2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik Olsson Luleå University of Technology MSc Programmes in Engineering Industrial Business Administration Department of Business Administration and Social Sciences Division of Industrial Logistics 2009:050 CIV - ISSN: 1402-1617 - ISRN: LTU-EX--09/050--SE

2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

2009:050 CIV

M A S T E R ' S T H E S I S

A Model for Supplier Selection& Total Cost of Purchasing

Henrik Olsson

Luleå University of Technology

MSc Programmes in Engineering Industrial Business Administration

Department of Business Administration and Social SciencesDivision of Industrial Logistics

2009:050 CIV - ISSN: 1402-1617 - ISRN: LTU-EX--09/050--SE

Page 2: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik
Page 3: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

LULEÅ UNIVERSITY OF TECHNOLOGY

A model for Supplier Selection & Total Cost of

Purchasing A case study at Emhart Glass Sweden

Henrik Olsson

23 January 2009

MASTER’S PROGRAMME

Industrial Engineering and Management

Department of Business Administration and Social Sciences

Division of Industrial logistics

Page 4: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik
Page 5: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

Preface This thesis is the last assignment of my education at Luleå University of Technology leading to a

Master’s degree in Industrial engineering and management. The subject of the thesis and the range

of the problem embraced my interest in logistics and purchasing. I believe the knowledge of strategic

purchasing and the focus on total cost is valuable for future opportunities, both for me and for

Emhart Glass.

The winter semester at Emhart Glass entailed contacts within the entire organization. I would

thereby like to thank those who provided me with information and ideas during this work. I would

especially like to express gratitude towards my mentor at Emhart Glass, Ann-Charlotte Gustafsson

and the manager of the purchasing department, Håkan Nilsson, for all their support. I would also like

to take this opportunity to thank my mentor at the university, Anders Segerstedt.

Sundsvall,

22 January 2009

Henrik Olsson

Page 6: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik
Page 7: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

Abstract The role of purchasing and its importance within organizations has grown during the past decades

along with the development of strategic purchasing. In the financial area, science has also tended to

focus on strategy, which has resulted in drawbacks when exploring the complexity of financial

measurement systems.

The purchasing department at Emhart Glass Sweden strives towards more strategic assignments and

more value adding activities. One part of this development is to focus on the total cost of purchasing

to show what aspects and how these aspects influences the total cost of purchasing. In the current

purchasing situation at Emhart Glass, the purchaser generally selects the supplier that offers the

lowest price mainly because it is hard to motivate another decision. Thereby, the purpose is to create

a model that calculates the total cost of purchasing from the best available supplier. The total cost

perspective aims to take focus away from price and to motivate strategic decision-making

conforming to the corporate mission. The delimitations were to keep the present sourcing strategy

with single sourcing and to use existing data from the present supplier base.

After studying financial literature, including activity-based costing and total cost of ownership as well

as science related to strategic purchasing and supplier selection problems the literature was

complemented with interviews and a questionnaire. This resulted in a suggested total cost model in

two parts. The first part uses the analytical hierarchy process for evaluation and selection of the best

supplier. The foundation of the process is pair wise comparisons between the main criterion of

quality, delivery, agility, environmental performance and its sub-criterion. The latter part is

calculation of the total cost of purchasing including the estimated costs of poor quality and inventory

costs.

The total cost model was tested on three sets of suppliers for separate commodities. The results

showed that agility is by far the most valued supplier feature and reflects the present characteristics

of Emhart Glass’ business. The process for supplier selection was easily conducted with decision-

making software ExpertChoice and the resulting charts provided possibilities to observe strengths

and weaknesses among the evaluated suppliers. The result from the calculations of the total cost of

purchasing was difficult to relate to since the total purchasing price differed among the suppliers.

Therefore, an indicator was calculated which shows the relationship between the purchasing price

and the other elements in the model.

By implementing the suggested model for supplier selection and calculation of the total cost of

purchasing, the purchaser can motivate the selection of a certain supplier based on the criteria in the

analytical hierarchy process. The total cost of purchasing motivates the selection further and takes

focus away from price and towards total cost.

Emhart Glass is recommended to use the analytical hierarchy process to form a future purchasing

strategy. By weighting the criteria in the analytical hierarchy process at different departments, the

strategy can be based on the expectations of all internal customers. Finally, the new indicator is

preferably implemented as a KPI in addition to purchasing price variance. The indicator evaluates the

purchasing department and the relationship between the supplier and Emhart Glass Sweden.

Page 8: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

Sammanfattning Inköpsfunktionens roll har blivit allt viktigare inom moderna organisationer och dess aktiviteter

tenderar att bli allt mer strategiskt inriktade. Samtidigt har forskningen inom redovisning följt samma

väg vilket varit till nackdel för forskning om komplexa finansiella mätsystem.

Inköpsavdelningen på Emhart Glass Sweden strävar mot mer strategiska uppgifter och mer

värdeskapande aktiviteter. En del i denna utveckling är att fokusera på den totala kostnaden för

inköp. Genom att visa vilka faktorer, samt hur dessa faktorer påverkar den totala inköpskostnaden

kan beslut rörande leverantörsval göras utifrån detta. I dagsläget fattas beslutet på Emhart Glass

generellt sett genom att den leverantör som är villig att leverera till lägst pris väljs. Anledning är att

det är svårt för inköparen att motivera ett annorlunda beslut. Med detta som grund är syftet att

skapa en modell som beräknar den totala inköpskostnaden av inköp från den bästa tillgängliga

leverantören. Genom att fokusera på totalkostnad snarare än pris kan beslutsfattandet göras mer

strategiskt och i enlighet med företagets mission. Förutsättningarna är att behålla single-sourcing och

att använda data från befintlig leverantörsbas.

Litteraturstudier av finansiella teorier, som activity based costing och total cost of ownership, samt

studier av forskning inom strategiskt inköp och problemställningar för leverantörsval har genomförts.

Litteraturstudierna har kompletterats med intervjuer och frågeformulär. Detta har resulterat i ett

förslag till totalkostnadsmodell uppdelad i två delar. Den första delen använder analytical hierarchy

process för att utvärdera och välja den bästa leverantören. Processen baseras på parvis jämförelser

mellan huvudkategorierna kvalitet, leverans, totalflexibilitet, miljöprestanda och dess

underkategorier. Den andra delen består av beräkningar av kostnader som innefattas av

kvalitetsbristkostnader och lagerhållningskostnader.

Totalkostnadsmodellen är testad på tre uppsättningar leverantörer från skilda produktgrupper.

Resultatet visar att totalflexibilitet är den mest värdefulla egenskapen hos en leverantör vilket

speglar verksamheten på Emhart Glass i dagsläget. Processen för leverantörsval var enkel att

genomföra med programvaran ExpertChoice. Programmet generade grafer över resultaten där de

utvärderade leverantörernas styrkor och svagheter kunde jämföras. Resultaten från

totalkostnadsberäkningarna var svårrelaterade eftersom det totala inköpspriset skiljer sig åt mellan

leverantörerna. Därför beräknades en indikator som visar relationen mellan inköpspris och övriga

kostnader i modellen.

Genom att implementera den föreslagna modellen för leverantörsval och total inköpskostnad kan

inköparen basera beslutet om leverantör utifrån faktorerna i analytical hierarchy process. Den totala

inköpskostnaden motiverar valet ytterligare och för fokus från pris till totalkostnad.

Emhart Glass rekommenderas att använda analytical hierarchy process till att forma sin framtida

inköpsstrategi. Genom att faktorerna viktas på olika avdelningar inom organisationen kan strategin

baseras på förväntningar från samtliga interna kunder. Slutligen föreslås att den nya indikatorn

implementeras som en KPI för att utvärdera inköpsavdelningens arbete och relationen mellan

leverantör och Emhart Glass Sweden.

Page 9: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

Table of Contents

1 Introduction ..................................................................................................................................... 1

1.1 Problem background ............................................................................................................... 1

1.2 Research problem ................................................................................................................... 2

1.3 Purpose .................................................................................................................................... 2

1.4 Delimitations ........................................................................................................................... 2

2 Emhart Glass .................................................................................................................................... 3

2.1 History ..................................................................................................................................... 3

2.2 The product ............................................................................................................................. 4

3 Frame of reference .......................................................................................................................... 7

3.1 Managing costs ........................................................................................................................ 7

3.1.1 Activity based costing ...................................................................................................... 7

3.1.2 Total cost of ownership ................................................................................................... 8

3.2 The role of purchasing ............................................................................................................. 9

3.2.1 Strategic purchasing ...................................................................................................... 10

3.2.2 Strategic purchasing and supply chain management .................................................... 11

3.3 Methods for evaluation and selection of suppliers ............................................................... 14

3.3.1 Evaluating environmental performance........................................................................ 17

3.3.2 Selection criteria ............................................................................................................ 18

3.3.3 The analytical hierarchy process ................................................................................... 19

4 Methodology & Tools .................................................................................................................... 25

4.1 Course of action .................................................................................................................... 25

4.2 Tools ...................................................................................................................................... 26

4.2.1 Interviews ...................................................................................................................... 26

4.2.2 Questionnaire ................................................................................................................ 26

4.2.3 Analytical hierarchy process .......................................................................................... 26

5 Present situation & problems........................................................................................................ 27

5.1 Production and purchasing ................................................................................................... 27

5.2 Sales & planning .................................................................................................................... 29

5.3 Evaluation .............................................................................................................................. 30

5.3.1 Evaluation of the purchasing department .................................................................... 30

5.3.2 Evaluation of suppliers .................................................................................................. 30

6 A suggested total cost model ........................................................................................................ 35

6.1 The AHP ................................................................................................................................. 35

Page 10: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

6.1.1 Selection criteria ............................................................................................................ 35

6.1.2 The weighted AHP ......................................................................................................... 38

6.1.3 Selecting a supplier ........................................................................................................ 39

6.2 Calculating the total cost of purchasing ................................................................................ 40

7 Conclusions .................................................................................................................................... 43

7.1 The AHP ................................................................................................................................. 43

7.2 Conclusions from the TCP...................................................................................................... 43

7.3 Final conclusions .................................................................................................................... 43

8 Discussion & Suggestions for further studies ................................................................................ 45

8.1 The AHP ................................................................................................................................. 45

8.2 The total cost of purchasing .................................................................................................. 45

8.3 Suggestions for further studies ............................................................................................. 46

9 Bibliography ................................................................................................................................... 47

Page 11: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

List of abbreviations

ABC Activity Based Costing

AHP Analytical Hierarchy Process

BPCS Business Planning and Control System (ERP system)

CPI Cost Performance Indicator

EMS Environmental Management System

MRB Material Review Board

OTD On Time Delivery

PPV Purchasing Price Variance

SCM Supply Chain Management TCO Total Cost of Ownership

TCP Total Cost of Purchasing

TVP Total Value of Purchasing

TQ Technical Quality

QFS Quality Feedback System

Supplier qualification status

UC Unqualified

CQ Conditionally Qualified

CQ-PI Conditionally Qualified – Phase In

CQ-PO Conditionally Qualified – Phase Out

Q Qualified

DQ Disqualified

Page 12: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik
Page 13: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

1

1 Introduction This first chapter contains a presentation of the subject and a description of the problem. This is

followed by the purpose and delimitations of the thesis.

1.1 Problem background

“It is unwise to pay too much, as it is unwise to pay too little. When you pay too much, you lose a little

money, that’s all. When you pay to little, you sometimes lose everything, because the thing you

bought was incapable of doing the thing you bought it to do.

The common law of business balance prohibits paying little and getting a lot. If you deal with the

lowest bidder, it’s well to add something for the risk you run. And if you do that, you will have enough

to pay for something better.” (Anonymous, from van Weele, 2005, p. 84)

The quotation captures the basis of this thesis, the balance between spending the least amount of

money and yet achieving high quality products at the right time.

Traditionally, the general firm was divided into departments and each department’s performance

was evaluated separately. Accounting practices were developed to measure departmental

performance such as cost per unit for manufacturing. Cost measurement for cross-functional

activities, was generally limited to common costs such as overhead, labor, utilities and so on.

(Bowersox, Closs, & Cooper, 2007, p. 7) Financial performance indicators tend to focus on short-term

results. Tseng, Chiu & Chen (2009) show that several studies support the introduction of non-

financial indicators and claims that manufacturing capability, human resource management and

supply-chain relations provide a more relevant picture of performance. Bowersox, Closs & Cooper

(2007) state that it is no longer certain that functions, individually performed best in class generate

an effective process or low total cost. To be able to manage the total cost of the entire process

numerous theoretical methods, such as activity based costing, total cost analysis, process

engineering and total cost of ownership, have been developed that aiming to quantify different

aspects of this issue.

Cooperation with the right supplier is of extreme importance in keeping the total cost under control.

However, the problem is finding the right supplier. Ellram (1995) wrote that supplier selection and

supplier evaluation are closely related activities. The first aims to select a supplier for the right

reasons, the latter to maintain a relationship as partners in business over time and to help the

supplier identify opportunities for improvement. Nollet, Calvi, Audet & Côté (2008) state that

purchasing decisions could impact favorably on the actual financial result of other departments but it

is difficult to measure the specific impact of a decision on the bottom line. The mentioned authors

were surprised that despite its importance, few recent papers explored the complexity of financial

measurement systems. Instead a trend towards strategic management was seen. The change of

focus towards strategy also emerged in purchasing ((Martinsons, 2008);(Rodney, Denis, Henderson,

& Hazlett, 2008);(Lai, Gunasekaran, & Edwin Cheng, 2008)) and has raised the purchasing function to

a higher level in the organization. The development is natural since purchasing is the function

through which up to 80% of the organizations costs pass through. Additionally, continuous contact

with large numbers of suppliers offers the possibility of generating many more strategically

Page 14: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

2

significant, cost-reducing innovations than any firm could hope to achieve from its internal resources

alone. (Ramsey & Croom, 2008)

Consequently, purchasing is no longer only a matter of acquiring goods and services but now involves

an engagement in the proactive management of supplier relations, seeking opportunities to add

value throughout the supply chain. Juran & Godfrey (1998) imply that value is the relative cost of

acquiring quality and that quality, or fitness for use, is assessed only on a thorough understanding of

the relevant customers and their needs. Therefore, the supply chain that manages to provide a given

level of quality at the lowest total cost of ownership generates most value.

1.2 Research problem

Emhart Glass is a supplier of equipment, controls and parts to the glass container industry. The

company is a contract manufacturer owned by Bucher Industries AG with headquarters in

Switzerland. All major sales activities are located at the headquarters and the purchasing function is

centralized and located in Sundsvall. The purchasing department works according to an annual

budget and is evaluated based on predetermined prices. This is a problem for the purchasing

department at Emhart Glass since the selection of supplier is based merely on lowest price. The

management at the purchasing department strives towards a strategic position within the company

where more aspects than price are taken into consideration. This is also a way to adapt to the newly

introduced line assembly which makes quality, flexibility and delivery dependability more important.

One step towards strategic purchasing is to show that the role of purchasing includes more

responsibilities than merely buying. According to Yeung (2008) the purchasing activities should be

considered as a strategic part of the supply chain. This is not the case in the present situation where

a major part of the working day is spent tracing goods and pushing suppliers to deliver fast.

1.3 Purpose

The purpose of this thesis was to create a model that calculates the total cost of buying direct

material from the best available supplier. The model should be able to evaluate the presumptive

suppliers and to calculate the total cost of purchasing. By evaluating suppliers from a total cost

perspective, the intention is to take focus away from price and to motivate strategic decision-making

conforming to the corporate mission.

In order to make the model useful the number of aspects for selection and cost calculation is a

balance between the amount of evaluation criteria and usability.

1.4 Delimitations

The model assumes single sourcing where a single supplier provides each product. Single sourcing is

the present sourcing strategy and Emhart Glass does not intend to change this strategy. The

calculations are based on available data which delimits the calculations to suppliers already

established as business partners. This however does not prevent the model being applied to new

products as long as a registered supplier provides the product. The model has not been implemented

during the timeframe of this thesis since implementation requires investments in decision-making

software or mathematical programming.

Page 15: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

3

2 Emhart Glass In this second chapter the development of Emhart Glass is described followed by a presentation of the

product manufactured in Sundsvall.

Emhart Glass is the world leading international supplier of equipment, controls and parts to glass

container industry. With broad-based expertise in glass container forming, glass conditioning, gob

forming, ware handling, cold end inspection, refractory parts and quality assurance, the company's

machines and systems are established and considered as standard products worldwide. Emhart Glass

also provides installation, training, production assistance, and maintenance related services and has

facilities in America, Europe and Asia. (Our company: Emhartglass)

The company has changed and developed throughout the over 250 years of business and has now

emerged to hold about 40 % of the world market of glass forming machines. (Emhart Glass Sweden

AB, 2006) The facility in Sundsvall employs about 350 people whereof twelve in the purchasing

department.

2.1 History

This chapter is retrieved from the 250-year anniversary book of Emhart Glass Sweden. (Emhart Glass

Sweden AB, 2006)

The business in Sundsvall started 1756 with Linderbergs Klockgjuteri, a foundry manufacturing

church bells and chandeliers. During the years, Linderbergs verkstäder produced various products

such as bolts, nails, brass products and fire pumps. The end of this era came after the great fire that

ruined most of Sundsvall in 1888.

As the industrialism conquered Europe, N.P Linderbergs Metallfabriks Aktiebolag was founded in

1894. Among the products where details for electric fittings, equipment for water, gas and steam,

bells, fittings for wagons and trains, clothes hangers, fire pumps and chandeliers.

In 1904, the company was sold to Aktiebolaget Sundsvalls förenade verkstäder (SFV) due to

economic difficulties. Initially, SFV mainly produced machines for sawmills and the pulp industry.

During the 1940s, the most profitable products were hydraulic products such as pumps and presses.

In 1952 the Emhart Manufacturing Company, situated in the USA with roots from 1912, bought the

Swedish company. The Hartford-Fairmont Company was united with Empire Machine Company to

become the Hartford-Empire Company in 1922. In 1951, the name was changed to Emhart

Manufacturing Company where the “Em” came from Empire and “Hart” from Hartford. Since 1912

their business was glass container machines and now, in 1952, the brand was introduced on the

European market. In 1959, Örebro motorfabrik was purchased and the production of hydraulic

products continued until 1969 when total focus on glass container machines became necessary.

The glass industry business continued to develop and in 1989 Black & Decker took over ownership of

the Emhart Corporation. The business was restructured in 1994 and Emhart Sweden AB was created

bringing together the plants in Sundsvall and Örebro. In 1998, the Bucher Group purchased the entire

Emhart Glass Group and the two Swedish facilities formed Emhart Glass Sweden AB.

Page 16: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

2.2 The products

The glass container manufacturing process

Figure 2-1, gob forming, forming machine, ware handling and inspection

provides gob forming and forming machine

Figure 2-1 Glass container manufacturing process

The machines are built in sections

machines, Individual section (IS) and New

mechanism for blowing the container

controlled by servomotors. Figure

and produces over 1 million containers a day.

Figure 2-2 10-section IS Machine & conveyer

4

The glass container manufacturing process provided by Emhart Glass includes the red sections in

, gob forming, forming machine, ware handling and inspection. Emhart Glass Sweden

gob forming and forming machine, Figure 2-2.

Glass container manufacturing process

The machines are built in sections, each section on an individual frame. There are two basic

IS) and New Individual Section (NIS). The major difference is

mechanism for blowing the containers where IS uses air cylinders and the NIS is pneumatic and

Figure 2-2 illustrates an IS machine with 10 sections.

and produces over 1 million containers a day.

& conveyer

Weight:

Height:

With:

Length:

Items: Part numbers:

42,000 kg

4.1 m

3.5 m

6.7 m

46,2,

the red sections in

. Emhart Glass Sweden

There are two basic

difference is the

where IS uses air cylinders and the NIS is pneumatic and

It weighs 42,000 kg

000 kg

4.1 m

3.5 m

6.7 m

,000 ,000

Page 17: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

In the process, melted glass comes from the furnace and

each section in the machine. In Figure

right shape and volume. The containers

and moved to the conveyer at the back of the machine.

Figure 2-3 Gobs placed into press

5

ss comes from the furnace and is molded into gobs that are separated to

Figure 2-3 gobs are placed in the press and are then blown to the

containers are lifted from the press and in Figure 2-

eyer at the back of the machine. Note the press with gobs

Figure 2-4 Bottles on conveyer

molded into gobs that are separated to

gobs are placed in the press and are then blown to the

4 they are cooled

with gobs at the rear.

Page 18: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

6

Page 19: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

7

3 Frame of reference Since this thesis aims to allocate total cost the theoretical framework the definition of cost and how

to manage costs in modern accounting first discussed. The role of purchasing and its relation to costs

is explained. Finally, some evaluation methods common in purchasing related science are presented.

3.1 Managing costs

The official terminology of the Chartered Institute of Management Accountants (1991) defines cost in

the following terms (Innes & Mitchell, 1993):

• (as a noun) The amount of expenditure (actual or notional) incurred on, or attributable to, a

specific thing or activity.

• (as a verb) To ascertain the cost of a specified thing or activity.

The definition defines that costs are related to things or activities. In order to allocate the total cost

of purchasing both things and activities, or material and immaterial aspects, ought to be considered.

3.1.1 Activity based costing

According to Kaplan and Cooper (1997) companies need cost systems to perform three primary

functions:

• Valuation of inventory and measurement of the cost of goods sold for financial reporting.

• Estimation of the costs of activities, products, services and customers.

• Providing economic feedback to managers and operators about process efficiency.

The first function aims to handle all of the organization’s external needs regarding investors,

regulators, tax authorities and so on. The second and third functions fulfill the needs of internal

management and contribute to understanding the internal operations. Internal operations have

become more important since the basis for competition shifted from efficient use of direct labor and

machines towards more accurate information about the cost of processes, products and customers

(Kaplan & Cooper, 1997). Activity based costing (ABC) suggests that costs should first be traced to

performed activities and then activities should be related to specific products or customer segments.

(Bowersox, Closs, & Cooper, 2007)

Drury (2000) writes that activities are related to many different tasks that can be described by verbs

associated with objects. Typical support activities include schedule production, set-up machines,

move material, purchase material, inspect items, process supplier records, expedite and process

customer orders. The activities are sometimes identical to cost centers used by traditional cost

systems. The second step is to allocate costs from cost centers to products or other chosen cost

objects. These objects are in ABC more related to non-volume based drivers such as the number of

production runs for production scheduling or the number of purchase orders for the purchasing

activity. ABC-systems can more accurately measure the resources consumed by cost objects since

they are based on a greater number of cost centers and cost drivers. Kaplan & Atkinson (1998) state

that ABC-systems establish a causal relationship between expenses and add a cause-and-effect

function that is a valuable source of information in inter-organizational decision situations. The

cause-and-effect function distinguishes the ABC-systems as more accurate since regular systems use

cost drivers where no cause-and-effect relationships exist. However, this can be discussed. Alnestig &

Page 20: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

8

Segerstedt (1996) present that e.g. in Sweden since long a “proportionality theorem” has been

propagated for cost allocations. Their study of cost accounting in different companies shows that

traditional costing (in Sweden) resembles ABC, accurate costing systems may exist even if the users

do not call them ABC.

A relevant example of a cost driver is the administrative ordering cost, the costs for administrating an

order. According to Mattson (2004) the administrative ordering cost contains the cost for handling

suggested orders, selection of supplier, negotiation, registering and order planning, delivery control,

quantity and quality control and receiving activities.

3.1.2 Total cost of ownership

Total cost of ownership (TCO) can be seen as an application of ABC that quantifies the costs involved

in acquiring and using purchased goods or services, states Wouters, Anderson & Wynstra (2005).

Concerning purchasing they mean that TCO can be used by decision-makers since the method

quantifies both value and price. TCO is different from ABC systems since costs need to be captured at

a level that is more detailed. It might also facilitate companies dealing with pressure in their

customer markets and making the purchasing function more value oriented. According to Juran &

Godfrey (1998, p. 21.4) TCO is also known as life-cycle cost or total system cost noted as “the sum of

all costs associated with the acquisition, installation, operations, maintenance, and retirement of a

good or service”. Ellram (1995) divides TCO into two approaches:

• Dollar-based approach based on actual cost data for each relevant element. This makes the

result derived from this method easy to understand since it possible to trace it back to each

individual cost element. However, it can be complicated to know what elements to include.

One modification of this is ABC. The dollar-based approach is excellent for repetitive

decisions where costs for key factors can be determined.

• Value-based approach combines the actual cost data with qualitative data that makes the

value-based approach more complicated to understand. The qualitative data are

transformed into quantitative and requires explanations of each cost element. This approach

gives an approximation of the TCO based on the weights and points for each element. Ellram

denotes that the value-based approach tends to be complicated and is often limited to three

or four major cost issues.

The administrative ordering cost in the example above is a part of the total ordering cost. The

difference between ABC and TCO can be described by the total ordering cost which includes costs

not directly related to activities. Such costs are obsolescence and deterioration of inventory as well

as stockouts. Stockouts are shown as lost sales and lost customer goodwill (Viale, 1996). Another

ordering cost is lost capacity (for manufacturing companies). Lost capacity occurs as a cost if the

company is producing inventory and holding the machine busy instead of producing customer orders.

(MGI Management institute Inc., 1999)

Transaction costs

Ellram (1995) shows that TCO is closely related to transaction costs (TC) and denotes that TCO is a

development from TC in economics literature. Transaction specific investments may involve human

recourses that are costly to replace. In purchasing, those might be suppliers’ employees with special

knowledge and involvement in the supplier-buyer relationship. This is relevant to TCO in terms of

costs related to the actual relationship in terms of reduced costs for soliciting and evaluating bids

Page 21: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

9

from numerous suppliers. It is also relevant when searching for and evaluating potential new

suppliers.

3.2 The role of purchasing

Modern purchasing has emerged from being considered a non value-added function towards being

recognized as a strategic function, an opportunity for process management and an improvement tool

for achieving competitive advantage. The most fundamental change is to base the decisions

regarding purchasing on a total process approach with the knowledge of TCO. The main differences

between the traditional and the strategic view of purchasing are presented in Table 3-1 (Juran &

Godfrey, 1998, p. 21.6).

Table 3-1 Traditional versus strategic view of the purchasing process (Juran & Godfrey, 1998, p. 21.6)

Aspect in the purchasing

process

Traditional view Strategic view

Supplier/buyer relationship Adversarial, competitive,

distrusting

Cooperative, partnership, based

on trust

Length of relationship Short term Long term, indefinite

Criteria for quality Conformance to specifications Fitness for use

Quality assurance Inspection upon receipt No incoming inspection necessary

Communications with

suppliers

Infrequent, formal, focus on

purchase orders, contracts,

legal issues

Frequent, focus on the exchange

of plans, ideas, and problem

solving opportunities

Inventory valuation An asset A liability

Supplier base Many suppliers, managed in

aggregate

Few suppliers, carefully selected

and managed

Interface between suppliers

and end users

Discouraged Required

Purchasing strategy Manage transactions, troubleshoot

Manage processes and relationships

Purchasing business plans Independent of end-user

organization business plans

Integrated with end-user

organization business plans

Geographic coverage of

suppliers

As required to facilitate

leverage

As required to facilitate problem

solving and continuous

improvement

Focus of Purchasing decisions Price Total cost of ownership

Key for Purchasing success Ability to negotiate Ability to identify opportunities

and collaborate on solutions

Another way of illustrating strategic thinking in the supply chain that occurred as a direct impact of

information technology is the change towards a responsive process. The traditional manufacturing

industry based their business on what the customer will demand in the future, see Figure 3-1.

Information concerning purchasing behavior was not readily available and firms were loosely linked

together. The typical manufacturer produced products based on forecasts and wholesalers,

distributors and retailers purchased upon their own unique forecasts. This usually ended up in

unplanned inventory and lead to a need to protect individual company interests, meaning the

relationships between business partners was adversarial. (Bowersox, Closs, & Cooper, 2007)

Page 22: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

10

In the responsive business model (Figure 3-2) the forecast reliance is reduced or eliminated by joint

planning and rapid information exchange between business partners. When all members of the

supply chain synchronize their operations, opportunities exist to reduce overall inventory and

eliminate costly duplicate practices. There are fewer steps to complete in the responsive process,

which makes it faster and less costly. Possibilities occur for the customer to order customized

products and for the manufacturer to deliver specialized products manufactured in small

batches.(Bowersox, Closs, & Cooper, 2007)

Figure 3-1 Anticipatory business model (Bowersox, Closs, & Cooper, 2007, p. 11)

Figure 3-2 Responsive business model(Bowersox, Closs, & Cooper, 2007, p. 12)

3.2.1 Strategic purchasing

“The main failure of the purchasing function is its concentration on negotiation and market price, and

in emphasizing short-term opportunistic decision-making. Such an emphasis ignores a strategic

holistic approach to purchasing and falls well short of any long-range planning horizons.”(Davis,

1985)

Davis quoted the above in 1985 but there are still companies with this approach to purchasing. Van

Weele (2005, p. 232) divides purchasing into three levels of tasks, responsibilities and authority. This

is a way of locating the function in the organization and a way to raise the awareness of the present

approach.

• Operational level includes all activities related to the ordering and expediting functions such

as:

o Order release of already concluded agreements with suppliers.

o Solving daily-based problems of quality, supply and payment.

o Monitoring and evaluating supplier performance.

• Tactical level includes tasks that involve how the purchasing function affects product, process

and supplier selection. A decision on this level requires coordination and cooperation with

other functions in the company such as engineering, manufacturing, logistics and quality

assurance and has an impact on one to three years. Some of the responsibilities are to:

o Prepare and develop value analysis programs aimed at design review and product

standardization.

o It includes adopting and conducting certification programs for suppliers aiming to

improve the quality of incoming goods.

o It also encompasses selection and contracting of suppliers in general and reduction

of the supply base in particular.

ForecastBuy

components and materials

Manufacture Warehouse Sell Deliver

SellBuy

components and materials

Manufacture Deliver

Page 23: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

11

• Strategic level includes long-term decisions that influence the future market position of the

company. Decisions on this level have a long-term strategic impact on purchasing and supply

functions and effect the company’s competitive position. It includes:

o Development of procedure and task description for the purchasing department.

o Develop programs for improvement of purchasing operations and performance.

o Decisions to make or buy/outsource.

o Establishing and maintaining contact and long-term contracts with

certified/preferred suppliers.

o Decisions on supplier strategy based on single/multiple sourcing.

o Major investment decisions (buildings, equipment, computers).

o Decisions to participate financially in supplier organizations to secure the future

supply of critical materials.

o Decisions related to policies on transfer-pricing, intercompany supplies, reciprocal

arrangements and barter deals.

A definition of strategic purchasing is:

“The process of planning, implementing, evaluating and controlling strategic and operating

purchasing decisions for directing all activities of the purchasing function toward opportunities

consistent with the firm’s capabilities to achieve its long term goals.” (Carr & Smeltzer, 1997)

3.2.2 Strategic purchasing and supply chain management

Moving purchasing towards the definition above the organization has to develop its capabilities with

regard to quality, delivery and price. However, in order to successfully develop long-term plans with

respect to these matters, associates from all functions such as design and production from more than

the managerial levels ought to be involved. Saunders (1997, p. 182) presents a few different

dimensions of capabilities that interact within supply chain management (SCM). Saunders denotes

that these are interrelated and a total strategic plan has to be developed. The dimensions are

strategic management of quality, material flow, cost and added value, supplier relationships and

human resources in the supply chain. Consider the correlation with Juran in Table 3-1.

Quality

Saunders (1997, p. 189) presents two meanings of quality related to purchasing. First, it involves

setting up specifications that establish the features of requirements that are desired. Second, there is

a need to ensure that the produced products and services have a high degree of conformance to the

specified requirements. The requirements do not only refer to the product but also include such

aspects as service and delivery time.

There is a trend in quality management involving a shift from methods of detecting quality problems

towards methods to prevent problems of quality. Based on quality programs with suppliers, quality is

assured at the source and no testing is necessary at the buyers’ location. Bergman & Klefsjö (2001, p.

64) write that the actual cost of quality is the lack of quality. It is more expensive to manufacture

defect products than to put effort into preventing faults. On this basis Bergman & Klefsjö (2001)

along with Harrington (1999) suggest a denotation from “cost of quality” to “cost of poor quality”. In

many companies, a considerable number of working hours are spent on the inspection of incoming

goods. Van Weele (2005, p. 193) implies that many companies have no idea about how much the

lack of quality is costing them. The main cost categories concerning total cost of quality are

Page 24: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

illustrated in Table 3-2.

Table 3-2 Total cost of quality (Saunders, 1997)

Cost category Description

Appraisal costs Include costs of inspection processes Prevention costs Includes costs of personnel and the application of methods to prevent

problems occurring etc.

Failure costs – internal Costs of process

the problem right, etc.

Failure costs – external Warranty costs and loss of reputation

Material flow

Van Weele (2005, p. 207) makes a di

incoming flow covers all activities

point of consumption in the company itself and

products are distributed from the company to the customer. The incoming flow is commonly

denoted as materials management and has developed along with the strategic thinking. Some

companies not only optimize the flow from supplier and company but also between supplier and

their suppliers.

To understand the total logistics van Weele

• The impact of design, engineering and developme

determine the structure of the future product. The specifications can be of such detail that

only a few suppliers can

standardization is important to keep

• The production department influences the

effectiveness and efficiency of the flow of

materials. Production usually aims for high

utilization of its assets without disruptiona lack of material. To prevent this, the department

usually builds up stocks that even out fluctuations.

What actually happens is that the problems are

hidden under a high level of inventory. The boat is

floating unaware of the problems below.

the problems the water

lowered and the problems will be

• The sales organization must have the customer in focus. It is not beneficial to

sales promise a delivery time within the internal production lead

order. This will probably end up

leads to a situation where purchasing has to put extra press

ahead of time and often at considerable extra cost

In order to identify and respond to the demands of the customer the modern supply chain has to be

responsive, known as agile manufacturing.

their products to the market quickly.

12

(Saunders, 1997)

Description

Include costs of inspection processes – labor, equipment, training, etc.Includes costs of personnel and the application of methods to prevent

problems occurring etc.

Costs of processing faulty goods, rectification areas, delays, scrap, putting

the problem right, etc.

Warranty costs and loss of reputation and sales because of delays etc.

makes a distinction between the outgoing and incoming material flow. The

incoming flow covers all activities required to optimize the flow of material from suppliers to the

point of consumption in the company itself and, as follows, the outgoing flow is how finished

products are distributed from the company to the customer. The incoming flow is commonly

denoted as materials management and has developed along with the strategic thinking. Some

e flow from supplier and company but also between supplier and

To understand the total logistics van Weele (2005) denotes a few key areas in this matter

The impact of design, engineering and development is serious since these activities

determine the structure of the future product. The specifications can be of such detail that

can act as presumptive alternatives. During design, striving for

standardization is important to keep down the number of items.

The production department influences the

effectiveness and efficiency of the flow of

materials. Production usually aims for high

utilization of its assets without disruptions due to lack of material. To prevent this, the department

usually builds up stocks that even out fluctuations.

What actually happens is that the problems are

hidden under a high level of inventory. The boat is

floating unaware of the problems below. To find

level slowly has to be

and the problems will become visible.

Figure 3-3 The Japanese

river(Grebener, 2004)

The sales organization must have the customer in focus. It is not beneficial to

sales promise a delivery time within the internal production lead-time in order

order. This will probably end up with a rushed work in planning, purchasing and assembly

leads to a situation where purchasing has to put extra pressure on the suppliers to deliver

ten at considerable extra cost.

In order to identify and respond to the demands of the customer the modern supply chain has to be

responsive, known as agile manufacturing. The agile manufacturer can respond to changes and get

their products to the market quickly. One of the contributing factors to becoming

labor, equipment, training, etc. Includes costs of personnel and the application of methods to prevent

ing faulty goods, rectification areas, delays, scrap, putting

sales because of delays etc.

outgoing and incoming material flow. The

to optimize the flow of material from suppliers to the

as follows, the outgoing flow is how finished

products are distributed from the company to the customer. The incoming flow is commonly

denoted as materials management and has developed along with the strategic thinking. Some

e flow from supplier and company but also between supplier and

in this matter:

since these activities

determine the structure of the future product. The specifications can be of such detail that

. During design, striving for

The Japanese

(Grebener, 2004)

The sales organization must have the customer in focus. It is not beneficial to the customer if

time in order to land an

purchasing and assembly. It

ure on the suppliers to deliver

In order to identify and respond to the demands of the customer the modern supply chain has to be

The agile manufacturer can respond to changes and get

e contributing factors to becoming an agile

Page 25: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

13

manufacturer is the ability to share information within all levels in the company, particularly where

small initial problems may have larger downstream effects. (Parkinson, 1999)

Cost and added value

According to Saunders (1997, p. 237) traditional buying practices have tended to focus on purchasing

price alone and managerial control systems have reinforced such approaches. Methods of managing

costs lead us back to chapter 3.1. Saunders presents numerous different ways of how to use the

information of costs related to purchasing and supply management. Some examples are: in

negotiations with suppliers, make or buy decisions, in development of existing and new products,

analysis of purchasing and logistics plans, analysis of internal transfer prices within organizations,

construction of material and departmental budgets, analysis of suppliers’ costs, performance

measurement in purchasing and supply management. Nevertheless, the key issues for management

are to carefully develop strategic plans with cost implications along with other aspects of value such

as quality and delivery.

To cover all costs related to purchasing involves numerous relevant costs. One of the more important

is inventory cost that according to the MGI Management Institute Inc. (1999) covers five categories:

• Item costs includes all costs to get the item into the plant such as product cost,

transportation cost, customs duties, insurance, direct material, direct labor and factory

overhead.

• Carrying costs includes costs caused by the amount of inventory carried including capital

costs from money tied up in inventory, storage costs like space, personnel and equipment

and risk costs present as obsolescence, damage, pilferage, insurance and deterioration.

• Ordering costs consists of production control costs, setup and teardown costs, lost capacity

costs and purchase order costs. Production control costs occur in manufacturing companies

since placing an order does not always mean buying something and there are the costs for

building inventory and setting inventory control planners to work. Lost capacity costs are

explained in 3.1.2.

• Stockout costs occur if demand during lead-time exceeds the forecast and available

inventory. Stockout costs include backorder costs, lost sales cost and lost customer costs.

Stockout cost can be explained by an example where a customer wants something and the

company cannot sell it immediately. The company has only lost money for not having the

item and a cost for going back to get it occur. If the product is available from other

companies the customer would most likely buy it somewhere else and not wait for the

backorder, a cost of lost sales. If the competing company fulfils the customer’s need it will

probably go to the competitor first the next time meaning, a cost of a lost customer.

• Capacity related costs are those of changing production levels and include

overtime/undertime, hiring, layoff, training and shift premiums. Layoffs are a cost mostly due

to loss of skills and lost credibility with other people in the industry. Hiring and training are

major costs but they pay off considering the alternative, ignorance.

Supplier relationships

It is sometimes said that you get the suppliers you deserve. This implies that supplier performance is,

at least partly, built upon reflections both on the way companies treat their suppliers and the

expectations companies have of them (Saunders, 1997, p. 252). As seen in 3.2.1, relationships on the

Page 26: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

14

strategic level are contracted on a long-term basis that helps both participants in developing. In

logistics, by giving the supplier insight into the supply needs and the production plan, they can

improve the level of service and lower logistics costs for both parties. Early mutual agreement on

quality requirements enables zero defect deliveries and lowered costs of poor quality for the

company. By introducing product and process engineering knowledge and experience of the supplier

early into the development process, the time to market and start-up costs may be reduced. By

involving the supplier in a close partnership, ideas for improvement can be brought up by both sides.

Often the supplier is blamed for any perceived problem with little consideration of the root of it. The

cause is often outside the control of a single supplier and may in fact either stem from the contractor

itself, or the actual relationship between the two parties ((van Weele, 2005) (Johnsen, Johnsen, &

Lamming, 2008)).

Intervening in a close relationship in a single sourcing scenario is not always preferred since it is

associated with risks. Shields (2005) denotes that it is more difficult for the buyer to be sure of an

appropriate level of competitive advantage in its own business in single sourcing. In periods of tight

supply, the buyer may be at a disadvantage in being able to ask other suppliers to accept orders.

There is a risk that other suppliers may lose interest in trying to compete for the business if they see

that a sole source situation is likely to persist. It is also a substantial risk if the single source has a

catastrophic event for example, is bought by a competitor or has financial problems.

Human resources

Human resources are often considered the firms most important asset. All the strategies and

techniques related to SCM are bound up with issues of how to develop and use human recourses.

Managing relations is important in order to be strategic, both inter-functional and inter-

organizational. One problem is the fact that organizations are divided into smaller, more manageable

fields of activity, long before any strategic objectives are identified. If every section has its own goals

and objectives the buck passing and “not my problem” syndrome might occur. (Saunders, 1997)

3.3 Methods for evaluation and selection of suppliers

As companies develop various overall strategies, the role of purchasing will be different. However,

the purchasing strategy has to be developed to support the overall strategy. At first, the decision

whether to make or buy arises and has to be based on the degree of competitive advantage

generated by the strategy. The second step is to develop a clear picture of purchasing spending

related to commodity. A commodity strategy should be developed with guidelines governing

whether or not to pursue product standardization and reduce the product variety, whether or not to

reduce the number of suppliers or what type of relationship should be developed. The next step is to

develop a supply base management strategy. It covers how many suppliers will be dealt with for a

certain commodity, what conditions and qualifications the suppliers should meet and how the best

suppliers will be selected. The last step is to develop supplier relationships with suppliers divided into

groups such as commercial suppliers, preferred suppliers and supplier partners. (van Weele, 2005)

The purchasing portfolio management analysis is suited for the development of commodity

strategies. The purchase portfolio (Figure 3-4) originally developed by Kraljic (1983) is used by many

of companies all over the world.

Page 27: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

15

For each commodity, a different strategy is feasible. Examples of strategies for suppliers and its

characteristics are illustrated in Table 3-3.

Table 3-3 Basic characteristics of the four supplier strategies (van Weele, 2005, p. 153)

Strategies:

Partnership Competitive

bidding

Secure supply Category

management and

e-procurement

solutions Characteristics:

Objective Create mutual

commitment in

long-term

relationship

Obtain best deal for

short term

Secure short- and long-

term supply risk

Reduce logistic

complexity

Improve

operational

efficiency

Reduce number of

suppliers

Suitable for Strategic

products

(gearboxes,

axles, engines)

Leverage products

(commodities, steel

plate, wire)

Bottleneck products

(natural flavors,

vitamins, pigments)

Routine products

(consumables,

supplies)

Leverage products

Alternative sources of

supply available

Substitution possible

→ Competitive

bidding

Routine products

Large product variety

High logistics complexity

Labor intensive

→ Category

management +

e-procurement

soulutions

Strategic products

Critical for products cost

price

Dependence on supplier

→ Performance

based

partnership

Bottleneck products

Monopolistic market

Large entry barriers

→ Secure supply +

search for

alternatives

Pu

rch

asi

ng

’s i

mp

act

on

fin

an

cia

l re

sult

s

Supply risk High Low

Low

H

igh

Leverage suppliers

Many competitors

Commodity products

→ Buyer

dominated

segment

Routine suppliers

Large supply

Many suppliers with

dependent position

→ Reduce number

of suppliers

Strategic suppliers

Market leaders

Specific know-how

→ Balance of

power may

differ among

buyer-supplier

Bottleneck suppliers

Technology leaders

Few, if any, alternative

suppliers

→ Supplier

dominated

segment S

up

pli

er

imp

act

on

fin

an

cia

l re

sult

s

Supply risk High Low

Low

H

igh

Figure 3-4 Purchasing product portfolio and supplier portfolio(van Weele, 2005, p. 150)

Page 28: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

16

Activities Accurate

forecast of

future

requirements

Supply-risk

analysis

Careful supplier

selection

Should cost

analysis

Rolling materials

schedules

Effective change-

order procedure

Vendor rating

Improve

product/market

knowledge

Search for alternative

products/suppliers

Reallocate purchasing

volumes over

suppliers

Optimize order

quantities

Target-pricing

Accurate forecast of

future requirements

Supply-risk analysis

Determine ranking in

suppliers client list

Develop preventive

measures (buffer stock,

consigned stock,

transportation)

Search for alternative

products/suppliers

Subcontract per

product

group/family

Standardize

product

assortment

Design effective

internal order

delivery and

invoicing

procedures

Delegate order

handling to internal

user

Decision level Board level

Cross-functional

approach

Board level

Purchasing

Purchasing

Cross-functional

approach

Purchasing

Cross-functional

approach

According to the given situation or strategy, different criteria are important when a model for

supplier selection is to be built. Several dimensions are mentioned that are important to multiple

objective supplier selection such as net price, quality, delivery, performance history, capacity,

communications system, service, geographical location, etc. Some authors propose linear weighting

in which suppliers are rated upon several criteria and in which these ratings are combined into a

single score. Others propose mathematical programming in which quantifiable criterion are taken

into account. (Degreave, Labro, & Roodhoft, 2000)

There are basically two different kinds of supplier selection problems depending on single sourcing or

multiple sourcing scenarios. In single sourcing there is only one decision; which supplier is the best. In

a multiple sourcing scenario, management wants to split order quantities among suppliers. There are

varieties of reasons including creating a constant environment of competitiveness. For single

sourcing scenarios linear weighting methods, analytic hierarchy process (AHP), analytic network

process (ANP), total cost approaches and mathematical programming (MP) techniques have been

used (Demirtas & Üstün, 2008). TCO and AHP are considered to be the more practical approaches.

Bhutta and Huq (2002) compared the two approaches regarding supplier selection. The conclusion

was that both approaches could help optimizing and concentrate recourses where they are needed.

However, AHP can help evaluate and compare suppliers on different evaluation criteria and, if cost

data are included as in TCO, AHP can provide a more robust tool for supplier selection based on both

qualitative and quantitative criteria. The AHP is described further in section 3.3.3.

Ghodsypour & O'Brien (1998) use the AHP for supplier selection in combination with linear

programming. The following steps are suggested:

1. Define the criteria for supplier selection.

2. Calculate the weights of the criteria.

3. Rate the alternative suppliers.

4. Compute the overall score of each supplier.

5. Build the linear model and maximize the total value of purchasing (TVP).

Page 29: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

17

Figure 3-5 Supplier selection algorithm (Ghodsypour & O'Brien, 1998)

In the model above, single sourcing is present when there are no constraints, meaning all suppliers

can satisfy the buyers’ requirements of demand, quality, delivery, etc. More recent research using

AHP, applies non-linear integer programming. Kokangul & Susuz (2009) present a model developed

from the above. The model contains Max (TVP) but simultaneously the minimum total cost of

purchase (TCP). TCP consist of purchase, transportation, order/setup, and holding cost. Note that the

TCP in the total cost model suggested in this thesis is developed and contains more elements than

Kokangul & Susuz.

3.3.1 Evaluating environmental performance

Along with the strategic development, managers and policy makers have begun to see the impact on

environmental performance from purchasing activities since purchased goods can affect the level of

waste and pollution generated. The impact is direct in that the products acquired increase waste and

pollution during storage, transportation, processing use or disposal. The impact can also be

considered indirect not only in terms of monetary costs but rather in terms of the waste streams

generated producing them. (Handfield, Walton, Stroufe, & Melnyk, 2002) The monetary savings

concerning environmental performance are due to a reduction in resource usage including raw

materials and supply, reduction in waste, water and energy use, and transport, travel and packaging.

This will to an extent also lead to more efficient processes and increased sales due to improved

reputation among customers. (Department for Environment Food and Rural affairs, 2006)

For the individual, environment also include the work environment. According to the Swedish Work

Environment Authority, the workplace should be adjusted to fit the physical and psychical

circumstances of the employee and the environment should be developing and motivating

(Arbetsmiljöverket, 2008). A satisfying work environment can be measured in terms of absence due

Page 30: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

18

to illness. Absence due to illness correlates with work environment, employee satisfaction,

motivation and productivity. (Hanson, 2004)

3.3.2 Selection criteria

In 1966 Dickson presented a list of 23 criterions for supplier selection, the ranking of these criterions

may be dependent upon the specific circumstances but Dickson suggested criteria and ranking

according to Table 3-4. These criteria do still cover most of the important factors up to present time.

Traditionally the four criteria cost, quality, delivery and service are assumed to be an appropriate set

and includes most of the criteria in Table 3-4.

Table 3-4 23 supplier selection criteria (Dickson, 1966)

1. Quality

2. Delivery 3. Performance history

4. Warranties and claim policies

5. Production facilities and capacity

6. Price

7. Technical capability

8. Financial status

9. Procedural compliance

10. Communications system

11. Reputation and position in industry

12. Desire for business

13. Management and organization

14. Operating control 15. Repair service

16. Attitude

17. Impression

18. Packing ability

19. Labor relations record

20. Geographical location

21. Amount of past business

22. Training aids

23. Reciprocal arrangements

Çelebi & Bayraktar (2008) describes the four criteria as follows:

• Cost (or price) performance refers to the direct monetary terms associated with suppliers. It

can be measured by comparison with other suppliers of the same commodity or by changes

in price provided by the supplier. It includes direct purchasing costs such as unit price,

transportation and ordering costs, as well as integration and cooperation costs.

• Quality refers to the level of achieved excellence of supplied goods to meet or exceed

buyer’s expectations. The criteria grouped under this category might have various

dimensions. Not only direct statistical measures, but also monetary issues related to quality

problems (i.e. cost of line failures), and quality assurance efforts like quality certification and

standards may be taken into account as well.

• Delivery evaluates the suppliers’ logistical capabilities and critical activities performed during

the time from which the products are ordered until arrival. It is an important issue that

influences costs, speed to market and value perception by the end user. It also includes

inaccurate, missed, or delayed deliveries that can disrupt operational efficiency.

• Service is defined in four main sub-performance measures as responsiveness, flexibility,

dependability and technology. Responsiveness refers to the degree of cooperation shown by

the supplier, while flexibility is the suppliers’ ability to support changes. Dependability is the

suppliers overall ability to make constant improvements in quality, cost and delivery as well

as loyalty during difficult times. Finally, technology defines the suppliers’ ability to advance

the state-of-the-art in its product.

Page 31: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

19

Concerning environmental evaluation Handfield, Walton, Stroufe & Melnyk (2002) suggest six

environmental performance attributes as results from three case studies. The attributes are product

attributes, waste management, labeling/certification, packaging/reverse logistics, compliance with

government regulations and environmental programs at the supplier’s facilities. The attributes are

used in an AHP for the environmental dimensions of purchasing as in Figure 3-6.

Figure 3-6 Framework for environmental performance attributes used in AHP model (Handfield, Walton, Stroufe, &

Melnyk, 2002)

Other studies suggest performance measurement indicators for environmental evaluation. In a study

of environmental performance in construction Tam, Tam, Zeng & Chan (2006) concluded that

regulatory compliance (including non-compliance records of inspection, complaints/warnings),

auditing activities (non-conformance reports and reports of marginal cases put under observation)

and resource consumption (energy, timber, paper and water consumption) as main areas.

3.3.3 The analytical hierarchy process

The analytical hierarchy process (AHP) is a multi-criteria decision-making method for determining a

single alternative (Figure 3-7). The AHP is used when the rank order of decision alternatives is to be

decided or in cases when an alternative from a set of variables is selected while considering

priorities. In developing an AHP model, first the decision-maker provides weighted preferences for

the criteria used to determine the preferences for the decision alternatives. Second, the model rates

each alternative using each sub-criterion. Finally, the AHP develops a prioritized ranking of the

Page 32: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

20

decision alternatives based on the relative importance placed on each criterion. (Stevenson & Ozgur,

2007).

Figure 3-7 Graphic presentation of the hierarchies for the supplier selection problem

Paired comparison is the foundation of AHP. The first step is to compare the criteria two by two using

the liker-type preference scale in Table 3-5. The statements “equally preferred” to “extremely

preferred” are represented by integers 1-9 where the italic statements function as separators.

(Stevenson & Ozgur, 2007)

Table 3-5 Preference scale for the pair wise comparisons (Stevenson & Ozgur, 2007, p. 495)

Verbal statement of the preference Numerical value

Equally preferred 1

Equally to moderately preferred 2 Moderately preferred 3

Moderately to strongly preferred 4 Strongly preferred 5

Strongly to very strongly preferred 6 Very strongly preferred 7

Very strongly to extremely preferred 8 Extremely preferred 9

The relative importance between criteria is then used to construct a preference matrix from which

weights for each criterion will be extracted. These subjective estimates of relative importance are

used to generate the weights assigned to each of the criteria. A paired comparison is then performed

on the sub-criteria under each criterion. The values are normalized and a consistency test is

performed where the normalized value matrixes are multiplied by the averages column of the

criteria. Calculating the average of the product gives us the eigenvalue (λA). The consistency index (CI)

is calculated, �� = ������ , where (n) is the number of criteria being compared. Using CI the consistency

ratio can be calculated, � = �� �, where RI is given in Table 3-6. The criteria are considered consistent

if CR < 0.10 (Handfield, Walton, Stroufe, & Melnyk, 2002).

Page 33: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

21

Table 3-6 Random index values (RI) for the comparison of n items (Stevenson & Ozgur, 2007, p. 497)

n 2 3 4 5 6 7 8 9 10

RI 0 0.58 0.90 1.12 1.24 1.32 1.41 1.45 1.51

Application of AHP for stereo system selection

To explain the process further an example from Stevenson & Ozgur(2007) where the process is used

for selecting a new stereo system. The choices are narrowed down to three products illustrated in

Figure 3-8.

Figure 3-8 Graphical representation of the hierarchies for the stereo system-selection problem (Stevenson & Ozgur, 2007,

p. 494)

The selection criteria are compared in pairs with respect to the importance to the decision-maker

and the matrix in Table 3-7 is formed.

Table 3-7 Pair wise comparison table for the stereo system selection problem(Stevenson & Ozgur, 2007, p. 495)

Criterion Price Sound Options

Price 1 3 4

Sound 1/3 1 3

Options 1/4 1/3 1

∑ 1 4/7 4 1/3 8

The matrix shows that options are moderately to strongly preferred to price and moderately

preferred to sound. Dividing each value by its column total normalizes provides the normalized

paired comparison matrix. The row average, to the far right, represents the priority for each

criterion. Thus, price is most important and options least important.

Page 34: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

22

Table 3-8 Normalized pair wise comparison table for the stereo system selection problem(Stevenson & Ozgur, 2007, p.

496)

Normalized values Price Sound Options Avg. weight

Price .631579 .692308 .5 .608

Sound .210526 .230769 .375 .2721

Options .157895 .076923 .125 .1199

∑ 1 1 1 1

Since the AHP depends on input provided by the decision maker and since the comparisons are

subjective, the comparison has to be consistent with a different but related pair wise comparison.

That is why the consistency ratio (CR) is calculated as described above. Multiplying the pair wise

comparison matrix (Table 3-7) by the Avg. weights from Table 3-8 provides a weighted sum priority.

Table 3-9 Calculation of the Weighted priorities for the criteria (Stevenson & Ozgur, 2007, p. 497)

Criterion Weighted Sum (1) Avg weight (2) Weighted sum priority (3)=(1)/(2)

Price 1.904 .608 3.13136

Sound .834 .2721 3.0669

Options .363 .1199 3.0242

The weighted sum priorities obtained in Table 3-9 are averaged to determine the eigenvalue (λA).

Thus, n=3, CI and CR is calculated.

Since CR < 0.10 the priority is considered consistent.

n 3:=

,

, < 0.10

1

1

3

1

4

3

1

1

3

4

3

1

0.608

0.2721

0.1199

1.904

0.834

0.363

=

λA3.13136 3.0669+ 3.0242+

33.074=:=

CIλA n−

n 1−:= CI 0.037=

RI 0.58:=

CRCI

RI:= CR 0.064=

Page 35: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

23

The next step is to determine three pair wise comparison matrices for each criterion comparing the

three products. The comparison in Table 3-10 is the three products in relation to Price. The pair wise

comparison is converted to proportion percentage values and averaged to see priorities. Table 3-10

shows that the Sharp product is preferred in terms of price.

Table 3-10 Comparison in relation to Price

Pair wise comparison Proportion percentage Priority percentage

Product Sharp Lucidity Clarity

Sharp 1 4 2

Lucidity 1/4 1 1/3

Clarity 1/2 3 1 ∑ 1.75 8 3.333

Product Sharp Lucidity Clarity

Sharp .5714 .5 .60

Lucidity .1429 .125 .10

Clarity .2857 .375 .30 ∑ 1 1 1

Product

Sharp .5571

Lucidity .1226

Clarity .3202 ∑ 1

After calculating consistency and priorities for Sound and Options the Priority percentage is

multiplied by the Avg. weight for each product and criteria. The final weighted score is then

calculated and the product with the highest overall priority is selected.

Table 3-11 Determination of the Overall priority (Stevenson & Ozgur, 2007, p. 500)

Sharp

Criterion Weight (%) (1) Priority (%) (2) (1)*(2)

Price .608 .5571 .3387

Sound .2721 .1373 .0374

Options .1199 .5794 .0695

Weighted score for Sharp .4456

Lucidity

Criterion Weight (%) (1) Priority (%) (2) (1)*(2)

Price .608 .1226 .0754

Sound .2721 .2395 .0652

Options .1199 .1865 .0224

Weighted score for Lucidity .1621

Clarity

Criterion Weight (%) (1) Priority (%) (2) (1)*(2)

Price .608 .3202 .1947

Sound .2721 .6232 .1696

Options .1199 .2341 .0281

Weighted score for Clarity .3984

In Table 3-11 the weighted score for each alternative is presented. The Sharp stereo system received

the highest score and should be selected in this example.

Page 36: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

24

Page 37: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

25

4 Methodology & Tools This chapter explains the approach when working with this thesis followed by descriptions of the tools

used.

According to directions from the mentor at the university, this chapter does not hold all of the

content that might be expected of a Master’s degree thesis. Nonetheless, the thesis fulfils the quality

requirements and the reported results should be the same if the study is repeated according to the

course of action below.

4.1 Course of action

The first step in writing this thesis was an introduction to the company and to the assignment. The

purpose and goals were defined. The author and mentors agreed that the extent of this area is

incredibly wide and had to be delimited and simplified so that the model could be easily used. The

delimitations were set to address the situation at Emhart Glass so that the model can be

implemented in practice.

Initially, the problem was specified based on the originally stated problem and the theoretical

research started in order to become familiar with subjects related to the stated problem and to

support the result on theory. All of the information for the theoretical framework was therefore

gathered from various published sources such as books, journals and periodicals. The sources were

accessed mainly from databases such as Elsevier, Ebsco and Emerald with total cost, total cost of

ownership, supplier selection, supplier evaluation and combinations of them as search concepts.

Since the problems discussed in the thesis are based on an assignment requested by the purchasing

department at Emhart Glass Sweden in Sundsvall all problem related issues are based on the

circumstances concerning the situation at this plant. This makes the research strategy a case study.

Referring to Yin (1994) a case study is an empirical phenomenon within its real life context, especially

when the boundaries between phenomenon and context are not clearly evident.

The next step was to explain the present situation at Emhart Glass. To be able to achieve an

understanding of the everyday work and problems the author was situated at the facility during the

writing of the thesis. Unstructured interviews were conducted with co-workers from the quality

department, the assembly line, logistics planning and the financial department to obtain a balanced

picture of the situation. The interviews also aimed to determine which factors to include in the

model. All interviews were individual and lasted for 45 minutes with the respondents in key positions

selected by the mentor.

Additional information about the factors to include was obtained by a form distributed to all

employees in the purchasing department. The results are presented in Appendix A. The author also

studied previous research and internal documentation to identify pertinent factors. The company

mission was also taken into consideration. A suggestion for what factors to include was constructed

and developed along with the mentor and the purchasing manager.

Once the selection criteria were confirmed, a group selected by the mentor was gathered for the

actual weighting of the criteria and sub-criteria of the AHP. There were three experienced

participants from the purchasing department and two participants from the quality department with

individual experience of customer relations and environmental issues. Two criteria were presented

Page 38: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

26

to the entire group and the participants were asked to decide to what extent one was superior to the

other. The weighted AHP was then applied to three sets of suppliers delivering three different

commodities, i.e. twelve suppliers in total. During these tests purchaser were asked to select three or

four suppliers who delivered the same commodity in order to test the AHP. The results were drawn

from these tests.

Along with the development of the AHP, suggestions for what to include in the total cost calculations

were presented to the mentor at Emhart Glass. The elements were obtained in essentially the same

way as the in the AHP but more closely adjusted to suit implementation and the available data. The

calculations where conducted in Mathcad 14.0. and tested on three suppliers used in the AHP.

Mathcad is an engineering calculation software and a standard program at Emhart Glass Sweden.

4.2 Tools

During the study several tools described in literature where used in the study. All of the used tools

are described below.

4.2.1 Interviews

The interviews during the thesis were of characteristically unstructured and initially aimed to

increase the author’s knowledge. This is a one of the goals for unstructured interviews (Merriam,

1994). The interviews also helped to balance the picture of problem areas with opinions from other

departments.

4.2.2 Questionnaire

A questionnaire was distributed to the purchasing department employees. Seventeen responded

which is the equivalent of 41 % answer rate. The questionnaire responses were used to identify

important factors for purchasing in general and from a total cost perspective.

4.2.3 Analytical hierarchy process

AHP is based on paired comparison. Since a major part of the thesis is based on the AHP, its

foundation in described is section 3.3.3.

The method is preferably used with support of decision-making software. In the thesis all calculations

were conducted in ExpertChoice 11.5. The software was selected partly due to its online availability

and the graphic interface. However, the choice was largely supported by its use in scientific articles.

Page 39: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

27

5 Present situation & problems This chapter describes the main problem areas and important activities performed at Emhart Glass.

The information for this chapter was gathered from interviews, internal documentation and other

remarks at the plant.

5.1 Production and purchasing

In March 2008 the assembly line for frames where fully functional and several previously hidden

problems occurred. Earlier production had three teams working simultaneously and if problems

occurred the operators simply helped the operators next to them. Line assembly requires more

accurate planning and deliveries from suppliers both in terms of time and quality. Even a small item

with small monetary value can, if lacking, stop the whole line. Production or the line organization and

base units are directly linked to the purchasing department in the value chain.

The (written) mission for the purchasing department is to set the conditions for the right quality of

purchased items. To achieve the mission the department has the following responsibilities:

• Establish contracts concerning price, quality and lead-time.

• Produce guidelines and methods in order to satisfy specifications.

• Maintain and update the supplier database.

• Evaluate new suppliers and report to the manager for approval.

• Cooperate with the quality department in signing quality agreements.

• Cooperate with the quality department contributing valuation of approved suppliers.

• Continuously present quality level per commodity for the quality council.

• Make decisions about changing supplier and if so, find a new supplier for established items.

When there is a requirement for an item in the direct material category the process starts by

determining if a new or existing supplier can provide the product. If the product is related to a

supplier the ERP-system is updated and a planner is releasing the order which can be a previous

purchasing order or a test order. If a new supplier is needed, the new supplier is first evaluated as

described in 5.3.2 and all administrative work is conducted. A new purchasing order is created and

has to be approved by the supplier. If no discrepancy actions are necessary the good process is

finished and the good ready for use. The process is described in Figure 5-1.

Page 40: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

28

Figure 5-1 Purchasing process of direct material

Several of the other departments have activities closely related to those of the purchasing

department. Some of the activities are listed in Table 5-1 and gives an indication of what

departments are directly influencing purchasing costs.

Table 5-1 Responsibilities related to purchasing department

Quality department Line organization and base

units

Receiving and inspection

• After instructions from head

of purchasing carry out

revision of ISO 9001 at the

supplier

• Revise suppliers with quality

agreements

• Support and develop quality management internally and

at the supplier

• Audit manufacturing

processes of items for

quality agreements

• Decide whether to remove

items from quality agreements due to

disturbance or changes

• After three months from

quality agreement decode

items to “to stock without

inspection”

• Release order from

contracted supplier

• Audit released orders

• Adjust quantity and delivery

time due to changed

requirements

• Update purchasing data if

the original order is changed

• Verify received good

according to present

specifications

• Inform purchasing and

quality departments

concerning discrepancy on

items with quality agreements

• Suggest items suitable for

quality agreements

Page 41: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

29

5.2 Sales & planning

The fact that all major sales activities are located at the headquarters in Switzerland has caused a gap

between the interests of sales and purchasing departments. The sales department is not working

actively in phasing out products and towards standardization. To some extent this causes high costs

since older parts have to be kept in stock as spare parts and new machines have to be modified to fit

the customers’ wishes rather than convincing the customer that modern techniques are better. The

effect is shown in Figure 5-2 . Of the total number of parts, 90 % have an annual volume below 400

pieces a year and 75 % below a 100 pieces annually. The sales force is also used to cut the price on

the end product without taking the total cost into consideration. This is shown to put pressure on the

purchasing department and the suppliers to cut prices rather than focusing on relationships and

improvement.

Figure 5-2 No. of parts in system

Concerning production planning, it is very common that changes from customers are allowed late in

the planning process. Sometimes changes are even made within the internal lead-time. This means

that purchasing has to pressure the suppliers to deliver within their internal lead-time. If the whole

chain is managed like this then planning and manufacturing are forced to go through the process in a

rush and quality problems might occur. Capacity might also be a problem for the supplier if the

supplier is manufacturing several items (as in Figure 5-3). In this case the supplier has to select which

item to manufacture and deliver on time, which may cause problems in the entire supply chain.

Figure 5-3 Supplier of multiple items

Another effect of this is that the problems, originally caused by Emhart Glass, influence the supplier

statistics negatively. The reasons are described in the next section.

010 000

20 00030 000

40 00050 000

60 000

70 00080 000

Total no. of parts

Active no. of parts

Page 42: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

30

5.3 Evaluation

Evaluation is performed on the own department to some extent but much of the work aims to

evaluate the performance of the suppliers.

5.3.1 Evaluation of the purchasing department

In the present situation the purchasing department is evaluated based on purchasing price variance

(PPV). PPV is the difference between a predetermined price and the actual price paid to the supplier.

The predetermined price, denoted as standard cost, is the budgeted price the purchaser should

meet. When purchasing, a positive variance generates less profit for the company and a negative

gives more profit than calculated beforehand. However, the total cost can differ from this key

performance indicator. For instance, if the purchaser decides to buy bigger quantities the actual price

is probably lowered, but the cost for holding items in stock will rise. Other factors not included in

price are all other important cost aspects such as quality and transportation.

If the standard cost is calculated at correct level there should be no variance. The PPV is thereby used

as a parameter for evaluating the standard cost. A high standard cost raises the amount paid for each

product and consequently increases the price of the finished machine. A low standard cost means

that the purchaser has to focus on the price when negotiating with the supplier. The purchasing

department is responsible for suggesting standard cost on products for each year.

5.3.2 Evaluation of suppliers

Before becoming a supplier, an evaluation is performed by the purchaser together with the

company. It contains general information about the firm, financial information, information of

production and production techniques plus how the company manages quality and environmental

issues. The qualification process might be based on a questionnaire filled in by the supplier denoted

as simplified qualification. It might also be filled in onsite following the supplier assessment

workbook, a full qualification. The supplier assessment workbook is a guide for what information to

gather from the supplier. The full qualification renders in an evaluation based on five graded scales

within the following areas:

• General information

• Finance

• Production/technique

• Quality

• Environment

Emhart Glass’ suppliers are also divided into five levels of qualification status for each product based

on the evaluation and performance data:

• Unqualified (UC) – no qualification study has been done. These are suppliers that could be in

the queue for qualification but no action has taken place.

• Conditionally qualified (CQ) – Suppliers that have had the simplified or full qualification

completed but have not yet had a satisfactory performance review AND/OR have extensive

Corrective Actions. Any suppliers that have not had a satisfactory performance review or

have extensive Corrective Actions are considered as Conditionally Qualified. Suppliers

becoming conditionally qualified as a result of passing the simplified or full qualification will

Page 43: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

31

be marked with Conditionally Qualified – phase in (CQ-PI) and suppliers falling out of the

status is marked Conditionally Qualified – phase out (CQ-PO).

• Qualified (Q) – Suppliers that have had the simplified or full qualification completed, have

had a satisfactory performance review and have no outstanding corrective actions.

• Disqualified (DQ) – Supplier that have been removed from the approved supplier list.

Depending on classification, different levels of quality verification is performed on the delivered item.

Approved products are items with quality assurance and are put directly to stock, while preferred

items are tested. About two thirds of all parts have quality assurance contracts.

Data on all incoming goods is saved and evaluated according to On Time Delivery (OTD) and

Technical Quality (TQ) is stored for all tested items.

• OTD – percentage of order lines delivered and reported into the Business Planning and

Control System (BPCS) at the latest on the (by Emhart Glass) requested delivery date

(approved by supplier).

• TQ – value of order line with detected quality problems (including negative variance in order

quantity)

The OTD accuracy has decreased drastically over the past two years but has recovered during 2008.

Figure 5-4 OTD as a percentage of No. of order lines from 1999 to 2008*

Many factors influencing the results of the OTD are caused by Emhart Glass itself. As mentioned

before it is common that changes are made late in the process. If the lead-time was 30 days and

changes are made 25 days from assembly the supplier usually tries to meet the request for shorter

lead-time. At the beginning of the lead-time it is rather common that the planner does not release

the order on the predetermined day. At Emhart Glass the lead-time includes transportation time

which varies depending on supplier. One scenario that may occur is that the supplier has stationary

transportation days. If the transportation day is missed, the products may have to wait a few days

until next pickup which increases the lead-time. Another issue is that incoming goods are not

reported into BPCS on the day of arrival. Goods from different suppliers are supposed to arrive on

separate days, but most of the suppliers have contracted weeks. When too many goods arrive at the

same time the volume is simply too great to handle in receiving.

70

80

90

100

OTD

OTD

*Average

Jan-Oct

Page 44: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

In order to evaluate the supplier and exclude Emhart Glass internal problems

evaluated by OTD-2 that measure

is influenced by the behavior of Emhart Glass it somewhat loses its importance. It happens that the

purchaser and the supplier disagree on the

The purchaser cannot always trust the evaluation as an argument for improving the supplier since

Emhart Glass may cause the root problem itself.

A big part of the OTD failures is however caused by the supplier.

somewhat be explained by the business climate

proportional to OTD due to high workload at the supplier. The improvements in 2008

by a lower load at the suppliers but is also caused by

suppliers.

A developing project is the Bubble

visually. The X-axis is the rejection rate in percent,

of deliveries. The Y-axis is 1 - OTD

each supplier. In the lower left corner the goals to achieve are marked in green and yellow.

development for each supplier can be traced from time to time

Figure 5-5 Bubble chart

Quality feedback system (QFS)

If faulty good are detected upon inspection

into the ERP-system. The report keeps track of all quality issues related to a specific component and

is reported back to the responsible purchaser and to the quality department for actions. Problematic

components are usually sent back to the supplier for corrections

under extreme time pressure it is sent to the Material Revie

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

-1,0 0,0 1,0 2,0 3,0 4,0 5,0

OT

D

Annual monetary volume Q3 2008

32

In order to evaluate the supplier and exclude Emhart Glass internal problems, suppliers are also

measures if the supplier delivered on their system lead-

of Emhart Glass it somewhat loses its importance. It happens that the

purchaser and the supplier disagree on the data, which makes both parties unsure of its accuracy.

The purchaser cannot always trust the evaluation as an argument for improving the supplier since

root problem itself.

A big part of the OTD failures is however caused by the supplier. The development in

business climate. High business activity is believed to be inversely

proportional to OTD due to high workload at the supplier. The improvements in 2008

lower load at the suppliers but is also caused by focus on OTD at Emhart Glas

A developing project is the Bubble chart, Figure 5-5, which aims to illustrate a suppliers

the rejection rate in percent, no. of complaints (No. of TQ issues) related to No.

OTD. The size of the bubble illustrates the annual monet

In the lower left corner the goals to achieve are marked in green and yellow.

development for each supplier can be traced from time to time via the chart.

If faulty good are detected upon inspection or later in the assembly, a complaint is reported as a QFS

The report keeps track of all quality issues related to a specific component and

rted back to the responsible purchaser and to the quality department for actions. Problematic

components are usually sent back to the supplier for corrections. If there is only a minor problem or

under extreme time pressure it is sent to the Material Review Board (MRB) for investigation. The

5,0 6,0 7,0 8,0 9,0 10,0 11,0 12,0 13,0 14,0 15,0 16,0 17,0

Complaint

Annual monetary volume Q3 2008

suppliers are also

-time. Since the OTD

of Emhart Glass it somewhat loses its importance. It happens that the

unsure of its accuracy.

The purchaser cannot always trust the evaluation as an argument for improving the supplier since

The development in Figure 5-4 can

. High business activity is believed to be inversely

proportional to OTD due to high workload at the supplier. The improvements in 2008 are explained

OTD at Emhart Glass with regard to the

which aims to illustrate a suppliers’ performance

o. of complaints (No. of TQ issues) related to No.

. The size of the bubble illustrates the annual monetary volume for

In the lower left corner the goals to achieve are marked in green and yellow. The

complaint is reported as a QFS

The report keeps track of all quality issues related to a specific component and

rted back to the responsible purchaser and to the quality department for actions. Problematic

. If there is only a minor problem or

w Board (MRB) for investigation. The

17,0 18,0 19,0 20,0

1

2

11

7

9

12

5

10

4

6

8

13

14

15

Page 45: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

33

MRB decides if the component can be used in assembly despite the fault or if the component should

be adjusted in-house.

Cost of poor quality

Emhart Glass has been measuring the cost of poor quality since 2002 and covers four areas:

• Internal cost, cost for scrap and adjustments.

• External cost, cost of customer complaints from financial product warranties and administration of complaints.

• Cost of inspections are costs from all units of receiving inspections, random inspections on

quality approved products in stock and similar measuring services. Costs for holding

measuring equipment are also included.

• Purchasing cost of administration for purchased items.

The measurements are separated at the two facilities in Sweden and it is not possible to trace it back

to a supplier.

Page 46: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

34

Page 47: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

35

6 A suggested total cost model This chapter contains the results and analysis of the total cost model. A suggestion for supplier

selection with the analytical hierarchy process is followed by a suggestion for how to calculate the

total cost of purchasing.

The total cost model was constructed in two sections where the first part rates and selects the best

supplier and the second part calculates the total cost. Thereby, the first part is value based and the

latter dollar based.

6.1 The AHP

The first part is the AHP-model that rates the suppliers and gives the presumptive suppliers a score

based on the selection criteria.

6.1.1 Selection criteria

Since there are so many aspects influencing the total cost it is of extreme importance that the right

criteria are considered. Each criterion was selected considering previous research, the present

situation and existing documentation at Emhart Glass. The company mission was also considered as a

ground.

The AHP-model without weights is shown in Figure 6-1 and the process selects the suppliers based

on quality, delivery, agility and environmental performance. Each aspect is explained in the following

sections.

Figure 6-1 Unweighted AHP-model

Page 48: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

36

Quality

Quality is related to costs of poor quality. The first sub criteria for evaluating quality is technical

quality (TQ) which is the ability to fulfill the agreed technical specifications and the ability to deliver

the ordered volume. TQ is already measured upon inspection at Emhart Glass for items without

quality assurance.

If the supplier has a high level of technical quality it might be suitable for quality assurance. The

quality inspection required evaluator is an evaluator of how suitable each supplier is judged to be for

quality assurance or how the supplier fulfils the expectations so that no inspection is required upon

receiving.

Supplier transaction complexity evaluates if there are any limitations for changing from a specific

supplier. This is referred to as transaction costs.

Delivery

Delivery is an important area since the consequences of poor delivery accuracy are very costly,

generally as an effect of delays in the value chain. Reliable OTD evaluates the OTD accuracy of the

supplier and is a well known KPI.

A supplier with short lead-time has a higher degree of control over its value chain and the supplier is

probably more cost efficient.

The geographical distance from supplier is important both in terms of emissions of CO2 but also for

minimizing costs and risks from the transportation itself including insurance, customs duties and

similar.

Agility

Agility can be said to compare the flexibility and responsiveness of the suppliers and how the

suppliers are developing. Agility is also a comparison of how the suppliers are using their assets. The

word agility is preferable to prepare for the future and the ideas of a responsive supply chain and

agile manufacturing.

At first technical development compares the investments in machines and technical knowledge.

However, the necessity of modern machines might be considered with the capacity of functions and

how it is used in mind.

The ability to identify opportunities and collaborate on solutions evaluates to which extent the

supplier initiates and suggests improvements and how the supplier collaborates in solving problems

identified by the buyer.

The level of trust and openness is important so that both parties are willing to share information. The

relationship between buyer and supplier should be built on trust so that the parties can help each

other and gain competitive advantage from each other.

Sometimes circumstances change. The planned production has to be rescheduled, new demands

occur or parts are missing or unusable. In these cases, it is important to have a supplier that is

flexible in its production chain and responsive to the buyer’s needs. This is evaluated by willingness

and ability to accept changes. In a long-term perspective, it can be new or developed products or

services.

Page 49: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

37

Employee satisfaction evaluates the actions for decreasing the level of absence due to illness.

Absence due to illness correlates with work environment, employee satisfaction, motivation and

productivity.

Environmental performance

Environmental performance is a becoming more and more important and the demands from

customers and society are growing. It is therefore necessary to not only minimize the company’s own

environmental impact but also to take responsibility for the whole supply chain.

One step is to recognize whether the supplier has adopted any environmental management system

(EMS) and if the supplier is involved in other programs concerning environmental issues.

From a cost perspective it is also important to reduce waste. With a waste management program the

supplier can actively control and reduce the solid waste tonnage as well as hazardous waste.

By reducing and reusing packaging material the weight, volume and cost of transportation is

increased. A supplier that is actively working with returnable/ reduced packaging material is

preferred.

To consider effects in the whole supply chain the suppliers are evaluated concerning the level of

environmental requirements on their suppliers. The level of second tier supplier environmental

evaluation aims to push the buyer, the supplier and their suppliers to improve the environmental

performance.

Page 50: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

38

6.1.2 The weighted AHP

The weights for the AHP were decided in a meeting with participant from the purchasing and quality

departments described in 4.1. Inconsistency was allowed so that the participants were allowed to

understand the thinking and how to work with the model without any constraints. At this stage, the

results aim to show patterns rather than accurate results. The meeting resulted in the priorities of

Figure 6-2 and are results from ExpertChoice.

Agility Quality Delivery Environmental

performance

Figure 6-2 Priorities of the selection criteria

Agility is by far the most important attribute for the suppliers of Emhart Glass. The level of trust and

openness thereby highly influences the overall picture but Willingness and ability to accept changes

is not far behind. The high priority for agility is not surprising since the most agile suppliers today are

receiving the best scores according to the present KPIs of OTD and TQ.

Page 51: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

39

Quality, technical quality is vital and it is presently one of the most important KPIs. Technical quality

is more important than Quality inspection required but on the other hand a high level of Technical

quality is a supposition for quality assurance.

Concerning delivery, the Short lead-time and Reliable OTD is almost of equal importance. Both lead-

time and OTD are factors that the purchasing department is focusing on in the future improvement

plans. Therefore, geographical distance from supplier is not shown to be a priority even due to the

high risks.

Environmental performance was shown to have a very low priority and it shows that the current

selection of suppliers does not have any focus on environmental issues other than whether the

supplier is certified according to ISO 14001. However, the presence of an EMS received the lowest

priority and waste management the top which is contradictory to the present evaluation form.

6.1.3 Selecting a supplier

The AHP was tested on three sets of suppliers delivering separate commodities. The graph in Figure

6-3 is the result from one of the tests with four suppliers. The names of the suppliers were deleted

due to the sensitive information of the individual suppliers.

Figure 6-3 Supplier selection with AHP

In this test “red” was considered the best supplier despite not performing best on all aspects. In the

graph it is obvious what strengths and weaknesses are associated with each supplier. If the suppliers

are acknowledged with the model the comparisons might be used as support in negotiations. In

these tests the comments from the purchasers was positive since the results corresponded with their

gut feeling. This model did now show their beliefs were correct and on what aspects their gut feeling

was wrong. Since the involved purchasers where positively surprised by the accuracy of the model

the aspects included in the AHP are considered relevant with some exemptions commented in

Conclusions. The same graph can be presented for each of the four performance indicators.

Page 52: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

40

6.2 Calculating the total cost of purchasing

The calculation of the total cost of purchasing is the dollar-based part of the total cost model. It is

divided into the segments suggested in literature covering cost of poor quality and inventory cost.

The available data in this specific case is also considered and decides how each post is calculated so

that actual calculations could be conducted. The calculations are thereby based on historical

performance of the suppliers. The calculation is conducted for one supplier at a time. The elements

of the total cost calculation follow below:

Formula 6-1 Administrative ordering cost (A)

� = �� ��

The administrative ordering cost is all costs for administrating an order. In the thesis, it does not

include delivery control and receiving activities that has a separate post called Inspection cost. The

administrative cost is calculated by multiplying an estimated standard cost for administrating one

order (��) by the number of invoices (� ) sent to the supplier. The standard cost was estimated by the

head of the purchasing department and the number of invoices was found in BPCS.

Formula 6-2 Quality feedback system (QFS)

��� = ���� ∗ �����

Formula 6-3 Material review board (MRB)

�� = �� � ∗ ����

QFS and MRB is the cost for each QFS report and each MRB errand. A standard cost for the reports

(���� and �� �) as well as the sum of QFSs and MRBs for each supplier was found in documents from

the quality department.

Formula 6-4 Inspection cost (I)

� = �� ��� �

Inspection cost is the cost for inspecting items for technical quality (TQ) upon receiving. The total

cost for conducting quality control (��) is multiplied by the number of items delivered from the

supplier (��) divided by the total number of received items (� � ). The inspection cost for the supplier

is thereby taken into consideration. �� was retrieved from the quality department, �� and � � from

BPCS. Inspection cost is only calculated for suppliers without quality assurance agreements.

Formula 6-5 Stockouts (SO)

�! = !� ∗ "

Stockouts includes backorder costs, lost sales costs and lost customer costs. It was calculated with

the assumption that each late order line causes delays in the assembly. The delay is avoided by

working overtime and a cost for overtime (!�) occur in terms of salary. x late orderliness, according

to OTD, is said to be equivalent with x hours of overtime. The number of late orderliness was

retrieved from the portal and the value of x was calculated by managers in assembly.

Formula 6-6 Holding cost (H)

# = $ ∗ %%

Page 53: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

41

The mean value of all items in stock for the supplier (v) times the carrying charge (cc) is the holding

cost. Data was retrieved from BPCS.

The calculation also holds the cost for transportation (T) retrieved from the logistics partner and the

price (P) of all purchased goods from the supplier. P is the price according to purchasing orders from

BPCS.

Formula 6-7 The total cost of purchasing (TCP)

&�' = � + ��� +�� + � + �! + # + & + '

The final formula representing the TCP is Formula 6-7. Since TCP generates an estimated cost it can

be used for comparing the development between different periods in total or segment by segment. P

is the biggest element in monetary terms and is preferably excluded to keep track of the cost of poor

quality and inventory costs.

Since the purchasing price adds most costs to the TCP an index was formed that shows the level of

total cost in relation to P.

Formula 6-8 Cost Performance Indicator

�'� = 100 +1 − '&�'-

The Cost Performance Indicator (CPI) can be used for comparing different suppliers despite the

proportion of P, which is not possible by only extracting P from the TCP.

Page 54: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

42

Page 55: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

43

7 Conclusions This chapter holds the conclusions from the AHP, the TCP and some conclusions for the suggested

model.

This thesis shows that numerous aspects influence the total cost of purchasing. Therefor the problem

is to find the most important aspects rather than all aspects. Previous studies show that the

categorization of costs has changed over the years but the elements are almost the same except

from the importance of environmental factors.

The approach for allocating and categorizing costs differs if the aim is value-based or dollar-based.

This is why the thesis proposes a model in two parts where quality, delivery, agility and

environmental performance are suggested for the value-based AHP and cost of poor quality and

logistics costs for the dollar-based TCP.

7.1 The AHP

The AHP is a process that is easy to use and the results were very concrete and straightforward. Once

the criteria were selected and the weights set, the actual comparison between suppliers was

estimated to about 20 minutes using ExpertChoice. This is considered very fast with respect to the

number of factors included in the comparison and should imply better accuracy and more frequent

evaluation of suppliers.

The criteria presented in the thesis forced the department to focus on the total cost and decide what

factors are the most essential when selecting a supplier. The results showed that agility was the most

important aspect to consider and the overall opinion was that this reflects the current situation at

Emhart Glass. Since many purchasing orders are released late in the process, the agile supplier can

respond to the demands from the buyer and promise to deliver on the requested day.

The AHP is very suitable for supplier selection and can be developed and adjusted to suit any future

strategy. Although the AHP has many inputs it does not cover everything. The results should be

evaluated and compared with the purchasers’ judgment and experience.

7.2 Conclusions from the TCP

Despite the fact that the TCP is not entirely correct it is a step in the right direction. It opens for an

awareness of the elements in the TCP and shows what element is related to the greatest costs. This is

very useful when it comes to reducing the costs by indicating where to put the most effort on

improvements. However, most important is that it provides a direct estimate for the costs and

motives in supplier selection.

The TCP is preferably used during negations to show the supplier the cost of inadequate actions or

weaknesses in the buyer-supplier relationship. The TCP can also be used for calculating cost savings

through improvements and for estimating the costs of different strategies.

7.3 Final conclusions

The overall strategy has to be communicated to the entire organization. A situation where

management focuses on price in terms of PPV and sales in terms of the price paid by the customer is

hard to combine with high accuracy in quality and delivery requested by purchasing, planning and

Page 56: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

44

the assembly. By implementing the suggested AHP, the supplier selection process can be illustrated

and the selection of a specific supplier can be motivated.

By letting different departments do the weighting, the AHP can show differences and similarities

among the demands on the suppliers. This can help create a solid overall strategy based on the

expectations of each department.

In order to take advantage of the results and conclusions of the thesis Emhart Glass is recommended

to invest in software for decision making, for instance ExpertChoice. It is possible to do the

calculations in Microsoft excel, Mathcad or similar but it is the graphic interface that adds usability.

Emhart should consider adopting different strategies for different commodities to a greater extent

than in the present situation. Regarding total costs, the results from both the AHP and the TCP

differed among the commodities. The weights in the AHP can be the same for all commodities but

the TCP can be improved to suit each commodity. The TCP presented in the thesis is constructed to

suit any purchasing situation of direct material but the accuracy can be better by adding or excluding

elements specific to the commodity.

The overall opinion at Emhart Glass in Sundsvall is that the model is interesting and focuses on new

areas outside the present framework for what is valuable at a supplier. It takes the focus away from

price and presents a wider range of criteria for supplier selection. It also presents a picture of the

costs generated when purchasing direct materials that can be calculated for a specific supplier.

Consequently, the thesis demonstrates a new KPI which indicates the total cost performance of

purchasing from a specific supplier. The CPI indicates the whole picture of purchasing and denotes

changes in the elements of the TCP. The new indicator is preferably used along with the present

indicators to apply a total cost perspective and evaluates the purchasing department and the

relations between a supplier and Emhart Glass. PPV should only be used to evaluate if the standard

cost is set at the right level.

Page 57: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

45

8 Discussion & Suggestions for further studies The focus on total cost was shown to be a very wide ranging problem with a huge amount of aspects

to take into consideration. Despite rigorous planning much time passed studying literature that is not

referred to in the thesis but which lead to a greater understanding and the range of the problem

area. Much of that science suggested more advanced mathematical programming but that was not

applicable to single sourcing scenarios under the circumstances of this case.

Before studying literature on the subject, the idea was to create a dollar-based model only. However,

the idea changed since no support for a single sourcing model was found covering the range of the

problem. A model with inputs like the AHP is more general and can be adapted to any organization

by changing the weights. The TCP is not as general but the elements are probably found in all

manufacturing companies. The thesis can thereby provide ideas of what elements to include in a

similar model.

8.1 The AHP

The strength with the AHP was shown in the end of the process when it was tested. It was easy to

overview the results and draw conclusions about the performance of each supplier. However, the

input to the model is sensitive and the results will most probably differ somewhat when the persons

involved in the process are more familiar with it. During the meeting when the criteria were

weighted, the participants learned how to think during the meeting and the comparisons were made

more quickly. It might also be interesting to achieve more inputs from groups from other

departments and have separate meetings with for example assembly, production and management.

The content and the thinking in the AHP showed itself to be different in the two weighting steps. In

the first step, where only the criterion where compared, it was easy to understand the differences

between all included aspects. The question during the first comparisons was:

How much more is one criteria preferred over the other? With a specific supplier in mind the

question asked was:

Which supplier is preferred with respect to a certain criteria? The latter caused confusion on some

criterion, for example the necessity of comparing the geographical distance from supplier if all

suppliers are located in the south of Sweden. In the comparison between suppliers there was also

some confusion on how to compare given a lack of information. This occurred particularly in

comparison of environmental performance. This area was not considered in the current evaluation

form and it was hard for the purchasers to have an opinion at all. However, the example can be used

to explain one of the biggest strengths with the process. As long as the same reasoning is used for a

criterion, the comparison is made on the same foundation.

The AHP conducted in the thesis are exceeding the level of inconsistency. It might change the result

of the tested model. However, accuracy is not as important in the test on suppliers as the selection of

the included criteria. However if the model is implemented and used for supplier selection new

weights have to be set.

8.2 The total cost of purchasing

The applied TCP is not as general as the AHP since the formulas are based more on available data

than a general purchasing situation. The fact that the calculations should be applied and calculated

Page 58: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

46

on single suppliers caused some problems in a late stage of the thesis and some elements were

excluded from the formula.

One important known cost that was not included was cost of customer complaints or warranties. In

some cases there was no doubt what caused the warranty claim but not always. To avoid a situation

where each individual complaint should be studied it was deleted from the formula. Depending on

commodity the likeliness of discovering problems differed. For example, problems with castings were

always discovered since they were used in production. Problems with circuit boards on the other

hand, could not be seen visually and was not always discovered during testing and thereby sent to

the customer resulting in a customer complaint. The reason for not including customer complaints

was that the data could not be allocated to an individual supplier.

Costs of environmental impact were also excluded. The intention was to calculate the emission of

CO2 and use the price for buying emission rights as an integer. Since the cost for reducing CO2 is very

small it should not have had any effect on the TCP.

8.3 Suggestions for further studies

A further recommendation is to develop a method to trace customer complaints back to a supplier.

Since the annual cost for warranties is extensive, it can be decreased for Emhart Glass by sharing the

cost with the responsible supplier.

It might also be interesting to do a complete study over organizational problems. Extensive savings

can probably be made if all activities in the value chain are working towards the same goal. A

suggestion is to begin with the communication and problem solving activities between Sweden and

Switzerland.

Another suggestion is to improve the communication between the suppliers and Emhart Glass. Much

of the administrative work could be performed automatically or by the supplier by electronic data

interchange.

Page 59: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

47

9 Bibliography Alnestig, P., & Segerstedt, A. (1996). Product costing in ten Swedish manufacturing companies.

International journal of production economics , 46-47, 441-457.

Arbetsmiljöverket. (2008). Arbetsmiljölagen. Arbetsmiljöverkets publikationsservice.

Atkinson, A. A., & Kaplan, R. S. (1998). Advanced management accounting (3d ed.). Upper Saddle

River, USA: Prentice Hall cop.

Bergman, B., & Klefsjö, B. (2001). Kvalitet från behov till användning. Lund, Sweden:

Studentlitteratur.

Bhutta, K. S., & Huq, F. (2002). Supplier selection problem: a comparison of the total cost of

ownership and analytic hierarchy process approaches. Supply Chain Management: An international

Journal , 7 (3), 126-135.

Bowersox, D. J., Closs, D. J., & Cooper, M. B. (2007). Supply Chain Logistics Management (2nd ed.).

Michigan, USA: McGraw Hill.

Carr, A. S., & Smeltzer, L. R. (1997). An empirically based operational definition of strategic

purchasing. European Journal of Purchasing and Supply Management , 3 (4), 199-207.

Çelebi, D., & Bayraktar, D. (2008). An integrated neural network and data envelopment analysis of

supplier evalutation under incomplete information. Expert systems with Applications , 35 (4), 1698-

1710.

Davis, O. (1985). Strategic Purchasing. Purchasing Management Handbook , 59-83.

Degreave, Z., Labro, E., & Roodhoft, F. (2000). An evaluation of vendor selection models from a total

cost of ownership perspective. European Journal of Operational Research , 125 (1), 34-58.

Demirtas, E. A., & Üstün, Ö. (2008). An integrated multiobjective decision making process for supplier

selection and order allocation. Omega , 36 (1), 76-90.

Department for Environment Food and Rural affairs. (2006). Environmental key performance

indicators - Reporting guidelines for UK Business. London: Queens printer and Controller.

Dickson, G. (1966). An analysis of vendor selection systems and decisions. Journal of Purchasing , 2

(1), 5-17.

Drury, C. (2000). Management & Cost Accounting (5th ed.). London, UK: Thomson Learning.

Ellram, L. M. (1995). Total cost of ownership: An analysis approach for purchasing. International

Journal of Physical Distribution & Logistics , 25 (8), 4-23.

Emhart Glass Sweden AB. (2006). Från hantverk till världsledande industri. Sundsvall, Sweden:

Emhart Glass Sweden AB.

Page 60: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

48

Ghodsypour, S., & O'Brien, C. (1998). A decision support system for supplier selection using an

integrated analytic hierarchy process and linear programming. International Journal of Production

Economoics , 56-57, 199-212.

Handfield, R., Walton, S. V., Stroufe, R., & Melnyk, S. A. (2002). Applying environmental criteria to

supplier assessment: A study in the application of the analytical hierachy process. European Journal

of Operational Research , 141 (1), 70-87.

Hanson, A. (2004). Hälsopromotion i arbetslivet. Lund: Studentlitteratur.

Harrington, J. H. (1999). Performance improvement: A total poor quality cost system. The TQM

Magazine , 11 (4), 221-230.

Innes, J., & Mitchell, F. (1993). Overhead Cost. London, UK: The Chartered Institute of Management

Accountants.

Johnsen, T. E., Johnsen, R. E., & Lamming, R. C. (2008). Supply relationship evaluation: The

relationship assessment process (RAP) and beyond. European Management Journal , 26 (4), 274-287.

Juran, J. M., & Godfrey, B. A. (1998). Juran's Quality Handbook (5th ed.). New York, USA: McGraw-

Hill.

Kaplan, R. S., & Cooper, R. (1997). Cost & Effect: Using Integrated Cost Systems to Drive Profitability

and Performance. Boston, USA: Harvard Business School Press.

Kokangul, A., & Susuz, Z. (2009). Integrated anlytical hierarch process and mathematical

programming to supplier selection problem with quantity discount. Applied Mathematical Modelling

, 33 (3), 1417-1429.

Kraljic, P. (1983, September). Purchasing must become Supply Management. Harvard Business

Review , p. 111.

Lai, K.-H., Gunasekaran, A., & Edwin Cheng, T. (2008). Responsive supply chain: A competitive

strategy in a networked economy. Omega , 36 (4), 549-564.

Martinsons, M. G. (2008). Relationship-based e-commerce: theory and evidence from China.

Information Systems Journal , 18 (4), 331-356.

Mattson, S.-A. (2004). Logistikens termer och begrepp. Stockholm, Sweden: PLAN Föreningen för

Produktionslogistik.

Merriam, S. B. (1994). Fallstudien som forskningsmetod. Lund: Studentlitteratur.

Nollet, J., Calvi, R., Audet, E., & Côté, M. (2008). When excessive cost savings measurement drowns

the objectives. Journal of Purchasing & Supply Management , 14 (2), 125-135.

Parkinson, S. (1999). Agile manufacturing. Work study , 48 (4), 134-137.

Ramsey, J., & Croom, S. (2008). The impact of evolutionary and developmental metaphors on

purchasing and supply chain management: A critique. Journal of Purchasing & Supply Management ,

14, 192-204.

Page 61: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

49

Rodney, M., Denis, L., Henderson, J., & Hazlett, S.-A. (2008, October). A grounded theory research

approach to building and testing TQM theory in operations management. Omega , 36 (5), pp. 825-

837.

Saunders, M. (1997). Strategic Purchasing & Supply Chain Management (2nd ed.). Great Britain:

PITMAN Publishing.

Stevenson, W. J., & Ozgur, C. (2007). Introduction to management science weith spreadsheets. New

York, USA: McGraw Hill.

Tam, V. W., Tam, C., Zeng, S., & Chan, K. (2006). Environmental performance measurement indicators

in construction. Building and Environment , 41 (6), 164-173.

Tseng, F.-M., Chiu, Y.-J., & Chen, J.-S. (2009). Measuring business performance in the high-tech

manufacturing industry: A case study of Taiwan’s large-sized TFT-LCD panel companies. Omega , 37

(3), 686-697.

van Weele, A. J. (2005). Purchasing & Supply Chain Management (4th ed.). Eindhoven, Netherlands:

Thomson.

Viale, D. J. (1996). Basics of Inventory Management - From Warehouse to Distribution center. USA:

Course Technology Crisp.

Wouters, M., Anderson, J. C., & Wynstra, F. (2005). The adoption of total cost of ownership for

sourcing decisions––a structural equations analysis. Accounting, Organizations and Society , 30 (2),

167-191.

Yeung, A. C. (2008). Strategic supply management, quality initiatives, and organizational

performance. Journal of Operations Management , 26 (4), 490-502.

Yin, R. K. (1994). Caste Study Research - Design and Methods (2nd ed.). USA: Sage publications, Inc.

Page 62: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

50

Internet

Grebener, P. (2004, June 12). Maskinteknik, info från inriktningsledarna. Retrieved September 30,

2008, from Royal Institute of Technology (KTH) Homepage:

http://www3.telge.kth.se/maskin/6s2405/mapp/Kursmaterial.doc

MGI Management institute Inc. (1999). Online courses: MGI Management Institute. Retrieved

November 6, 2008, from MGI Basics of Supply Chain Management:

www.mgi.com/onlinecourses/e56/unit5/57.html

SA, E. G. (n.d.). Our company: Emhartglass. Retrieved December 16, 2008, from Emhartglass:

http://www.emhartglass.com/en/our-company

Shields, H. C. (2005, May 25). Single Sourcing: Pros & Cons. Retrieved January 21, 2009, from

ThomasNet: Industrial Newsroom:

http://news.thomasnet.com/IMT/archives/2005/05/single_sourcing.html

Verbal

Position Department

Quality engineers Quality department

Manager mechanism assembly Production Manager financial department Finance

Logistics developer Logistics

Purchasers Purchasing department

Page 63: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

1

Appendix A. Questionnaire for deciding relevant factors of purchasing

Hej, jag har nu kommit så långt med examensarbetet att det är dags att välja ut vilka faktorer som är relevanta i en modell för totalkostnad. Eftersom du är expert är jag tacksam för din hjälp med att identifiera faktorerna genom följande frågor:

1. Vilka faktorer är viktiga vid inköp ur ett totalkos tnadsperspektiv? (börja med att lista faktorer, max 10 st. Rangordna därefter faktorerna genom att markera med siffror från 1 och uppåt där 1 är viktigast)

Viktiga faktorer vid inköp ur ett totalkostnadsperspektiv? Rang Styckkostnad

Rätt artikel/utförande

Kvalitet

Leverantörssäkerhet

Utarbeta strategi för köp av varor/tjänster (1. Tex standardprodukter – fler leverantörer, prispress, 2. Specialkompetenskrävande prod – få leverantörer, nära samarbete) eller (1. Återkommande behov – RAMAVTAL 2. Sporadiska behov – MARKNADSANALYS, PRISPRESS 3. Investeringar – LEVERANTÖRSUTV/VAL, PRODUKTENS KVALITET, SERVICEGRAD, KOMMERSIELLA OCH BRANSCHVILLKOER, PRIS/AVTAL

Rätt tid

Teknisk kvalitet

1

Ställkostnad

Rätt kvalitet

Pris

Kvalitet Begränsa och standardisera produktsortiment Rätt kvalitet

Leveransprecision

2

Kvalitet

Rätt pris

OTD

Ledtid

Samordna inköp (skaffa effektiva rutiner för inköpshantering, centrilera så långt det går.) Flexibilitet i produktionen

Pris

3

Leveranssäkerhet

Rätt leverantör

Transporter

Pris Optimera och utveckla de administrativa flödena (tex samlingsfakturor, förkontering Pris

Leveranstid

4

Frakter

Rätt tid (OTD + Ledtid)

Processer

5

Page 64: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

2

Flexibilitet

Emballage

Miljöhänsyn (transporter, emballage, korrosionsskydd etc.

Miljö

6

Kontroll overhead cost

Miljö

Ställkostnad

7

Ekonomi overhead cost

Transport

8

Tull 9

10

2. Vilka övriga faktorer är viktiga vid inköp? (börja med att lista faktorer, max 10 st. Rangordna därefter faktorerna genom att markera med siffror från 1 och uppåt där 1 är viktigast)

Övriga viktiga faktorer vid inköp? Rang Maskinpark som passar våra produkter

Samarbete med leverantör

Ständiga förbättringar

Att orderhandläggaren pratar svenska el. bra engelska

Antal leverantörer

1

Nära samarbete med lev. för att utveckla nya lösningar och material

Öppenhet Leverantörssamverkan

Att lev. har ordning i sitt system

2

Miljömedveten Kommunikation

3

Anpassningsbar

Pålitlighet – ärlighet

4

Information 5

Egna initiativ (från lev.) 6

Page 65: 2009:050 CIV MASTER'S THESIS - DiVA portal1025108/FULLTEXT01.pdf · 2016. 10. 4. · 2009:050 CIV MASTER'S THESIS A Model for Supplier Selection & Total Cost of Purchasing Henrik

3

7

8

9

10

Kommunikation med leverantör

Logistiska lösningar

Leverantör som tar initiativ till förändring (inte prishöjning)

Svar utan rang

3. Övrigt att tillägga? (tips, synpunkter, frågor)