OLGA UGM Oslo 2009 Mari F. Langseth, Senior Project Engineer, Integrated Operations, ABB Oil, Gas & Petrochemicals Flow assurance applications in a Integrated Operations framework

ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

  • Upload
    ahmed

  • View
    39

  • Download
    0

Embed Size (px)

DESCRIPTION

ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

Citation preview

Page 1: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

OLGA UGM Oslo 2009Mari F. Langseth, Senior Project Engineer, Integrated Operations, ABB Oil, Gas & Petrochemicals

Flow assurance applications in a Integrated Operations framework

Page 2: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 2

Outline

Introduction to ABB ABB Integrated Operations Realizing value through IO Flow assurance & Integrated Operations Concluding Remarks

Page 3: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 3

Power and productivity for a better worldABB’s vision

As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way.

Page 4: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 4

ABB within Oil, Gas and Petrochemicals

Key deliverables

Electrical, Control, Instrumentation and Telecommunication (ECIT)

Integrated Operations

Lifecycle services

Page 5: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 5

ABB IO Portfolio

Performance Solutions & Services Flow Assurance & Production Optimization Asset Management & Condition Monitoring Information Management & IT Security Operation and Collaboration Centers

OperationalExperience (Site)

ElectricalEngineering

SoftwareDevelopment

ControlEngineering

ProcessEngineering

ProductionTechnology

MechanicalEngineering

Page 6: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 6

Realizing Value in Brown Fields

Page 7: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 7

Challenge: Handling Process Variations

Page 8: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 8

System Setup for Remote Support (Year 2002)

Siemens Tele Perm (DCS)

ABB AC 800M

Norsk Hydro Brage Subnet

SOIL

TCP/IP

ABB PCABB Remote Room

Access Code

ABB Network

OnshoreOffshore

TCP/IP

Page 9: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 9

Realizing Value in Green Fields

Page 10: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 10

EIT Integrated Approach

One supplier for:

Electrical Instrumentation/Automation Telecommunication Integrated Operations

Page 11: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 11

EIT + IO Project Model

EPC

E I T

IO

Page 12: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 12

Supplier Involvement in all the Project Phases

Influence concepts

FEEDBasic/Detail

Design

Commission

Start-upConcept Operation

Select the rightcontentand infrastructure

InstrumentationInfrastructureFramework

Applications

SupportTuningCalibrationSet-up

Lifecycle SupportTuningOptimization

Page 13: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

Flow Assurance and Integrated Operations

Page 14: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 14

Flow assurance & IO

Integration of systems, applications and competency needs to be included early in the project phase

Integrated flow assurance studies/concept developments: The layout, control and operation of the receiving facility has a significant impact

on flow assurance in pipelines and gathering systems Similarly, flow assurance aspects in pipelines and wells has a significant impact

in topside control and optimization

Integration of both flow assurance and topside/control/operational competency is required for providing overall understanding and optimal design of pipelines and gathering systems

Concept/Feed phase

Page 15: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 15

Flow assurance & IO

Improved accuracy of study results Interactions between processing facility, control systems and pipeline design Integrated control of pipelines and processing facility

Slug control and mitigation Production Optimization Design and optimization of gas lift MEG injection

Required changes to topside control system and HMI from new tie-in Condition and performance monitoring Etc.

Typical benifits from integrated studies

Page 16: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 16

Flow Assurance and IOABB’s IO Compliant Topology

Control appl

Monitoring applicationSupervisory controloptimization

Monitoring

SupportOperation

Page 17: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 17

Flow Assurance & IO

Flow assurance applications from ABB Slug control and mitigation (AFC/AWC) Virtual Flow Metering (WMS) Gas Lift Optimization (GLO) Insight Erosion Management system Other custom-built applications

ABB applications

14 15 16 17 18 19 20days

[-]

Slugging, resulting in a loss of oil production

Slugging eliminated, oil production increased by ~10%

Pip

elin

e Inle

t p

ress

ure

Oil

pro

du

ctio

n

from

Tor

AWC Ramp-Up Configuration

AWC Ramp-Up

Page 18: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 18

Flow Assurance & IOIntegration of ABB products

AWC(AC800M)

Field Instrumentation

DCS

Ctr Mode:

Manual

Auto

Fault

Well Monitoring System

Oil Rate:

Rec. GL Rate:

OPC Link fail:

Gas Lift Optimizer

GU

I (for remote access)

Servers

OP

C S

erver

WMSOS display

Engineering interface

Page 19: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 19

Flow Assurance & IOIntegration of ABB applications with OLGA Online

Example: Subsea tie-in

AFC

Slug control and mitigationOLGA Online

PMSHydrate Leak detection

Ramp up Etc

Improved performance of AFC by providing virtualdynamic measurements

Advisor outputs implemented by AFC

OLGA Online Virtual

measurementsAdvisor outputs

WMS

Improved virtual flowrates from WMS andOLGA Online

Insight

Improved erosion monitoring using processdata and OLGA Online fluid velocities

Common historian for easier data access

Integrated flow assurance and optimization system

Page 20: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 20

Flow Assurance & IO

Structured IO framework facilitates improved support of both installed applications and operations itself

Improved data access for both suppliers and operators Bring suppliers expertise into the loop

Remote collaboration Product support might highlight operational opportunities

e.g. tuning/support on virtual metering systems might reveal possibilities for optimizing production

Improved service through Service Environment

Operational Support

Page 21: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

The benefits of ABB Service Environment™Modern oil and gas operations rely on advanced technological solutions to

optimize production reduce operating costs increase safety extend the overall field lifecycle

One TeamISO ProcessesProceduresIT Security SharingKnowledgeSupporting tool The unique Service Environment™ program

is designed to effectively manage complex and integrated systems

Page 22: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

© ABB GroupApril 8, 2023 | Slide 22

Concluding Remarks

Integrated operations gives significant benefits for both operators and suppliers

Systems and competency are becoming more inter-dependent Requires an “integrated” approach both within consultancy and

product deliveries Vendors participation through the whole life-cycle gets increasingly

important

2007 - 2007Commissioning

Flow Assurance, Process Control and Operations Knowledge and Experience

04.06.2007 - 19.09.2007Operations

2007 - 2007FEED/

Engineering

2007 - 2007Implementation/

Testing

2007 - 2007Start-up

Page 23: ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework