25
Pre-Engineered PEB STRUCTRUAL STEEL WORKS FOR COMPLETE METAL BUILDING SOLUTIONS PEB ENGINEERING & CONSTRUCTIONS. An ISO 9001 - 2008 Company TM GROUP SURYA Steel Building Corporate Office Jai Ganesh Vision Complex, ‘B’ Wing, 2 nd Floor, office no.: 264, 265, 266, Akurdi, Pune-411 035.Maharashtra-India. Factory Address Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038. Mail-Id:- [email protected] , [email protected] Website:- www.groupsurya.in Contact’s No. +91 7507778565 /7507778559

An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Embed Size (px)

Citation preview

Page 1: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Pre-Engineered

PEB STRUCTRUAL STEELWORKSFORCOMPLETE METAL BUILDING SOLUTIONS

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

TM

GROUP SURYA

Steel Building

Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,

Pune-411 035.Maharashtra-India. Factory Address

Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- [email protected], [email protected]

Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559

Page 2: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

GROUP SURYA

Pre-Engineered

Steel Building

CivilConstructions

TM

Page 3: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Vision & Mission..

TM

Our Strength..

Our Expertise..

Page 4: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

AB

OU

T U

S

Page 5: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Name of Company :- GROUP SURYA PEB ENGINEERING AND CONSTRUCTIONS,PUNE.

Date Of Estab. :- April 2009

Corporate Office :- Jai Ganesh Vision Complex, ‘B’ Wing, 2nd

Floor, office no.: 264, 265, 266, Akurdi, Pune-411 035.Maharashtra-India.

Factory Address :- Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talwade, Pune-411 038.

Director :- Mr. Yogesh Wake +919960900219 +91 9823444119:

Mail-Id :[email protected] ; [email protected]

Website :- www.groupsurya.inContact’s No. :- +91 7507778565 /+91 7507778559

Turnover :- Rs. 55 Crores ( 550 Million INR)

Bankers :- Thane Janata Saha. (TJSB) Bank LtdPAN :- AAKFG4754DVAT TIN :- 27910867840V w.e.f. 23.11.2011CST TIN :- 27910867840C w.e.f. 23.11.2011EXCISE REG NO. :- AAKFG4754DEM001SERVICE TAX NO. :- AAKFG4754DSD001RANGE :- AKURDI 1DIVISION :- PUNE 1COMMISSIONARATE :- PUNE 1

Company Profile..TM

Page 6: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

What is PEB ?TM

Pre-Engineered Buildings (PEBs) Conventional Steel Buildings

Design

Quick and efficient; since PEBs are mainly formed of

standard sections and connections, design time is

significantly reduced. Basic designs are used ove and

over.

Slow: Each conventional steel structure is

designed from scratch by the Consultant, with

fewer design aids available to the Engineer.

Delivery Average 6 to 8 weeks. Average 20 to 26 weeks.

Foundations Simple design, easy to construct and light weight. Extensive, heavy foundations required.

Erection Cost & Time

Both costs & time of erection are minimized.

Typically, they are 20% more expensive than

PEB. In most of the cases, the erection costs

and time are not estimated accurately.

The erection process is easy, fast, step by step and

with hardly any requirement for equipments.

Erection is slow and extensive field labor is

required. Heavy equipment is often needed.

ArchitectureOutstanding architectural design can be achieved at

low cost using standard architectural features and

interface details.

Special architectural design and features must

be developed for each project, which often

require research and thus resulting in much

highter costs.

Future Expansion

PEB Building are designed with future expansion in

mind. It is simple, easy and cost effective. One

supplier can co-ordinate changes.

Future expansion would be more difficult and,

more likely, costlier.

Price Overall price -30% lower Overall price - Higher Price per square meter.

GROUP SURYA PEB BUILDINGS V/S CONVENTIONAL BUILDING

Page 7: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Types of Typical FramesTM

Page 8: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Page 9: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Page 10: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Page 11: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Page 12: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Page 13: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

TM

Success Engineers, Bhosari,Industrial Shed in PEB with

civil work (20,000 sq.ft.) (8 month)

Mahindra Logistics, Chakan, Pune Industrial

Shed in PEB with civil work (1,07,000 sq.ft.) 6

month

Mr. Desai, WaghajaiNagar Chakan Industrial

Shed in PEB (10,000 sq.ft.) 3 month

Chavan Industries, Waghjai Nagar, Chakan. Industrial shed with PEB

and civil work.( 34000 sq. ft) 4 months

Arofine

Page 14: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

TM

GROUP SURYA

Constructions

Civil

CIVIL WORKS FOR COMPLETE BUILDING SOLUTIONS

Page 15: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Our Clients..TM

Page 16: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Sr no Year Name of Client

Nature of works Duration

1 2013-14 Rudrapratap Indian Logistics , YelwadiChakan, Pune

Industrial Shed in PEB with civil work (2,41,000 sq.ft.)

8 month

2 2013-14 Mahindra Logistics, Chakan, Pune Industrial Shed in PEB with civil work (1,07,000 sq.ft.)

6 month

3 2013-14 Killick Engineering Pvt. Ltd., Malegaon MIDC

Sinner, Nashik

Industrial Shed in PEB with civil work (60,000 sq.ft.)

6 month

4 2013-14 Ram Corrugates Boxes Pvt, LTd. , ChakanPhase2 , Bhamboli .

Industrial Shed in PEB with MaizzenaineFloor (32,000 sq.ft.)

6 month

5 2013-14 M Plus CNC Tech Pvt. Ltd, Chakan Industrial Shed in PEB with civil work (22,000 sq.ft.)

4 month

6 2013-14 Success Engineers, Bhosari Industrial Shed in PEB with civil work (20,000 sq.ft.)

3 month

7 2012-13 Ramdas Botre, Chakan, Pune Industrial Shed in PEB (16,000 sq.ft.) 3 month

8 2013-14 Hyudai Showroom, Sangmner,Ahmednagar Industrial Shed in PEB with civil work (25,000 sq.ft.)

4 month

9 2013-14 Kisan dongare, Rohkal Industrial Shed in PEB (15,000 sq.ft.) 3 month

10 2013-14 S. M .Construction, Chakan Industrial Shed in PEB (12,000 sq.ft.) 3 month

11 2013-14 Mr. Desai, Waghajai Chakan Industrial Shed in PEB (10,000 sq.ft.) 3 month

12 2013-14 Rajhans Milk Dairy Sangamner , Ahmednagar

Industrial Shed in PEB (60,000 sq.ft.) 4 month

13 2013-14 Henkel Adhesive Tachnologies P Ltd, Jejuri, Pune

Industrial Shed in PEB with civil work (20,000 sq.ft.)

3 month

14 2013-14 Govind Agro, Lonand ,Satara Industrial Shed in PEB (13,000 sq.ft.) 3 month

15 2013-14 Praksh Pawar, Chakan Industrial Shed in PEB with civil work (20,000 sq.ft.)

3 month

16 2013-14 M/S S.P. Moulds Pvt. Ltd., Khalumbre,Chakan.

Industrial Shed in PEB with civil work (20,000 sq.ft.)

3 month

17 2013-14 Mr. A.K.Gupta ., Malegaon MIDC Sinner, Nashik

Industrial Shed in PEB with civil work (10,000 sq.ft.)

2 month

18 2013-14 Mr. Bharat Kad Industries, Chakan, Maharashtra

Industrial Shed in PEB (27000 sq.ft.) 3 month

19 2013-14 Sahyadri Agro & food products Pvt ltd, Akole, Sangamner

Industrial Shed in PEB with civil work (42,000 sq.ft.)

4 month

20 2013-14 Ajinkya Cars (General Motors), Barshi road, latur

Industrial Shed in PEB (10,000 sq.ft.) 2 month

21 2013-14 Lande Patil Transport, Bhosari, Pune Industrial Shed in PEB with civil work (15,000 sq.ft.)

3 month

22 2013-14 Forecad Technologies Ltd, bhosari, Pune Industrial Shed in PEB with civil work (9,000 sq.ft.)

2 month

In Process Project Details..TM

Page 17: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Rinder India Pvt. Ltd. MIDC Chakan, Pune Industrial Shed in PEB with civil work.(35000 Sq.ft)

Elite Plasto-Mech Industries, Savardari, Chakan Industrial Shed in PEB with civil work

(37500 sq ft)

Completed Project..TM

DTL Ancillaries Pvt. Ltd. Gat No.373, Plot No. 1 & 2, Ambethan

MIDC, Chakan Conventional Industrial Shed with mezzanine

floor. ( 55000 sq ft)

BridgeStone, Near Hyundai, Savardari, Chakan

Acme Industries Pvt. Ltd. Waghajai Nagar Chakan

Page 18: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Sr. No

Year Name of Client Consultants Nature of work Duration

12012-

13 Creative Ashtech Power

Projects Ltd. Aundh, Group Surya

Industrial Shed in PEB at Dahanu Power Plant.(12500 Sq.ft)

2 months

22012-

13 ABB Electricals, Nashik Group Surya

Industrial Shed in PEB with civil work (6500 sq ft)

1 month

32012-

13Mahadevi industrial Park,

Kharabwadi, Chakan. Group Surya

Industrial shed with PEB and civil work.( 65000 sq ft)

6 months

42012-

13Sadguru Auto Comp. Pvt. Ltd. Mahalunge, Chakan

Group suryaIndustrial shed with PEB and civil

work.( 35000 sq ft)4 months

52011-

12 Mauli Fabricators,

Ambethan MIDC, Chakan Architect Mr. Oak

Industrial Shed in PEB with civil work and office building ( 38000 sq ft)

5 months

62011-

12 Vighnaharta Warehouse, Waghjai nagar, Chakan.

Group Surya Ware House in PEB with civil work

and office building ( 35000sq ft) 4 months

72012-

13Rajyog Showroom, Latur. SA architect.

General Motors Vehicle showroom with PEB work.(12000 sq ft)

3 months

82012-

13Mahalunkar Estate, Mahalunge, Chakan

Group suryaIndustrial shed with PEB and civil

work.( 35000 sq ft)4 months

92012-

13Banashankari Warehouse KDBIA, Bijapur, Karnataka

Group suryaWare House with civil and PEB work.(

22000 sq ft)3 months

102012-

13Acme Industries Group surya Industrial Shed in PEB with civil work

(35,000 sq.ft.) 4 month

112012-

13Ashok Leyland Wagholi ,

PuneGroup surya Industrial Shed in PEB (22,000 sq.ft.) 4 month

122012-

13Honda Showroom ,

Sangamner, AhmednagarGroup surya Industrial Shed in PEB (16,000 sq.ft.) 3 month

132012-

13Shree Elecricals Group surya Industrial Shed in PEB (26,000 sq.ft.) 3 months

142011-

12 Mangal Industries, Talwade Group surya

Industrial Shed in PEB with civil work( 20000 sq ft)

3 months

152007-

08 GKN Sintered Metals Ltd,

Pimpri, Pune

Arc-Aids Architectural Consultant -

Pune.

Construction of shed (22500 sq.ft) 6 months

162012-

13Precision weighing system

Jejuri Group surya

Industrial shed with PEB and civil work.( 5000 sq. ft)

2 month

Completed Project..TM

Page 19: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Ashok Layland

Rajyog Toyota

Hero Honda Showroom

Showrooms & Offices..TM

Page 20: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Sr. No

Year Name of Client Consultants Nature of work Duration

17 2012-13 Pragati Engineers, Talwade Group suryaIndustrial shed with PEB and civil work.(

6000 sq. ft)2 month

18 2012-13 Vijeta Press Tools, Talwade Group SuryaIndustrial shed with PEB and civil work.(

5000 sq. ft)2 month

19 2012-13 Om Engineers, Talawade Group suryaIndustrial shed with PEB and civil work.(

5000 sq. ft)2 month

20 2012-13Chavan Industries, Waghjai

Nagar, Chakan. Group surya

Industrial shed with PEB and civil work.( 34000 sq. ft)

4 months

212012-13 KTA Spindle Tooling ,

Hinjewadi , PuneGroup surya Industrial Shed in PEB (45,000 sq.ft.) 4 month

22 2011-12 Padmavati Fly Ash & Bricks, Undari Pisoli, Katraj, Pune

Group SuryaWare House in PEB with civil work (

35000 sq. ft) 4.5 months

23 2012-13 Sahyadri Technomech Group suryaIndustrial shed with PEB work. (6000 sq.

ft)2 month

24 2011-12 Kirpekar Engineering Pvt. Ltd

- Hinjawadi Archicon Associates

- Pune. construction of Factory Shed PEB and

civil(23500 sq. ft) 3 months

25 2010-11 Hotel orchid Client itself Structural Glazing & Alcomate Paneling 3 months

26 2010-11 EMS Technologies Pvt. Ltd.

Pirangut

Environs -Architects, Planners

Landscape & Interior Designers –

Pune

Factory Shed, Compound wall, Internal Roads,& Site Development Etc.(22500

sq. ft) 5 months

27 2010-11 Francois Compressors India

Pvt. Ltd. PirangutArchicon Associates

- Pune. Tremix Flooring,Toilet Block,Temperory Shed & other Misc. works( 15000 sq. ft)

4 months

28 2010-11 Elpro International Ltd.

Chinchawad Elpro

constrution of extention building 27000 sq. ft.

6 months

29 2010-11 J P Engg, Hadapsar, Pune Archicon Associates

- Pune.

Construction of RCC office bldg @ 37500 sft, Internal Trimix Concrete Roads,

miscellanious civil works. 8 months

30 2009-10 Sungwoo Automotive India

Pvt. Ltd, Takave, Pune

Sungwoo Automotive India

Pvt.Ltd.

Construction of shed with civil work (40000 sq.ft)

7 months

31 2008-09 Mould Tech Pvt Ltd Supa

MIDC, Ahmednagar Pawan gandhi

Construction of shed in fabricated structure (45000 sq.ft)

7 months

Completed Project..TM

Page 21: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Ongoing Project Pics..TM

Page 22: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

QUALITY CONTROL EXCAVATION EQUP'S WITH OUR ASOCIATES

Theodofite 05 NosTata Hitachi Wx 200 + Wx 350 06 Nos

Autolevel 06 Nos JCB Excort 3 D 4 Nos

Concrete Moulds 70 Nos D 40 Kamatsu Bulldozers 01 Nos

Slump Test Cones 10 NosDumpers (Tata & Leyland )

18 Nos

Cube Testing Machine 02 Nos

Excort Bibro Roller ( 5250 )

01 Nos

Moisture Meter 03 NosBEML Motor Grader 02 Nos

Weigh Balance 08 NosHydraulic Breaker Atlas Capcc 03 Nos

Sand Sieve 05 Set Crup Hydaulic Breaker MB1600 & 2200

06 Nos

Metal Sieve 06 Set Hyva & Tata 1613 (TC) Dumpers. 04 Nos

STEEL SHUTTERING OTHER MACHINERY

Cup - Lock Scaffolding 0650 Sqm

Generator Set (125 KVA,30 KVA ) 04 Nos

Acro Spans 3200 Nos Earth Compactor 04 Nos

Props 7250 Nos Drill Machine 11 Nos

Plates 6200 Nos Grinder 08 Nos

Bressing Pipe 3100 Nos Welding Machine 24 Set

M S Couplers 6800 Nos Ele. Breaker 05 No

M S Shikanja 1300 Nos FLOORING

H Frame Scaffolding 00850 Set Tremix Flooring System 03 Nos

Ply Wood Formwork 14500 Sqm Tile Polishing Machine 04 Nos

Equipments & Machineries..TM

Page 23: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Dressing cotton General Medicines 1” & 3’’roller BandagePotassium Permanganate Iodine bottle, Dettol, Burnol / Sofromycene Knife, Scissors

Safety Policy..TM

Page 24: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Preventive Measures..TM

Page 25: An ISO 9001 - 2008 Company€¦ ·  · 2013-11-25Company Profile.. TM. What is PEB ? TM Pre-Engineered Buildings ... Mahindra Logistics, Chakan, Pune Industrial ... Dettol, Burnol

Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,

Pune-411 035.Maharashtra-India. Factory Address

Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- [email protected], /[email protected]

Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

GROUP SURYA

Thank youTM