60
1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire Builder, in motor 5019 Pictures and captions by Alfred B Butler, Pullman WA collection of Bruce Butler PowerPoint presentation by Bruce Butler

1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Embed Size (px)

Citation preview

Page 1: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1953 cab ride across the Great Northern’s electrified subdivision

Westbound on train #5, the Cascade, in diesel 251-A

Eastbound on train #2, the Empire Builder, in motor 5019

Pictures and captions by Alfred B Butler, Pullman WAcollection of Bruce Butler

PowerPoint presentation by Bruce Butler

Page 2: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Summer 1953 cab ride across GN’s electrified zoneIntroduction by Bruce Butler

Dick Harbour was a Professor of Electrical Engineering at Washington State College in PullmanWA. Every summer he would arrange a field trip for some students. In the summer of 1953this was a trip in the locomotive cab across GN’s electrified zone from Wenatchee to Skykomishon train #5, the Cascadian and returning on train #2, the Empire Builder. The student who wasscheduled for this trip had to cancel at the last minute. My father, Alfred B Butler, was aProfessor of Physics at WSC. Dick, knowing my father’s interest in trains and his specialinterest in railroad electrification, invited him to take the students’ place on the trip. I alsowanted to go very badly, but at age 13 was deemed to be too young for such an adventure.Maybe dad just didn’t want to rock the boat and possibly loose out on a good thing!

I did get to go that morning when we dropped him at the Wenatchee station to get onto #5, andagain that evening when #2 arrived. These pictures were taken by him on both the westboundtrip and on the eastbound return trip. While the “Cascadian” used a 2-unit FT diesel set that ranthrough from Spokane to Seattle, the eastbound “Empire Builder” had one of the big W classelectric motors built by General Electric in 1948.

My father was born in 1911 and developed an early interest in things scientific and technical.The Milwaukee’s electrification project was big news when he was a boy and it captured hisimagination and interest. He grew up in Spokane WA where his father, Alfred D Butler, was theSpokane City Engineer and made frequent trips to the coast. His preferred route was alwayson the Great Northern.

The remainder of this presentation is taken from images I scanned from my father’s photoalbum. The picture captions are his.

Page 3: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Original trip notes by Alfred B Butler - part 1

Page 4: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Original trip notes by Alfred B Butler - part 2

Page 5: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.1 - No. 5 holds the “Main” at Monitor for a meet with No. 6.

Page 6: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.2 - 12:51 PM No. 6 shows up on time

Page 7: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.3 - Eastbound “Cascadian” growles slowly into the passing track.

Page 8: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.4 - Diesel 251-A idles waiting for #6 to clear. #251-A doing 330 miles/day has run over 1,800,000 miles. 1350 hp each unit.

Page 9: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.5 -Engineer Al White notches back the throttle with an eye on ammeter. 1000 amps. #250 and #251 are the oldest FTs on GN. 75 RPM per throttle notch.

Page 10: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.6 - 5 cars trail #251. Friction 5# per ton. Load 20# per ton on 1% grade.

Page 11: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.7 - Winton tunnel. Engineer got 4 deer last night. 1.6% grade.

Page 12: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.8 - Rails & Trolley reflect light from tunnel opening. Tunnel on a curve. Pantograph apt to bounce.

Page 13: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.9 - Length 4059.4 feet. Sound level high.

Page 14: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.10 - Flag stop at Winton. On time at 1:42 pm

Page 15: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.11 - A hand on the whistle; rain on the windshield.

Page 16: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.12 - new $1,000,000 alignment straightens track.

Page 17: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.13 - Mile post 1696.3 - high trestle & tunnel.

Page 18: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.14 - Looking down from the trestle. 2.2% grade.

Page 19: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.15 - A mountain in the way. Short tunnel; you can see thru.

Page 20: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.16 - We crest the grade at Berne. Elevation 2883 ft. Cascade tunnel length 7.79 miles or 41,152 ft.

Page 21: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.17 - 2:04 pm. Drop 500 ft in 8 miles. 8 mi/hr wind west to east through open tunnel. 34-36 applications of air from here to Skykomish.

Page 22: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.18 - 10 degree curve. Outside rail elevated 3-3/4” to allow 30 mph speed.

Page 23: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.19 - Slow order. Movement of bank. 15 mph. GN Geologists are draining hillside. New rail ready to install.

Page 24: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.20 - Looking back from Engineer’s side. Acceleration coasting 12 mph per minute. 1.57% grade.

Page 25: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

1.21 - Skykomish - on time 2:50 PM. Rain on windshield.

Page 26: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.0A - #5 makes a brief pause at Skykomish.

Page 27: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.0B - A wave from Engineer White and #5 is on its way to Seattle.

Page 28: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.1 - Motor generator sets in the Skykomish substation. Been running steadily since 1927. Original bearings. 350 amps at 13,200 volts; 9400 H.P.

Page 29: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.2 - Transformers outside. Step down from 110,000 volts to 44,000 volts to 11.500 volts, 11,000 volts 25 cycle on trolley.

Page 30: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.3/2.4 - The Empire Builder, #2, on time from Seattle at 5:23 PM arrival in Skykomish. 13 cars. 504 is an EMD E7 unit.

Page 31: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.5 - Electric motor 5019 with heater car backs on to #2 after the diesel has been cut off. George Meyers, Engineer.

Page 32: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.6 - Coupled and ready. Switch aligned.

Page 33: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.7 - Notched out on the 2.2% grade to the tunnel. 30 mph on the tangent track.

Page 34: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.8 - Rated at 1900 tons on 2.2% grade. 5200 H.P. 22 mph. Class W motor, built by General Electric in 1948.

Page 35: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.9 - A deer bounces across the track.

Page 36: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.11 - Looking back from the Fireman’s side; do the passengers give a thought to the engine crew?

Page 37: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.12 - Approaching a curve the pantographs seem about to slide off the trolley wire.

Page 38: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.13 - Slide fences and snaking cars.

Page 39: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.14 - West end of Cascade tunnel at Scenic. Still 8 miles of 1.57% upgrade. It used to cost $1,000,000 a year to maintain the snowsheds.

Page 40: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.15 - Over the top and into regeneration.

Page 41: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.16 - 5019 is 101 ft long. Wheel diameter 42”. Gear ratio 70/17. Tractive effort 82,600# at 23 mph.

Page 42: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.17 - Dry hills, new ballast & slide fence.

Page 43: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.18 - We let her roll!

Page 44: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.19 - Whistling for valley crossings. 22 lb force against trolley wire.

Page 45: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

2.20 - Wear on trolley wire 0.001”/year. Resistance 0.2 ohm/mile trolley to rail out and back. Copper cadmium beryllium alloy. 0000 equivalent. 2300# tension, 150 ft span.

Page 46: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.6 - Cashmere 7:05 pm, On Time.

Page 47: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.7 - Bob Newton running engine. Superintendent in charge of the electrification. Dick Harbour on right.

Page 48: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.8 - Bob Newton, hand on the throttle.

Page 49: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.9 - The meters tell the story. We’re doing about 48 mph!

Page 50: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.11 - We went thru the unit to the rear cab for a view of the train as we near the Columbia river.

Page 51: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.12 - Yard limit Wenatchee. 55 mph.

Page 52: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.13 - Green signal.

Page 53: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.14 - On time - Wenatchee 7:20 P.M.

Page 54: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

3.15 - We say goodbye as diesel 275 takes up the load.

Page 55: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

. 3.16 - Our host for this trip; Bob Newton

Page 56: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Substation graph showing KW in motoring or regeneration. Eastbound, Skykomish to Levenworth.

Page 57: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Substation graph showing KW in motoring or regeneration. Eastbound, Levenworth to Wenatchee

Page 58: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Great Northern timetable showing

Wenatchee - Seattle

Page 59: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

Data sheet for the W class motors 5018 and 5019

Page 60: 1953 cab ride across the Great Northern’s electrified subdivision Westbound on train #5, the Cascade, in diesel 251-A Eastbound on train #2, the Empire

The End

I hope you have enjoyed this brief look at Great Northern’s electrified zone, ca 1953

Pictures and captions by Alfred B Butler

PowerPoint presentation done by Bruce Butler

special thanks to Gary Tarbox for his helpful suggestions on PowerPoint