31
5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install Guide Page 1 of 31 800-728-4010 bestbuymetals.com 5V-Crimp, 2.5” Corrugated, 1.25” Corrugated Install Guide

5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

  • Upload
    others

  • View
    18

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 1 of 31

800-728-4010bestbuymetals.com

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated

Install Guide

Page 2: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 2 of 31

IMPORTANT NOTICE

This manual contains suggestions and guidelines on how to install panels and

trim details. The contents of this manual include the guidelines that were in

effect at the time this publication was originally printed. In an effort to keep

pace with the ever-changing code environment, we retain the right to change

specifications and / or designs at any time without incurring any obligations.

To insure you have the latest information available, please inquire or visit our

web site. Application and design details are for illustrative purposes only and

may not be appropriate for all environmental conditions and/or building

designs. Projects should be engineered and installed to conform to applicable

building codes, regulations, and accepted industry practices.

Page 3: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 3 of 31

TABLE OF CONTENTS

Introduction, Design, & Testing ................................................................................................................

Panel Installation ...........................................................................................................................................

Accessories.......................................................................................................................................................

Trim Dimensions ...........................................................................................................................................

Trim Assemblies

Fascia ...................................................................................................................................................

Mini Eave ............................................................................................................................................

Eave Trim ............................................................................................................................................

Rake .....................................................................................................................................................

Preformed Valley ............................................................................................................................

Transition ...........................................................................................................................................

Gambrel .............................................................................................................................................

Hip .......................................................................................................................................................

Ridge ...................................................................................................................................................

Vented Ridge ...................................................................................................................................

High Side Peak .................................................................................................................................

Side Wall .............................................................................................................................................

End Wall .............................................................................................................................................

Valley Lapping ................................................................................................................................................

Valley Cutting .................................................................................................................................................

Pipe Flashing ..................................................................................................................................................

Curb Detail ......................................................................................................................................................

Panel Endlap Detail ......................................................................................................................................

4

5-8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27-29

30

Page 4: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 4 of 31

2.5” Corrugated5V-Crimp

Introduction

5V-Crimp, 2.5” Corrugated, and 1.25” Corrugated are through fastened roof and wall systems designed forease of installation, strength, and longevity. All are available in a range of paint colors in both 26 and 29gauge steel. They are also available in unpainted Galvalume® and galvanized. Our paint system carries a 40year warranty and Galvalume® a 25 year warranty.

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 4 of 31

12"

24"

0.5"

12"

24"0.25"

1.25"

24" Wall Coverage0.5"

2.67"21.3" Roof Coverage

Panel Fastener

FASTENING PATTERN

ALTERNATE FASTENING PATTERN

Panel Fastener

Panel Fastener

Field of Panel

Ends of Panel

ROOF - ATTACHMENT DETAILS

ROOF - FASTENING PATTERN

Panel Fastener

Field of Panel

Ends of Panel

Side Lap Fastener

Panel FastenerSide Lap Fastener

Panel FastenerSide Lap Fastener

WALL - ATTACHMENT DETAILS

WALL - FASTENING PATTERN

Panel Fastener

Ends and Field of Panel

Panel Fastener

Side Lap Fastener

Typical Screw Fastening Pattern

ATTACHMENT DETAIL

FASTENING PATTERN

Panel Fastener

PROFILE PROFILE

1.25” Corrugated

PROFILE

**Pjm Dboojoh (xbwjoftt po gmbuqbo) jt b obuvsbm pddvssfodf jogmbu qbo nfubm qbofmt boe jt opub dbvtf gps qbofm sfkfdujpo/

Page 5: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 5 of 31

Panel Installation Guide

If metal is not to be installed immediately, store inside in a well ventilated, dry location. Condensation or other moisture canform between the sheets during storage causing water stains or white rust which detracts from the appearance of the productand may affect the product’s useful life. Trapped moisture between sheets of painted metal can cause white rust to formunderneath the paint. This can cause the paint to flake off the panel immediately or several years later. To prevent white rustand staining, break the shipping bands on the material. Store the material on end or on an incline of at least 8” with asupporting board underneath to prevent sagging. Fan the sheets slightly at the bottom to allow for air circulation. Keep thesheets off of the ground with an insulator such as wood. Any outdoor storage is at the customer’s own risk. If outdoorstorage cannot be avoided, protect the metal using a canvas cover or waterproof paper. Never cover the metal with plasticas this will cause condensation to form.

Storage

Insure that the structure is square and true before beginning panel installation. If the structure is not square, the panels willnot properly seal at the side laps. Green or damp lumber is not recommended. Moisture released from the damp lumber maydamage the metal panels. Remove any loose metal shavings left on roof surface immediately to prevent corrosion. Keep rooffree of debris that could trap moisture on the metal, causing corrosion. The minimum pitch for roofing applications is 3:12.

General Installation Information

Always wear heavy gloves when working with steel panels to avoid cuts from sharp edges. When power cutting or drillingsteel panels, always wear safety glasses to prevent eye injury from flying metal fragments. If you must walk on a metalroof, take great care. Metal panels can become slippery, so always wear shoes with non-slip soles. Avoid working on metalroofs during wet conditions when the panels can become extremely slippery. Walking or standing on a metal roof whichdoes not have a plywood or other deck beneath it is not recommended. However, if you must do so, always walk on thepurlins, never between.

Safety Precautions

Fastening

If you wish to pre-drill fastener holes, use a cover sheet to prevent hot metalshavings from sticking to panels. It is recommended that you cut panelsupside down using a nibbler. For best results, use #14 x 7/8” Lap Screws atpanel overlaps. For installation into a steel frame, use #12 x 1” (minimum)Self-Drilling Screws. For installation into a wood frame, use #10 x 1”(minimum) Wood Screws.

Underdriven Overdriven Correct

Page 6: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 6 of 31

For best results, start siding at door, window, or other opening in the wall. Use corner trim or other standard trimfor strong, neat edges. Slopes of less than 3” on 12” are not recommended. For slopes under 4“ on 12”, field appliedseam sealant is recommended. For slopes of 3” on 12” or greater, end lap panels 6”. Do not put fasteners in the lapif panels are over 35’ long. Side laps should face away from the prevailing direction of driving rain. Lay the firstsheet along the eave at the down-wind side of the roof. Install sheets in the sequence shown above, always endlapping the upper panel on the top of the lower panel.

Roofing & Siding

Allow an overhang of 2” at the eave to provide for a drip edge. Use closure at eave to prevent insect or birdinfestation at openings. To protect against uplifting winds and to provide a finished appearance, apply rake trimor other standard gable trim. Apply fasteners every 6”-10”. Seal off ridge and panel using closure strip. Use oftube or tape sealant is recommended at side laps, especially for more shallow roofs. Apply the tube or tapesealant as shown in Figure 2 (front) at all lap ribs.

Pattern Installation Options

Sheet Installation Pattern

SyntheticUnderlayment

SyntheticUnderlayment

Install Metal Directly to Wood Frame

• Use Maximum 2’ Purlin Spacing

• Install Metal

*DO NOT USE THIS OPTION FOR

HEATED SPACES

*OIL CANNING/RIPPLING MORECOMMON OVER OPEN FRAME

Install Metal on Solid Deck

• Lay Plywood Deck

• Apply Synthetic

Underlayment or other

Moisture Barrier Protection

• Install Metal

Install Metal Over Existing

Shingles

• Apply Synthetic

Underlayment or other

Moisture Barrier Protection

• Install Metal

Purlins

Top of Wall Bottom of Wall - Drip Cap

Bottom of Wall - Rat Guard

Side of Window or Door

Bottom of WindowTop of Window or Door

Outside Corner

Inside Corner

Siding Trim Details

Page 7: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 7 of 31

Ridge

Eave

Rake

Rake

1 3

1

2

3

4

5

6

1

3

4

2

Point A

Point C

Ro

of Slo

pe

Ridge

Eave

Rake

Rake

Ro

of Slo

pe

Point A

Point C

1

3

2

Point B

Using two tape measures, locate point C by hookingone tap to a nail at point A and the second tape to anail at point B. Extend the tapes until they cross andmeet at 4’ on the first tape and 5’ on the second tapeand place a temporary nail where 4’ and 5’ meet.

...the 4’ and 5’ measurements arethe 4 and 5 sides of the 3...4...5...triangle.

Establish a line from point A to point B bytemporarily marking each point with a nail.The line must be parallel to the eave and inthis example 3’ long (this is the 3 side of the3...4...5... Triangle). Note:

For larger 3...4...5...Triangles multipleeach side of the triangle by the desiredincrease in size. For example, if the roofpanels are 25’ from eave to ridge,multiply each side by a factor of 6 for an18’...24’...30’...Triangle. Obviously, thecloser the triangle vertical leg length isto matching the panel length, thegreater the squaring accuracy.

Hook a chalk line to point A and pull it inline with point C and mark a chalk line onthe roof deck.

This will be the square reference line forthe panel installation.

3...4...5...Triangle Method

Page 8: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 8 of 31

Eave

Ridge

Rake

Rake

Ro

of Slo

pe

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

4

Squ

are Referen

ce Line

Ridge

Rake

Rake

Eave

1 2

5

1 2

Mark chalk lines parallel with the square referenceline out ahead of panel installation so that panelsquare can be checked as the panels are installed.Suggested line spacing is one foot beyond 3 panelswide or about 10 feet.

Check for square by measuringthe distance from the installedpanel edge to the chalk line atboth the eave and ridge. If themeasurements match, then theinstalled panels are square, if not,adjustments must be made tobring the panels back into square.

3...4...5...Triangle Method

Page 9: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 9 of 31

1 1/4" CORRUGATED

2 1/2" CORRUGATED

Accessories

Touch Up Paint

Pipe Boot(Various sizes, heat treated &

retro fit also available)

Tube Sealant

Corrugated Closure StripWorks for inside/outside

5V-Crimp Outside Closure Strip 5V-Crimp Inside Closure Strip

Double Bead Butyl Tape(7/8” x 3/16” x 40’ or 25’

depending on plant)

Butyl Tape(3/8” x 3/32” x 45’)

Flex-O-Vent Ridge Vent Material1.5” x 3” x 10’

Synthetic RoofUnderlayment

3/8” 7/8”

1”, 1-½” , 2”, 2-½”Hex Head Wood Screw

Metal-to-Wood

1”, 1.25”., 1.5”Hex Head Self Driller

Metal-to-Metal

Emseal Expanding Hip/Valley Closure1” x 1” x 19’ 8”

Pop Rivet (Stainless)(1/8” x 3/16”)

#7/8” Hex HeadLap Stitch ScrewMetal-to-Metal

1” , 1.5”, 2”Pancake HeadWood Screw

1” , 1.5”, 2”Pancake Head

Self Driller

Profile Vent Ridge VentDepth varies x 3” x 25’ (not available for

1.25” Corrugated)

Page 10: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 10 of 31

Ridge Rake Eave Valley

Endwall Sidewall Pitch Break Gambrel

High Side Peak Fascia / Angle Outside Corner Inside Corner

J-Channel Rat Guard Drip Cap Flat Sheet

Typical Trim Profiles (size/design vary by plant)

Std Rake (5V-Crimpor Corrugated)

Flat Rake (SometimesChosen for Corrugated)

Std Sidewall (5V-Crimpor Corrugated)

Flat Sidewall (SometimesChosen for Corrugated)

Page 11: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 11 of 31

5

1

2

3

4

Install the roof substrate according to localbuilding code requirements.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the Fascia trim and butt ends.

Fasten trim with Pancake Screws 2’ apartalong the length of the trim.

Fasten trim with Wood Screws spaced 2’apart along the length of the trim.

Roof Substrate

Moisture Barrier

Fascia Trim

Trim Pancake Screw

Trim Wood Screw

FasciaNumbers indicate suggested trim assembly sequence.

Page 12: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 12 of 31

8

6

7

Moisture Barrier

Trim Pancake Screw

Mini Trim

Roof Substrate

Panel

Optional Tube Sealant

Inside Closure

Install moisture barrier according to the manufacturer’s recommendedprocedure and in compliance with local building code requirements.

Mini EaveNumbers indicate suggested trim assembly sequence.

Fasten trim with Pancake Screws spaced 12” apart alongthe length of the trim.

Install the Mini Eave and lap ends.

Install the roof substrate according to local buildingcode requirements.

Install the panel and overhang the panel aminimum of 1” beyond the Mini Eave edge.See panel squaring method in this manual.

Apply optional Tube Sealant to the top side ofthe Inside Closure.

Place the Inside Closure over the top of theoptional Butyl Tape.

Fasten wood screw at the Inside Closure oneach side of major ribs.

5Optional Butyl TapeInstall continuous along Eave at 1” upfrom face.

3

1

2

4

Panel Wood Screw 9

Page 13: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 13 of 31

8

6

7

Moisture Barrier

Trim Pancake Screw

Eave Trim

Roof Substrate

Panel

Optional Tube Sealant

Inside Closure

Install moisture barrier according to the manufacturer’s recommendedprocedure and in compliance with local building code requirements.

Fasten trim with Pancake Screws spaced 12” apart alongthe length of the trim.

Install the Eave Trim and lap ends.

Install the roof substrate according to local buildingcode requirements.

Install the panel and overhang the panel aminimum of 1” beyond the Eave Trim edge.See panel squaring method in this manual.

Apply optional Tube Sealant to the top side ofthe Inside Closure.

Place the Inside Closure over the top of theoptional Butyl Tape.

Fasten wood screw at the Inside Closure on eachside of major ribs.

5Optional Butyl TapeInstall continuous along eave at 1” upfrom face.

3

1

2

4

Eave EdgeNumbers indicate suggested trim assembly sequence.

Panel Wood Screw 9

Page 14: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 14 of 31

2

35

RakeNumbers indicate suggested trim assembly sequence.

Butyl TapeApply Butyl Tape along the length of the panel.

Moisture Barrier

Roof Substrate

Panel Wood Screw

Panel

Install moisture barrier according to themanufacture’s recommended procedureand in compliance with local buildingcode requirements.

Install the roof substrate according tolocal building code requirements.

Fasten panels to the roof substrate usingWood Screws spaced according to therecommended fastening pattern andfrequency, and in compliance with localbuilding codes.

Install the panel and overhang the panel aminimum of 1” beyond the Eave Trim edge.See panel squaring method in this manual.

4

1

Rake TrimInstall the Rake trim and overlap the ends4”. See lapping diagram in this manual.

Trim Wood ScrewFasten trim with Wood Screws spaced 12”apart along the length of the trim.

Trim Wood ScrewFasten trim with Wood Screwsspaced 12” apart along the lengthof the trim.

6

7

8

Corrugated - Flat Rake Option

Page 15: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 15 of 31

1

2

3

7

Preformed ValleyNumbers indicate suggested trim assembly sequence.

Moisture Barrier

Trim Pancake Screw

Roof Substrate

Install moisture barrier according to themanufacture’s recommended procedure and incompliance with local building code requirements.

Fasten trim with Pancake Screws spaced 12” apart along the lengthof the trim. See lapping diagram fastener pattern in this manual.

Install the roofsubstrate according to localbuilding code requirements.

Preformed Valley Trim

Panel Wood Screw

PanelInstall the panel a minimum of 3” up from thewater diverter at the bottom of the Valley and minimumof 3” down from the top of the Valley. See panel squaring method in this manual.

Install the Valley trim and overlap the ends 4”.See lapping diagram in this manual.

Expanding ClosurePlace Expanding Closure, parallel to each side of theValley center water diverter. Closure should be up from thepanel end about 1”. See panel minimum set back above.

Notes:1. See Valley Lapping - Page 252. See Valley Cutting - Page 26

4”minimum

4

Tube SealantApply Optional Tube Sealant to the topside of the Closure.

65

8

Page 16: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 16 of 31

31 2

5

6

10

8

13

12

15

7

Panel Wood ScrewFasten panels to the roof substrate using Wood Screwsspaced according to the recommended fasteningpattern and frequency, and in compliance with localbuilding codes.

PanelInstall the panel up 1” the transition bend. See panel squaringmethod in this manual.

Optional Tube SealantApply Tube Sealant to the top side of the Inside Closure.

Inside ClosurePlace the Inside Closure over the top of the Butyl Tape.The closure should be about 1” up from the panel end.

Transition TrimPlace the Transition Flashing Trim over theOutside Closure.

Trim Wood ScrewFasten trim withWood Screwsspaced 18” apartalong the length ofthe trim, throughthe rib. See lappingdiagram.

Optional Butyl TapeApply optional Butyl tape across the

width of the panel.

Optional Tube SealantApply optional Tube Sealant to the top side of the

Outside Closure

Outside ClosurePlace the Outside Closure over the top of the optional Butyl Tape.

Optional Butyl TapeApply optional Butyl Tape across the width of the panel.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws

spaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

PanelInstall the panel and overhang the panel a minimum of 1” beyond

the eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacture’s recommended

procedure and in compliance with local building code requirements.

Roof SubstrateInstall the roof substrate according to local building code requirements.

TransitionNumbers indicate suggested trim assembly sequence.

14

4

11

Trim Pancake ScrewFasten trim with Pancake Screws spaced12” apart along the length of the trim. 9

Page 17: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 17 of 31

GambrelNumbers indicate suggested trim assembly sequence.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws spacedaccording to the recommended fastening pattern andfrequency, and in compliance with local building codes.

PanelInstall the panel up 1” the transition bend. See panel squaring methodin this manual.

Optional Tube Sealant

Trim Wood ScrewFasten trim with Wood Screwsspaced 18” apart along thelength of the trim, throughthe rib.

Outside ClosurePlace the Outside Closure over the

top of the Butyl Tape.

Optional Butyl TapeApply opt. Butyl Tape across the width of the panel.

Roof SubstrateInstall the roof substrate according to local

building code requirements.

Apply optional Tube Sealant to the top side of theInside Closure.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws

spaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

Opt. Tube SealantApply optional TubeSealant to the top sideof the Inside Closure.

PanelInstall the panel andoverhang the panel aminimum of 1” beyond theeave edge.

Moisture BarrierInstall moisture barrier according to the

manufacture’s recommended procedure and incompliance with local building code requirements.

Opt. Butyl TapeApply optional Butyl Tapeacross the width of the panel.

Inside ClosurePlace the Inside Closure overthe top of the Butyl Tape up

about 1” from the panel end.

Gambrel TrimPlace the Gambrel Flashing Trimover the Outside Closure.

14

15

Trim Pancake ScrewFasten trim with Pancake Screws spaced 12” apart along the lengthof the trim.

9

4

8

11

1213

1

2

5

6

7

10

3

Page 18: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 18 of 31

12

4

3

6

5

8

9

7

HipNumbers indicate suggested trim assembly sequence.

Trim Wood ScrewFasten trim with Wood Screws spaced 18” apart along the length of the trim,through the rib. See lapping diagram.

Opt. Tube SealantApply optional Tube Sealant to the top side of the Expanding Closure.

Hip TrimPlace the Hip Trim over the Expanding Closure.

Expanding Closure

Opt. Butyl TapeApply optional Butyl Tapeacross width of panel.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws

spaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

PanelInstall the panel and overhang the panel a minimum of 1” beyond

the eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacture’s recommended

procedure and in compliance with local building code requirements.

Roof SubstrateInstall the roof substrate according to local building code requirements.

Place Expanding Closure parallel to eachside of the hip center line so that hip fastenerpenetrates the center of the closure.Closure should be up from the panelend about 1”.

Page 19: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 19 of 31

12

4

3

6

5

8

9

7

RidgeNumbers indicate suggested trim assembly sequence.

Trim Wood ScrewFasten trim with Wood Screws spaced 18” apart along the length of the trim,through the rib. See lapping diagram.

Opt. Tube SealantApply optional Tube Sealant to the top side of the Outside Closure.

Ridge TrimPlace the Ridge Trim over the Outside Closure.

Outside ClosurePlace the Outside Closure over the top of the Butyl Tape.

Opt. Tape SealantApply optional Butyl Tapeacross the width of the panel.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws

spaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

PanelInstall the panel and overhang the panel a minimum of 1” beyond

the eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacture’s recommended

procedure and in compliance with local building code requirements.

Roof SubstrateInstall the roof substrate according to local building code requirements.

Page 20: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 20 of 31

4

1

2

5

6

7

3

LP2 VentedClosure Option

Vented RidgeNumbers indicate suggested trim assembly sequence.

Trim Wood ScrewFasten trim with Wood Screws spaced 18” apart along thelength of the trim, through the rib. See lapping diagramfastener pattern in this manual.

Ridge TrimPlace the Ridge Trim over the Outside Closure.

Vent MaterialApply ridge vent material along the outsideedge of the Ridge Cap Trim.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws

spaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

PanelInstall the panel and overhang the panel a minimum of 1” beyond

the eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacture’s recommended

procedure and in compliance with local building code requirements.

Roof SubstrateInstall the roof substrate according to local building code requirements.

Page 21: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 21 of 31

4

5

High Side PeakNumbers indicate suggested trim assembly sequence.

Opt. Tube Sealant

Trim Wood ScrewFasten trim with Wood Screws spaced 2’ apart along the length of the trim.See lapping diagram.

Apply optional Tube Sealant to the top sideof the Inside Closure.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

Opt. Butyl TapeApply optional Butyl Tape across the width of the panel.

PanelInstall the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacturer’srecommended procedure and in compliance with localbuilding code requirements.

High Side Peak TrimPlace the High Side Peak Trim over the Outside Closure.

Trim Wood ScrewFasten trim with Wood Screws spaced 18” apartalong the length of the trim, through the rib.See lapping diagram.

Outside ClosurePlace the Outside Closure over the tipof the optional Butyl Tape.

Roof SubstrateInstall the roof substrate according tolocal building code requirements.

3

8

9

1

10

6

7

2

Page 22: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 22 of 31

6

1

2

3

5

4

Side WallNumbers indicate suggested trim assembly sequence.

Tube Sealant

Trim Wood ScrewFasten trim with Wood Screws spaced 2’ apartalong the length of the trim. See lapping diagram.

Apply Tube Sealant continuously along the Counter Flashing and generously filling the spacebetween the flashing and the wall. Round or slope the Sealant top so that water will run off.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws spacedaccording to the recommended fastening pattern and frequency,and in compliance with local building codes.

Butyl TapeApply Butyl Tape along thelength of the panel.

PanelInstall the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Moisture BarrierInstall moisture barrier according to the manufacturer'srecommended procedure and in compliance with localbuilding code requirements.

Counter FlashingPosition the Counter Flashing above the Side Wall Trim asshown. Some applications may not need counter flashing.

Side Wall TrimPlace the Side Wall Trim over theButyl tape and overlap the ends 4”.See lapping diagram in this manual.

Roof SubstrateInstall the roof substrate accordingto local building code requirements.

Trim Wood ScrewFasten trim with Wood Screws spaced 2’ apart along the length ofthe trim. If wall material is not wood, fasteners will be by others.

7

8

9

10

Corrugated - Flat Sidewall Option

Page 23: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 23 of 31

6

8

7

4

5

End WallNumbers indicate suggested trim assembly sequence.

Tube Sealant

Trim Wood ScrewFasten trim with Wood Screws spaced 18”apart along the length of the trim,through the rib. See lapping diagram.

Apply Tube Sealant continuously along the Counter Flashing and generously filling the spacebetween the flashing and the wall. Round or slope the Sealant top so that water will run off.

Panel Wood ScrewFasten panels to the roof substrate using Wood Screws spaced according to the recommendedfastening pattern and frequency, and in compliance with local building codes.

Butyl TapeApply Butyl Tape along the length of the panel.

PanelInstall the panel and overhang the panel aminimum of 1” beyond the eave edge. Seepanel squaring method in this manual.

Moisture BarrierInstall moisture barrieraccording to the manufacturer'srecommended procedure.

Counter FlashingPosition the Counter Flashing above the Side Wall Trim as shown.Some applications may not need counter flashing.

End Wall TrimPlace the End Wall Trim over the Butyl tape and overlap the ends 4”.See lapping diagram in this manual.

Roof SubstrateInstall the roof substrate according tolocal building code requirements.

Trim Wood ScrewFasten trim with Wood Screws spaced 2’ apart along the length of the trim.If wall material is not wood, fasteners will be by others.

Tube SealantApply Tube Sealant along the lengthof the Outside Closure.

Outside ClosurePlace the Outside Closure over the top of the Butyl Tape.

1

2

3

9

10

11

12

Page 24: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 24 of 31

4” lap line

Cross section of completedvalley Lap

Cut 4” notch in Valley hem if applicable Cut 4” notch in Valley hem if applicable

Edge ofPanel

Apply two rows of Tube Sealant spaced 2” apart

Edge ofPanel

Edge ofPanel

Edge ofPanel

Valley Lapping

After cutting notches and applying Tube Sealant, slide the up slope valley into thehem groove (if applicable) while lapping over the top of the low slope valley 4”..

Page 25: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 25 of 31

Valley starter cutting diagram with water diverter tabs.

Before folding tabs

2. Bend Line, bend left tab down 90º 3. Bend Line, bend right tab down 90º

After folding tabs

Cut alone dashed lines1.

Valley Cutting at Eave

Page 26: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 26 of 31

Cut pipe flashing along the

pipe diameter marking.

Apply tube sealant to theunderside of the pipeflashing.

Slide pipe flashing

down over the pipe.

Press the pipe flashing into contours of panel configurationand fasten to the panel with wood screws or stitch screws.Apply additional sealant around base if desired.

Pipe Flashing

Page 27: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 27 of 31

CURB DETAIL (Chimneys & Skylights)

Install panels around curb.

STEP 1

Apply End Wall and Side Wall flashings.

STEP 2

Note: Curb framing and underlayment notshown for clarity. Curb must beproperly wrapped with approvedmembrane underlayment prior toinstallation of panels/flashings.

Remove panel material to outside

edges of major rib.

18” min.

Page 28: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 28 of 31

CURB DETAIL (Chimneys & Skylights) (cont.)

Install low wall flashing.

STEP 3

Install Counter Flashing.

STEP 4

18" min.

Fold over

Fold

See detail A-A

Detail A-A typical Remove panel material each side

Set flashing and field trace against curb todetermine trim profile prior to cut.

Page 29: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 29 of 31

CURB DETAIL (Chimneys & Skylights) (cont.)

Install foam closure andprepare for upper panel install.

STEP 5

Fasten upper panel overLow Wall flashing.

STEP 6

Page 30: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

5V-Crimp, 2.5” Corrugated, 1.25” Corrugated - Install GuidePage 30 of 31

PANEL ENDLAP DETAIL (Short Run)

PANEL ENDLAP DETAIL (Long Run)

Use when total panel run is less than 35 feet

Use when total panel run is 35 feet or greater

Page 31: 5V-Crimp, 2.5in Corrugated, 1.25in Corrugated - Install Guide

Metal Roofing, Nationwide

800-728-4010bestbuymetals.com

**Pjm Dboojoh (xbwjoftt po gmbu qbo) jt b obuvsbm pddvssfodf jogmbu qbo nfubm qbofmt boe jt opu b dbvtf gps qbofm sfkfdujpo/