17
3 MeV measurement line U. Raich Linac-4 Beam Coordination Committee 20.10.2009

3 MeV measurement line

  • Upload
    overton

  • View
    56

  • Download
    0

Embed Size (px)

DESCRIPTION

3 MeV measurement line. U. Raich Linac-4 Beam Coordination Committee 20.10.2009. Layout of the line. The BPMS. BPM Simulations. Simulations by J. Tan. BPM Simulations. Simulations: J. Tan. BPM simulations. Simulations: J. Tan. Status of BPMs. - PowerPoint PPT Presentation

Citation preview

Page 1: 3  MeV  measurement line

3 MeV measurement line

U. Raich

Linac-4 Beam Coordination Committee 20.10.2009

Page 2: 3  MeV  measurement line

Layout of the line

CERN, 20.October 2009 Uli Raich BE/BI

Page 3: 3  MeV  measurement line

The BPMS

CERN, 20.October 2009 Uli Raich BE/BI

Page 4: 3  MeV  measurement line

BPM Simulations

CERN, 20.October 2009 Uli Raich BE/BI

Simulations by J. Tan

Page 5: 3  MeV  measurement line

BPM Simulations

CERN, 20.October 2009 Uli Raich BE/BISimulations: J. Tan

Page 6: 3  MeV  measurement line

BPM simulations

CERN, 20.October 2009 Uli Raich BE/BI

Simulations: J. Tan

Page 7: 3  MeV  measurement line

Status of BPMs• Mechanical drawing available but not approved yet• Simulations being done to determine resolution

– Position– Intensity– Phase

• Consequences of debunching being studied using Giulia’s optics simulations

• 3 devices + electronics foreseen for June 2010• 3 MeV measurement line will be used as test bench for

all Linac-4 BPMs

CERN, 20.October 2009 Uli Raich BE/BI

Page 8: 3  MeV  measurement line

Transformer

CERN, 20.October 2009 Uli Raich BE/BI

Page 9: 3  MeV  measurement line

Status of Transformer• Drawings ready for approval• Workshop is informed• The ceramics are ordered (has longest delay) and will be delivered

by March 2010• 2 Devices ready by June 2010• Will use same electronics as transformers at source and in LEBT• 3 MeV measurement line can be used to test new (and cheaper)

electronics to be used for Linac-4• EMC tests done with pulsing Quadrupole next to the transformer

CERN, 20.October 2009 Uli Raich BE/BI

Page 10: 3  MeV  measurement line

BSM (Feschenko Monitor)

CERN, 20.October 2009 Uli Raich BE/BI

Page 11: 3  MeV  measurement line

Status of BSM• Preliminary drawing available• Feschenko and collaborator will come to CERN

2.11 – 6.11 to discuss details• First inspection by Didier does not show any mechanical

incompatibilities• Electronics and software specifications to be formalized• Device should be ready by the end of 2010

CERN, 20.October 2009 Uli Raich BE/BI

Page 12: 3  MeV  measurement line

Emittance Meter / SEMGrid

CERN, 20.October 2009 Uli Raich BE/BI

Page 13: 3  MeV  measurement line

Status of Emittance Meter / SEMGrid• Emittance meter is currently installed on 3 MeV source• Consists of slit and grid in 2 tanks

– Grid to be re-used– Slit about to be re-designed for higher than source energy (up to

12 MeV)Simulations have been made

– Electronics ready– LabView program ready for testing in beam

• Size problems for integration into the tunnel (sticks into transport zone)

CERN, 20.October 2009 Uli Raich BE/BI

Page 14: 3  MeV  measurement line

SEMGrid in spectrometer line• Not yet clear if in/out mechanism is needed• In/out mechanisms do exist• Integration with dump to be studied• 1 plane of 0.5mm wire distance• Electronics solution is available but a new and cheaper

one may be studied• Software to be specified and written

CERN, 20.October 2009 Uli Raich BE/BI

Page 15: 3  MeV  measurement line

Halo Monitor

CERN, 20.October 2009 Uli Raich BE/BI

Page 16: 3  MeV  measurement line

Halo Monitor• Device developed by M. Hori• Device is ready and was tested in beam• Commissioning in 3 MeV to be done• Take-over of responsibility for this device by CERN staff

CERN, 20.October 2009 Uli Raich BE/BI

Page 17: 3  MeV  measurement line

CERN, 20.October 2009 Uli Raich BE/BI

Instruments in the measurement line• Transformers

– 2 transformers in the straight section of the line– Design done, ready for approval

• Halo Monitor– finished

• Emittance Meter box – hor/ver slit (on 1 movement) – hor/ver SEMGrids on 2 movements– will use the SEMGrids, movement and tank from source emittance meter– new, high energy slit under design

• SEMGrid– retractable hor (possibly on movement)

• BPMs– preliminary design done

• BSM– preliminary design received from INR