Transcript

Rekap RABREKAPITULASI RENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN IRIGASI TERSIER COT TRIENGKOTA LHOKSEUMAWENOPEKERJAANJUMLAH BIAYA ( Rp.)TOTAL JUMLAH BIAYA (Rp.)IPEKERJAAN PERSIAPAN45,000,000.00A. Pembersihan Lapangan4,000,000.00B. Pemasangan profil dan Pengukuran Awal (MC.0)30,000,000.00C. Direksi Keets, Los Kerja dan Gudang10,000,000.00D. Pembuatan Papan Nama Proyek1,000,000.00IIPEKERJAAN SALURAN TERSIER COT TRIENG KIRI2,793,875,801.07A. Pembangunan Saluran Tersier (L = 2553 m)2,762,608,061.35B. Pekerjaan Box Tersier Tipe - II (2 unit)10,289,298.54C. Pekerjaan Box Tersier Tipe - III (2 uit)10,231,272.39D. Pekerjaan Box Kuarter (3 unit)10,747,168.80IIIPEKERJAAN SALURAN TERSIER COT TRIENG KANAN3,134,238,767.67A. Pembangunan Saluran Tersier (L = 2057 m)2,846,499,486.39B. Bangunan Bagi Sadap (4 unit)152,190,023.45C. Pekerjaan Gorong-gorong/box culvert (1 unit)18,542,229.98D. Pekerjaan Talang Air (1 unit)91,557,027.84E. Pintu sorong rangka baja (13 buah)25,450,000.00IVPEKERJAAN SALURAN TERSIER COT TRIENG KANAN A1,141,596,165.16A. Pembangunan Saluran Tersier (L = 1047 m)1,123,629,257.95B. Pekerjaan Box Tersier Tipe - II (3 unit)14,776,318.11C. Pekerjaan Box Kuarter (1 unit)3,190,589.10VPEKERJAAN SALURAN TERSIER COT TRIENG KANAN B1,050,547,101.04A. Pembangunan Saluran Tersier (L = 846 m)1,035,419,086.41B. Pekerjaan Box Tersier Tipe - I (1 unit)11,937,425.52C. Pekerjaan Box Kuarter ( 1 unit)3,190,589.10VIPEKERJAAN SALURAN TERSIER COT TRIENG KANAN C1,324,717,844.85A. Pembangunan Saluran Tersier (L = 1080 m)1,309,589,830.22B. Pekerjaan Box Tersier Tipe - I (1 unit)11,937,425.52C. Pekerjaan Box Kuarter (1 unit)3,190,589.10VIIPEKERJAAN LAIN-LAIN35,000,000.00A. Administrasi, Progress dan Pelaporan8,000,000.00B. Pengukuran dan Pembuatan Mutual Check (MC)20,000,000.00C. Foto Dokumentasi2,000,000.00D. P3K dan Obat -obatan5,000,000.00JUMLAH9,524,975,679.78DIBULATKAN9,524,970,000.00Terbilang : " Sembilan Milyar Lima Ratus Dua Puluh Empat Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah"Lhokseumawe, Desember 2008Menyetujui,Kepala Dinas Pekerjaan UmumPT. Citra Rancang GlobalKota LhokseumaweIR. KAMARUZZAMANMUSTAFA UMAR STNip. 110045829Direktur UtamaMengetahui,Menyetujui,Pengguna AnggaranPejabat Pembuat KomitmenBappeda Kota LhokseumaweBappeda Kota LhokseumaweDRS. T. SOFYANSYAHTAUFIK S.SosPEMBINA TK. I/Nip. 010092878Nip. 010281789

RAB - CT kiriRENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN TERSIER COT TRIENG KIRI (L = 2351 meter)DESA COT TRIENG - KOTA LHOKSEUMAWENOURAIAN PEKERJAANSTNVOLUMEANALISAHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)IPEKERJAAN SALURAN IRIGASISaluran Tersier Cot Trieng Kirim2,351.001. Galian tanahm31,747.62Anl A127,675.0048,365,311.552. Timbunan tanahm33,605.47Anl D299,190.00357,626,346.123. Striping/kupasanm28,544.70Anl B12,035.0017,388,462.064. Beton K-175m31,290.83Anl Supl 1a1,812,192.102,339,227,941.62JUMLAH I2,762,608,061.35IIPEKERJAAN BANGUNAN IRIGASIA. Pekerjaan Box Tersier Tipe - IIUnit2.001. Galian tanahm37.09Anl A127,675.00196,160.402. Timbunan tanahm34.42Anl D299,190.00438,419.803. Beton K-175m34.66Anl. Supl 1a1,812,192.108,437,566.424. Pas. Batu 1:4m31.66Anl E2561,700.00932,983.705. Plasteran 1:2m26.44Anl G.50h44,125.50284,168.22Jumlah A10,289,298.54B. Pekerjaan Box Tersier Tipe - IIIUnit2.001. Galian tanahm37.09Anl A127,675.00196,160.402. Timbunan tanahm33.84Anl D299,190.00380,393.653. Beton K-175m34.66Anl. Supl 1a1,812,192.108,437,566.424. Pas. Batu 1:4m31.66Anl E2561,700.00932,983.705. Plasteran 1:2m26.44Anl G.50h44,125.50284,168.22Jumlah B10,231,272.39C. Pekerjaan Box KarterUnit3.001. Galian tanahm34.87Anl A127,675.00134,832.602. Timbunan tanahm311.85Anl D299,190.001,175,401.503. Beton K-175m34.20Anl. Supl 1a1,812,192.107,611,206.824. Pas. Batu 1:4m32.49Anl E2561,700.001,399,475.555. Plasteran 1:2m29.66Anl G.50h44,125.50426,252.33Jumlah C10,747,168.80JUMLAH II (A+B+C)31,267,739.73JUMLAH ( I + II )2,793,875,801.07Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

RAB - CT kananRENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN (2057 meter)DESA COT TRIENG - KOTA LHOKSEUMAWENOURAIAN PEKERJAANSTNVOLUMEANALISAHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)IPEKERJAAN SALURAN IRIGASISaluran Tersier Cot Trieng Kananm2,057.001. Pembongkaran Saluran dan Bangunan Lamam1,243.00Ls10,000.0012,430,000.002. Galian tanahm31,488.83Anl A127,675.0041,203,370.253. Timbunan tanahm33,972.34Anl D299,190.00394,015,908.654. Striping/kupasanm278.75Anl B12,035.00160,256.255. Beton K-175m31,323.64Anl Supl 1a1,812,192.102,398,689,951.24JUMLAH I2,846,499,486.39IIPEKERJAAN BANGUNAN IRIGASIA. Bangunan Bagi Sadapunit4.001. Galian tanahm399.80Anl A127,675.002,762,092.312. Timbunan tanahm3105.17Anl D299,190.003. Beton K-175m349.30Anl. Supl 1a1,812,192.1089,345,057.354. Beton K-225m311.94Anl. Supl 1b3,590,848.4842,863,958.255. Pas. Batu 1:4m328.72Anl E2561,700.0016,133,428.256. Plasteran 1:2m224.60Anl G.50h44,125.501,085,487.30Jumlah A152,190,023.45B. Pekerjaan Gorong-gorong/box culvertunit1.001. Galian tanahm38.80Anl A127,675.00243,540.002. Beton K-225m32.80Anl. Supl 1b3,590,848.4810,054,375.733. Pas. Batu 1:4m312.36Anl E2561,700.006,942,612.004. Plasteran 1:2m229.50Anl G.50h44,125.501,301,702.25Jumlah B18,542,229.98C. Pekerjaan Talang Airunit1.001. Galian tanahm3123.89Anl A127,675.003,428,655.752. Pas. Batu 1:4m356.88Anl E2561,700.0031,949,496.003. Plasteran 1:2m2132.16Anl G.50h44,125.505,831,626.084. Beton tumbuk 1:3:5m311.04Anl G.44657,610.007,263,170.935. Beton K-175m30.43Anl. Supl 1a1,812,192.10784,679.186. Beton K-225m39.90Anl. Supl 1b3,590,848.4835,549,399.907. Cerucuk Kayum30.00Ls125,000.003,750,000.008. PerancahLs1.00Ls3,000,000.003,000,000.00Jumlah C91,557,027.84D. Pintu sorong rangka bajaBH13.001. Pintu Uk. B = 1.3 H = 0.8BH1.00Ls2,500,000.002,500,000.002. Pintu Uk. B = 1.0 H = 0.65BH1.00Ls2,200,000.002,200,000.003. Pintu Uk. B = 0.9 H = 0.55BH1.00Ls2,100,000.002,100,000.004. Pintu Uk. B = 0.8 H = 0.55BH1.00Ls2,000,000.002,000,000.005. Pintu Uk. B = 0.8 H = 0.5BH4.00Ls1,900,000.007,600,000.006. Pintu Uk. B = 0.5 H = 0.5BH4.00Ls1,800,000.007,200,000.007. Pintu Uk. B = 0.5 H = 0.8BH1.00Ls1,850,000.001,850,000.00Jumlah D25,450,000.00JUMLAH II (A+B+C+D)287,739,281.27JUMLAH TOTAL ( I + II )3,134,238,767.67Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

RAB - CT kanan (A)RENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN A (L = 1047 meter)DESA COT TRIENG - KOTA LHOKSEUMAWENOURAIAN PEKERJAANSTNVOLUMEANALISAHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)IPEKERJAAN SALURAN IRIGASISaluran Tersier Cot Trieng Kanan Am1,047.001. Galian tanahm3430.40Anl A127,675.0011,911,320.002. Timbunan tanahm31,534.23Anl D299,190.00152,180,273.703. Striping/kupasanm24,418.76Anl B12,035.008,992,166.434. Beton K-175m3524.53Anl Supl 1a1,812,192.10950,545,497.83JUMLAH I1,123,629,257.95IIPEKERJAAN BANGUNAN IRIGASIA. Box Tersier TIPE-IIunit3.001. Galian tanahm310.63Anl A127,675.00294,240.602. Timbunan tanahm36.63Anl D299,190.003. Beton K-175m36.98Anl. Supl 1a1,812,192.1012,656,349.634. Pas. Batu 1:4m32.49Anl E2561,700.001,399,475.555. Plasteran 1:2m29.66Anl G.50h44,125.50426,252.33Jumlah A14,776,318.11B. Box Kuarterunit1.001. Galian tanahm31.62Anl A127,675.0044,944.202. Timbunan tanahm33.95Anl D299,190.003. Beton K-175m31.40Anl. Supl 1a1,812,192.102,537,068.944. Pas. Batu 1:4m30.83Anl E2561,700.00466,491.855. Plasteran 1:2m23.22Anl G.50h44,125.50142,084.11Jumlah B3,190,589.10JUMLAH II (A+B)17,966,907.21JUMLAH ( I + II )1,141,596,165.16Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

RAB - CT kanan (B)RENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN B (L = 846 meter)DESA COT TRIENG - KOTA LHOKSEUMAWENOURAIAN PEKERJAANSTNVOLUMEANALISAHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)IPEKERJAAN SALURAN IRIGASISaluran Tersier Cot Trieng Kanan Bm846.001. Galian tanahm3158.51Anl A127,675.004,386,764.252. Timbunan tanahm32,277.60Anl D299,190.00225,915,144.003. Striping/kupasanm23,952.14Anl B12,035.008,042,604.904. Beton K-175m3439.84Anl Supl 1a1,812,192.10797,074,573.26JUMLAH I1,035,419,086.41IIPEKERJAAN BANGUNAN IRIGASIA. Box Tersier TIPE-Iunit1.001. Galian tanahm33.18Anl A127,675.0088,117.202. Timbunan tanahm33.25Anl D299,190.003. Beton K-175m35.69Supl 1a1,812,192.1010,307,748.664. Pas. Batu 1:4m32.49Anl E2561,700.001,399,475.555. Plasteran 1:2m23.22Anl G.50h44,125.50142,084.11Jumlah A11,937,425.52B. Box Kuarterunit1.001. Galian tanahm31.62Anl A127,675.0044,944.202. Timbunan tanahm33.95Anl D299,190.003. Beton K-175m31.40Supl 1a1,812,192.102,537,068.944. Pas. Batu 1:4m30.83Anl E2561,700.00466,491.855. Plasteran 1:2m23.22Anl G.50h44,125.50142,084.11Jumlah B3,190,589.10JUMLAH II (A+B)15,128,014.62JUMLAH ( I + II )1,050,547,101.04Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

RAB - CT kanan (C)RENCANA ANGGARAN BIAYAPEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN B (L = 1080 meter)DESA COT TRIENG - KOTA LHOKSEUMAWENOURAIAN PEKERJAANSTNVOLUMEANALISAHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)IPEKERJAAN SALURAN IRIGASISaluran Tersier Cot Trieng Kanan Cm1,080.001. Galian tanahm3100.18Anl A127,675.002,772,481.502. Timbunan tanahm32,906.32Anl D299,190.00288,277,880.803. Striping/kupasanm25,101.11Anl B12,035.0010,380,758.854. Beton K-175m3556.32Anl Supl 1a1,812,192.101,008,158,709.07JUMLAH I1,309,589,830.22IIPEKERJAAN BANGUNAN IRIGASIA. Box Tersier TIPE-Iunit1.001. Galian tanahm33.18Anl A127,675.0088,117.202. Timbunan tanahm33.25Anl D299,190.003. Beton K-175m35.69Supl 1a1,812,192.1010,307,748.664. Pas. Batu 1:4m32.49Anl E2561,700.001,399,475.555. Plasteran 1:2m23.22Anl G.50h44,125.50142,084.11Jumlah A11,937,425.52B. Box Kuarterunit1.001. Galian tanahm31.62Anl A127,675.0044,944.202. Timbunan tanahm33.95Anl D299,190.003. Beton K-175m31.40Supl 1a1,812,192.102,537,068.944. Pas. Batu 1:4m30.83Anl E2561,700.00466,491.855. Plasteran 1:2m23.22Anl G.50h44,125.50142,084.11Jumlah B3,190,589.10JUMLAH II (A+B)15,128,014.62JUMLAH ( I + II )1,324,717,844.85Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

Rkp ANLDAFTAR HARGA SATUAN PEKERJAANPEMBANGUNAN JARINGAN IRIGASI TERSIER COT TRIENGKOTA LHOKSEUMAWENOURAIAN PEKERJAANSATUANANALISAHARGA SATUANIPEKERJAAN TANAH11 m2 Pembersihan dan striping/kosrekanm2Anl B.12,035.0021 m3 Galian tanah h > 1-2 m dan membuang hasil galianm3Anl. A.127,675.0031 m3 Timbunan tanah untuk tanggul saluranm3Anl D.299,190.00IIPEKERJAAN BETON DAN PASANGAN1Beton 1 pc : 1,5 ps : 2,5 kr (Beton Non-Struktural)m3Anl F.2607,010.002Beton Cor K-225 (Beton Struktural)m3Anl G.41927,610.003Pekerjaan Bekisting (cetakan)m2Anl F.8145,620.004Pasangan Batu Kali (1 : 4)m3Anl E.2561,700.005Plesteran (1 pc : 2 ps, tebal 1 cm)m2Anl G.50h44,125.506Pekerjaan Beton Corm3Anl. G.44657,610.007Beton Lining Saluran dan Bangunan Air (K-175)m3Supl. 1a1,812,192.108Beton Talang Air (K-225)m3Supl. 1b3,590,848.48Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

AnalisaANALISA HARGA SATUANPEMBANGUNAN JARINGAN IRIGASI TERSIERDESA COT TRIENG - KOTA LHOKSEUMAWE1. Pekerjaan Kupasan/StripingAnl B.11 M2 Pembersihan dan striping/kosrekan0.05Org Pekerja@Rp.35,000.00Rp.1,750.000.005Org Mandor@Rp.57,000.00Rp.285.00JumlahRp.2,035.002. Pekerjaan Galian TanahAnl. A.11 M3 Galian tanah h > 1-2 m dan membuang hasil galian0.75Org Pekerja@Rp.35,000.00Rp.26,250.000.025Org Mandor@Rp.57,000.00Rp.1,425.00JumlahRp.27,675.003. Pekerjaan Timbunan TanahAnl D.21 M3 Timbunan tanah untuk tanggul salurana. Bahan1.0Tanah Timbun@Rp.69,000.00Rp.69,000.00JumlahRp.69,000.00b. 1 M3 Upah Angkutan0.33Org Pekerja@Rp.35,000.00Rp.11,550.000.01Org Mandor@Rp.57,000.00Rp.570.00JumlahRp.12,120.00c. 1 M3 Upah Pemadatan Tanah0.5Org Pekerja@Rp.35,000.00Rp.17,500.000.01Org Mandor@Rp.57,000.00Rp.570.00JumlahRp.18,070.00Jlh TotalRp.99,190.004. Pekerjaan Beton Non Struktural K-175Anl F.21 M3 Beton 1 pc : 1,5 ps : 2,5 kr)a. Bahan beton8.0Zak PC (40 kg)@Rp.45,000.00Rp.360,000.000.82M3 Kerikil@Rp.145,000.00Rp.118,900.000.54M3 Pasir Beton@Rp.126,500.00Rp.68,310.00JumlahRp.547,210.00b. Upah kerja beton0.41Org Pekerja@Rp.35,000.00Rp.14,350.000.02Org Mandor@Rp.57,000.00Rp.1,140.000.7Org Tukang Batu@Rp.57,000.00Rp.39,900.000.07Org Kepala Tukang@Rp.63,000.00Rp.4,410.00JumlahRp.59,800.00Jlh TotalRp.607,010.005. Pekerjaan Beton Struktural K-225Anl G.411 M3 Beton Cor K-225a. Bahan beton10.0Zak PC (40 kg)@Rp.45,000.00Rp.450,000.000.54Pasir Beton@Rp.126,500.00Rp.68,310.000.82Batu Kerikil@Rp.145,000.00Rp.118,900.00JumlahRp.637,210.00b. Upah kerja beton6.0Org Pekerja@Rp.35,000.00Rp.210,000.001.0Org Tukang Batu@Rp.57,000.00Rp.57,000.000.1Org Kepala Tukang@Rp.63,000.00Rp.6,300.000.3Org Mandor@Rp.57,000.00Rp.17,100.00JumlahRp.290,400.00Jumlah TotalRp.927,610.006. Pekerjaan PembesianAnl F.10100 kg Pekerjaan besi betona. Bahan110kg besi beton@Rp.15,200.00Rp.1,672,000.002.0kg kawat ikat@Rp.16,500.00Rp.33,000.00JumlahRp.1,705,000.00b. Upah kerja besi beton2.25Org Kepala Tukang@Rp.63,000.00Rp.141,750.006.75Org Tukang Besi@Rp.57,000.00Rp.384,750.006.75Org Pekerja@Rp.35,000.00Rp.236,250.00JumlahRp.762,750.00Jumlah TotalRp.2,467,750.00Untuk 1 Kg Pekerjaan Besi (1/100)Rp.24,677.507. Pekerjaan BekistingAnl F.81 M2 Pekerjaan bekisting/cetakana. Bahan0.34Kayu Bekisting@Rp.2,600,000.00Rp.884,000.004.0Paku Kayu@Rp.10,000.00Rp.40,000.00JumlahRp.924,000.00b. Upah kerja bekisting0.5Org Kepala Tukang@Rp.63,000.00Rp.31,500.000.1Org Mandor@Rp.57,000.00Rp.5,700.005.0Org Tukang Kayu@Rp.57,000.00Rp.285,000.002.0Org Pekerja@Rp.35,000.00Rp.70,000.004.0Org Bongkar Bekisting@Rp.35,000.00Rp.140,000.00JumlahRp.532,200.00Jumlah TotalRp.1,456,200.00Untuk 1 M2 (1/10)Rp.145,620.008. Lain-lain: Membongkar Cetakan Beton0.400Pekerja@Rp.35,000.00Rp.14,000.00JumlahRp.14,000.009. Pekerjaan Pasangan Batu kali 1:4Anl E.21 M3 Pas. Batu kali 1 pc : 4 psa. Bahan1.20M3 Batu Kali@Rp.183,750.00Rp.220,500.003.30Zak PC (50 kg)@Rp.60,000.00Rp.198,000.000.41M3 Pasir@Rp.126,500.00Rp.51,865.00JumlahRp.470,365.00b. Upah kerja pas. Batu 1:40.600Org Tukang Batu@Rp.57,000.00Rp.34,200.000.060Org Kepala Tukang@Rp.63,000.00Rp.3,780.001.500Org Pekerja@Rp.35,000.00Rp.52,500.000.015Org Mandor@Rp.57,000.00Rp.855.00JumlahRp.91,335.00Jumlah TotalRp.561,700.0010. Pekerjaan Plasteran 1:2Anl G.50h1 M2 Plesteran campuran 1 pc : 2 ps, tebal 1 cma. Bahan0.315Zak PC (40 kg)@Rp.45,000.00Rp.14,175.000.017M3 Pasir@Rp.126,500.00Rp.2,150.50JumlahRp.16,325.50b. Upah kerja plasteran 1:20.2Org Tukang@Rp.57,000.00Rp.11,400.000.02Org Kepala Tukang@Rp.63,000.00Rp.1,260.000.4Org Pekerja@Rp.35,000.00Rp.14,000.000.02Org Mandor@Rp.57,000.00Rp.1,140.00JumlahRp.27,800.00Jlh TotalRp.44,125.5011. Pekerjaan Beton CorAnl. G.441M3 Beton Cor 1:3:5a. Bahan0.91M3 Kerikil Bersih@Rp.145,000.00Rp.131,950.000.54M3 Pasir Beton@Rp.126,500.00Rp.68,310.004.54Zak PC (40 kg)@Rp.45,000.00Rp.204,300.00JumlahRp.404,560.00b. Tenaga Kerja6.0Org Pekerja@Rp.35,000.00Rp.210,000.000.2Org Mandor@Rp.57,000.00Rp.11,400.000.05Org Kepala Tukang@Rp.63,000.00Rp.3,150.000.5Org Tukang@Rp.57,000.00Rp.28,500.00JumlahRp.253,050.00Jlh TotalRp.657,610.0012. Pekerjaan Beton Saluran dan Bangunan Bagi/SadapAnl Supl. 1a1 M3 Beton Lining Saluran/Bang. Air K-1751.0M3 Beton K175Rp.607,010.00Rp.607,011.0021.8Kg BesiRp.24,677.50Rp.537,969.504.18M2 Pekerjaan BekistingRp.145,620.00Rp.608,691.604.18M2 Membongkar CetakanRp.14,000.00Rp.58,520.00JumlahRp.1,812,192.1013. Pekerjaan Beton TalangAnl Supl. 1b1 M3 Beton Talang Air K-2251.0M3 Beton K225Rp.927,610.00Rp.927,610.0062.45Kg BesiRp.24,677.50Rp.1,541,109.887.03M2 Pekerjaan BekistingRp.145,620.00Rp.1,023,708.607.03M2 Membongkar CetakanRp.14,000.00Rp.98,420.00JumlahRp.3,590,848.48Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

Upah dan BahanDAFTAR HARGA BAHAN DAN UPAHPEMBANGUNAN JARINGAN IRIGASI TERSIERDESA COT TRIENG - KOTA LHOKSEUMAWEA.UPAHNOUPAHSATUANHARGA SATUAN (Rp.)1PekerjaOrg/Hari35,000.002TukangOrg/Hari57,000.003Kepala TukangOrg/Hari63,000.004MandorOrg/Hari57,000.00B.BAHAN / MATERIALNOBAHAN/MATERIALSATUANHARGA SATUAN (Rp.)1PasirM3126,500.002KerikilM3145,000.003Semen (PC) 40 kgZak45,000.004Semen (PC) 50 kgZak60,000.005Tanah TimbunM369,000.006Besi PolosKg15,200.007KawatKg16,500.008PakuKg10,000.009Kayu BekistingM32,600,000.0010Batu KaliM3183,750.00Lhokseumawe, Desember 2008PT. Citra Rancang GlobalMUSTAFA UMAR STDirektur Utama

PembesianPERHITUNGAN JUMLAH PEMBESIAN (1 M3 Beton K-175)PEMBANGUNAN JARINGAN IRIGASI TERSIERDESA COT TRIENG - KOTA LHOKSEUMAWENo.Pias SaluranB (m)H (m)T (m)A (m2)L/M3 (m)Besi Dia. 10 (bh)Besi Dia. 8 (bh)Besi Dia. 10 (kg)Besi Dia. 8 (kg)Berat Total Besi (kg/M3)1BCT.1 - BCT.21.301.250.200.761.3217.004.7613.807.3321.132BCT.2 - BCT.31.001.100.200.641.5614.605.4614.087.3421.413BCT.3 - BCT.40.801.000.200.561.7913.006.1014.327.2321.554BT.2.1 - BT.2.20.750.970.200.541.8612.566.3114.407.2021.615BT.2.2 - BT.2.30.700.950.200.521.9212.206.4914.487.4121.896BT.2.3 - BK.2.10.700.950.200.521.9212.206.4914.487.1821.667BCT.3 - BT.30.801.100.200.601.6712.605.7612.966.6019.568BT.3 - BK.20.500.850.200.442.2710.607.4914.867.1021.979BCT.4 - BT.4 ki0.801.000.200.561.7913.006.1014.327.2321.5510BT.4 ki - BK.4.20.500.850.200.442.2710.607.4914.867.1021.9711BCT.1 - BT.1.10.900.950.200.561.7913.806.1015.207.7122.9212BT.1.1 - BT.1.20.900.950.200.561.7913.806.1015.207.7122.9213BT.1.2 - BT.1.30.800.900.200.521.9213.006.4915.437.7023.1214BT.1.3 - BK.1.20.500.850.200.442.2710.607.4914.867.1021.9715BT.1.3 - BT.1.40.700.950.200.521.9212.206.4914.487.1821.6616BT.1.4 - BK.1.30.500.850.200.442.2710.607.4914.867.1021.9717BT.1.4 - BK.1.40.500.850.200.442.2710.607.4914.867.1021.9712.6516.3232.6094.15370.820.740.961.926.48Bekisting (M2/M3)4.18Rata-rata21.81