  • TABLE OF CONTENT

    Quality Enhancement Program 2014 2

    Background

    Definition

    Referential

    Requirement of Quality Management

    Quality Assurances Implementation

    Quality Surveillance by Company

    Audit Process Flow

    Audit Plan

  • Provide Confidence to COMPANY

    BACKGROUNDS

    3 Quality Enhancement Program 2014

    Project Requirement

    Project Deliverables

    Contractor

    Sub Contractor

    Vendor

    RISK

    QMS Efficiently Implemented

    Extended to Supply Chain

    Customer Satisfaction

    Meet Requirement

  • DEFINITION

    4 Quality Enhancement Program 2014

    Quality Assurance

    Quality Assurance is the CONTRACTOR management process of systematic planning, implementing and evidencing organizational provisions which, if properly applied, will reasonably assure COMPANY that the quality of the WORK will be achieved in line with CONTRACT requirements

    Quality Control

    Quality Control is the CONTRACTOR operational process of verifying and reviewing Design and Engineering outputs and inspecting and testing individual components or assembled units (or packages) to check the conformity to CONTRACT requirements complemented by the recording of associated data.

    REFERENTIAL o CR EP PJC 551 Quality Surveillance upon Contractor o GS EP PJC 501 Requirements for Contractor Quality Management

  • REQUIREMENT OF QUALITY MANAGEMENT

    5 Quality Enhancement Program 2014

    Quality Management System (QMS)

    Perennial

    Contract

    Quality Manual

    Quality Plan

    Submission of Quality Management Documentation

    Per

    enni

    al

    CTR Quality Manual

    ISO

    900

    1 C

    ertif

    icat

    e Obtained from independent Accredited Body (3rd party)

    Validity dates Activities Covered

    Qua

    lity

    Sys

    tem

    Control of (project activities) Documentation and Records

    Inte

    rnal

    Aud

    it Documented Procedure List of Qualified Auditors

    Qua

    lity

    Pla

    n Version p - Preliminary

  • QUALITY ASSURANCE IMPLEMENTATION

    6 Quality Enhancement Program 2014

    Customer Requirement

    Project Preparation

    Project Quality Plan Quality

    Objective Resource

    Management Organization

    Chart Job

    Description Competency

    Experience Education Skill Training

    Sub CTR Finance

    Project Budget

    Engineering

    Design Input Data Sheet

    Design Review Calculation Design

    Review Record

    Design Output Drawing

    Procurement

    Purchasing Purchase

    Request Purchase

    Order Expediting

    Expediting Report

    Vendor Assessment & Evaluation Approved

    Vendor List Sub CTR

    Awarding

    Construction

    Fabrication and Installation Fabrication

    and Installation Procedures

    Welding Book

    Reports (Visual, Dimensional Control, etc)

    Inspection and Testing ITP Inspection

    Reports NDT Reports Hydrotest

    Close Out

    Document Traceability QC Dossier

    Warranty

    Customer Satisfaction

    Material Control

    Project Material Control Material

    Status

    Warehouse

    Receiving Material MVR

    Issued Material Issued Slip

    Material Stock Material

    Balance Sheet

    Facility

    Maintenance Equipment Maintenance

    Plan Maintenance

    Record Equipment

    Calibration Calibration

    Record

    Quality Assurance

    Continual Improvement

    Management Review

    Internal Audit Corrective

    Action Preventive

    Action Non

    Conformance System

    Performance Analysis

    Customer Complaint

    Document Control

    Management System

    External Standard

    Document Maintenance

  • QUALITY SURVEILLANCE BY COMPANY

    7 Quality Enhancement Program 2014

    Audit of Contractor QMS by

    Company

    Monitoring and Second Level Inspection by

    Company

    Independent Verification by

    Certifying Authority or

    Basic Certification

    Independent Verification by

    Marine Warranty Surveyor

  • AUDIT PROCESS FLOW

    8 Quality Enhancement Program 2014

  • THANK YOU

    QUALITY IS NEVER AN ACCIDENT, IT IS ALWAYS THE RESULT OF INTELLIGENT EFFORT