2005 Eni Field Trip - Libya
Giorgio MoscatelliProjects Director
Faisal ShitaSenior Offshore Project Manager
September 23rd, 2005
2
Western Libya Gas Project: overall scheme
LIBYA
LIBYA
SICILY
SICILY
540 Kmcoast to coast
•Ø 32”
•Ø 16” •Ø 36”
•Ø 10”
•Ø 32”
1.127
540 Km
MELLITAH
SABRATHA Plt.
SICILY
GELA
BahrEssalamLIBYA
Wafa
520 kmCoast to Coast
Productionstart-up on schedule
and budget
3
Western Libya Gas:world scale project
>20,000 people employed 10 international main contractor/consortium
9 main engineering/construction locations outside Libya
Langfang
YokohamaFukuyama
London
Sabratha & Bahr Essalam
Mellitah
Wafa
ParisItaly
Tripoli UlsanKuantan
Dusseldorf
Malaysia
4
Western Libya Gas Project Upstream Overview
Eni Gas operator (Eni 50% - NOC 50%)
Reserves (Eni share):950 M boe
Gas Production of 10.0 Bcm/Y (100%)4.0 bscm/y - Wafa6.0 bscm/y - Bahr Essalam
of which:
8.0 bscm/y delivered to Italy2.0 bscm/y delivered to local market
Peak production by 1Q06:Eni equity: 128 kboe/d
Local Gas Line
540 K
m
Onshore Pipelines
WAFADesert Plant
MELLITAHComplex
Wafa Coastal Plant, Mellitah Plant and gas compression
station
SABRATHAPlatform
SubseaClusters
Gas Export Line
GREEN STREAM
5
Western Libya Gas Project WAFA Field Production 2005 (100%)
Wafa GasWafa NGLWafa Oil/Cond.
Start up on October 2004 On schedule
128 131
Budget Jan-Aug 05 Actual Jan-Aug 05
Kboe/d
6
Bahr Essalam Field DevelopmentHighlight
June 2002Project Kick-off
4 August 2005First offshore gas
410 kmCables
50,000 tEquipment & Structures
27Number of wells
300 kmSealine & Gathering
4,000Manpower
7
Sabratha Platform Jacket – Main Features
20 slots, 202 m height, 24,000 T
8 legs, 16 foundation piles (120-150m long each)
Installation method: launched and self upending
Installation campaign 3rd – 19th October 2004
Bahr Essalam Field DevelopmentSabratha Platform
8
Deck Installation Main Features
Bahr Essalam Field DevelopmentSabratha Platform
The deck installation was performed by the crane vessel Saipem 7000, in 3 main lift from 29th October to 11th November 2004 as follows:
Integrated deck, 12,100 T weight in lifting condition. This was the world record as single offshore lift
Living Quarter, 1,700T weight, accommodation for 117 people
Flare, 700T weight & 117m length
Other minor lifts
The process plant is designed to treat:
• 25 MlnSm3/d of dry Gas• 5,100 m3/d of condensate
9
Living Quarter Installation Early November 2004
Living Quarter Installation
The Living Quarter installation was performed by the crane vessel Saipem 7000 early November 2004 during the Deck installation campaign
The living Quarter, 1,700T weight is capable to accommodate 117 people
Jacket Installation 3rd-19th October ‘04
Bahr Essalam Field Development Sabratha Platform
10
Hook-up & Commissioning 12th November 2004 – 24th July 2005
Bahr Essalam Start up 4th August 2005
Bahr Essalam Field DevelopmentSabratha Platform
11
MANIFOLD 1AND HP
SEPARATOR 1
RAW GAS FROM
SUBSEAWELLS
MANIFOLD 2AND HP
SEPARATOR 2
TESTMANIFOLDAND TEST
SEAPARATOR
FLASH GASCOMPRESSOR
HP PRODUCTIONCOOLING AND DEHYDRATION
TRAIN 2
CONDENSATERECOVERY
TRAIN
CONDENSATEEXPORT SYSTEM
GAS EXPORTPIG TRAP
BOURI GAS PIG TRAP
BOURICONDENSATE
PIG TRAP
To Mellitah
To Mellitah
Bahr Essalam Field DevelopmentSabratha Platform - Overall Process Scheme
RAW GASFROM
PTF WELLS
HP PRODUCTIONCOOLING AND DEHYDRATION
TRAIN 1
12
Each of the 11 subsea Xmas Tree has the following main features:
Pressure Rating 5000 psiWeight 38 TonDimensions 4.5m L x4.5m W x5m HActuated valves controlled from the Platform through a control umbilical
Presently 8 subsea wells have been completed (5 on Endline & 3 on Midline)
Bahr Essalam Field DevelopmentSubsea System
Subsea X-mas Trees
13
Bahr Essalam Field DevelopmentSubsea System
Endline and Midline PSMs installed on September 2004
PSMs post installation test and PGB-PSM spoolsinstallation October–December 2004
Protective Structure Manifold (PSM)
11 Subsea wells divided in two clusters (5+6)
The protection is granted by two PSM with production facilities
The main features of each PSM are:
6 slots830 T, 65m L x18.5m W x10m H1 production manifold +1 test manifold with actuated valves controlled from the Platform
14
Sealine installation campaign 18th May 2004 – 16th June 2005
Sealine ready for Gas in 16June 2005
Gathering system from the subseawells to Sabratha Platform:
22” production line + 8” test line - 24 Km long claddedwith corrosion resistant alloy.Design Pressure 211 bar 4” service line - 24 Km long Design Pressure 345 bar
Export system from Sabratha Platform to Mellitah:
36” gas sealine - 107 Km longDesign pressure 88 bar 10” condensate sealine - 107 Km long. Design pressure 79 bar
Sealines system
Bahr Essalam Field DevelopmentSealines
Bahr Essalam Field Development
Mellitah Plant
16
Slug Catcher Condensate Stabilization
Gas Trains # 1,2,3
Steam and Power Generation
Common Process Facilities
Buffer Tank & StabilizedCondensate Storage Tank
Liquid SulphurStorage
Solid SulphurArea
Sulphur RecoveryTrains # 1,2,3
Main Pipe-rack West /East
Bahr Essalam Field DevelopmentMellitah - Offshore Gas Treatment Area
17
4,400TTank Erection
1,800KmE & I Cable Pulling
27,000,000hrsManhours worked
14,700TPiping Installation
22,700TPipe rack & Steel Structures
62,000m3Foundations and Buildings
QuantitiesUnitDescription
Bahr Essalam Field DevelopmentMellitah Plant - Main Features
18
RECEIVINGTRAPSAND
SLUG CATCHER
CONDENSATETREATINGTRAIN 1
CONDENSATETREATINGTRAIN 2
OFF - GAS COMPRESSION
GASTREATINGTRAIN 1
GASTREATINGTRAIN 2
GASTREATINGTRAIN 3
LPG FRACT.TRAIN 1
LPG FRACT.TRAIN 2
STABILIZED CONDENSATE STORAGE
LPG TO WAFA COASTAL
STORAGE & EXPORT FACILITIES (6,400 bbl\day)
SULPHUR TO SOLIDIFICATION &
SHIPLOADING FACILITIES (528 Ton/day)
GAS CONDENSATE
GAS TO METERING & SALES (6.6x109
Sm3/y)
45,000 m3
BUFFER
45,000 m3
STORAGE
45,000 m3
STORAGE
WAFA EXPORT
39.000 (bbl/day)
Bahr Essalam Field DevelopmentMellitah Plant - Overall Process Scheme
SULPHURTRAIN 1
SULPHURTRAIN 2
SULPHURTRAIN 3
19
2 condensate stabilization trains with a total process capacity of 39,000 bbls/day
Bahr Essalam Field Development Mellitah Plant
Condensate Stabilization
20
3 gas treatment trains with a design capacity to process and produce 6.6 MMscm/day of gas each
The process consists of gas sweetening, sulphurremoval, gas dehydration for water removal and hydrocarbon dew point control with NGL extraction (6,400 bbl/day)
Bahr Essalam Field Development Mellitah Plant
Gas Treatment
21
3 sulphur recovery trains are installed
The total recovery capacity is 528 Ton/day of sulphur
Each train consists of MDEA absorber, MDEA regenerator, thermal reactor and sulphurcondenser pit
Bahr Essalam Field DevelopmentMellitah Plant
Sulphur Recovery
22
2 tanks for liquid sulphurstorage, solidification unit and solid sulphur storage handling section
The sulphur is shipped through a belt conveyor and a ship loader located on the jetty
Bahr Essalam Field DevelopmentMellitah Plant
Sulphur Storage
23
4 HP steam boilers with a capacity of 330 Ton/h of steam each
Steam is utilized for power generation and process purposes
3 steam turbine with a power generation capacity of 25 MW each
Bahr Essalam Field DevelopmentMellitah Plant
Steam Boilers
24
3 tanks with a capacity of 45,000 m3 each
The condensate coming from the treatment train is stored and then sent to the fiscal metering and export system
Bahr Essalam Field DevelopmentMellitah Plant
Condensate Storage