An- Najah National University Faculty of Engineering Civil Engineering Department. COST STUDY FOR TWO BEDS TO THE SAME PROJECT (construction main transmission pipeline project for Anabta villag e. Prepared by: Hazim Hamd -Allah Abdallah Mizyed Supervisor : E . Barraq Jumaa 2012. - PowerPoint PPT Presentation

Citation preview

Page 1: An- Najah  National University Faculty of  Engineering Civil Engineering Department

An-Najah National UniversityFaculty of Engineering

Civil Engineering Department

COST STUDY FOR TWO BEDS TO THE SAME

PROJECT (construction main transmission pipeline project for Anabta villagePrepared by:

Hazim Hamd-Allah Abdallah Mizyed

Supervisor : E. Barraq Jumaa2012

Page 2: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Hypothesis of Graduating project 2:

compare between two bids for the same project: ** the first one is estimation equal to 1.548.600 ILS, ** the second is estimation equal to 1.804.600 ILS.

Page 3: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Location of the project :

AnabtaIt’s a Palestinian city is considered one of the largest

cities of Tulkarem, a town divided into two parts:

**the old town which is located in the center and houses built by 150-100 years, the population of the old town 2000 people,

**The rest of the areas some are built from 50-70 years and the other newly built during the last twenty years, and the town has a population of 7000 new people.

** The town has a population of about 9000 people (2010)

Page 4: An- Najah  National University Faculty of  Engineering Civil Engineering Department

subject :

project is aiming to construct of water transmission line starting from well No.3 to the tank No.1 (2100 m of 8 inch) and from this tank to Kufur Ruman tank (2300 m of 6 inch)steel pipes.

Page 5: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Project Overview

“pipeline Project for Anabta village/ Tulkarm“

** The whole pipeline length for the project to be construction is about 4 km.

Page 6: An- Najah  National University Faculty of  Engineering Civil Engineering Department

The activities for this project is :

1)Mobilization and Demobilization

2)Earth works 3)Supply of pipes4)Valves and Fitting5)Installation of pipes6)Provisional Item

Page 7: An- Najah  National University Faculty of  Engineering Civil Engineering Department

MOBILIZATION

Allow for each and every expense to mobilize, set up offices, stores,

compound, signs, Insurance, etc…, including any taxes, rents,

temporary facilities and electricity

Page 8: An- Najah  National University Faculty of  Engineering Civil Engineering Department

EARTH WORKS include :

* Excavate

** Soft Backfilling For Trenches

*** Final Backfilling and Reinstatement

Page 9: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Supply of pipes

•For Pipelines:1. Welded Steel Pipes DN2002. Welded Steel Pipes DN150

Page 10: An- Najah  National University Faculty of  Engineering Civil Engineering Department

 Valves and Fitting

* Supply, install and construct : COMBINED GATE VALVE and CHECK VALVE CHAMBER , Combination Air Valve Chambers , Cast In Situ Washout Manholes , Float control valve

* Rehabilitation for the Existing Tanks : external paint , hand rail and external ladder

Page 11: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Installation of pipes

Installation and Welding of pipes and accessories along the route of pipelines , and welded joints must be wrapped by using sleeves

Page 12: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Provisional Item

the PWA reserves the right for carrying additional testing for any part of the works included in the contract, during and/ or after the execution of the work.

Page 13: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Summary of the bills:

Page 14: An- Najah  National University Faculty of  Engineering Civil Engineering Department

0

100000

200000

300000

400000

500000

600000

700000

800000

900000

AB

chart diagram

Page 15: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Sample on Comparison between two bids

Supply of pipes For bed A When Contractor A, calculated the

amounts, he depended on the Israeli cost since it is cheaper and has all the specifications. And after taking the bid, it was found that the Palestinian Water Authority prefers the national industry so it was agreed on the Israeli cost between the contractor and the factory, and on the same specifications.

  

Page 16: An- Najah  National University Faculty of  Engineering Civil Engineering Department

For bed B,

When contractor B, calculated the amounts, he from the beginning depended on the Palestinian cost even though it is more expensive and has all the specifications .

Page 17: An- Najah  National University Faculty of  Engineering Civil Engineering Department

• Earth works

For bed A the contractor want to rent all machine which he need to complete the work .

For bed B•the contractor have all machine which he need to complete the work ( he don’t need to rent any machine )

Page 18: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Conclusion :1) The increase in the number of the contracting corporations in the Palestinian market led to bids less than the estimated cost, since many corporations calculate the bid as to cover all their overhead expenses in order to guarantee it’s place in the market and to keep the employees working for these corporation through covering their salaries and expenses.

Page 19: An- Najah  National University Faculty of  Engineering Civil Engineering Department

2) The decrease in the number of the bids in markets in contrast with

the number of the existing corporations because of many external political reasons which

aims to affect the internal economical policies of Palestine.

Page 20: An- Najah  National University Faculty of  Engineering Civil Engineering Department

3)Sometimes , it’s not the gains which comes in the first place for

the contractors, but it’s the reputation which matters to them

specially when they are fresh contractors or the corporation

which they belong to is fresh and new.

Page 21: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Primavera

Page 22: An- Najah  National University Faculty of  Engineering Civil Engineering Department

Thank you …