of 5 /5
1 Public Works Department 475 North Cross Street Sycamore, IL 60178 Engineering (815) 895-4557 www.cityofsycamore.com City of Sycamore 0.75 MG ELEVATED STORAGE TANK REPAIRS Addendum #2 Issued January 26, 2021 5 Pages This addendum is issued for the purpose of clarifying the intent of the contract documents and plans and also for making necessary corrections, deletions, and/or additions to the documents and plans. This addendum shall supersede any information found with the Contract Documents, Plans or previous addenda. Each bidder shall include this document into their proposal along with entering the information and signing below. Company Signature of Authorized Personnel Date Clarifications: 1. Clarification: Lead Paint Testing Results information can be found on the attached four pages and shall be considered as part of the contract documents. 2. Clarification: Coating is limited to touch up painting. High volume air monitoring shall not be required as part of the project scope. l:\engineering department\water and watermain\2021 tower 1 repair\addendum 2\0.75 mg elevated storage tank repairs addendum 2.doc

0.75 MG ELEVATED STORAGE TANK REPAIRS

  • Author
    others

  • View
    0

  • Download
    0

Embed Size (px)

Text of 0.75 MG ELEVATED STORAGE TANK REPAIRS

Addendum #2
5 Pages
This addendum is issued for the purpose of clarifying the intent of the contract documents and plans and also for making necessary corrections, deletions, and/or additions to the documents and plans. This addendum shall supersede any information found with the Contract Documents, Plans or previous addenda. Each bidder shall include this document into their proposal along with entering the information and signing below.
Company Signature of Authorized Personnel Date
Clarifications: 1. Clarification: Lead Paint Testing Results information can be found on the attached four pages and shall
be considered as part of the contract documents.
2. Clarification: Coating is limited to touch up painting. High volume air monitoring shall not be required as part of the project scope. l:\engineering department\water and watermain\2021 tower 1 repair\addendum 2\0.75 mg elevated storage tank repairs addendum 2.doc
APPENDIX E