11

1. Create Sustainable Places - City of Hume · 2016-01-15 · Working to contribute to and create sustainable places is not new to Hume City Council and this Action Plan builds on

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

 

1  

1. Create Sustainable Places  Sustainable Places are those that meet community needs and protect and enhance our biodiversity and the environmental systems on which we depend.  They are vibrant and engaging places to live or visit with strong local economies.  They are welcoming and supportive environments where people from all backgrounds and all life stages have equitable access to resources without negatively impacting future generations.  Sustainable Places are also resilient to significant threats such as those posed by climate change: hotter, drier conditions and more extreme weather events.  Creating Sustainable Places in Hume City is relevant at a number of scales including:  the municipality as a whole and how it connects with the broader metropolitan area; suburbs and neighbourhoods, parks, public spaces and streetscapes down to individual buildings and homes.  It is relevant to both growth areas in Hume and existing neighbourhoods.    Many of the decisions that impact on places in Hume are taken by other levels of government and/or in the private realm.  Hume City Council has many important roles to play however in helping to create more sustainable places.  These include: leading by example in the provision of Council and community buildings and infrastructure; as a planning authority; as an advocate to other levels of government; as a service deliverer; and through community engagement and support.     Working to contribute to and create sustainable places is not new to Hume City Council and this Action Plan builds on the strong foundations and achievements of the Environmental Sustainability Framework 2002 and the Pathways to Sustainability: an Environmental Framework 2009‐2013.  A broad range of Council Departments are involved in this work as indicated in the Action Plan below.  

2. Guiding principles   The guiding principles of Creating Sustainable Places are:   

Planning and facilitation of sustainable communities where local employment, recreational opportunities and use of sustainable transport are supported and biodiversity values are conserved and enhanced. 

Application of Environmentally Sustainable Design and Development (ESD) principles:o Optimise size, multipurpose and use of existing buildings including integration with the 

natural environment and design for sustainable transportation o Energy efficiency, passive solar and renewable energy sources to minimise greenhouse 

gases o Protect waterways and use water efficiently o Use environmentally preferable products o Enhance indoor environmental quality o Optimise operational and maintenance practices  

 

Design for resilience and adaptation to the current and future impacts of climate change.

 

2  

Objective 1:  Demonstrating sustainability and ESD leadership in council buildings, infrastructure projects and assets.  Target:   TBC based on tree canopy benchmark and strategy development. Measure:    Percentages of tree canopy cover (Council owned trees) within suburbs. 

Objective 1:     ID  ACTION RESPONSIBILITY COMPLETE 

ACTION BY RESOURCES

1.1  Continue to integrate ESD targets, checklists, considerations and outcomes in processes for design, construction and commissioning of new Council buildings.  

Lead: Sustainable Environment, Capital Works,  Support:  Infrastructure Planning, Social Development,  Leisure and Youth Services 

Ongoing Existing

1.2  Investigate opportunities to ensure heating and cooling operational systems at new Council facilities are performing in accordance with the design intent, optimal ESD performance and that relevant staff are confidant in using the systems for appropriate user comfort. 

Lead: Sustainable Environment, Capital Works  Support:  Infrastructure Planning, Social Development,  Leisure and Youth Services 

December 2017 

Existing

1.3  Public place infrastructure developed by Council will demonstrate best practice ESD, Water Sensitive Urban Design and consideration of climate change impacts (shading, pale coloured surfaces, water availability etc.) 

Lead: Infrastructure Planning, Engineering and Assets, Subdivisions   Support: Sustainable Environment, Urban Places   

Ongoing  Existing

1.4  Investigate the development of data management processes and/or purchase of systems to enable effective management of water and energy use at key Council facilities 

Lead: Sustainable Environment Support: Organizational Performance and Engagement  

June 2017 Investigations within existing budget. 

 

3  

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

1.5  Investigate the development of a Council policy for achieving ESD outcomes in Council facilities  

Lead: Sustainable Environment Support:  Capital Works, Infrastructure Planning, Social Development,  Leisure and Youth Services 

June 2017 Existing

1.6  Continue to improve the energy and water efficiency of existing Council buildings (with a particular emphasis on large energy and water using facilities), via actions from the Greenhouse Action Plan and Integrated Water Management Plan and use data and case studies to communicate outcomes 

Lead: Sustainable Environment  Support: Capital Works, Services, Leisure and Youth Services. 

Ongoing  Existing                                     

1.7  Undertake Post Occupancy Evaluation of new major buildings and establish common practice of review and evaluation for all major projects ‐ disseminate results and provide opportunities for learning.  

Lead: Sustainable Environment Support:  Capital Works, Infrastructure Planning, Social Development,  Leisure and Youth Services 

Ongoing Existing

1.8  Promote sustainability features of new and existing facilities via staff and visitor induction, media releases and articles in Council publications, signage or interactive displays where appropriate. 

Lead: Sustainable Environment Support: Capital Works, Infrastructure Planning, Social Development, Leisure and Youth Services 

Ongoing  Existing

1.9  Continue to pursue energy efficient street lighting opportunities including in new subdivisions; for decorative fittings; for higher wattage lights; dimming controls etc. 

Lead: Sustainable Environment, Subdivisions  Support: Services 

Ongoing  Investigations within existing budget.  Large scale upgrades would require a business case to Council. 

1.10  Investigate opportunities to reduce the environmental impacts of road and pavement construction and / or other major projects as identified. 

Lead: Engineering and AssetsSupport: Sustainable Environment    

June 2018 Investigations within existing budget. 

1.11  Continue to investigate and pursue opportunities for local procurement of environmentally preferable road and pavement construction materials. 

Lead: Capital Works Support: Engineering and Assets, Economic Development, Sustainable Environment 

Ongoing Within Existing Budgets 

 

4  

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

1.12  As per the Leadership Pathway Action Plan: 

Conduct research into and develop options for incorporating social, environmental and impact investment strategies into Council’s Investment Policy.   Prepare and present a discussion paper to EMT and Councillors for their consideration.   

Lead:  Finance Support: Property Services, Parks and Open Space, Social Development, Sustainable Environment 

December 2016 

Existing.

1.13  As per the Land and Biodiversity Plan: Increase tree canopy coverage in urban areas and offset any lost canopy to achieve a net gain in canopy coverage.  

Lead: Parks and Open Space Support: Subdivisions 

To be confirmed following strategy development. 

Existing (pending consideration of Urban Forest Strategy and Action Plan)  

  

   

 

5  

Objective 2:  Optimal use of a strong planning framework to progress ESD outcomes.  Target:   70% Measure:    Percentage of triggered planning permit applications submitting a Sustainability Statement or Built Environment Sustainability Scorecard 

per year. 

 ID  ACTION RESPONSIBILITY COMPLETE 

ACTION BY RESOURCES

2.1  Continue to develop Growth Area Plans and other strategic planning documents with an aim to conserve biodiversity values and create new areas that allow for local employment and recreational opportunities and support sustainable transport. 

Lead: Strategic Planning  Ongoing  Existing

2.2  Continue to provide training and professional development to build ESD understanding and capacity of Statutory Planners and other Council staff.  

Lead: Statutory Planning Support: Sustainable Environment, Human Resources 

Ongoing Existing

2.3  Advise and build capacity within the local Design Industry around Hume’s membership of the Council Alliance for a Sustainable Built Environment (CASBE) and implementation of the Sustainable Design Assessment in the Planning Process (SDAPP). 

Lead: Statutory Planning Support: Sustainable Environment, Urban Places,  

December2015 

Existing

2.4  Work with planning permit applicants for 6 or more dwellings to improve ESD outcomes in private dwellings through the submission and review of a Sustainability Statement or a consultant’s report (via the Social Impact Assessment process) for 10 or more dwellings.  

Lead: Statutory Planning Support: Sustainable Environment 

December 2016 

Existing

2.5  Review the implementation of Sustainable Design Assessment in the Planning Process at Hume with a view to adjusting the intervention trigger as required and progressing towards the use of the Built Environment Sustainability Scorecard (BESS) software.   

Lead: Statutory Planning Support: Sustainable Environment, Urban Places 

April 2017 To Be Determined following review of stage 1   

 

6  

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

2.6  Work with other Councils via the Council Alliance for a Sustainable Built Environment and the Municipal Association of Victoria and other alliances in strategic advocacy to improve ESD and climate adaptation planning laws and guidelines and ESD requirements in the National Construction Code.    

Lead: Statutory Planning Support: Sustainable Environment, Strategic Planning  

Ongoing Existing

2.7  Investigate and develop the rationale for a Local ESD Policy for the Hume Planning Scheme. 

Lead: Statutory PlanningSupport: Sustainable Environment  Support:  Strategic Planning 

June 2018 Existing

2.8  Develop a Local ESD Policy for the Hume Planning Scheme. Lead: Strategic Planning Support: Statutory Planning, Sustainable Environment 

June 2019 Existing

2.9  Continue to participate in the Sunbury Growth Areas Integrated Water Management project to identify and support the integration of best practice water management for new Sunbury Precinct Structure Plans (PSPs).   

Lead: Western Water Support: Dept. of Environment, Land, Water and Planning (DELWP), Hume CC (led by Sustainable Environment), Melbourne Water, Metropolitan Planning Authority 

Ongoing Existing

2.10  Investigate other opportunities to improve sustainability and ESD outcomes via the subdivisions approval process. 

Lead: Sustainable Environment, Subdivisions  Support: Statutory Planning 

June 2016 Existing

2.11  Continue to participate in State level water management planning processes including the Water Future North and Water Future West projects 

Lead: Dept. of Environment, Land, Water and Planning (DELWP)  Support: Hume CC (led by Sustainable Environment) Water Authorities, Melbourne Water, Metropolitan Planning Authority. 

Ongoing To be reviewed following completion of Water Future North and Water Future West. 

 

7  

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

2.12  Investigate opportunities for sustainable infrastructure provision and ESD outcomes via the Hume Central precinct, other structure plans, place frameworks developed as a part of the Hume’s Places project and Masterplan processes (e.g. Seabrook Reserve). 

Lead:  Urban Places Support: Sustainable Environment 

Ongoing  Existing

 

    

 

8  

Objective 3: Support the community to create sustainable places and healthy, comfortable and resource efficient homes and buildings.   Target:   >200/yr Measure:    Number of home assessments and retrofits undertaken for low income households 

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

3.1  Engage developers and community in best practice and demonstration projects (e.g. VEIL student projects, place making consultation) to drive market demand and supply  

Lead: Urban Places Support: Sustainable Environment, Social Development 

Ongoing Existing

3.2  As per the Live Green Plan:  Continue to offer simple home retrofits to around 100 Home Care Clients vulnerable to Heatwaves per year via Stage 2 of the Hume Heatwave Help program 

Lead: Aged Services and Public Health  Support: Sustainable Environment 

June 2016 and ongoing 

Existing 

3.3  As per the Live Green Plan:  Design and deliver targeted engagement activities for people living on low‐incomes and from culturally and linguistically diverse backgrounds to reduce their energy bills and make their homes more climate resilient:  

Continue to offer simple home retrofits to around 100 Home Care Clients vulnerable to Heatwaves each year via Stage 2 of the Hume Heatwave Help program.  

Assist low income households to undertake simple home retrofits to enhance the comfort and resource efficiency of their homes through the grant funded Energy Smart Neighbourhoods pilot program.  

Review the Energy Smart Neighbourhoods program and use the lessons to develop an ongoing program to engage low income households to reduce energy use, improve comfort and better manage bills.  

Lead: Sustainable Environment (Energy Smart Neighbourhoods) and Aged Services and Public Health (Hume Heatwave Help) 

December 2016 

Approved for referral to the 2016/17 budget process at Council meeting of 14 September as part of the Live Green Plan approval 

 

9  

ID  ACTION RESPONSIBILITY COMPLETE ACTION BY 

RESOURCES

3.4  As per the Live Green Plan:  Work with businesses to promote discounted sustainability retrofits and investigate other products and opportunities (e.g. solar photo‐voltaic and solar hot water systems) to reduce residents’ energy use, costs and improve comfort. 

Lead: Sustainable Environment Support: Economic Development (Business Efficiency Network) 

June 2016 Existing as per Live Green Plan 

3.5  Advocate for more widespread action to improve the comfort and efficiency of old housing stock including through the One Million Homes Campaign. 

Lead: Sustainable Environment Support: Social Development 

Ongoing Existing

3.6  Support the installation of wicking beds and other sustainable gardening infrastructure in community facilities and public places. 

Lead:  Sustainable EnvironmentSupport: Finance and Property Development, Aged Services and Public Health. 

Ongoing Existing

3.7  Investigate and progress the uptake of Environmental Upgrade Agreements for Hume Businesses (cost effective finance for environmental upgrades repaid through Council rates) . 

Lead: Economic DevelopmentSupport: Finance and Property Development 

December 2016  

Existing for investigations. 

3.8  Investigate the opportunity for reviewing the Residential Nature Strip Landscaping Policy and Guidelines to enable residents to grow food and/or support biodiversity via suitable nature strip plantings  

Lead: Parks and Open Space Support: Sustainable Environment 

June 2016 Existing for investigations.  (Cost recovery via a permit fee may be recommended pending the investigation). 

 

 

10