    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/30/2019 105th HSJV Weekly Meeting

    2/25

    2/10/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    3/25

    2/10/20

    1. Previous Meeting

    2. HSE Programs

    1. Previous Meeting

    2. HSE Programs

    5. Weekly Inspection

    6. Medical Cases

    5. Weekly Inspection

    6. Medical Cases

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause

    wise, Company, and Area

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause

    wise, Company, and Area

    7. Environmental Issues

    8. Action Plans

    7. Environmental Issues

    8. Action Plans

    BARAKAH NUCLEAR POWER PLANT PROJECT

    HSE Findings by Company

    Reported Near Miss Evaluation by Findings Score

    HSE Findings by Company

    Reported Near Miss Evaluation by Findings Score

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    4/25

    2/10/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS

    ACTIONACTION

    BYBY

    DUEDUE

    DATEDATE STATUSSTATUS

    For two consecutive weeks D&I still performs low interms of HSE findin s submission. The same

    1LowSubmission

    & High Findings

    organization who had garnered high rating in HSEfindings. D&I must report on next meeting acomprehensive action plans providing solution tocurrent high risk type of HSE findings, and lowsubmission.

    D&INext

    MeetingDone

    2 High Findings

    Seobon failed to explain background of their total

    findings. The company ranks second in the number

    of HSE findings. Seobon will come back on next

    meeting and discuss details of their findings

    SeobonNext

    MeetingDone

    BARAKAH NUCLEAR POWER PLANT PROJECT

    including planned corrective actions.

    3 Site WorkplaceCleanliness

    The status of site workplace cleanliness checklistawareness training and other related activities shallbe feedback in this meeting.

    HSJV NextMeeting

    Done

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    5/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descr ipt ionDescr ipt ion ::

    Minimum requirement of elect r ical system to have an ELCB with speci f ic rat ing onMinimum requirement of elect r ical system to have an ELCB with speci f ic rat ing on

    this kind of safety device. The equipment is inspected by HSJV Electricalthis kind of safety device. The equipment is inspected by HSJV Electrical

    Team, HSE, and Subcontractor electrician. Inspection wil l continue next week.Team, HSE, and Subcontractor electrician. Inspection wil l continue next week.

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    Au di t chec kl ist is av ai lab le bas e from req u irem en ts of ap pl icab le HSEAu di t chec kl ist is av ai lab le bas e from req u irem en ts of ap pl icab le HSE

    standards, proj ect procedur es , and local regulat ions(ADEHSMS)standards, proj ect procedur es , and local regulat ions(ADEHSMS)

  • 7/30/2019 105th HSJV Weekly Meeting

    6/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ItemAncil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 5 0 0 0 0 0 7 0 0

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0

    (This Week From Feb 02 Feb 08, 2013)

    First Aid Cases(FA) 0 1 0 0 0 0 1 2 0 2 0 2 1 7 0 0

    MedicalTreatment Cases

    (MTC)0 0 0 0 0 2 0 2 0 0 0 0 0 4 0 0

    Restricted WorkCases (RWC) 0 0 0 1 0 0 0 1 0 0 0 0 0 2 0 0

    LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Property/Vehicle

    Accid ents 1 1 0 1 0 1 1 1 1 1 0 1 3 6 0 0

    Environmental0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 2 (2013)

    e ease

    Forthisweek Cumulative

    OneStrike Policy 0 107*

  • 7/30/2019 105th HSJV Weekly Meeting

    7/25

    2/10/20

    Source: CAR, Near Miss, Observation Cards and Walkthrough

    (This Week From Feb 02 Feb 08 , 2013)

    KEPCO&HSJV SUBCONArea

    .

    Inspections

    .

    Findings & HSJVSUBCON

    Anc il lary

    Area5 57 13 44

    Camp

    Area4 19 17 2

    Office

    Area5 79 11 68

    100

    150

    200

    250

    300

    350

    68

    276

    52

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Power

    Block5 323 47 276

    Village 1 5 61 9 52

    Village 2 5 34 0 34

    Total Findings 573

    0

    50 13 17 11 9 0234

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    8/25

    2/10/20

    (This Week From Feb 02 Feb 08 , 2013)

    Issued

    NearMissNearMiss

    CARCAR

    0 0 0 0

    5 42 183 230

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    4 7 0 1 35 183

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&WFOC&WF 0 50 293 343

    5 92 476 573

    0 0 0 0 50 293

    4 7 0 1 85 476

    Feb02 Feb08,2013

    for the Period Total Open

    CompanyCCAP CAR/NM

    D&I 1

    Gusan 2 0

    HSJV 1 3

    Isam Kabbani 1

    Company2013 OPEN

    D&I 1 1

    Isam Kabbani 1 1

    Seoyong 1 1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Seoyong 1 1

    WBG 1

    Total4 7

    WBG 1 1

    Total 4 4

  • 7/30/2019 105th HSJV Weekly Meeting

    9/25

    2/10/20

    (This Week From Feb 02 Feb 08, 2013)

    3639

    4450

    55

    ElectricalSafety

    MaterialManagement

    Signs,Barriers&barricades

    PPE

    Access&Egress

    67

    81212

    131515

    2126

    2829

    3434

    H

    Excavation

    Training

    PoorIllumination

    FallProtection

    Hand&PowerTools

    Environmental

    Health&Welfare

    WasteManagement

    Lifting

    ColorCoding

    Plant&Equipment

    WorkingatHeight

    FirePrevention

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Source: CAR, Near Miss, Walkthrough and Observation Card111

    24

    6

    0 10 20 30 40 50 60

    Documents

    MaterialHandling

    ConfinedSpace

    ManualHandling

    Supervision

    PTW

    Suspended cable should be

    hanged above ground

    clearing access of personnel Sharp edges should have

    Welders should wear PPE-

    face mask, welding gloves

    1 32

    (RCB, Samjin)

    Remove obstruction at

    stairway in the bui lding (MCO

    5, Seoyong)

    Improve access by installing

    handrails, and secure at

    different corners. (Power

    Block, Gusan)

    barriers (RCB, Samjin)

    Stockpile of rebars must be

    kept inside barricaded area

    (TGB, D&I)

    Perimeter of RCB 3 to be

    enclosed by pipe barricade(RCB, WBG)

    Re lace dama ed barricade

    . ,

    Workers at roof top should

    have helmet fitted wi th chain

    strap (STC, Seobon)

    Workers must use safety

    harness when working on

    open edge (Village 2, Towers

    Tech)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Provide access inside rebar

    foundation works

    (O&M, Seobon)

    Access and Egress Signs, & Barricades

    confining panel boards(UCT, Jonghap PB)

    PPE

    Flagmen to use safety glass

    at all times(Intake Basin,Al

    Raeel)

  • 7/30/2019 105th HSJV Weekly Meeting

    10/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    600

    700

    70

    80KEPCO/HSJV

    SUBCON

    (This Week From Feb 02 Feb 08, 2013)

    100

    200

    300

    400

    500

    10

    20

    30

    40

    50

    60Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyong

    Seoyong(PB)

    TowersTech

    Gusan

    Gusan(PB)

    Eunmin

    Jonghap

    Jonghap(PB)

    YounChang

    YounChang(PB)

    WBG

    Hilalco

    Advan

    Hanlim

    Uwell

    YooA

    HyundaiC&I

    Samjin

    Eugene

    Daemyung

    Seobon

    D&I

    AlRaeel

    DOW

    Samho

  • 7/30/2019 105th HSJV Weekly Meeting

    11/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    9.010.0

    7.2

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)

    Source: CAR, Near Miss, Walkthrough

    and Observation Card reported byKEPCO & HSJV

    0.01.02.03.04.05.06.07.0

    . 6.66.2

    0.2

    4.4

    0.5 0.2 0.2 0.2

    3.1 2.9

    6.15.4

    1.0

    4.0

    2.2

    0.5 0.2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem

    1.JointInspection willbecarriedoutbyAreaManagementTeam.

    2.SpotTrainingwillbegiven toworkersaboutmajorfindings

    3.Actionplanwillbe submittedtoHSJVHSETeamdevelopbySeobon

    Legend : (I) Infra, (PB) Power Block

  • 7/30/2019 105th HSJV Weekly Meeting

    12/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Total No. of Findings: 31Access&Egress,6Health&Welfare,1

    Supervision,1Environmental,1 Poor

    Illumination,1

    Cause Nos

    Access &Egress 6

    WorkingAtHeights 5

    Control Measure Due Date

    Clearaccessofobstruction

    inworkplaceandconfined

    space.Provideaccessto

    rebarworks.

    Alw aysSigns,Barriers&

    Barricades,2

    Scaffolding,1Waste

    Management,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Installedge orfall

    protectionforworksat

    height.Observe100%tieoff

    ofsafetyharness.

    Alw aysWorkingat

    Height,5Housekeeping,4

    FallProtection,3PPE,3

    Plant&Equipment,2

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/30/2019 105th HSJV Weekly Meeting

    13/25

    2/10/20

    Top Hazards

    Total No. of Findings: 25

    Signs,Barriers&Barricades,5Housekeeping,1

    WasteManagement,1 Access&Egress,1

    Cause Nos

    Signs, Barrier&Barricades 5

    MaterialManagement 5

    Control Measure Due Date

    Ensurebarricadeand

    correctplacementonfire

    hydrantbeforework

    commence.

    Immediate

    PPE,2

    Health&Welfare,2

    FirePrevention,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Propermanagementof

    scaffoldingmaterialand

    othersstored

    at

    lay

    down

    area.

    Immediate MaterialManagement,5

    ColorCoding,4

    ElectricalSafety,3

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    14/25

    2/10/20

    AREAAREA : AB 2 (WBG) 02 February 2013: AB 2 (WBG) 02 February 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

    AREAAREA : Batch Plant (WBG) 06 February 2013: Batch Plant (WBG) 06 February 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

  • 7/30/2019 105th HSJV Weekly Meeting

    15/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    16/25

    2/10/20

    AREAAREA : Vill age 1 (: Village 1 (GusanGusan) 02 February 2013) 02 February 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    17/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemarkCommi tt ee Ins pect ion 2013-02-05 HSJV, KEPCO, HSE Manag ement Team 0 Fi nd ing

    Weekly Inspection 2013-02-06 HSJV HSE Team 14 Findings

    3

    4

    5

    FindingsperCompany Total

    5Missinghandrails/edgeprotection

    Findingsbreakdown

    1

    4

    2

    1

    4

    2

    0

    1

    2

    D&I Gusan(PB) Hanlim IsamKabbani Seobon Seoyong(PB)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    1

    1

    2

    3

    0 1 2 3 4 5 6

    Incompleteclamps

    Housekeeping

    NoAccess

    Incompleteworkingplatform

    Incomplete Nobarricade

    Incomplete PPE

    Key item : Working At Heights

  • 7/30/2019 105th HSJV Weekly Meeting

    18/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned Supervisor

    Preventive Acti on

    1

    Cutforthe

    leftring

    finger

    D&I

    PowerBlock

    TGB

    2/2/2013

    Theinjuredpatientwas

    installingscaffoldpipe

    withhiscolleaguewhile

    IPwasholdingoneend

    ofpipesuddenlyhis

    companionmovedthe

    pipe,IPringfingerwas

    pressedbetweenthe

    Cleansingand

    dressingthe

    wound

    Analgesicgivenfor

    pain

    BARAKAH NUCLEAR POWER PLANT PROJECT

    plank.IP

    sustained

    minorlaceration.

  • 7/30/2019 105th HSJV Weekly Meeting

    19/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description ObservednegligibleHydraulicoilleakageatCWDC

    Actiontaken Maintainthehoseanddisposalofcontaminatedspillkitstothehazardousskipbin

    Status CLOSED

  • 7/30/2019 105th HSJV Weekly Meeting

    20/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description Observednegligible

    Hydraulic

    oil

    leakage

    at

    RCB

    UNIT

    2

    Actiontaken Maintaintheequipmentanddisposalofcontaminatedspillkitstothehazardousskipbin

    Status CLOSED

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description ObservedaircompressorwithoutdriptrayatOperationMaintenanceBuilding

    Actiontaken Placeimperviousdriptraypreventingfromoilleakagecancontaminatesoil

    Status CLOSED

  • 7/30/2019 105th HSJV Weekly Meeting

    21/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description Observedneglected

    asphalt

    waste

    mixed

    with

    garbage

    at

    west

    side

    of

    batch

    plant

    ActionPlan Disposalofthewastetoconcreteskipbinandsegregatethematwastesegregationarea

    Status OPEN

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description Observedhazardoussubstanceatnondesignatedareawithoutafireextinguisher,MSDS,anddriptrayatTGB

    ActionPlan Movethemtoproperchemicalstoragewith afireextinguisher,MSDS,anddriptray

    Status OPEN

  • 7/30/2019 105th HSJV Weekly Meeting

    22/25

    2/10/20

    No.0 DateActio n by

    CompanyDescription Status

    Closing

    Date

    Expiration

    DateR ef . N o. M ai n Ar ea S ub -A re a I ss ued By

    Issuer

    CompanyUA/UC

    1 2Feb13 WBG Minorhydraulicoilleakage Closed 4Feb13 7Feb13 20130428PowerBlock

    RCB HSJVRenatoPonce

    UC

    2 2Feb13 WBG

    Excavatorwithplate#67528observedminorhydraulicoil

    leakageontheboomfitting/hoseduringdiggingoperationat

    CWDC5

    Closed 9Feb13 7Feb13 20130448PowerBlock

    CWDC HSJVRenatoPonce

    UC

    Negligiblesewagewastewaterleakageontoilettank,ground

    BARAKAH NUCLEAR POWER PLANT PROJECT

    3 5Feb13r

    Mountainsoilcontaminationadversely

    affectinggroundwatersamplingmonitoringandactivities.

    Closed 9Feb1 3 1 0Feb13 20130454w r

    BlockLaydown HSJV

    PonceUC

    4 5Feb13 Seoyong

    Neglectedandimproper

    dumpingof

    concrete

    waste

    mixedwithcontructiondebrisgeneratedformtheconstruction

    area.

    Open 10Feb13 20130455Ancillary

    AreaLaydown HSJV

    RenatoPonce

    UC

    No. DateActio n by

    CompanyDescription Status

    Closing

    Date

    Expiration

    DateRef . No . Mai n Ar ea Su b-Ar ea I ss ued B y

    Issuer

    CompanyUA/UC

    5 5Feb13 WBG

    Neglectedandimproperdumpingofasphaltwaste,mixedgarbage

    andconstructiondebrisgeneratedfromconstruction

    workarea.

    Open 10Feb13 20130456Ancillary

    AreaWestSidebatching

    HSJVRenatoPonce

    UC

    6 7Feb13 Seo yo ng

    Hazardousmaterials"formoil"withoutproperchemicalstorage,

    stackedatSeoyong temporarymaterialsstorageareaatUnit2

    Closed 10Feb13 12Feb13 20130468 PowerB lo ck T GB HSJVRenatoPonce

    UC

    BARAKAH NUCLEAR POWER PLANT PROJECT

    .

    7 7Feb1 3 S eob on

    Stationarydieseloperatedaircompressorgeneratorequipmentobservedwithoutimperviousdriptrayplacedunderneathduringairblowingoperation@Operation

    MaintenanceBuilding.

    Open 12Feb13 20130469 OfficeArea O&Marea HSJVRenatoPonce

    UC

  • 7/30/2019 105th HSJV Weekly Meeting

    23/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    WASTEMANAGEMENTUPDATE

    Week=31/01/2013 06/02/2013

    Thisweek Lastweek

    Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 72 0 0 72 0 45

    Metal 24 0 0 24 0 45

    Construction 136 315 0 120 450 0

    Concrete 0 0 90 0 0 0Wood(Good) 0 0 0 0 0 0Wood(Bad) 208 135 0 152 90 0

    Plastic 136 0 45 88 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Municipal 0 264 0 0 264 0Hazardous 0 0 0 16 8 8

    TotalSolidWaste 576 714 135 18.9% 472 812 98 12.06%

  • 7/30/2019 105th HSJV Weekly Meeting

    24/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/30/2019 105th HSJV Weekly Meeting

    25/25

    2/10/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT