4
  Long Beach City College  TEST PLAN Template 1 – (title description)  Contents Section 1.0 High Level Description Section 2.0 Test Script Steps / Test Results Section 3.0 Detailed Instructions for Running Test Script Section 1.0 High Level Description Script Numer  !odule "de# $$$$ Completion Date Process ! "o#ule Test Plan Title Department!Sta$$ Name Depen#enc ies ! Prere%uisites Te st &'ective ! Special (nstructions (nstructions Test Author:  Enter any in formation or specific instructio ns for th is test scri pt (as appl icable). Doc Create#) Page 1 o$ 1 ((TS)

9.0 Template Test Plan_12

Embed Size (px)

DESCRIPTION

9.0 Template Test Plan_12

Citation preview

HCM 89 Test Script Template

(Module Code) xxx_(test script title descriptions)Sample

Long Beach City College

TEST PLAN Template 1 (title description)

Contents

Section 1.0High Level DescriptionSection 2.0Test Script Steps / Test ResultsSection 3.0Detailed Instructions for Running Test ScriptSection 1.0High Level Description

Script Number (Module Cde) xxxxCompletion DateProcess / Module

Test Plan TitleDepartment/Staff Name

Dependencies / Prerequisites

Test Objective / Special Instructions

Instructions

Test Author: Enter any information or specific instructions for this test script (as applicable).

Section 2.0Summary and Test Results

InstructionsTest Author: Complete columns one and two prior to testing - listing all test items contained in this process, along with a short description.

Test Analyst: Complete the remaining information, listing test results. Please use the "Comments" column to provide a summary of any issues or further actions required for each test item. This enables SR Department to quickly view the overall results of each test script. Additional space is provided in Section 3.0 (if needed) to record detailed problems encountered for any individual step.

Test ItemShort DescriptionTested ByDateP/FRetest P/FComments

A

B

C

D

E

Sign-Off Instructions

Sign off indicates that all test items in this script were run and the script has passed. "Pass with Errors" indicates that minor issues were encountered. Please list errors.

Please add additional tables if multiple test cycles occur. DateNamePassPass with ErrorsFail

Comments / Errors

DateNamePassPass with ErrorsFail

Comments / Errors

Section 3.0Detailed Instructions for Running the Test Script

Instructions

Test Author: Provide detailed instructions for each Test Item identified in Section 2.0. Please add new tables, as needed so there is a one-to-one correspondence between the number of tables in this section and the number of Test Items listed in Section 2.0.

Test Analyst:If detailed comments are needed, you may use the "Test Comments" column provided. However, please enter the overall comments of whether the item passed or failed in Section 2.0 - so all business analysts have a summary-level overview of how each test item performed.

A Short Description

Expected Outcome

Navigation / InputInstructionsTest Comments

B Short Description

Expected Outcome

Navigation / InputInstructionsTest Comments

C Short Description

Expected Outcome

Navigation / InputInstructionsTest Comments

D Short Description

Expected Outcome

Navigation / InputInstructionsTest Comments

E Short Description

Expected Outcome

Navigation / InputInstructionsTest Comments

Doc Created: Page 1 of 1IITS:Doc Created:Page 4 of 4IITS: