21
AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday, May 22, 2013 Thursday, May 23, 2013 DoubleTree Hotel San Diego Downtown 1646 Front Street San Diego, California 1. Call to Order. Call meeting to order by Chair Chip Carson at 8:00 a.m. on Wednesday, May 22, 2013 at the DoubleTree Hotel, San Diego, California. 2. Self-introduction of Committee Members and Guests. For a current committee roster, see pg. 2. 3. Approval of Previous Meeting Minutes. Approve the May 23-24, 2012 meeting minutes, pg. 5. 4. The New Process. See handouts from PowerPoint presentation, pg. 8. 5. Definitions Task Group. See pg. 19. 6. Hazardous Materials Task Group. See pg. 20. 7. Multi Hazards Task Group. The task group consisting of Norm Groner – Chair, Amy Cheng, Scott Laramee and Jake Pauls was retained on the agenda. 8. NFPA 101 Chapter 2 Reference to NFPA 400. See pg. 21. 9. NFPA 101 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before the meeting date. 10. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before the meeting date. 11. Other Business. 12. Adjournment. Enclosures Page 1 of 21

AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

AGENDA NFPA Technical Committee on Fundamentals

NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday, May 22, 2013 Thursday, May 23, 2013

DoubleTree Hotel San Diego Downtown 1646 Front Street

San Diego, California

1. Call to Order. Call meeting to order by Chair Chip Carson at 8:00 a.m. on Wednesday, May 22, 2013 at the DoubleTree Hotel, San Diego, California.

2. Self-introduction of Committee Members and Guests. For a current committee roster, see pg. 2.

3. Approval of Previous Meeting Minutes. Approve the May 23-24, 2012 meeting minutes, pg. 5.

4. The New Process. See handouts from PowerPoint presentation, pg. 8.

5. Definitions Task Group. See pg. 19.

6. Hazardous Materials Task Group. See pg. 20.

7. Multi Hazards Task Group. The task group consisting of Norm Groner – Chair, Amy

Cheng, Scott Laramee and Jake Pauls was retained on the agenda.

8. NFPA 101 Chapter 2 Reference to NFPA 400. See pg. 21.

9. NFPA 101 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before the meeting date.

10. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be

distributed before the meeting date.

11. Other Business.

12. Adjournment.

Enclosures

Page 1 of 21

Page 2: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

Address List No PhoneFundamentals SAF-FUN

Safety to Life

Ron Coté03/27/2013

SAF-FUNWayne G. CarsonChairCarson Associates, Inc.35 Horner Street, Suite 120Warrenton, VA 20186-3415

SE 1/1/1988SAF-FUN

Ron CotéSecretary (Staff-Nonvoting)National Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

1/1/1991

SAF-FUNFarid AlfawakhiriPrincipalAmerican Iron and Steel Institute380 Cottonwood LaneNaperville, IL 60540Alternate: Jonathan Humble

M 7/23/2008SAF-FUN

Andrew BlumPrincipalExponent, Inc.17000 Science Drive, Suite 200Bowie, MD 20715Alternate: Richard T. Long, Jr.

SE 8/2/2010

SAF-FUNAmy Y. ChengPrincipalClark County Department of Development ServicesPlans Examination Division4701 West Russell RoadLas Vegas, NV 89118

E 10/23/2003SAF-FUN

Salvatore DiCristinaPrincipalRutgers, The State University of New Jersey82 Street 1603, Livingston CampusPiscataway, NJ 08854

E 4/15/2004

SAF-FUNHelen DiPietroPrincipalNorth Carolina Department of InsuranceOffice of State Fire MarshalMail Service Center 1202Raleigh, NC 27699-1202Alternate: Robert A. Speed

E 03/05/2012SAF-FUN

Tod DoeblerPrincipalMenomonee Falls Fire DepartmentW140 N7501 Lilly RoadMenomonee Falls, WI 53051International Fire Marshals Association

E 03/05/2012

SAF-FUNRobert J. EugenePrincipalUL LLC121 Woodard RoadNewport, WA 99156

RT 10/6/2000SAF-FUN

David W. FrablePrincipalUS General Services AdministrationPublic Buildings Service665 Green Meadow LaneGeneva, IL 60134

U 10/27/2009

SAF-FUNMarshall J. GaubertPrincipalJefferson Parish Fire Department6005 Ruth StreetMetairie, LA 70003

E 10/20/2010SAF-FUN

Michael O. GencarelliPrincipalUS Department of the NavyNAVFAC HQ: Medical Facilities Design Office (MDFO)1322 Patterson Avenue, Suite 1000Washington, DC 20374

E 10/18/2011

SAF-FUNRalph D. GerdesPrincipalRalph Gerdes Consultants, LLC5510 South East Street, Suite EIndianapolis, IN 46227American Institute of Architects

SE 10/28/2008SAF-FUN

Norman E. GronerPrincipalJohn Jay College of Criminal JusticeDepartment of Protection Management445 West 59th Street Rm 3530NNew York, NY 10019

SE 4/16/1999

1Page 2 of 21

Page 3: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

Address List No PhoneFundamentals SAF-FUN

Safety to Life

Ron Coté03/27/2013

SAF-FUNMorgan J. HurleyPrincipalSociety of Fire Protection Engineers7315 Wisconsin Avenue, Suite 620EBethesda, MD 20814

U 10/10/1998SAF-FUN

David J. JacobyPrincipalSimpson Gumpertz & Heger19 West 34th Street, Suite 1000New York, NY 10001

SE 7/14/2004

SAF-FUNDavid P. KleinPrincipalUS Department of Veterans Affairs810 Vermont Avenue, NW, Suite 800Mail Code: (10NA8)Washington, DC 20420

U 4/1/1995SAF-FUN

Scott T. LarameePrincipalAon Fire Protection Engineering Corporation5000 Executive Parkway, Suite 340San Ramon, CA 94583

I 10/27/2009

SAF-FUNJames K. LathropPrincipalKoffel Associates, Inc.81 Pennsylvania AvenueNiantic, CT 06357Alternate: Sharon S. Gilyeat

SE 7/1/1995SAF-FUN

Vickie J. LovellPrincipalInterCode Incorporated200 NE 2nd Avenue, Suite 309Delray Beach, FL 33444Alliance for Fire & Smoke Containment & Control, Inc.

M 08/09/2012

SAF-FUNJack McNamaraPrincipalBosch Security Systems130 Perinton ParkwayFairport, NY 14450-9199National Electrical Manufacturers AssociationAlternate: William P. Adams

M 3/1/2011SAF-FUN

Ricardo MurgaPrincipalUS Department of Health & Human ServicesPhoenix Area Indian Health ServiceTwo Renaissance Square40 North Central Ave., Suite 720Phoenix, AZ 85004

E 8/9/2011

SAF-FUNJake PaulsPrincipalJake Pauls Consulting Services in Building Use & Safety12507 Winexburg Manor Drive, Suite 201Silver Spring, MD 20906American Public Health Association

C 7/12/2001SAF-FUN

Dennis L. PittsPrincipalAmerican Wood Council1721 West Plano Parkway, #224Plano, TX 75075American Forest & Paper AssociationAlternate: Rodney A. McPhee

M 10/27/2009

SAF-FUNMilosh T. PuchovskyPrincipalWorcester Polytechnic InstituteDepartment of Fire Protection Engineering100 Institute RoadWorcester, MA 01609

SE 8/5/2009SAF-FUN

Rodger ReiswigPrincipalTyco/SimplexGrinnell3640 Haddington CourtApopka, FL 32712Automatic Fire Alarm Association, Inc.Alternate: Thomas P. Hammerberg

M 3/2/2010

SAF-FUNPatrick S. SabaPrincipalHewlett Packard Company1707 Ritchie HighwayAnnapolis, MD 21409

M 3/1/2011SAF-FUN

Victoria B. ValentinePrincipalNational Fire Sprinkler Association, Inc.40 Jon Barrett RoadPatterson, NY 12563Alternate: Jeffrey M. Hugo

M 10/23/2003

2Page 3 of 21

Page 4: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

Address List No PhoneFundamentals SAF-FUN

Safety to Life

Ron Coté03/27/2013

SAF-FUNSteven F. WydeveldPrincipalWydeveld Construction & Consulting, Inc.23541 South Saddle Creek DriveManhattan, IL 60442

SE 10/23/2003SAF-FUN

William P. AdamsAlternateApollo America2479 Peachtree Road NE, Unit 1101Atlanta, GA 30305National Electrical Manufacturers AssociationPrincipal: Jack McNamara

M 3/1/2011

SAF-FUNSharon S. GilyeatAlternateKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Principal: James K. Lathrop

SE 10/20/2010SAF-FUN

Thomas P. HammerbergAlternateAutomatic Fire Alarm Association, Inc.14 Sammy McGhee Boulevard, #103PO Box 1569Jasper, GA 30143Automatic Fire Alarm Association, Inc.Principal: Rodger Reiswig

M 3/2/2010

SAF-FUNJeffrey M. HugoAlternateNational Fire Sprinkler Association, Inc.1088 West Borton RoadEssexville, MI 48732National Fire Sprinkler AssociationPrincipal: Victoria B. Valentine

M 03/07/2013SAF-FUN

Jonathan HumbleAlternateAmerican Iron and Steel Institute45 South Main Street, Suite 312West Hartford, CT 06107-2402American Iron and Steel InstitutePrincipal: Farid Alfawakhiri

M 03/05/2012

SAF-FUNRichard T. Long, Jr.AlternateExponent, Inc.17000 Science Drive, Suite 200Bowie, MD 20715Principal: Andrew Blum

SE 10/18/2011SAF-FUN

Rodney A. McPheeAlternateCanadian Wood Council99 Bank Street, Suite 400Ottawa, ON K1P 6B9 CanadaAmerican Forest & Paper AssociationPrincipal: Dennis L. Pitts

M 10/6/2000

SAF-FUNRobert A. SpeedAlternateNorth Carolina Office of the State Fire MarshalEngineering Division, Evaluation Services Section322 Chapanoke RoadRaleigh, NC 27603Principal: Helen DiPietro

E 10/29/2012SAF-FUN

Pichaya ChantranuwatNonvoting MemberFusion Consultants Co. Ltd/Thailand81/55 Soi Phumijit, Rama 4 RoadPrakanong, KlontoeyBangkok, 10110 Thailand

SE 1/18/2001

SAF-FUNSteven OrlowskiNonvoting MemberNational Association of Home Builders1201 15th Street, NWWashington, DC 20005-2800

U 10/18/2011SAF-FUN

Ron CotéStaff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

1/1/1991

3Page 4 of 21

Page 5: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

 BLD/SAF‐FUN5‐2012FIRSTDRAFTMeetingMinutes/Page1

 

NFPA Technical Committee on Fundamentals NFPA 101 and NPFA 5000 FIRST DRAFT MEETING MINUTES

Wednesday-Thursday, May 23-24, 2012 Indianapolis Convention Center

Indianapolis, IN

1. Call to Order. The meeting was called to order by Chair Chip Carson at 8:00 a.m. on May 23, 2012 at the Indianapolis Convention Center, Indianapolis, IN.

2. Introduction of Committee Members and Guests. TECHNICAL COMMITTEE MEMBERS PRESENT

NAME COMPANY Wayne Chip Carson, Chair Carson Associates, Inc. Ron Cote, Secretary – Nonvoting National Fire Protection Association William Adams Alt. to Jack McNamara

Apollo America Rep: National Electrical Manufacturers Assn.

Andrew Blum, Principal Exponent, Inc. Amy Cheng, Principal Clark County Department of Development

Services Salvatore DiCristina, Principal Rutgers, The State University of New Jersey Tod Doebler, Voting Alternate to IFMA Rep.

Menomonsee Falls Fire Department Rep: International Fire Marshals Association

Helen DiPietro, Principal North Carolina Department of Insurance Joshua Elvove, Principal US General Services Administration Robert Eugene, Principal UL LLC Ralph Gerdes, Principal Ralph Gerdes Consultants, LLC

Rep: American Institute of Architects Norman Groner, Principal John Jay College of Criminal Justice Jonathan Humble Alt. to Farid Alfawakhiri

American Iron and Steel Institute

Morgan Hurley, Principal Society of Fire Protection Engineers David Klein, Principal US Department of Veterans Affairs Scott Laramee, Principal Aon Fire Protection Engineering Corporation James Lathrop, Principal Koffel Associates, Inc. Jack McNamara, Principal Bosch Security Systems

Rep: National Electrical Manufacturers Assn. Ricardo Murga, Principal US Department of Health & Human Services

Steven Orlowski, Nonvoting Member National Association of Home Builders

Page 5 of 21

Page 6: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

 BLD/SAF‐FUN5‐2012FIRSTDRAFTMeetingMinutes/Page2

Jake Pauls, Principal Jake Pauls Consulting Services in Building Use & Safety Rep: American Public Health Association

Dennis Pitts, Principal American Wood Council Rep: American Forest & Paper Association

Milosh Puchovsky, Principal Worcester Polytechnic Institute Rodger Reiswig, Principal Tyco/SimplexGrinnell

Rep: Automatic Fire Alarm Association, Inc. GUESTS

NAME COMPANY Allan Fraser NFPA Tracy Golinveaux NFPA Robert Harmeyer NFPA TC on Health Care Occupancies Jonathan Hart NFPA Jeff Hugo National Fire Sprinkler Association Shelley Siegel, FASID American Society of Interior Designers Robert Solomon NFPA Robert A. Speed NC Department of Insurance

TECHNICAL COMMITTEE MEMBERS NOT PRESENT

NAME COMPANY

Michael Ashley, Voting Alternate to AFSCC Rep.

Alliance for Fire & Smoke Containment & Control

Marshall Gaubert, Principal Jefferson Parish Fire Department Michael Gencarelli, Principal US Department of the Navy Patrick Saba, Principal Hewlett Packard Company Stephen Skalko, Principal Portland Cement Association Victoria Valentine, Principal National Fire Sprinkler Association Inc. Steven Wydeveld, Principal Wydeveid Construction & Consulting Inc.

3. Approval of Prior Meeting Minutes. The October 6, 2010 meeting minutes were approved as written and distributed.

4. The New Process Review. The new process was reviewed and then used throughout the

meeting to address Public Input and generate First Revisions.

5. Multi Hazards (other than fire) Task Group Report. The task group reported. Task group to be retained on agenda. [Norm Groner – Chair, Amy Cheng, Scott Laramee and Jake Pauls].

6. Correlating Committee Wish List for 2015 Editions. The list, as received from the Correlating Committees, was reviewed. First revisions were created relative to updating annex text and permitting an occupancy separation to be created by an atrium.

Page 6 of 21

Page 7: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

 BLD/SAF‐FUN5‐2012FIRSTDRAFTMeetingMinutes/Page3

7. NFPA 5000 Changes Needed for Correlation with NFPA 101. Needed First revisions created.

8. NFPA 101 First Draft (formerly ROP) Preparation. First Draft preparation done with Public Inputs answered and First Revisions created.

 

9. NFPA 5000 First Draft (formerly ROP) Preparation. First Draft preparation done with Public Inputs answered and First Revisions created.

 

10. Other Business. Norm Groner agreed to draft requests, for Chair Carson’s consideration and official submittal, to Fire Protection Research Foundation for research on people movement and multi-hazards issues.

11. Future Meeting. The committee’s Second Draft preparation meeting is tentatively

scheduled for the week of May 20-23, 2013.

12. Adjournment. On Wednesday, May 23 the meeting was recessed at 5:00 p.m. On Thursday, May 24 the meeting was reconvened at 8:00 a.m. and adjourned at 12:00 p.m.

Page 7 of 21

Page 8: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

1

NFPA Second Draft MeetingNFPA Second Draft Meeting

NFPA 101/5000FUNDAMENTALS

COMMITTEE

May 22-23, 2013

San Diego, CA

COMMITTEE

1

NFPA Second Draft MeetingNFPA Second Draft Meeting

At this and all NFPA committee meetings we are concerned with your safety

If the fire alarm sounds, pleaseIf the fire alarm sounds, please proceed to an exit

2

NFPA Second Draft MeetingNFPA Second Draft Meeting

Members, please verify/update your contact information

Use of tape recorders or other means capable of reproducing verbatimcapable of reproducing verbatim transcriptions of this meeting is not permitted

3

Page 8 of 21

Page 9: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

2

NFPA Second Draft MeetingNFPA Second Draft Meeting

GuestsAll guests are asked to sign in and

identify their affiliations

Participation is limited to TC members or those individuals who have previously requested time to address the committee

Other participation is granted at the discretion of the Chair

Guest seating is located around the room

4

NFPA Second Draft MeetingNFPA Second Draft Meeting

Members categorized in ANY interest category who have been retained to represent the interests of ANOTHER interest category must declare those interests to the committee and refrain from voting, both in the meeting and on the ballot item

5

NFPA Second Draft MeetingNFPA Second Draft Meeting

General ProceduresFollow Robert’s Rules of Order

Di i i tiDiscussion requires a motion

6

Page 9 of 21

Page 10: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

3

NFPA Second Draft MeetingNFPA Second Draft Meeting

Motions for Ending Debate - Move Previous Question or “Call the Question”Not in order when another has the floor

Requires a second

This motion is not debatable and does not automatically stop debate

A 2/3 affirmative vote immediately closes debate and returns to the original motion on the floor

Less then 2/3 allows debate to continue

7

NFPA Second Draft MeetingNFPA Second Draft Meeting

Committee member actions:

Member addresses the chair Receives recognition from the chair I t d th ti Introduces the motion Another member seconds the

motion

8

NFPA Second Draft MeetingNFPA Second Draft Meeting

Committee chair actions:

States the motionCalls for discussionEnsures all issues have been heardTakes the voteAnnounces the result of the vote

9

Page 10 of 21

Page 11: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

4

NFPA Second Draft MeetingNFPA Second Draft Meeting

Technical Committee on FundamentalsConsumer, 1 Member: 4%

Enforcer, 7 Members: 25%

Insurance, 1 Member: 4%

Manufacturer, 7 Members: 25%

Research & Testing, 1 Member: 4%

Special Expert, 8 Members: 29%

User, 3 Members: 11%

Installer/Maintainer, 0 Members: 0%

Labor, 0 Members: 0%

10

NFPA Second Draft MeetingNFPA Second Draft Meeting

Timeline

Comment Stage (Second Draft):Public Comment Closing Date: 05/03/2013Second Draft Meeting: TodayPosting of Second Draft for TC Balloting: 08/23/2013Posting of Second Draft for TC Balloting: 08/23/2013Posting of Second Draft for NITMAM: 01/03/2014

Tech Session Preparation:NITMAM Closing Date: 02/07/2014NITMAM /CAM Posting Date: 04/04/2014NFPA Annual Meeting: 06/09-12/2014 (Las Vegas)

Standards Council Issuance: Issuance of Documents with CAM: 08/14/2014 edition date

11

NFPA Second Draft MeetingNFPA Second Draft MeetingNew Process New Process –– What’s New?What’s New?

Changes in Terms:New Term Old Term

Comment Stage ROC Stage

Public Comment Public Comment

Second Draft Meeting ROC Meeting

Second RevisionCommittee Comment or Accepted

Public Comment

Committee Comment(a Second Revision that failed

ballot)

(a Comment reported as Rejected due to failed ballot)

Second Draft Report ROC

Second Draft ROC Draft

12

Page 11 of 21

Page 12: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

5

NFPA Second Draft MeetingNFPA Second Draft Meeting

• Technical Committee Actions:

Resolving Public CommentsResolving Public Comments Committee Action and Committee Statement

Creating Second Revisions

13

14

NFPA Second Draft MeetingNFPA Second Draft Meeting

• Resolving Public Comments (See Regs §4.4.8.1)Committee develops a Committee Action Accept

Reject but see…

Reject

Reject but Hold

15

Page 12 of 21

Page 13: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

6

NFPA Second Draft MeetingNFPA Second Draft Meeting

• Committee StatementsCommittee must clearly indicate reasons for not

accepting the recommendation and/or point to a relevant Second RevisionAll Public Comments Actions must have a

Committee StatementCommittee StatementMust include a valid technical reasonNo vague references to “intent”Explain how the submitter’s substantiation is

inadequateNeither Public Comment Actions nor Committee

Statements get balloted

16

NFPA Second Draft MeetingNFPA Second Draft Meeting

• Create a Second Revision (SR)Committee wants to make a change (to

add, delete or modify) the First Draft

Committee develops a Committee Statement (CS) substantiating the change

Each SR gets balloted

17

NFPA Second Draft MeetingNFPA Second Draft Meeting

No “new material” after the Public Input Stage since it hasn’t had the benefit of public review

What constitutes new material is decided by th T h i l C itt C l tithe Technical Committee or Correlating Committee

Adding “new material” at the Comment Stage could successfully be challenged through appeal to the Standards Council

18

Page 13 of 21

Page 14: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

7

NFPA Second Draft MeetingNFPA Second Draft Meeting

Formal voting Voting during meeting is used to

establish a sense of agreement (simple majority)(simple majority)

Secured by letter ballot (2/3 agreement)Only the results of the formal ballot

determine the official position of the committee on the Second Draft

19

NFPA Second Draft MeetingNFPA Second Draft Meeting

Ballots are on the Second Revisions (SR) ONLYPublic Comment Actions and Committee

Statements not ballotedReference materials are available - Second Draft, Public Comments, First Draft Report

Ballot form allows you to vote: Ballot form allows you to vote: Affirmative on all SRAffirmative on all SR with exceptions specifically

noted Ballot form provides a column for affirmative

with commentNote: This box needs to be checked only if there

is an accompanying comment Reject or abstain requires a reason 20

NFPA Second Draft MeetingNFPA Second Draft Meeting

Initial ballot

Circulation of negatives and comments

Members may change votes during circulationcirculation

Second Revision that fails letter ballot is designated as a Committee Comment (in the 2nd Draft Report), marked as “Reject” and deleted from the Second Draft.

21

Page 14 of 21

Page 15: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

8

NFPA Second Draft MeetingNFPA Second Draft Meeting

If a Second Revision fails ballot and the subject text was a result of a First Draft change, a Supplementary Ballot is conducted

Ballot asks TC if it still favors the First Revision change reported in the First DraftIf Y h S d If Yes, same change appears as Second Revision and is shown in the Second Draft

If No, the change appears as a Committee Comment (rejected) and the Second Draft text reverts to previous edition

See Regs §4.4.10.2.1

22

Electronic Balloting Electronic Balloting • Ballots will be an online format• Alternates are strongly encouraged

to return ballots

• Ballot session will time out after 90 minutes

• Use “submit” to save your work

23

Electronic Balloting Electronic Balloting

Click link on the ballot email received

Sign in with NFPA.org Committee Login and Password

24

Page 15 of 21

Page 16: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

9

Electronic Balloting Electronic Balloting

Select either Affirmative on All or Affirmative with Exception(s)

25

Electronic Balloting Electronic Balloting

Use “See FR/SR - #” link to review all First/Second Revisions

Use “Edit election” to change individual votes or to modify vote after submitting ballot

Choosing AFFIRMATIVE ON ALL

26

Electronic Balloting Electronic Balloting

Make selection: Affirmative with Comment, Negative, or Abstain

No selection made-defaults to affirmative Must include comment on each vote

Choosing AFFIRMATIVE WITH EXCEPTION(S)

27

Page 16 of 21

Page 17: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

10

Electronic Balloting Electronic Balloting

To complete ballot click Participant Consent and Submit

Return and edit any votes before ballot due date

28

TC Struggles with an Issue

• TC needs data on a new technology or

i

Code Fund Lends a Hand

• TC rep and/or staff liaison submits a C d F d

Research Project Carried Out

• Funding for project is provided by th C d F demerging

issue• Two opposing

views on an issue with no real data

• Data presented is not trusted by committee

Code Fund Request

• Requests are reviewed by a Panel and chosen based on need / feasibility

the Code Fund and/or industry sponsors

• Project is completed and data is available to TC

www.nfpa.org/codefund29

LegalLegal

Antitrust: the single most important provision- Federal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce Section 1 of the Sherman Act

Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim

30

Page 17 of 21

Page 18: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

3/27/2013

11

LegalLegal

Activities Disapproved by the CourtsPacking meetings

Hiding commercial interest throwing the committees out of balance

No final decision-making authority to unbalanced Task Groups; include all interested parties

Hiding scientific or technical information from committees

31

Doc Info PagesDoc Info Pages

Document Information

• Document scope• Current/Previous

Edition information• Issued TIAs, FIs and

Errata

Next Edition

• Submit Public Input/Comments via Electronic Submission System.

• Meetings and Ballots

Technical Committee

• Committee name, responsibility and scope

• Staff liaison• Committee list

• Archived revision information

• Standard Council Decisions

• Articles and Reports• Read only document

• ROP/ROC or First Draft Report and Second Draft Report

• NITMAM and Standard Council Decisions

• Private TC info• Ballot circulations,

informational ballots and other committee info

• Private committee contact information

• Current committee documents in PDF format

• Committees seeking members and committee online application

32

NFPA Second Draft MeetingNFPA Second Draft Meeting

Any questions?

33

Page 18 of 21

Page 19: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

1

Cote, Ron

From: Cote, RonSent: Wednesday, November 21, 2012 2:33 PMTo: Bigda, Kristin; Harrington, Greg; Fraser, Allan; Vecchiarelli, TracyCc: Solomon, RobertSubject: SAF Agenda Item for Second Draft Meetings

Please add the subject of Definitions to each SAF/BLD technical committee Second Draft meeting agenda for which you serve as staff liaison. Each Technical Committee chair is asked to identify a member to serve on the definitions task group. The Minutes item from the SAF-AAC Correlating Committee’s November 6, 2012 meeting follows:

Definitions. The committee agreed to have each defined term assigned to a specific technical committee so that committee would have responsibility for the maintenance and revision of such term. A task group is to be formed after the Second Draft meetings of the current revision cycle. The task group will report to the Correlating Committee (CC) its recommendations for the definitions assignments in time for the CC to review the recommendations at its first meeting of the 2018 revision cycle. Each Technical Committee chair is asked to identify a member to serve on the task group.

Allan and Tracy, the BLD-AAC Correlating Committee asked that same be done by the NFPA 5000 TCs. Ron Coté, P.E. Principal Life Safety Engineer NFPA - Quincy, MA USA  

 

Page 19 of 21

Page 20: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

1

Cote, Ron

From: Cote, RonSent: Wednesday, November 21, 2012 2:43 PMTo: Bigda, Kristin; Harrington, Greg; Fraser, Allan; Vecchiarelli, TracyCc: Solomon, RobertSubject: Hazardous Materials - Agenda Item

Please add the subject of Hazardous Areas to each SAF/BLD technical committee Second Draft meeting agenda for which you serve as staff liaison. Each Technical Committee is asked to decide whether it wants to participate in a task group on the subject of hazardous materials. The Minutes item from the SAF-AAC Correlating Committee’s November 6, 2012 meeting follows:

Hazardous Materials. Jeff Tubbs raised the issue of whether NFPA 101 should address hazardous materials (as done in NFPA 5000 Chapter 34). The committee noted that health hazards are not within the scope of NFPA 101. Conflicts exist among the NFPA codes. It was agreed to:

o Add the subject of hazardous materials to the agenda for all NFPA 101 technical committee Second Draft meetings

o Gather comments from each technical committee including whether it wants to participate in a task group on the subject of hazardous materials

o Report results to the Correlating Committee at its Second Draft review meeting o Ask the Standards Council, after the Correlating Committee’s Second Draft meeting, to

establish a task group from the membership of the NFPA 1, 30, 101, 400 and 5000 committees to address conflicts and overlapping requirements related to hazardous materials

Allan and Tracy, the BLD-AAC Correlating Committee asked that same be done by the NFPA 5000 TCs. Ron Coté, P.E. Principal Life Safety Engineer NFPA - Quincy, MA USA  

 

Page 20 of 21

Page 21: AGENDA NFPA Technical Committee on Fundamentals NFPA 101 … · 2016-03-28 · AGENDA NFPA Technical Committee on Fundamentals NFPA 101 and NFPA 5000 Second Draft Meeting Wednesday,

1

Cote, Ron

From: Cote, RonSent: Wednesday, March 13, 2013 7:07 AMTo: Dolan, JamesSubject: RE: NFPA 101 2012

Editorial error. I’ll make a note to get the NFPA 400 reference added to Chapter 2 via the new Terra system during the 2nd draft meetings so the same mistake doesn’t happen for the 2015 edition.  Relative to the 2012 edition, it’s easy to explain that it is NFPA policy to cite the NFPA referenced publication edition as the most current available when NFPA 101‐2012 went to press. That means that NFPA 400‐2010 is what is intended. Luckily NFPA 400’s full title, and not just the number, appears in 36/37.4.5.3.  Thanks for reporting the error.  Ron Coté, P.E. Principal Life Safety Engineer NFPA - Quincy, MA USA  

 

From: Dolan, James Sent: Tuesday, March 12, 2013 8:16 PM To: Cote, Ron Subject: NFPA 101 2012  Hi Ron, We reference NFPA 400 in chapter 36—see below, but the document is not listed in chapter 2.  36.4.5.3 Storage, Arrangement, Protection, and Quantities of Hazardous Commodities. The storage, arrangement, protection, and quantities of hazardous commodities shall be in accordance with the applicable provisions of the following: (1) The fire code (see 3.3.94) (2) NFPA 13, Standard for the Installation of Sprinkler Systems (3) NFPA 30, Flammable and Combustible Liquids Code (4) NFPA 30B, Code for the Manufacture and Storage of Aerosol Products (5) NFPA 400, Hazardous Materials Code, Chapter 14, for organic peroxide formulations (6) NFPA 400, Hazardous Materials Code, Chapter 15, for oxidizer solids and liquids (7) NFPA 400, Hazardous Materials Code, various chapters, depending on characteristics of a particular pesticide (8) NFPA1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and Pyrotechnic Articles 36.4.5.4 Detection, Alarm, and Communications Systems. Thanks. Jim Dolan NFPA 732.492.8397   

Page 21 of 21