125th HSJV Weekly Meeting

Embed Size (px)

Citation preview

  • 7/29/2019 125th HSJV Weekly Meeting

    1/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 125th HSJV Weekly Meeting

    2/26

    7/1/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    1. Safety Moment

    2. Previous Meeting

    1. Safety Moment

    2. Previous Meeting

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    8. Incident Reports

    9. Medical Cases

    10.Environmental Issues

    11.Action Plans

    Gusan

    8. Incident Reports

    9. Medical Cases

    10.Environmental Issues

    11.Action Plans

    Gusan

    BARAKAH NUCLEAR POWER PLANT PROJECT

    va ua on y n ngs core6. Findings Analysis per Discipline

    va ua on y n ngs core6. Findings Analysis per Discipline

  • 7/29/2019 125th HSJV Weekly Meeting

    3/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 125th HSJV Weekly Meeting

    4/26

    7/1/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE

    DATEDATESTATUSSTATUS

    High HSEGusan Contractor from HSJ V acquired high number ofHSE findings with score of 4.0. This rating is based on

    Next

    proportional to the severity of given risk. Gusan willpresent on next meeting their corrective actions.

    Meeting

    2 EAD Visit

    ENEC representative reiterated the upcoming visit ofEnvironmental Agency Abu Dhabi (EAD) on 26th J une2013. Subcontractors must initiate intensivehousekeeping at site as part of the preparation.

    HSJ V J une 2013

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 125th HSJV Weekly Meeting

    5/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1.1. Tas kTas k Fo rc eFo r ce TeamTeam w asw as fo rmedf or med c o mp o sedc om po sed o f of HeadHead Of fi ceOf fi ce HSEHSE TeamTeam

    headedh ead ed b yb y Sen io r Sen io r Vi c eVi ce Pres iden tPr es i den t t ot o ver if yv er if y HSEHSE i ss u esi ss u es r ai s edr ai s ed d ur in gdur ing

    CEOsCEOs (ENEC/HSJV)(ENEC/HSJV) meetingmeeting..

    2. Top Management Off sit e HSE Work sho p2. Top Management Off sit e HSE Work sho p -- 2 J ul y2 July -- 04 July 201304 July 2013

    At ten ding Or gan izat ion : ENEC, KEPCO, HSJV @At ten ding Or gan izat ion : ENEC, KEPCO, HSJV @ YasYas IslandIsland

    Date FindingsIssued

    TotalKEPCO HSJV Subcon

    1) CAR status before & after gates changed- Camera is more strictly not allowed on site after gates were changed.

    15.June to21.June

    (Beforegatechanged)CAR

    13 32 177 222

    22.Juneto28.June

    (Aftergatechanged)5 13 145 158

    2) Camera permissions official requests to KEPCO Admin and HSSE Team- Official memo was issued on 19th.Feb.2013 and 26th.May.2013.

    BARAKAH NUCLEAR POWER PLANT PROJECT

    13 46 477 536

  • 7/29/2019 125th HSJV Weekly Meeting

    6/26

    7/1/20

    EAD Key Check Points

    1) Chemical Storage Management 2) NOC(No Objection Certificate) Attachment

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1.1 . A l l r el ev an t i te ms ar e p l ac ed i nAl l rel ev an t i tem s ar e p lac ed inchemical storage.chemical storage.

    2.2 . D if f er en t t yp es o f c he mi c al s s h ou l d beDi f ferent types of chemicals should beseperatedseperated wi th concrete bunds or t r ipwi th concrete bunds or t r iptray.tray.

    1.1 . NOC should be a tt ached on t heNOC shoul d be attached on thenot ice boards.not ice boards.

    EAD Key Check Points

    3) Waste Management 4) Housekeeping

    12

    3 45

    6

    7

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1.1 . The highes t s t andard housekeepingThe highest s tandard hou sekeepingneeded.needed.

    .. en ca on s gnageen ca on s gnage2.2. Per s on i n c har g e s i gn ag ePerson in charge s ignage3.3. Sp i l l k i tSpi l l k i t4.4. Fi re Ex ti ng ui sh er Fire Extinguisher5.5 . B ar r i ca de (b o t h s i d es an d re ar Barr icade(both sides and rear

    d i rect ion)d i rect ion)6.6. AssignedAs signed --trained personnelt ra ined personnel7.7. Si m pl i ci ty s h el t er o r s h ad e fo r Simpl ic i ty shel ter or shade for

    ass igned personnelass igned personnel Through segregation needed.Through segregation needed.

  • 7/29/2019 125th HSJV Weekly Meeting

    7/26

    7/1/20

    CICPA Card

    and

    CICPA

    CardRFIDCard

    or

    and

    RFIDCard

    BARAKAH NUCLEAR POWER PLANT PROJECT

    CICPA Card

    Descript ionDescript ionThe new gates were opened with project site divided into zones (red, yellow, &The new gates were opened with project site divided into zones (red, yellow, &

    green). The CICPA fully in co ntrol in Gates 3 and B, other gates have sing le passgreen). The CICPA fully in co ntrol in Gates 3 and B, other gates have sing le pass

    requirement .requirement .

    Visitor

    cardor or

    CICPA

    Card RFIDCard

    Visitor

    Card

    RFID

    Card

    Hand & Finger Injury Training RecordDATE MONTH INSTRUCTOR COURSES COMPANY ATTENDEE TRAINING

    23-Jun-13 Jun Suhail/Heo/Bakul Hands and Powertools Seoyong 208 Spot

    23-Jun-13 Jun Bakul/Chart Hands and Powertools Seoyong 116 Spot

    24-Jun-13 Jun Bakul Hand and Power tools Jonghap,U-Jin 8 Special

    24-Jun-13 Jun Bakul/Chart Hand and Power tools Gusan 228 Spot

    25-Jun-13 Jun Choi Hand and PowertoolsJonghap,Sungchang, Gusan ,Hwachon

    plant20 Special

    25-Jun-13 Jun Bakul Hand and Powertools Advan 427 Spot

    26-Jun-13 Jun Bakul/Chart Hand and Powertools D&I 175 Spot

    26-Jun-13 Jun Bakul Hand and Powertools Gusan 5 Special

    27-Jun-13 Jun Bakul/Suhail Hand and Powertools Hilalco 178 Special

    27-Jun-13 Jun Chakandee Hand and Powertools Gusan 9 Special

    29-Jun-13 Jun Choi Hands and Powertools Advan,Gusan , Sungchang 36 SpecialSpecialTrainingSpotTraining

    BARAKAH NUCLEAR POWER PLANT PROJECT

    29-Jun-13 Jun Bakul/Chart Hands and Powertools Samjin 127 Special

    Total 1537

    Descript ionDescript ion

    The cont inuat ion of hand & f inger spot t ra in ings conducted at theThe cont inuat ion of hand & f inger spot t ra in ings conducted at the

    work place as part of project s promotio n to decrease number of injuries.work place as part of project s promotio n to decrease number of injuries.

  • 7/29/2019 125th HSJV Weekly Meeting

    8/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 18 0 0 0 0 0 20

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1

    (This Week From June 22 28, 2013)

    First Aid Cases (FA) 0 4 0 0 0 6 1 43 0 7 0 3 1 63

    Medical TreatmentCases (MTC) 0 2 0 1 0 5 0 12 0 0 0 1 0 21

    Restricted WorkCases (RWC) 0 2 0 1 0 0 0 5 0 0 0 0 0 8

    LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3

    Property/Vehicle

    Accid ents 0 3 0 1 0 4 0 7 0 2 0 1 0 18

    Environmental

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 24 (2013)

    Release

    Forthisweek CumulativeOneStrike Policy 1 130*

  • 7/29/2019 125th HSJV Weekly Meeting

    9/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From June 22 June 28, 2013)

    Issued

    NearMissNearMissCARCAR

    0 0 0 0

    3 13 145 161

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    3 7 0 0 6 145

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&WFOC&WF 0 29 298 3273 42 443 488

    0 0 0 0 29 298

    3 7 0 0 35 443

  • 7/29/2019 125th HSJV Weekly Meeting

    10/26

    7/1/20

    2929

    3032

    39

    Access&Egress

    PPE

    Plant&Equipment

    Signs,Barriers&barricades

    FirePrevention

    (This Week From June 22 June 28, 2013)

    811

    1315

    1718

    192020

    2124

    2525

    27

    ColorCoding

    Documents

    PTW

    Lifting

    Scaffolding

    FallProtection

    ElectricalSafety

    HotWorks

    WorkingatHeight

    WasteManagement

    Environmental

    MaterialManagement

    Hand&PowerTools

    Health&Welfare

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1111

    35

    66

    0 5 10 15 20 25 30 35 40 45

    ManualHandling

    ConfinedSpace

    Excavation

    LOTO

    Emergency&Evacuation

    Training

    PoorIllumination

    Supervision

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Forklift operator and banks

    man must have propercoordination

    (Workshop, D&I)(Workshop, D&I)

    Clearing path towards fir e

    fighting equipment (Ancillary(Ancillary

    AreaArea SeilSeil

    Conduit pipe threading-

    bending machine must be

    provided with barrier and

    1 32

    Air com pressor mus t begrounded and resting on spill

    containment tray when in

    operation (Power(Power

    Block,Block, SeobonSeobon))

    MEWP outriggers must be in

    contact on ground when

    extended and used.

    STC HanlimSTC Hanlim

    ,,

    Provide sufficient number of

    fire extinguisher to diesel

    tanker(Intake Basin, Al(Intake Basin, Al RaeelRaeel))

    Fire hydrant point must be

    free of any obstruction

    (Fabrication(FabricationShop,Shop, YounchangYounchang PB)PB)

    signage

    (Village 1, Hyundai C&I)(Village 1, Hyundai C&I)

    Install barricade for main

    electrical panel cabinet

    (CWIS,(CWIS, Seoyon gSeoyong PB)PB)

    Proper stacking of

    material, barricaded, will be

    followed by the team. (Village(Village

    1 H undai C&I1 H undai C&I

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ,,

    BanksmanBanksman should be in fullshould be in full

    control when managingcontrol when managing

    forkliftforklift (Ancillary(Ancillary

    Area,Area, Younc hangYounchang PB)PB)

    Oxygen cylinder must befitted with protective cap

    when not in use (Village(Village

    1, Hanlim)1, Hanlim)

    Set barricade during

    dismantling of scaffold.

    (ADB,(ADB, SeobonSeobon))

    Fire Prevention Plant and EquipmentSigns, Barriers, & Barric ades

  • 7/29/2019 125th HSJV Weekly Meeting

    11/26

    7/1/20

    BARAKAHNUCLEARPOWERPLANTPROJECT

    AncillaryArea46

    Village23

    FindingsperArea(This Week From June 22 June 28, 2013)

    Arch(I)Mech41

    Piping

    9

    2%

    FindingsperDiscipline9%

    OfficeArea60

    12%

    V llage157

    12%

    19%

    Civil

    84

    Elec

    56

    12%

    9%

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PowerBlock319

    66%

    Arch(PB)201

    41%

    17%

  • 7/29/2019 125th HSJV Weekly Meeting

    12/26

    7/1/20

    (This Week From June 22 June 28, 2013)

    115

    100

    150

    FindingsperCompany(ArchPB)

    21

    149

    Si ns Barriers& Barricades

    Supervision

    Training

    WasteManagementWorkingatHeightFindingsperCause(ArchPB)

    2711 6 3

    0

    50

    Advan D&I DOW Samjin Seobon Seoyong(PB)

    1 28 8 4 7

    66

    3 411 8

    46

    2 1 5

    19

    3 3

    010203040506070

    FindingsperArea(ArchPB)

    66

    17

    577

    138

    1711

    148

    214

    27

    Documents

    ElectricalSafetyEmergency&EvacuationEnvironmental

    FallProtectionFirePreventionHand&PowerToolsHealth&Welfare

    HotWorksHousekeepingLifting

    MaterialManagementPlant&EquipmentPoorIlluminationPPE

    PTW

    Scaffolding

    ,

    BARAKAH NUCLEAR POWER PLANT PROJECT

    183

    0 5 10 15 20

    Access&EgressColorCoding

    Corrective Action

    Replacement of damaged signage, setting signage at workplace.

    Maintenance of cleanliness at smoking shelter.

    Installation of fi rm and safe ladders.

    (This Week From June 22 June 28, 2013)

    31

    1

    29

    17

    1

    14

    110

    20

    30

    40

    FindingsperCompany(ArchInfra)

    4

    3

    1

    3

    l

    Signs,Barriers&Barricades

    Training

    WasteManagement

    WorkingatHeight

    FindingsperCause(ArchInfra)

    14

    31

    3 4 2

    40

    10

    20

    30

    40

    50

    FindingsperArea(ArchInfra)

    4

    4

    2

    6

    5

    11

    5

    3

    4

    6

    1

    5

    7

    9

    6

    Documents

    ElectricalSafety

    Emergency&Evacuation

    Environmental

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    HotWorks

    Housekeeping

    Lifting

    MaterialManagement

    Plant&Equipment

    PPE

    PTW

    l

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0Ancillary

    Area

    OfficeA re a P BCPI2 PBLa ydown PBO &M V il la ge1 31

    0 2 4 6 8 10 12

    Access&EgressColor

    Coding

    Corrective Action

    Containers or closed room free of flammable substances. Use of suitable footwear during concrete finishing works. Ensure equipment free of any oil leaks.

    Stationary air compressor supported with drip tray.

  • 7/29/2019 125th HSJV Weekly Meeting

    13/26

    7/1/20

    (This Week From June 22 June 28, 2013)

    65

    40

    60

    80

    FindingsperCompany(Civil)1

    5

    2

    Su ervision

    Training

    WasteManagement

    WorkingatHeight

    FindingsperCause(Civil)

    3 3

    18

    2 112

    0

    20

    AlR aee l E uge ne Gu san Hi lal co HSJ V S eo yo ng(PB)

    WBG

    62 3

    36

    4

    19

    3 18

    2

    05

    10152025303540

    FindingsperArea(Civil)

    1

    2

    8

    3

    10

    1

    7

    4

    2

    1

    2

    11

    5

    3

    6

    Documents

    ElectricalSafety

    Environmental

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    Housekeeping

    Lifting

    Manual Handling

    MaterialManagement

    Plant&Equipment

    PPE

    PTW

    Signs,Barriers&Barricades

    BARAKAH NUCLEAR POWER PLANT PROJECT

    6

    1

    1

    0 2 4 6 8 10 12

    Access&Egress

    ColorCoding

    ConfinedSpace

    Corrective Action

    Repair of heavy equipment operators cabin air conditioning system. Diesel tanker to have sufficient number of fire extinguishers. Paints and other chemicals moved to designated place with reference MSDS posted.

    (This Week From June 22 June 28, 2013)

    2

    11

    23

    42

    11

    6

    2468

    1012

    FindingsperCompany(Mech)1

    1

    3

    l

    Supervision

    WasteManagement

    WorkingatHeight

    FindingsperCause(Mech)

    18

    13 2 1 2 2 1 2

    8

    1

    0

    5

    10

    15

    20

    FindingsperArea(Mech)

    2

    3

    11

    2

    1

    2

    1

    1

    2

    2

    2

    Electrical Safety

    Environmental

    FirePrevention

    Hand&PowerTools

    HotWorks

    Housekeeping

    Lifting

    LOTO

    Plant&Equipment

    PPE

    PTW

    ca old ng

    BARAKAH NUCLEAR POWER PLANT PROJECT

    2

    0 2 4 6 8 10 12

    ColorCoding

    l l

    Corrective Action

    Access to fire fighting equipment is free of any blockage or obstruction.

    Completion of scaffolding parts and tagging prior put into use.

  • 7/29/2019 125th HSJV Weekly Meeting

    14/26

    7/1/20

    (This Week From June 22 June 28, 2013)

    3

    6

    4

    6

    8

    FindingsperCompany(Piping)1

    l

    Signs,Barriers&Barricades

    FindingsperCause(Piping)

    0

    2

    SungChang YounChang(PB)

    4

    2 22

    3

    4

    5

    FindingsperArea(Piping)

    1

    2

    2

    1

    1

    1

    ElectricalSafety

    FirePrevention

    HotWorks

    Housekeeping

    Plant&Equipment

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    1

    AncillaryArea PBABUnit1 PBLaydown PBRCB1

    0 0.5 1 1.5 2 2.5

    Corrective Action

    Provision of screen to contain radiation, and displaced metal slugs from gas cutting works.

    Proper management of empty cylinders its storage and handling followed by working crews.

    (This Week From June 22 June 28, 2013)

    12

    32

    20

    30

    40

    FindingsperCompany(Elec)

    2

    1

    2

    Signs,Barriers&Barricades

    Supervision

    WorkingatHeight

    FindingsperCause(Elec)

    2

    0

    Daemyung HyundaiC&I Jonghap Jonghap(PB) Y ounChang(PB)

    26

    14

    10

    15

    20

    25

    30

    FindingsperArea(Elec)

    1

    5

    10

    4

    3

    5

    4

    1

    4

    5

    2

    Excavation

    FallProtection

    Hand&PowerTools

    Health&Welfare

    HotWorks

    Housekeeping

    MaterialManagement

    Plant&Equipment

    PoorIllumination

    PPE

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4 3 1 1 1

    0

    5

    Ancillary

    Area

    Office

    Area

    PBAB

    Unit1

    PBAB

    Unit2

    PBO&M PBTGB1 Village1 Village22

    14

    0 2 4 6 8 10 12

    Access&Egress

    ColorCodingElectrical

    Safety

    Corrective Action

    Workers were trained on right positioning when working with hand and power tools. Periodic trainingas part continuous education program is planned by HSJ V HSE Team.

  • 7/29/2019 125th HSJV Weekly Meeting

    15/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    77

    70

    80

    13

    41

    2015

    21

    11

    20

    48

    1920

    30

    40

    50

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4 3 3 3 2 4

    0

  • 7/29/2019 125th HSJV Weekly Meeting

    16/26

    7/1/20

    70

    80

    90 ConfinedSpaceEmergency&Evacuation

    Training

    PoorIllumination

    Supervision

    ColorCoding

    10,Signs,Barriers,&Barricades

    20

    30

    40

    50

    60PTW

    Documents

    FallProtection

    Scaffolding

    HotWorks

    Lifting

    Environmental

    ElectricalSafety

    Hand&PowerTools

    WorkingatHeight

    MaterialManagement

    7,Signs,Barriers,&Barricades

    7 Environmental

    4,Health&Welfare4,FirePrevention

    4,PlantandEquipment

    6,Housekeeping

    5,AccessandEgress

    5,Housekeeping

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    10WasteManagement

    Plant&Equipment

    FirePrevention

    Health&

    Welfare

    PPE

    Access&Egress

    Signs,Barriers&Barricades

    Housekeeping

    ,

    700

    80090

    100KEPCO/HSJV

    SUBCON

    (This Week From June 22 28, 2013)

    100

    200

    300

    400

    500

    600

    203040506070 Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyong

    Seoyong(PB)

    TowersTech

    Gusan

    Jonghap

    Jonghap(PB)

    YounChang

    YounChang(PB)

    Hwachon

    WBG

    Hilalco

    Advan

    Hanlim

    Uwell

    YooA

    HyundaiC&I

    Samjin

    Eugene

    Daemyung

    SeobonD&I

    AlRaeel

    DOW

    Samho

    IsamKabbani

    Geumhwa

    SungchangSeil

  • 7/29/2019 125th HSJV Weekly Meeting

    17/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4.0

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)Source: CAR, Near Miss, Walkthrough and

    Observation Card reported by KEPCO & HSJV

    0.0

    1.0

    2.0

    3.0

    1.4

    0.60.2

    0.0

    1.9

    1.21.0

    0.20.4

    1.7

    0.70.4

    1.0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem1.JointInspection willbecarriedoutbyAreaManagementTeam.

    2.SpotTrainingwillbegiven toworkersaboutmajorfindings

    3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby YounChang(Infra)

    Legend : (I) Infra, (PB) Power Block

  • 7/29/2019 125th HSJV Weekly Meeting

    18/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Scaffolding 3

    Total No. of Findings : 12Scaffolding,3

    ColorCodin 1

    FirePrevention,1

    Housekeeping 2

    Control Measure Due Date

    Restrict workersfromusingincompletescaffoldandensurethattagsareprovided.

    Done

    ElectricalSafety,1

    ,

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Providecable

    hangers

    for

    propercablemanagement. DoneHousekeeping,2

    Plant&Equipment,1

    WorkingatHeight,1Environmental,1

    HotWorks,1

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 125th HSJV Weekly Meeting

    19/26

    7/1/20

    Top Hazards

    Total No. of Findings: 10

    ElectricalSafety,2

    ColorCoding,1

    ElectricalSafety 2FirePrevention 2

    Control Measure Due Date

    Ensurethatcontrolpanelsareproperlyinspectedandsecurelyinstalled. Sone

    re revent on,2

    Workingat

    Health&Welfare,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Propersegregationandstorageofcombustiblematerials shouldbepracticed.

    Done

    Housekeeping,1PPE,1

    Scaffolding,1

    ,

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 125th HSJV Weekly Meeting

    20/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemark

    Commi tt ee Ins pect ion 2013-06-25 HSJV, KEPCO, HSE Manag ement Team Fi ndi ngs

    Weekly Inspection 2013-06-26 HSJV HSE Team 4 Findings

    2

    3

    FindingsperCompany

    2NoSegregation

    FindingsperCausal

    2 2

    0

    1

    Hanlim Seobon

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    0 0.5 1 1.5 2 2.5

    NoSpillKit

    NoDripTray

    Key item : Chemical Storage

  • 7/29/2019 125th HSJV Weekly Meeting

    21/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive

    Act ion

    1Injury;left

    4thFinger

    ADVAN

    Danilo Dizon

    Carpenter

    PowerBlock

    TheIPwithhisSupervisor

    triedtoadjusttheconnector

    ofanadjustableAtype

    laddertotransferittothe

    workingarea.Notawareofhis

    Supervisorssuddenreleaseof

    theladder,theconnectorsnip

    Assessedby

    Dr.Kim.

    Wound

    cleansingand

    compressive

    dressingdone.

    BARAKAH NUCLEAR POWER PLANT PROJECT

    28062013

    07:00

    inbetween

    the

    sharp

    edges

    of

    thesnippingconnector.

    Subsequently,theIPsustained

    cutwounds.

    medicines

    given.

  • 7/29/2019 125th HSJV Weekly Meeting

    22/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AFTERBEFORE

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Power Block Laydown Yard

    Description Obseved chemical storages without drip tray .

    Act ion taken Bunded wall already enclosed to contain hazmats in case of spillage.

    Status CLOSED

  • 7/29/2019 125th HSJV Weekly Meeting

    23/26

    7/1/20

    AFTERBEFORE

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Power Block Laydown Yard

    Description Poor hazmats segregation insi de storage, neglected diesel drums were outside chemical storage.

    Act ion taken Segregation of hazmat already done, provided new fuel storage for diesel drums.

    Status CLOSED

    AFTER

    BEFORE

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Power Block Laydown Yard

    Description Deteriorated old No Objection Certificate on not ice board and improper management of gascylinders.

    Act ion taken New NOC immediately provided and gas cylinders stored properly in st orage.

    Status CLOSED

  • 7/29/2019 125th HSJV Weekly Meeting

    24/26

    7/1/20

    No.0 DateActio n by

    CompanyDescription Status Closing Date

    Expiration

    Date

    Ref. No.

    CARM ai n Area Sub -A re a Issu ed By

    Issuer

    Company

    123 June

    2013Seoyong

    Two (2) units of unbundedor no drip

    tray chemical storage observed .CLOSED

    29 June

    2013

    29 June

    20131594

    Power

    Block

    Laydown

    Yard

    Renato

    PonceHSJV

    223 June

    2013D & I

    Poor hazmat segregation inside

    storage, no padlock and substandard

    fuel storage

    CLOSED29 June

    2013

    29 June

    20131599

    Power

    Block

    Laydown

    Yard

    Renato

    PonceHSJV

    3

    23 June

    2013 SamjinDeteriorated No Objection Certificate

    on notice board and improper

    stacking of gas cylinders.

    CLOSED29 June

    2013

    29 June

    20131600

    Power

    Block

    Laydown

    Yard

    Renato

    PonceHSJV

    BARAKAH NUCLEAR POWER PLANT PROJECT

    WASTEMANAGEMENTUPDATEWeek=20/06/2013 26/06/2013

    Thisweek LastweekCollected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 64 0 0 80 0 0

    Metal 64 0 45 64 0 90

    Construction 152 855 135 136 1350 0

    Concrete 0 0 45 0 0 0

    Wood(Good) 0 0 0 0 0 0

    Wood(Bad) 226 225 0 216 135 0

    Plastic 200 0 0 128 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Municipal 0 328 0 0 280 0Hazardous 0 0 0 8 8 0

    TotalSolidWaste 706 1408 225 31.87% 632 1773 90 14.24%

  • 7/29/2019 125th HSJV Weekly Meeting

    25/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 125th HSJV Weekly Meeting

    26/26

    7/1/20

    BARAKAH NUCLEAR POWER PLANT PROJECT