  • Project Overview

    State of California Public Utilities Commission MAY 2015

    FACT SHEET

    Public Scoping Comments and Next Steps

    The CPUC invites the public to present comments about the Alberhill and Valley–Ivyglen Projects and the scope of the EIR. Comments may be mailed, emailed, or faxed. All public scoping comments must be received or postmarked by June 5, 2015. Once the public scoping period ends, the CPUC will prepare a Draft EIR, which will be circulated for public review and comment.

    For more information… Email: [email protected] Website: http://tinyurl.com/Alberhill Mail: Alberhill System Project c/o Ecology and Environment, Inc., 505 Sansome Street, Suite 300 San Francisco, CA 94111 Fax: (415) 398-5326 Voicemail: (877) 313-5385

    Alberhill System Project

    Southern California Edison (SCE) is proposing to construct a new 500/115-kV Substation (Alberhill Substation) within the Valley South 115-kV System service area (Figure 1) to meet projected electrical demand that would exceed the current operating limit of the Valley South 115-kV System.

    The California Public Utilities Commission (CPUC), as Lead Agency under the California Environmental Quality Act (CEQA), will prepare an Environmental Impact Report (EIR) for the Alberhill Project. The CPUC is also the Lead Agency for another SCE-proposed project: the Valley–Ivyglen Subtransmission Line Project (Valley–Ivyglen Project). The Alberhill Project would be constructed within approximately 6.5 miles of the same right-of-way as the Valley–Ivyglen Project and would be located on some of the structures constructed for the Valley–Ivyglen Project. Due to geographic proximity, overlapping impacts, and similar timelines, the CPUC determined that it would be in the public’s best interest to disclose the environmental impacts of the Valley–Ivyglen and Alberhill Projects in a single EIR. The EIR will provide separate analyses for each project. This EIR will describe the nature and extent of the impacts resulting from the Valley–Ivyglen and Alberhill Projects. There will be opportunities during the EIR process for the public to learn about and comment on the proposed projects and their environmental impacts.

    Project Components

    The proposed Alberhill Project includes construction of the following components (Figure 2):

    A new 500/115-kV substation (Alberhill Substation); Two, approximately 1.-5-mile-long, 500-kV transmission lines to connect the Alberhill Substation to the existing Serrano-Valley 500-kV transmission line; One new and four modified subtransmission lines, totaling approximately 20.5 miles, to transfer five substations served by the Valley South 115-kV System to the Alberhill Substation; Telecommunications lines on the new and replaced transmis- sion and subtransmission lines and in new and existing underground conduit; and A 120-foot microwave antenna tower at the proposed Alber- hill Substation site, microwave telecommunications antennas at the existing Santiago Peak communications site and Serrano Substation, and other telecommunications equipment installations at existing and proposed substations.

    Potential Environmental Impacts Identified

    In its initial review of the Alberhill Project, the CPUC has identified the following potential adverse environmental impacts:

    Aesthetics – Operation of a new substation, transmission lines, and subtransmission lines could result in impacts on scenic roads and visual quality. Air Quality – Construction activities could result in fugitive dust emissions that exceed local air district thresholds. Biological Resources – Construction activities could result in impacts on special status species and sensitive habitats. Hazardous Materials – Construction activities could result in temporary effects from the use of hazardous materials. Opera- tion of a substation could result in impacts during an accidental release of hazardous materials. Hydrology and Water Quality – Construction activities could result in impacts on drainage patterns and water quality.

    • •

  • Valley South 115-kV System and Electrical Needs Area Alberhill System Project

    Figure 1

    WALNUT

    BARRE

    SERRANO

    MIRA LOMA

    IVYGLEN ALBERHILL (proposed)

    ELSINORE

    SKYLARK

    TENAJA

    NEWCOMB

    VALLEY

    Lake Elsinore

    L O S A N GE L E S C OUNTY

    SAN BERNARDINO COUNTY

    R IVERS IDE COUNTY

    62 60

    91

    39

    74

    74

    74

    79

    79

    3

    1

    1

    111

    243

    15

    15

    1510 10

    10

    5

    5

    5

    10

    215

    215

    210

    O RANGE C OUNTY

    SAN D IEGO COUNTY

    P a c i fi c O c e a n 500/115-kV substation 115/12-kV substation

    0 5 10 15

    M I L E S

    20 25

    N

    FOGARTY

    Note: Only the substations within the western side of the existing Valley South 115-kV System would be part of the proposed Alberhill 115-kV System. Only the Tenaja Substation within the eastern side of the Valley South 115-kV System is shown.

    Glendora

    West Covina

    Ontario

    San Bernardino

    Hemet Perris

    Palm Springs

    Corona

    Anaheim

    Orange

    Temecula

    Riverside

    Mission Viejo

    Huntington Beach

    Cities (City of Lake Elsinore city limits shown in white)

    Alberhill 115-kV System (proposed)

    Valley North 115-kV System

    City of Lake Elsinore

    Valley South115-kV System and Electrical Needs Area

    Riverside County

    Orange County

    CITY OF LAKE

    ELSINORE

    U N I N C O R P O R A T E D

    R I V E R S I D E C O U N T Y

    CITY OF CANYON

    LAKE

    CITY OF PERRIS

    CITY OF MENIFEE

    CITY OF WILDOMAR

    Lake

    Lee Lake

    Lake Mathews – Estelle Mountain Reserve

    Elsinore

    IVYGLEN

    ELSINORE

    SKYLARK

    NEWCOMB

    0 1

    M I L E S

    2

    Alberhill System Project Figure 2

    Proposed Alberhill Substation site

    Substation location

    CA

    Modi�ed, replaced, or new 115-kV subtransmission line

    Proposed 500-kV transmission line

    Existing 500-kV Serrano-Valley transmission line

    City boundaries

    GRAND AVE

    15

    15

    15

    74

    74

    74

    M U

    R R

    IE TA

    R D

    G O

    ET Z

    R D

    N E WP ORT RD

    BUN DY

    LEMO N S T

    SCOTT RD

    E T HANAC RD

    C A NY

    ON R

    D

    CO RY

    DO N

    S T

    M ISSIO

    N TR A

    IL LA

    KE S

    T

    300-ft. segment (not to scale)

    TEMESCAL CANYON RD

    LAKESHORE DR

    LAKESHORE DR

    BAKER ST N

    O RT

    H M

    AI N

    (500-kV transmission line alignments revised April 2011 to avoid the Reserve)

    FOGARTY

Search related