Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/ Airport Passenger Terminals Douglas Tobin Architect Engineer, (DTAE), specialist in Airport Master Planning, Airport Passenger Terminal Building and Systems Project Development. DTAE has been involved in the development of over 50 Airport Passenger Terminals. DTAE has participated on project teams performing the full scope of services required for the Master Planning, Design Development, Construction Documents and Construction Implementation Management of the project works. The following provides an upper management outline of the project development process. DTAE divides an Airport Passenger Terminal Project into the following Program Development categories: Part 1 - Master Planning, Concept Design, Design Development - Phase 1 Report Part 2 - Building Facility Architecture and Engineering Part 3 - Architectural Engineering Infrastructure, Terminal and Systems o Architectural Program, Energy Analysis and Life Cycle Evaluations o Terminal Design – Check-in through Boarding o Civil, Mechanical, Structural, Electrical, Fire Protection Building Components o Security Systems, CCTV, Access Control and Screening Systems o Baggage Handling Systems o Boarding Control Systems, IT Systems o Maintenance and Material Handling Systems o Roadway and Ramp Planning and Design o Concessions Planning and Design Part 4 - Building Design and Engineering, Contract and Construction Documents Part 5 - Tender Evaluation, Contract Negotiation and Award Part 6 - Project Implementation Management Our expertise includes the following main components of Passenger Terminal development: Project Program Development Overall Site and Facility Master Planning Facility Planning, Cost & Numerical Analysis Building Architecture, Design and Program Management Civil, Structural, Mechanical, Electrical Engineering Fire Protection and Security Systems Engineering Baggage Handling Systems Engineering Customs X-ray & Inspection Systems Design Development Douglas Tobin Architect Engineer Architect Engineer Planner

150414-DTAE-Airport Passenger Terminals

Embed Size (px)

Citation preview

Page 1: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Airport Passenger Terminals Douglas Tobin Architect Engineer, (DTAE), specialist in Airport Master Planning, Airport Passenger Terminal Building and Systems Project Development. DTAE has been involved in the development of over 50 Airport Passenger Terminals. DTAE has participated on project teams performing the full scope of services required for the Master Planning, Design Development, Construction Documents and Construction Implementation Management of the project works. The following provides an upper management outline of the project development process. DTAE divides an Airport Passenger Terminal Project into the following Program Development categories:

Part 1 - Master Planning, Concept Design, Design Development - Phase 1 Report Part 2 - Building Facility Architecture and Engineering Part 3 - Architectural Engineering Infrastructure, Terminal and Systems

o Architectural Program, Energy Analysis and Life Cycle Evaluations o Terminal Design – Check-in through Boarding o Civil, Mechanical, Structural, Electrical, Fire Protection Building Components o Security Systems, CCTV, Access Control and Screening Systems o Baggage Handling Systems o Boarding Control Systems, IT Systems o Maintenance and Material Handling Systems o Roadway and Ramp Planning and Design o Concessions Planning and Design

Part 4 - Building Design and Engineering, Contract and Construction Documents Part 5 - Tender Evaluation, Contract Negotiation and Award Part 6 - Project Implementation Management

Our expertise includes the following main components of Passenger Terminal development:

Project Program Development Overall Site and Facility Master Planning Facility Planning, Cost & Numerical Analysis Building Architecture, Design and Program Management Civil, Structural, Mechanical, Electrical Engineering Fire Protection and Security Systems Engineering Baggage Handling Systems Engineering Customs X-ray & Inspection Systems Design Development

Douglas Tobin Architect Engineer Architect Engineer Planner

Page 2: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Queen Alia International Airport, QAIA, Amman, Jordan

(Rendering by others) (Photo by others)

Queen Alia International Airport, QAIA, Amman, Jordan As part of the QAIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project design review, construction management, testing and commissioning of the new QAIA Passenger Terminal included the following:

IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc. General Security Equipment – This includes the ACS, CCTV, PTB CCTV, Software, Specification engineering review

and critique. Security Equipment Tender review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and

Level 3 X-Ray units, Pre-Board Screen X-Ray units, etc. Baggage Handling System engineering design and specifications planning review and report. Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, UPS, and Security Equipment. Security and Customs Screening Equipment - Functional Specifications engineering review and report. BHS - Baggage Handling System Explosive Detection System design and specification engineering review and report. BRS - Baggage Reconciliation System design and specification engineering review and report. Passenger Terminal systems testing, debug and commissioning.

Page 3: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius

(Photo by others)

Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius As part of the SSRIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project design review, construction management, testing and commissioning of the new SSRIA Passenger Terminal included the following:

Passenger Terminal Building Envelope Architectural Design, Construction Documents, Construction Management IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc. General Security Equipment – This includes the ACS, CCTV, PTB, CCTV, Software, and engineering review. Security Equipment review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3 X-

Ray units, Pre-Board Screen X-Ray units, etc. Baggage Handling System engineering design and specifications planning review, implementation and testing. Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, PA, UPS, and Security

Equipment. BHS and BRS - Baggage Handling System Explosive Detection and Reconciliation System design and specification

engineering review, implementation and testing. Passenger Terminal systems testing, debug and commissioning.

Page 4: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Pulkovo International Airport – Saint Petersburg, Russia

(Photo by Others)

Airport Passenger Terminal Architecture, Structural Engineering, Quantity Survey Cost Estimating and Value Engineering As part of the Gensler / Louis Berger Group (LBG) Project team Douglas Tobin Architect Engineer (DTAE) was responsible for the review and critique of the Master Plan and development of the following project works:

Architectural Envelope Preliminary Design and Analysis Building and Ramp Quantity Survey and Cost estimates for Tendering Structural Engineering for the Passenger Terminal Structural Engineering of the Terminal Exterior Envelope, Curtain Wall Systems and Structural Skylights and Roofs. Structural Engineering and Design for the Underground Passenger Tunnels to Remote building Terminal Satellite. Preliminary Structural Engineering and Design of the Aircraft Ramp Value Engineering Design Improvements and Recommendations Roof Truss Structural Engineering, Cost Estimating and Value Engineering

Page 5: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Quito International Airport – Quito, Ecuador

Quito International Airport – Project Peer Review and Critique As part of the Construction Management team Douglas Tobin Architect Engineer’s key responsibilities involved the Engineering Design and Specifications planning review, critique and Tender Evaluation review and report. Project responsibilities involved the following Airport Passenger Terminal Systems:

IT systems, Network, Master Clock, FIDS, BIDS, Server Configuration, etc. General Security Equipment – This includes the Airside CCTV, ACAMS, PTB CCTV, Software, Specification

engineering review and critique. Security Equipment Tender - The Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3

X-Ray units, Pre-Board Screen X-Ray units, etc. Baggage Handling System engineering design and specifications planning review and report. Tender Evaluation of the Technical specification compliance for the IT, BHS, and Security Equipment Tenders. Security and Customs Screening Equipment - Functional Specifications engineering review and report. Baggage Handling System Explosive Detection System design and specification engineering review and report. BRS -

Baggage Reconciliation System.

Page 6: 150414-DTAE-Airport Passenger Terminals

Phone: 001-860-488-5838 e-mail: mailto:[email protected] Fax: 001-203-426-3213 web: http://arc-ae.net/

Benazir Bhutto International Airport New Islamabad International Airport Islamabad, Pakistan Louis Berger Group Baggage Handlings Systems Design & Development Architectural Engineering and Project Development

Bradley International Airport Windsor Locks, CT US Airways Terminal A – Departures Level Architectural Planning and Design Check in Counter and Kiosk Design Albany Municipal Airport Albany, NY Temporary Passenger Terminal FIS Terminal Relocation Project Douglas J. Tobin Responsible for; Building Architecture and Engineering

Value Engineering (VE) Study for New York Port Authority International Arrivals Building Redevelopment (IAB) Passenger Terminal & Baggage Systems Consultant Team

Contact Information: Douglas J. Tobin P.E., R.A. Architects Engineers Planners 14 Sand Hill Road Sandy Hook, CT 06482-1624 203-426-0146 203-426-3213 Fax. Web: http://arc-ae.net/ E-mail: [email protected]

[email protected] 150310-DTAE-Airport Passenger Terminals.doc