam

72,000.00

9,000.00

3.

MANDOR

L03

Orang/Hari/jam

72,000.00

9,000.00

4.

OPERATOR

L04

Orang/Hari/jam

72,000.00

9,000.00

5.

PEMBANTU OPERATOR

L05

Orang/Hari/jam

50,000.00

6,250.00

6.

SUPIR/DRIVER

L06

Orang/Hari/jam

72,000.00

9,000.00

7.

PEMBANTU SUPIR/DRIVER

L07

Orang/Hari/jam

50,000.00

6,250.00

8.

MEKANIK

L08

Orang/Hari/jam

72,000.00

9,000.00

9.

PEMBANTU MEKANIK

L09

Orang/Hari/jam

50,000.00

6,250.00

10.

KEPALA TUKANG

L10

Orang/Hari/jam

80,000.00

10,000.00

Medan,

September 2011

MENEJER TEKNIK

SADARUDDIN, ST. MM

DAFTAR ISI ANALYSA PEKERJAAN SIPIL TAHUN 2009NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 URAIAN Daftar Peralatan Daftar Upah Daftar Bahan Daftar Rekap Daftar Pekerjaan Tanah Daftar Pekerjaan Jalan & Aspal Daftar Pekerjaan Pancang & T. Berskrup Daftar Pekerjaan Rangka Atap & Plafond Daftar Pekerjaan Kuda - Kuda & List Plank Daftar Pekerjaan Jembatan Daftar Pekerjaan Kosen Daftar Pekerjaan Pintu dan Jendela Daftar Pekerjaan Langit - Langit, Lantai, dan Dinding Papan Daftar Pekerjaan Cetakan Daftar Pekerjaan Batu Kosong, Turap Daftar Pekerjaan Plesteran Daftar Pekerjaan Pasangan Bata Daftar Pekerjaan Beton Daftar Pekerjaan Beton Bertulang Daftar Pekerjaan Lantai Daftar Pekerjaan Rabung dan Talang Daftar Pekerjaan Pembesian Daftar Pekerjaan Mengecat Daftar Pekerjaan Bongkar Pasang Daftar Pekerjaan Suplemen Daftar Pekerjaan Instalasi Listrik Daftar Pekerjaan Pipa Galvanis Daftar Pekerjaan Pipa PVC Daftar Pekerjaan Alat Sambung Daftar Pekerjaan Instalasi Air HALAMAN 1 2 3 9 16 18 21 23 25 26 27 29 31 34 35 36 38 41 43 45 47 49 50 53 55 59 65 66 67 70

Medan,

Mei 2004

PEMELIHARAAN BANGUNAN ASISTEN MENEJER

SADARUDDIN, ST. MM

4

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SEWA PERALATAN TAHUN 2009No. 1 1. U R A I A N 2 MESIN GILING SATUAN 3 HARI BIAYA SEWA ( Rp.) 4 400,000.00

2.

PONTON PANCANG

HARI

1,750,000.00

3.

PERALATAN PANCANG

HARI

475,000.00

4.

CRANE

HARI

1,600,000.00

5.

JACK SNIPER

HARI

225,000.00

6.

M E S I N LAS

HARI

350,000.00

7.

BOR BETON

HARI

150,000.00

8.

BOR BETON MATA INTAN

HARI

275,000.00

9.

VIBRO COMPACTOR

HARI

1,100,000.00

10.

EXAVATOR

HARI

1,500,000.00

11.

BULDOZER

HARI

1,400,000.00

12.

STAMPER

HARI

150,000.00

13.

THEODOLITH

HARI

75,000.00

18,750.00 93,750.00

14.

WATERPASS

HARI

45,000.00 11250 56,250.00

15.

COMPRESSOR

HARI

550,000.00

16.

PERANCAH KERJA

HARI

275,000.00

17.

GRADER

HARI

1,400,000.00

Medan,

Januari

ASM PEMELIHARAAN

SADARUDDIN, ST. MM

5

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SATUAN BAHAN TAHUN 2011No. 1 A. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 URAIAN/JENIS BAHAN BANGUNAN 2 BAHAN BANGUNAN GEDUNG Agregat Kasar Agregat Halus Agregat Kelas C1 Agregat Kelas C2 Aspal 60/70 Aspal Emulsi Asphalt Concrete (AC) Atap Asbes Gelombang Atap Aluminium Gelombang Atap Super Dek Atap Plastik Gelbang Fiber Atap Nipah Atap Rumbia Atap Gemteng Metal Amplas Asbes Batu Gunung Batu Kali Batu Koral Batu Pecah 10-15cm Batu Pecah 5-7cm Batu Pecah 3-5cm Batu Pecah 2-3cm Batu Belah Besi Beton Polos Besi Beton Ulir Besi Profil Besi Baja IWF Besi Plat Strip Bak Air Fiberglass Bak Cuci piring 2 lobang komplet Bensin Batu Alam (paras) Batu Tempel Batu Bata cetak mesin Batu Kerawang Cat Kilat setara Bee brand Cat Perak setara Bee Brand Cat Tembok setara Paragon Cat Tembok setara Vinilex Cat Vernis Cat Manie Besi Cat Manie Kayu Cat Dasar KODE 3 SATUAN 4 H. SATUAN (Rp.) 5 KETERANGAN 6

m3 m3 m3 m3 kg kg ton kaki kaki kaki lembar lembar lembar lembar lbr keping m3 m3 m3 m3 m3 m3 m3 m3 kg kg kg kg kg bh unit liter m2 m2 bh bh kg kg kg kg kg kg kg kg

25,000.00 10,000.00 18,000.00 54,000.00 4,000.00 4,000.00 77,000.00 3,000.00 13,000.00 133,000.00 133,000.00 145,000.00 197,000.00 197,000.00 197,000.00 197,000.00 145,000.00 13,000.00 13,000.00 21,000.00 21,000.00 21,000.00 375,000.00 692,000.00 4,500.00 180,000.00 135,000.00 800.00 4,000.00 43,000.00 43,000.00 13,000.00 19,000.00 34,000.00 20,000.00 20,000.00 34,000.00

6

No. 1 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96

URAIAN/JENIS BAHAN BANGUNAN 2 Casing Conblok 6 cm Door Closer Door Holder Dempul Engsel Pintu Nyilon 4" Engsel Jendela Nyilon 4" Filler Filter Plastik Floor Drain Floor Hardener Geotextienle Non Woven Gebalan rumput Genteng Keramik Genteng PC warna Genteng Rabung Gedek/Topas bambu Gedek/ Topas kelapa sawit Gypsum Grendel Besar 4" Hak Angin Biasa Handle (pegangan) Hot Roll Sheet (HSR) Ijuk Jerjak Besi Kayu Bulat O4"K Kayu Profil Kayu papan /Broti (Setara Kayyu kuat Klas 1) Kayu papan /Broti (Setara Kayyu kuat Klas 2) Kayu papan /Broti (Setara Kayyu kuat Klas 3) Kayu papan /Broti (Setara Kayyu kuat Klas 4) Kayu setara Damuli 8-10 Kerikil Beton Keramik polos 20x20 cm Keramik polos 20x25 cm Keramik polos 30x30 cm Keramik polos 40x40 cm Keramik 60x60cm Keramik Warna polos 20X20 cm Keramik Siku (bon-bon) Karpet Kanstin 15X30X45 cm Kanstin 15X30X60 cm kawat licin /Bronjong Kawat Beton kawat Las Kloset duduk (dengan bak air) Kloset jongkok Kran air lokal Kran air bebek Lokal Kran air setara San Ei Kran Air bebek setara San Ei

KODE 3

SATUAN 4 m2 bh bh bh kg pasang pasang kg m2 bh kg m2 m2 keping keping keping lembar lembar m2 bh pasang bh ton m2 m2 btg btg m3 m3 m3 m3 btg m3 bh bh bh bh bh bh m' m2 bh bh kg kg dos bh bh bh bh bh bh

H. SATUAN (Rp.) 5 27,000.00 1,800.00 180,000.00 90,000.00 15,000.00 10,000.00 10,000.00 19,000.00 13,000.00 15,000.00 3,500.00 45,000.00 18,000.00 9,000.00 6,000.00 7,000.00 27,000.00 27,000.00 20,000.00 4,000.00 10,000.00 4,000.00 800,000.00 27,000.00 270,000.00 18,000.00 18,000.00 7,902,000.00 5,822,000.00 3,115,000.00 3,115,000.00 18,000.00 166,000.00 1,960.00 2,250.00 4,909.09 8,833.33 45,000.00 1,960.00 9,300.00 36,000.00 22,000.00 27,000.00 13,000.00 19,000.00 8,000.00 1,350,000.00 143,000.00 13,000.00 31,000.00 100,000.00 126,000.00

KETERANGAN 6

7

No. 1 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147

URAIAN/JENIS BAHAN BANGUNAN 2 kunci Tanam 4" Kunci Lock KCL Biasa 6" (antik) Kunci Lock Besar Uk.4" Kunci silinder Kuas Kaca 3 mm Kaca 5 mm Kaca 8 mm (tempred) Kaca 12 mm (tempred) Kaca jendela nako+ rangka Kaca Blok Kipas angin Stainlesstell lengkap Lantai kayu (Gym floor) Lem Kayu Lem Lisplank motif bunga 14x40 minyak Silinder Minyak gemuk Minyak Solar Minyak tanah/lampu Kerosine Minyak bekisting Minyak Gerdang Minyak Cat Material pilihan Oxygen las Paving blok Pintu Gulung besi Pintu Besi Pintu lipar Harmonika Pintu KM/WC PVC Pipa Porous Plat baja Paku Paku skrup Plamur Porselin Polos 30x30cm Parquet Kayu Solid Pipa medium 6 m (GI) 1/2" Pipa medium 6 m (GI) 3/4" Pipa medium 6 m (GI) 1" Pipa medium 6 m (GI) 1 1/2" Pipa medium 6 m (GI) 2" Pipa medium 6 m (GI) 2,5" Pipa medium 6 m (GI) 3" Pipa medium 6 m (GI) 4" Pipa medium 6 m (GI) 6" Pipa Galvanis 6 m 1/2" Pipa Galvanis 6 m 3/4" Pipa Galvanis 6 m 1" Pipa Galvanis 6 m 1 1/2"

KODE 3

SATUAN 4 bh bh bh bh bh kaki kaki kaki kaki m2 bh bh m2 kg kg bh liter liter liter liter liter kg liter liter m3 kg bh m2 m2 m2 set m' kg kg kg kg bh m2 m' m' m' m' m' m' m' m' m' m' m' m' m'

H. SATUAN (Rp.) 5 52,000.00 135,000.00 52,000.00 27,000.00 13,000.00 13,000.00 14,000.00 90,000.00 135,000.00 108,000.00 23,000.00 900,000.00 180,000.00 13,000.00 45,000.00 8,600.00 27,000.00 35,000.00 4,500.00 7,500.00 7,500.00 22,000.00 24,000.00 15,000.00 197,000.00 9,000.00 1,800.00 450,000.00 720,000.00 1,186,000.00 336,000.00 15,000.00 21,000.00 16,000.00 23,000.00 18,000.00 8,000.00 270,000.00 2,900.00 3,700.00 5,700.00 6,700.00 7,500.00 9,000.00 11,600.00 16,400.00 23,900.00 10,950.00 14,400.00 18,000.00 27,000.00

KETERANGAN 6

8

No. 1 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198

URAIAN/JENIS BAHAN BANGUNAN 2 Pipa Galvanis 6 m 2" Pipa Galvanis 6 m 2 1/2" Pipa Galvanis 6 m 3" Pipa Galvanis 6 m 4" Pipa Galvanis 6 m 5" Pipa Ga