%669% %669% Page 1 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2014 Sterling Highway MP 173 669 (4-H1) LUMP 1 25,000.00 45,000.00 80,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 15,000.00 30,000.00 25,000.00 80,000.00 Preservation TRAFFIC 0.22% 0.44% 0.36% 1.07% Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H1 Preservation (42821/56176 55260/7847) 3 Bids Tendered 2014 Sterling Highway MP 173 669 (4-H2) LUMP 1 30,000.00 68,333.33 90,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 68,000.00 90,000.00 85,000.00 30,000.00 Preservation TRAFFIC 1.00% 1.33% 1.23% 0.40% Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H2 Preservation (42821/56176 55260/7847) 3 Bids Tendered 2014 Sterling Highway MP 173 669 (4-H3) LUMP 1 30,000.00 53,333.33 80,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 15,000.00 30,000.00 50,000.00 80,000.00 Preservation TRAFFIC 0.22% 0.44% 0.72% 1.07% Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H3 Preservation (42821/56176 55260/7847) 3 Bids Tendered 2014 Sterling Highway MP 173 669 (4-H4) LUMP 1 30,000.00 73,333.33 100,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 83,000.00 90,000.00 100,000.00 30,000.00 Preservation TRAFFIC 1.23% 1.33% 1.44% 0.40% Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H4 Preservation (42821/56176 55260/7847) 3 Bids Tendered 2009 Parks Hwy MP 287-305 669(1) Lump 1 10,000.00 14,083.33 30,000.00 7,091,346 09 Rehabilitation And Automated Traffic Sum 20,000.00 30,000.00 11,500.00 11,000.00 Resurface Recorder 0.20% 0.42% 0.15% 0.14% (20492/77137/0) 6 Bids Tendered

%669% %669% Page 1 of 34 --Project Name Item Number Unit ...dot.alaska.gov/.../Highways_and_Harbors/669.pdf · %669% %669% Page 1 of 34 Opened--Project Name Item Number Unit (f) Quantity

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

%669% %669% Page 1 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Sterling Highway MP 173 669 (4-H1) LUMP 1 25,000.00 45,000.00 80,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 15,000.00 30,000.00 25,000.00 80,000.00

Preservation TRAFFIC 0.22% 0.44% 0.36% 1.07%

Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H1 Preservation (42821/56176 55260/7847) 3 Bids Tendered

2014 Sterling Highway MP 173 669 (4-H2) LUMP 1 30,000.00 68,333.33 90,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 68,000.00 90,000.00 85,000.00 30,000.00

Preservation TRAFFIC 1.00% 1.33% 1.23% 0.40%

Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H2 Preservation (42821/56176 55260/7847) 3 Bids Tendered

2014 Sterling Highway MP 173 669 (4-H3) LUMP 1 30,000.00 53,333.33 80,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 15,000.00 30,000.00 50,000.00 80,000.00

Preservation TRAFFIC 0.22% 0.44% 0.72% 1.07%

Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H3 Preservation (42821/56176 55260/7847) 3 Bids Tendered

2014 Sterling Highway MP 173 669 (4-H4) LUMP 1 30,000.00 73,333.33 100,000.00 6,769,000 05 to 174 Pavement AUTOMATED SUM 83,000.00 90,000.00 100,000.00 30,000.00

Preservation TRAFFIC 1.23% 1.33% 1.44% 0.40%

Sterling Highway MP 174 RECORDERS - SITE to 179 Pavement H4 Preservation (42821/56176 55260/7847) 3 Bids Tendered

2009 Parks Hwy MP 287-305 669(1) Lump 1 10,000.00 14,083.33 30,000.00 7,091,346 09 Rehabilitation And Automated Traffic Sum 20,000.00 30,000.00 11,500.00 11,000.00

Resurface Recorder 0.20% 0.42% 0.15% 0.14%

(20492/77137/0) 6 Bids Tendered

%669% %669% Page 2 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 West Dowling Road Phase 669(1) Each 3 10,000.00 30,000.00 50,000.00 36,856,108 12 II: C St to Minnesota Drive Automated Traffic 5,000.00 10,000.00 50,000.00 0.00

& Recorder 0.04% 0.08% 0.40% 0.00%

Alaska's Best Place: Raspberry Road to Ressel Avenue (42058/51030 54823/7846) 2 Bids Tendered

2011 Trunk Road 669(1) Lump 1 14,840.00 17,977.14 22,000.00 13,969,176 11 Reconstruction, Phase II Automated Traffic Sum 30,000.00 14,840.00 20,000.00 18,000.00

Palmer-Wasilla Highway to Recorder 0.16% 0.11% 0.13% 0.11%

Palmer-Fishhook Rd (35222/51132/7846) 7 Bids Tendered

2011 West Dowling Road - 669(1) Each 2 10,000.00 11,746.00 12,738.00 13,486,059 11 Phase I, Old Seward Automated Traffic 60,000.00 10,000.00 12,738.00 12,500.00

Highway to C Street & Recorder 0.71% 0.15% 0.18% 0.18%

Cordova Street Extension (35201/50898 53454/7846) 3 Bids Tendered

2009 Trunk Road 669(1) Lump 1 10,000.00 22,500.00 30,000.00 22,945,463 05 Reconstruction, Phase I. Automated Traffic Sum 38,000.00 16,000.00 30,000.00 30,000.00

Parks Highway to Recorder 0.12% 0.07% 0.12% 0.12%

Palmer-Wasilla Highway (22872/59301/7846) 8 Bids Tendered

2009 Parks Highway MP 72-83, 669(1) Lump 1 42,500.00 45,357.14 50,000.00 20,758,919 09 Willow to Kashwitna Automated Traffic Sum 50,000.00 50,000.00 45,000.00 48,000.00

(24913/54985/7846) Recorder 0.18% 0.24% 0.21% 0.21%

7 Bids Tendered

2014 Abbott Road Pavement 669(1) Lump 1 17,500.00 24,750.00 32,000.00 1,390,905 10 Preservation New Seward Automated Traffic Sum 7,500.00 32,000.00 17,500.00 0.00

Highway to 88th Avenue Recorder 0.60% 2.30% 1.04% 0.00%

(43473/56728/7846) 2 Bids Tendered

2011 Illinois Street 669(1) LUMP 1 138,000.00 147,000.00 150,000.00 21,965,863 12 Reconstruction AUTOMATED SUM 159,500.00 150,000.00 138,000.00 150,000.00

(33274/63102/0) TRAFFIC RECORDER 0.70% 0.68% 0.62% 0.67%

4 Bids Tendered

2015 Parks Highway MP 669(1) Lump 1 29,600.00 34,215.41 50,000.00 42,094,598 08 44.5-48.8 Reconstruction Automated Traffic Sum 30,000.00 30,000.00 50,000.00 30,000.00

Church Road to Pittman Recorder - Site 1, 0.06% 0.07% 0.11% 0.07%

Road (44808/52929/0) Parks Hwy Station 5 Bids Tendered 191+50

2015 Ingra and Gambell Phase 669(1) Lump 1 7,500.00 10,250.00 13,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 13,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.25% 0.14% 0.00%

2 Bids Tendered 52367000

%669% %669% Page 3 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Parks Highway M P 669(1) Lump 1 100,000.00 123,000.00 150,000.00 28,866,904 11 239-252 Rehabilitation Automatic Vehicle Sum 20,000.00 100,000.00 142,000.00 100,000.00

(41926/61275/1163) Classification 0.07% 0.35% 0.48% 0.34%

4 Bids Tendered

2010 Nordale Road Pavement 669(1) Lump 1 26,000.00 29,666.67 33,000.00 1,748,183 05 Rehabilitation - FMATS Piezoelectric Sensor Sum 10,000.00 33,000.00 30,000.00 26,000.00

(Badger Road to Chena Replacement 0.40% 1.89% 1.63% 1.38%

River) (28033/63158/0) 3 Bids Tendered

2018 Parks Hwy MP 99-123.5 669(1) Lump 1 22,000.00 23,750.00 26,000.00 13,727,979 05 Pavement Preservation Traffic Data - Chulitna Sum 10,000.00 25,000.00 26,000.00 22,000.00

HSIP: Parks Hwy: 0.07% 0.18% 0.17% 0.14%

Systemic Passing Lanes MP 99-123.5 (48390//0) 4 Bids Tendered

2016 Seward Highway: 92nd 669(1) Lump 1 12,000.00 14,994.12 23,658.83 9,982,120 02 Avenue Connector Traffic Data - Site 1 Sum 16,650.00 14,000.00 12,000.00 12,700.00

(45465/59770/7846) 0.16% 0.14% 0.12% 0.12%

7 Bids Tendered

2014 Parks Highway MP 669(1) Lump 1 50,000.00 53,866.80 57,537.00 15,967,622 01 43.5-44.5 Reconstruction, Traffic Data - Site 1 Sum 18,000.00 50,000.00 57,000.00 50,000.00

Lucus Road To Church 0.12% 0.31% 0.31% 0.27%

Road (42230/52914/7847) 5 Bids Tendered

2015 Ingra and Gambell Phase 669(10) Lump 1 100,000.00 112,500.00 125,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 50,000.00 100,000.00 125,000.00 0.00

(44515/57858/7845) Recorder-Site 0.92% 1.89% 2.33% 0.00%

2 Bids Tendered 52344000

2014 Edgerton Highway MP 669(102) Each 4.0 2,500.00 6,250.00 9,500.00 7,445,892 04 0-19 Resurfacing (42129) Automated Traffic (Alt) 2,500.00 6,250.00 5,500.00 7,500.00

6 Bids Tendered Recorder Loops 0.11% 0.34% 0.30% 0.37%

2014 Edgerton Highway MP 669(102) Lump 1 10,000.00 25,000.00 38,000.00 7,445,892 04 0-19 Resurfacing Automated Traffic Sum 10,000.00 25,000.00 22,000.00 30,000.00

(42129/63909/0) Recorder Loops 0.11% 0.34% 0.30% 0.37%

6 Bids Tendered

2017 Farmers Loop Resurfacing 669(102) Lump 1 31,000.00 32,250.00 33,750.00 12,656,111 06 and Signal Interconnect Automated Traffic Sum 25,000.00 32,000.00 31,000.00 33,750.00

(47065//0) Recorder Loops 0.17% 0.25% 0.23% 0.25%

3 Bids Tendered

2017 Farmers Loop Resurfacing 669(102) Each 1.0 31,000.00 32,250.00 33,750.00 12,656,111 06 and Signal Interconnect Automated Traffic (Alt) 25,000.00 32,000.00 31,000.00 33,750.00

(47065) Recorder Loops 0.17% 0.25% 0.23% 0.25%

3 Bids Tendered

%669% %669% Page 4 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Airport Way Preventive 669(102) Lump 1 75,000.00 83,333.33 95,000.00 8,240,476 05 Maintenance - Stage II, Automatic Traffic Sum 11,000.00 80,000.00 95,000.00 75,000.00

Northern Region Signal Recorder Loops 0.15% 0.97% 1.12% 0.85%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/0)

2015 Airport Way Preventive 669(102) Each 7.0 10,714.29 11,904.76 13,571.43 8,240,476 05 Maintenance - Stage II, Automatic Traffic (Alt) 1,571.43 11,428.57 13,571.43 10,714.29

Northern Region Signal Recorder Loops 0.15% 0.97% 1.12% 0.85%

Interconnect - Airport Way/Peger Road & Northern Region Pedestrian Improvements (44455) 3 Bids Tendered

2016 FMATS Pedestrian 669(102)-B Lump 1 42,000.00 57,833.33 81,500.00 8,963,033 04 Improvements - Stage I, Automatic Traffic Sum 207,000.00 42,000.00 81,500.00 50,000.00

Peger Road Resurfacing, Recorder Loops 1.82% 0.47% 0.88% 0.48%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/0) 3 Bids Tendered

2017 Farmers Loop Resurfacing 669(103) Each 1.0 3,950.00 4,050.00 4,200.00 12,656,111 06 and Signal Interconnect Temperature Data (Alt) 25,000.00 3,950.00 4,000.00 4,200.00

(47065) Probe 0.17% 0.03% 0.03% 0.03%

3 Bids Tendered

2017 Farmers Loop Resurfacing 669(103) Lump 1 3,950.00 4,050.00 4,200.00 12,656,111 06 and Signal Interconnect Temperature Data Sum 25,000.00 3,950.00 4,000.00 4,200.00

(47065//0) Probe 0.17% 0.03% 0.03% 0.03%

3 Bids Tendered

2014 Edgerton Highway MP 669(103) Lump 1 16,000.00 26,708.33 50,000.00 7,445,892 04 0-19 Resurfacing Temperature Data Sum 10,000.00 24,000.00 24,000.00 20,000.00

(42129/63909/0) Probe 0.11% 0.32% 0.32% 0.24%

6 Bids Tendered

%669% %669% Page 5 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 College Road Pavement 669(104) Lump 1 150,000.00 155,000.00 160,000.00 7,090,895 04 Rehabilitation & College Automatic Vehicle Sum 150,000.00 160,000.00 155,000.00 150,000.00

Rd/Antoinette Classification 2.19% 2.26% 2.11% 1.89%

Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1161)

2015 College Road Pavement 669(104) Each 1.0 150,000.00 155,000.00 160,000.00 7,090,895 04 Rehabilitation & College Automatic Vehicle (Alt) 150,000.00 160,000.00 155,000.00 150,000.00

Rd/Antoinette Classification 2.19% 2.26% 2.11% 1.89%

Ave/Margaret Ave Intersection Reconstruction (44449) 3 Bids Tendered

2018 HSIP: Phillips Field Road 669(104) Lump 1 90,000.00 91,000.00 92,000.00 3,244,574 02 Safety Improvements and Automatic Vehicle Sum 117,000.00 92,000.00 90,000.00 0.00

Phillips Field Road - Classifier 3.19% 2.84% 2.75% 0.00%

Automated Vehicle Classification (46888//0) 2 Bids Tendered

2018 Elliott Highway MP 0-12 669(104)-A Lump 1 30,000.00 80,500.00 125,000.00 24,869,247 05 Rehabilitation, Northern Automated Traffic Sum 160,000.00 125,000.00 125,000.00 30,000.00

Region Deep Culverts Recorder 0.61% 0.50% 0.45% 0.10%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//0) 4 Bids Tendered

2017 Farmers Loop Resurfacing 669(105) Each 1.0 16,000.00 16,333.33 17,000.00 12,656,111 06 and Signal Interconnect Piezoelectric Sensor (Alt) 60,000.00 16,000.00 16,000.00 17,000.00

(47065) Replacement 0.40% 0.13% 0.12% 0.13%

3 Bids Tendered

2017 Farmers Loop Resurfacing 669(105) Lump 1 16,000.00 16,333.33 17,000.00 12,656,111 06 and Signal Interconnect Piezoelectric Sensor Sum 60,000.00 16,000.00 16,000.00 17,000.00

(47065//0) Replacement 0.40% 0.13% 0.12% 0.13%

3 Bids Tendered

2014 Cordova Point Whitshed 669(105) Lump 1 36,000.00 41,000.00 48,000.00 2,180,349 08 Road M P 0-3 Asphalt Piezoelectric Sensor Sum 10,000.00 39,000.00 36,000.00 48,000.00

Surface Repairs Replacement 0.53% 1.79% 1.56% 1.93%

(41879/64020/0) 3 Bids Tendered

2018 Northern Region Radar 669(106-A)-A Lump 1 58,889.00 59,629.67 60,000.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 45,000.00 60,000.00 58,889.00 60,000.00

Detection (46555//0) Automatic Vehicle 7.02% 8.02% 7.86% 7.95%

3 Bids Tendered Classification - Airport Way West Of Steese Expy

%669% %669% Page 6 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Northern Region Radar 669(106-B)-A Lump 1 58,889.00 60,496.33 62,600.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 45,000.00 62,600.00 58,889.00 60,000.00

Detection (46555//0) Automatic Vehicle 7.02% 8.37% 7.86% 7.95%

3 Bids Tendered Classification - Parks Hwy West of Lathrop St

2018 Northern Region Radar 669(106-C)-A Lump 1 58,200.00 59,029.67 60,000.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 45,000.00 58,200.00 58,889.00 60,000.00

Detection (46555//0) Automatic Vehicle 7.02% 7.78% 7.86% 7.95%

3 Bids Tendered Classification - Parks Hwy Near Ester

2018 Northern Region Radar 669(106-D)-A Lump 1 58,300.00 59,729.67 62,000.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 45,000.00 58,300.00 58,889.00 62,000.00

Detection (46555//0) Automatic Vehicle 7.02% 7.80% 7.86% 8.21%

3 Bids Tendered Classification - Richardson Hwy At Moose Creek

2018 Northern Region Radar 669(106-E)-A Lump 1 60,000.00 65,094.67 73,984.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 45,000.00 61,300.00 73,984.00 60,000.00

Detection (46555//0) Automatic Vehicle 7.02% 8.20% 9.88% 7.95%

3 Bids Tendered Classification - Richardson Hwy at Gulkana Airport

2018 Northern Region Radar 669(106-F)-A Lump 1 61,400.00 68,411.67 77,835.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 54,000.00 61,400.00 77,835.00 66,000.00

Detection (46555//0) Automatic Vehicle 8.42% 8.21% 10.39% 8.74%

3 Bids Tendered Classification - Richardson Hwy At Ernestine

2018 Northern Region Radar 669(106-G)-A Lump 1 60,000.00 66,411.67 77,835.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 54,000.00 61,400.00 77,835.00 60,000.00

Detection (46555//0) Automatic Vehicle 8.42% 8.21% 10.39% 7.95%

3 Bids Tendered Classification - Glenn Hwy at Nelchina Maintenance Camp

2018 Northern Region Radar 669(106-H)-A Lump 1 60,000.00 64,664.00 72,692.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 54,000.00 61,300.00 72,692.00 60,000.00

Detection (46555//0) Automatic Vehicle 8.42% 8.20% 9.70% 7.95%

3 Bids Tendered Classification - Tok Cutoff Hwy at MP 119

2018 Northern Region Radar 669(106-I)-A Lump 1 58,000.00 58,396.33 58,889.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 54,000.00 58,300.00 58,889.00 58,000.00

Detection (46555//0) Automatic Vehicle 8.42% 7.80% 7.86% 7.68%

3 Bids Tendered Classification - Badger Rd East of Old Richardson Hwy

%669% %669% Page 7 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Northern Region Radar 669(106-J)-A Lump 1 58,000.00 59,629.67 62,000.00 747,900 06 Sites For Non-Intrusive Radar-Based Sum 54,000.00 58,000.00 58,889.00 62,000.00

Detection (46555//0) Automatic Vehicle 8.42% 7.76% 7.86% 8.21%

3 Bids Tendered Classification - Parks Hwy North of Chena River Bridge

2015 International Airport Road 669(1A) Lump 1 16,000.00 23,000.00 30,000.00 6,487,960 06 Pavement Preservation Automated Traffic Sum 7,500.00 16,000.00 30,000.00 0.00

South Aircraft Drive to Recorder - Site H1 0.11% 0.25% 0.46% 0.00%

Homer Drive (44768/56729/7846) 2 Bids Tendered

2018 Seward Highway, MP 669(1A) Lump 1 30,000.00 35,509.09 50,000.00 51,418,510 02 75-90 Road and Bridge Automatic Traffic Sum 25,000.00 30,000.00 50,000.00 30,000.00

Rehabilitation, Phase I Recorders - Site H 0.04% 0.06% 0.10% 0.04%

(48081//7846) 4 Bids Tendered

2013 Northern Region 669(1-A) Lump 1 110,000.00 120,100.00 137,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 104,000.00 111,400.00 110,000.00 122,000.00

Classification Classification, Delta 5.94% 6.66% 6.34% 5.63%

(40133/63321/1514) Junction 4 Bids Tendered

2014 5th and 6th Avenue 669(1A) Lump 1 6,975.00 8,987.50 11,000.00 8,696,000 05 Paving, L Street To Ingra New Automated Traffic Sum 7,000.00 11,000.00 6,975.00 0.00

L & I Couplet Pavement Recorder Site 1 0.08% 0.13% 0.07% 0.00%

Preservation: Phase 1 (42905/57835 58003/7846) 2 Bids Tendered

2018 Kenai Spur Highway 669(1A) Lump 1 13,090.00 18,503.66 30,500.00 12,869,962 03 Rehabilitation: Sports Lake Traffic Data - Site H1 Sum 21,000.00 13,090.00 20,000.00 13,500.00

Road To Swires Road - 0.15% 0.10% 0.15% 0.10%

Phase I (48214/54594/7846) 6 Bids Tendered

2017 AMATS: O'Malley Road 669(1A) Lump 1 50,000.00 65,142.78 76,413.88 21,769,589 01 Reconstruction: Phase I, Traffic Data - Site H1 Sum 14,000.00 50,000.00 70,000.00 60,000.00

Seward Hwy To Livingston 0.07% 0.23% 0.28% 0.24%

(46522//7846) 5 Bids Tendered

2015 International Airport Road 669(1B) Lump 1 67,000.00 71,125.00 75,250.00 6,487,960 06 Pavement Preservation Automated Traffic Sum 15,000.00 67,000.00 75,250.00 0.00

South Aircraft Drive to Recorder - Site H2 0.22% 1.03% 1.16% 0.00%

Homer Drive (44768/56729/7846) 2 Bids Tendered

%669% %669% Page 8 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Northern Region 669(1-B) Lump 1 93,000.00 105,597.50 116,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 74,000.00 103,390.00 93,000.00 110,000.00

Classification Classification, 4.22% 6.18% 5.36% 5.08%

(40133/63321/1514) Fairbanks (Fairbanks 4 Bids Tendered Street)

2014 5th and 6th Avenue 669(1B) Lump 1 6,975.00 8,987.50 11,000.00 8,696,000 05 Paving, L Street To Ingra New Automated Traffic Sum 7,000.00 11,000.00 6,975.00 0.00

L & I Couplet Pavement Recorder Site 2 0.08% 0.13% 0.07% 0.00%

Preservation: Phase 1 (42905/57835 58003/7846) 2 Bids Tendered

2018 Kenai Spur Highway 669(1B) Lump 1 13,090.00 18,503.66 30,500.00 12,869,962 03 Rehabilitation: Sports Lake Traffic Data - Site H2 Sum 21,000.00 13,090.00 20,000.00 13,500.00

Road To Swires Road - 0.15% 0.10% 0.15% 0.10%

Phase I (48214/54594/7846) 6 Bids Tendered

2013 Northern Region 669(1-C) Lump 1 122,000.00 147,250.00 202,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 139,500.00 126,000.00 122,000.00 139,000.00

Classification Classification, Cordova 7.96% 7.53% 7.03% 6.41%

(40133/63321/1514) (Whitshed Road) 4 Bids Tendered

2014 5th and 6th Avenue 669(1C) Lump 1 8,425.00 11,212.50 14,000.00 8,696,000 05 Paving, L Street To Ingra New Automated Traffic Sum 8,500.00 14,000.00 8,425.00 0.00

L & I Couplet Pavement Recorder Site 3 0.09% 0.16% 0.09% 0.00%

Preservation: Phase 1 (42905/57835 58003/7846) 2 Bids Tendered

2018 Kenai Spur Highway 669(1C) Lump 1 55,000.00 111,412.12 140,000.00 12,869,962 03 Rehabilitation: Sports Lake Traffic Data - Site H3 Sum 100,000.00 55,000.00 120,000.00 108,000.00

Road To Swires Road - 0.72% 0.43% 0.90% 0.80%

Phase I (48214/54594/7846) 6 Bids Tendered

2013 Northern Region 669(1-D) Lump 1 122,000.00 153,587.50 202,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 102,500.00 127,850.00 122,000.00 162,500.00

Classification Classification, Nome 5.85% 7.64% 7.03% 7.50%

(40133/63321/1514) (Nome - Teller 4 Bids Tendered Highway)

2014 5th and 6th Avenue 669(1D) Lump 1 8,425.00 11,212.50 14,000.00 8,696,000 05 Paving, L Street To Ingra New Automated Traffic Sum 8,500.00 14,000.00 8,425.00 0.00

L & I Couplet Pavement Recorder Site 4 0.09% 0.16% 0.09% 0.00%

Preservation: Phase 1 (42905/57835 58003/7846) 2 Bids Tendered

%669% %669% Page 9 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Northern Region 669(1-E) Lump 1 110,000.00 125,000.00 144,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 103,100.00 116,000.00 110,000.00 130,000.00

Classification Classification, Cantwell 5.89% 6.93% 6.34% 6.00%

(40133/63321/1514) (George Parks 4 Bids Tendered Highway)

2013 Northern Region 669(1-F) Lump 1 129,000.00 155,125.00 179,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 135,000.00 140,500.00 129,000.00 179,000.00

Classification Classification, 7.71% 8.40% 7.44% 8.26%

(40133/63321/1514) Fairbanks (Geist Road) 4 Bids Tendered

2013 Northern Region 669(1-G) Lump 1 110,000.00 124,300.00 150,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 103,950.00 112,200.00 110,000.00 125,000.00

Classification Classification, Healy 5.93% 6.71% 6.34% 5.77%

(40133/63321/1514) (George Parks 4 Bids Tendered Highway)

2016 AMATS: Abbott Rd. 669(1H) Lump 1 50,000.00 72,244.89 92,000.00 8,348,321 03 Rehab-Phase I Automated Traffic Sum 30,000.00 50,000.00 77,500.00 76,000.00

(45647/59190/7846) Recorder - Site H1 0.32% 0.60% 0.90% 0.87%

8 Bids Tendered

2013 Northern Region 669(1-H) Lump 1 110,000.00 121,000.00 140,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 100,800.00 111,000.00 110,000.00 123,000.00

Classification Classification, Nenana 5.75% 6.64% 6.34% 5.68%

(40133/63321/1514) (George Parks 4 Bids Tendered Highway)

2017 Dowling Road: Old Seward 669(1H2) Lump 1.0 8,450.00 11,150.00 15,000.00 2,066,575 05 Hwy to Lake Otis Parkway AUTOMATED Sum 10,000.00 8,450.00 15,000.00 10,000.00

Pavement Preservation TRAFFIC (Alt) 0.43% 0.41% 0.68% 0.45%

(47034) RECORDERS - SITE 3 Bids Tendered H2

2017 Dowling Road: Old Seward 669(1H2) LUMP 1 8,450.00 11,150.00 15,000.00 2,066,575 05 Hwy to Lake Otis Parkway AUTOMATED SUM 10,000.00 8,450.00 15,000.00 10,000.00

Pavement Preservation TRAFFIC 0.43% 0.41% 0.68% 0.45%

(47034/CSHWY00075/7846) RECORDERS - SITE 3 Bids Tendered H2

2017 Dowling Road: Old Seward 669(1H3) LUMP 1 20,000.00 25,195.67 35,000.00 2,066,575 05 Hwy to Lake Otis Parkway AUTOMATED SUM 30,000.00 20,587.00 35,000.00 20,000.00

Pavement Preservation TRAFFIC 1.30% 1.00% 1.59% 0.89%

(47034/CSHWY00075/7846) RECORDERS - SITE 3 Bids Tendered H3

2017 Dowling Road: Old Seward 669(1H3) Lump 1.0 20,000.00 25,195.67 35,000.00 2,066,575 05 Hwy to Lake Otis Parkway AUTOMATED Sum 30,000.00 20,587.00 35,000.00 20,000.00

Pavement Preservation TRAFFIC (Alt) 1.30% 1.00% 1.59% 0.89%

(47034) RECORDERS - SITE 3 Bids Tendered H3

2013 Northern Region 669(1-I) Lump 1 106,000.00 136,875.00 186,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 120,650.00 119,000.00 106,000.00 136,500.00

Classification Classification, 6.89% 7.11% 6.11% 6.30%

(40133/63321/1514) Northway 4 Bids Tendered

%669% %669% Page 10 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Northern Region 669(1-K) Lump 1 100,000.00 119,925.00 160,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 80,650.00 106,000.00 100,000.00 113,700.00

Classification Classification, 4.60% 6.34% 5.76% 5.25%

(40133/63321/1514) Fairbanks (Steese 4 Bids Tendered Highway)

2013 Northern Region 669(1-L) Lump 1 115,000.00 138,500.00 174,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 122,000.00 117,000.00 115,000.00 148,000.00

Classification Classification, 6.96% 6.99% 6.63% 6.83%

(40133/63321/1514) Fairbanks (Highway 2 - 4 Bids Tendered South Gate)

2013 Northern Region 669(1-M) Lump 1 108,000.00 129,841.25 168,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 90,450.00 112,865.00 108,000.00 130,500.00

Classification Classification, North 5.16% 6.75% 6.22% 6.02%

(40133/63321/1514) Pole (East Badger 4 Bids Tendered Loop)

2013 Northern Region 669(1-N) Lump 1 108,000.00 131,850.00 160,000.00 1,672,705 06 Automatic Vehicle Automatic Vehicle Sum 120,200.00 115,500.00 108,000.00 143,900.00

Classification Classification, 6.86% 6.90% 6.22% 6.64%

(40133/63321/1514) Fairbanks (Farmer's 4 Bids Tendered Loop Road)

2009 Muldoon Rd. Resurfacing, 669(2) Each 4 13,000.00 14,450.00 15,000.00 3,673,329 11 36th to Glenn Hwy & Automated Traffic 7,500.00 13,000.00 15,000.00 15,000.00

HSIP: 6th Avenue at Recorder 0.56% 1.42% 1.47% 1.45%

Muldoon Road Safety Improvements (25455/50810 57254/7846) 4 Bids Tendered

2015 Parks Highway MP 669(2) Lump 1 50,000.00 101,395.11 120,000.00 42,094,598 08 44.5-48.8 Reconstruction Automated Traffic Sum 50,000.00 120,000.00 50,000.00 110,000.00

Church Road to Pittman Recorder - Site 2, 0.11% 0.29% 0.11% 0.24%

Road (44808/52929/0) Parks Hwy Station 5 Bids Tendered 334+00

2015 Ingra and Gambell Phase 669(2) Lump 1 7,500.00 9,250.00 11,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 11,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.21% 0.14% 0.00%

2 Bids Tendered 52372000

2014 5th and 6th Avenue 669(2) Each 13 1,225.00 1,262.50 1,300.00 8,696,000 05 Paving, L Street To Ingra Test Automated Traffic 700.00 1,300.00 1,225.00 0.00

L & I Couplet Pavement Recorder Sites 0.10% 0.19% 0.16% 0.00%

Preservation: Phase 1 (42905/57835 58003/7847) 2 Bids Tendered

2014 Parks Highway MP 669(2) Lump 1 50,000.00 83,654.00 95,000.00 15,967,622 01 43.5-44.5 Reconstruction, Traffic Data - Site 2 Sum 30,000.00 50,000.00 95,000.00 90,000.00

Lucus Road To Church 0.20% 0.31% 0.52% 0.49%

Road (42230/52914/7847) 5 Bids Tendered

%669% %669% Page 11 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Seward Highway: 92nd 669(2) Lump 1 26,000.00 33,992.69 47,500.00 9,982,120 02 Avenue Connector Traffic Data - Site 2 Sum 39,300.00 30,000.00 26,000.00 28,000.00

(45465/59770/7846) 0.37% 0.30% 0.26% 0.27%

7 Bids Tendered

2015 Ingra and Gambell Phase 669(3) Lump 1 7,500.00 9,250.00 11,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 11,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.21% 0.14% 0.00%

2 Bids Tendered 53887000

2016 Seward Highway: 92nd 669(3) Lump 1 22,000.00 29,907.34 42,000.00 9,982,120 02 Avenue Connector Traffic Data - Site 3 Sum 34,800.00 29,000.00 22,000.00 26,500.00

(45465/59770/7846) 0.33% 0.29% 0.22% 0.26%

7 Bids Tendered

2015 Ingra and Gambell Phase 669(4) Lump 1 7,500.00 10,250.00 13,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 13,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.25% 0.14% 0.00%

2 Bids Tendered 53893000

2012 Sterling Hwy MP 37-45 669(4) Lump 1 45,000.00 47,533.33 50,000.00 4,799,276 06 Pavement Preservation Traffic Data Sum 75,000.00 45,000.00 50,000.00 47,600.00

(38025/54128/7847) 1.27% 0.94% 0.97% 0.89%

3 Bids Tendered

2009 Kodiak: Rezanof Dr. 669(4) LUMP 1 110,000.00 127,500.00 145,000.00 5,963,225 05 Resurfacing Coast Guard TRAFFIC DATA - SITE SUM 20,000.00 110,000.00 145,000.00 0.00

Access Road To Marine H3, PIEZOELECTRIC 0.45% 1.84% 2.24% 0.00%

Way (19675/51930/7847) SENSORS 2 Bids Tendered

2009 Central Region Highway 669(4A) Lump 1 6,500.00 12,750.00 25,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H1 Sum 61,000.00 9,500.00 10,000.00 6,500.00

(21992/60074/7847) 4.29% 0.50% 0.45% 0.28%

4 Bids Tendered

2010 Sterling Highway MP 669(4A) Lump 1 9,000.00 17,250.00 30,000.00 3,750,509 09 90-82 Resurfacing Traffic Data - Site H4 Sum 5,000.00 9,000.00 20,000.00 10,000.00

(29634/52493/7847) 0.09% 0.24% 0.51% 0.25%

4 Bids Tendered

2009 Central Region Highway 669(4B) Lump 1 119,000.00 166,000.00 200,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H2 Sum 86,000.00 119,000.00 160,000.00 185,000.00

(21992/60074/7847) 6.05% 6.28% 7.15% 8.05%

4 Bids Tendered

2010 Sterling Highway MP 669(4B) Lump 1 9,000.00 17,250.00 30,000.00 3,750,509 09 90-82 Resurfacing Traffic Data - Site H5 Sum 5,000.00 9,000.00 20,000.00 10,000.00

(29634/52493/7847) 0.09% 0.24% 0.51% 0.25%

4 Bids Tendered

%669% %669% Page 12 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Northern Lights Blvd: 669(4-BH10) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Benson 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Site H10 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496

2015 Northern Lights Blvd: 669(4-BH12) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Benson 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Site H12 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Northern Lights Blvd: 669(4-BH2) Lump 1 18,000.00 26,500.00 35,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 30,000.00 18,000.00 35,000.00 0.00

Otis Pavement Recorders - Benson 0.34% 0.21% 0.36% 0.00%

Preservation, Phase 1 Site H2 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Northern Lights Blvd: 669(4-BH4) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Benson 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Site H4 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

%669% %669% Page 13 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Northern Lights Blvd: 669(4-BH6) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Benson 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Site H6 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496

2015 Northern Lights Blvd: 669(4-BH8) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Benson 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Site H8 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2009 Central Region Highway 669(4C) Lump 1 117,000.00 157,250.00 200,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H3 Sum 66,000.00 117,000.00 155,000.00 157,000.00

(21992/60074/7847) 4.64% 6.18% 6.93% 6.83%

4 Bids Tendered

2009 Central Region Highway 669(4D) Lump 1 150,000.00 188,125.00 213,500.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H4 Sum 94,000.00 213,500.00 150,000.00 189,000.00

(21992/60074/7847) 6.62% 11.27% 6.70% 8.22%

4 Bids Tendered

2009 Central Region Highway 669(4E) Lump 1 124,500.00 164,625.00 200,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H5 Sum 94,000.00 124,500.00 150,000.00 184,000.00

(21992/60074/7847) 6.62% 6.57% 6.70% 8.01%

4 Bids Tendered

2009 Central Region Highway 669(4F) Lump 1 6,500.00 13,050.00 25,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H6 Sum 66,000.00 10,700.00 10,000.00 6,500.00

(21992/60074/7847) 4.64% 0.57% 0.45% 0.28%

4 Bids Tendered

2009 Central Region Highway 669(4G) Lump 1 147,500.00 215,125.00 250,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H7 Sum 134,000.00 147,500.00 230,000.00 233,000.00

(21992/60074/7847) 9.43% 7.79% 10.28% 10.14%

4 Bids Tendered

2009 Central Region Highway 669(4H) Lump 1 186,500.00 215,375.00 230,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H8 Sum 129,000.00 186,500.00 220,000.00 225,000.00

(21992/60074/7847) 9.08% 9.85% 9.83% 9.79%

4 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H0) Lump 1 15,000.00 21,000.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H0 Sum 15,000.00 15,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.17% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

%669% %669% Page 14 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Sterling Highway: Soldotna 669(4-H1) Lump 1 10,900.00 14,100.00 17,500.00 3,688,652 12 Urban Pavement Automated Traffic Sum 20,000.00 13,000.00 17,500.00 15,000.00

Preservation Recorder Site H1 0.50% 0.35% 0.47% 0.36%

(45376/58524/0) 4 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H1) Each 4.0 2,725.00 3,525.00 4,375.00 3,688,652 12 Urban Pavement Automated Traffic (Alt) 5,000.00 3,250.00 4,375.00 3,750.00

Preservation (45376) Recorder Site H1 0.50% 0.35% 0.47% 0.36%

4 Bids Tendered

2010 Seward Highway MP 669(4-H1) Each 1.0 50,000.00 50,000.00 50,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H1 (Alt) 30,000.00 50,000.00 50,000.00 0.00

(32033) 0.32% 0.68% 0.65% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H1) Lump 1 50,000.00 50,000.00 50,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H1 Sum 30,000.00 50,000.00 50,000.00 0.00

(32033/52491/7847) 0.32% 0.68% 0.65% 0.00%

2 Bids Tendered

2013 Sterling Highway Mp 79 - 669(4-H1) Lump 1 50,000.00 56,000.00 63,000.00 4,789,467 10 82.5 Pavement Traffic Data - Site H1 Sum 15,000.00 55,000.00 50,000.00 63,000.00

Preservation 0.28% 1.15% 1.03% 1.22%

(41786/54151/7847) 3 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H1) Lump 1 12,000.00 17,750.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H1 Sum 15,000.00 12,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.14% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

2013 Sterling Highway Mp 79 - 669(4-H1) Each 4.0 12,500.00 14,000.00 15,750.00 4,789,467 10 82.5 Pavement Traffic Data - Site H1 (Alt) 3,750.00 13,750.00 12,500.00 15,750.00

Preservation (41786) 0.28% 1.15% 1.03% 1.22%

3 Bids Tendered

2011 EAGLE RIVER LOOP 669(4-H1) Lump 1 15,170.00 17,667.50 20,000.00 2,599,433 07 ROAD RESURFACING: Traffic Data Site H1 Sum 13,000.00 18,000.00 20,000.00 15,170.00

GLENN HWY TO EAGLE 0.46% 0.69% 0.70% 0.52%

RIVER RD (GF) (33695/52881/7847) 4 Bids Tendered

2013 Kenai Spur Highway MP 669(4-H1) Lump 1 30,000.00 32,500.00 35,000.00 3,872,478 06 0-3 Pavement Traffic Data Site H1 Sum 10,000.00 35,000.00 30,000.00 0.00

Preservation 0.28% 0.90% 0.77% 0.00%

(40631/54142/7847) 2 Bids Tendered

2017 Palmer-Wasilla Highway 669(4-H1) Lump 1 9,000.00 13,388.50 20,000.00 4,648,330 06 Eastern Terminus, Phase I Traffic Data Site H1 Sum 13,000.00 18,000.00 11,500.00 11,500.00

(47145/51363/0) 0.23% 0.39% 0.24% 0.23%

9 Bids Tendered

2010 Seward Highway MP 669(4-H10) Each 1.0 10,000.00 11,000.00 12,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H10 (Alt) 10,000.00 10,000.00 12,000.00 0.00

(32033) 0.11% 0.14% 0.16% 0.00%

2 Bids Tendered

%669% %669% Page 15 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H10) Lump 1 10,000.00 11,000.00 12,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H10 Sum 10,000.00 10,000.00 12,000.00 0.00

(32033/52491/7847) 0.11% 0.14% 0.16% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H11) Each 1.0 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H11 (Alt) 8,000.00 8,000.00 10,000.00 0.00

(32033) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H11) Lump 1 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H11 Sum 8,000.00 8,000.00 10,000.00 0.00

(32033/52491/7847) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H12) Each 1.0 14,000.00 14,000.00 14,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H12 (Alt) 10,000.00 14,000.00 14,000.00 0.00

(32033) 0.11% 0.19% 0.18% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H12) Lump 1 14,000.00 14,000.00 14,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H12 Sum 10,000.00 14,000.00 14,000.00 0.00

(32033/52491/7847) 0.11% 0.19% 0.18% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H13) Lump 1 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H13 Sum 5,000.00 6,500.00 7,000.00 0.00

(32033/52491/7847) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H13) Each 1.0 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H13 (Alt) 5,000.00 6,500.00 7,000.00 0.00

(32033) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H14) Each 1.0 1,800.00 2,400.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H14 (Alt) 4,000.00 1,800.00 3,000.00 0.00

(32033) 0.04% 0.02% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H14) Lump 1 1,800.00 2,400.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H14 Sum 4,000.00 1,800.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.02% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H15) Lump 1 10,000.00 10,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H15 Sum 10,000.00 10,000.00 10,000.00 0.00

(32033/52491/7847) 0.11% 0.14% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H15) Each 1.0 10,000.00 10,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H15 (Alt) 10,000.00 10,000.00 10,000.00 0.00

(32033) 0.11% 0.14% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H16) Lump 1 10,000.00 10,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H16 Sum 10,000.00 10,000.00 10,000.00 0.00

(32033/52491/7847) 0.11% 0.14% 0.13% 0.00%

2 Bids Tendered

%669% %669% Page 16 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H16) Each 1.0 10,000.00 10,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H16 (Alt) 10,000.00 10,000.00 10,000.00 0.00

(32033) 0.11% 0.14% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H17) Each 1.0 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H17 (Alt) 5,000.00 6,500.00 7,000.00 0.00

(32033) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H17) Lump 1 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H17 Sum 5,000.00 6,500.00 7,000.00 0.00

(32033/52491/7847) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H18) Each 1.0 15,000.00 15,000.00 15,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H18 (Alt) 12,000.00 15,000.00 15,000.00 0.00

(32033) 0.13% 0.21% 0.19% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H18) Lump 1 15,000.00 15,000.00 15,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H18 Sum 12,000.00 15,000.00 15,000.00 0.00

(32033/52491/7847) 0.13% 0.21% 0.19% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H19) Lump 1 500.00 2,750.00 5,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H19 Sum 4,000.00 500.00 5,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.06% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H19) Each 1.0 500.00 2,750.00 5,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H19 (Alt) 4,000.00 500.00 5,000.00 0.00

(32033) 0.04% 0.01% 0.06% 0.00%

2 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H2) Each 4.0 2,725.00 3,525.00 4,375.00 3,688,652 12 Urban Pavement Automated Traffic (Alt) 5,000.00 3,250.00 4,375.00 3,750.00

Preservation (45376) Recorder Site H2 0.50% 0.35% 0.47% 0.36%

4 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H2) Lump 1 10,900.00 14,100.00 17,500.00 3,688,652 12 Urban Pavement Automated Traffic Sum 20,000.00 13,000.00 17,500.00 15,000.00

Preservation Recorder Site H2 0.50% 0.35% 0.47% 0.36%

(45376/58524/0) 4 Bids Tendered

2010 Seward Highway MP 669(4-H2) Lump 1 10,000.00 12,500.00 15,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H2 Sum 10,000.00 10,000.00 15,000.00 0.00

(32033/52491/7847) 0.11% 0.14% 0.19% 0.00%

2 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H2) Lump 1 12,000.00 17,750.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H2 Sum 15,000.00 12,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.14% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

2013 Debarr Road Resurfacing 669(4-H2) Lump 1 15,000.00 44,666.67 60,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H2 Sum 7,000.00 15,000.00 60,000.00 0.00

3 Bids Tendered 0.16% 0.33% 1.23% 0.00%

%669% %669% Page 17 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H2) Each 9,000.0 1.11 1.39 1.67 7,310,434 10 115-124 Resurfacing Traffic Data - Site H2 (Alt) 1.11 1.11 1.67 0.00

(32033) 0.11% 0.14% 0.19% 0.00% 2 Bids Tendered

2013 Kenai Spur Highway MP 669(4-H2) Lump 1 30,000.00 32,500.00 35,000.00 3,872,478 06 0-3 Pavement Traffic Data Site H2 Sum 10,000.00 35,000.00 30,000.00 0.00

Preservation 0.28% 0.90% 0.77% 0.00%

(40631/54142/7844) 2 Bids Tendered

2011 EAGLE RIVER LOOP 669(4-H2) Lump 1 60,000.00 68,308.50 80,000.00 2,599,433 07 ROAD RESURFACING: Traffic Data Site H2 Sum 26,000.00 60,000.00 80,000.00 63,234.00

GLENN HWY TO EAGLE 0.93% 2.31% 2.80% 2.15%

RIVER RD (GF) (33695/52881/7847) 4 Bids Tendered

2010 Seward Highway MP 669(4-H20) Lump 1 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H20 Sum 10,000.00 11,000.00 13,000.00 0.00

(32033/52491/7847) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H20) Each 1.0 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H20 (Alt) 10,000.00 11,000.00 13,000.00 0.00

(32033) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H21) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H21 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H21) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H21 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H22) Each 1.0 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H22 (Alt) 8,000.00 8,000.00 10,000.00 0.00

(32033) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H22) Lump 1 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H22 Sum 8,000.00 8,000.00 10,000.00 0.00

(32033/52491/7847) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H23) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H23 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H23) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H23 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

%669% %669% Page 18 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H24) Lump 1 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H24 Sum 5,000.00 6,500.00 7,000.00 0.00

(32033/52491/7847) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H24) Each 1.0 6,500.00 6,750.00 7,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H24 (Alt) 5,000.00 6,500.00 7,000.00 0.00

(32033) 0.05% 0.09% 0.09% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H25) Lump 1 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H25 Sum 10,000.00 11,000.00 13,000.00 0.00

(32033/52491/7847) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H25) Each 1.0 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H25 (Alt) 10,000.00 11,000.00 13,000.00 0.00

(32033) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H26) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H26 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H26) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H26 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H29) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H29 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H29) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H29 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H3) Lump 1 10,900.00 14,100.00 17,500.00 3,688,652 12 Urban Pavement Automated Traffic Sum 20,000.00 13,000.00 17,500.00 15,000.00

Preservation Recorder Site H3 0.50% 0.35% 0.47% 0.36%

(45376/58524/0) 4 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H3) Each 4.0 2,725.00 3,525.00 4,375.00 3,688,652 12 Urban Pavement Automated Traffic (Alt) 5,000.00 3,250.00 4,375.00 3,750.00

Preservation (45376) Recorder Site H3 0.50% 0.35% 0.47% 0.36%

4 Bids Tendered

2013 Debarr Road Resurfacing 669(4-H3) Lump 1 15,000.00 17,333.33 19,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H3 Sum 5,000.00 15,000.00 19,000.00 0.00

3 Bids Tendered 0.11% 0.33% 0.39% 0.00%

2010 Seward Highway MP 669(4-H3) Each 1.0 14,000.00 14,000.00 14,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H3 (Alt) 15,000.00 14,000.00 14,000.00 0.00

(32033) 0.16% 0.19% 0.18% 0.00%

2 Bids Tendered

%669% %669% Page 19 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H3) Lump 1 14,000.00 14,000.00 14,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H3 Sum 15,000.00 14,000.00 14,000.00 0.00

(32033/52491/7847) 0.16% 0.19% 0.18% 0.00%

2 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H3) Lump 1 12,000.00 17,750.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H3 Sum 15,000.00 12,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.14% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

2011 EAGLE RIVER LOOP 669(4-H3) Lump 1 12,727.00 15,511.75 18,320.00 2,599,433 07 ROAD RESURFACING: Traffic Data Site H3 Sum 10,000.00 16,000.00 15,000.00 12,727.00

GLENN HWY TO EAGLE 0.36% 0.62% 0.52% 0.43%

RIVER RD (GF) (33695/52881/7847) 4 Bids Tendered

2010 Seward Highway MP 669(4-H30) Each 1.0 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H30 (Alt) 10,000.00 11,000.00 13,000.00 0.00

(32033) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H30) Lump 1 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H30 Sum 10,000.00 11,000.00 13,000.00 0.00

(32033/52491/7847) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H31) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H31 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H31) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H31 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H32) Each 1.0 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H32 (Alt) 10,000.00 11,000.00 13,000.00 0.00

(32033) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H32) Lump 1 11,000.00 12,000.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H32 Sum 10,000.00 11,000.00 13,000.00 0.00

(32033/52491/7847) 0.11% 0.15% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H33) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H33 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H33) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H33 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

%669% %669% Page 20 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H34) Lump 1 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H34 Sum 4,000.00 500.00 3,000.00 0.00

(32033/52491/7847) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H34) Each 1.0 500.00 1,750.00 3,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H34 (Alt) 4,000.00 500.00 3,000.00 0.00

(32033) 0.04% 0.01% 0.04% 0.00%

2 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H4) Each 4.0 2,725.00 3,525.00 4,375.00 3,688,652 12 Urban Pavement Automated Traffic (Alt) 5,000.00 3,250.00 4,375.00 3,750.00

Preservation (45376) Recorder Site H4 0.50% 0.35% 0.47% 0.36%

4 Bids Tendered

2015 Sterling Highway: Soldotna 669(4-H4) Lump 1 10,900.00 14,100.00 17,500.00 3,688,652 12 Urban Pavement Automated Traffic Sum 20,000.00 13,000.00 17,500.00 15,000.00

Preservation Recorder Site H4 0.50% 0.35% 0.47% 0.36%

(45376/58524/0) 4 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H4) Lump 1 12,000.00 17,750.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H4 Sum 15,000.00 12,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.14% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

2013 Debarr Road Resurfacing 669(4-H4) Lump 1 15,000.00 17,333.33 19,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H4 Sum 5,000.00 15,000.00 19,000.00 0.00

3 Bids Tendered 0.11% 0.33% 0.39% 0.00%

2010 Seward Highway MP 669(4-H4) Lump 1 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H4 Sum 8,000.00 8,000.00 10,000.00 0.00

(32033/52491/7847) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H4) Each 1.0 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H4 (Alt) 8,000.00 8,000.00 10,000.00 0.00

(32033) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2011 EAGLE RIVER LOOP 669(4-H4) Lump 1 10,000.00 12,647.50 15,000.00 2,599,433 07 ROAD RESURFACING: Traffic Data Site H4 Sum 8,500.00 15,000.00 10,000.00 11,590.00

GLENN HWY TO EAGLE 0.30% 0.58% 0.35% 0.39%

RIVER RD (GF) (33695/52881/7847) 4 Bids Tendered

2010 Seward Highway MP 669(4-H5) Lump 1 7,500.00 8,750.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H5 Sum 8,000.00 7,500.00 10,000.00 0.00

(32033/52491/7847) 0.09% 0.10% 0.13% 0.00%

2 Bids Tendered

2017 Kalifornsky Beach Road, 669(4-H5) Lump 1 12,000.00 17,750.00 30,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H5 Sum 15,000.00 12,000.00 30,000.00 16,000.00

& Signalization 0.13% 0.14% 0.32% 0.16%

(47186/59778/7846) 4 Bids Tendered

%669% %669% Page 21 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Seward Highway MP 669(4-H5) Each 1.0 7,500.00 8,750.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H5 (Alt) 8,000.00 7,500.00 10,000.00 0.00

(32033) 0.09% 0.10% 0.13% 0.00%

2 Bids Tendered

2013 Debarr Road Resurfacing 669(4-H5) Lump 1 15,000.00 17,333.33 19,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H5 Sum 5,000.00 15,000.00 19,000.00 0.00

3 Bids Tendered 0.11% 0.33% 0.39% 0.00%

2013 Debarr Road Resurfacing 669(4-H6) Lump 1 15,000.00 17,333.33 19,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H6 Sum 5,000.00 15,000.00 19,000.00 0.00

3 Bids Tendered 0.11% 0.33% 0.39% 0.00%

2017 Kalifornsky Beach Road, 669(4-H6) Lump 1 30,000.00 32,000.00 35,000.00 8,695,855 07 MP 16 to 22.2 Resurfacing Traffic Data - Site H6 Sum 23,000.00 30,000.00 30,000.00 33,000.00

& Signalization 0.20% 0.34% 0.32% 0.33%

(47186/59778/7846) 4 Bids Tendered

2010 Seward Highway MP 669(4-H6) Each 1.0 13,000.00 14,000.00 15,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H6 (Alt) 8,000.00 13,000.00 15,000.00 0.00

(32033) 0.09% 0.18% 0.19% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H6) Lump 1 13,000.00 14,000.00 15,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H6 Sum 8,000.00 13,000.00 15,000.00 0.00

(32033/52491/7847) 0.09% 0.18% 0.19% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H7) Each 1.0 19,000.00 19,500.00 20,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H7 (Alt) 25,000.00 19,000.00 20,000.00 0.00

(32033) 0.27% 0.26% 0.26% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H7) Lump 1 19,000.00 19,500.00 20,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H7 Sum 25,000.00 19,000.00 20,000.00 0.00

(32033/52491/7847) 0.27% 0.26% 0.26% 0.00%

2 Bids Tendered

2013 Debarr Road Resurfacing 669(4-H7) Lump 1 15,000.00 17,333.33 19,000.00 4,590,728 05 (GF) (40444/53433/7847) Traffic Data - Site H7 Sum 5,000.00 15,000.00 19,000.00 0.00

3 Bids Tendered 0.11% 0.33% 0.39% 0.00%

2010 Seward Highway MP 669(4-H8) Lump 1 10,000.00 11,500.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H8 Sum 10,000.00 10,000.00 13,000.00 0.00

(32033/52491/7847) 0.11% 0.14% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H8) Each 1.0 10,000.00 11,500.00 13,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H8 (Alt) 10,000.00 10,000.00 13,000.00 0.00

(32033) 0.11% 0.14% 0.17% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H9) Each 1.0 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H9 (Alt) 8,000.00 8,000.00 10,000.00 0.00

(32033) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

2010 Seward Highway MP 669(4-H9) Lump 1 8,000.00 9,000.00 10,000.00 7,310,434 10 115-124 Resurfacing Traffic Data - Site H9 Sum 8,000.00 8,000.00 10,000.00 0.00

(32033/52491/7847) 0.09% 0.11% 0.13% 0.00%

2 Bids Tendered

%669% %669% Page 22 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Central Region Highway 669(4I) Lump 1 216,000.00 271,750.00 310,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H9 Sum 164,000.00 216,000.00 310,000.00 281,000.00

(21992/60074/7847) 11.54% 11.41% 13.85% 12.23%

4 Bids Tendered

2009 Central Region Highway 669(4J) Lump 1 137,500.00 188,625.00 220,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H12 Sum 94,000.00 137,500.00 190,000.00 207,000.00

(21992/60074/7847) 6.62% 7.26% 8.49% 9.01%

4 Bids Tendered

2009 Central Region Highway 669(4K) Lump 1 148,500.00 208,625.00 246,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site H13 Sum 61,000.00 148,500.00 200,000.00 246,000.00

(21992/60074/7847) 4.29% 7.84% 8.94% 10.70%

4 Bids Tendered

2009 Minnesota Drive 669(4K) Each 1 128,800.00 148,200.00 165,000.00 6,809,020 04 Resurfacing (22032/51135 Traffic Data - Site HII 44,999.75 128,800.00 161,000.00 165,000.00

51340/7847) 0.52% 1.89% 2.33% 2.16%

4 Bids Tendered

2009 Central Region Highway 669(4L) Lump 1 52,000.00 86,000.00 102,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - SIte Sum 61,000.00 52,000.00 90,000.00 102,000.00

(21992/60074/7847) H13A 4.29% 2.75% 4.02% 4.44%

4 Bids Tendered

2009 Central Region Highway 669(4M) Lump 1 35,500.00 79,375.00 100,000.00 1,893,700 05 Data Equipment 2008 Traffic Data - Site Sum 61,000.00 35,500.00 90,000.00 92,000.00

(21992/60074/7847) H13B 4.29% 1.87% 4.02% 4.00%

4 Bids Tendered

2015 Northern Lights Blvd: 669(4-NH2) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H2 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Northern Lights Blvd: 669(4-NH3) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H3 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

%669% %669% Page 23 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Northern Lights Blvd: 669(4-NH4) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H4 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496

2015 Northern Lights Blvd: 669(4-NH5) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H5 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Northern Lights Blvd: 669(4-NH6) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H6 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Northern Lights Blvd: 669(4-NH7) Lump 1 18,000.00 20,500.00 23,000.00 8,572,860 03 Forest Park Dr. To Lake Automated Traffic Sum 20,000.00 18,000.00 23,000.00 0.00

Otis Pavement Recorders - Northern 0.22% 0.21% 0.24% 0.00%

Preservation, Phase 1 Lights Site H7 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/7845) 2 Bids Tendered

2015 Ingra and Gambell Phase 669(5) Lump 1 7,500.00 10,250.00 13,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 13,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.25% 0.14% 0.00%

2 Bids Tendered 53897000

2010 Glenn Hwy: Airport Heights 669(5) Each 22 1,800.00 2,325.00 3,000.00 11,052,764 01 To Hiland Resurfacing Presence Loop 1,250.00 2,500.00 3,000.00 2,000.00

(25119/51945/7847) 0.20% 0.50% 0.59% 0.37%

4 Bids Tendered

%669% %669% Page 24 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Ingra and Gambell Phase 669(6) Lump 1 7,500.00 10,250.00 13,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 9,500.00 13,000.00 7,500.00 0.00

(44515/57858/7845) Recorder-Site 0.17% 0.25% 0.14% 0.00%

2 Bids Tendered 54118000

2010 Glenn Hwy: Airport Heights 669(6) Each 21 1,750.00 4,437.50 5,500.00 11,052,764 01 To Hiland Resurfacing Piezoelectric Sensor 2,500.00 1,750.00 5,500.00 5,000.00

(25119/51945/7847) 0.38% 0.33% 1.03% 0.88%

4 Bids Tendered

2010 GLENN HWY: EKLUTNA 669(6) Each 8 2,000.00 4,507.75 5,731.00 5,859,876 03 TO PARKS HWY Piezoelectric Sensor 2,500.00 5,300.00 5,000.00 2,000.00

RESURFACING/CULVERT 0.25% 0.72% 0.62% 0.24%

MP 13.0(FARM AVE)

(27674/52110 52385/7847)

4 Bids Tendered

2015 Ingra and Gambell Phase 669(7) Lump 1 122,000.00 138,500.00 155,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 75,000.00 122,000.00 155,000.00 0.00

(44515/57858/7845) Recorder-Site 1.37% 2.30% 2.89% 0.00%

2 Bids Tendered 1120545U

2014 AMATS: A St Resurfacing: 669(7) Lump 1 66,000.00 78,000.00 90,000.00 5,686,743 05 Northern Lights Blvd to 9th Refurbish Automated Sum 18,000.00 90,000.00 66,000.00 0.00

Ave and HSIP: 16th Ave at Traffic Recorder 0.40% 1.58% 1.12% 0.00%

A Street Channelization Improvements (42707/56000 51331/7847) 2 Bids Tendered

2014 5th and 6th Avenue 669(7) Each 40 875.00 887.50 900.00 8,696,000 05 Paving, L Street To Ingra Refurbish Automated 500.00 900.00 875.00 0.00

L & I Couplet Pavement Traffic Recorder Loop 0.22% 0.41% 0.35% 0.00% Preservation: Phase 1 (42905/57835 58003/7847) 2 Bids Tendered

2015 Ingra and Gambell Phase 669(8) Lump 1 15,000.00 18,500.00 22,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 14,000.00 22,000.00 15,000.00 0.00

(44515/57858/7845) Recorder-Site 0.26% 0.42% 0.28% 0.00%

2 Bids Tendered 52356000

2015 Ingra and Gambell Phase 669(9) Lump 1 15,000.00 18,500.00 22,000.00 5,296,083 06 1 Paving, 5th to 36th Automated Traffic Sum 15,000.00 22,000.00 15,000.00 0.00

(44515/57858/7845) Recorder-Site 0.27% 0.42% 0.28% 0.00%

2 Bids Tendered 52351000

2018 Portage Glacier Rd 669(99) Lump 1 8,541.93 14,774.23 20,000.00 2,253,083 01 Resurfacing; MP 4.7 to Remove and Replace Sum 10,000.00 15,555.00 20,000.00 8,541.93

Whittier Tunnel RWIS Sensors and 0.36% 0.69% 0.83% 0.35%

(47989//7845) Conduit 4 Bids Tendered

%669% %669% Page 25 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Glenn Highway: Airport 669(A) Lump 1 6,000.00 13,333.33 24,000.00 9,998,959 03 Heights Drive to Hiland Site R3, RWIS Site Sum 14,000.00 6,000.00 24,000.00 10,000.00

Road, Pavement 0.12% 0.06% 0.23% 0.09%

Preservation (46737//7846) 3 Bids Tendered

2017 Glenn Highway: Airport 669(A) TDP 3.0 2,000.00 4,444.44 8,000.00 9,998,959 03 Heights Drive to Hiland Site R3, RWIS Site (Alt) 4,666.67 2,000.00 8,000.00 3,333.33

Road, Pavement 0.12% 0.06% 0.23% 0.09%

Preservation (46737) 3 Bids Tendered

2017 Glenn Highway: Eklutna to 669(A) TDP 12.0 4,166.67 4,166.67 4,166.67 5,541,578 12 Parks Highway Pavement Traffic Data: H1 (Alt) 1,875.00 4,166.67 4,166.67 4,166.67

Preservation (47863) 0.36% 0.90% 0.90% 0.90%

3 Bids Tendered

2017 Glenn Highway: Eklutna to 669(A) Lump 1 50,000.00 50,000.00 50,000.00 5,541,578 12 Parks Highway Pavement Traffic Data: H1 Sum 22,500.00 50,000.00 50,000.00 50,000.00

Preservation 0.36% 0.90% 0.90% 0.90%

(47863/58534/7846) 3 Bids Tendered

2017 Glenn Highway: Airport 669(B) piezoelectric 5.0 4,000.00 4,733.33 5,200.00 9,998,959 03 Heights Drive to Hiland Site W4, WIM sensor 3,800.00 5,000.00 5,200.00 4,000.00

Road, Pavement Northbound 1 (Alt) 0.16% 0.25% 0.25% 0.18%

Preservation (46737) 3 Bids Tendered

2017 Glenn Highway: Airport 669(B) Lump 1 20,000.00 23,666.67 26,000.00 9,998,959 03 Heights Drive to Hiland Site W4, WIM Sum 19,000.00 25,000.00 26,000.00 20,000.00

Road, Pavement Northbound 1 0.16% 0.25% 0.25% 0.18%

Preservation (46737//7846) 3 Bids Tendered

2017 Glenn Highway: Airport 669(C) piezoelectric 8.0 2,500.00 2,833.33 3,125.00 9,998,959 03 Heights Drive to Hiland Site W5, WIM sensor 3,125.00 3,125.00 2,875.00 2,500.00

Road, Pavement Northbound 2 (Alt) 0.22% 0.25% 0.22% 0.18%

Preservation (46737) 3 Bids Tendered

2017 Glenn Highway: Airport 669(C) Lump 1 20,000.00 22,666.67 25,000.00 9,998,959 03 Heights Drive to Hiland Site W5, WIM Sum 25,000.00 25,000.00 23,000.00 20,000.00

Road, Pavement Northbound 2 0.22% 0.25% 0.22% 0.18%

Preservation (46737//7846) 3 Bids Tendered

2017 Glenn Highway: Airport 669(D) Lump 1 20,000.00 22,333.33 25,000.00 9,998,959 03 Heights Drive to Hiland Site W7, WIM Sum 19,000.00 25,000.00 22,000.00 20,000.00

Road, Pavement Southbound 1 0.16% 0.25% 0.21% 0.18%

Preservation (46737//7846) 3 Bids Tendered

%669% %669% Page 26 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Glenn Highway: Airport 669(D) piezoelectric 6.0 3,333.33 3,722.22 4,166.67 9,998,959 03 Heights Drive to Hiland Site W7, WIM sensor 3,166.67 4,166.67 3,666.67 3,333.33

Road, Pavement Southbound 1 (Alt) 0.16% 0.25% 0.21% 0.18%

Preservation (46737) 3 Bids Tendered

2017 Glenn Highway: Airport 669(E) piezoelectric 2.0 2,500.00 8,333.33 12,500.00 9,998,959 03 Heights Drive to Hiland Site W8, WIM sensor 3,500.00 12,500.00 2,500.00 10,000.00

Road, Pavement Southbound 2 (Alt) 0.06% 0.25% 0.05% 0.18%

Preservation (46737) 3 Bids Tendered

2017 Glenn Highway: Airport 669(E) Lump 1 5,000.00 16,666.67 25,000.00 9,998,959 03 Heights Drive to Hiland Site W8, WIM Sum 7,000.00 25,000.00 5,000.00 20,000.00

Road, Pavement Southbound 2 0.06% 0.25% 0.05% 0.18%

Preservation (46737//7846) 3 Bids Tendered

2010 Weigh-in-Motion Rehab: 669(H1) Lump 1 1,209,432.00 1,338,144.00 1,500,000.00 3,851,734 01 Minnesota Dr. Near Automated Traffic Sum 707,000.00 1,209,432.00 1,500,000.00 1,305,000.00

Raspberry Rd., Sterling Recorder, Minnesota 32.21% 31.40% 36.89% 30.45%

Hwy MP 88.4, Glenn Hwy Drive H1 MP 53.3 (26218/51059/7847) 3 Bids Tendered

2016 Seward Highway: Dimond 669(H13) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 8,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H13 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

2016 Seward Highway: Dimond 669(H15) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 8,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H15 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

2016 Seward Highway: Dimond 669(H16) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 8,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H16 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

2016 Seward Highway: Dimond 669(H17) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 8,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H17 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

2016 Seward Highway: Dimond 669(H18) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 10,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H18 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

%669% %669% Page 27 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Seward Highway: Dimond 669(H19) LUMP 1 7,000.00 7,325.00 7,650.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 8,000.00 7,650.00 7,000.00 0.00

Road Reconstruction, H19 0.01% 0.01% 0.01% 0.00%

Phase I (46380//0) 2 Bids Tendered

2010 Weigh-in-Motion Rehab: 669(H2) Lump 1 661,000.00 694,666.67 740,000.00 3,851,734 01 Minnesota Dr. Near Automated Traffic Sum 305,000.00 683,000.00 740,000.00 661,000.00

Raspberry Rd., Sterling Recorder, Sterling 13.90% 17.73% 18.20% 15.42%

Hwy MP 88.4, Glenn Hwy Highway H2 MP 53.3 (26218/51059/7847) 3 Bids Tendered

2010 Weigh-in-Motion Rehab: 669(H3) Lump 1 323,000.00 398,666.67 508,000.00 3,851,734 01 Minnesota Dr. Near Automated Traffic Sum 155,000.00 323,000.00 365,000.00 508,000.00

Raspberry Rd., Sterling Recorder, Glenn 7.06% 8.39% 8.98% 11.85%

Hwy MP 88.4, Glenn Hwy Highway H3 MP 53.3 (26218/51059/7847) 3 Bids Tendered

2016 Seward Highway: Dimond 669(H4) LUMP 1 139,000.00 144,500.00 150,000.00 55,969,371 12 Boulevard to Dowling TRAFFIC DATA - SITE SUM 150,000.00 139,000.00 150,000.00 0.00

Road Reconstruction, H4 0.21% 0.25% 0.25% 0.00%

Phase I (46380//0) 2 Bids Tendered

2015 West Anchorage Roads 669(K1) Lump 1 20,000.00 33,750.00 47,500.00 2,243,416 06 Pavement Preservation Automated Traffic Sum 10,000.00 20,000.00 47,500.00 0.00

(44709/58795/7845) Recorder - Sand Lake 0.41% 0.89% 1.60% 0.00%

2 Bids Tendered Road

2016 C Street Paving and 669(K1) Lump 1 20,000.00 61,666.67 85,000.00 10,998,774 07 Anchorage Curb Ramps Automated Traffic Sum 35,000.00 20,000.00 85,000.00 80,000.00

2016 Recorder - Site 1, C St 0.32% 0.18% 0.74% 0.68%

(46058/ANCPAV2016/7846) at Chester Creek 3 Bids Tendered

2015 AMATS: Eagle River Road 669(K1) Lump 1 80,000.00 83,333.33 90,000.00 6,887,552 03 Mp 0.0-5.3 Pavement Automated Traffic Sum 76,000.00 80,000.00 80,000.00 90,000.00

Preservation Recorder - Site 1, 1.03% 1.16% 1.09% 1.18%

(44413/56185/0) Eagle River Road 3 Bids Tendered

2014 Central Region Highway 669(K1) Lump 1 75,000.00 77,500.00 80,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 86,760.00 80,000.00 75,000.00 0.00

(43114/52809/7847) Recorder - Site 1, 2.17% 1.76% 1.28% 0.00%

2 Bids Tendered Parks Hwy Chulitna at MP 117

%669% %669% Page 28 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Raspberry Road: Jewel 669(K1) Each 1.0 20,000.00 20,170.00 20,340.00 6,769,856 09 Lake - Minnesota Automated Traffic (Alt) 55,000.00 20,000.00 20,340.00 0.00

Pavement Preservation Recorder - Site 1, 0.67% 0.30% 0.29% 0.00%

HSIP: Jewel Lake Rd At Raspberry Rd West of Raspberry Rd. East - West Arlene St Left Turn Lanes (45141) 2 Bids Tendered

2015 Raspberry Road: Jewel 669(K1) Lump 1 20,000.00 20,170.00 20,340.00 6,769,856 09 Lake - Minnesota Automated Traffic Sum 55,000.00 20,000.00 20,340.00 0.00

Pavement Preservation Recorder - Site 1, 0.67% 0.30% 0.29% 0.00%

HSIP: Jewel Lake Rd At Raspberry Rd West of Raspberry Rd. East - West Arlene St Left Turn Lanes (45141/56727 58760/7845) 2 Bids Tendered

2018 Glenn Hwy: S. Inner 669(K1) Lump 1 22,000.00 30,750.00 50,000.00 36,616,095 05 Springer Loop to W. Arctic Automated Traffic Sum 17,000.00 50,000.00 22,000.00 25,000.00

Avenue Recorder-Site 1 0.04% 0.14% 0.06% 0.06%

Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//7846) 4 Bids Tendered

2018 C St, 40th Ave to 669(K1) Lump 1 6,760.00 10,586.67 13,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 8,000.00 6,760.00 12,000.00 13,000.00

Preservation and AMATS: Recorder-Site 1, C St 0.08% 0.08% 0.13% 0.12%

Anchorage Area Wide North of Peninsula Cir Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K1) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 1, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of Cope St 2 Bids Tendered

2014 Central Region Highway 669(K10) Lump 1 70,000.00 70,000.00 70,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 60,230.00 70,000.00 70,000.00 0.00

(43114/52809/7847) Recorder - Site 10, 1.51% 1.54% 1.20% 0.00%

2 Bids Tendered Bridge Access Rd at K-Beach Rd

2017 Tudor Road, Minnesota to 669(K10) Lump 1 56,000.00 63,000.00 70,000.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 18,000.00 56,000.00 70,000.00 0.00

Preservation Recorder-Site 10, 0.17% 0.56% 0.65% 0.00%

(47192/58507/7846) Tudor Rd WIM Site 2 Bids Tendered East of Baxter Rd

%669% %669% Page 29 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Central Region Highway 669(K11) Lump 1 50,000.00 52,500.00 55,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 45,100.00 55,000.00 50,000.00 0.00

(43114/52809/7847) Recorder - Site 11, 1.13% 1.21% 0.85% 0.00%

2 Bids Tendered Arctic Blvd South of W. 76th Ave

2017 Tudor Road, Minnesota to 669(K11) Lump 1 8,500.00 9,050.00 9,600.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 9,600.00 8,500.00 0.00

Preservation Recorder-Site 11, 0.11% 0.10% 0.08% 0.00%

(47192/58507/7846) Tudor Rd North of 2 Bids Tendered Pioneer Rd

2014 Central Region Highway 669(K12) Lump 1 100,000.00 115,000.00 130,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 72,880.00 130,000.00 100,000.00 0.00

(43114/52809/7847) Recorder - Site 12, 1.83% 2.86% 1.71% 0.00%

2 Bids Tendered Minnesota Dr at Chester Creek

2014 Central Region Highway 669(K13) Lump 1 60,000.00 67,500.00 75,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 56,240.00 75,000.00 60,000.00 0.00

(43114/52809/7847) Recorder - Site 13, C 1.41% 1.65% 1.02% 0.00%

2 Bids Tendered St at Chester Creek

2014 Central Region Highway 669(K15) Lump 1 90,000.00 115,000.00 140,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 75,670.00 90,000.00 140,000.00 0.00

(43114/52809/7847) Recorder - Site 15, 1.90% 1.98% 2.39% 0.00%

2 Bids Tendered Seward Hwy South of E. Benson Blvd

2014 Central Region Highway 669(K16) Lump 1 30,000.00 40,000.00 50,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 36,760.00 50,000.00 30,000.00 0.00

(43114/52809/7847) Recorder - Site 16, Old 0.92% 1.10% 0.51% 0.00%

2 Bids Tendered Seward Hwy at E. 81st Ave

2014 Central Region Highway 669(K17) Lump 1 45,000.00 52,500.00 60,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 44,050.00 60,000.00 45,000.00 0.00

(43114/52809/7847) Recorder - Site 17, 1.10% 1.32% 0.77% 0.00%

2 Bids Tendered Abbott Rd at Corbin Dr

2014 Central Region Highway 669(K18) Lump 1 25,000.00 27,500.00 30,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 29,390.00 30,000.00 25,000.00 0.00

(43114/52809/7847) Recorder - Site 18, 0.74% 0.66% 0.43% 0.00%

2 Bids Tendered Elmore Rd North of E. 84th Ave

2014 Central Region Highway 669(K19) Lump 1 40,000.00 47,500.00 55,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 36,760.00 55,000.00 40,000.00 0.00

(43114/52809/7847) Recorder - Site 19, C 0.92% 1.21% 0.68% 0.00%

2 Bids Tendered St North of E. Dimond Blvd

2014 Central Region Highway 669(K2) Lump 1 75,000.00 85,000.00 95,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 62,620.00 95,000.00 75,000.00 0.00

(43114/52809/7847) Recorder - Site 2, Old 1.57% 2.09% 1.28% 0.00%

2 Bids Tendered Seward Hwy at Sundown Ct

%669% %669% Page 30 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Raspberry Road: Jewel 669(K2) Lump 1 99,500.00 99,750.00 100,000.00 6,769,856 09 Lake - Minnesota Automated Traffic Sum 120,000.00 100,000.00 99,500.00 0.00

Pavement Preservation Recorder - Site 2, 1.46% 1.48% 1.44% 0.00%

HSIP: Jewel Lake Rd At Raspberry Rd East of Raspberry Rd. East - West Northwood St Left Turn Lanes (45141/56727 58760/7845)

2015 Raspberry Road: Jewel 669(K2) Each 1.0 99,500.00 99,750.00 100,000.00 6,769,856 09 Lake - Minnesota Automated Traffic (Alt) 120,000.00 100,000.00 99,500.00 0.00

Pavement Preservation Recorder - Site 2, 1.46% 1.48% 1.44% 0.00%

HSIP: Jewel Lake Rd At Raspberry Rd East of Raspberry Rd. East - West Northwood St Left Turn Lanes (45141) 2 Bids Tendered

2018 Glenn Hwy: S. Inner 669(K2) Lump 1 21,000.00 86,500.00 250,000.00 36,616,095 05 Springer Loop to W. Arctic Automated Traffic Sum 17,000.00 50,000.00 21,000.00 25,000.00

Avenue Recorder-Site 2 0.04% 0.14% 0.06% 0.06%

Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//7846) 4 Bids Tendered

2018 C St, 40th Ave to 669(K2) Lump 1 6,760.00 10,586.67 13,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 8,000.00 6,760.00 12,000.00 13,000.00

Preservation and AMATS: Recorder-Site 2, C St 0.08% 0.08% 0.13% 0.12%

Anchorage Area Wide North of Minnesota Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K2) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 2, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of Bering St 2 Bids Tendered

2014 Central Region Highway 669(K20) Lump 1 40,000.00 47,500.00 55,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 44,130.00 55,000.00 40,000.00 0.00

(43114/52809/7847) Recorder - Site 20, C 1.11% 1.21% 0.68% 0.00%

2 Bids Tendered St South of W. Tudor Rd

2014 Central Region Highway 669(K21) Lump 1 50,000.00 55,000.00 60,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 40,440.00 60,000.00 50,000.00 0.00

(43114/52809/7847) Recorder - Site 21, C 1.01% 1.32% 0.85% 0.00%

2 Bids Tendered St South of W. International Airport Rd

%669% %669% Page 31 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Central Region Highway 669(K23) Lump 1 30,000.00 37,500.00 45,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 28,470.00 45,000.00 30,000.00 0.00

(43114/52809/7847) Recorder - Site 23, 0.71% 0.99% 0.51% 0.00%

2 Bids Tendered Minnesota Dr-International Airport Rd Ramps

2014 Central Region Highway 669(K24) Lump 1 40,000.00 47,500.00 55,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 40,440.00 55,000.00 40,000.00 0.00

(43114/52809/7847) Recorder - Site 24, 1.01% 1.21% 0.68% 0.00%

2 Bids Tendered Parks Hwy at N. Frontage Rd

2014 Central Region Highway 669(K25) Lump 1 25,000.00 27,500.00 30,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 29,390.00 30,000.00 25,000.00 0.00

(43114/52809/7847) Recorder - Site 25, 0.74% 0.66% 0.43% 0.00%

2 Bids Tendered Wasilla-Fishhook Rd

2014 Central Region Highway 669(K26) Lump 1 25,000.00 27,500.00 30,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 29,390.00 30,000.00 25,000.00 0.00

(43114/52809/7847) Recorder - Site 26, 0.74% 0.66% 0.43% 0.00%

2 Bids Tendered Glenn Hwy at E. Arctic Ave

2014 Central Region Highway 669(K27) Lump 1 30,000.00 40,000.00 50,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 36,760.00 50,000.00 30,000.00 0.00

(43114/52809/7847) Recorder - Site 27, W. 0.92% 1.10% 0.51% 0.00%

2 Bids Tendered International Airport Rd

2014 Central Region Highway 669(K29) Lump 1 80,000.00 92,500.00 105,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 71,805.00 105,000.00 80,000.00 0.00

(43114/52809/7847) Recorder - Site 29, 1.80% 2.31% 1.37% 0.00%

2 Bids Tendered Lake Otis Pkwy South of E. 74th Ave

2014 Central Region Highway 669(K3) Lump 1 50,000.00 50,000.00 50,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 43,320.00 50,000.00 50,000.00 0.00

(43114/52809/7847) Recorder - Site 3, E. 1.09% 1.10% 0.85% 0.00%

2 Bids Tendered Palmer-Wasilla Hwy at Trunk Rd

2018 C St, 40th Ave to 669(K3) Lump 1 6,760.00 10,586.67 13,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 8,000.00 6,760.00 12,000.00 13,000.00

Preservation and AMATS: Recorder-Site 3, C St 0.08% 0.08% 0.13% 0.12%

Anchorage Area Wide North of 100th Ave Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K3) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 3, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/0) Rd East of Cordova St 2 Bids Tendered

%669% %669% Page 32 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Central Region Highway 669(K30) Lump 1 55,000.00 77,500.00 100,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 51,360.00 55,000.00 100,000.00 0.00

(43114/52809/7847) Recorder - Site 30, S. 1.29% 1.21% 1.71% 0.00%

2 Bids Tendered Knik-Goose Bay Rd at S. Old Knik Rd

2014 Central Region Highway 669(K4) Lump 1 50,000.00 50,000.00 50,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 46,150.00 50,000.00 50,000.00 0.00

(43114/52809/7847) Recorder - Site 4, 1.16% 1.10% 0.85% 0.00%

2 Bids Tendered Seward Hwy Moose Pass at MP 31

2018 C St, 40th Ave to 669(K4) Lump 1 6,760.00 10,586.67 13,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 8,000.00 6,760.00 12,000.00 13,000.00

Preservation and AMATS: Recorder-Site 4, C St 0.08% 0.08% 0.13% 0.12%

Anchorage Area Wide North of 92nd Ave Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K4) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 4, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of Fairbanks 2 Bids Tendered St

2014 Central Region Highway 669(K5) Lump 1 50,000.00 50,000.00 50,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 47,990.00 50,000.00 50,000.00 0.00

(43114/52809/7847) Recorder - Site 5, 1.20% 1.10% 0.85% 0.00%

2 Bids Tendered Kalifornsky Beach Rd at MP 1

2017 Tudor Road, Minnesota to 669(K5) Lump 1 6,500.00 7,950.00 9,400.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 6,500.00 9,400.00 0.00

Preservation Recorder,-Site 5, Tudor 0.11% 0.07% 0.09% 0.00%

(47192/58507/7846) Rd East of Juneau St 2 Bids Tendered

2018 C St, 40th Ave to 669(K5) Lump 1 13,670.00 18,556.67 22,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 14,000.00 13,670.00 20,000.00 22,000.00

Preservation and AMATS: Recorder-Site 5, C St 0.14% 0.16% 0.22% 0.21%

Anchorage Area Wide North of 76th Ave Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2014 Central Region Highway 669(K6) Lump 1 100,000.00 120,000.00 140,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 107,040.00 140,000.00 100,000.00 0.00

(43114/52809/7847) Recorder - Site 6, E. 2.68% 3.08% 1.71% 0.00%

2 Bids Tendered Northern Lights Blvd

%669% %669% Page 33 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 C St, 40th Ave to 669(K6) Lump 1 22,560.00 28,186.67 32,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 14,000.00 22,560.00 30,000.00 32,000.00

Preservation and AMATS: Recorder-Site 6, C St 0.14% 0.26% 0.33% 0.31%

Anchorage Area Wide North of 68th Ave Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K6) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 6, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of MacInnes 2 Bids Tendered St

2018 C St, 40th Ave to 669(K7) Lump 1 6,756.00 10,585.33 13,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 8,000.00 6,756.00 12,000.00 13,000.00

Preservation and AMATS: Recorder-Site 7, C St 0.08% 0.08% 0.13% 0.12%

Anchorage Area Wide North of Potter Dr Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K7) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 7, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of Piper St 2 Bids Tendered

2014 Central Region Highway 669(K8) Lump 1 60,000.00 62,500.00 65,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 57,280.00 65,000.00 60,000.00 0.00

(43114/52809/7847) Recorder - Site 8, 1.43% 1.43% 1.02% 0.00%

2 Bids Tendered Glenn Hwy Kepler at MP 37

2018 C St, 40th Ave to 669(K8) Lump 1 30,000.00 32,333.33 35,000.00 8,532,028 03 Minnesota Pavement Automated Traffic Sum 16,000.00 32,000.00 30,000.00 35,000.00

Preservation and AMATS: Recorder-Site 8, C St 0.16% 0.38% 0.33% 0.34%

Anchorage Area Wide North of Tudor Rd Trails Rehabilitaion - C Street Pathway (48136//7846) 3 Bids Tendered

2017 Tudor Road, Minnesota to 669(K8) Lump 1 53,000.00 56,500.00 60,000.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 16,000.00 53,000.00 60,000.00 0.00

Preservation Recorder-Site 8, Tudor 0.15% 0.53% 0.56% 0.00%

(47192/58507/7846) Rd East of Tudor 2 Bids Tendered Centre Dr (West)

2014 Central Region Highway 669(K9) Lump 1 70,000.00 82,500.00 95,000.00 4,551,390 09 Data Equipment 2012 Automated Traffic Sum 63,480.00 95,000.00 70,000.00 0.00

(43114/52809/7847) Recorder - Site 9, 1.59% 2.09% 1.20% 0.00%

2 Bids Tendered Parks Hwy at E. Broadview Ave

%669% %669% Page 34 of 34 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 243 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Tudor Road, Minnesota to 669(K9) Lump 1 5,150.00 6,825.00 8,500.00 9,986,105 06 E. 36th, Pavement Automated Traffic Sum 12,000.00 5,150.00 8,500.00 0.00

Preservation Recorder-Site 9, Tudor 0.11% 0.05% 0.08% 0.00%

(47192/58507/7846) Rd East of Defiance St 2 Bids Tendered