CHILLED WATER (CHW) AND CONDENSER SIDE STREAM FILTERS FOR CHILLER UPGRADE SIDE STREAM FILTRATION CASE STUDY CLIENT Chelsea Football Club DATE March 2012 BUILDING LOCATION West Stand - London SECTOR Sports and Entertainment Facilities ABOUT THE PROJECT The aim of the project was to improve the quality of the air supply to the West Stand and the comfort of Chelsea FC’s corporate hospitality clients. PROJECT CHALLENGES As part of stadium re-development new heating and cooling systems were installed to improve the quality of air supply to the West Stand and the comfort of the corporate hospitality clients. This involved replacing old pipework which had deteriorated due to contamination and wear. The value of Side Stream filtration for controlling debris and biofilm in the closed loop systems was fully evaluated and it was decided that the benefits in supporter comfort justified implementation. To ensure maximum performance a fully boosted pump system was installed on the condenser circuit to minimise fluid loss from the circuit. Amazon Filters Ltd. Albany Park Estate, Frimley Road, Camberley, Surrey GU16 7PG UK Tel: +44 (0) 1276 670600 www.amazonfilters.com The Project was delivered on time, to budget and corporate hospitality has been significantly improved to the benefit of all. AMAZON FILTERS SIDE STREAM FILTRATION 61 SERIES MULTI ROUND HOUSING 3 20 MICRON SUPAGARD FILTER CARTRIDGE 3 AUTOMATIC VENT VALVES 3 DRAIN VALVES 3 READY TO INSTALL PUMP/FILTER SYSTEM 3 COMPRISING 61 SERIES HOUSING AND HIGH TEMPERATURE CARTRIDGES

Amazon Filters Provide ‘Side Stream Filtration’ to Chelsea Football Club

Embed Size (px)

DESCRIPTION

Amazon Filters recently provided Chelsea Football Club with Side Stream filters for their chilled water (CHW) and condenser circuits.

Citation preview

Page 1: Amazon Filters Provide ‘Side Stream Filtration’ to Chelsea Football Club

CHILLED WATER (CHW) ANDCONDENSER SIDE STREAM FILTERS

FOR CHILLER UPGRADE

SIDE STREAM FILTRATION CASE STUDY

CLIENTChelsea Football Club

DATEMarch 2012

BUILDING LOCATIONWest Stand -London

SECTORSports andEntertainment Facilities

ABOUT THE PROJECTThe aim of the project was to improve the quality of the air supply to the West Stand and the comfort of Chelsea FC’s corporate hospitality clients.

PROJECT CHALLENGESAs part of stadium re-development new heating and cooling systems were installed to improve the quality of air supply to the West Stand and the comfort of the corporate hospitality clients.

This involved replacing old pipework which had deteriorated due to contamination and wear. The value of Side Stream filtration for controlling debris and biofilm in the closed loop systems was fully evaluated and it was decided that the benefits in supporter comfort justified implementation.

To ensure maximum performance a fully boosted pump system was installed on the condenser circuit to minimise fluid loss from the circuit.

Amazon Filters Ltd. Albany Park Estate, Frimley Road, Camberley, Surrey GU16 7PG UKTel: +44 (0) 1276 670600 www.amazonfilters.com

The Project was deliveredon time, to budget andcorporate hospitality has been significantly improved tothe benefit of all.

“ “AMAZON FILTERS SIDE STREAM FILTRATION 61 SERIES MULTI ROUND HOUSING 3

20 MICRON SUPAGARD FILTER CARTRIDGE 3

AUTOMATIC VENT VALVES 3

DRAIN VALVES 3

READY TO INSTALL PUMP/FILTER SYSTEM 3

COMPRISING 61 SERIES HOUSING ANDHIGH TEMPERATURE CARTRIDGES