    PROBLEMS FACED & ACTION TAKEN

    E R O S I O NProblem :

    High pressure air mixes with ash and leaks to low pressure sideleads to erosion of static seals, radial seals etc.

    Action Taken :

    Reverse rotation of APH ( Gas to SA to PA )

    Additional layer of by-pass seal near sector plate.

    Kao-wool packing carried out at the inboard sector plates,static seals and ASP TO SP seal.

    Seal thickness increased (1.6 mm to 2.5 mm)

    Seal tabs introduced in Axial & Radial seals.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    2/25

    PROBLEMS FACED & ACTION TAKEN

    Problem :

    High Leakage of Air to Gas path

    Action Taken :

    1. Double sealing arrangement introduced in Khaperkheda,Simhadri & Talcher projects etc.

    2. PG tests conducted in various R&M projects and resultsfound

    encouraging.2. Before PG tests, APHs are attended for seal adjustments,

    issued Technical Directive regarding Leakage & necessaryoperations.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    3/25

    PROBLEMS FACED & ACTION TAKEN

    F I R EDuring start up with oil firing, impropercombustion may result in the accumulation ofcondensed oil vapours and un burnt carbon onAir preheater surfaces by carry over from

    furnace.PREVENTIVE

    Soot blower should be in operation.

    Fire sensing device ( Thermocouples ) to be

    commissioned.Oil carry over detector to be commissioned andmonitored during oil firing.

    Heat rate of firing should be controlled.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    4/25

    PROBLEMS FACED & ACTION TAKEN

    BEARING FAILURESOil contamination

    Starvation of oil

    Mis-alignment

    Lack of maintenanceHigher operating oil

    temperature

    Foreign materials in

    bearing

    Action Taken:

    Technical directive

    issued.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    5/25

    PROBLEMS FACED & ACTION TAKEN

    PROBLEMS IN DRIVE UNIT ASSY ;

    Over running clutch failure:Over heating

    Sealed bearings

    No oil circulation

    Action Taken:

    New design evolved eliminating

    Overrunning clutches in main

    and stand by electric drives.

    Vibration of drive unit:Misalignment.

    Failure of bearings in motor,

    gear box etc

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    6/25

    PROBLEMS FACED & ACTION TAKEN

    CLEANING DEVICE ASSY :

    Drive unit failure

    Chandrapur unit-7 SAPH failed due to closure of

    soot blower drain valve.

    - The drain valve to be kept crack open

    - Technical directive issued.Nozzle erosion

    - Parking position to be at inboard end.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    7/25

    PROBLEMS FACED & ACTION TAKEN

    FIRE SENSING DEVICE ASSY :

    Failure of Thermocouples:

    Design changed to individual thermocouples.

    Failure of scanners:

    Local Temperature scanners eliminated anddirectly connected to DDCMIS for betteroperation from Khaperkheda project onwards.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    8/25

    OPERATION PROBLEMS

    HIGHER PRESSURE DROP ACROSS APH

    1. Choking of heating elements

    2. Higher flows

    3. Eroded/damaged heating elements -obstructs flow path.

    4. Improper steam parameters and

    eroded nozzles and steam pipes.

    5. Low cold end average temperature.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    9/25

    OPERATION PROBLEMS

    HIGH GAS LEAVING TEMPERATURES

    1. More gas flow with high inlet temperature

    temp.2. Less air flow and high inlet temp.

    3. Choking of SCAPH less air flow

    4. Choking of heating elements

    5. Erosion & corrosion of heating elements

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    10/25

    OPERATION PROBLEMS

    CHOKING OF HEATING ELEMENTS :1. Improper evacuation of economiser hopper.

    2. Corrosion of heating elements

    3. Boiler slagging

    4. Improper drying of heating elements after waterwashing.

    5. Excess air operation.

    6. Leak in SCAPH and water washing & deluge line,soot blower passing etc.

    7. Frequent water washing of heating elements andimproper drying.

    8. Proper exit gas temperature with respect to % ofsulphur in fuel.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    11/25

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    12/25

    TROUBLE SHOOTING

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    13/25

    Sl. FAULT PROBABLE CAUSES REMEDY

    01 Excessive leak

    between gas and air

    side

    Damaged / worn out

    seals.

    - Due to high gas

    inlet temp. Less air

    flow.

    Inspect all seals and

    adjust or replace if

    necessary.

    02. Excessive noise

    from rotor

    Warped rotor due to

    excessive

    expansion.

    Foreign object in

    rotor.

    Bad bearings

    Reduce boiler load

    or admit more cold

    air.

    Stop rotor and

    visually inspect it

    Replace Bearings.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    14/25

    03. Rotor does not turn Defective drive unit

    Foreign object in

    rotor

    Ensure power is

    available to drive

    unit

    Check pinion gear

    and pin rack.

    Inspect rotor and

    remove any foreign

    object.

    04 Drive unit

    overheats

    Inadequate

    lubrication in drive

    unit.

    Pinion gear and pin

    rack meshing too

    hard due to

    expansion

    Hard rubbing seals

    Bad bearings in gear

    reducer.

    Lubricate drive unit

    components

    Adjust drive unit to

    proper clearances.

    Adjust seals *

    Change the

    bearings.

    * Slight overheating due to hard rubbing seals may be relieved when the Air preheater

    reaches normal running temperature or after the seals have worn in properly.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    15/25

    05 Noisy Bearings Inadequate

    lubrication

    Check that oil is

    flowing through

    Flow indicator and

    check oil line, if

    necessary

    06 Oil temperature too

    high

    Insufficient cooling

    Improper oil

    viscosity being used.

    Absorption of

    radiation heat due to

    improper insulation.

    Check that

    adequate water flow

    is going into oil

    cooler

    Replace oil with

    proper type of oil.

    Insulate properly.

    07. Circulating oil

    foamy

    Air leak into the oil

    system

    Check for an air leak

    on the suction side

    of the oil system.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    16/25

    08. Low oil level Leak in oil system Locate and arrest the leak.

    09. Soot blower

    not

    functioning

    Power failure

    Swivel header travel

    incorrect.

    Incorrect steampressure

    Check electrical connection.

    Check the speed reducermoveable parts for binding.

    Adjust travel of nozzle pipe.

    Ensure adequate steam

    supply is available.

    Check DA head valve.

    10. Excessive

    pressure

    drop through

    gas & air

    sides

    Badly fouled heating

    elements.

    - due to improper

    combustion.

    Excessive plugging.

    Thinned down and

    damaged elements

    Operate soot blower and

    check soot blower steam for

    proper pr. and temperature.

    Investigate & remeditate the

    cause. If soot blower is noteffective, heater can be

    isolated and water washed

    off load (in worst case),

    remove the basket and clean

    them outside. Rectify and

    replace the element baskets.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    17/25

    11. Variation

    (periodic

    kick) in the

    main driveammeter

    current

    Excessive rubbing

    of some seals.

    Faulty bearings

    Locate faulty seals and

    replace.

    Rectify or replace thebearings.

    12. Abnormalincrease in

    the

    temperature

    Starting up of fireinside the Air

    preheater

    Immediately isolate airheater and check for fire

    and admit large quantity

    of water. CO2 foam,

    steam should not be

    used.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    18/25

    13. Increase in

    gas outlet

    temp. and

    steady fall

    of air outlet

    temp.

    Air preheater

    stalled.

    Heating elements

    plugged

    Isolate Air pre heater

    and check for troubles

    in the drive system.

    Clean heating

    elements.

    14. Excessive

    pressure

    build up by

    Lub oilpump.

    Oil filter chocked Clean or replace the

    cartridge.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    19/25

    IMPROVEMENTS REQUIRED - INSTALLATION

    1. Storage of APH components.

    2. Maintenance of stored components.

    3. Support bearing - oil contamination.

    4. Improper locking of shim type sector plate adjusters.

    5. Welding of drive panel before final alignment

    6. Insulation of primary centre section sector plate adjusters.

    7. Ensure free movement of hot end sector plates after staticseal welding to avoid guide bearing failures.

    8. Check the main drive motor alignment with gear box andcorrect if necessary before trial operation.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    20/25

    IMPROVEMENTS REQUIRED - COMMISSIONING

    Before light up: Commission Cleaning device assy, oil carryover probe, fire sensing device, RSA & wash pipe assy.

    Maintain gas outlet tempr is same in both APHs (with in 10 C )

    If one APH is used out of two, the other APH should be kept inrotation or should be blanked properly to avoid fire.

    Ash accumulation over guide bearing assy, soot blower assy &

    LOPs must be avoided.

    Ensure clean dry air to Air motor without moisture. Keep the airmotor in working condition by operating 5 minutes in a day.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    21/25

    IMPROVEMENTS REQUIRED - COMMISSIONING

    1. Lub oil pumps should not be started when the lub oiltemperature is less than 40 c to avoid pump oil sealfailure.

    1. Water washing is to be done during shutdown when the gasinlet temperature is 100 c. Do not water wash APH justbefore light up since proper drying is not possible which maylead to more unburnt deposition which in turn cause APHfire.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    22/25

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    23/25

    IMPORTANT INSTRUCTIONS - DO'S

    1. Plan in advance the sequence of erection.

    2. Keep the necessary tools and tackles ready before start of erection.3. Contact the Airpreheater engineering / BAP / Ranipet if any deviation

    or rectification is to be made.

    4. Apply rust preventive oil to protect components from rusting due to

    long storage and bad weather.

    5. Store the heating elements covered with tarpaulin and ensure cover

    sheets even after installation into the rotor.6. Maintain the required accuracy in erection, which leads for a

    satisfactory operation.

    7. Tighten bolts to the required torque.

    8. Fill the bearings with specified oil or equivalent even during erection.

    9. Rotate the Airpreheater in the correct direction of rotation.

    10. Keep a record of the readings in the check sheets which shall be

    despatched for the reference of Airpreheater Engineering / BAP /

    Ranipet.

    11. Seal weld outside and inside for rotor housing panels, connecting

    plates (hot and cold) to housing panels, connecting plates (hot and

    cold) to air and gas ducts.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    24/25

    IMPORTANT INSTRUCTIONS - DON'TS

    1. Do not mix up items belonging to different Airpreheaters.2. Do not use shop lugs for lifting components / assemblies.

    3. Do not support rotor on hot end connecting plate while lifting.

    4. Do not carry out the bearing assemblies in open, dusty

    atmosphere.

    5. Do not spoil the seal leaf by standing on them, by any otherexternal load or interference with foreign material or by wrong

    direction of rotation.

    6. Do not allow any foreign particle such as electrode bits, slag

    wool etc enter into heat transfer elements during erection.

    7. Do not carry out final welds before final alignments, checks etc.8. Do not spoil the seal straight edge during trail run.

    9. Do not start Airpreheater without filling with specified lubricants

    during erection check up.

    10. Do not operate air motor without filter lubricator during trial run.

  • 8/13/2019 Air Preheater in Thermal Power Plant Problem n Sol

    25/25

    DAILY CHECK

    Oil levels in :

    Support bearing, Guide bearing, Main drive gear reducer &

    Air line lubricator

    For any unusual noise in:

    Rotor , Rotor main drive bearings, Drive motor, Main gear reducer,

    Cleaning device during operation & Oil circulation systems

    For cleanliness near:Rotor drive unit, Rotor main bearings,

    Cleaning device & Oil circulation system

    Instruments for proper working:

    Bearing lube oil thermometers, Bearing lube oil pressure gauges ,

    Thermocouples if provided in bearings for alarm or remote

    indication. Air inlet and outlet, gas inlet and outlet temperature

    measuring instruments. Manometers for measuring pressure drop

    across air preheater for gas and air flows.

    The condition of cold end elements