24
Name of Presentation IBI Group 2900+ people world-wide 75 offices world-wide Two offices in India

2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Embed Size (px)

Citation preview

Page 1: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Name of Presentation

IBI Group

2900+ people world-wide

75 offices world-wide

Two offices in India

Page 2: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Name of Presentation

Urban Land / Master Planning Architecture

IBI Group - Core Disciplines

Land Use Planning

Urban Design

Landscape Architecture

Urban & Regional Development

Economic/Financial Analysis

Office, Commercial & Residential

Educational & Institutional

Medical & Research

Hospitality

Transportation Facilities

Page 3: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Name of Presentation

Transportation (Metro, LRT, BRT & HSR) Intelligent Transport Systems

IBI Group - Core Disciplines

Multi-Modal Transportation

Strategic Planning

Physical Planning & Design

Operational Planning

Transportation and Land Use

Transit-Oriented Development

Communication Systems

Intelligent Transport Systems

Revenue Collection Systems

Traffic & Transit Management Centres

Smart Cities/Intelligent Buildings

Security Systems

Page 4: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Name of Presentation

Mysore ITS – Implementation Challenges

by Shan Venkat, Senior Transportation Engineer

IBI Group

July 13, 2012

Page 5: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Structure

• Introduction

• Project Learning

• Conclusion

Page 6: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

INTRODUCTION

6

Page 7: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Introduction: Components & Scope

• AVL

• Real-Time PIS (ETA & ETD)

• In-Vehicle Display

• Voice Announcement

• CCS

• MIS Reports

• EMS

• Training

Components

7

Scope500 buses

105 bus shelters

45 platforms

6 bus terminals

Page 8: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

PROJECT LEARNING

8

Page 9: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Organization Structure

Impact

• Multi level monitoring – Close Co-ordination with City Administration, PMU, WB

Consultants, State Govt. etc

• Capacity building – In-depth study, thread-bear discussions and knowledge

transfer

• Sound Management Review Techniques – Weekly Meetings, Monthly

Steering Committee Meetings, Field visits, Adhoc meetings, consultations with PMC etc. So

far 11 Steering Committee Meetings headed by Managing Director, KSRTC and 19 Weekly

Review Meetings headed by Head-PIU have been held with circulation of meeting

proceedings for action points.

KSRTC

Vendor M & EPMC

May 14, 2011 Aug 26, 2011 Apr 2, 2012

Page 10: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Solution Provider- Project Phases & Activities

Build Pilot Rollout

Program Management

• Site Survey• Site Plan Sign-off• System Study &

Review SRS• Procurement of

Hardware• Installation and

Commissioning of Hardware and Applications

• Customization of Application

• Installation of VMU & Displays

• Integration testing of Application

• Run Pilot for selected Bus routes

• Performance tuning• Generate MIS

Reports• Basic training – Pilot

Phase

• ITS Application configuration

• Data Management• Delivery and

Installation of Remaining VMU, Display Units

• Commission DR & Testing

• Backup & Restore• System fine tuning• Training • User Acceptance

Test (UAT) & documentation

Software

Infrastructure

VMU + Display Units

EMS

Operations

Training

10

Page 11: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

IBI Group - Project Phases & Activities

Design/Build Procurement Implementation

• Power calculations

• CCS room design• Communication

bandwidth calculation

• Database sizing• Software

specifications• Hardware

specifications• Design document

for VMU and PIS• Test plans for

VMU, PIS, & SFAT• ETA algorithm• EMS• Software

application development

• FAT for custom hardware (VMU and PIS )

• Software FAT• Procurement of

off-the-shelf and custom hardware

• Software procurement

• Deliveries for full system

• Full system hardware installation

• Full system software installation

• ITS Application configuration

• System Integration

• POP & WIR• System

Acceptance• Roll out

• Kick off meeting• Site Survey• Site Plan Sign-off• System Study &

Review SRS• Project Plan• Implementation

Plan

Planning

Page 12: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Solution Provider - Implementation Plan ( Initially 30 tasks)

Page 13: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

IBI Group - Revised Implementation Plan (185 tasks)

Page 14: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

GIS Map – Operational Requirements

What should the GIS map display?

Page 15: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Installation & Types of Buses

Page 16: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Installation – Equipment Locations

• End user acceptance and usage

• Understanding of operations

Page 17: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Civil Works

• Multi-Organization Coordination

– Bus Shelter Structure

– Raw Power @ Bus Shelters

– Locations

• CCS Room

– AC Ducting Delay – 1 month

– Flooring Delay – 1 month

KSRTC – Mysore ITS17

Page 18: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Project Planning – Route & Bus Stop Validation

Incomplete Trips

Incomplete Trips

U-Turn @ KRS Stop

Page 19: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Video wall

BEFORE NOW

Samsung 50 inch TV Christie Videowall

(bezel is more than 4 cm) (bezel is less than 7 mm)

Page 20: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Functional Vs. Technical Requirements

• Power Requirements

– UPS: Original (10 KVA + 10 KVA); Final (20 KVA + 20 KVA)

– Diesel Generator: Original (30 KVA); Final (70 KVA)

• Passenger Information Signs (PIS) – Readability 3m to 30m

– Size: Original – Existing Vendor Solution, Final – As per RFP

– Pitch : Original - 10mm, Final – 10mm

– Color: Original – red; Final - yellow

– Font (Kannada): Original – Baraha; Final – Nudi 05

Page 21: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Planning & Documentation

• SRS – Detailed SRS (11 revisions) has been completed.

• Project Plan – Detailed project plan that looks at operations not software & hardware

• Site report – detailed survey identifying the gaps and site requirements for the project prior to implementation.

• In-bus equipment installation guide – An installation guide detailing the locations for VMU, In-bus PIS, timer, amplifiers, speakers and battery has been identified (close coordination with drivers and other crew) and been documented for all the seven types of buses.

• Testing – A systematic testing in terms of FAT followed by field tests is in place for the VMU and PIS display boards. Prior to this, VMU, PIS and SFAT test plans (5 revisions) has been completed.

• SMS plan – Detailed SMS plan created.

• Design documents/Calculations – PIS design document, Power calculations document, communication bandwidth is in place.

• Training Plan for Crew and other Stakeholders

Page 22: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Project Learning - continued

• Acquaintance with World Bank Procurement Procedures

• Identification and Construction of bus shelters in time

• Ensuring power supply at bus shelters

• Placement of PMC and M&E services in time

• Setting right expectations

• Exposure to the crew about the system in advance

• Location and designing of CCS

• Budgeting of project components should have practical

approach

• MIS report prepared with close coordination with the client by understanding

their needs and requirements

Page 23: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Conclusion

• Capacity Development

– The adequacy of the resources need to be understood, identified and

assigned accordingly. The skill set of resources is another major issue.

• Ground Realities

– Knowing when you are hitting a brick wall and changing direction is

important.

– Importance of Planning vs. Jugaad

• Culture Change

– The culture of “yes sir’’ needs to change.

• “Devil is in the detail”

Page 24: 2900+ people world-wide 75 offices world-wide Two offices ... Venkat.pdf · 2900+ people world-wide 75 offices world-wide Two offices in ... (Kannada): Original –Baraha; Final –Nudi

Thank You