Innovation Pipeline Subsystem Enables Increased Innovation Speed & Decreased Risk

By Creating Alignment with Strategy, Departments & Teams

1

Page 2: 3   ie 2015 innovation pipeline

2-1

Page 3: 3   ie 2015 innovation pipeline

An Innovation Engineering implementation story with an Innovation Pipeline focus

2-2

Page 4: 3   ie 2015 innovation pipeline

AcmePowerCo, Inc.

An Innovation Engineering implementation story with an Innovation Pipeline focus

2-3

Page 5: 3   ie 2015 innovation pipeline

AcmePowerCo, Inc.

An Innovation Engineering implementation story with an Innovation Pipeline focus

fictitious of course!

2-4

Page 6: 3   ie 2015 innovation pipeline

ALERT!

3-1

Page 7: 3   ie 2015 innovation pipeline

ALERT!This is not THE WAY…

It’s A WAY!

3-2

Page 8: 3   ie 2015 innovation pipeline

AcmePowerCo Background

4-1

Page 9: 3   ie 2015 innovation pipeline

AcmePowerCo was established 75 years ago with a patented technology that changed the game in their industry. They sell to DoD, other government agencies, and a number multi-national industrial companies. After a few decades of success, they fell into the trap of just competing on price in response to RFPs…

AcmePowerCo Background

4-2

Page 10: 3   ie 2015 innovation pipeline

AcmePowerCo was established 75 years ago with a patented technology that changed the game in their industry. They sell to DoD, other government agencies, and a number multi-national industrial companies. After a few decades of success, they fell into the trap of just competing on price in response to RFPs…

AcmePowerCo Background

AND Cost Cutting

4-3

Page 11: 3   ie 2015 innovation pipeline

AcmePowerCo was established 75 years ago with a patented technology that changed the game in their industry. They sell to DoD, other government agencies, and a number multi-national industrial companies. After a few decades of success, they fell into the trap of just competing on price in response to RFPs…

AcmePowerCo Background

Acme’s new CEO recognized that the cost-focused approach was not going to help the company meet the investor’s growth targets.

AND Cost Cutting

4-4

Page 12: 3   ie 2015 innovation pipeline

AcmePowerCo was established 75 years ago with a patented technology that changed the game in their industry. They sell to DoD, other government agencies, and a number multi-national industrial companies. After a few decades of success, they fell into the trap of just competing on price in response to RFPs…

AcmePowerCo Background

Something had to be done…

Acme’s new CEO recognized that the cost-focused approach was not going to help the company meet the investor’s growth targets.

AND Cost Cutting

4-5

Page 13: 3   ie 2015 innovation pipeline

AcmePowerCo The Situation

5-1

Page 14: 3   ie 2015 innovation pipeline

AcmePowerCo The Situation

About a year and a half ago, the CEO and his leadership team decided to implement Innovation Engineering by starting with Division X, where the GM was excited about being the first to give IE a try. By systematically executing a start-up plan to accelerate implementation, success came fast.

5-2

Page 15: 3   ie 2015 innovation pipeline

AcmePowerCo The Situation

About a year and a half ago, the CEO and his leadership team decided to implement Innovation Engineering by starting with Division X, where the GM was excited about being the first to give IE a try. By systematically executing a start-up plan to accelerate implementation, success came fast.

This led to a decision to expand and kick off IE in Division Y. The Division Y GM was excited about following on Division X’s success, but she and her team were inexperienced with IE and needed help.

5-3

Page 16: 3   ie 2015 innovation pipeline

AcmePowerCo My Role

6-1

Page 17: 3   ie 2015 innovation pipeline

AcmePowerCo My Role

I’m Jane, and I was the first certified IE Black Belt at Acme and have had the most experience using the system - conducting training, running sessions, leading and coaching projects…

6-2

Page 18: 3   ie 2015 innovation pipeline

AcmePowerCo My Role

I’m Jane, and I was the first certified IE Black Belt at Acme and have had the most experience using the system - conducting training, running sessions, leading and coaching projects…

The CEO tasked me with leading a 6-month effort to get Division Y started with IE.

6-3

Page 19: 3   ie 2015 innovation pipeline

AcmePowerCo My Role

I’m Jane, and I was the first certified IE Black Belt at Acme and have had the most experience using the system - conducting training, running sessions, leading and coaching projects…

The CEO tasked me with leading a 6-month effort to get Division Y started with IE.

I’d “Watched One”, “Done One”, and it was time to “Teach One.”

6-4

Page 20: 3   ie 2015 innovation pipeline

AcmePowerCo My Role

I’m Jane, and I was the first certified IE Black Belt at Acme and have had the most experience using the system - conducting training, running sessions, leading and coaching projects…

The CEO tasked me with leading a 6-month effort to get Division Y started with IE.

I’d “Watched One”, “Done One”, and it was time to “Teach One.”

What did I do?

6-5

Page 21: 3   ie 2015 innovation pipeline

First Step

Prepared for my first meeting with the Division Y GM

7-1

Page 22: 3   ie 2015 innovation pipeline

First Step

Prepared for my first meeting with the Division Y GM

7-2

Page 23: 3   ie 2015 innovation pipeline

Reviewed the latest IE Black Belt Operations Manual in Labs/Tools to brush up on the Guides that might apply to the 6-month start-up.

✦ IE Strategy Activation ✦ IE Project Accelerator ✦ IE Create Session

First Step

Prepared for my first meeting with the Division Y GM

7-3

Page 24: 3   ie 2015 innovation pipeline

Reviewed the Start-Up Plan we used when kicking off IE in my Division to get ideas about options for Division Y.

Next

Prepared for my first meeting with the Division Y GM

8-1

Page 25: 3   ie 2015 innovation pipeline

Reviewed the Start-Up Plan we used when kicking off IE in my Division to get ideas about options for Division Y.

Next

Prepared for my first meeting with the Division Y GM

8-2

Page 26: 3   ie 2015 innovation pipeline

Determined how much the GM knew about IE and AcmePowerCo’s progress, and provided a brief overview of both, including showing a few videos from the Labs Video Library.

Met with Division Y GM

9-1

Page 27: 3   ie 2015 innovation pipeline

Determined how much the GM knew about IE and AcmePowerCo’s progress, and provided a brief overview of both, including showing a few videos from the Labs Video Library.

Met with Division Y GM

9-2

Page 28: 3   ie 2015 innovation pipeline

Went over the Planning Meeting Agendas, Timelines, Preparation Checklists, etc., from the Guides with the GM to explain what we need to do prior to sessions.

Met with Division Y GM

10-1

Page 29: 3   ie 2015 innovation pipeline

Went over the Planning Meeting Agendas, Timelines, Preparation Checklists, etc., from the Guides with the GM to explain what we need to do prior to sessions.

Met with Division Y GM

10-2

Page 30: 3   ie 2015 innovation pipeline

Went over the Planning Meeting Agendas, Timelines, Preparation Checklists, etc., from the Guides with the GM to explain what we need to do prior to sessions.

Met with Division Y GM

10-3

Page 31: 3   ie 2015 innovation pipeline

Went over the Planning Meeting Agendas, Timelines, Preparation Checklists, etc., from the Guides with the GM to explain what we need to do prior to sessions.

Met with Division Y GM

10-4

Page 32: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

11-1

Page 33: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

11-2

Page 34: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

11-3

Page 35: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

Strategic Alignment

11-4

Page 36: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

Very ImportantAccelerator

Session 3.5 Days

LEAP & CORE

BasicCREATE Session

.5 to 1.5 DaysCORE

Yellow Card Session Options

Strategic Alignment

11-5

Page 37: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

Very ImportantAccelerator

Session 3.5 Days

LEAP & CORE

BasicCREATE Session

.5 to 1.5 DaysCORE

Yellow Card Session Options

Accelerates the creation, communication, & commercialization of ideas to address a VIO or

VIS, accomplishing months of work in days.

Strategic Alignment

11-6

Page 38: 3   ie 2015 innovation pipeline

Determined which path makes sense.

Met with Division Y GM

Blue Card Session Options

Very ImportantStrategy

Activation 1.5 Days

BasicInformal Meeting

.5 Day

Translates your vision & strategy into motivating & actionable project missions

to be activated by your team.

Very ImportantAccelerator

Session 3.5 Days

LEAP & CORE

BasicCREATE Session

.5 to 1.5 DaysCORE

Yellow Card Session Options

Accelerates the creation, communication, & commercialization of ideas to address a VIO or

VIS, accomplishing months of work in days.

Very ImportantReinvent Session

.5 to 1.5 Days

BasicBlitz

Session 1 to 3 Hours

Problem Solving Session Options

PURPOSE: To Overcome Project

Death Threats/Milestones Without Compromising

Project Mission or Meaningful Uniqueness

Uses stimulus & diversity to tackle a stubborn Death Threat for an existing

innovation project, accelerating progress toward a decision.

Strategic Alignment

11-7

Page 39: 3   ie 2015 innovation pipeline

DRAFT 6-Month Start-Up Plan & Review/Edit with GM

12

Page 40: 3   ie 2015 innovation pipeline

13

Page 41: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

14-1

Page 42: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM

14-2

Page 43: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM • Senior leaders who help set company strategy and act as Management Coaches for

innovation project teams, providing honest and helpful guidance on death threats, resources, etc.

14-3

Page 44: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM • Senior leaders who help set company strategy and act as Management Coaches for

innovation project teams, providing honest and helpful guidance on death threats, resources, etc.

• Will participate in Strategy Activation.

14-4

Page 45: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM • Senior leaders who help set company strategy and act as Management Coaches for

innovation project teams, providing honest and helpful guidance on death threats, resources, etc.

• Will participate in Strategy Activation.

IE Black Belts - 4 volunteers

14-5

Page 46: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM • Senior leaders who help set company strategy and act as Management Coaches for

innovation project teams, providing honest and helpful guidance on death threats, resources, etc.

• Will participate in Strategy Activation.

IE Black Belts - 4 volunteers• Change agents who train other employees on IE, facilitate sessions, and act as

Process Coaches to help innovation project teams maintain process discipline and keep focused on faster and cheaper.

14-6

Page 47: 3   ie 2015 innovation pipeline

Selected the IE Blue Belts & IE Black Belts to go to Innovation College.

Education

IE Blue Belts - 4 volunteers, including GM • Senior leaders who help set company strategy and act as Management Coaches for

innovation project teams, providing honest and helpful guidance on death threats, resources, etc.

• Will participate in Strategy Activation.

IE Black Belts - 4 volunteers• Change agents who train other employees on IE, facilitate sessions, and act as

Process Coaches to help innovation project teams maintain process discipline and keep focused on faster and cheaper.

• Will conduct mining, present and coach teams during Strategy Activation & Accelerator, coach resulting projects, conduct Problem Solving Sessions, etc.

14-7

Page 48: 3   ie 2015 innovation pipeline

Innovation College

15-1

Page 49: 3   ie 2015 innovation pipeline

Innovation College

Digital 100+

Videos/Quizzes to a grade of 100%

15-2

Page 50: 3   ie 2015 innovation pipeline

Innovation College

Digital 100+

Videos/Quizzes to a grade of 100%

Lab

5 Days All Assignments to a grade of 100%

15-3

Page 51: 3   ie 2015 innovation pipeline

Innovation College

Digital 100+

Videos/Quizzes to a grade of 100%

Lab

5 Days All Assignments to a grade of 100%

IE Blue Belts & Black Belts

15-4

Page 52: 3   ie 2015 innovation pipeline

Innovation College

Digital 100+

Videos/Quizzes to a grade of 100%

Lab

5 Days All Assignments to a grade of 100%

Application

16 Application Assignments where you apply to your work

with a grade of 100%

IE Black Belts Only(If diligent, certified in about 6 months)

IE Blue Belts & Black Belts

15-5

Page 53: 3   ie 2015 innovation pipeline

Innovation College

Digital 100+

Videos/Quizzes to a grade of 100%

Lab

5 Days All Assignments to a grade of 100%

Experience

As Project Leader on Define/Discover/Develop

project(s) for your company

Application

16 Application Assignments where you apply to your work

with a grade of 100%

IE Black Belts Only(If diligent, certified in about 6 months)

IE Blue Belts & Black Belts

15-6

Page 54: 3   ie 2015 innovation pipeline

Completed/assigned the items on the IE Strategy Activation Checklist, explaining steps, logic, and tips to IE Black Belt Candidates (“Teach One”)

IE Strategy Activation Planning

16-1

Page 55: 3   ie 2015 innovation pipeline

Completed/assigned the items on the IE Strategy Activation Checklist, explaining steps, logic, and tips to IE Black Belt Candidates (“Teach One”)

IE Strategy Activation Planning

16-2

Page 56: 3   ie 2015 innovation pipeline

Set Up a Session Page for Strategy Activation SessionHad one of the new IE Black Belt candidates set up the page in Labs.

17-1

Page 57: 3   ie 2015 innovation pipeline

Set Up a Session Page for Strategy Activation SessionHad one of the new IE Black Belt candidates set up the page in Labs.

17-2

Page 58: 3   ie 2015 innovation pipeline

Set Up a Session Page for Strategy Activation SessionHad one of the new IE Black Belt candidates set up the page in Labs.

17-3

Page 59: 3   ie 2015 innovation pipeline

Set Up a Session Page for Strategy Activation SessionHad one of the new IE Black Belt candidates set up the page in Labs.

17-4

Page 60: 3   ie 2015 innovation pipeline

Invited the TeamThe Black Belt candidate who set up the page invited the team selected by the GM - 16 Leaders.

18-1

Page 61: 3   ie 2015 innovation pipeline

Invited the TeamThe Black Belt candidate who set up the page invited the team selected by the GM - 16 Leaders.

18-2

Page 62: 3   ie 2015 innovation pipeline

Invited the TeamThe Black Belt candidate who set up the page invited the team selected by the GM - 16 Leaders.

18-3

Page 63: 3   ie 2015 innovation pipeline

Added a Stimulus Mining Request for TeamThrough the session page, the team was invited to post Stimulus Mining in an Idea Request linked in Collaboration Cafe.

19-1

Page 64: 3   ie 2015 innovation pipeline

Added a Stimulus Mining Request for TeamThrough the session page, the team was invited to post Stimulus Mining in an Idea Request linked in Collaboration Cafe.

19-2

Page 65: 3   ie 2015 innovation pipeline

Added a Stimulus Mining Request for TeamThrough the session page, the team was invited to post Stimulus Mining in an Idea Request linked in Collaboration Cafe.

19-3

Page 66: 3   ie 2015 innovation pipeline

Added a Stimulus Mining Request for TeamThrough the session page, the team was invited to post Stimulus Mining in an Idea Request linked in Collaboration Cafe.

19-4

Page 67: 3   ie 2015 innovation pipeline

Immersion - Strategy Activation

The Black Belt candidates conducted immersive Stimulus Mining and built Spark Decks.

20-1

Page 68: 3   ie 2015 innovation pipeline

Immersion - Strategy Activation

The Black Belt candidates conducted immersive Stimulus Mining and built Spark Decks.

MARKET Mining

INSIGHT Mining

Classic Mining

20-2

Page 69: 3   ie 2015 innovation pipeline

Immersion - Strategy Activation

The Black Belt candidates conducted immersive Stimulus Mining and built Spark Decks.

PATENT Mining

WISDOM Mining

Tech Mining

MARKET Mining

INSIGHT Mining

Classic Mining

20-3

Page 70: 3   ie 2015 innovation pipeline

Immersion - Strategy Activation

The Black Belt candidates conducted immersive Stimulus Mining and built Spark Decks.

PATENT Mining

WISDOM Mining

Tech Mining

MARKET Mining

INSIGHT Mining

Classic Mining

FUTURE Mining

UNRELATED Mining

Stretch Mining

20-4

Page 71: 3   ie 2015 innovation pipeline

Innovation Culture Assessment - Strategy ActivationThe Strategy Activation participants completed the Innovation Culture Assessment, which assessed the current perceptions of innovation across the team. We used the results to help us adapt how we would facilitate the session.

21-1

Page 72: 3   ie 2015 innovation pipeline

Innovation Culture Assessment - Strategy ActivationThe Strategy Activation participants completed the Innovation Culture Assessment, which assessed the current perceptions of innovation across the team. We used the results to help us adapt how we would facilitate the session.

21-2

Page 73: 3   ie 2015 innovation pipeline

Innovation Culture Assessment - Strategy ActivationThe Strategy Activation participants completed the Innovation Culture Assessment, which assessed the current perceptions of innovation across the team. We used the results to help us adapt how we would facilitate the session.

21-3

Page 74: 3   ie 2015 innovation pipeline

IE Strategy Activation Session

22-1

Page 75: 3   ie 2015 innovation pipeline

IE Strategy Activation Session

DAY 1 • The IE Black Belt candidates presented Spark Decks and

facilitated group exercises. • 80 Blue Cards were created, each addressing a VIO or VIS.

22-2

Page 76: 3   ie 2015 innovation pipeline

IE Strategy Activation Session

DAY 1 • The IE Black Belt candidates presented Spark Decks and

facilitated group exercises. • 80 Blue Cards were created, each addressing a VIO or VIS.

DAY 2 • The team was encouraged to confront reality and think

deeper while reviewing all the Blue Cards created on Day 1. • Dividing into smaller groups, each mini team selected their

favorite 1 or 2 Blue Cards and refined for presentation. • Each team presented their top Blue Cards (8 in all) along with

quick research on the size of the opportunity area.

22-3

Page 77: 3   ie 2015 innovation pipeline

IE Strategy Activation Game Plan Meeting

• A few days later, the IE Black Belt candidates and I met with the GM and her core leadership team to select the Blue Card to activate in the IE Project Accelerator

23-1

Page 78: 3   ie 2015 innovation pipeline

IE Strategy Activation Game Plan Meeting

• A few days later, the IE Black Belt candidates and I met with the GM and her core leadership team to select the Blue Card to activate in the IE Project Accelerator

• She and her team selected and refined a Blue Card requesting VIO Leap Ideas.

23-2

Page 79: 3   ie 2015 innovation pipeline

Enter the Blue Card into LabsOne of the IE Black Belts entered the selected Blue Card into Labs.

24-1

Page 80: 3   ie 2015 innovation pipeline

Enter the Blue Card into LabsOne of the IE Black Belts entered the selected Blue Card into Labs.

24-2

Page 81: 3   ie 2015 innovation pipeline

Enter the Blue Card into LabsOne of the IE Black Belts entered the selected Blue Card into Labs.

24-3

Page 82: 3   ie 2015 innovation pipeline

IE Project Accelerator Process Overview

25-1

Page 83: 3   ie 2015 innovation pipeline

IE Project Accelerator Process Overview1. Accelerator PREP

Define Mission & prepare team for the experience ahead

Strategy Activation • Project Narrative• Mission• Strategic Exclusions• Tactical Constraints• Exploration Areas (3)

Deep Immersion & Synthesis • Customer Problems• Technology• Create Sessions…

Culture Assessment

25-2

Page 84: 3   ie 2015 innovation pipeline

2. Accelerator SESSION Rapid Cycles of Create, Feedback, Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

IE Project Accelerator Process Overview1. Accelerator PREP

Define Mission & prepare team for the experience ahead

Strategy Activation • Project Narrative• Mission• Strategic Exclusions• Tactical Constraints• Exploration Areas (3)

Deep Immersion & Synthesis • Customer Problems• Technology• Create Sessions…

Culture Assessment

25-3

Page 85: 3   ie 2015 innovation pipeline

3. Project COACHING 8 weeks of rapid Cycles to address Death Threats, Build Confidence and get closer to a Development Decision

FOCUSED ON Death Threats… • Market RISK• Technology RISK• Organizational RISK

2. Accelerator SESSION Rapid Cycles of Create, Feedback, Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

IE Project Accelerator Process Overview1. Accelerator PREP

Define Mission & prepare team for the experience ahead

Strategy Activation • Project Narrative• Mission• Strategic Exclusions• Tactical Constraints• Exploration Areas (3)

Deep Immersion & Synthesis • Customer Problems• Technology• Create Sessions…

Culture Assessment

25-4

Page 86: 3   ie 2015 innovation pipeline

3. Project COACHING 8 weeks of rapid Cycles to address Death Threats, Build Confidence and get closer to a Development Decision

FOCUSED ON Death Threats… • Market RISK• Technology RISK• Organizational RISK

2. Accelerator SESSION Rapid Cycles of Create, Feedback, Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

IE Project Accelerator Process Overview

Participants are a diverse group of people close to the work. Leaders of the Projects accelerated after the session will come from this group. Typically, less than 30% of participants in the Accelerator were in the Strategy Activation Session.

1. Accelerator PREP Define Mission & prepare team for the experience ahead

Strategy Activation • Project Narrative• Mission• Strategic Exclusions• Tactical Constraints• Exploration Areas (3)

Deep Immersion & Synthesis • Customer Problems• Technology• Create Sessions…

Culture Assessment

25-5

Page 87: 3   ie 2015 innovation pipeline

Set Up a Session Page for Accelerator SessionOne of the new IE Black Belt candidates set up the Session page in Labs.

26-1

Page 88: 3   ie 2015 innovation pipeline

Set Up a Session Page for Accelerator SessionOne of the new IE Black Belt candidates set up the Session page in Labs.

26-2

Page 89: 3   ie 2015 innovation pipeline

Set Up a Session Page for Accelerator SessionOne of the new IE Black Belt candidates set up the Session page in Labs.

AND attached it to the Blue Card.

26-3

Page 90: 3   ie 2015 innovation pipeline

IE Project Accelerator Planning Meeting

• The IE Black Belt candidates and I met with the GM and her core leadership team.

27-1

Page 91: 3   ie 2015 innovation pipeline

IE Project Accelerator Planning Meeting

• The IE Black Belt candidates and I met with the GM and her core leadership team.

• With all having some experience, we were efficient at going through the Prep Checklist!

27-2

Page 92: 3   ie 2015 innovation pipeline

IE WorkshopsOne of the IE Black Belt candidates set up IE Workshops for the Accelerator Team of 18 volunteers.

28-1

Page 93: 3   ie 2015 innovation pipeline

IE WorkshopsOne of the IE Black Belt candidates set up IE Workshops for the Accelerator Team of 18 volunteers.

28-2

Page 94: 3   ie 2015 innovation pipeline

IE WorkshopsOne of the IE Black Belt candidates set up IE Workshops for the Accelerator Team of 18 volunteers.

28-3

Page 95: 3   ie 2015 innovation pipeline

IE WorkshopsWe followed the step-by-step Guide for Workshops in the IE Black Belt Operations Manual to run the sessions:

29-1

Page 96: 3   ie 2015 innovation pipeline

IE WorkshopsWe followed the step-by-step Guide for Workshops in the IE Black Belt Operations Manual to run the sessions:

29-2

Page 97: 3   ie 2015 innovation pipeline

IE WorkshopsWe followed the step-by-step Guide for Workshops in the IE Black Belt Operations Manual to run the sessions:

• Create, Communicate, & Commercialize Workshop - participants learned the basics of IE and applied what they learned using team-based interactive case study exercises.

29-3

Page 98: 3   ie 2015 innovation pipeline

IE WorkshopsWe followed the step-by-step Guide for Workshops in the IE Black Belt Operations Manual to run the sessions:

• Create, Communicate, & Commercialize Workshop - participants learned the basics of IE and applied what they learned using team-based interactive case study exercises.

• Stimulus Mining Workshop - provided an overview of the 5 types of Stimulus Mining, and participants conducted mining and posted to the Accelerator Idea Request.

29-4

Page 99: 3   ie 2015 innovation pipeline

Immersion - Project AcceleratorThe Black Belt candidates conducted immersive Stimulus Mining, completed Merwyn Rapid Research - Insight Mining, & built Spark Decks.

30-1

Page 100: 3   ie 2015 innovation pipeline

Immersion - Project AcceleratorThe Black Belt candidates conducted immersive Stimulus Mining, completed Merwyn Rapid Research - Insight Mining, & built Spark Decks.

PATENT Mining

WISDOM Mining

Tech Mining

MARKET Mining

INSIGHT Mining

Classic Mining

FUTURE Mining

UNRELATED Mining

Stretch Mining

30-2

Page 101: 3   ie 2015 innovation pipeline

Immersion - Project AcceleratorThe Black Belt candidates conducted immersive Stimulus Mining, completed Merwyn Rapid Research - Insight Mining, & built Spark Decks.

PATENT Mining

WISDOM Mining

Tech Mining

MARKET Mining

INSIGHT Mining

Classic Mining

FUTURE Mining

UNRELATED Mining

Stretch Mining

im Problem Surveys

30-3

Page 102: 3   ie 2015 innovation pipeline

Immersion - Project AcceleratorThe Black Belt candidates conducted immersive Stimulus Mining, completed Merwyn Rapid Research - Insight Mining, & built Spark Decks.

PATENT Mining

WISDOM Mining

Tech Mining

MARKET Mining

INSIGHT Mining

Classic Mining

FUTURE Mining

UNRELATED Mining

Stretch Mining

im Problem Surveys

30-4

Page 103: 3   ie 2015 innovation pipeline

Innovation Culture Assessment - Project AcceleratorThe Accelerator participants completed the Innovation Culture Assessment. Just like with the Strategy Activations Session, we used the results to help us adapt how we facilitated the session.

31-1

Page 104: 3   ie 2015 innovation pipeline

Innovation Culture Assessment - Project AcceleratorThe Accelerator participants completed the Innovation Culture Assessment. Just like with the Strategy Activations Session, we used the results to help us adapt how we facilitated the session.

31-2

Page 105: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionI was the “conductor” for the session, while the IE Black Belt candidates presented Spark Decks, facilitated group exercises, and coached teams.

32-1

Page 106: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionI was the “conductor” for the session, while the IE Black Belt candidates presented Spark Decks, facilitated group exercises, and coached teams.

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

32-2

Page 107: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionI was the “conductor” for the session, while the IE Black Belt candidates presented Spark Decks, facilitated group exercises, and coached teams.

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 1: Mind Expansion - The team created 183 ideas!

32-3

Page 108: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionI was the “conductor” for the session, while the IE Black Belt candidates presented Spark Decks, facilitated group exercises, and coached teams.

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

32-4

Page 109: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionI was the “conductor” for the session, while the IE Black Belt candidates presented Spark Decks, facilitated group exercises, and coached teams.

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

For market testing, we used: • InterAct® Customer Feedback Session • Merwyn Rapid Research:

✦ Idea Coach ✦ Idea Doubling ✦ Idea Scan ✦ Insight Mining

32-5

Page 110: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionDuring the session, the IE Black Belt candidates coached the teams though entering their Yellow Cards in Labs.

33-1

Page 111: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionDuring the session, the IE Black Belt candidates coached the teams though entering their Yellow Cards in Labs.

33-2

Page 112: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionDuring the session, the IE Black Belt candidates coached the teams though entering their Yellow Cards in Labs.

33-3

Page 113: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionThe IE Black Belt candidates also coached the teams though rapid cycles of learning.

34-1

Page 114: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionThe IE Black Belt candidates also coached the teams though rapid cycles of learning.

34-2

Page 115: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionThe IE Black Belt candidates also coached the teams though rapid cycles of learning.

34-3

Page 116: 3   ie 2015 innovation pipeline

IE Project Accelerator SessionThe IE Black Belt candidates also coached the teams though rapid cycles of learning.

Not this week, LAST HOUR!

1 to 2 Hour Learning Cycles!

34-4

Page 117: 3   ie 2015 innovation pipeline

IE Project Accelerator Session

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

35-1

Page 118: 3   ie 2015 innovation pipeline

IE Project Accelerator Session

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 3: Problem Solving

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

35-2

Page 119: 3   ie 2015 innovation pipeline

IE Project Accelerator Session

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 3: Problem Solving

Day 4: Refined & Presented - We had volunteers to lead 9 projects!

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

35-3

Page 120: 3   ie 2015 innovation pipeline

IE Project Accelerator Session

The Accelerator SESSION Rapid Cycles of Create, Feedback,

Recreate, Encourage DEEPER THINKING…

All Projects Customized Work Often Includes…

Research, Cost Estimating,Technical Feasibility,

Works/Looks Like Prototypes, Problem Solving

6 +/- Patentable Inventions

InterACTDay 1

Day 2 Day 3 Day 4

Day 3: Problem Solving

Day 4: Refined & Presented - We had volunteers to lead 9 projects!

Day 1: Mind Expansion - The team created 183 ideas!

Day 2: Confronted Reality - Prototyping and business models

For market testing, we used: • InterAct® Customer Feedback Session • Merwyn Rapid Research

35-4

Page 121: 3   ie 2015 innovation pipeline

IE Project Accelerator Game Plan Meeting

36-1

Page 122: 3   ie 2015 innovation pipeline

IE Project Accelerator Game Plan Meeting

• The next day, the IE Black Belt candidates and I met with the GM and her core leadership team who selected 4 ideas to accelerate FIRST.

36-2

Page 123: 3   ie 2015 innovation pipeline

IE Project Accelerator Game Plan Meeting

• IE Blue Belt Management Coaches and IE Black Belt were selected for each Project.

• The next day, the IE Black Belt candidates and I met with the GM and her core leadership team who selected 4 ideas to accelerate FIRST.

36-3

Page 124: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Project Leader Check In

37-1

Page 125: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Project Leader Check In• The IE Black Belt candidates met with their Project Leaders and scheduled the Project

Kickoff Meeting and the regular Weekly Project Update Meetings - starting the next week!

37-2

Page 126: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Project Leader Check In• The IE Black Belt candidates met with their Project Leaders and scheduled the Project

Kickoff Meeting and the regular Weekly Project Update Meetings - starting the next week!

• They showed the Leaders the “How To” video on Project KickOff Meetings and Weekly Project Update Meetings and directed them to the Weekly Project Update Meeting Guide.

37-3

Page 127: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Project Leader Check In• The IE Black Belt candidates met with their Project Leaders and scheduled the Project

Kickoff Meeting and the regular Weekly Project Update Meetings - starting the next week!

• They showed the Leaders the “How To” video on Project KickOff Meetings and Weekly Project Update Meetings and directed them to the Weekly Project Update Meeting Guide.

37-4

Page 128: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Project Leader Check In• The IE Black Belt candidates met with their Project Leaders and scheduled the Project

Kickoff Meeting and the regular Weekly Project Update Meetings - starting the next week!

• They showed the Leaders the “How To” video on Project KickOff Meetings and Weekly Project Update Meetings and directed them to the Weekly Project Update Meeting Guide.

30 Minutes MAX!

37-5

Page 129: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Management Coach Check-In

38-1

Page 130: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Management Coach Check-In

The IE Black Belt candidates met with the Management Coach and selected the AcmePowerCo VIO LEAP Checklist, which we had already customized when getting started in my Division by cloning and editing the VIO LEAP Best Practice Master Checklist.

38-2

Page 131: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Management Coach Check-In

The IE Black Belt candidates met with the Management Coach and selected the AcmePowerCo VIO LEAP Checklist, which we had already customized when getting started in my Division by cloning and editing the VIO LEAP Best Practice Master Checklist.

38-3

Page 132: 3   ie 2015 innovation pipeline

IE Project Kickoffs - Management Coach Check-In

Change AcmePowerCo

AcmePowerCo

39

Page 133: 3   ie 2015 innovation pipeline

AcmePowerCo Current Status

40-1

Page 134: 3   ie 2015 innovation pipeline

AcmePowerCo Current Status

This is where I am now, and I look forward to helping this Division Rock and Roll! I have to go coach an IE Black Belt candidate through their first Project Kickoff Meeting, so Lydia’s going to fill you on what comes next.

40-2

Page 135: 3   ie 2015 innovation pipeline

AcmePowerCo Current Status

This is where I am now, and I look forward to helping this Division Rock and Roll! I have to go coach an IE Black Belt candidate through their first Project Kickoff Meeting, so Lydia’s going to fill you on what comes next.

Thanks for listening!

40-3

Page 136: 3   ie 2015 innovation pipeline

AcmePowerCo Current Status

This is where I am now, and I look forward to helping this Division Rock and Roll! I have to go coach an IE Black Belt candidate through their first Project Kickoff Meeting, so Lydia’s going to fill you on what comes next.

Thanks for listening!

Jane

40-4

Page 137: 3   ie 2015 innovation pipeline

AcmePowerCo Current Status

This is where I am now, and I look forward to helping this Division Rock and Roll! I have to go coach an IE Black Belt candidate through their first Project Kickoff Meeting, so Lydia’s going to fill you on what comes next.

Thanks for listening!

Jane Stay tuned for“The rest of the story”…

40-5

Page 138: 3   ie 2015 innovation pipeline

The Innovation completely

DevelopDiscover DeliverDefine

41-1

Page 139: 3   ie 2015 innovation pipeline

The Innovation completely

Concept CardFill in all that you can - start from front side or back side

Meaningfully Unique PRODUCT / SERVICE & Promise PROOF 1) What is your product/service/process innovation? 2) How does it make the promise possible?

_______________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

PASSION This project is important to me and to my organization because...

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

Customer Cost - if available (cost/time/hassle) ________________________________

________________________________________________________________________

This is a great value when you consider... ________________________________________

________________________________________________________________________

Inventor’s Autograph: ___________________________________________________v.2 © 2011, Eureka! Institute, Inc. All Rights Reserved.

Project / Product / Service Name: ____________________________________ Suggestive of the Benefit

NEWS HEADLINE: Explain your News in 1 sentence. The first...

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

The Customer & their PROBLEM WHO is the Customer & WHAT is their Problem (complaint, frustration, wish)

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

Meaningfully Unique BENEFIT PROMISE

Make a clear, specific and if possible numeric promise to address the problem.

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

More details on the BACK of CARD...

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Focus Area check the one primary area...___ Established Customers, Markets, or Systems___ New Customers, Markets or Systems

BEST GUESS @ Concept

• Customer• Problem• Promise• Proof• Passion

DevelopDiscover DeliverDefine

41-2

Page 140: 3   ie 2015 innovation pipeline

The Innovation completely

Concept CardFill in all that you can - start from front side or back side

Meaningfully Unique PRODUCT / SERVICE & Promise PROOF 1) What is your product/service/process innovation? 2) How does it make the promise possible?

_______________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

PASSION This project is important to me and to my organization because...

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

Customer Cost - if available (cost/time/hassle) ________________________________

________________________________________________________________________

This is a great value when you consider... ________________________________________

________________________________________________________________________

Inventor’s Autograph: ___________________________________________________v.2 © 2011, Eureka! Institute, Inc. All Rights Reserved.

Project / Product / Service Name: ____________________________________ Suggestive of the Benefit

NEWS HEADLINE: Explain your News in 1 sentence. The first...

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

The Customer & their PROBLEM WHO is the Customer & WHAT is their Problem (complaint, frustration, wish)

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

Meaningfully Unique BENEFIT PROMISE

Make a clear, specific and if possible numeric promise to address the problem.

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

More details on the BACK of CARD...

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Focus Area check the one primary area...___ Established Customers, Markets, or Systems___ New Customers, Markets or Systems

BEST GUESS @ Concept

• Customer• Problem• Promise• Proof• Passion

DevelopDiscover DeliverDefine

BEST GUESS @ MATH

• Potential• Price• Sales• Cost• Profit

41-3

Page 141: 3   ie 2015 innovation pipeline

The Innovation completely

Concept CardFill in all that you can - start from front side or back side

Meaningfully Unique PRODUCT / SERVICE & Promise PROOF 1) What is your product/service/process innovation? 2) How does it make the promise possible?

_______________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

PASSION This project is important to me and to my organization because...

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

Customer Cost - if available (cost/time/hassle) ________________________________

________________________________________________________________________

This is a great value when you consider... ________________________________________

________________________________________________________________________

Inventor’s Autograph: ___________________________________________________v.2 © 2011, Eureka! Institute, Inc. All Rights Reserved.

Project / Product / Service Name: ____________________________________ Suggestive of the Benefit

NEWS HEADLINE: Explain your News in 1 sentence. The first...

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

The Customer & their PROBLEM WHO is the Customer & WHAT is their Problem (complaint, frustration, wish)

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

Meaningfully Unique BENEFIT PROMISE

Make a clear, specific and if possible numeric promise to address the problem.

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

More details on the BACK of CARD...

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Strategic Purpose: It addresses a... check one___ Very Important Problem (Weaknesses/Threats) ___ Very Important Opportunity (Strengths/Opportunities)

Focus Area check the one primary area...___ Established Customers, Markets, or Systems___ New Customers, Markets or Systems

BEST GUESS @ Concept

• Customer• Problem• Promise• Proof• Passion

DevelopDiscover DeliverDefine

HOWEVER Early In Process

ALWAYS Unknowns

= Death Threats In need of

Learning Plan

BEST GUESS @ MATH

• Potential• Price• Sales• Cost• Profit

41-4

Page 142: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

1. Plan What Death Threat?

2. Do Learn

3. Study What learned?

4. Act Apply Revise Stop STUDY

P•D•S•A

We are DISCOVERING How to Make Our

Idea something worth investing the time, money,

and energy required to develop it.

42

Page 143: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

1. Plan What Death Threat?

2. Do Learn

3. Study What learned?

4. Act Apply Revise Stop STUDY

P•D•S•A

Death Threats are Resolved using…

Fail FAST Fail CHEAP Cycles of Learning

What’s the Fastest, CheapestWay to Learn More

43

Page 144: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

44-1

Page 145: 3   ie 2015 innovation pipeline

1. Plan

2. Do

3. Study

4. Act

Fail FAST Fail CHEAP

Each week we Learn MORE & Reduce RISK

DevelopDiscover DeliverDefine

44-2

Page 146: 3   ie 2015 innovation pipeline

1. Plan

2. Do

3. Study

4. Act

Fail FAST Fail CHEAP

Each week we Learn MORE & Reduce RISK

YES - Keep learning

NO - Kill the project

Each week project leader Makes A REAL Decision

DevelopDiscover DeliverDefine

44-3

Page 147: 3   ie 2015 innovation pipeline

Yes, No

When we follow the system we make a Decision in 8 Weeks

DevelopDiscover DeliverDefine

45

Page 148: 3   ie 2015 innovation pipeline

DEVELOP Alpha DELIVERDEVELOP

BetaDEVELOP

1st ReleaseDEFINE DISCOVER

10% of Investment

There areTwo BigDecision

Points

46-1

Page 149: 3   ie 2015 innovation pipeline

DEVELOP Alpha DELIVERDEVELOP

BetaDEVELOP

1st ReleaseDEFINE DISCOVER

10% of Investment

60% of Investment

Big Decision PointGoNot Now

There areTwo BigDecision

Points

46-2

Page 150: 3   ie 2015 innovation pipeline

DEVELOP Alpha DELIVERDEVELOP

BetaDEVELOP

1st ReleaseDEFINE DISCOVER

10% of Investment

60% of Investment

Big Decision PointGoNot Now

30% of Investment

Big Decision PointGoNot Now

There areTwo BigDecision

Points

46-3

Page 151: 3   ie 2015 innovation pipeline

DEFINE DISCOVER DELIVERDEVELOP Alpha

Ver .330%

DEVELOP Beta

Ver .660%

DEVELOP 1st Release

Ver .990%

Ver 1.098%Ver .1

10%Ver .220%

DevelopDiscover DeliverDefine

Three Phases in Develop

47

Page 152: 3   ie 2015 innovation pipeline

DEVELOP Alpha

TradeoffPrototypes

3 VersionsFor Design,Technology

Ver .330%

Develop is often 2, 3, or 4 Phases

48-1

Page 153: 3   ie 2015 innovation pipeline

DEVELOP Alpha

TradeoffPrototypes

3 VersionsFor Design,Technology

Ver .330%

DEVELOP Beta

FunctionalPrototype

A fully functionalproduct/service

refinement needed

Ver .660%

Develop is often 2, 3, or 4 Phases

48-2

Page 154: 3   ie 2015 innovation pipeline

DEVELOP Alpha

TradeoffPrototypes

3 VersionsFor Design,Technology

Ver .330%

DEVELOP Beta

FunctionalPrototype

A fully functionalproduct/service

refinement needed

Ver .660%

DEVELOP 1st Release

SellablePrototype

It could be taken live a few

rough edges

Ver .990%

Develop is often 2, 3, or 4 Phases

48-3

Page 155: 3   ie 2015 innovation pipeline

Proof of Concept

PrototypeCustomerFeedback

on Concept

TradeoffPrototypes

Customer Feedbackon Options

FunctionalPrototype

Customer Feedback

on Function

SellablePrototype

Customer Feedbackon Details

FinalOfferingCustomer Feedback

with Revenue

WrittenPrototype

Clarity on Concept

CUSTOMERS are great at REACTING this makes them

INVALUABLE In giving FEEDBACK on YOUR innovations

49-1

Page 156: 3   ie 2015 innovation pipeline

Proof of Concept

PrototypeCustomerFeedback

on Concept

TradeoffPrototypes

Customer Feedbackon Options

FunctionalPrototype

Customer Feedback

on Function

SellablePrototype

Customer Feedbackon Details

FinalOfferingCustomer Feedback

with Revenue

WrittenPrototype

Clarity on Concept

CUSTOMERS are great at REACTING this makes them

INVALUABLE In giving FEEDBACK on YOUR innovations

Each Builds Confidence

49-2

Page 157: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

When you Go to Market

competition & customers

ADAPT TO YOUR

NEW OFFERING

50

Page 158: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

THUS - when you Go to Market is when

you need to be able to LEARN & CHANGE FAST

51-1

Page 159: 3   ie 2015 innovation pipeline

DevelopDiscover DeliverDefine

THUS - when you Go to Market is when

you need to be able to LEARN & CHANGE FAST

This is easier if it’s part of your culture

51-2

Page 160: 3   ie 2015 innovation pipeline

It’s about Freedom within a Framework

52-1

Page 161: 3   ie 2015 innovation pipeline

It’s about Freedom within a Framework

IDEA • Customer • Problem • Promise • Proof • Price • Passion • Purpose • Math • Death Threats

DEFINE DISCOVER DELIVERDEVELOP

AlphaDEVELOP

BetaDEVELOP

1st Release

It’s about always getting smarter…as Fast & Cheap as possible

52-2

Page 162: 3   ie 2015 innovation pipeline

Operating System Structure & Processes

E. Work Process for Tasks

C. Phases (aka Stages & Gates)DELIVERDEFINE DISCOVER

D. Check List Process (Lists customized for how the culture manages CORE & LEAP - Death Threats & Milestones)

DEVELOP

A. Blue Card

B. Yellow Cards

CHECK LISTS are our standardized “game plans” for WHAT (standards), WHY (reasons), HOW (methods) Yellow Cards become reality. The aim of the check list process is to create alignment between leadership, employees & departments.

A strategic “Theory” on what is Very Important for our Organization’s short & long term success.Also known as the “Commanders Intent.”

Tactical “Theories” of a how we might accomplish the Commanders Intent (New or improved products, services or systems). Their only reason for existence is to deliver on the Blue Card.

This is process for how it all comes together when we are doing the work. It’s an iterative system that guides the work on the Yellow Cards by integrating the Commander’s Intent (Blue Card), with the organization’s “game plan” for change (Check Lists).

Our phases for increasing our investment in Yellow Cards.

53

Page 163: 3   ie 2015 innovation pipeline

Check List Systems

Designed to CONTROL

Only tell you WHAT to Do They don’t tell you WHY or HOW.

54-1

Page 164: 3   ie 2015 innovation pipeline

Check List Systems

Designed to CONTROL

Only tell you WHAT to Do They don’t tell you WHY or HOW.

Control is Through ALERTS When You Make Mistakes

54-2

Page 165: 3   ie 2015 innovation pipeline

Check List Systems

Designed to ENABLE

55-1

Page 166: 3   ie 2015 innovation pipeline

Check List Systems

Designed to ENABLE

Tell you WHAT to Do WHY to Do ItHOW to Do It

55-2

Page 167: 3   ie 2015 innovation pipeline

Check List Systems

Designed to ENABLE

Leadership Peace of Mind is Through …• Clear Blue Card - Constraints, etc.• Clear Check List - Standards• Clear PLAN - Success Standards• Engaged Management Coaches

Tell you WHAT to Do WHY to Do ItHOW to Do It

55-3

Page 168: 3   ie 2015 innovation pipeline

Operating System Check Lists Define

56-1

Page 169: 3   ie 2015 innovation pipeline

WHAT Needs to be done

WHY Is it Important

HOW Do we do it

Operating System Check Lists Define

56-2

Page 170: 3   ie 2015 innovation pipeline

WHAT Needs to be done

WHY Is it Important

HOW Do we do it

Operating System Check Lists Define

Without documentation, there is no standardized work. Employees don’t know what to do!

56-3

Page 171: 3   ie 2015 innovation pipeline

PLAN: What success looks like - goal, metric or desired outcome…when addressing this Death Threat (Milestone), at this point in time, for this Project and for this Blue Card.

57-1

Page 172: 3   ie 2015 innovation pipeline

PLAN: What success looks like - goal, metric or desired outcome…when addressing this Death Threat (Milestone), at this point in time, for this Project and for this Blue Card.

DO: To achieve this we will do the following work, activity or experiment.

57-2

Page 173: 3   ie 2015 innovation pipeline

PLAN: What success looks like - goal, metric or desired outcome…when addressing this Death Threat (Milestone), at this point in time, for this Project and for this Blue Card.

DO: To achieve this we will do the following work, activity or experiment.

STUDY: Did we reach our success standard? THINK deeply, why did we or why didn’t we?

57-3

Page 174: 3   ie 2015 innovation pipeline

PLAN: What success looks like - goal, metric or desired outcome…when addressing this Death Threat (Milestone), at this point in time, for this Project and for this Blue Card.

DO: To achieve this we will do the following work, activity or experiment.

STUDY: Did we reach our success standard? THINK deeply, why did we or why didn’t we?

ACT: Based on what has been learned, has this Death Threat (Milestone) been resolved?

57-4

Page 175: 3   ie 2015 innovation pipeline

PDSA Drives DisciplineWhat is your biggest challenge?

58-1

Page 176: 3   ie 2015 innovation pipeline

PDSA Drives Discipline

1. Lack of Disciplined Learning Cycles2. Lack of Curiosity3. Lack of Courage to Fail

What is your biggest challenge?

58-2

Page 177: 3   ie 2015 innovation pipeline

PDSA Drives Discipline

1. Lack of Disciplined Learning Cycles2. Lack of Curiosity3. Lack of Courage to Fail

55% 13% 32%

What is your biggest challenge?

58-3

Page 178: 3   ie 2015 innovation pipeline

PDSA Drives Discipline

1. Lack of Disciplined Learning Cycles2. Lack of Curiosity3. Lack of Courage to Fail

55% 13% 32%

What is your biggest challenge?

It’s how stuff gets done… Ideas become Reality!

58-4

Page 179: 3   ie 2015 innovation pipeline

Without Leadership Defining Clearly What Success Looks Like

Using…

59-1

Page 180: 3   ie 2015 innovation pipeline

Check List Standards What, Why, How

Without Leadership Defining Clearly What Success Looks Like

Using…

59-2

Page 181: 3   ie 2015 innovation pipeline

Check List Standards What, Why, How

Blue Card

Constraints Exclusions

&/or

Without Leadership Defining Clearly What Success Looks Like

Using…

59-3

Page 182: 3   ie 2015 innovation pipeline

Check List Standards What, Why, How

Blue Card

Constraints Exclusions

&/or Setting The Plan

Success Standards

&/or

Without Leadership Defining Clearly What Success Looks Like

Using…

59-4

Page 183: 3   ie 2015 innovation pipeline

Check List Standards What, Why, How

Blue Card

Constraints Exclusions

&/or Setting The Plan

Success Standards

&/or

Without Leadership Defining Clearly What Success Looks Like

Using…Being a Change

Agent is Very RISKY As there are no rules.

59-5

Page 184: 3   ie 2015 innovation pipeline

60-1

Page 185: 3   ie 2015 innovation pipeline

INNOVATION

60-2

Page 186: 3   ie 2015 innovation pipeline

INNOVATION It’s How We Organize Going From Strategy

to Idea to Reality

60-3

Page 187: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?

61-1

Page 188: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?Similar to Jane, you have been asked to help an organization develop a 6 month IE Start-Up Plan. The problem is that you don’t work for the organization, so you don’t know much about how they operate. You have your first Planning Meeting scheduled with the leader to start roughing out a plan.

Situation:

61-2

Page 189: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?

T E A MIn a team of 5 or 6, select at least 1 of the types of organizations below to help. Discuss with your team what are questions you’d ask the leader to get the information you need to draft a 6 month IE Start-Up Plan. You can pick a specific organization, but not one where you already know the answers! List what your team thinks are the 5 most important questions to ask to help you develop a plan. Select a spokesperson to report out.

Task:

Similar to Jane, you have been asked to help an organization develop a 6 month IE Start-Up Plan. The problem is that you don’t work for the organization, so you don’t know much about how they operate. You have your first Planning Meeting scheduled with the leader to start roughing out a plan.

Situation:

61-3

Page 190: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?

T E A MIn a team of 5 or 6, select at least 1 of the types of organizations below to help. Discuss with your team what are questions you’d ask the leader to get the information you need to draft a 6 month IE Start-Up Plan. You can pick a specific organization, but not one where you already know the answers! List what your team thinks are the 5 most important questions to ask to help you develop a plan. Select a spokesperson to report out.

Task:

Similar to Jane, you have been asked to help an organization develop a 6 month IE Start-Up Plan. The problem is that you don’t work for the organization, so you don’t know much about how they operate. You have your first Planning Meeting scheduled with the leader to start roughing out a plan.

Situation:

Government Agency

61-4

Page 191: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?

T E A MIn a team of 5 or 6, select at least 1 of the types of organizations below to help. Discuss with your team what are questions you’d ask the leader to get the information you need to draft a 6 month IE Start-Up Plan. You can pick a specific organization, but not one where you already know the answers! List what your team thinks are the 5 most important questions to ask to help you develop a plan. Select a spokesperson to report out.

Task:

Similar to Jane, you have been asked to help an organization develop a 6 month IE Start-Up Plan. The problem is that you don’t work for the organization, so you don’t know much about how they operate. You have your first Planning Meeting scheduled with the leader to start roughing out a plan.

Situation:

Government Agency Fortune 50 Company

61-5

Page 192: 3   ie 2015 innovation pipeline

How would you help get started filling an Innovation Pipeline?

T E A MIn a team of 5 or 6, select at least 1 of the types of organizations below to help. Discuss with your team what are questions you’d ask the leader to get the information you need to draft a 6 month IE Start-Up Plan. You can pick a specific organization, but not one where you already know the answers! List what your team thinks are the 5 most important questions to ask to help you develop a plan. Select a spokesperson to report out.

Task:

Similar to Jane, you have been asked to help an organization develop a 6 month IE Start-Up Plan. The problem is that you don’t work for the organization, so you don’t know much about how they operate. You have your first Planning Meeting scheduled with the leader to start roughing out a plan.

Situation:

Government Agency Fortune 50 Company 100 Year Old 100 Employee Company with only a handful of products

61-6