Ajedrez Project
Alluvial Ecological Gold
Argentina2014
ESPIRITU DE LOS ANDES S.A. is an Argentine company focused on the exploration, development and exploitation of alluvail ecolgical gold projects in the country.
AJEDREZ PROJECT is one of most important alluvial gold projects in Argentina due to the quality of the ore and the estimate amount of its reserves
The Project is located in the well-known Gold District Sierra de La Rinconada, in the northwest region of the Province of Jujuy, 300 km away from the capital of the province, the City of San Salvador de Jujuy.
2
THE PROJECT
AJEDREZ PROJECT
70Km.
25 Km. 25 Km.
200Km.
50Km.
AJEDREZPROJECT
AJEDREZPROJECT
LA QUIACA
AJEDREZ PROJECTLOCATION & DISTANCEPROVINCE OF JUJUY - ARGENTINA
AJEDREZ PROJECT
2 Mining Properties
6.000 Ha
3.900 m. a. s. l.
Given the characteristics of this deposit, it is possible to implement conventional mechanical methods to extract and concentrate gold at a very low cost.
The main gold reserves of the Project are located in the river terraces and the floodplain.
5
THE PROJECT
AJEDREZ PROJECT
The average ore grade within these exploration targets is 0,6 g/m3. Areas with up to 1,0 g/m3 have also been found.
The current exploration area represents approximately 25% of the total surface of the Project. Preliminary Studies and previous exploitation work in the area allow the estimation of the existence of at least 100,000 troy ounces (around 3,000 kg) of gold in this sector of the Project.
Due to the almost complete lack of snow season, exploration and exploitation activities can be carried out through the entire year.
6
THE PROJECT
AJEDREZ PROJECT
AJEDREZ PROJECT PROVINCE OF JUJUY - ARGENTINA
AJEDREZ PROJECTACCESS & ROADS
PROVINCE OF JUJUY - ARGENTINA
9
AJEDREZ PROJECT ACCESS & ROADS
CERRO OROSMAYO
AJEDREZ PROJECT
11
BACKGROUND - EXPLOITATION HISTORICAL SITES
AJEDREZ PROJECT
12
BACKGROUND- EXPLOITATION AREAS AT OROSMAYO (2006)
Mines Alfa, Beta & Gama
AJEDREZ PROJECT
Ciénaga Grande Sector
AJEDREZ PROJECTBACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006)
Campo Lavadero Sector
AJEDREZ PROJECTBACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006)
Campo Lavadero Sector
Thickness of the Mineralized Sector:
2 meters (from bottom to top)
Delta Mine
AJEDREZ PROJECT BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006)
Cortaderoyoc Sector
Epsilon Mine
AJEDREZ PROJECT BACKGROUND – EXPLOITATION AREAS AT OROSMAYO (2006)
Thickness of the Mineralized Sector:
2 meters (from bottom to top)
17
BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
AJEDREZ PROJECT
18
BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
AJEDREZ PROJECT
knelson 32”
Tromel
Knelson 10”
BACKGROUND- CONCENTRATION PILOT PLANT AT OROSMAYO (2006)
AJEDREZ PROJECT
AJEDREZ PROJECT BACKGROUND- GOLD AT OROSMAYO (2006)
By the end of 2013, ESPIRITU DE LOS ANDES S.A. signed a Joint Venture Contract with J.E.M.S.E. (Energy and Mining State Company of the Province of Jujuy), in the pursuit of development and growth of both Companies, as well as the economy and welfare of the local Communities and the areas of influence where the Project is located.
21
PRESENT
AJEDREZ PROJECT
During the last two years, ESPIRITU DE LOS ANDES S.A. has been engaged to the intense task of socialization with the local Communities that inhabit the Project area, reaching a very positive and important Company-Community relationship.
22
PRESENT
AJEDREZ PROJECT
The Environmental Impact Assessment (E.I.A.) of the Project has recently been unanimously agreed on and approved by the Provincial Environmental Management Unit of Jujuy, Unidad de Gestión Ambiental Provincial (U.G.A.M.P.). This entity is formed by more than ten (10) state organizations of the Province of Jujuy, the University of Jujuy, the Central Union of Mine Workers and representatives of the local communities and indigenous peoples.
On May 7th 2014, the Directorate of Mining of the Province of Jujuy approved the E.I.A., thus authorizing the exploration activities for the Ajedrez Project.
23
PRESENT
AJEDREZ PROJECT
24
MINING POTENTIAL
GENERAL CONDITIONS
NETWORKING
AJEDREZ PROJECT
Since the approval of the E.I.A., an intense exploration programme is being carried out. Its main objective is to confirm the gold potential of the Project and to define its economic feasibility as soon as possible:
- Mineralogical Analysis
- Granulometric Analysis
- Sedimentological Analysis
- Hydrological Survey
- Geochemical Analysis
25
PRESENT
AJEDREZ PROJECT
26
AJEDREZ PROJECT
27
AJEDREZ PROJECT
A treatment plant will be installed within the Project area, and it will be equipped mainly with centrifugal concentrators, with a high recovery rate of very fine ore.
28
FUTURE INVESTMENT & EXPLOITATION PLAN
AJEDREZ PROJECT
The current design for the Exploitation Stage foresees the monthly production of eight (8) to twelve (12) kilograms of gold, with the ore concentration equipment in use.
Provided this production rate is maintained, the Project could have a mine life of thirty (30) years.
Due to the strong commitment to the continuous improvement of the life conditions of the Local Communities, the Company is carrying out constant corporate social responsibility work.
ESPIRITU DE LOS ANDES S.A. plans to start producing ecological gold on the first semester of 2015.
29
FUTURE INVESTMENT & EXPLOITATION PLAN
AJEDREZ PROJECT
THANK YOU FOR
YOUR ATTENTION!!!
AJEDREZ PROJECT