21
Alberto Luna

Alberto Luna portfolio

Embed Size (px)

DESCRIPTION

Selected works in Spain and UK at a glance

Citation preview

Alberto Luna

Alberto BurgosAssistant

SimónInterioresArchitect

ThreeSixtyArchitectureArchitect

JM ArchitectsProject Architect

2011 2012 2013 2014 2015201001_bu i l d ing wo rks

The project team have created a concept approach that will work with the historical aspects of the site to create a unique luxury combina-tion of historical elegance and con-temporary design.The project promotes the activa-tion to the frontage of Market Street with active ground floor space. As well as a contemporary architectu-ral aesthetic borne from a thorough analysis of the site and its historic progression whilst referencing con-textual materials.

MARKET STREET HOTEL

Ground floor plan

1.Edinburgh Castle 2.St.Giles cathedral 3.City chambers 4.City Art Centre 5.North Bridge jmarchitecs

Location: Edinburgh, UKStatus of building work: Planning

The hotel proposal offers a major development opportunity for a city centre site that has been empty and derelict for a period of approximately 50 years.

1

2

3

4

5

Location

Seventh floor plan Market Street

Reception sketch

Elevation sketch

Section

Floor plan

Section through cabinet Manifestation

The £1.9m facility for Glo-bal energy company Chevron co-vers 4000 square meters. It was designed to enable real time com-munication and problem solving with any oil installation, anywhere in the world, at any time.The principal outcome from a design perspective has seen suc-cessful integration of technology into the architecture of the space, ensuring a seamless environment not dominated by screens but ex-tremely comfortable and ergono-mic for the users.

PILOT FOR CHEVRON’S STATE-OF-ART CONFERENCE COMMUNICATION FACILITY

jmarchitecs

Location: Aberdeen, UKEnd of building work: 2014

Floor plan

Open consult elevations Site plan

Major renovation of a pri-mary branch situated at the heart of the City of London. The project ´s main challenge was to respect the original features of the bicente-nary building while giving a fresh and modern look to its facilities. There was a huge amount of work in collaboration with Conservation officers and Planning Officers.

CITY OF LONDON BANK ROYAL BANK OF SCOTLAND

jmarchitecs

Location: London, UKEnd of building work: 2014

Site plan

The Natwest Moorgate flagship project, one of the client’ key sites and most ambitious RBS projects in England. A £2.4m com-plete renovation and expansion of a listed building located in the City of London. The project involved a complete alteration of the layout with the addition of a mezzanine level and a secondary entrance. The continued incorporation of last minute demands and changes was one of the main challenges the project manager, site manager and myself had to deal with. I ran the project from feasibility to its suc-cessful handover being the coordi-nator of the architects team at all times.

PILOT STUDY FOR RBS NEW BRAND STATREGY

IN LONDON

jmarchitecs

Location: London, UKEnd of building work: 2013Floor plan

Mezzanine levelSection through wall openings

Cross section

Existing plan

Selection of two projects showing the work carried out whi-le employed by ThreeSixty. On one hand we carried out several refur-bishments which took account of the clients needs and what was possible within the confines of the original dwelling, leading us to great results. On the other hand we de-signed we designed new houses on empty plots. In addition to the aspects mentioned, there was a compromise with the location and surrounding of the new buildings.

35 MORAY PLACE2 BARONY ST

ThreeSixty Architecture

Location: Edinburgh, UKEnd of building work: 2012New plan

Existing and new internal elevations

Existing plan

First floor plan

External elevation

Location planGround floor plan

Images from various house alterations Housing and dwelling specia-lized company where the smallest detail has the same protagonism as the whole. Balance of quality, de-sign and comfort in all projects.

SIMON INTERIORES OFFICESAlteration of the facade and interior of the offices. 600sqm. Externally, the main idea was to highlight the industrial unit within the industrial state, this being a repetitious pat-tern throughout the complex. (See next page).

SIMON INTERIORESINTERIORS

Location: Alicante, SpainEnd of building works: 2011/12

Second floor planFirst floor plan

Main office space

02_compe t i t i ons

Extension and renovation of the existing museum seeking for a flexible place, where dynamic and participative spaces are created na-turally. The project is orientated to culture and leisure development.This infraestructure goes beyond the design of the bulding and expla-natory spaces, affecting in addition the resolution of an urban space of quality, in what today is a dead spa-ce in misuse.

EXTENSION OF THE MUSEUM OF HISTORY

Location: Valencia, Spain2011

Ideation process

Sections and elevations Cross sections Axonometry

North elevation

Ideation process

Revitalization of a degra-ded area through the realization of a large cultural public market comple-tely open to the city.The main idea is to promote the pu-blic space to the maximum, it being returned to the citizen. In order to achieve this, there is not any kind of architectural barrier, enchancing the multiplicity of spaces and inter-personal relationships.Urban development conditions very limited with regards to building hei-ght and the existence of a former gasholder in disuse.

CULTURAL MARKET

Location: Valencia, Spain2011

South elevation

Section through auditorium Cross section

03_con tac t

[email protected] Ocean St NorthBondi NSW 2026

0406 165 140