List of 12 Infrastructure Projects 1. Soekarno-Hatta International Airport (SHIA) Railways 2. Cilamaya New Port Development Project 3. Pandaan – Malang Toll Road 4. Manado – Bitung Toll Road 5. Cileunyi – Sumedang – Dawuan Toll Road Project 6. Balikpapan – Samarinda Toll Road, East Kalimantan 7. Bogor & Depok Solid Waste Treatment and Final Disposal, West Java 8. Surakarta Solid Waste Treatment and Final Disposal for Greater Bandung Area

1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

  • Upload
    lynhi

  • View
    241

  • Download
    8

Embed Size (px)

Citation preview

Page 1: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

List of 12 Infrastructure Projects

1. Soekarno-Hatta International Airport (SHIA) Railways

2. Cilamaya New Port Development Project

3. Pandaan – Malang Toll Road

4. Manado – Bitung Toll Road

5. Cileunyi – Sumedang – Dawuan Toll Road Project

6. Balikpapan – Samarinda Toll Road, East Kalimantan

7. Bogor & Depok Solid Waste Treatment and Final Disposal, West Java

8. Surakarta Solid Waste Treatment and Final Disposal for Greater Bandung Area

Page 2: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

9. Southern Bali Water Supply

11. Bandung Light Rail Transit, West Java, Corridor I

12. Sumatera Selatan Monorail, South Sumatera

10. Pondok Gede Water Supply , Bekasi, West Java

List of 12 Infrastructure Projects

Page 3: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Soekarno – Hatta International Airport – Jakarta Railways

PROJECT TITLE

Soekarno-Hatta International Airport – Jakarta

Railway Project

PROJECT LOCATION

DKI Jakarta and Banten Province

CONTRACTING AGENCY

Ministry of Transportation

PROJECT BACKGROUND

Currently, Jakarta population hasexceeded 10 million people and only oneaccess to the airport via the toll road.With an annual total of 51,5 millionpassengers and annual increase of 15%,it caused a need of alternativetransportation in order to respondtoward the tremendeous growth.

SCOPE OF WORK

• Design and construct the railinfrastructure, and procure the rollingstock

• Provide substantial private finance forthe initial costs

• Operate and maintain theinfrastructure and rolling stock

• Collect fare revenue and other income

PPP MODALITY

BOT (to be decided)

Estimated construction cost: US$ 2.57 billion

INVESTMENT ESTIMATED COST

TENTATIVE SCHEDULE

Finalization of Outline Business Case andProject Readiness (2013)

Final Business Case, TenderDocument, Pre-Qualification (2014)

Bidding and Evaluation (H1 2015)

Negotiation with Preferred Bidder (H1 2015)

Contract Award (H2 2015)

Director of Railways Traffic and TransportationMinistry of TransportationJl. Medan Merdeka Barat No.8 , Gedung Karta lantai 11, Jakarta 10110 IndonesiaPhone: +62 21 3506526 Fax : +62 21 3506526 Email : [email protected]

[email protected]

CONTACT

Page 4: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

PROJECT TITLE

Expansion of Tanjung Priok Port, Cilamaya Karawang

PROJECT LOCATION

Karawang Region, West Java Province

CONTRACTING AGENCY

Ministry of Transportation

PROJECT BACKGROUND

Future growth of shipping activities inWest Java have to be accommodated byan adequate port facilities. To supportthis, the expansion of the Port of TanjungPriok - Cilamaya needs to be done. Thiswill reduce transportation costs forindustry in the northern region of WestJava and increase the comparativeadvantage for export commodities

SCOPE OF WORK

Harbor area is about 250 ha with elevation of 4 meters above sea level :1. Reclamation area about 140 ha.2. Ciparage coastal area about 110 ha.Harbor pond depth : 13 m.Harbor pond length : 1.25 km.Harbor pond pier : 2.5 km.Total pier length : 3.4 km.

TENTATIVE SCHEDULE

Finalization of Final Business Case (2013)

Preparation of Detailed Engineering

Design (2014-2015)

Pre-Qualification (2016)

Bidding & Evaluation (2017)

Estimated Project value: US$ 2.39 billion (phase 1)US$ 1.06 billion (phase 2)

INVESTMENT ESTIMATED COST

H2 2017• Negotiation with Preferred

Bidder• Contract Award

CONTACT

Mr. Adolf R. TambunanDirector of Port and Dredging, Ministry of TransportationKarya Building 15th Floor, Jl. Medan Merdeka Barat No. 8 Jakarta 10110, INDONESIATlp : +62 21 3506964Fax : +62 21 3848963/34834847

Transportation Service and Partnership Analysis Center, Minisitry of Transportation.Cipta Building 6th Floor Jl. Medan Merdeka Barat No.8 Jakarta 10110, INDONESIATlp : +62 21 3517608Fax : +62 21 3852671

Expansion of Tanjung Priok Port, Cilamaya, Karawang, West Java

Page 5: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Pandaan – Malang Toll Road

PROJECT BACKGROUND

Malang – Pandaan road is part ofSouthern Java road network that cinnectthe Surabaya Municipal with the otherarea in East Java through MalangRegency and Pasuruan. The regionaldevelopment has created disturbanceand barriers to the transportation flow inthe existing road Pandaan – Malang. Forinstance, high frequency of pedestrianand public vehicles in the artery and tollroad congestion. Thus, the toll road isdesigned to improve connectivity withinthe region.

SCOPE OF WORK

Length: 37.62 km

Design speed 80-120 km/hr

Number of lane 2x3 lanes

Lane of width 3.60 m

Outer Shoulder Width 3.00 m

Inner Shoulder width 1.50 m

Media width 12.70 m

PROJECT TITLE

Pandaan – Malang Toll Road

PROJECT LOCATION

East Java Province

CONTRACTING AGENCY

Indonesia Toll Road Authority (BPJT)

PPP MODALITY

Financing, engineering design, construction, operation and maintenance during the concession period

Estimated construction cost: US$ 399

INVESTMENT ESTIMATED COST

CONTACT

Head of Indonesia Toll Road

Authority (BPJT)

Gedung Bina Marga Lantai 3, Jalan

Pattimura No.20 Kebayoran Baru ,

Jakarta Selatan 12110, INDONESIA

Tlp : +62 21 7258063

Fax : +62 21 7257126

Email : [email protected],

[email protected]

Page 6: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Manado – Bitung Toll Road

PROJECT TITLE

Manado – Bitung Toll Road

LOCATION

Province of North Sulawesi

CONTRACTING AGENCY

Ministry of Public Works

PROJECT BACKGROUND

Toll Road Project Manado - Bitung is a project that built toconnect the city with the Port of Bitung Manado. Bitungharbor has been established as the integrated EconomicDevelopment Area (KAPET) by the government and beinginitiated into Special Economic Zones (KEK).

CONTACT

Head of Indonesia Toll Road Authority (BPJT)Gedung Bina Marga Lantai 3 Jalan Pattimura No.20 Kebayoran Baru Jakarta Selatan 12110, INDONESIA Tlp : +62 21 7258063Fax : +62 21 7257126Email : [email protected], [email protected]

TENTATIVE SCHEDULE SCOPE OF WORK

Length : 31.80 kmDesign Speed : 80.00 km/hNumber of Lane : 2 x 2 lanes

(phase I):2 x 3 lanes (phase II)

Lane of width : 3.60 mOuter Shoulder Width : 3.00 mInner Shoulder Width : 1.50 mMedian Width : 3.00 – 2.50 mRight of Way : 40.00 m (minimum)

ESTIMATED INVESTMENT COST

Estimated Project Value: US$ 353 millionLand Acquisition Value: US$ 26.67million

Finalization of FinalBusiness Case (H2 2014)

Pre Qualification (H2 2014)

Bidding & Evaluation (H1 2015)

Negotiation withPreferred Bidder (H2 2015)

Contract Award (H1 2016)

Page 7: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Cileunyi – Sumedang – Dawuan (Cisumdawu) Toll Road

PROJECT TITLE

Cileunyi – Sumedang – Dawuan Toll Road

LOCATION

West Java

CONTRACTING AGENCY

BPJT, Ministry of Public Works

BACKGROUND

This toll road will provide direct access for goods transportation from some areasto the port city of Cirebon. This toll road is urgentlyrequired to help shift some of the development of theregion to the east side of Bandung.

CONTACT

Mr. A. Gani Ghazaly AkmanHead of Indonesia Toll Road Authority (BPJT)Gedung Bina Marga Lantai 3 Jalan Pattimura No.20 Kebayoran Baru Jakarta Selatan 12110, INDONESIA Tlp : +62 21 7258063Fax : +62 21 7257126Email : [email protected], [email protected]

SCOPE OF WORK

Length: 58.59 kmDesign Speed : 100 km/jamNumber of Lane : 2 x 3 lajurLane Width : 3.60 mOuter Shoulder Width : 5.00 mInner Shoulder Width : 1.5 mMedian Width : 5.50 m

ESTIMATED INVESTMENT COST

Private: Rp 7.32 trillion (US$ 779 million); Total investment, including government support: Rp 9.26 trillion (US$ 985.1 million)

PPP MODALITY

BOT (Build – Operate – Transfer), with concession period of 35 years

TENTATIVE SCHDULE

Finalization of FinalBusiness Case and Tender(2014)

Pre Qualification (H 12015)

Bidding & Evaluation (H2 2015)

Negotiation with PreferredBidders (H1 2016)

Contract Award (H2 2016)

Page 8: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Balikpapan-Samarinda Toll Road , West Kalimantan

PROJECT TITLE

Balikpapan-Samarinda Toll Road , West

Kalimantan

PROJECT BACKGROUND

This project will develop new toll

road corridor from Balikpapan to

Samarinda for 99.02 kilometers and

as part the establishment of a sub

regional multi-modal transport

network to support the free

movement of people and goods

across borders.

SCOPE OF WORK

Length 99.40 km

Design speed 80 km/hr

Number of lane 2x2 lanes

Lane of width 3,6 m

Outershoulder width 3,0 m

Inner shoulder width 1,5 m

Media width 3,8 m

Right of Way 40.00 m (minimum)

TENTATIVE SCHEDULE

PROJECT LOCATION

East Kalimantan Province

CONTRACTING AGENCY

Indonesia Toll Road Authority (BPJT)

The estimated project cost is US$ 1,200.00 million; US$ 133.33 million is allocated for land acquisition

INVESTMENT ESTIMATED COST

Finalization of FinalBusiness Case (H1 2014)

Pre Qualification (H2 2014)

Bidding & Evaluation (H1 2015)

Negotiation with PreferredBidders (H2 2015)

Contract Award (H2 2016)

PPP MODALITY

BOT (Build-Operate-Transfer)

Head of Indonesia Toll Road Authority (BPJT)

Gedung Bina Marga Lantai 3, Jalan Pattimura

No.20 Kebayoran Baru , Jakarta Selatan 12110,

INDONESIA

Tlp : +62 21 7258063

Fax : +62 21 7257126

Email : [email protected], [email protected]

CONTACT

Page 9: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Solid Waste Treatment and Final Disposal for Bogor Area at Nambo

PROJECT TITLE

Solid Waste Treatment and Final Disposal for Bogor Area at Nambo

PROJECT LOCATION

Bogor, West Java Province

CONTRACTING AGENCY

West Java Provincial Government

PROJECT BACKGROUND

The concept of this project is to operate asanitary landfill site which will facilitateefficient disposal of household, andcommercial waste from the the cities ofBogor in final disposal site.

The final disposal site should incorporatewaste sorting, recycling and orcomposting facilities.

SCOPE OF WORK

• Operational capacity: 1500 ton/day• Output target:

RDF and Compost

TENTATIVE SCHEDULE

Finalization of FinalBusiness Case (2013)

Finalization Bidding Documents (H1 2014)

Pre Qualification (H2 2014)

Bidding, Evaluation andContract (H1 2015)

INVESTMENT ESTIMATED COST

Construction (2015 – 2016)

CONTACT

Mr. Edi BachtiarHead of West Java Regional Solid Waste Management (BPSR), Human Settlement and Housing Agency, West Java ProvinceJl. Kawaluyaan Indah No.4 Bandung 40286,West Java INDONESIATlp : +62 22 7332078 Email: [email protected]

PPP MODALITY

BOT (Build – Operate – Transfer) with 20 - 30years of concession period)

Estimated Project Value US$ 60 Million, consist of :• Land Acquisition and Basic Infrastructure, US$ 12 Million• Intermediate Treatment Facilities (ITF) and Operational

Facilities, US$ 48 Miliion

Page 10: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Solid Waste Treatment and Final Disposal - Surakarta

PROJECT TITLE

Solid Waste Treatment & Final Disposal, Surakarta

PROJECT LOCATION

Surakarta Municipal, Central Java Province

CONTRACTING AGENCY

Municipal Government of Surakarta

PROJECT BACKGROUND

Limited land for the city of

Surakarta to Final Disposal Site

and high costs in operational costs

require, are the main reason for

local government to choose and set

the system technology in the

processing of waste for the city of

Surakarta

SCOPE OF WORK

Integrated solid waste management (waste

prevention, recycling and composting,

combustion and disposal in properly designed,

constructed, and managed landfills)

TENTATIVE SCHEDULE

Finalization of FinalBusiness Case (2013)

Pre Qualification (H2 2014)

Bidding & Evaluation (H1 2014)

Negotiation (H2 2014)

Estimated Project Value US$ 30 Million

INVESTMENT ESTIMATED COST

Contract Award (2014)

Head of Investment and Financial Division, Surakarta Development Planning AgencyJl. Jenderal Sudirman No.2 Surakarta, Central Java, INDONESIAPhone : +62 271 655277Fax : +62 271 655277Email : [email protected]

PPP MODALITY

BOT (Build – Operate – Transfer) with 20 years of concession period)

CONTACT

Page 11: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Southern Bali Water Supply

PROJECT TITLE

Southern Bali Water Supply, Bali Province

PROJECT LOCATION

Denpasar Municipal, Badung Regency, KlungkungRegency, and Gianyar Regency

CONTRACTING AGENCY

Provincial Government of Bali

PROJECT BACKGROUND

Tourism and related development in

Southern Bali region is currently

being constrained due to

inadequate drinking water supplies.

The Government of Klungkung

Regency has set a plan to improve

water supply in Denpasar – Badung

- Gianyar Klungkung

(SARBAGIKU) area, in particular

Denpasar Municipal, Badung

Regency, Klungkung Regency, and

Gianyar Regency.

SCOPE OF WORK• Water Treatment Plant (WTP) with capacity 1,000

l/s from Tukad Unda.•Reservoir.• Transmission pipe, transmitted from WTP to

distribution point.• Operation and Maintenance of WTP from Tukad

Penet with capacity 300 l/s and Tukad Petanu with• Capacity 300 l/s.

TENTATIVE SCHEDULE

FS Finalization andGCA evaluation for FS (2013)

Pre Qualification (H1 2014)

Bidding & Evaluation (H2 2014)

Designation of Preferred Bidder (H2 2014)

Estimated Project Value US$ 218.8 million

INVESTMENT ESTIMATED COST

Contract Award (H1 2015)

PPP MODALITY

BOT (Build – Operate – Transfer)

Head of Local Development Planning Agency (BAPPEDA), Bali ProvinceJl. Agung Tresna, Denpasar 80235, BaliPhone : +62 361 226974Fax : +62 361 226491

CONTACT

Page 12: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Pondok Gede Water Supply, Bekasi, West Java

PROJECT TITLE

Pondok Gede Water Supply, Bekasi, West Java

PROJECT LOCATION

Bekasi Municipal, West Java Province

CONTRACTING AGENCY

Municipal Government of Bekasi

PROJECT BACKGROUND

By the implementation of PondokGede Water Supply Project, the BekasiMunicipal plans to increase the totalservice coverage for the Pondok Gedeand surrounding area. The realizationof this project will accelerate the cityprocess to achieve the MDG’s target of80 percent.

SCOPE OF WORK

•Water intakes with total capacity 300 l/s.•Water transmission•Water treatment plant with capacity of 300 l/s•Reservoir with capacity 2x1,650 m3•Distribution pipelines for 61 km•House connections for 30,000 consumers

TENTATIVE SCHEDULE US$ 20.00 million

INVESTMENT ESTIMATED COST

Finalization of FinalBusiness Case (2014)

Pre Qualification (2014-2015)

Bidding & Evaluation (2015)

Negotiation withPreferred Bidder (2015)

Contract Award (2016)

PPP MODALITY

BOT (Build – Operate – Transfer)

Mr. Aceng SolahudinAssistant of Development and Community, Regional Secretariat of Bekasi Municipal Jl . Jendral Ahmad Yani No.1 , Bekasi MunicipalPhone : +62 21 889 61767Email: [email protected]

CONTACT

Operation (2017)

Page 13: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Bandung Light Rail Transit, West Java

PROJECT TITLE

Bandung Light Rail Transit, West Java

PROJECT LOCATION

Bandung, West Java Province

CONTRACTING AGENCY

Government of Bandung Municipal

PROJECT BACKGROUND

The area of Bandung is transformed as atourist destination, especially duringholidays. Various activities have becomedriver for economic growth in Bandungand its surrounding. The LocalGovernment of Bandung Municipaldemanding the construction of atransportation mode that meet thecharacteristic of the area and anticipatethe growing future needs, which ismonorail transportation system.

SCOPE OF WORK

This Project is divided into 2 corridors:•Trans Cikapundung Monorail:Dago Bengkok (North)- Pasirluyu (South) intersection withexisting East-West rail road at Viaduct (will be centralStation)•Bandung Monorail Solicited Project, City Core (Loop Line)and Radial (Y Line and Feeder Line),Loop Line (Green Line) : 11.20 kmY-Line (Blue Line) : 15.50 kmFeeder Line (Red Line) : 13.40 kmThis Project are divided into four construction corridors:•Dago Bengkok (North)-Pasirluyu (South) intersection withexisting East-West rail road at Viaduct (will be centralstation) : 11.5 km for Trans Cikapundung•Loop Line (Green Line) : 11.2 km•Y-Line (Blue Line) : 15.5 km•Feeder Line (Red Line) : 13.4 km

TENTATIVE SCHEDULE

Finalization of Final Business Case and Project Readiness (2014)

Final Business Case and TenderDocument (2014)

Pre-Qualification (H1 2015)

Bidding & Evaluation (H2 2015) Estimated Project value: US$ 2,868,040,000

INVESTMENT ESTIMATED COST

Negotiation with Preferred Bidder (H1 2016)

CONTACT

Mr. E.M. Ricky GustiadiHead of Bandung Municipal Transportation AgencyJl. Soekarno Hatta No.68 Bandung, West JavaPhone : +62 22 5220769Fax : +62 22 5220768Contract Award (H2 2016)

Page 14: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

Development of South Sumatera Monorail

PROJECT TITLE

Development of South Sumatera Monorail

PROJECT LOCATION

South Sumatera Province

CONTRACTING AGENCY

Provincial Government of South Sumatera

PROJECT BACKGROUND

The Local Government of South SumateraProvince plans to build monorail as a partof mass transportation in the area withmedium load capacity. Through thedevelopment of monorail, the PalembangMunicipal expects to be able to anticipatethe people movement within the area ofPalembang.

SCOPE OF WORK

The monorail development plan in Palembang Municipalwith it's specific condition is divided into four corridors,namely :Corridor 1 : Masjid Agung – Jakabaring - South Ring Road.Corridor 2: Prameswara – UNSRI Bukit – Kapten Rivai –Veteran – Perintis Kemerdekaan – RE Martadinata –Mayor Zen.Corridor 3: Demang Lebar Daun – Basuki Rahmat – R.Sukamto – Abdul Rozak – Patal Pusri.Corridor 4 : Sultan Mahmud Badaruddin II Airport – MasjidAgung.

TENTATIVE SCHEDULE

Finalization of Final Business Case (2014)

Final Business Case and TenderDocument (H2 2014)

Pre-Qualification (H1 2015)

Bidding & Evaluation (H2 2015)

Estimated Project value: US$ 550.00 Million (Debt PortionUS$ 345.00 Million, Equity Portion US$ 165.00 Million

INVESTMENT ESTIMATED COST

Negotiation with Preferred Bidder (H2 2015)

CONTACT

Mr. KurniawanHead of UPTD Railway Transportation Agency SouthSumateraJl. Kapten A.Rivai No.51, Palembang, South SumateraPhone : +62 711 363125Fax : +62 711 377170Email : [email protected]

Mr. Basyarudin AhmadSecretary of Public Works Agency, South SumateraProvinceJl. Ade Irma Nasution No.10 Palembang, South SumateraPhone : +62 711 313431Fax : +62 711 321053Email : [email protected]

Contract Award (H1 2016)

Page 15: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

IndonesiaInvestment Coordinating Board

15

List of Infrastructure Project 2015 (with PPP Scheme) – PPP Book 2015

Page 16: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

List of Infrastructure Project 2015 (with PPP Scheme) – PPP Book 2015

16

NO PROJECT VALUE (US$ Million) GCA

1. Tanjung Enim – Tanjung Api-Api Coal Railway, South Sumatera

- Director of Railway Traffic and Transport, Ministry of Transportation (Mr. Hanggoro Budi Wiryawan) P/F: +62 21 3505557E: [email protected]

-

2. Bandung Monorail, West Java 2.000 Head of Bandung Municipal Transportation Agency (Mr. E.M. Ricky Gustiadi)P/F: +62 22 5220769

3. Soekarno Hatta International Airport – Halim Railway

2.570 Director of Railway Traffic and Transport, Ministry of Transportation (Mr. Hanggoro Budi Wiryawan) P/F: +62 21 3505557E: [email protected]

4. West Semarang Water Supply 68 Semarang City Government (Mr. Purnomo Dwi Sasongko)P/F: +62 24 3541095E: [email protected]

5. Pondok Gede Water Supply, West Java 20 Local Development Planning Agency (BAPPEDA) Bekasi Municipal (Mr. Dadang Mulyana)P/F: +62 21 8801339E: [email protected]

6. Pekanbaru Water Supply, Riau - National Supporting Agency for Water Supply System Development (BPPSPAM)Jl. Wijaya I No. 68, Kebayoran Baru, Jakarta 12170, Telp: 021 72789126, Fax. 0217260520

7. Solid Waste Treatment and Final Disposal –Bogor and Depok Area, West Java

60 Head of BPSR, West Java Province (Mr. Edi Bahtiar)P/F: +62 22 7332078E: [email protected]

Page 17: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

List of Infrastructure Project 2015 (with PPP Scheme) – PPP Book 2015

Market Sounding of PPP Infrastructure Projects 17

NO PROJECT VALUE (US$) GCA

8. Integrated Terminal of Gedebage (Railway), Bandung, West Java

133 Head of Transportation Agency Bandung City (Mr. E. M. Ricky Gustiadi)P/F: +62 22 5220769/8

9. Development of South Sumatera Monorail

550 Head of UPTD Railway Transportation Agency South Sumatera (Mr. Kurniawan)P: +62 711 363 125F: +62 711 377170E: [email protected]

10. Strategic Infrastructure and Regional Development of Sunda Strait

25.000 Secretary of Steering Committee for Sunda Strait Infrastructure and Area Development (Mr. A. Hermanto Dardak)P/F: + 62 21 7246487

11. Manado-Bitung Toll Road, North Sulawesi

353 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

12. Tanjung Priok Access Toll Road, DKI Jakarta

612,5 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

13. Balikpapan-Samarinda Toll Road, East Kalimantan

1.200 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

Page 18: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

List of Infrastructure Project 2015 (with PPP Scheme) – PPP Book 2015

Market Sounding of PPP Infrastructure Projects 18

NO PROJECT VALUE (US$) GCA

14. Kayu Agung – Palembang – Betung Toll Road, South Sumatera

836,15 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

15. Expansion of Tanjung Priok Port, Cilamaya, Karawang, East Java

2.390 (phase 1)1.060 (phase 2)

Director of Port and Dredging, Ministry of Transportation (Mr. Adolf Tambunan)P: +62 21 3506964F: +62 21 3848963E: [email protected]

16. Expansion of Kabil Port (Tanjung Sauh Terminal, Batam, Riau Island)

805,8 Deputy for Control, BP Batam (Mr. Asroni Harahap)P: +62 778 462024F: +62 778 462192

17. Development of Makassar New Port, South Sulawesi

421,5 Director of Port and Dredging, Ministry of Transportation (Mr. Adolf Tambunan)P: +62 21 3506964F: +62 21 3848963E: [email protected]

18. Development of Baubau Port, Southeast Sulawesi - Director of Port and Dredging, Ministry of Transportation (Mr. Adolf Tambunan)P: +62 21 3506964F: +62 21 3848963E: [email protected]

19. Development of Garongkong Port, South Sulawesi

- Director of Port and Dredging, Ministry of Transportation (Mr. Adolf Tambunan)P: +62 21 3506964F: +62 21 3848963E: [email protected]

20. Development of New Bali Airport, Bali 510 Head of Transportation Agency Bali Province (Mr. I Ketut Artika)P: +62 361 227730F: +62 361 222436

Page 19: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

Indonesia Investment Coordinating Board

List of Infrastructure Project 2015 (with PPP Scheme) – PPP Book 2015

Market Sounding of PPP Infrastructure Projects 19

NO PROJECT VALUE (US$ Million) GCA

21. Kulonprogo International Airport, DI Yogyakarta 500 Head of Transportation, Communication and Informatics Agency DI Yogyakarta Province (Mr. Budi Antono)P: +62 274 520424F: +62 274 555246

22. Development of Batam Railway - Director of Railway Traffic and Transport, Ministry of Transportation (Mr. Hanggoro Budi Wiryawan) P/F: +62 21 3505557E: [email protected]

23. Cileunyi – Sumedang - Dawuan Toll Road, West Java 985,1 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

24. Pandaan – Malang Toll Road, East Java 399 Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

25. Pasir Koja – Soreang Toll Road, West Java - Head of Indonesia Toll Road Authority (BPJT) (Mr. A. Gani Ghazaly Akman)P: +62 21 7258063 or +62 21 7257126F: +62 21 7257126E: [email protected]

26. DKI Sewage Treatment Plant 173.5 Head of Locasl Development Planning Agency, DKI Jakarta (Mrs. Sarwo Handhayani)P: + 62 21 3822159 or 3842062F: + 62 21 3482871 or 3842871

TOTAL 40.647,55

Page 20: 1. Soekarno-Hatta International Airport (SHIA) … Investment Coordinating Board Soekarno –Hatta International Airport –Jakarta RailwaysPROJECT TITLE Soekarno-Hatta International

TERIMA KASIH

Invest in...

© 2014 by Indonesian Investment Coordinating Board. All rights

reserved

INDONESIA INVESTMENT PROMOTION CENTER (IIPC)

CONTACT US

BADAN KOORDINASI PENANAMAN MODAL

(BKPM)

Jl. Jend. Gatot Subroto No. 44, Jakarta 12190

P.O. Box 3186, Indonesia

P : +62 21 5292 1334

F : +62 21 5264 211

E : [email protected]

Abu Dhabi

Level 4 Building B- Al Mamoura Mohammed BinKhalifa Street (15th St) Muroor

District, Abu Dhabi, UEA

P : +971 26594275 / 26594274

F : +971 26594150

London

St. Martins House, 16 St. Martins le Grand, 3rd Floor London, EC1A 4EN,

UNITED KINGDOM

P : +44 (0) 207 397 8564

F : +44 (0) 207 397 8565

New York

370 Lexington Ave. Suite 1903 New York, NY 10017, UNITED STATES OF

AMERICA

P : +1 646 885 6600

F : +1 646 885 6601

Singapore

8 Temasek Boulevard, Suntec Tower 3, #33-03 SINGAPORE 038988

P : +65 6334 4410

F : +65 6334 4891

Sydney

Gold Field House, 1 Alfred Street, Suite 903 Sydney, NSW 2000, AUSTRALIA

P : +612 9252 0091

F : +612 9252 0092

Taipei

Indonesian Economic and Trade Office to Taipei Director of Investment

Department

6F, No. 550, Rui Guang Road, Neihu District Taipei 114

P : +886 2 8752 6170 ext. 31, +886 2 8752 6084 (direct)

F : +886 2 8752 3706

Tokyo

Fukoku Seimei Building 23F 2-2-2 Uchisaiwai-cho, Chiyoda-ku Tokyo 100-0011

JAPAN

P : +81 3 3500 3878

F : +81 3 3500 3879

Seoul

International Financial Centre Seoul, 15 FL Two IFC, 10, Gukjegeumyung-ro,

Youngdeungpo-gu, Seoul, 150945 Korea