30
1 May 9, 2022 Describe C300 and Series C I/O Configuration C300 Configuration Describe C300 and Series C I/O Configuration C300 Configuration Describe C300 and Series C I/O Configuration EXP20R300 - EPKS CEE C200/C300/ACE

07 20R300 1 C300 Configuration

Embed Size (px)

Citation preview

Page 1: 07 20R300 1 C300 Configuration

1April 19, 2023

Describe C300 and Series C I/O Configuration

C300 Configuration Describe C300 and Series C I/O Configuration C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 2: 07 20R300 1 C300 Configuration

Honeywell

2

April 19, 2023

Introduction

• In this lesson you will learn to configure C300 Controller andSeries C I/O

• PMIO configuration is discussed in a separate lesson• The steps for configuration are similar to the C200

configuration with some differences:– Add a new Control Processor Module to the Project hierarchy

• Control Builder adds the CEE and two IOLINK modules– Configure the Controller– Configure the CEE– Configure the IOLINKs (PMIO or Series C IO)– Configure the IOMs– Assign the IOMs to the IOLINKs– Load the Controller, CEE, IOLINKS, and the IOPs– Activate the CEE

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 3: 07 20R300 1 C300 Configuration

Honeywell

3

April 19, 2023

Topics

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 4: 07 20R300 1 C300 Configuration

Honeywell

4

April 19, 2023

Configuring a Controller

Follow these steps to add a new controller from the pull-down menus

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 5: 07 20R300 1 C300 Configuration

Honeywell

5

April 19, 2023

Configuring a Controller – Main Tab

Data entry details will be provided in the lab exercise

Item name

Check for redundant controller

Device index Number of C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 6: 07 20R300 1 C300 Configuration

Honeywell

6

April 19, 2023

Configuring a Controller – Server History Tab

History parameters and control level required to operate this C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 7: 07 20R300 1 C300 Configuration

Honeywell

7

April 19, 2023

Configuring a Controller – Group and Trend Assignment

Select OK to close and save the new

controller

Point, group, trend and associated

displays (residing on the server) are

defined on the Server Displays tab

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 8: 07 20R300 1 C300 Configuration

Honeywell

8

April 19, 2023

C300 View in Control Builder

C300, CEE, and IOLINKs

Redundancy

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 9: 07 20R300 1 C300 Configuration

Honeywell

9

April 19, 2023

Configuring a CEE

Data entry details will be provided in the Lab exercise

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 10: 07 20R300 1 C300 Configuration

Honeywell

10

April 19, 2023

Which of the following statements is not true for C300 configuration?

Question 1: C300 Configuration

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C

I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C

I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C

I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C

I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Correct! When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Correct! When a C300 controller is created in Control Builder 2 IOLINKS are automatically

added.

Click anywhere to continue.

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C I/O". When a C300 controller is created in

Control Builder 2 IOLINKS are automatically added.

Click anywhere to continue.

Incorrect. The false statement is "Only one IOLINK is automatically created for Series C I/O". When a C300 controller is created in

Control Builder 2 IOLINKS are automatically added.

Click anywhere to continue.

Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!

Your answer:Your answer:The correct answer is:The correct answer is:

You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing

You must answer the question before continuing

Submit Clear

A) Device Index number specified on the C300 IOTA needs to be specified

B) 2 IOLINKs are automatically created

C) Only one IOLINK is automatically created for Series C I/O

D) 5ms Base Execution Period is supported for non-redundant C300 configuration

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 11: 07 20R300 1 C300 Configuration

Honeywell

11

April 19, 2023

Topics

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 12: 07 20R300 1 C300 Configuration

Honeywell

12

April 19, 2023

IOLINK Configuration – Link 1

I/O Link number 1 Cable - Gray

I/O family selection

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 13: 07 20R300 1 C300 Configuration

Honeywell

13

April 19, 2023

IOLINK Configuration – Link 2

I/O Link number 2 Cable - Violet

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 14: 07 20R300 1 C300 Configuration

Honeywell

14

April 19, 2023

Configuring C300 Hardware

• The Control Processor Module (CPM) and its Control Execution Environment (CEE) are now configured but not yet downloaded

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 15: 07 20R300 1 C300 Configuration

Honeywell

15

April 19, 2023

Question 2: IOLINK Configuration

Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!

Your answer:Your answer:The correct answer is:The correct answer is:

You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing

You must answer the question before continuing

Submit Clear

Correct! When configuring an IOLINK only one type of IO family can be connected to each IOLINK

i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Correct! When configuring an IOLINK only one type of IO family can be connected to each IOLINK

i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Incorrect. When configuring an IOLINK only one type of IO family can be connected to each

IOLINK i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Incorrect. When configuring an IOLINK only one type of IO family can be connected to each

IOLINK i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Incorrect. When configuring an IOLINK only one type of IO family can be connected to each

IOLINK i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Incorrect. When configuring an IOLINK only one type of IO family can be connected to each

IOLINK i.e. Series C or PM IO, one type on each link.

Click anywhere to continue.

Which of the following items are specified during IOLINK configuration?A) Series C or PM IO, one type on each IOLINK

B) Series A I/O type

C) Whether Series C and PM IO is to be used on the same IOLINK

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 16: 07 20R300 1 C300 Configuration

Honeywell

16

April 19, 2023

Topics

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 17: 07 20R300 1 C300 Configuration

Honeywell

17

April 19, 2023

Configuring Series_C_IO

Menu method

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 18: 07 20R300 1 C300 Configuration

Honeywell

18

April 19, 2023

Configuring Series_C_IO, contd.

Control Builder automatically

names the IOM

21

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 19: 07 20R300 1 C300 Configuration

Honeywell

19

April 19, 2023

Configuring Series_C_IO, contd.

IOM number

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 20: 07 20R300 1 C300 Configuration

Honeywell

20

April 19, 2023

Assigning Series_C_IO

13

Assigned to CEE

2

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 21: 07 20R300 1 C300 Configuration

Honeywell

21

April 19, 2023

Topics

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 22: 07 20R300 1 C300 Configuration

Honeywell

22

April 19, 2023

Loading the Controller, CEE, and IOMs

Not yet loaded

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 23: 07 20R300 1 C300 Configuration

Honeywell

23

April 19, 2023

Verify that the items to load are checked

Note: You can decide to have the modules go to the active state automatically by clicking this checkbox with the Post Load State selected to be “Active”

Loading the Controller, CEE, and IOMs, contd.

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 24: 07 20R300 1 C300 Configuration

Honeywell

24

April 19, 2023

Question 3: IOP Configuration

Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Correct! The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Correct! The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.

Click anywhere to continue.

Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!

Your answer:Your answer:The correct answer is:The correct answer is:

You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing

You must answer the question before continuing

Submit Clear

Assigned I/O modules appear under:

A) Unassigned tree in Project tab

B) IOLINK tree in Project tab

C) Directly under the CEE tree in Project tab

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 25: 07 20R300 1 C300 Configuration

Honeywell

25

April 19, 2023

Topics

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 26: 07 20R300 1 C300 Configuration

Honeywell

26

April 19, 2023

Activating a Control Strategy

Select LASTCOLD

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 27: 07 20R300 1 C300 Configuration

Honeywell

27

April 19, 2023

Activating a Control Strategy, contd.

Click Yes

Blue: The object is not running (inactive)

Green: The object is running (active)

Red: Communication failure

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 28: 07 20R300 1 C300 Configuration

Honeywell

28

April 19, 2023

Other C300 Configuration

• A Control Module is configured like a C200 Control Module, a sample is shown

• For more detail, please refer to the sample lab procedure

Series C I/O Channels

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 29: 07 20R300 1 C300 Configuration

Honeywell

29

April 19, 2023

Summary

• When you configure and load C300 hardware and I/O in Control Builder, remember:

– Series C IOM number is set on the IOTA of the corresponding IOM using a numbered jumper plug

– The device index of C300 can be found on the rotary switches located in front of the C300 board

– Before loading the C300 controller, its Control Execution Environment (CEE) and IOLINKs:

• Configure the Controller, its CEE, and IOLINKs

• Define the I/O Family type on each IOLINK

• Assign the IOMs to the respective IOLINKs

– Activate the C300 from the CEE

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE

Page 30: 07 20R300 1 C300 Configuration

Honeywell

30

April 19, 2023

Conclusion

Describe C300 and Series C I/O Configuration

CompletionCompletionCertificateCertificate

Proceed to the next lesson in your course material

C300 Configuration Describe C300 and Series C I/O Configuration

EXP20R300 - EPKS CEE C200/C300/ACE